tender for clarification and evaporator fabrication works removing the calandria of the evaporator and installing and fitting a new calandria of 650 m square heating surface and installing all the pipe lines valves and accessories in their place , replacing an old and worn out grand consultant juice plaza condensate syrup bottle with an 8 10 mm msc plate by connecting all connections. , the worn out umbrella plate in the vapor cell semi concentrator was removed and the plate was repaired and replaced with plastic , replacing the umbrella in the wide body vapor cell semi concentrator with a dated and 6 8 mm msc plate and conducting a trial. , removing the neck selvage of the quad body semi container and replacing it with a new 8 10 mm ms plate and testing it. , removing the neck selvage of the quad body semi container and repairing it with the provided plate and testing it. , cutting out the weakened roof of the quad body and replacing it with a 12mm plate provided and testing it. , cutting out the weakened part of the semi capacitor vapor cell quad body cell and replacing it with a 10 12mm plate provided and testing it for a satisfactory leak proofing test. , removal of the weak part of the exhaust pipeline going to the semi condenser vapor shell and fitting a new 800 mm diameter pipeline using the provided 8 10 mm plate in its place. , cutting out the worn partition plates of the top and bottom headers of the juice heater and replacing them with the provided 8 10 mm plate arranging for fitting the rubber strip , installing and strengthening the umbrella fitted to the vapor shell semiconductor quad body and conducting a satisfactory trial. , removing the weak intermediate first vapor second vapor pipes of the quad bodies and constructing new ones with a diameter of 500 650 mm using an 8 10 mm plate and conducting a satisfactory trial. , removing the weakened intermediate first vapor second vapor pipes of the quad bodies and installing new ones with a diameter of 700 850 mm from 8 10 mm plates and conducting a satisfactory trial. , dismantle fabricate and erect a 600 800 mm band and conduct a satisfactory trial. , dismantle fabricate and erect a 900 1100 mm band and conduct a satisfactory trial. , remove the steam valve from the juice heater and installation a new right angle valve size 400 500 mm with the corresponding pipe connection modifications and conduct a trial. , cut and remove the double beat valve from the juice heater and installation a new double beat valve size 8 diameter and conduct a trial , remove the intermediate coolers from the film type sulfur furnaces and installation them using the provided pipe plate and conduct a trial. , installation the sublimation pipes from the satvik type sulfur furnaces using the provided pipe or a new one and conduct a trial. , remove the empty filtrate bottle from the vacuum filter and installation a new filtrate bottle using an 8 10 mm ms plate and conduct a trial. make all connections and conduct a trial. , removing the filtrate bottle plate of the vacuum filter and repairing it with the provided plate and giving it a trial. , removing the filtrate plate of the vacuum filter tray and repairing it with the provided plate. , cutting and removing the neck shell of the lime slaker at the lime station and replacing it with a new one using the provided plate and giving it a trial. , creating the melter from the satvik sulfur furnace with a new 8 10 mm plate and giving it a satisfactory trial by installing the steam coil. , removing the worn out coils in the melters of the satvik sulfur furnace replacing them with new ones and conducting hydraulic testing and giving a satisfactory trial. , removing the worn out plates of the vacuum filter condensers replacing them with new ones and giving a satisfactory trial , removing the damaged weak steam coils in the film tine sulfur melters replacing them with new ones and conducting hydraulic testing and giving a satisfactory trial , renovate and installation a new so2 chamber inside the coolers of the satvik sulfur furnace and conduct a trial. , remove the old corroded so2 gas line at the sulfur furnace station and installation the new seamless ms line with flanges tightening the joints and bolts , remove the grooved plate of the mud mixture on the vacuum filter and repair it with the new plate provided , remove the grooved plate of the filtrate tank located below the vacuum filter installation the plate provided and perform a trial. , repairing the weak parts of juice and mud with dry box of clarifier and making all the connections. , patch the weak shell of the burning chamber of the film type sulfur furnace with the plate provided for a length of approximately 5 feet from the bottom and give a satisfactory trial. , patch the weak and rotten platforms of both vacuum filters with a new burner from the provided plate. , removing the so2 chamber inside the last cooler of the film type sulfur furnace and installing a new one using the provided 10 mm ms plate and making all connections. , repairing the damaged clear juice bottles near the clear juice pumps and making all the connections and giving satisfactory trial. , cut out and remove all rotten mud scrapers inside the door clarifier and installation the provided plates and belts according to size and give a satisfactory trial. , coat and remove the weak mud boot plates in each compartment of the clarifier and installation the provided new plates. , repairing the weak parts of the agitator fitted on the vacuum filter and giving satisfactory trial. , removing, clarification and evaporator fabrication works, clarification and evaporator