tender for clarification and evaporator fabrication works removing the calandria of the evaporator and installing and fitting a new calandria of 650 m square heating surface and installing all the pipe lines valves and accessories in their place , replacing an old and worn out grand consultant juice plaza condensate syrup bottle with an 8 10 mm msc plate by connecting all connections. , the worn out umbrella plate in the vapor cell semi concentrator was removed and the plate was repaired and replaced with plastic , replacing the umbrella in the wide body vapor cell semi concentrator with a dated and 6 8 mm msc plate and conducting a trial. , removing the neck selvage of the quad body semi container and replacing it with a new 8 10 mm ms plate and testing it. , removing the neck selvage of the quad body semi container and repairing it with the provided plate and testing it. , cutting out the weakened roof of the quad body and replacing it with a 12mm plate provided and testing it. , cutting out the weakened part of the semi capacitor vapor cell quad body cell and replacing it with a 10 12mm plate provided and testing it for a satisfactory leak proofing test. , removal of the weak part of the exhaust pipeline going to the semi condenser vapor shell and fitting a new 800 mm diameter pipeline using the provided 8 10 mm plate in its place. , cutting out the worn partition plates of the top and bottom headers of the juice heater and replacing them with the provided 8 10 mm plate arranging for fitting the rubber strip , installing and strengthening the umbrella fitted to the vapor shell semiconductor quad body and conducting a satisfactory trial. , removing the weak intermediate first vapor second vapor pipes of the quad bodies and constructing new ones with a diameter of 500 650 mm using an 8 10 mm plate and conducting a satisfactory trial. , removing the weakened intermediate first vapor second vapor pipes of the quad bodies and installing new ones with a diameter of 700 850 mm from 8 10 mm plates and conducting a satisfactory trial. , dismantle fabricate and erect a 600 800 mm band and conduct a satisfactory trial. , dismantle fabricate and erect a 900 1100 mm band and conduct a satisfactory trial. , remove the steam valve from the juice heater and installation a new right angle valve size 400 500 mm with the corresponding pipe connection modifications and conduct a trial. , cut and remove the double beat valve from the juice heater and installation a new double beat valve size 8 diameter and conduct a trial , remove the intermediate coolers from the film type sulfur furnaces and installation them using the provided pipe plate and conduct a trial. , installation the sublimation pipes from the satvik type sulfur furnaces using the provided pipe or a new one and conduct a trial. , remove the empty filtrate bottle from the vacuum filter and installation a new filtrate bottle using an 8 10 mm ms plate and conduct a trial. make all connections and conduct a trial. , removing the filtrate bottle plate of the vacuum filter and repairing it with the provided plate and giving it a trial. , removing the filtrate plate of the vacuum filter tray and repairing it with the provided plate. , cutting and removing the neck shell of the lime slaker at the lime station and replacing it with a new one using the provided plate and giving it a trial. , creating the melter from the satvik sulfur furnace with a new 8 10 mm plate and giving it a satisfactory trial by installing the steam coil. , removing the worn out coils in the melters of the satvik sulfur furnace replacing them with new ones and conducting hydraulic testing and giving a satisfactory trial. , removing the worn out plates of the vacuum filter condensers replacing them with new ones and giving a satisfactory trial , removing the damaged weak steam coils in the film tine sulfur melters replacing them with new ones and conducting hydraulic testing and giving a satisfactory trial , renovate and installation a new so2 chamber inside the coolers of the satvik sulfur furnace and conduct a trial. , remove the old corroded so2 gas line at the sulfur furnace station and installation the new seamless ms line with flanges tightening the joints and bolts , remove the grooved plate of the mud mixture on the vacuum filter and repair it with the new plate provided , remove the grooved plate of the filtrate tank located below the vacuum filter installation the plate provided and perform a trial. , repairing the weak parts of juice and mud with dry box of clarifier and making all the connections. , patch the weak shell of the burning chamber of the film type sulfur furnace with the plate provided for a length of approximately 5 feet from the bottom and give a satisfactory trial. , patch the weak and rotten platforms of both vacuum filters with a new burner from the provided plate. , removing the so2 chamber inside the last cooler of the film type sulfur furnace and installing a new one using the provided 10 mm ms plate and making all connections. , repairing the damaged clear juice bottles near the clear juice pumps and making all the connections and giving satisfactory trial. , cut out and remove all rotten mud scrapers inside the door clarifier and installation the provided plates and belts according to size and give a satisfactory trial. , coat and remove the weak mud boot plates in each compartment of the clarifier and installation the provided new plates. , repairing the weak parts of the agitator fitted on the vacuum filter and giving satisfactory trial. , removing, clarification and evaporator fabrication works, clarification and evaporator

Latest Tender Detail from uttar pradesh cooperative sugar factories federation ltd UPCSFFL for the tender for clarification and evaporator fabrication works removing the calandria of the evaporator and installing and fitting a new calandria of 650 m square heating surface and installing all the pipe lines valves and accessories in their place , replacing an old and worn out grand consultant juice plaza condensate syrup bottle with an 8 10 mm msc plate by connecting all connections. , the worn out umbrella plate in the vapor cell semi concentrator was removed and the plate was repaired and replaced with plastic , replacing the umbrella in the wide body vapor cell semi concentrator with a dated and 6 8 mm msc plate and conducting a trial. , removing the neck selvage of the quad body semi container and replacing it with a new 8 10 mm ms plate and testing it. , removing the neck selvage of the quad body semi container and repairing it with the provided plate and testing it. , cutting out the weakened roof of the quad body and replacing it with a 12mm plate provided and testing it. , cutting out the weakened part of the semi capacitor vapor cell quad body cell and replacing it with a 10 12mm plate provided and testing it for a satisfactory leak proofing test. , removal of the weak part of the exhaust pipeline going to the semi condenser vapor shell and fitting a new 800 mm diameter pipeline using the provided 8 10 mm plate in its place. , cutting out the worn partition plates of the top and bottom headers of the juice heater and replacing them with the provided 8 10 mm plate arranging for fitting the rubber strip , installing and strengthening the umbrella fitted to the vapor shell semiconductor quad body and conducting a satisfactory trial. , removing the weak intermediate first vapor second vapor pipes of the quad bodies and constructing new ones with a diameter of 500 650 mm using an 8 10 mm plate and conducting a satisfactory trial. , removing the weakened intermediate first vapor second vapor pipes of the quad bodies and installing new ones with a diameter of 700 850 mm from 8 10 mm plates and conducting a satisfactory trial. , dismantle fabricate and erect a 600 800 mm band and conduct a satisfactory trial. , dismantle fabricate and erect a 900 1100 mm band and conduct a satisfactory trial. , remove the steam valve from the juice heater and installation a new right angle valve size 400 500 mm with the corresponding pipe connection modifications and conduct a trial. , cut and remove the double beat valve from the juice heater and installation a new double beat valve size 8 diameter and conduct a trial , remove the intermediate coolers from the film type sulfur furnaces and installation them using the provided pipe plate and conduct a trial. , installation the sublimation pipes from the satvik type sulfur furnaces using the provided pipe or a new one and conduct a trial. , remove the empty filtrate bottle from the vacuum filter and installation a new filtrate bottle using an 8 10 mm ms plate and conduct a trial. make all connections and conduct a trial. , removing the filtrate bottle plate of the vacuum filter and repairing it with the provided plate and giving it a trial. , removing the filtrate plate of the vacuum filter tray and repairing it with the provided plate. , cutting and removing the neck shell of the lime slaker at the lime station and replacing it with a new one using the provided plate and giving it a trial. , creating the melter from the satvik sulfur furnace with a new 8 10 mm plate and giving it a satisfactory trial by installing the steam coil. , removing the worn out coils in the melters of the satvik sulfur furnace replacing them with new ones and conducting hydraulic testing and giving a satisfactory trial. , removing the worn out plates of the vacuum filter condensers replacing them with new ones and giving a satisfactory trial , removing the damaged weak steam coils in the film tine sulfur melters replacing them with new ones and conducting hydraulic testing and giving a satisfactory trial , renovate and installation a new so2 chamber inside the coolers of the satvik sulfur furnace and conduct a trial. , remove the old corroded so2 gas line at the sulfur furnace station and installation the new seamless ms line with flanges tightening the joints and bolts , remove the grooved plate of the mud mixture on the vacuum filter and repair it with the new plate provided , remove the grooved plate of the filtrate tank located below the vacuum filter installation the plate provided and perform a trial. , repairing the weak parts of juice and mud with dry box of clarifier and making all the connections. , patch the weak shell of the burning chamber of the film type sulfur furnace with the plate provided for a length of approximately 5 feet from the bottom and give a satisfactory trial. , patch the weak and rotten platforms of both vacuum filters with a new burner from the provided plate. , removing the so2 chamber inside the last cooler of the film type sulfur furnace and installing a new one using the provided 10 mm ms plate and making all connections. , repairing the damaged clear juice bottles near the clear juice pumps and making all the connections and giving satisfactory trial. , cut out and remove all rotten mud scrapers inside the door clarifier and installation the provided plates and belts according to size and give a satisfactory trial. , coat and remove the weak mud boot plates in each compartment of the clarifier and installation the provided new plates. , repairing the weak parts of the agitator fitted on the vacuum filter and giving satisfactory trial. , removing, clarification and evaporator fabrication works, clarification and evaporator in sarsawa, uttar pradesh,. Reference number 16103288. Don't miss out on this chance to be part of a significant project. Register for free today to access the complete tender details and download the necessary documents. Seize the opportunity with Tender 18!

T18 Ref No:16103288
Tender ID:GEM/2026/B/7718994
Tender Agency:uttar pradesh cooperative sugar factories federation ltd UPCSFFL
City:sarsawa
State:uttar pradesh
Tender Related Keywords :
Description :
total quantity = 6469
T18 Ref No:16103288Tender Value:1455151.53
Tender ID:GEM/2026/B/7718994Tender EMD:Refer Document
Tender Agency:uttar pradesh cooperative sugar factories federation ltd UPCSFFLTender Fee:Refer Document
City:sarsawaPublished Date:Jul 03, 2026
State:uttar pradeshDue Date:Jul 18, 2026
Tender Related Keywords :vacuum filter, juice heater, rubber strip, steam valve, angle valve, pipe lines, ms plate, so2 gas, boltsTender Opening Date:Jul 18, 2026
Description :total quantity = 6469

Get Complete Tender Documents to Participate

Tender NoticeBOQEligibilityEMD DetailsImportant Dates
We take all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.

Browse GeM Portal Tenders

This Government Tender has been Published  by Uttar Pradesh Cooperative Sugar Factories Federation Ltd UPCSFFL for work related to vacuum filter,juice heater,rubber strip,steam valve,angle valve,pipe lines,ms plate,so2 gas,bolts in Sarsawa, Uttar Pradesh. The Tender work is tender for clarification and evaporator fabrication works removing the calandria of the evaporator and installing and fitting a new calandria of 650 m square heating surface and installing all the pipe lines valves and accessories in their place , replacing an old and worn out grand consultant juice plaza condensate syrup bottle with an 8 10 mm msc plate by connecting all connections. , the worn out umbrella plate in the vapor cell semi concentrator was removed and the plate was repaired and replaced with plastic , replacing the umbrella in the wide body vapor cell semi concentrator with a dated and 6 8 mm msc plate and conducting a trial. , removing the neck selvage of the quad body semi container and replacing it with a new 8 10 mm ms plate and testing it. , removing the neck selvage of the quad body semi container and repairing it with the provided plate and testing it. , cutting out the weakened roof of the quad body and replacing it with a 12mm plate provided and testing it. , cutting out the weakened part of the semi capacitor vapor cell quad body cell and replacing it with a 10 12mm plate provided and testing it for a satisfactory leak proofing test. , removal of the weak part of the exhaust pipeline going to the semi condenser vapor shell and fitting a new 800 mm diameter pipeline using the provided 8 10 mm plate in its place. , cutting out the worn partition plates of the top and bottom headers of the juice heater and replacing them with the provided 8 10 mm plate arranging for fitting the rubber strip , installing and strengthening the umbrella fitted to the vapor shell semiconductor quad body and conducting a satisfactory trial. , removing the weak intermediate first vapor second vapor pipes of the quad bodies and constructing new ones with a diameter of 500 650 mm using an 8 10 mm plate and conducting a satisfactory trial. , removing the weakened intermediate first vapor second vapor pipes of the quad bodies and installing new ones with a diameter of 700 850 mm from 8 10 mm plates and conducting a satisfactory trial. , dismantle fabricate and erect a 600 800 mm band and conduct a satisfactory trial. , dismantle fabricate and erect a 900 1100 mm band and conduct a satisfactory trial. , remove the steam valve from the juice heater and installation a new right angle valve size 400 500 mm with the corresponding pipe connection modifications and conduct a trial. , cut and remove the double beat valve from the juice heater and installation a new double beat valve size 8 diameter and conduct a trial , remove the intermediate coolers from the film type sulfur furnaces and installation them using the provided pipe plate and conduct a trial. , installation the sublimation pipes from the satvik type sulfur furnaces using the provided pipe or a new one and conduct a trial. , remove the empty filtrate bottle from the vacuum filter and installation a new filtrate bottle using an 8 10 mm ms plate and conduct a trial. make all connections and conduct a trial. , removing the filtrate bottle plate of the vacuum filter and repairing it with the provided plate and giving it a trial. , removing the filtrate plate of the vacuum filter tray and repairing it with the provided plate. , cutting and removing the neck shell of the lime slaker at the lime station and replacing it with a new one using the provided plate and giving it a trial. , creating the melter from the satvik sulfur furnace with a new 8 10 mm plate and giving it a satisfactory trial by installing the steam coil. , removing the worn out coils in the melters of the satvik sulfur furnace replacing them with new ones and conducting hydraulic testing and giving a satisfactory trial. , removing the worn out plates of the vacuum filter condensers replacing them with new ones and giving a satisfactory trial , removing the damaged weak steam coils in the film tine sulfur melters replacing them with new ones and conducting hydraulic testing and giving a satisfactory trial , renovate and installation a new so2 chamber inside the coolers of the satvik sulfur furnace and conduct a trial. , remove the old corroded so2 gas line at the sulfur furnace station and installation the new seamless ms line with flanges tightening the joints and bolts , remove the grooved plate of the mud mixture on the vacuum filter and repair it with the new plate provided , remove the grooved plate of the filtrate tank located below the vacuum filter installation the plate provided and perform a trial. , repairing the weak parts of juice and mud with dry box of clarifier and making all the connections. , patch the weak shell of the burning chamber of the film type sulfur furnace with the plate provided for a length of approximately 5 feet from the bottom and give a satisfactory trial. , patch the weak and rotten platforms of both vacuum filters with a new burner from the provided plate. , removing the so2 chamber inside the last cooler of the film type sulfur furnace and installing a new one using the provided 10 mm ms plate and making all connections. , repairing the damaged clear juice bottles near the clear juice pumps and making all the connections and giving satisfactory trial. , cut out and remove all rotten mud scrapers inside the door clarifier and installation the provided plates and belts according to size and give a satisfactory trial. , coat and remove the weak mud boot plates in each compartment of the clarifier and installation the provided new plates. , repairing the weak parts of the agitator fitted on the vacuum filter and giving satisfactory trial. , removing, clarification and evaporator fabrication works, clarification and evaporator. Tender18 Provide this type Government Tender Information on daily basis.


This tender invites eligible contractors, suppliers, manufacturers, consultants, Startups, Msmes, traders and service providers to submit bids for the specified project, supply, service, or work requirement.


Before applying, interested bidders should review the tender scope, eligibility criteria, estimated contract value, important dates, technical requirements, reqired docuent list for bidder and bid submission instructions as per provided in the official tender documents. 


This Verified Information Provide By Tender18 in this page so Bidder Can Easiy  Understanding tender  requirements and bidders can prepare a compliant and competitive tender proposal.

To participate in the tender for clarification and evaporator fabrication works removing the calandria of the evaporator and installing and fitting a new calandria of 650 m square heating surface and installing all the pipe lines valves and accessories in their place , replacing an old and worn out grand consultant juice plaza condensate syrup bottle with an 8 10 mm msc plate by connecting all connections. , the worn out umbrella plate in the vapor cell semi concentrator was removed and the plate was repaired and replaced with plastic , replacing the umbrella in the wide body vapor cell semi concentrator with a dated and 6 8 mm msc plate and conducting a trial. , removing the neck selvage of the quad body semi container and replacing it with a new 8 10 mm ms plate and testing it. , removing the neck selvage of the quad body semi container and repairing it with the provided plate and testing it. , cutting out the weakened roof of the quad body and replacing it with a 12mm plate provided and testing it. , cutting out the weakened part of the semi capacitor vapor cell quad body cell and replacing it with a 10 12mm plate provided and testing it for a satisfactory leak proofing test. , removal of the weak part of the exhaust pipeline going to the semi condenser vapor shell and fitting a new 800 mm diameter pipeline using the provided 8 10 mm plate in its place. , cutting out the worn partition plates of the top and bottom headers of the juice heater and replacing them with the provided 8 10 mm plate arranging for fitting the rubber strip , installing and strengthening the umbrella fitted to the vapor shell semiconductor quad body and conducting a satisfactory trial. , removing the weak intermediate first vapor second vapor pipes of the quad bodies and constructing new ones with a diameter of 500 650 mm using an 8 10 mm plate and conducting a satisfactory trial. , removing the weakened intermediate first vapor second vapor pipes of the quad bodies and installing new ones with a diameter of 700 850 mm from 8 10 mm plates and conducting a satisfactory trial. , dismantle fabricate and erect a 600 800 mm band and conduct a satisfactory trial. , dismantle fabricate and erect a 900 1100 mm band and conduct a satisfactory trial. , remove the steam valve from the juice heater and installation a new right angle valve size 400 500 mm with the corresponding pipe connection modifications and conduct a trial. , cut and remove the double beat valve from the juice heater and installation a new double beat valve size 8 diameter and conduct a trial , remove the intermediate coolers from the film type sulfur furnaces and installation them using the provided pipe plate and conduct a trial. , installation the sublimation pipes from the satvik type sulfur furnaces using the provided pipe or a new one and conduct a trial. , remove the empty filtrate bottle from the vacuum filter and installation a new filtrate bottle using an 8 10 mm ms plate and conduct a trial. make all connections and conduct a trial. , removing the filtrate bottle plate of the vacuum filter and repairing it with the provided plate and giving it a trial. , removing the filtrate plate of the vacuum filter tray and repairing it with the provided plate. , cutting and removing the neck shell of the lime slaker at the lime station and replacing it with a new one using the provided plate and giving it a trial. , creating the melter from the satvik sulfur furnace with a new 8 10 mm plate and giving it a satisfactory trial by installing the steam coil. , removing the worn out coils in the melters of the satvik sulfur furnace replacing them with new ones and conducting hydraulic testing and giving a satisfactory trial. , removing the worn out plates of the vacuum filter condensers replacing them with new ones and giving a satisfactory trial , removing the damaged weak steam coils in the film tine sulfur melters replacing them with new ones and conducting hydraulic testing and giving a satisfactory trial , renovate and installation a new so2 chamber inside the coolers of the satvik sulfur furnace and conduct a trial. , remove the old corroded so2 gas line at the sulfur furnace station and installation the new seamless ms line with flanges tightening the joints and bolts , remove the grooved plate of the mud mixture on the vacuum filter and repair it with the new plate provided , remove the grooved plate of the filtrate tank located below the vacuum filter installation the plate provided and perform a trial. , repairing the weak parts of juice and mud with dry box of clarifier and making all the connections. , patch the weak shell of the burning chamber of the film type sulfur furnace with the plate provided for a length of approximately 5 feet from the bottom and give a satisfactory trial. , patch the weak and rotten platforms of both vacuum filters with a new burner from the provided plate. , removing the so2 chamber inside the last cooler of the film type sulfur furnace and installing a new one using the provided 10 mm ms plate and making all connections. , repairing the damaged clear juice bottles near the clear juice pumps and making all the connections and giving satisfactory trial. , cut out and remove all rotten mud scrapers inside the door clarifier and installation the provided plates and belts according to size and give a satisfactory trial. , coat and remove the weak mud boot plates in each compartment of the clarifier and installation the provided new plates. , repairing the weak parts of the agitator fitted on the vacuum filter and giving satisfactory trial. , removing, clarification and evaporator fabrication works, clarification and evaporator, bidders should first download and review all available tender documents. These documents generally include the Notice Inviting Tender (NIT), Bill of Quantities (BOQ), technical specifications, eligibility criteria, scope of work, and bid submission instructions.


Tender Governemnt Authorities like Uttar Pradesh Cooperative Sugar Factories Federation Ltd UPCSFFL usually publish these documents on their official eProcurement portals, departmental tender portals, the GeM Tender Portal, or other government procurement platforms or on newspapre. Finding and accessing the correct tender documents across multiple portals can sometimes be time-consuming for bidders. 


To make the process easier, Tender18 provides quick access to the available tender documents related to this Sarsawa , Uttar Pradesh tender on a single page. Businesses involved in vacuum filter,juice heater,rubber strip,steam valve,angle valve,pipe lines,ms plate,so2 gas,bolts related products, services, or works can conveniently download the relevant documents and review the tender requirements without spending time searching across different procurement portals.

The tender for clarification and evaporator fabrication works removing the calandria of the evaporator and installing and fitting a new calandria of 650 m square heating surface and installing all the pipe lines valves and accessories in their place , replacing an old and worn out grand consultant juice plaza condensate syrup bottle with an 8 10 mm msc plate by connecting all connections. , the worn out umbrella plate in the vapor cell semi concentrator was removed and the plate was repaired and replaced with plastic , replacing the umbrella in the wide body vapor cell semi concentrator with a dated and 6 8 mm msc plate and conducting a trial. , removing the neck selvage of the quad body semi container and replacing it with a new 8 10 mm ms plate and testing it. , removing the neck selvage of the quad body semi container and repairing it with the provided plate and testing it. , cutting out the weakened roof of the quad body and replacing it with a 12mm plate provided and testing it. , cutting out the weakened part of the semi capacitor vapor cell quad body cell and replacing it with a 10 12mm plate provided and testing it for a satisfactory leak proofing test. , removal of the weak part of the exhaust pipeline going to the semi condenser vapor shell and fitting a new 800 mm diameter pipeline using the provided 8 10 mm plate in its place. , cutting out the worn partition plates of the top and bottom headers of the juice heater and replacing them with the provided 8 10 mm plate arranging for fitting the rubber strip , installing and strengthening the umbrella fitted to the vapor shell semiconductor quad body and conducting a satisfactory trial. , removing the weak intermediate first vapor second vapor pipes of the quad bodies and constructing new ones with a diameter of 500 650 mm using an 8 10 mm plate and conducting a satisfactory trial. , removing the weakened intermediate first vapor second vapor pipes of the quad bodies and installing new ones with a diameter of 700 850 mm from 8 10 mm plates and conducting a satisfactory trial. , dismantle fabricate and erect a 600 800 mm band and conduct a satisfactory trial. , dismantle fabricate and erect a 900 1100 mm band and conduct a satisfactory trial. , remove the steam valve from the juice heater and installation a new right angle valve size 400 500 mm with the corresponding pipe connection modifications and conduct a trial. , cut and remove the double beat valve from the juice heater and installation a new double beat valve size 8 diameter and conduct a trial , remove the intermediate coolers from the film type sulfur furnaces and installation them using the provided pipe plate and conduct a trial. , installation the sublimation pipes from the satvik type sulfur furnaces using the provided pipe or a new one and conduct a trial. , remove the empty filtrate bottle from the vacuum filter and installation a new filtrate bottle using an 8 10 mm ms plate and conduct a trial. make all connections and conduct a trial. , removing the filtrate bottle plate of the vacuum filter and repairing it with the provided plate and giving it a trial. , removing the filtrate plate of the vacuum filter tray and repairing it with the provided plate. , cutting and removing the neck shell of the lime slaker at the lime station and replacing it with a new one using the provided plate and giving it a trial. , creating the melter from the satvik sulfur furnace with a new 8 10 mm plate and giving it a satisfactory trial by installing the steam coil. , removing the worn out coils in the melters of the satvik sulfur furnace replacing them with new ones and conducting hydraulic testing and giving a satisfactory trial. , removing the worn out plates of the vacuum filter condensers replacing them with new ones and giving a satisfactory trial , removing the damaged weak steam coils in the film tine sulfur melters replacing them with new ones and conducting hydraulic testing and giving a satisfactory trial , renovate and installation a new so2 chamber inside the coolers of the satvik sulfur furnace and conduct a trial. , remove the old corroded so2 gas line at the sulfur furnace station and installation the new seamless ms line with flanges tightening the joints and bolts , remove the grooved plate of the mud mixture on the vacuum filter and repair it with the new plate provided , remove the grooved plate of the filtrate tank located below the vacuum filter installation the plate provided and perform a trial. , repairing the weak parts of juice and mud with dry box of clarifier and making all the connections. , patch the weak shell of the burning chamber of the film type sulfur furnace with the plate provided for a length of approximately 5 feet from the bottom and give a satisfactory trial. , patch the weak and rotten platforms of both vacuum filters with a new burner from the provided plate. , removing the so2 chamber inside the last cooler of the film type sulfur furnace and installing a new one using the provided 10 mm ms plate and making all connections. , repairing the damaged clear juice bottles near the clear juice pumps and making all the connections and giving satisfactory trial. , cut out and remove all rotten mud scrapers inside the door clarifier and installation the provided plates and belts according to size and give a satisfactory trial. , coat and remove the weak mud boot plates in each compartment of the clarifier and installation the provided new plates. , repairing the weak parts of the agitator fitted on the vacuum filter and giving satisfactory trial. , removing, clarification and evaporator fabrication works, clarification and evaporator from Sarsawa, Uttar Pradesh may be relevant for contractors, suppliers, vendors, manufacturers, consultants, service providers, startups, MSMEs, and other organizations involved in vacuum filter,juice heater,rubber strip,steam valve,angle valve,pipe lines,ms plate,so2 gas,bolts related products, services, or works. However, eligibility to participate depends on the qualification criteria specified by Uttar Pradesh Cooperative Sugar Factories Federation Ltd UPCSFFL in the official tender documents.

Before submitting a bid, interested applicants should carefully review the eligibility conditions, technical requirements, financial criteria, work experience requirements, annual turnover conditions, registrations, certifications, and any other supporting documents required by the tendering authority. The detailed qualification requirements and bidder eligibility criteria are available in the tender notice and related documents provided on this page. 

Ensuring compliance with all eligibility and qualification requirements before bid submission can help bidders avoid disqualification and improve their chances of successful participation in the tender process.

Tende18 provides comprehensive tender bidding services, including a complete tender summary along with a detailed analysis of the Tender Qualification and Eligibility Criteria.

Interested in participating in the tender for clarification and evaporator fabrication works removing the calandria of the evaporator and installing and fitting a new calandria of 650 m square heating surface and installing all the pipe lines valves and accessories in their place , replacing an old and worn out grand consultant juice plaza condensate syrup bottle with an 8 10 mm msc plate by connecting all connections. , the worn out umbrella plate in the vapor cell semi concentrator was removed and the plate was repaired and replaced with plastic , replacing the umbrella in the wide body vapor cell semi concentrator with a dated and 6 8 mm msc plate and conducting a trial. , removing the neck selvage of the quad body semi container and replacing it with a new 8 10 mm ms plate and testing it. , removing the neck selvage of the quad body semi container and repairing it with the provided plate and testing it. , cutting out the weakened roof of the quad body and replacing it with a 12mm plate provided and testing it. , cutting out the weakened part of the semi capacitor vapor cell quad body cell and replacing it with a 10 12mm plate provided and testing it for a satisfactory leak proofing test. , removal of the weak part of the exhaust pipeline going to the semi condenser vapor shell and fitting a new 800 mm diameter pipeline using the provided 8 10 mm plate in its place. , cutting out the worn partition plates of the top and bottom headers of the juice heater and replacing them with the provided 8 10 mm plate arranging for fitting the rubber strip , installing and strengthening the umbrella fitted to the vapor shell semiconductor quad body and conducting a satisfactory trial. , removing the weak intermediate first vapor second vapor pipes of the quad bodies and constructing new ones with a diameter of 500 650 mm using an 8 10 mm plate and conducting a satisfactory trial. , removing the weakened intermediate first vapor second vapor pipes of the quad bodies and installing new ones with a diameter of 700 850 mm from 8 10 mm plates and conducting a satisfactory trial. , dismantle fabricate and erect a 600 800 mm band and conduct a satisfactory trial. , dismantle fabricate and erect a 900 1100 mm band and conduct a satisfactory trial. , remove the steam valve from the juice heater and installation a new right angle valve size 400 500 mm with the corresponding pipe connection modifications and conduct a trial. , cut and remove the double beat valve from the juice heater and installation a new double beat valve size 8 diameter and conduct a trial , remove the intermediate coolers from the film type sulfur furnaces and installation them using the provided pipe plate and conduct a trial. , installation the sublimation pipes from the satvik type sulfur furnaces using the provided pipe or a new one and conduct a trial. , remove the empty filtrate bottle from the vacuum filter and installation a new filtrate bottle using an 8 10 mm ms plate and conduct a trial. make all connections and conduct a trial. , removing the filtrate bottle plate of the vacuum filter and repairing it with the provided plate and giving it a trial. , removing the filtrate plate of the vacuum filter tray and repairing it with the provided plate. , cutting and removing the neck shell of the lime slaker at the lime station and replacing it with a new one using the provided plate and giving it a trial. , creating the melter from the satvik sulfur furnace with a new 8 10 mm plate and giving it a satisfactory trial by installing the steam coil. , removing the worn out coils in the melters of the satvik sulfur furnace replacing them with new ones and conducting hydraulic testing and giving a satisfactory trial. , removing the worn out plates of the vacuum filter condensers replacing them with new ones and giving a satisfactory trial , removing the damaged weak steam coils in the film tine sulfur melters replacing them with new ones and conducting hydraulic testing and giving a satisfactory trial , renovate and installation a new so2 chamber inside the coolers of the satvik sulfur furnace and conduct a trial. , remove the old corroded so2 gas line at the sulfur furnace station and installation the new seamless ms line with flanges tightening the joints and bolts , remove the grooved plate of the mud mixture on the vacuum filter and repair it with the new plate provided , remove the grooved plate of the filtrate tank located below the vacuum filter installation the plate provided and perform a trial. , repairing the weak parts of juice and mud with dry box of clarifier and making all the connections. , patch the weak shell of the burning chamber of the film type sulfur furnace with the plate provided for a length of approximately 5 feet from the bottom and give a satisfactory trial. , patch the weak and rotten platforms of both vacuum filters with a new burner from the provided plate. , removing the so2 chamber inside the last cooler of the film type sulfur furnace and installing a new one using the provided 10 mm ms plate and making all connections. , repairing the damaged clear juice bottles near the clear juice pumps and making all the connections and giving satisfactory trial. , cut out and remove all rotten mud scrapers inside the door clarifier and installation the provided plates and belts according to size and give a satisfactory trial. , coat and remove the weak mud boot plates in each compartment of the clarifier and installation the provided new plates. , repairing the weak parts of the agitator fitted on the vacuum filter and giving satisfactory trial. , removing, clarification and evaporator fabrication works, clarification and evaporator issued by Uttar Pradesh Cooperative Sugar Factories Federation Ltd UPCSFFL for vacuum filter,juice heater,rubber strip,steam valve,angle valve,pipe lines,ms plate,so2 gas,bolts related work in Sarsawa, Uttar Pradesh? TENDER18 provides complete assistance to help businesses understand tender requirements, access tender documents, review eligibility criteria, qualification requirements, important dates, and bid submission guidelines associated with this tender.

Our Tender18 Expert Technical team can assist with vendor and GeM registration on the relevant departmental, eProcurement, GeM, or government tender portal, preparation of technical and financial bid documents, compliance with qualification criteria, document verification, and complete online tender submission support. Whether you are a contractor, supplier, manufacturer, consultant, startup, or MSME working in the field of vacuum filter,juice heater,rubber strip,steam valve,angle valve,pipe lines,ms plate,so2 gas,bolts, Tender18 can help simplify the tender participation process and support you throughout every stage of bidding for this tender. so that tender18 is one the top leading tender consultant in Inda.

1.

Whom should I contact if I have further queries about the Tender scope?

You can fill out the integrated inquiry form below on this detail page to share your company profile. Our consultancy desk will review your query regarding vacuum filter,juice heater,rubber strip,steam valve,angle valve,pipe lines,ms plate,so2 gas,bolts parameters and guide you on how to coordinate efficiently with the procurement team of Uttar Pradesh Cooperative Sugar Factories Federation Ltd UPCSFFL

2.

How can Tender18 assist my business in winning this government contract?

Tender18 provides end-to-end professional bidding support and documentation advisory for Tender For Clarification And Evaporator Fabrication Works Removing The Calandria Of The Evaporator And Installing And Fitting A New Calandria Of 650 M Square Heating Surface And Installing All The Pipe Lines Valves And Accessories In Their Place , Replacing An Old And Worn Out Grand Consultant Juice Plaza Condensate Syrup Bottle With An 8 10 Mm Msc Plate By Connecting All Connections. , The Worn Out Umbrella Plate In The Vapor Cell Semi Concentrator Was Removed And The Plate Was Repaired And Replaced With Plastic , Replacing The Umbrella In The Wide Body Vapor Cell Semi Concentrator With A Dated And 6 8 Mm Msc Plate And Conducting A Trial. , Removing The Neck Selvage Of The Quad Body Semi Container And Replacing It With A New 8 10 Mm Ms Plate And Testing It. , Removing The Neck Selvage Of The Quad Body Semi Container And Repairing It With The Provided Plate And Testing It. , Cutting Out The Weakened Roof Of The Quad Body And Replacing It With A 12mm Plate Provided And Testing It. , Cutting Out The Weakened Part Of The Semi Capacitor Vapor Cell Quad Body Cell And Replacing It With A 10 12mm Plate Provided And Testing It For A Satisfactory Leak Proofing Test. , Removal Of The Weak Part Of The Exhaust Pipeline Going To The Semi Condenser Vapor Shell And Fitting A New 800 Mm Diameter Pipeline Using The Provided 8 10 Mm Plate In Its Place. , Cutting Out The Worn Partition Plates Of The Top And Bottom Headers Of The Juice Heater And Replacing Them With The Provided 8 10 Mm Plate Arranging For Fitting The Rubber Strip , Installing And Strengthening The Umbrella Fitted To The Vapor Shell Semiconductor Quad Body And Conducting A Satisfactory Trial. , Removing The Weak Intermediate First Vapor Second Vapor Pipes Of The Quad Bodies And Constructing New Ones With A Diameter Of 500 650 Mm Using An 8 10 Mm Plate And Conducting A Satisfactory Trial. , Removing The Weakened Intermediate First Vapor Second Vapor Pipes Of The Quad Bodies And Installing New Ones With A Diameter Of 700 850 Mm From 8 10 Mm Plates And Conducting A Satisfactory Trial. , Dismantle Fabricate And Erect A 600 800 Mm Band And Conduct A Satisfactory Trial. , Dismantle Fabricate And Erect A 900 1100 Mm Band And Conduct A Satisfactory Trial. , Remove The Steam Valve From The Juice Heater And Installation A New Right Angle Valve Size 400 500 Mm With The Corresponding Pipe Connection Modifications And Conduct A Trial. , Cut And Remove The Double Beat Valve From The Juice Heater And Installation A New Double Beat Valve Size 8 Diameter And Conduct A Trial , Remove The Intermediate Coolers From The Film Type Sulfur Furnaces And Installation Them Using The Provided Pipe Plate And Conduct A Trial. , Installation The Sublimation Pipes From The Satvik Type Sulfur Furnaces Using The Provided Pipe Or A New One And Conduct A Trial. , Remove The Empty Filtrate Bottle From The Vacuum Filter And Installation A New Filtrate Bottle Using An 8 10 Mm Ms Plate And Conduct A Trial. Make All Connections And Conduct A Trial. , Removing The Filtrate Bottle Plate Of The Vacuum Filter And Repairing It With The Provided Plate And Giving It A Trial. , Removing The Filtrate Plate Of The Vacuum Filter Tray And Repairing It With The Provided Plate. , Cutting And Removing The Neck Shell Of The Lime Slaker At The Lime Station And Replacing It With A New One Using The Provided Plate And Giving It A Trial. , Creating The Melter From The Satvik Sulfur Furnace With A New 8 10 Mm Plate And Giving It A Satisfactory Trial By Installing The Steam Coil. , Removing The Worn Out Coils In The Melters Of The Satvik Sulfur Furnace Replacing Them With New Ones And Conducting Hydraulic Testing And Giving A Satisfactory Trial. , Removing The Worn Out Plates Of The Vacuum Filter Condensers Replacing Them With New Ones And Giving A Satisfactory Trial , Removing The Damaged Weak Steam Coils In The Film Tine Sulfur Melters Replacing Them With New Ones And Conducting Hydraulic Testing And Giving A Satisfactory Trial , Renovate And Installation A New So2 Chamber Inside The Coolers Of The Satvik Sulfur Furnace And Conduct A Trial. , Remove The Old Corroded So2 Gas Line At The Sulfur Furnace Station And Installation The New Seamless Ms Line With Flanges Tightening The Joints And Bolts , Remove The Grooved Plate Of The Mud Mixture On The Vacuum Filter And Repair It With The New Plate Provided , Remove The Grooved Plate Of The Filtrate Tank Located Below The Vacuum Filter Installation The Plate Provided And Perform A Trial. , Repairing The Weak Parts Of Juice And Mud With Dry Box Of Clarifier And Making All The Connections. , Patch The Weak Shell Of The Burning Chamber Of The Film Type Sulfur Furnace With The Plate Provided For A Length Of Approximately 5 Feet From The Bottom And Give A Satisfactory Trial. , Patch The Weak And Rotten Platforms Of Both Vacuum Filters With A New Burner From The Provided Plate. , Removing The So2 Chamber Inside The Last Cooler Of The Film Type Sulfur Furnace And Installing A New One Using The Provided 10 Mm Ms Plate And Making All Connections. , Repairing The Damaged Clear Juice Bottles Near The Clear Juice Pumps And Making All The Connections And Giving Satisfactory Trial. , Cut Out And Remove All Rotten Mud Scrapers Inside The Door Clarifier And Installation The Provided Plates And Belts According To Size And Give A Satisfactory Trial. , Coat And Remove The Weak Mud Boot Plates In Each Compartment Of The Clarifier And Installation The Provided New Plates. , Repairing The Weak Parts Of The Agitator Fitted On The Vacuum Filter And Giving Satisfactory Trial. , Removing, Clarification And Evaporator Fabrication Works, Clarification And Evaporator . Our senior analysts help you decode the complete project guidelines, manage accurate costing sheets, and complete error-free submissions on the official platform used by Uttar Pradesh Cooperative Sugar Factories Federation Ltd UPCSFFL.

3.

What are the main reasons for a technical tender rejection?

Most online bids face rejection during the initial evaluation round due to avoidable errors like uploading blurred document scans, submitting expired DSCs, or missing critical experience papers required for Tender For Clarification And Evaporator Fabrication Works Removing The Calandria Of The Evaporator And Installing And Fitting A New Calandria Of 650 M Square Heating Surface And Installing All The Pipe Lines Valves And Accessories In Their Place , Replacing An Old And Worn Out Grand Consultant Juice Plaza Condensate Syrup Bottle With An 8 10 Mm Msc Plate By Connecting All Connections. , The Worn Out Umbrella Plate In The Vapor Cell Semi Concentrator Was Removed And The Plate Was Repaired And Replaced With Plastic , Replacing The Umbrella In The Wide Body Vapor Cell Semi Concentrator With A Dated And 6 8 Mm Msc Plate And Conducting A Trial. , Removing The Neck Selvage Of The Quad Body Semi Container And Replacing It With A New 8 10 Mm Ms Plate And Testing It. , Removing The Neck Selvage Of The Quad Body Semi Container And Repairing It With The Provided Plate And Testing It. , Cutting Out The Weakened Roof Of The Quad Body And Replacing It With A 12mm Plate Provided And Testing It. , Cutting Out The Weakened Part Of The Semi Capacitor Vapor Cell Quad Body Cell And Replacing It With A 10 12mm Plate Provided And Testing It For A Satisfactory Leak Proofing Test. , Removal Of The Weak Part Of The Exhaust Pipeline Going To The Semi Condenser Vapor Shell And Fitting A New 800 Mm Diameter Pipeline Using The Provided 8 10 Mm Plate In Its Place. , Cutting Out The Worn Partition Plates Of The Top And Bottom Headers Of The Juice Heater And Replacing Them With The Provided 8 10 Mm Plate Arranging For Fitting The Rubber Strip , Installing And Strengthening The Umbrella Fitted To The Vapor Shell Semiconductor Quad Body And Conducting A Satisfactory Trial. , Removing The Weak Intermediate First Vapor Second Vapor Pipes Of The Quad Bodies And Constructing New Ones With A Diameter Of 500 650 Mm Using An 8 10 Mm Plate And Conducting A Satisfactory Trial. , Removing The Weakened Intermediate First Vapor Second Vapor Pipes Of The Quad Bodies And Installing New Ones With A Diameter Of 700 850 Mm From 8 10 Mm Plates And Conducting A Satisfactory Trial. , Dismantle Fabricate And Erect A 600 800 Mm Band And Conduct A Satisfactory Trial. , Dismantle Fabricate And Erect A 900 1100 Mm Band And Conduct A Satisfactory Trial. , Remove The Steam Valve From The Juice Heater And Installation A New Right Angle Valve Size 400 500 Mm With The Corresponding Pipe Connection Modifications And Conduct A Trial. , Cut And Remove The Double Beat Valve From The Juice Heater And Installation A New Double Beat Valve Size 8 Diameter And Conduct A Trial , Remove The Intermediate Coolers From The Film Type Sulfur Furnaces And Installation Them Using The Provided Pipe Plate And Conduct A Trial. , Installation The Sublimation Pipes From The Satvik Type Sulfur Furnaces Using The Provided Pipe Or A New One And Conduct A Trial. , Remove The Empty Filtrate Bottle From The Vacuum Filter And Installation A New Filtrate Bottle Using An 8 10 Mm Ms Plate And Conduct A Trial. Make All Connections And Conduct A Trial. , Removing The Filtrate Bottle Plate Of The Vacuum Filter And Repairing It With The Provided Plate And Giving It A Trial. , Removing The Filtrate Plate Of The Vacuum Filter Tray And Repairing It With The Provided Plate. , Cutting And Removing The Neck Shell Of The Lime Slaker At The Lime Station And Replacing It With A New One Using The Provided Plate And Giving It A Trial. , Creating The Melter From The Satvik Sulfur Furnace With A New 8 10 Mm Plate And Giving It A Satisfactory Trial By Installing The Steam Coil. , Removing The Worn Out Coils In The Melters Of The Satvik Sulfur Furnace Replacing Them With New Ones And Conducting Hydraulic Testing And Giving A Satisfactory Trial. , Removing The Worn Out Plates Of The Vacuum Filter Condensers Replacing Them With New Ones And Giving A Satisfactory Trial , Removing The Damaged Weak Steam Coils In The Film Tine Sulfur Melters Replacing Them With New Ones And Conducting Hydraulic Testing And Giving A Satisfactory Trial , Renovate And Installation A New So2 Chamber Inside The Coolers Of The Satvik Sulfur Furnace And Conduct A Trial. , Remove The Old Corroded So2 Gas Line At The Sulfur Furnace Station And Installation The New Seamless Ms Line With Flanges Tightening The Joints And Bolts , Remove The Grooved Plate Of The Mud Mixture On The Vacuum Filter And Repair It With The New Plate Provided , Remove The Grooved Plate Of The Filtrate Tank Located Below The Vacuum Filter Installation The Plate Provided And Perform A Trial. , Repairing The Weak Parts Of Juice And Mud With Dry Box Of Clarifier And Making All The Connections. , Patch The Weak Shell Of The Burning Chamber Of The Film Type Sulfur Furnace With The Plate Provided For A Length Of Approximately 5 Feet From The Bottom And Give A Satisfactory Trial. , Patch The Weak And Rotten Platforms Of Both Vacuum Filters With A New Burner From The Provided Plate. , Removing The So2 Chamber Inside The Last Cooler Of The Film Type Sulfur Furnace And Installing A New One Using The Provided 10 Mm Ms Plate And Making All Connections. , Repairing The Damaged Clear Juice Bottles Near The Clear Juice Pumps And Making All The Connections And Giving Satisfactory Trial. , Cut Out And Remove All Rotten Mud Scrapers Inside The Door Clarifier And Installation The Provided Plates And Belts According To Size And Give A Satisfactory Trial. , Coat And Remove The Weak Mud Boot Plates In Each Compartment Of The Clarifier And Installation The Provided New Plates. , Repairing The Weak Parts Of The Agitator Fitted On The Vacuum Filter And Giving Satisfactory Trial. , Removing, Clarification And Evaporator Fabrication Works, Clarification And Evaporator in Uttar Pradesh.

4.

Can contractors located outside the local region participate in this bid?

Eligibility for outstation bidders depends entirely on the terms set inside the document for Tender For Clarification And Evaporator Fabrication Works Removing The Calandria Of The Evaporator And Installing And Fitting A New Calandria Of 650 M Square Heating Surface And Installing All The Pipe Lines Valves And Accessories In Their Place , Replacing An Old And Worn Out Grand Consultant Juice Plaza Condensate Syrup Bottle With An 8 10 Mm Msc Plate By Connecting All Connections. , The Worn Out Umbrella Plate In The Vapor Cell Semi Concentrator Was Removed And The Plate Was Repaired And Replaced With Plastic , Replacing The Umbrella In The Wide Body Vapor Cell Semi Concentrator With A Dated And 6 8 Mm Msc Plate And Conducting A Trial. , Removing The Neck Selvage Of The Quad Body Semi Container And Replacing It With A New 8 10 Mm Ms Plate And Testing It. , Removing The Neck Selvage Of The Quad Body Semi Container And Repairing It With The Provided Plate And Testing It. , Cutting Out The Weakened Roof Of The Quad Body And Replacing It With A 12mm Plate Provided And Testing It. , Cutting Out The Weakened Part Of The Semi Capacitor Vapor Cell Quad Body Cell And Replacing It With A 10 12mm Plate Provided And Testing It For A Satisfactory Leak Proofing Test. , Removal Of The Weak Part Of The Exhaust Pipeline Going To The Semi Condenser Vapor Shell And Fitting A New 800 Mm Diameter Pipeline Using The Provided 8 10 Mm Plate In Its Place. , Cutting Out The Worn Partition Plates Of The Top And Bottom Headers Of The Juice Heater And Replacing Them With The Provided 8 10 Mm Plate Arranging For Fitting The Rubber Strip , Installing And Strengthening The Umbrella Fitted To The Vapor Shell Semiconductor Quad Body And Conducting A Satisfactory Trial. , Removing The Weak Intermediate First Vapor Second Vapor Pipes Of The Quad Bodies And Constructing New Ones With A Diameter Of 500 650 Mm Using An 8 10 Mm Plate And Conducting A Satisfactory Trial. , Removing The Weakened Intermediate First Vapor Second Vapor Pipes Of The Quad Bodies And Installing New Ones With A Diameter Of 700 850 Mm From 8 10 Mm Plates And Conducting A Satisfactory Trial. , Dismantle Fabricate And Erect A 600 800 Mm Band And Conduct A Satisfactory Trial. , Dismantle Fabricate And Erect A 900 1100 Mm Band And Conduct A Satisfactory Trial. , Remove The Steam Valve From The Juice Heater And Installation A New Right Angle Valve Size 400 500 Mm With The Corresponding Pipe Connection Modifications And Conduct A Trial. , Cut And Remove The Double Beat Valve From The Juice Heater And Installation A New Double Beat Valve Size 8 Diameter And Conduct A Trial , Remove The Intermediate Coolers From The Film Type Sulfur Furnaces And Installation Them Using The Provided Pipe Plate And Conduct A Trial. , Installation The Sublimation Pipes From The Satvik Type Sulfur Furnaces Using The Provided Pipe Or A New One And Conduct A Trial. , Remove The Empty Filtrate Bottle From The Vacuum Filter And Installation A New Filtrate Bottle Using An 8 10 Mm Ms Plate And Conduct A Trial. Make All Connections And Conduct A Trial. , Removing The Filtrate Bottle Plate Of The Vacuum Filter And Repairing It With The Provided Plate And Giving It A Trial. , Removing The Filtrate Plate Of The Vacuum Filter Tray And Repairing It With The Provided Plate. , Cutting And Removing The Neck Shell Of The Lime Slaker At The Lime Station And Replacing It With A New One Using The Provided Plate And Giving It A Trial. , Creating The Melter From The Satvik Sulfur Furnace With A New 8 10 Mm Plate And Giving It A Satisfactory Trial By Installing The Steam Coil. , Removing The Worn Out Coils In The Melters Of The Satvik Sulfur Furnace Replacing Them With New Ones And Conducting Hydraulic Testing And Giving A Satisfactory Trial. , Removing The Worn Out Plates Of The Vacuum Filter Condensers Replacing Them With New Ones And Giving A Satisfactory Trial , Removing The Damaged Weak Steam Coils In The Film Tine Sulfur Melters Replacing Them With New Ones And Conducting Hydraulic Testing And Giving A Satisfactory Trial , Renovate And Installation A New So2 Chamber Inside The Coolers Of The Satvik Sulfur Furnace And Conduct A Trial. , Remove The Old Corroded So2 Gas Line At The Sulfur Furnace Station And Installation The New Seamless Ms Line With Flanges Tightening The Joints And Bolts , Remove The Grooved Plate Of The Mud Mixture On The Vacuum Filter And Repair It With The New Plate Provided , Remove The Grooved Plate Of The Filtrate Tank Located Below The Vacuum Filter Installation The Plate Provided And Perform A Trial. , Repairing The Weak Parts Of Juice And Mud With Dry Box Of Clarifier And Making All The Connections. , Patch The Weak Shell Of The Burning Chamber Of The Film Type Sulfur Furnace With The Plate Provided For A Length Of Approximately 5 Feet From The Bottom And Give A Satisfactory Trial. , Patch The Weak And Rotten Platforms Of Both Vacuum Filters With A New Burner From The Provided Plate. , Removing The So2 Chamber Inside The Last Cooler Of The Film Type Sulfur Furnace And Installing A New One Using The Provided 10 Mm Ms Plate And Making All Connections. , Repairing The Damaged Clear Juice Bottles Near The Clear Juice Pumps And Making All The Connections And Giving Satisfactory Trial. , Cut Out And Remove All Rotten Mud Scrapers Inside The Door Clarifier And Installation The Provided Plates And Belts According To Size And Give A Satisfactory Trial. , Coat And Remove The Weak Mud Boot Plates In Each Compartment Of The Clarifier And Installation The Provided New Plates. , Repairing The Weak Parts Of The Agitator Fitted On The Vacuum Filter And Giving Satisfactory Trial. , Removing, Clarification And Evaporator Fabrication Works, Clarification And Evaporator. While many public sector projects allow national competitive bidding, certain localized works require local offices or specific registration metrics in Sarsawa.

5.

Do I need an active GeM Portal registration to apply for this work?

If this procurement is routed through the central marketplace, an active GeM Seller ID is mandatory to supply vacuum filter,juice heater,rubber strip,steam valve,angle valve,pipe lines,ms plate,so2 gas,bolts items. Tender18 offers complete assistance for brand cataloging, profile creation, and vendor assessment required officially by Uttar Pradesh Cooperative Sugar Factories Federation Ltd UPCSFFL

6.

What are the primary legal documents required to submit a valid bid?

To register an eligible bid for these vacuum filter,juice heater,rubber strip,steam valve,angle valve,pipe lines,ms plate,so2 gas,bolts contracts, companies must prepare their core compliance documents. Vendors operating across Uttar Pradesh must ensure they possess a valid GST registration, permanent account number (PAN), and active Class-3 Digital Signature Certificates.

7.

What products or services are required for this active work?

This public procurement cycle is specifically looking for qualified vendors and suppliers who can provide high-quality vacuum filter,juice heater,rubber strip,steam valve,angle valve,pipe lines,ms plate,so2 gas,bolts solutions. The operational execution, delivery, and deployment of these materials must be managed locally within the Sarsawa region.

8.

Where can I review the estimated cost or budget details for this Tender?

The estimated project cost and budget thresholds can be reviewed directly inside the tender document. Bidders can analyze these qualification files to check if their firm meets the financial capability criteria specified for Tender For Clarification And Evaporator Fabrication Works Removing The Calandria Of The Evaporator And Installing And Fitting A New Calandria Of 650 M Square Heating Surface And Installing All The Pipe Lines Valves And Accessories In Their Place , Replacing An Old And Worn Out Grand Consultant Juice Plaza Condensate Syrup Bottle With An 8 10 Mm Msc Plate By Connecting All Connections. , The Worn Out Umbrella Plate In The Vapor Cell Semi Concentrator Was Removed And The Plate Was Repaired And Replaced With Plastic , Replacing The Umbrella In The Wide Body Vapor Cell Semi Concentrator With A Dated And 6 8 Mm Msc Plate And Conducting A Trial. , Removing The Neck Selvage Of The Quad Body Semi Container And Replacing It With A New 8 10 Mm Ms Plate And Testing It. , Removing The Neck Selvage Of The Quad Body Semi Container And Repairing It With The Provided Plate And Testing It. , Cutting Out The Weakened Roof Of The Quad Body And Replacing It With A 12mm Plate Provided And Testing It. , Cutting Out The Weakened Part Of The Semi Capacitor Vapor Cell Quad Body Cell And Replacing It With A 10 12mm Plate Provided And Testing It For A Satisfactory Leak Proofing Test. , Removal Of The Weak Part Of The Exhaust Pipeline Going To The Semi Condenser Vapor Shell And Fitting A New 800 Mm Diameter Pipeline Using The Provided 8 10 Mm Plate In Its Place. , Cutting Out The Worn Partition Plates Of The Top And Bottom Headers Of The Juice Heater And Replacing Them With The Provided 8 10 Mm Plate Arranging For Fitting The Rubber Strip , Installing And Strengthening The Umbrella Fitted To The Vapor Shell Semiconductor Quad Body And Conducting A Satisfactory Trial. , Removing The Weak Intermediate First Vapor Second Vapor Pipes Of The Quad Bodies And Constructing New Ones With A Diameter Of 500 650 Mm Using An 8 10 Mm Plate And Conducting A Satisfactory Trial. , Removing The Weakened Intermediate First Vapor Second Vapor Pipes Of The Quad Bodies And Installing New Ones With A Diameter Of 700 850 Mm From 8 10 Mm Plates And Conducting A Satisfactory Trial. , Dismantle Fabricate And Erect A 600 800 Mm Band And Conduct A Satisfactory Trial. , Dismantle Fabricate And Erect A 900 1100 Mm Band And Conduct A Satisfactory Trial. , Remove The Steam Valve From The Juice Heater And Installation A New Right Angle Valve Size 400 500 Mm With The Corresponding Pipe Connection Modifications And Conduct A Trial. , Cut And Remove The Double Beat Valve From The Juice Heater And Installation A New Double Beat Valve Size 8 Diameter And Conduct A Trial , Remove The Intermediate Coolers From The Film Type Sulfur Furnaces And Installation Them Using The Provided Pipe Plate And Conduct A Trial. , Installation The Sublimation Pipes From The Satvik Type Sulfur Furnaces Using The Provided Pipe Or A New One And Conduct A Trial. , Remove The Empty Filtrate Bottle From The Vacuum Filter And Installation A New Filtrate Bottle Using An 8 10 Mm Ms Plate And Conduct A Trial. Make All Connections And Conduct A Trial. , Removing The Filtrate Bottle Plate Of The Vacuum Filter And Repairing It With The Provided Plate And Giving It A Trial. , Removing The Filtrate Plate Of The Vacuum Filter Tray And Repairing It With The Provided Plate. , Cutting And Removing The Neck Shell Of The Lime Slaker At The Lime Station And Replacing It With A New One Using The Provided Plate And Giving It A Trial. , Creating The Melter From The Satvik Sulfur Furnace With A New 8 10 Mm Plate And Giving It A Satisfactory Trial By Installing The Steam Coil. , Removing The Worn Out Coils In The Melters Of The Satvik Sulfur Furnace Replacing Them With New Ones And Conducting Hydraulic Testing And Giving A Satisfactory Trial. , Removing The Worn Out Plates Of The Vacuum Filter Condensers Replacing Them With New Ones And Giving A Satisfactory Trial , Removing The Damaged Weak Steam Coils In The Film Tine Sulfur Melters Replacing Them With New Ones And Conducting Hydraulic Testing And Giving A Satisfactory Trial , Renovate And Installation A New So2 Chamber Inside The Coolers Of The Satvik Sulfur Furnace And Conduct A Trial. , Remove The Old Corroded So2 Gas Line At The Sulfur Furnace Station And Installation The New Seamless Ms Line With Flanges Tightening The Joints And Bolts , Remove The Grooved Plate Of The Mud Mixture On The Vacuum Filter And Repair It With The New Plate Provided , Remove The Grooved Plate Of The Filtrate Tank Located Below The Vacuum Filter Installation The Plate Provided And Perform A Trial. , Repairing The Weak Parts Of Juice And Mud With Dry Box Of Clarifier And Making All The Connections. , Patch The Weak Shell Of The Burning Chamber Of The Film Type Sulfur Furnace With The Plate Provided For A Length Of Approximately 5 Feet From The Bottom And Give A Satisfactory Trial. , Patch The Weak And Rotten Platforms Of Both Vacuum Filters With A New Burner From The Provided Plate. , Removing The So2 Chamber Inside The Last Cooler Of The Film Type Sulfur Furnace And Installing A New One Using The Provided 10 Mm Ms Plate And Making All Connections. , Repairing The Damaged Clear Juice Bottles Near The Clear Juice Pumps And Making All The Connections And Giving Satisfactory Trial. , Cut Out And Remove All Rotten Mud Scrapers Inside The Door Clarifier And Installation The Provided Plates And Belts According To Size And Give A Satisfactory Trial. , Coat And Remove The Weak Mud Boot Plates In Each Compartment Of The Clarifier And Installation The Provided New Plates. , Repairing The Weak Parts Of The Agitator Fitted On The Vacuum Filter And Giving Satisfactory Trial. , Removing, Clarification And Evaporator Fabrication Works, Clarification And Evaporator by Uttar Pradesh Cooperative Sugar Factories Federation Ltd UPCSFFL

9.

How can I download the official BOQ file for this opportunity?

You can download the commercial Bill of Quantities (BOQ) spreadsheet directly using the secure link provided on this page. The BOQ file contains the item descriptions and rate filling forms officially validated for Tender For Clarification And Evaporator Fabrication Works Removing The Calandria Of The Evaporator And Installing And Fitting A New Calandria Of 650 M Square Heating Surface And Installing All The Pipe Lines Valves And Accessories In Their Place , Replacing An Old And Worn Out Grand Consultant Juice Plaza Condensate Syrup Bottle With An 8 10 Mm Msc Plate By Connecting All Connections. , The Worn Out Umbrella Plate In The Vapor Cell Semi Concentrator Was Removed And The Plate Was Repaired And Replaced With Plastic , Replacing The Umbrella In The Wide Body Vapor Cell Semi Concentrator With A Dated And 6 8 Mm Msc Plate And Conducting A Trial. , Removing The Neck Selvage Of The Quad Body Semi Container And Replacing It With A New 8 10 Mm Ms Plate And Testing It. , Removing The Neck Selvage Of The Quad Body Semi Container And Repairing It With The Provided Plate And Testing It. , Cutting Out The Weakened Roof Of The Quad Body And Replacing It With A 12mm Plate Provided And Testing It. , Cutting Out The Weakened Part Of The Semi Capacitor Vapor Cell Quad Body Cell And Replacing It With A 10 12mm Plate Provided And Testing It For A Satisfactory Leak Proofing Test. , Removal Of The Weak Part Of The Exhaust Pipeline Going To The Semi Condenser Vapor Shell And Fitting A New 800 Mm Diameter Pipeline Using The Provided 8 10 Mm Plate In Its Place. , Cutting Out The Worn Partition Plates Of The Top And Bottom Headers Of The Juice Heater And Replacing Them With The Provided 8 10 Mm Plate Arranging For Fitting The Rubber Strip , Installing And Strengthening The Umbrella Fitted To The Vapor Shell Semiconductor Quad Body And Conducting A Satisfactory Trial. , Removing The Weak Intermediate First Vapor Second Vapor Pipes Of The Quad Bodies And Constructing New Ones With A Diameter Of 500 650 Mm Using An 8 10 Mm Plate And Conducting A Satisfactory Trial. , Removing The Weakened Intermediate First Vapor Second Vapor Pipes Of The Quad Bodies And Installing New Ones With A Diameter Of 700 850 Mm From 8 10 Mm Plates And Conducting A Satisfactory Trial. , Dismantle Fabricate And Erect A 600 800 Mm Band And Conduct A Satisfactory Trial. , Dismantle Fabricate And Erect A 900 1100 Mm Band And Conduct A Satisfactory Trial. , Remove The Steam Valve From The Juice Heater And Installation A New Right Angle Valve Size 400 500 Mm With The Corresponding Pipe Connection Modifications And Conduct A Trial. , Cut And Remove The Double Beat Valve From The Juice Heater And Installation A New Double Beat Valve Size 8 Diameter And Conduct A Trial , Remove The Intermediate Coolers From The Film Type Sulfur Furnaces And Installation Them Using The Provided Pipe Plate And Conduct A Trial. , Installation The Sublimation Pipes From The Satvik Type Sulfur Furnaces Using The Provided Pipe Or A New One And Conduct A Trial. , Remove The Empty Filtrate Bottle From The Vacuum Filter And Installation A New Filtrate Bottle Using An 8 10 Mm Ms Plate And Conduct A Trial. Make All Connections And Conduct A Trial. , Removing The Filtrate Bottle Plate Of The Vacuum Filter And Repairing It With The Provided Plate And Giving It A Trial. , Removing The Filtrate Plate Of The Vacuum Filter Tray And Repairing It With The Provided Plate. , Cutting And Removing The Neck Shell Of The Lime Slaker At The Lime Station And Replacing It With A New One Using The Provided Plate And Giving It A Trial. , Creating The Melter From The Satvik Sulfur Furnace With A New 8 10 Mm Plate And Giving It A Satisfactory Trial By Installing The Steam Coil. , Removing The Worn Out Coils In The Melters Of The Satvik Sulfur Furnace Replacing Them With New Ones And Conducting Hydraulic Testing And Giving A Satisfactory Trial. , Removing The Worn Out Plates Of The Vacuum Filter Condensers Replacing Them With New Ones And Giving A Satisfactory Trial , Removing The Damaged Weak Steam Coils In The Film Tine Sulfur Melters Replacing Them With New Ones And Conducting Hydraulic Testing And Giving A Satisfactory Trial , Renovate And Installation A New So2 Chamber Inside The Coolers Of The Satvik Sulfur Furnace And Conduct A Trial. , Remove The Old Corroded So2 Gas Line At The Sulfur Furnace Station And Installation The New Seamless Ms Line With Flanges Tightening The Joints And Bolts , Remove The Grooved Plate Of The Mud Mixture On The Vacuum Filter And Repair It With The New Plate Provided , Remove The Grooved Plate Of The Filtrate Tank Located Below The Vacuum Filter Installation The Plate Provided And Perform A Trial. , Repairing The Weak Parts Of Juice And Mud With Dry Box Of Clarifier And Making All The Connections. , Patch The Weak Shell Of The Burning Chamber Of The Film Type Sulfur Furnace With The Plate Provided For A Length Of Approximately 5 Feet From The Bottom And Give A Satisfactory Trial. , Patch The Weak And Rotten Platforms Of Both Vacuum Filters With A New Burner From The Provided Plate. , Removing The So2 Chamber Inside The Last Cooler Of The Film Type Sulfur Furnace And Installing A New One Using The Provided 10 Mm Ms Plate And Making All Connections. , Repairing The Damaged Clear Juice Bottles Near The Clear Juice Pumps And Making All The Connections And Giving Satisfactory Trial. , Cut Out And Remove All Rotten Mud Scrapers Inside The Door Clarifier And Installation The Provided Plates And Belts According To Size And Give A Satisfactory Trial. , Coat And Remove The Weak Mud Boot Plates In Each Compartment Of The Clarifier And Installation The Provided New Plates. , Repairing The Weak Parts Of The Agitator Fitted On The Vacuum Filter And Giving Satisfactory Trial. , Removing, Clarification And Evaporator Fabrication Works, Clarification And Evaporator within the Uttar Pradesh jurisdiction

10.

How can I find the submission closing date for this contract?

The official timeline and deadline details for Tender For Clarification And Evaporator Fabrication Works Removing The Calandria Of The Evaporator And Installing And Fitting A New Calandria Of 650 M Square Heating Surface And Installing All The Pipe Lines Valves And Accessories In Their Place , Replacing An Old And Worn Out Grand Consultant Juice Plaza Condensate Syrup Bottle With An 8 10 Mm Msc Plate By Connecting All Connections. , The Worn Out Umbrella Plate In The Vapor Cell Semi Concentrator Was Removed And The Plate Was Repaired And Replaced With Plastic , Replacing The Umbrella In The Wide Body Vapor Cell Semi Concentrator With A Dated And 6 8 Mm Msc Plate And Conducting A Trial. , Removing The Neck Selvage Of The Quad Body Semi Container And Replacing It With A New 8 10 Mm Ms Plate And Testing It. , Removing The Neck Selvage Of The Quad Body Semi Container And Repairing It With The Provided Plate And Testing It. , Cutting Out The Weakened Roof Of The Quad Body And Replacing It With A 12mm Plate Provided And Testing It. , Cutting Out The Weakened Part Of The Semi Capacitor Vapor Cell Quad Body Cell And Replacing It With A 10 12mm Plate Provided And Testing It For A Satisfactory Leak Proofing Test. , Removal Of The Weak Part Of The Exhaust Pipeline Going To The Semi Condenser Vapor Shell And Fitting A New 800 Mm Diameter Pipeline Using The Provided 8 10 Mm Plate In Its Place. , Cutting Out The Worn Partition Plates Of The Top And Bottom Headers Of The Juice Heater And Replacing Them With The Provided 8 10 Mm Plate Arranging For Fitting The Rubber Strip , Installing And Strengthening The Umbrella Fitted To The Vapor Shell Semiconductor Quad Body And Conducting A Satisfactory Trial. , Removing The Weak Intermediate First Vapor Second Vapor Pipes Of The Quad Bodies And Constructing New Ones With A Diameter Of 500 650 Mm Using An 8 10 Mm Plate And Conducting A Satisfactory Trial. , Removing The Weakened Intermediate First Vapor Second Vapor Pipes Of The Quad Bodies And Installing New Ones With A Diameter Of 700 850 Mm From 8 10 Mm Plates And Conducting A Satisfactory Trial. , Dismantle Fabricate And Erect A 600 800 Mm Band And Conduct A Satisfactory Trial. , Dismantle Fabricate And Erect A 900 1100 Mm Band And Conduct A Satisfactory Trial. , Remove The Steam Valve From The Juice Heater And Installation A New Right Angle Valve Size 400 500 Mm With The Corresponding Pipe Connection Modifications And Conduct A Trial. , Cut And Remove The Double Beat Valve From The Juice Heater And Installation A New Double Beat Valve Size 8 Diameter And Conduct A Trial , Remove The Intermediate Coolers From The Film Type Sulfur Furnaces And Installation Them Using The Provided Pipe Plate And Conduct A Trial. , Installation The Sublimation Pipes From The Satvik Type Sulfur Furnaces Using The Provided Pipe Or A New One And Conduct A Trial. , Remove The Empty Filtrate Bottle From The Vacuum Filter And Installation A New Filtrate Bottle Using An 8 10 Mm Ms Plate And Conduct A Trial. Make All Connections And Conduct A Trial. , Removing The Filtrate Bottle Plate Of The Vacuum Filter And Repairing It With The Provided Plate And Giving It A Trial. , Removing The Filtrate Plate Of The Vacuum Filter Tray And Repairing It With The Provided Plate. , Cutting And Removing The Neck Shell Of The Lime Slaker At The Lime Station And Replacing It With A New One Using The Provided Plate And Giving It A Trial. , Creating The Melter From The Satvik Sulfur Furnace With A New 8 10 Mm Plate And Giving It A Satisfactory Trial By Installing The Steam Coil. , Removing The Worn Out Coils In The Melters Of The Satvik Sulfur Furnace Replacing Them With New Ones And Conducting Hydraulic Testing And Giving A Satisfactory Trial. , Removing The Worn Out Plates Of The Vacuum Filter Condensers Replacing Them With New Ones And Giving A Satisfactory Trial , Removing The Damaged Weak Steam Coils In The Film Tine Sulfur Melters Replacing Them With New Ones And Conducting Hydraulic Testing And Giving A Satisfactory Trial , Renovate And Installation A New So2 Chamber Inside The Coolers Of The Satvik Sulfur Furnace And Conduct A Trial. , Remove The Old Corroded So2 Gas Line At The Sulfur Furnace Station And Installation The New Seamless Ms Line With Flanges Tightening The Joints And Bolts , Remove The Grooved Plate Of The Mud Mixture On The Vacuum Filter And Repair It With The New Plate Provided , Remove The Grooved Plate Of The Filtrate Tank Located Below The Vacuum Filter Installation The Plate Provided And Perform A Trial. , Repairing The Weak Parts Of Juice And Mud With Dry Box Of Clarifier And Making All The Connections. , Patch The Weak Shell Of The Burning Chamber Of The Film Type Sulfur Furnace With The Plate Provided For A Length Of Approximately 5 Feet From The Bottom And Give A Satisfactory Trial. , Patch The Weak And Rotten Platforms Of Both Vacuum Filters With A New Burner From The Provided Plate. , Removing The So2 Chamber Inside The Last Cooler Of The Film Type Sulfur Furnace And Installing A New One Using The Provided 10 Mm Ms Plate And Making All Connections. , Repairing The Damaged Clear Juice Bottles Near The Clear Juice Pumps And Making All The Connections And Giving Satisfactory Trial. , Cut Out And Remove All Rotten Mud Scrapers Inside The Door Clarifier And Installation The Provided Plates And Belts According To Size And Give A Satisfactory Trial. , Coat And Remove The Weak Mud Boot Plates In Each Compartment Of The Clarifier And Installation The Provided New Plates. , Repairing The Weak Parts Of The Agitator Fitted On The Vacuum Filter And Giving Satisfactory Trial. , Removing, Clarification And Evaporator Fabrication Works, Clarification And Evaporator are available inside the detailed notification files. Bidders planning to target this contract in Sarsawa should check the official portal schedule early to complete their online technical and financial submission well before the closing hours.

Get Expert Tender Bidding Support

Looking For Complete Tender Bidding Consultancy? Our Technical Experts Will Help You Prepare And Submit Your Tender Successfully.

Call Our Expert: +91 7069661818
Your Information Is 100% Secure & Confidential