Search Tenders
Filters
Reset All
Tender Status
T18 Ref No
All States
All Cities
All Agencies
Tender ID
Due Date
Tender Value
Tender Source (GeM, Cppp & Others)
Tender Type

5Latest Wax injection machine Tenders List

Latest Wax injection machine Tenders in India – Verified Leads & Real-Time Insights by Tender18

Finding the right Wax injection machine tenders in India’s competitive e-procurement ecosystem requires more than just access—it demands accurate data, real-time monitoring, and expert analysis.

At Tender18 Infotech Private Limited, we bring deep industry experience in government procurement to help businesses identify, evaluate, and win Wax injection machine tenders efficiently. With a centralized platform aggregating 1100+ live tenders, we provide a single, trusted source for opportunities from central, state, and PSU departments.


Real-Time Wax injection machine Tender Intelligence & Monitoring

Our advanced dashboard delivers actionable insights and structured tender data, enabling you to make faster and smarter bidding decisions.

We categorize Wax injection machine tenders into:

  • Supply Tenders – BOQs and specifications sourced from GeM and PSUs
  • Service Tenders – NITs and scope of work from CPPP and state portals
  • EPC Projects – Large-scale infrastructure tenders with financial and design data

✔ This structured approach ensures complete transparency and deeper bid analysis before submission.


Comprehensive Sources of Wax injection machine Tenders

Tender18 acts as a centralized gateway by aggregating tenders from trusted and official sources:

  • Central Government Portals – CPPP, NIC, and Government e-Marketplace (GeM)
  • Railways & Transport – IREPS and Metro Rail projects
  • Power & Energy PSUs – NTPC, ONGC, NHPC, PowerGrid
  • Defense & Strategic Sectors – MES and DRDO tenders
  • State e-Procurement Portals – Gujarat, Maharashtra, Tamil Nadu, UP, and more

✔ Every listing is verified and regularly updated to maintain data accuracy and trust.


Step-by-Step Guide to Participate in Wax injection machine Tenders

1. Eligibility & Prequalification

Before bidding, ensure compliance with:

  • Financial turnover requirements (30–50% of tender value)
  • Past experience (2–3 similar projects)
  • Valid solvency certificate

2. Mandatory Documentation Checklist

Prepare the following to avoid disqualification:

  • Digital Signature Certificate (Class 3 DSC)
  • GST, PAN, MSME/Udyam registration
  • EMD (Earnest Money Deposit) or exemption proof
  • Technical bid with execution methodology

3. BOQ Analysis & Financial Bidding

The BOQ (Bill of Quantities) is the most critical component:

  • Analyze item-wise pricing
  • Ensure competitive yet sustainable quotes
  • Avoid underbidding risks (L1 pressure)

✔ Expert analysis can significantly improve your bid success ratio.


Why Tender18 is a Trusted Platform for Wax injection machine Tenders

✔ Proven Expertise in Government Procurement

We combine industry knowledge with practical bidding experience.

✔ Verified & Reliable Data

All Wax injection machine tenders are sourced from official portals and cross-checked for accuracy.

✔ Advanced Filtering Tools

Filter tenders by value, EMD, location, and category for precise targeting.

✔ Corrigendum & Update Tracking

Get instant alerts on deadline changes and specification updates.

✔ Historical Data Insights

Analyze past tender results to understand pricing trends and competition.

✔ End-to-End Bidding Support

From discovery to submission, including GeM onboarding and strategy.


Growth of Wax injection machine Sector in 2026

With the Government of India focusing on digital procurement and infrastructure expansion, the Wax injection machine sector has seen significant growth in e-tendering opportunities.

The rise of GeM-based procurement models like:

  • L1 Purchase
  • Direct Procurement
  • MSME-friendly policies

…has made it easier for startups and SMEs to participate and win contracts


Frequently Asked Questions (SEO Optimized)

How can I get daily Wax injection machine tender alerts?

You can register on Tender18 and select your preferred category. You will receive daily email alerts with all new Wax injection machine tenders.

Is EMD mandatory for all Wax injection machine tenders?

No, MSME and Udyam-registered businesses may get exemptions. Always check the NIT for specific conditions.

What is the difference between a Wax injection machine work tender and supply tender?

A supply tender involves delivering goods, while a work tender includes execution, labor, and project completion.

Can I access private Wax injection machine tenders on Tender18?

Yes, we also track major private sector and EPC tenders along with government opportunities.


Get Expert Support for Wax injection machine Tenders

Tender18 is more than a listing platform—we are your strategic partner in winning tenders.

Our services include:

  • Tender discovery & analysis
  • Documentation support
  • Bid strategy & submission
  • GeM registration & OEM onboarding

📞 Call / WhatsApp: +91 7069661818
🌐 Website: www.tender18.com

Due Date
T18 Ref No : 16239051
Source : GEM Tenders
corrigendum tender for fabrication repairing the condensate tank pump delivery line of the pan 1 , repairing the condensate tank pump delivery line of the pan 2 , repairing the condensate tank pump delivery line of the pan 3 , replacing damaged bypass line band flange of melter 1 , replacing damaged bypass line band flange of melter 2 , replacing damaged bypass line band flange of melter 3 , replace damaged 100 pound 3inch size pipeline from pan no 1 to pan no 6 and give satisfactory trial , replace the weak vapor pipe from pan no 1 to 6 size dia 1 150 m length 30 m 1 , replace the weak vapor pipe from pan no 1 to 6 size dia 1 150 m length 30 m 2 , replace main hole dia 600 mm of pan no 3 sevual with 10 mm thick plate , replace damaged overflow pipeline of bh and cl molasses conditioner of 6inch size 1 , replace damaged overflow pipeline of bh and cl molasses conditioner of 6inch size 2 , replace corroded nipples pipes flanges of 6inch size header on pan no 5 and 6 installation related nipples valves etc and give satisfactory trial , replace damaged ammonia pipeline flange nipple in pan no 4 and 6 1 , replace damaged ammonia pipeline flange nipple in pan no 4 and 6 2 , replace damaged ammonia pipeline flange nipple in pan no 4 and 6 3 , replace damaged ammonia pipeline flange nipple in pan no 4 and 6 4 , replace damaged ammonia pipeline flange nipple in pan no 4 and 6 5 , cut and remove damaged wash-out line installed on the pan and rebuild with supplied pipe and installation it 1 , cut and remove damaged wash-out line installed on the pan and rebuild with supplied pipe and installation it 2 , replace damaged washing pipeline nipple flange band on pan no 6 1 , replace damaged washing pipeline nipple flange band on pan no 6 2 , replace damaged washing pipeline nipple flange band on pan no 6 3 , replace damaged washing pipeline nipple flange band on pan no 6 4 , installation valve in steam line at pan no 2 550 mm 1 , installation valve in steam line at pan no 2 550 mm 2 , installation valve in steam line at pan no 2 550 mm 3 , installation valve in steam line at pan no 2 550 mm 4 , replace nipple and band of a heavy tank 2 , replace nipple and band of a heavy tank 3 , replace nipple and band of a heavy tank 4 , remove clean and reinstall 4inch size syrup line on pan , cut and remove syrup header and fabricate and installation new header , replacing the 6inch size glycol washing line fitted on pan no 1 , replacing nipples of different lines of pan no 6 1 , replacing nipples of different lines of pan no 6 2 , replacing nipples of different lines of pan no 6 3 , replacing nipples of different lines of pan no 6 4 , replacing 10inch size nipples of cut off line of pan no 6 1 , replacing 10inch size nipples of cut off line of pan no 6 2 , replacing 10inch size nipples of cut off line of pan no 6 3 , replacing 10inch size nipples of cut off line of pan no 6 4 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 1 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 2 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 3 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 4 , fabricating m s bed for syrup pump and motor fitting and alignment followed by satisfactory trial , dismantling weak condensate bottle of old set , replacing weak pipeline flange valve and band of old set vertical juice heater 1 , replacing weak pipeline flange valve and band of old set vertical juice heater 2 , replacing weak pipeline flange valve and band of old set vertical juice heater 3 , replacing weak pipeline flange valve and band of old set vertical juice heater 4 , replacing weak pipeline flange valve and band of old set vertical juice heater 5 , replacing weak pipeline of old quad set no 4 1 , replacing weak pipeline of old quad set no 4 2 , replacing weak pipeline of old quad set no 4 3 , replacing weak pipeline of old quad set no 4 4 , replacing weak pipeline of old quad set no 4 5 , dismantling damaged mesh of section pipe located at injection no 2 and 3 and making a new one from given m s plate and fitting it , cutting and discarding old damaged reducer plate of section pipe located at injection no 2 and 3 and remaking the same , fitting water line from overhead to service tank 1 , fitting water line from overhead to service tank 2 , details of work of canti machine no 6 and 7 1 , details of work of canti machine no 6 and 7 2 , details of work of canti machine no 6 and 7 3 , details of work with new pipes from s sugarbin 1 , details of work with new pipes from s sugarbin 2 , details of work with new pipes from s sugarbin 3 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 1 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 2 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 3 , work on hot water line of brown sugar magma 1 , work on hot water line of brown sugar magma 2 , work on hot water line of brown sugar magma 3 , work on hot water line of brown sugar magma 4 , cutting and removing damaged monitor casing and ribs , cutting and removing damaged center shaft and arms inside kcp machines no 1 and 2 bending and fitting new parts with 8 to 10 mm plate , dismantling damaged upper cover part of canty machine no 6 and 7 scrapping fabricating and fitting new cover with 12 mm plate and making all related connections , dismantling damaged part of molasses weighing scale receiving tank and fabricating and fitting new part by bending 8 mm thick, fabrication, fabricate and installation 6inch size nipple, fabricate and installation 6inch size flange, dismantling 6inch size pipeline, installing 6inch size pipeline and giving satisfactory trial, fabricate and installation 6inch size band, replace damaged 100 pound 3inch size pipeline from pan no 1 to pan no 6 and give satisfactory trial, dismantle the weak vapor pipe from pan no 1 to 6, fabricate the weak vapor pipe from pan no 1 to 6, replace main hole dia 600 mm of pan no 3 sevual with 10 mm thick plate, replace damaged overflow pipeline of bh and cl molasses conditioner of 6inch size, replace corroded nipples pipes flanges of 6inch size header on pan no 5 and 6 installation related nipples valves etc and give satisfactory trial, replace 2inch size pipeline, fabricate and installation 2inch size flange, fabricate and installation 2inch size nipple, fabricate and installation 3inch size flange, fabricate and installation 3inch size valve, replace and installation 6inch size pipeline, replace 6inch size pipeline of the above, installation valve in steam line at pan no 2 550 mm, installation flange in steam line at pan no 2 550 mm, installation nipple in steam line at pan no 2 550 mm, fabricate and installation catcher element size 75 x 75 x 8 angle on pan no 4 and 5, replace nipples of the above tank, replace bands of the above tank, replace partition of syrup tank with 10/12 mm thick plate, remove clean and reinstall 4inch size syrup line on pan, cut and remove syrup header and fabricate and installation new header, replacing the 6inch size glycol washing line fitted on pan no 1, replacing nipples of 2inch size line mentioned above, replacing nipples of 4inch size line mentioned above, replacing nipples of 6inch size line mentioned above, replacing nipples of 8inch size line mentioned above, replacing 10inch size nipples of cut off line of pan no 6, replacing 10inch size pipe line, making and fitting 10inch size flange, making and fitting 10inch size band, making and fitting 8inch size band, replacing 4inch size pipe line, making and fitting 4inch size flange, making and fitting 4inch size valve, fabricating m s bed for syrup pump and motor fitting and alignment followed by satisfactory trial, dismantling weak condensate bottle of old set vertical line juice heater and quad body no 4 disposing to scrap yard fabricating all connections using 8/10 mm plates and giving satisfactory vacuum trial, replacing 2inch size pipeline, replacing 6inch size pipeline, making and fitting 2inch size flange, making and fitting 6inch size flange, making and fitting 6inch size band, making and fitting 6inch size valve, dismantling damaged mesh of section pipe located at injection no 2 and 3 and making a new one from given m s plate and fitting it, cutting and discarding old damaged reducer plate of section pipe located at injection no 2 and 3 and remaking the same, fitting mentioned line into service tank, making and fitting 8inch size nipple, dismantling and fitting 6inch size pipeline, dismantling resistance box installed on spray making and fitting new one from given m m plate carrying out proper stay fitting and welding and conducting leak proof trial, dismantling and installing 8inch size pipeline, fabricating and installing 8inch size bands, fabricating and installing 8inch size flanges, dismantling and installing 12inch size pipeline, fabricating and installing 12inch size bands, fabricating and installing 12inch size flanges, dismantling and installing 3inch size pipeline, manufacturing and installing 3inch size nipples, manufacturing and installing 3inch size bands, cutting and removing damaged monitor casing and ribs inside canty no 1 and 2 and kcp machine 1 and 2 patching with 10/12 mm ms plate and giving satisfactory trial 1, cutting and removing damaged center shaft and arms inside kcp machines no 1 and 2 bending and fitting new parts with 8 to 10 mm plate 1, dismantling damaged upper cover part of canty machine no 6 and 7 scrapping fabricating and fitting new cover with 12 mm plate and making all related connections, dismantling damaged part of molasses weighing scale receiving tank and fabricating and fitting new part by bending 8 mm thick plate and depositing scrap in scrap yard, dismantling damaged plate of sugar discharge chute from sugar elevator to sugar grader and fabricating and fitting new plate of 6 mm thickness depositing scrap in scrap yard, modifying sugar chute of grader in dryer house and giving satisfactory trial, dismantling and installing 4inch size pipeline, fabricating and installing 4inch size flanges, manufacturing and installing 4inch size bands, manufacturing and installing 4inch size nipples, removing transit heater installed on c centrifugal machine opening side plate for cleaning and hydraulic servicing reinstalling in place and making all connections, dismantling and installing 2inch size pipeline, fabricating and installing 2inch size flanges, manufacturing and installing 2inch size nipples, manufacturing and installing 2inch size valves, removing old taper of sugar hopper no 1 scrapping it fabricating new one from 3/5 mm ms plate installing and giving satisfactory trial, dismantling and installing 6inch size pipeline, manufacturing and installing 6inch size bands, manufacturing and installing 6inch size flanges, manufacturing and installing 5inch size flanges, manufacturing and installing 5inch size valves, removing damaged/weak top and bottom sugar discharge chute of canty machine no 4 including flange scrapping fabricating new parts with 6 mm ms plate as per suit sample preparing all connections like angle channel etc fitting on side and giving satisfactory trial, installing 2inch flow meter, dismantling the damaged 6inch dia pipeline from primary clarifier to anoxic tank and putting it in scrap yard and installing a new pipeline, installing 4inch size valve/nrv, fabricating 4inch size band, fabricating and installing 2inch size flange, dismantling the damaged 8inch dia pipeline from aeration tank to secondary tank and putting it in scrap yard, dismantling diffusers installed in aeration tank and putting them in scrap yard and replacing the throat part, in sulfate removal plant reaction chamber dismantling corroded 6 mm partition plate putting it in scrap yard and fabricating with new 8 mm plate, dismantling corroded 2inch size treated water outlet line of etp and putting in scrap yard and installing new 3inch size line at the same location, dismantling 800 mm dia exhaust pipe line below turbine with nipple band flange and putting in scrap yard, fabricating 800 mm dia exhaust pipeline below turbine from 12 mm plate by bending and installing at position and providing satisfactory trial, fabricating 800 mm dia exhaust pipeline below vapor cell 950 wag meter from 12 mm plate by bending and installing at position and providing satisfactory trial, fabricating 800 mm dia exhaust pipeline below vapor cell 950 wag meter from 12 mm plate by bending into t shape and installing at position and providing satisfactory trial, fabricating 800 mm dia exhaust pipeline dummy/flange from 12 mm plate by bending and installing at position and providing satisfactory trial, dismantling weak part of semichemiser 1000 wag meter warm saser putting scrap in scrap yard fabricating from 12 mm thick plate by bending and installing with related connections and giving satisfactory trial size dia 3 4 m, dismantling weak parts of old quad body no 2 and 3 20inch vapor pipe putting scrap in scrap yard fabricating from 8 mm thick plate by bending and installing and providing satisfactory trial, dismantling weak parts of vapor pipe 32inch size of vapor cell 1000 wag meter putting scrap in scrap yard fabricating from 8 mm thick plate by bending and installing and providing satisfactory trial, dismantling weak part of 6inch size header of all juice heaters condensate and installing new one, removing all partition plates of juice heater header by cutting straight and circular shapes cleaning tube plate completely and fabricating new circular and straight partition plates from 10/12 mm plate installing and preparing header with ms strips as before applying rubber strips and providing satisfactory trial, cutting out quailons and all related angles fixed in clarifier compartments and refitting after completion of work and providing satisfactory trial, patching inside clarifier with 6/8 mm ms plate, dismantling damaged 8inch size ms pipeline from clarifier clear juice overflow tank to sombox, installing 6inch size ms pipeline from clarifier compartments no 2 and 3 to mud tank and providing satisfactory trial, opening 6inch size valve and installing at designated location, fabricating 6inch size nipple and installing at designated location, fabricating 6inch size flange by cutting plate and dismantling to fit, dismantling 4inch size air pipeline above door including nipple band flange and putting scrap in scrap yard, installing 4inch size air pipeline above door and providing satisfactory trial, dismantling 6inch size ms pipeline of big vacuum filter mud tank overflow line and putting scrap in scrap yard, fitting and trial of 6inch size ms pipeline overflow line of big vacuum filter mud tank at position, fabricating 6inch size band, fabricating 8inch size band, dismantling 8inch size pipeline from big vacuum filter pump to condenser and putting scrap in scrap yard, fitting and trial of 8inch size pipeline from big vacuum filter pump to condenser at position, dismantling 4inch ms pipeline from filter juice header to vibro screen, fitting and trial of 4inch ms pipeline from filter juice header to vibro screen at position, making 4inch size nipple, opening 4inch size valve, installing 4inch size valve at the specified location, cutting 4inch size flange from plate making it and fitting after drilling, dismantling 3inch size pipeline, installing and fitting 3inch size line at position and giving satisfactory trial, making and installing 3inch size t, making and installing 3inch size nipple, cutting 3inch size flange from plate making it and installing, making and installing 3inch size band, dismantling 8inch size clear juice overflow pipeline, installing and fitting 8inch size clear juice overflow pipeline at position and giving satisfactory trial, installing and fitting 6inch size pipeline at position and giving satisfactory trial, making and installing 6inch size band/elbow at specified location, making and installing 6inch size t, dismantling 4inch size pipeline, installing and fitting 4inch size pipeline at position and giving satisfactory trial, making and installing 4inch size band, making and installing 4inch size t, dismantling 10inch size pipeline, installing fitting and trial of 10inch size pipeline at position, making and installing 10inch size t, making and installing 10inch size dummy/flange, dismantling 6inch pipeline, installing fitting and trial of 6inch size pipeline at position, opening and binding 6inch size valve, installing fitting and trial of 4inch size pipeline at position, making and installing 8inch and 6inch size cross, dismantling 4inch size ammonia pipeline of semichemiser quad, installing 4inch size ammonia pipeline of semichemiser quad at position, making 4inch size band, making 4inch size t, making 4inch size flange, dismantling 2inch size pipeline, fixing 2inch size pipeline in position, dismantling new quad no 2 vapor pipe 24inch size vapor pipeline fabricating it by bending with 10 mm thick plate and installing, fabricating and installing 24inch size bends, fabricating and installing 24inch size tees, fabricating and installing 24inch size flange/dummy, dismantling 24inch size pipeline, fitting 24inch size pipeline in position, fabricating and installing 24inch size flange, cutting damaged 6inch syrup pump header fabricating new header and installing along with fitting all related nipples valves etc and conducting satisfactory trial, dismantling bent incoming and outgoing wax and heater cell and partition plate between double beat valve of juice heater/ juice heater header fabricating new one using 12/10 mm plate as before installing and conducting satisfactory trial, dismantling 6inch condensate header of juice heaters and replacing the weak part, fitting 6inch size pipeline in position and conducting satisfactory trial, fabricating and installing 6inch size flange, fabricating and installing 6inch size nipple, fabricating and installing 6inch size tees, dismantling and fitting 6inch size pipeline in position and conducting satisfactory trial
T18 Ref No : 16022210
Source : GEM Tenders
tender for pan no 6 4 , installation valve in steam line at pan no 2 550 mm 1 , installation valve in steam line at pan no 2 550 mm 2 , installation valve in steam line at pan no 2 550 mm 3 , installation valve in steam line at pan no 2 550 mm 4 , replace nipple and band of a heavy tank 2 , replace nipple and band of a heavy tank 3 , replace nipple and band of a heavy tank 4 , remove clean and reinstall 4inch size syrup line on pan , cut and remove syrup header and fabricate and installation new header , replacing the 6inch size glycol washing line fitted on pan no 1 , replacing nipples of different lines of pan no 6 1 , replacing nipples of different lines of pan no 6 2 , replacing nipples of different lines of pan no 6 3 , replacing nipples of different lines of pan no 6 4 , replacing 10inch size nipples of cut off line of pan no 6 1 , replacing 10inch size nipples of cut off line of pan no 6 2 , replacing 10inch size nipples of cut off line of pan no 6 3 , replacing 10inch size nipples of cut off line of pan no 6 4 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 1 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 2 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 3 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 4 , fabricating m s bed for syrup pump and motor fitting and alignment followed by satisfactory trial , dismantling weak condensate bottle of old set , replacing weak pipeline flange valve and band of old set vertical juice heater 1 , replacing weak pipeline flange valve and band of old set vertical juice heater 2 , replacing weak pipeline flange valve and band of old set vertical juice heater 3 , replacing weak pipeline flange valve and band of old set vertical juice heater 4 , replacing weak pipeline flange valve and band of old set vertical juice heater 5 , replacing weak pipeline of old quad set no 4 1 , replacing weak pipeline of old quad set no 4 2 , replacing weak pipeline of old quad set no 4 3 , replacing weak pipeline of old quad set no 4 4 , replacing weak pipeline of old quad set no 4 5 , dismantling damaged mesh of section pipe located at injection no 2 and 3 and making a new one from given m s plate and fitting it , cutting and discarding old damaged reducer plate of section pipe located at injection no 2 and 3 and remaking the same , fitting water line from overhead to service tank 1 , fitting water line from overhead to service tank 2 , details of work of canti machine no 6 and 7 1 , details of work of canti machine no 6 and 7 2 , details of work of canti machine no 6 and 7 3 , details of work with new pipes from s sugarbin 1 , details of work with new pipes from s sugarbin 2 , details of work with new pipes from s sugarbin 3 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 1 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 2 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 3 , work on hot water line of brown sugar magma 1 , work on hot water line of brown sugar magma 2 , work on hot water line of brown sugar magma 3 , work on hot water line of brown sugar magma 4 , cutting and removing damaged monitor casing and ribs , cutting and removing damaged center shaft and arms inside kcp machines no 1 and 2 bending and fitting new parts with 8 to 10 mm plate , dismantling damaged upper cover part of canty machine no 6 and 7 scrapping fabricating and fitting new cover with 12 mm plate and making all related connections , dismantling damaged part of molasses weighing scale receiving tank and fabricating and fitting new part by bending 8 mm thick, fabrication, fabricate and installation 6inch size nipple, fabricate and installation 6inch size flange, dismantling 6inch size pipeline, installing 6inch size pipeline and giving satisfactory trial, fabricate and installation 6inch size band, replace damaged 100 pound 3inch size pipeline from pan no 1 to pan no 6 and give satisfactory trial, dismantle the weak vapor pipe from pan no 1 to 6, fabricate the weak vapor pipe from pan no 1 to 6, replace main hole dia 600 mm of pan no 3 sevual with 10 mm thick plate, replace damaged overflow pipeline of bh and cl molasses conditioner of 6inch size, replace corroded nipples pipes flanges of 6inch size header on pan no 5 and 6 installation related nipples valves etc and give satisfactory trial, replace 2inch size pipeline, fabricate and installation 2inch size flange, fabricate and installation 2inch size nipple, fabricate and installation 3inch size flange, fabricate and installation 3inch size valve, replace and installation 6inch size pipeline, replace 6inch size pipeline of the above, installation valve in steam line at pan no 2 550 mm, installation flange in steam line at pan no 2 550 mm, installation nipple in steam line at pan no 2 550 mm, fabricate and installation catcher element size 75 x 75 x 8 angle on pan no 4 and 5, replace nipples of the above tank, replace bands of the above tank, replace partition of syrup tank with 10/12 mm thick plate, remove clean and reinstall 4inch size syrup line on pan, cut and remove syrup header and fabricate and installation new header, replacing the 6inch size glycol washing line fitted on pan no 1, replacing nipples of 2inch size line mentioned above, replacing nipples of 4inch size line mentioned above, replacing nipples of 6inch size line mentioned above, replacing nipples of 8inch size line mentioned above, replacing 10inch size nipples of cut off line of pan no 6, replacing 10inch size pipe line, making and fitting 10inch size flange, making and fitting 10inch size band, making and fitting 8inch size band, replacing 4inch size pipe line, making and fitting 4inch size flange, making and fitting 4inch size valve, fabricating m s bed for syrup pump and motor fitting and alignment followed by satisfactory trial, dismantling weak condensate bottle of old set vertical line juice heater and quad body no 4 disposing to scrap yard fabricating all connections using 8/10 mm plates and giving satisfactory vacuum trial, replacing 2inch size pipeline, replacing 6inch size pipeline, making and fitting 2inch size flange, making and fitting 6inch size flange, making and fitting 6inch size band, making and fitting 6inch size valve, dismantling damaged mesh of section pipe located at injection no 2 and 3 and making a new one from given m s plate and fitting it, cutting and discarding old damaged reducer plate of section pipe located at injection no 2 and 3 and remaking the same, fitting mentioned line into service tank, making and fitting 8inch size nipple, dismantling and fitting 6inch size pipeline, dismantling resistance box installed on spray making and fitting new one from given m m plate carrying out proper stay fitting and welding and conducting leak proof trial, dismantling and installing 8inch size pipeline, fabricating and installing 8inch size bands, fabricating and installing 8inch size flanges, dismantling and installing 12inch size pipeline, fabricating and installing 12inch size bands, fabricating and installing 12inch size flanges, dismantling and installing 3inch size pipeline, manufacturing and installing 3inch size nipples, manufacturing and installing 3inch size bands, cutting and removing damaged monitor casing and ribs inside canty no 1 and 2 and kcp machine 1 and 2 patching with 10/12 mm ms plate and giving satisfactory trial 1, cutting and removing damaged center shaft and arms inside kcp machines no 1 and 2 bending and fitting new parts with 8 to 10 mm plate 1, dismantling damaged upper cover part of canty machine no 6 and 7 scrapping fabricating and fitting new cover with 12 mm plate and making all related connections, dismantling damaged part of molasses weighing scale receiving tank and fabricating and fitting new part by bending 8 mm thick plate and depositing scrap in scrap yard, dismantling damaged plate of sugar discharge chute from sugar elevator to sugar grader and fabricating and fitting new plate of 6 mm thickness depositing scrap in scrap yard, modifying sugar chute of grader in dryer house and giving satisfactory trial, dismantling and installing 4inch size pipeline, fabricating and installing 4inch size flanges, manufacturing and installing 4inch size bands, manufacturing and installing 4inch size nipples, removing transit heater installed on c centrifugal machine opening side plate for cleaning and hydraulic servicing reinstalling in place and making all connections, dismantling and installing 2inch size pipeline, fabricating and installing 2inch size flanges, manufacturing and installing 2inch size nipples, manufacturing and installing 2inch size valves, removing old taper of sugar hopper no 1 scrapping it fabricating new one from 3/5 mm ms plate installing and giving satisfactory trial, dismantling and installing 6inch size pipeline, manufacturing and installing 6inch size bands, manufacturing and installing 6inch size flanges, manufacturing and installing 5inch size flanges, manufacturing and installing 5inch size valves, removing damaged/weak top and bottom sugar discharge chute of canty machine no 4 including flange scrapping fabricating new parts with 6 mm ms plate as per suit sample preparing all connections like angle channel etc fitting on side and giving satisfactory trial, installing 2inch flow meter, dismantling the damaged 6inch dia pipeline from primary clarifier to anoxic tank and putting it in scrap yard and installing a new pipeline, installing 4inch size valve/nrv, fabricating 4inch size band, fabricating and installing 2inch size flange, dismantling the damaged 8inch dia pipeline from aeration tank to secondary tank and putting it in scrap yard, dismantling diffusers installed in aeration tank and putting them in scrap yard and replacing the throat part, in sulfate removal plant reaction chamber dismantling corroded 6 mm partition plate putting it in scrap yard and fabricating with new 8 mm plate, dismantling corroded 2inch size treated water outlet line of etp and putting in scrap yard and installing new 3inch size line at the same location, dismantling 800 mm dia exhaust pipe line below turbine with nipple band flange and putting in scrap yard, fabricating 800 mm dia exhaust pipeline below turbine from 12 mm plate by bending and installing at position and providing satisfactory trial, fabricating 800 mm dia exhaust pipeline below vapor cell 950 wag meter from 12 mm plate by bending and installing at position and providing satisfactory trial, fabricating 800 mm dia exhaust pipeline below vapor cell 950 wag meter from 12 mm plate by bending into t shape and installing at position and providing satisfactory trial, fabricating 800 mm dia exhaust pipeline dummy/flange from 12 mm plate by bending and installing at position and providing satisfactory trial, dismantling weak part of semichemiser 1000 wag meter warm saser putting scrap in scrap yard fabricating from 12 mm thick plate by bending and installing with related connections and giving satisfactory trial size dia 3 4 m, dismantling weak parts of old quad body no 2 and 3 20inch vapor pipe putting scrap in scrap yard fabricating from 8 mm thick plate by bending and installing and providing satisfactory trial, dismantling weak parts of vapor pipe 32inch size of vapor cell 1000 wag meter putting scrap in scrap yard fabricating from 8 mm thick plate by bending and installing and providing satisfactory trial, dismantling weak part of 6inch size header of all juice heaters condensate and installing new one, removing all partition plates of juice heater header by cutting straight and circular shapes cleaning tube plate completely and fabricating new circular and straight partition plates from 10/12 mm plate installing and preparing header with ms strips as before applying rubber strips and providing satisfactory trial, cutting out quailons and all related angles fixed in clarifier compartments and refitting after completion of work and providing satisfactory trial, patching inside clarifier with 6/8 mm ms plate, dismantling damaged 8inch size ms pipeline from clarifier clear juice overflow tank to sombox, installing 6inch size ms pipeline from clarifier compartments no 2 and 3 to mud tank and providing satisfactory trial, opening 6inch size valve and installing at designated location, fabricating 6inch size nipple and installing at designated location, fabricating 6inch size flange by cutting plate and dismantling to fit, dismantling 4inch size air pipeline above door including nipple band flange and putting scrap in scrap yard, installing 4inch size air pipeline above door and providing satisfactory trial, dismantling 6inch size ms pipeline of big vacuum filter mud tank overflow line and putting scrap in scrap yard, fitting and trial of 6inch size ms pipeline overflow line of big vacuum filter mud tank at position, fabricating 6inch size band, fabricating 8inch size band, dismantling 8inch size pipeline from big vacuum filter pump to condenser and putting scrap in scrap yard, fitting and trial of 8inch size pipeline from big vacuum filter pump to condenser at position, dismantling 4inch ms pipeline from filter juice header to vibro screen, fitting and trial of 4inch ms pipeline from filter juice header to vibro screen at position, making 4inch size nipple, opening 4inch size valve, installing 4inch size valve at the specified location, cutting 4inch size flange from plate making it and fitting after drilling, dismantling 3inch size pipeline, installing and fitting 3inch size line at position and giving satisfactory trial, making and installing 3inch size t, making and installing 3inch size nipple, cutting 3inch size flange from plate making it and installing, making and installing 3inch size band, dismantling 8inch size clear juice overflow pipeline, installing and fitting 8inch size clear juice overflow pipeline at position and giving satisfactory trial, installing and fitting 6inch size pipeline at position and giving satisfactory trial, making and installing 6inch size band/elbow at specified location, making and installing 6inch size t, dismantling 4inch size pipeline, installing and fitting 4inch size pipeline at position and giving satisfactory trial, making and installing 4inch size band, making and installing 4inch size t, dismantling 10inch size pipeline, installing fitting and trial of 10inch size pipeline at position, making and installing 10inch size t, making and installing 10inch size dummy/flange, dismantling 6inch pipeline, installing fitting and trial of 6inch size pipeline at position, opening and binding 6inch size valve, installing fitting and trial of 4inch size pipeline at position, making and installing 8inch and 6inch size cross, dismantling 4inch size ammonia pipeline of semichemiser quad, installing 4inch size ammonia pipeline of semichemiser quad at position, making 4inch size band, making 4inch size t, making 4inch size flange, dismantling 2inch size pipeline, fixing 2inch size pipeline in position, dismantling new quad no 2 vapor pipe 24inch size vapor pipeline fabricating it by bending with 10 mm thick plate and installing, fabricating and installing 24inch size bends, fabricating and installing 24inch size tees, fabricating and installing 24inch size flange/dummy, dismantling 24inch size pipeline, fitting 24inch size pipeline in position, fabricating and installing 24inch size flange, cutting damaged 6inch syrup pump header fabricating new header and installing along with fitting all related nipples valves etc and conducting satisfactory trial, dismantling bent incoming and outgoing wax and heater cell and partition plate between double beat valve of juice heater/ juice heater header fabricating new one using 12/10 mm plate as before installing and conducting satisfactory trial, dismantling 6inch condensate header of juice heaters and replacing the weak part, fitting 6inch size pipeline in position and conducting satisfactory trial, fabricating and installing 6inch size flange, fabricating and installing 6inch size nipple, fabricating and installing 6inch size tees, dismantling and fitting 6inch size pipeline in position and conducting satisfactory trial
T18 Ref No : 16355769
Source : GEM Tenders
corrigendum tender for pan no 6 4 , installation valve in steam line at pan no 2 550 mm 1 , installation valve in steam line at pan no 2 550 mm 2 , installation valve in steam line at pan no 2 550 mm 3 , installation valve in steam line at pan no 2 550 mm 4 , replace nipple and band of a heavy tank 2 , replace nipple and band of a heavy tank 3 , replace nipple and band of a heavy tank 4 , remove clean and reinstall 4inch size syrup line on pan , cut and remove syrup header and fabricate and installation new header , replacing the 6inch size glycol washing line fitted on pan no 1 , replacing nipples of different lines of pan no 6 1 , replacing nipples of different lines of pan no 6 2 , replacing nipples of different lines of pan no 6 3 , replacing nipples of different lines of pan no 6 4 , replacing 10inch size nipples of cut off line of pan no 6 1 , replacing 10inch size nipples of cut off line of pan no 6 2 , replacing 10inch size nipples of cut off line of pan no 6 3 , replacing 10inch size nipples of cut off line of pan no 6 4 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 1 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 2 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 3 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 4 , fabricating m s bed for syrup pump and motor fitting and alignment followed by satisfactory trial , dismantling weak condensate bottle of old set , replacing weak pipeline flange valve and band of old set vertical juice heater 1 , replacing weak pipeline flange valve and band of old set vertical juice heater 2 , replacing weak pipeline flange valve and band of old set vertical juice heater 3 , replacing weak pipeline flange valve and band of old set vertical juice heater 4 , replacing weak pipeline flange valve and band of old set vertical juice heater 5 , replacing weak pipeline of old quad set no 4 1 , replacing weak pipeline of old quad set no 4 2 , replacing weak pipeline of old quad set no 4 3 , replacing weak pipeline of old quad set no 4 4 , replacing weak pipeline of old quad set no 4 5 , dismantling damaged mesh of section pipe located at injection no 2 and 3 and making a new one from given m s plate and fitting it , cutting and discarding old damaged reducer plate of section pipe located at injection no 2 and 3 and remaking the same , fitting water line from overhead to service tank 1 , fitting water line from overhead to service tank 2 , details of work of canti machine no 6 and 7 1 , details of work of canti machine no 6 and 7 2 , details of work of canti machine no 6 and 7 3 , details of work with new pipes from s sugarbin 1 , details of work with new pipes from s sugarbin 2 , details of work with new pipes from s sugarbin 3 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 1 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 2 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 3 , work on hot water line of brown sugar magma 1 , work on hot water line of brown sugar magma 2 , work on hot water line of brown sugar magma 3 , work on hot water line of brown sugar magma 4 , cutting and removing damaged monitor casing and ribs , cutting and removing damaged center shaft and arms inside kcp machines no 1 and 2 bending and fitting new parts with 8 to 10 mm plate , dismantling damaged upper cover part of canty machine no 6 and 7 scrapping fabricating and fitting new cover with 12 mm plate and making all related connections , dismantling damaged part of molasses weighing scale receiving tank and fabricating and fitting new part by bending 8 mm thick, fabrication, fabricate and installation 6inch size nipple, fabricate and installation 6inch size flange, dismantling 6inch size pipeline, installing 6inch size pipeline and giving satisfactory trial, fabricate and installation 6inch size band, replace damaged 100 pound 3inch size pipeline from pan no 1 to pan no 6 and give satisfactory trial, dismantle the weak vapor pipe from pan no 1 to 6, fabricate the weak vapor pipe from pan no 1 to 6, replace main hole dia 600 mm of pan no 3 sevual with 10 mm thick plate, replace damaged overflow pipeline of bh and cl molasses conditioner of 6inch size, replace corroded nipples pipes flanges of 6inch size header on pan no 5 and 6 installation related nipples valves etc and give satisfactory trial, replace 2inch size pipeline, fabricate and installation 2inch size flange, fabricate and installation 2inch size nipple, fabricate and installation 3inch size flange, fabricate and installation 3inch size valve, replace and installation 6inch size pipeline, replace 6inch size pipeline of the above, installation valve in steam line at pan no 2 550 mm, installation flange in steam line at pan no 2 550 mm, installation nipple in steam line at pan no 2 550 mm, fabricate and installation catcher element size 75 x 75 x 8 angle on pan no 4 and 5, replace nipples of the above tank, replace bands of the above tank, replace partition of syrup tank with 10/12 mm thick plate, remove clean and reinstall 4inch size syrup line on pan, cut and remove syrup header and fabricate and installation new header, replacing the 6inch size glycol washing line fitted on pan no 1, replacing nipples of 2inch size line mentioned above, replacing nipples of 4inch size line mentioned above, replacing nipples of 6inch size line mentioned above, replacing nipples of 8inch size line mentioned above, replacing 10inch size nipples of cut off line of pan no 6, replacing 10inch size pipe line, making and fitting 10inch size flange, making and fitting 10inch size band, making and fitting 8inch size band, replacing 4inch size pipe line, making and fitting 4inch size flange, making and fitting 4inch size valve, fabricating m s bed for syrup pump and motor fitting and alignment followed by satisfactory trial, dismantling weak condensate bottle of old set vertical line juice heater and quad body no 4 disposing to scrap yard fabricating all connections using 8/10 mm plates and giving satisfactory vacuum trial, replacing 2inch size pipeline, replacing 6inch size pipeline, making and fitting 2inch size flange, making and fitting 6inch size flange, making and fitting 6inch size band, making and fitting 6inch size valve, dismantling damaged mesh of section pipe located at injection no 2 and 3 and making a new one from given m s plate and fitting it, cutting and discarding old damaged reducer plate of section pipe located at injection no 2 and 3 and remaking the same, fitting mentioned line into service tank, making and fitting 8inch size nipple, dismantling and fitting 6inch size pipeline, dismantling resistance box installed on spray making and fitting new one from given m m plate carrying out proper stay fitting and welding and conducting leak proof trial, dismantling and installing 8inch size pipeline, fabricating and installing 8inch size bands, fabricating and installing 8inch size flanges, dismantling and installing 12inch size pipeline, fabricating and installing 12inch size bands, fabricating and installing 12inch size flanges, dismantling and installing 3inch size pipeline, manufacturing and installing 3inch size nipples, manufacturing and installing 3inch size bands, cutting and removing damaged monitor casing and ribs inside canty no 1 and 2 and kcp machine 1 and 2 patching with 10/12 mm ms plate and giving satisfactory trial 1, cutting and removing damaged center shaft and arms inside kcp machines no 1 and 2 bending and fitting new parts with 8 to 10 mm plate 1, dismantling damaged upper cover part of canty machine no 6 and 7 scrapping fabricating and fitting new cover with 12 mm plate and making all related connections, dismantling damaged part of molasses weighing scale receiving tank and fabricating and fitting new part by bending 8 mm thick plate and depositing scrap in scrap yard, dismantling damaged plate of sugar discharge chute from sugar elevator to sugar grader and fabricating and fitting new plate of 6 mm thickness depositing scrap in scrap yard, modifying sugar chute of grader in dryer house and giving satisfactory trial, dismantling and installing 4inch size pipeline, fabricating and installing 4inch size flanges, manufacturing and installing 4inch size bands, manufacturing and installing 4inch size nipples, removing transit heater installed on c centrifugal machine opening side plate for cleaning and hydraulic servicing reinstalling in place and making all connections, dismantling and installing 2inch size pipeline, fabricating and installing 2inch size flanges, manufacturing and installing 2inch size nipples, manufacturing and installing 2inch size valves, removing old taper of sugar hopper no 1 scrapping it fabricating new one from 3/5 mm ms plate installing and giving satisfactory trial, dismantling and installing 6inch size pipeline, manufacturing and installing 6inch size bands, manufacturing and installing 6inch size flanges, manufacturing and installing 5inch size flanges, manufacturing and installing 5inch size valves, removing damaged/weak top and bottom sugar discharge chute of canty machine no 4 including flange scrapping fabricating new parts with 6 mm ms plate as per suit sample preparing all connections like angle channel etc fitting on side and giving satisfactory trial, installing 2inch flow meter, dismantling the damaged 6inch dia pipeline from primary clarifier to anoxic tank and putting it in scrap yard and installing a new pipeline, installing 4inch size valve/nrv, fabricating 4inch size band, fabricating and installing 2inch size flange, dismantling the damaged 8inch dia pipeline from aeration tank to secondary tank and putting it in scrap yard, dismantling diffusers installed in aeration tank and putting them in scrap yard and replacing the throat part, in sulfate removal plant reaction chamber dismantling corroded 6 mm partition plate putting it in scrap yard and fabricating with new 8 mm plate, dismantling corroded 2inch size treated water outlet line of etp and putting in scrap yard and installing new 3inch size line at the same location, dismantling 800 mm dia exhaust pipe line below turbine with nipple band flange and putting in scrap yard, fabricating 800 mm dia exhaust pipeline below turbine from 12 mm plate by bending and installing at position and providing satisfactory trial, fabricating 800 mm dia exhaust pipeline below vapor cell 950 wag meter from 12 mm plate by bending and installing at position and providing satisfactory trial, fabricating 800 mm dia exhaust pipeline below vapor cell 950 wag meter from 12 mm plate by bending into t shape and installing at position and providing satisfactory trial, fabricating 800 mm dia exhaust pipeline dummy/flange from 12 mm plate by bending and installing at position and providing satisfactory trial, dismantling weak part of semichemiser 1000 wag meter warm saser putting scrap in scrap yard fabricating from 12 mm thick plate by bending and installing with related connections and giving satisfactory trial size dia 3 4 m, dismantling weak parts of old quad body no 2 and 3 20inch vapor pipe putting scrap in scrap yard fabricating from 8 mm thick plate by bending and installing and providing satisfactory trial, dismantling weak parts of vapor pipe 32inch size of vapor cell 1000 wag meter putting scrap in scrap yard fabricating from 8 mm thick plate by bending and installing and providing satisfactory trial, dismantling weak part of 6inch size header of all juice heaters condensate and installing new one, removing all partition plates of juice heater header by cutting straight and circular shapes cleaning tube plate completely and fabricating new circular and straight partition plates from 10/12 mm plate installing and preparing header with ms strips as before applying rubber strips and providing satisfactory trial, cutting out quailons and all related angles fixed in clarifier compartments and refitting after completion of work and providing satisfactory trial, patching inside clarifier with 6/8 mm ms plate, dismantling damaged 8inch size ms pipeline from clarifier clear juice overflow tank to sombox, installing 6inch size ms pipeline from clarifier compartments no 2 and 3 to mud tank and providing satisfactory trial, opening 6inch size valve and installing at designated location, fabricating 6inch size nipple and installing at designated location, fabricating 6inch size flange by cutting plate and dismantling to fit, dismantling 4inch size air pipeline above door including nipple band flange and putting scrap in scrap yard, installing 4inch size air pipeline above door and providing satisfactory trial, dismantling 6inch size ms pipeline of big vacuum filter mud tank overflow line and putting scrap in scrap yard, fitting and trial of 6inch size ms pipeline overflow line of big vacuum filter mud tank at position, fabricating 6inch size band, fabricating 8inch size band, dismantling 8inch size pipeline from big vacuum filter pump to condenser and putting scrap in scrap yard, fitting and trial of 8inch size pipeline from big vacuum filter pump to condenser at position, dismantling 4inch ms pipeline from filter juice header to vibro screen, fitting and trial of 4inch ms pipeline from filter juice header to vibro screen at position, making 4inch size nipple, opening 4inch size valve, installing 4inch size valve at the specified location, cutting 4inch size flange from plate making it and fitting after drilling, dismantling 3inch size pipeline, installing and fitting 3inch size line at position and giving satisfactory trial, making and installing 3inch size t, making and installing 3inch size nipple, cutting 3inch size flange from plate making it and installing, making and installing 3inch size band, dismantling 8inch size clear juice overflow pipeline, installing and fitting 8inch size clear juice overflow pipeline at position and giving satisfactory trial, installing and fitting 6inch size pipeline at position and giving satisfactory trial, making and installing 6inch size band/elbow at specified location, making and installing 6inch size t, dismantling 4inch size pipeline, installing and fitting 4inch size pipeline at position and giving satisfactory trial, making and installing 4inch size band, making and installing 4inch size t, dismantling 10inch size pipeline, installing fitting and trial of 10inch size pipeline at position, making and installing 10inch size t, making and installing 10inch size dummy/flange, dismantling 6inch pipeline, installing fitting and trial of 6inch size pipeline at position, opening and binding 6inch size valve, installing fitting and trial of 4inch size pipeline at position, making and installing 8inch and 6inch size cross, dismantling 4inch size ammonia pipeline of semichemiser quad, installing 4inch size ammonia pipeline of semichemiser quad at position, making 4inch size band, making 4inch size t, making 4inch size flange, dismantling 2inch size pipeline, fixing 2inch size pipeline in position, dismantling new quad no 2 vapor pipe 24inch size vapor pipeline fabricating it by bending with 10 mm thick plate and installing, fabricating and installing 24inch size bends, fabricating and installing 24inch size tees, fabricating and installing 24inch size flange/dummy, dismantling 24inch size pipeline, fitting 24inch size pipeline in position, fabricating and installing 24inch size flange, cutting damaged 6inch syrup pump header fabricating new header and installing along with fitting all related nipples valves etc and conducting satisfactory trial, dismantling bent incoming and outgoing wax and heater cell and partition plate between double beat valve of juice heater/ juice heater header fabricating new one using 12/10 mm plate as before installing and conducting satisfactory trial, dismantling 6inch condensate header of juice heaters and replacing the weak part, fitting 6inch size pipeline in position and conducting satisfactory trial, fabricating and installing 6inch size flange, fabricating and installing 6inch size nipple, fabricating and installing 6inch size tees, dismantling and fitting 6inch size pipeline in position and conducting satisfactory trial

Unlock Full Tender Access

Start Free Trial to download documents before deadline

T18 Ref No : 16324690
Source : GEM Tenders
corrigendum tender for fabrication repairing the condensate tank pump delivery line of the pan 1 , repairing the condensate tank pump delivery line of the pan 2 , repairing the condensate tank pump delivery line of the pan 3 , replacing damaged bypass line band flange of melter 1 , replacing damaged bypass line band flange of melter 2 , replacing damaged bypass line band flange of melter 3 , replace damaged 100 pound 3inch size pipeline from pan no 1 to pan no 6 and give satisfactory trial , replace the weak vapor pipe from pan no 1 to 6 size dia 1 150 m length 30 m 1 , replace the weak vapor pipe from pan no 1 to 6 size dia 1 150 m length 30 m 2 , replace main hole dia 600 mm of pan no 3 sevual with 10 mm thick plate , replace damaged overflow pipeline of bh and cl molasses conditioner of 6inch size 1 , replace damaged overflow pipeline of bh and cl molasses conditioner of 6inch size 2 , replace corroded nipples pipes flanges of 6inch size header on pan no 5 and 6 installation related nipples valves etc and give satisfactory trial , replace damaged ammonia pipeline flange nipple in pan no 4 and 6 1 , replace damaged ammonia pipeline flange nipple in pan no 4 and 6 2 , replace damaged ammonia pipeline flange nipple in pan no 4 and 6 3 , replace damaged ammonia pipeline flange nipple in pan no 4 and 6 4 , replace damaged ammonia pipeline flange nipple in pan no 4 and 6 5 , cut and remove damaged wash-out line installed on the pan and rebuild with supplied pipe and installation it 1 , cut and remove damaged wash-out line installed on the pan and rebuild with supplied pipe and installation it 2 , replace damaged washing pipeline nipple flange band on pan no 6 1 , replace damaged washing pipeline nipple flange band on pan no 6 2 , replace damaged washing pipeline nipple flange band on pan no 6 3 , replace damaged washing pipeline nipple flange band on pan no 6 4 , installation valve in steam line at pan no 2 550 mm 1 , installation valve in steam line at pan no 2 550 mm 2 , installation valve in steam line at pan no 2 550 mm 3 , installation valve in steam line at pan no 2 550 mm 4 , replace nipple and band of a heavy tank 2 , replace nipple and band of a heavy tank 3 , replace nipple and band of a heavy tank 4 , remove clean and reinstall 4inch size syrup line on pan , cut and remove syrup header and fabricate and installation new header , replacing the 6inch size glycol washing line fitted on pan no 1 , replacing nipples of different lines of pan no 6 1 , replacing nipples of different lines of pan no 6 2 , replacing nipples of different lines of pan no 6 3 , replacing nipples of different lines of pan no 6 4 , replacing 10inch size nipples of cut off line of pan no 6 1 , replacing 10inch size nipples of cut off line of pan no 6 2 , replacing 10inch size nipples of cut off line of pan no 6 3 , replacing 10inch size nipples of cut off line of pan no 6 4 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 1 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 2 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 3 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 4 , fabricating m s bed for syrup pump and motor fitting and alignment followed by satisfactory trial , dismantling weak condensate bottle of old set , replacing weak pipeline flange valve and band of old set vertical juice heater 1 , replacing weak pipeline flange valve and band of old set vertical juice heater 2 , replacing weak pipeline flange valve and band of old set vertical juice heater 3 , replacing weak pipeline flange valve and band of old set vertical juice heater 4 , replacing weak pipeline flange valve and band of old set vertical juice heater 5 , replacing weak pipeline of old quad set no 4 1 , replacing weak pipeline of old quad set no 4 2 , replacing weak pipeline of old quad set no 4 3 , replacing weak pipeline of old quad set no 4 4 , replacing weak pipeline of old quad set no 4 5 , dismantling damaged mesh of section pipe located at injection no 2 and 3 and making a new one from given m s plate and fitting it , cutting and discarding old damaged reducer plate of section pipe located at injection no 2 and 3 and remaking the same , fitting water line from overhead to service tank 1 , fitting water line from overhead to service tank 2 , details of work of canti machine no 6 and 7 1 , details of work of canti machine no 6 and 7 2 , details of work of canti machine no 6 and 7 3 , details of work with new pipes from s sugarbin 1 , details of work with new pipes from s sugarbin 2 , details of work with new pipes from s sugarbin 3 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 1 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 2 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 3 , work on hot water line of brown sugar magma 1 , work on hot water line of brown sugar magma 2 , work on hot water line of brown sugar magma 3 , work on hot water line of brown sugar magma 4 , cutting and removing damaged monitor casing and ribs , cutting and removing damaged center shaft and arms inside kcp machines no 1 and 2 bending and fitting new parts with 8 to 10 mm plate , dismantling damaged upper cover part of canty machine no 6 and 7 scrapping fabricating and fitting new cover with 12 mm plate and making all related connections , dismantling damaged part of molasses weighing scale receiving tank and fabricating and fitting new part by bending 8 mm thick, fabrication, fabricate and installation 6inch size nipple, fabricate and installation 6inch size flange, dismantling 6inch size pipeline, installing 6inch size pipeline and giving satisfactory trial, fabricate and installation 6inch size band, replace damaged 100 pound 3inch size pipeline from pan no 1 to pan no 6 and give satisfactory trial, dismantle the weak vapor pipe from pan no 1 to 6, fabricate the weak vapor pipe from pan no 1 to 6, replace main hole dia 600 mm of pan no 3 sevual with 10 mm thick plate, replace damaged overflow pipeline of bh and cl molasses conditioner of 6inch size, replace corroded nipples pipes flanges of 6inch size header on pan no 5 and 6 installation related nipples valves etc and give satisfactory trial, replace 2inch size pipeline, fabricate and installation 2inch size flange, fabricate and installation 2inch size nipple, fabricate and installation 3inch size flange, fabricate and installation 3inch size valve, replace and installation 6inch size pipeline, replace 6inch size pipeline of the above, installation valve in steam line at pan no 2 550 mm, installation flange in steam line at pan no 2 550 mm, installation nipple in steam line at pan no 2 550 mm, fabricate and installation catcher element size 75 x 75 x 8 angle on pan no 4 and 5, replace nipples of the above tank, replace bands of the above tank, replace partition of syrup tank with 10/12 mm thick plate, remove clean and reinstall 4inch size syrup line on pan, cut and remove syrup header and fabricate and installation new header, replacing the 6inch size glycol washing line fitted on pan no 1, replacing nipples of 2inch size line mentioned above, replacing nipples of 4inch size line mentioned above, replacing nipples of 6inch size line mentioned above, replacing nipples of 8inch size line mentioned above, replacing 10inch size nipples of cut off line of pan no 6, replacing 10inch size pipe line, making and fitting 10inch size flange, making and fitting 10inch size band, making and fitting 8inch size band, replacing 4inch size pipe line, making and fitting 4inch size flange, making and fitting 4inch size valve, fabricating m s bed for syrup pump and motor fitting and alignment followed by satisfactory trial, dismantling weak condensate bottle of old set vertical line juice heater and quad body no 4 disposing to scrap yard fabricating all connections using 8/10 mm plates and giving satisfactory vacuum trial, replacing 2inch size pipeline, replacing 6inch size pipeline, making and fitting 2inch size flange, making and fitting 6inch size flange, making and fitting 6inch size band, making and fitting 6inch size valve, dismantling damaged mesh of section pipe located at injection no 2 and 3 and making a new one from given m s plate and fitting it, cutting and discarding old damaged reducer plate of section pipe located at injection no 2 and 3 and remaking the same, fitting mentioned line into service tank, making and fitting 8inch size nipple, dismantling and fitting 6inch size pipeline, dismantling resistance box installed on spray making and fitting new one from given m m plate carrying out proper stay fitting and welding and conducting leak proof trial, dismantling and installing 8inch size pipeline, fabricating and installing 8inch size bands, fabricating and installing 8inch size flanges, dismantling and installing 12inch size pipeline, fabricating and installing 12inch size bands, fabricating and installing 12inch size flanges, dismantling and installing 3inch size pipeline, manufacturing and installing 3inch size nipples, manufacturing and installing 3inch size bands, cutting and removing damaged monitor casing and ribs inside canty no 1 and 2 and kcp machine 1 and 2 patching with 10/12 mm ms plate and giving satisfactory trial 1, cutting and removing damaged center shaft and arms inside kcp machines no 1 and 2 bending and fitting new parts with 8 to 10 mm plate 1, dismantling damaged upper cover part of canty machine no 6 and 7 scrapping fabricating and fitting new cover with 12 mm plate and making all related connections, dismantling damaged part of molasses weighing scale receiving tank and fabricating and fitting new part by bending 8 mm thick plate and depositing scrap in scrap yard, dismantling damaged plate of sugar discharge chute from sugar elevator to sugar grader and fabricating and fitting new plate of 6 mm thickness depositing scrap in scrap yard, modifying sugar chute of grader in dryer house and giving satisfactory trial, dismantling and installing 4inch size pipeline, fabricating and installing 4inch size flanges, manufacturing and installing 4inch size bands, manufacturing and installing 4inch size nipples, removing transit heater installed on c centrifugal machine opening side plate for cleaning and hydraulic servicing reinstalling in place and making all connections, dismantling and installing 2inch size pipeline, fabricating and installing 2inch size flanges, manufacturing and installing 2inch size nipples, manufacturing and installing 2inch size valves, removing old taper of sugar hopper no 1 scrapping it fabricating new one from 3/5 mm ms plate installing and giving satisfactory trial, dismantling and installing 6inch size pipeline, manufacturing and installing 6inch size bands, manufacturing and installing 6inch size flanges, manufacturing and installing 5inch size flanges, manufacturing and installing 5inch size valves, removing damaged/weak top and bottom sugar discharge chute of canty machine no 4 including flange scrapping fabricating new parts with 6 mm ms plate as per suit sample preparing all connections like angle channel etc fitting on side and giving satisfactory trial, installing 2inch flow meter, dismantling the damaged 6inch dia pipeline from primary clarifier to anoxic tank and putting it in scrap yard and installing a new pipeline, installing 4inch size valve/nrv, fabricating 4inch size band, fabricating and installing 2inch size flange, dismantling the damaged 8inch dia pipeline from aeration tank to secondary tank and putting it in scrap yard, dismantling diffusers installed in aeration tank and putting them in scrap yard and replacing the throat part, in sulfate removal plant reaction chamber dismantling corroded 6 mm partition plate putting it in scrap yard and fabricating with new 8 mm plate, dismantling corroded 2inch size treated water outlet line of etp and putting in scrap yard and installing new 3inch size line at the same location, dismantling 800 mm dia exhaust pipe line below turbine with nipple band flange and putting in scrap yard, fabricating 800 mm dia exhaust pipeline below turbine from 12 mm plate by bending and installing at position and providing satisfactory trial, fabricating 800 mm dia exhaust pipeline below vapor cell 950 wag meter from 12 mm plate by bending and installing at position and providing satisfactory trial, fabricating 800 mm dia exhaust pipeline below vapor cell 950 wag meter from 12 mm plate by bending into t shape and installing at position and providing satisfactory trial, fabricating 800 mm dia exhaust pipeline dummy/flange from 12 mm plate by bending and installing at position and providing satisfactory trial, dismantling weak part of semichemiser 1000 wag meter warm saser putting scrap in scrap yard fabricating from 12 mm thick plate by bending and installing with related connections and giving satisfactory trial size dia 3 4 m, dismantling weak parts of old quad body no 2 and 3 20inch vapor pipe putting scrap in scrap yard fabricating from 8 mm thick plate by bending and installing and providing satisfactory trial, dismantling weak parts of vapor pipe 32inch size of vapor cell 1000 wag meter putting scrap in scrap yard fabricating from 8 mm thick plate by bending and installing and providing satisfactory trial, dismantling weak part of 6inch size header of all juice heaters condensate and installing new one, removing all partition plates of juice heater header by cutting straight and circular shapes cleaning tube plate completely and fabricating new circular and straight partition plates from 10/12 mm plate installing and preparing header with ms strips as before applying rubber strips and providing satisfactory trial, cutting out quailons and all related angles fixed in clarifier compartments and refitting after completion of work and providing satisfactory trial, patching inside clarifier with 6/8 mm ms plate, dismantling damaged 8inch size ms pipeline from clarifier clear juice overflow tank to sombox, installing 6inch size ms pipeline from clarifier compartments no 2 and 3 to mud tank and providing satisfactory trial, opening 6inch size valve and installing at designated location, fabricating 6inch size nipple and installing at designated location, fabricating 6inch size flange by cutting plate and dismantling to fit, dismantling 4inch size air pipeline above door including nipple band flange and putting scrap in scrap yard, installing 4inch size air pipeline above door and providing satisfactory trial, dismantling 6inch size ms pipeline of big vacuum filter mud tank overflow line and putting scrap in scrap yard, fitting and trial of 6inch size ms pipeline overflow line of big vacuum filter mud tank at position, fabricating 6inch size band, fabricating 8inch size band, dismantling 8inch size pipeline from big vacuum filter pump to condenser and putting scrap in scrap yard, fitting and trial of 8inch size pipeline from big vacuum filter pump to condenser at position, dismantling 4inch ms pipeline from filter juice header to vibro screen, fitting and trial of 4inch ms pipeline from filter juice header to vibro screen at position, making 4inch size nipple, opening 4inch size valve, installing 4inch size valve at the specified location, cutting 4inch size flange from plate making it and fitting after drilling, dismantling 3inch size pipeline, installing and fitting 3inch size line at position and giving satisfactory trial, making and installing 3inch size t, making and installing 3inch size nipple, cutting 3inch size flange from plate making it and installing, making and installing 3inch size band, dismantling 8inch size clear juice overflow pipeline, installing and fitting 8inch size clear juice overflow pipeline at position and giving satisfactory trial, installing and fitting 6inch size pipeline at position and giving satisfactory trial, making and installing 6inch size band/elbow at specified location, making and installing 6inch size t, dismantling 4inch size pipeline, installing and fitting 4inch size pipeline at position and giving satisfactory trial, making and installing 4inch size band, making and installing 4inch size t, dismantling 10inch size pipeline, installing fitting and trial of 10inch size pipeline at position, making and installing 10inch size t, making and installing 10inch size dummy/flange, dismantling 6inch pipeline, installing fitting and trial of 6inch size pipeline at position, opening and binding 6inch size valve, installing fitting and trial of 4inch size pipeline at position, making and installing 8inch and 6inch size cross, dismantling 4inch size ammonia pipeline of semichemiser quad, installing 4inch size ammonia pipeline of semichemiser quad at position, making 4inch size band, making 4inch size t, making 4inch size flange, dismantling 2inch size pipeline, fixing 2inch size pipeline in position, dismantling new quad no 2 vapor pipe 24inch size vapor pipeline fabricating it by bending with 10 mm thick plate and installing, fabricating and installing 24inch size bends, fabricating and installing 24inch size tees, fabricating and installing 24inch size flange/dummy, dismantling 24inch size pipeline, fitting 24inch size pipeline in position, fabricating and installing 24inch size flange, cutting damaged 6inch syrup pump header fabricating new header and installing along with fitting all related nipples valves etc and conducting satisfactory trial, dismantling bent incoming and outgoing wax and heater cell and partition plate between double beat valve of juice heater/ juice heater header fabricating new one using 12/10 mm plate as before installing and conducting satisfactory trial, dismantling 6inch condensate header of juice heaters and replacing the weak part, fitting 6inch size pipeline in position and conducting satisfactory trial, fabricating and installing 6inch size flange, fabricating and installing 6inch size nipple, fabricating and installing 6inch size tees, dismantling and fitting 6inch size pipeline in position and conducting satisfactory trial
T18 Ref No : 16445982
Location : darjeeling , west bengal
Source : GEM Tenders
tender for drug and pharmaceutical items e ifa re 13 benzoyl peroxide 2dot5 w w ointment tube of 20gm , e ifa re 13 calcipotriol 0dot005 heximar , e ifa re 13 clindamycin 1 adapalene 0dot1 aloe allantoin gel tube of 15 gm , e ifa re 13 clindamycin 1 gel 10 gm , e ifa re 13 hydroquinone 2 ointment , e ifa re 13 syringe dispo plastic 3 ml with needle , e ifa re 13 disposable polythene plain drape bed sheet 140cms x 150cms , e ifa re 13 sterile disposable trolly cover green , e ifa re 13 biopsy gun disposable , e ifa re 13 non ionic iso osmolar ioduinated contrast 320 mg ml vial , e ifa re 13 reusable medical gowns made up of 100 cotton , e ifa re 13 kidney tray disposable , e ifa re 13 coaxial biopsy needle assorted sizes , e ifa re 13 sterile type cover for usg probe , e ifa re 13 automatic core biopsy gun 18 g with 16 cm needle length and 22 mm penitration , e ifa re 13 automatic core biopsy gun 20 g with 10 cm needle length and 11 mm penitration , e ifa re 13 dispo spinal needle assorted sizes , e ifa re 13 thermal printer paper for usg machine 110mm x18mtr , e ifa re 13 fuji dry view laser films 12 x 10 , e ifa re 13 fuji dry view laser films 10 x 8 , e ifa re 13 inj gadobutrol 1dot0mmol ml 10ml vial , e ifa re 13 sony thermal printing paper type v high glossy upp 110hg 110mm x 18mtr , e ifa re 13 mri compitable ecg electrode pkt of 50 electrodes , e ifa re 13 disposable mri kit for 65 115 mri injector system , e ifa re 13 medrad mri integral t with check valve 1 connector tube , e ifa re 13 dry view laser films fuji 17 x 14 di hl pkt of 100 , e ifa re 13 injection iodinated radiographic contrast with 76 w v diatrizoate salts in ampoule of 20ml , e ifa re 13 ultrasound jelly tube of 250 gm , e ifa re 13 2 sertaconazole cream 30gmdot , e ifa re 13 4 benzoyl peroxide wash 50 gmdot , e ifa re 13 2 salicylic acid face wash 60 ml , e ifa re 13 cr kojic acid 2 niacinamide 4 soy isoflavones 0dot2 tettrahydrocurcumin 0dot1 tube of 15gm , e ifa re 13 kojic acid 2dot0 vit c 2dot5 tube of 15gm , e ifa re 13 cream octinoxate 7dot5 niacinamide 4dot0 glycolic acid 3dot0 kojic acid dipalmitate2dot5 , e ifa re 13 vit k under eye serum 30 ml , e ifa re 13 retinol 0dot15 eye seryl 1 phytonadioane 1 15 gm cream , e ifa re 13 cream octyl methoxycinnamate oxybenzone titanium dioxide 60gm , e ifa re 13 cream octinoxate diethylamino hydrobenzoyl hexyl benzoate bis ethyloxyphenol methoxyphenyl , e ifa re 13 shea butter mango butter cocoa butter dimethicone propylene glycol glycerine 150gm , e ifa re 13 emu oil clovel oil caffine zinc oxide copper tripeptide magnesium oxide melatonin bott of 50ml , e ifa re 13 capixyl anagain richter hair solution 60 ml , e ifa re 13 lotion minoxidil 2 60ml , e ifa re 13 desonide 0dot05 w w gel 10gm , e ifa re 13 clobetasol propinate 0dot05 lactic acid 12 gel 30 gm , e ifa re 13 lotion betamethasone 0dot05 zinc sulfate 0dot5 50ml , e ifa re 13 lotion calcipotriol 0dot005 clobetasol propionate 0dot05 20mldot , e ifa re 13 lotion halobetasol 0dot05 salicylic acid 3 30ml , e ifa re 13 tab apremilast 10 mg , e ifa re 13 tab apremilast 20 mg , e ifa re 13 tab finasteride 1mg , e ifa re 13 tab valacyclovir 1gm , e ifa re 13 acyclovir 800 mg tab , e ifa re 13 ciclopirox 1 zpto 1 100 ml shampoo , e ifa re 13 crystal trichloroacitic acid 100 500gm , e ifa re 13 synthetic polyglactine 910 rapid absorption sutures 5 0 3 8 circle reverse cutting box of 12 , e ifa re 13 monofilament poliglecaprone 25 sutures 5 0 3 8 circle reverse cutting box of 12 , e ifa re 13 monofilament poliglecaprone 25 sutures 4 0 3 8 circle reverse cutting box of 12 , e ifa re 13 monofilament polyprolene sutures 4 0 3 8 circle reverse cutting box of 12 , e ifa re 13 monofilament polyprolene sutures 5 0 3 8 circle reverse cutting box of 12 , e ifa re 13 dermaroller 1dot5 m needle , e ifa re 13 dispo gauze piece radio opaque , e ifa re 13 endoloop catgut nodot 1 for lap surgeries , e ifa re 13 harmonic ace 7 shear product code harsh 23 for open surgeries , e ifa re 13 harmonic ace 7 shear product code harsh 36 for open surgeries , e ifa re 13 harmonic transducer compatable with har 23 36 , e ifa re 13 gigliwires , e ifa re 13 endopath endobag 10 mm , e ifa re 13 bowie dick test pack class 2 indicator for vaccum leak test , e ifa re 13 non latex micro optic sterile powder free surgical hand gloves size 7dot0 , e ifa re 13 non latex micro optic sterile powder free surgical hand gloves size 7dot5 , e ifa re 13 latex micro optic sterile powder free surgical hand gloves size 7dot0 , e ifa re 13 latex micro optic sterile powder free surgical hand gloves size 7dot5 , e ifa re 13 endoloop polyglactin 910 violet braided size 1 0 for lap surgeries , e ifa re 13 inj palliperidone palmitate 75 mg , e ifa re 13 nicotex gum 2mg , e ifa re 13 vareicline 1mg tab , e ifa re 13 inj thiamine 100 mg ml 2 ml amp , e ifa re 13 micropipettes tips for 1 200 ul , e ifa re 13 alcohol dehydrated , e ifa re 13 antistreptolysin o test latex agglutination principle complete with control serum , e ifa re 13 liquor formaldehyde 40 w v , e ifa re 13 fdp determination kit of 40 testsdot , e ifa re 13 glycerine ar glycerol , e ifa re 13 prothrombin time reagents to give control of 10 14 secs , e ifa re 13 pttk reagent , e ifa re 13 stain eosin water soluble , e ifa re 13 stain giemsa , e, benzoyl peroxide (2.5% w/w) ointment, tube of 20gm, calcipotriol 0.005%(heximar), clindamycin 1% + adapalene 0.1% aloe allantoin gel tube of 15 gm, clindamycin 1% gel 10 gm, hydroquinone 2% ointment, syringe dispo plastic 3 ml with needle, disposable polythene plain drape (bed sheet)140cms x 150cms, sterile disposable trolly cover green, biopsy gun disposable, non ionic iso-osmolar ioduinated contrast 320 mg/ml vial, reusable medical gowns made up of 100% cotton, kidney tray disposable, coaxial biopsy needle assorted sizes, sterile type cover for usg probe, automatic core biopsy gun 18 g with 16 cm needle length and 22 mm penitration, automatic core biopsy gun 20 g with 10 cm needle length and 11 mm penitration, dispo spinal needle assorted sizes, thermal printer paper for usg machine 110mm x18mtr, fuji dry view laser films 12 x 10, fuji dry view laser films 10 x 8, inj gadobutrol 1.0mmol/ml, 10ml vial, sony thermal printing paper type v (high glossy) upp-110hg 110mm x 18mtr, mri compitable ecg electrode (pkt of 50 electrodes), disposable mri kit for 65/115 mri injector system, medrad mri integral t with check valve 1 connector tube, dry view laser films fuji 17 x 14 di-hl, pkt of 100, injection iodinated radiographic contrast with 76% w/v diatrizoate salts in ampoule of 20ml iodine content 370mg/ml, ultrasound jelly tube of 250 gm, 2% sertaconazole cream, 30gm., 4% benzoyl peroxide wash 50 gm., 2% salicylic acid face wash 60 ml, cr kojic acid 2%,niacinamide 4%,soy isoflavones 0.2%,tettrahydrocurcumin 0.1%,tube of 15gm, kojic acid 2.0%, vit c 2.5%, tube of 15gm, cream octinoxate7.5%,niacinamide 4.0%, glycolic acid 3.0%, kojic acid dipalmitate2.5%, arbutin 1.5%, mulberry extract1%, tocopheryl acetate 1.0%, allantoin 0.4%, licoric extract 40%,tetrahydrocurcumin 0.05%,30gm, vit k under eye serum 30 ml, retinol 0.15 % , eye seryl 1% phytonadioane 1 % 15 gm cream, cream octyl methoxycinnamate, oxybenzone,titanium dioxide 60gm, cream octinoxate,diethylamino hydrobenzoyl hexyl benzoate,bis-ethyloxyphenol methoxyphenyl, microfine titanium dioxide,dimethicone,alykyl benzoate,diethyhexyl butamido triazone, shea butter, mango butter, cocoa butter dimethicone, propylene glycol, glycerine, 150gm, emu oil,clovel oil,caffine,zinc oxide,copper tripeptide,magnesium oxide ,melatonin,bott of 50ml, capixyl, anagain richter hair solution 60 ml, lotion minoxidil 2% 60ml, desonide 0.05% w/w gel 10gm, clobetasol propinate 0.05%, lactic acid 12% gel 30 gm, lotion betamethasone 0.05%+zinc sulfate 0.5% 50ml, lotion calcipotriol 0.005%, clobetasol propionate 0.05% 20ml., lotion halobetasol 0.05% + salicylic acid 3%, 30ml, tab apremilast 10 mg, tab apremilast 20 mg, tab finasteride 1mg, tab valacyclovir 1gm, acyclovir 800 mg tab, ciclopirox 1% + zpto 1% 100 ml shampoo, crystal trichloroacitic acid 100%, 500gm, synthetic polyglactine 910 rapid absorption sutures 5-0, 3/8 circle reverse cutting (box of 12), monofilament poliglecaprone 25 ,sutures 5-0, 3/8 circle reverse cutting (box of 12), monofilament poliglecaprone 25 sutures 4-0, 3/8 circle reverse cutting (box of 12), monofilament polyprolene sutures 4-0, 3/8 circle reverse cutting (box of 12), monofilament polyprolene sutures 5-0, 3/8 circle reverse cutting (box of 12), dermaroller 1.5 m needle, dispo gauze piece radio opaque, endoloop catgut no. 1 for lap surgeries, harmonic ace+7 shear (product code harsh-23 ) for open surgeries, harmonic ace+7 shear (product code harsh-36 ) for open surgeries, harmonic transducer compatable with har 23 & 36, gigliwires, endopath endobag 10 mm, bowie dick test pack ( class 2 indicator for vaccum leak test ), non-latex micro-optic sterile powder free surgical hand gloves size- 7.0, non-latex micro-optic sterile powder free surgical hand gloves size- 7.5, latex micro-optic sterile powder free surgical hand gloves size- 7.0, latex micro-optic sterile powder free surgical hand gloves size- 7.5, endoloop polyglactin 910 , violet, braided, size-1/0 , for lap surgeries, inj palliperidone palmitate 75 mg, nicotex gum 2mg, vareicline 1mg tab, inj thiamine 100 mg/ml, 2 ml amp, micropipettes, tips for 1 -200 ul, alcohol dehydrated, antistreptolysin o test, latex agglutination principle, complete with control serum, liquor formaldehyde 40 % w/v, fdp determination kit of 40 tests., glycerine ar (glycerol), prothrombin time reagents to give control of 10-14 secs, pttk reagent, stain eosin, water soluble, stain giemsa, paracheck for pv or pf, kit of 50, paraffin wax, melting 56 degree centigrade to 60 degree centigrade, chloroxylenol sol pot hydroxide 13.6g, chloroxylenol solution 50.5g oleic acid-7.5ml castor oil-63.0g terpineal-100ml ethanol (96%)-200ml purified water freshly boiled & cooled to produce 1000ml, antimicrobial hand gel containing ethyl alcohol 60% + cyclomethicone c12-15 alkyl lactate + cetyl lactate + phenoxyethanol + stearyl alcohol with moisturizer, dextrose monohydrate for oral use in pack of 100 gm with or without vitamins and minerals, fdp kit of 15 tests, glass cover slip (22x50mmx10gm) (blue star english glass), multistix 10 sg siemens (1x100 test), pap stain kit, sterile cotton swabs in screw cap polypropylene tubes pack of 100, band aid, hematoxylin harris stain 500 ml bottle, abst disc amoxycillin potasium clavulanate, abst disc ampicillin sulbactem, abst disc ceftazidime avibactem, abst disc cefoxitin, abst vancomycin mic strip, abst disc high level gentamycin, abst disc fosfomycin, aso titer, disposable petridishes (size-90 x 15 cm), gram stain kit (ready to use), lj media slant ready to use, rapid test kit of ra factor, ready use sugar set (biochemical reaction), typhidot igg & igm, abst disc piperacillin tazobactum 100 mcg cartridge, zn stain ready to use, india ink (pack size- 100 ml), grocott s methenamine silver (gms) stain, ready to use, inj hyaluronidase 1500 iu, sterile cotton buds, pkt of 100, tropicamide 0.02% +phynylephrine hcl 3.0%+lidocain hcl 1% inj, pilocarpine intra cameral inj 0.5% pilocarpine nitrate intra ocular inj without preservatives,amp 0.1 ml each, trypan blue 0.6% inj in vial of 1 ml, proparacaine eye drops .5%, bott of 5 ml, drape, surg disposable for eye surgery 5 mtr into 5 mtr with adhesive area in peresterilised pack., fibrin glue two component fibrin sealant(firinogen+thrombin complex with anrotinin), opthalmoscope normal cell (large), hydroxy propyl methyl cellulose 2ml prefilled syringe, sodium hyaluronate ophthalmic solution 14% /ml prefilled syringe, cannula air inj high craft style 27/30 g, inj brolucizumab 120 mg/ml(vial filter needle), balance salt sterile opthalmic irrigation solution with glutathlone disulphide 500 ml bottle, dexamethasone 0.7 mg intravitreal implant with applicator (sterile), safety guard cataract knife system with slider and non slip grip, acetyl cysteine 600mg (mucinac) tab, allopurinol 100mg tab, apixaban 5mg tab, aspirin 150mg tab, capecitabine 500mg tab, carvedilol 3.125mg tab, cefpodoxime 200mg tab, doxophylline 400mg tab, escitalopram 10mg tab, etophyllin 115mg + thiophyllin 35mg special repair (150mg) tab, folic acid 5mg tab, itopride 50mg tab, linezolid 600mg tab, montelukast 5mg tab, naproxen 250mg tab, prazosin special repair 2.5mg tab, prednisolone 20mg tab, prednisolone 5mg tab, propranolol 20mg tab, pyridoxine 100mg tab, ramipril 2.5mg tab, s amlodipine 5mg tab, vitamin e 200mg cap, inj hepatitis b vaccin 10ml, ondansetron (2mg/ml) 4 ml inj, inj paracetamol 150 mg/ml, 2 ml iv, inj vancomycin 500mg, insulin highly purified human neutral 40 iu/ml, 10 ml inj, noradrenaline bitartrate 2 mg/ml, 2 ml inj, enoxaparin 60mg inj, foleys catheter 2 way silicon size 16 fr, phenytoin sodium 100 mg (eptoin) tab, metformin 500mg tab, losartan 25mg tab, losartan 50mg tab, ranitidine 150mg tab, aceclofenac 100mg +paracetamol 325mg tab, amoxycillin 500mg cap, cefixime 100mg tab, ciprofloxacin 500mg + tinidazole 600mg tab, silver sulfadiazine oint 1%w/w, tube of 10gm, ciprofloxacin 250mg tab, cefuroxime 250mg tab, levofloxacin 500mg tab, ofloxacin 200mg tab, ofloxacin 400mg tab, tinidazole 500mg tab, povidone iodine 10 % oint, tube of 20gm, povidone iodine 5% w/w tube of 15 gm, lotion povidone-iodine germicidal gargle 2% w/v, bott of 100ml (betadine), povidone iodine 200 mg pessary, povidone iodine mouthwash, doxycycline 100mg cap, syp chlorpheneramine malate 1 mg + paracetamol 125 mg + phenylephrine hydrochloride 5 mg bott of 60 ml, silver sulfadiazine 1% oint 500 gms jar, solifenacin 5mg tab, heal pad, telmisartan 40mg tab, vitamin b complex with a minimum concentration of vit b1-5 mg, vit b6- 3mg, vit b12-5mcg therapeutic tab/cap, povidone iodine sol 10% bottle of 100 ml

Every year, central and state government departments release thousands of high-value contracts specifically dedicated to Wax Injection Machine. Whether it involves bulk material supply, executing specialized operational services, or end-to-end turnkey project execution, the demand for capable vendors in the Wax Injection Machine sector is massive.

At Tender18, we help businesses cut through the noise and exclusively target the exact work categories they specialize in. Instead of browsing through generic procurement sites, our platform isolates high-potential opportunities that match your specific industry capabilities.

Work Dynamics in the Wax Injection Machine Sector

Government requirements for this specific vertical generally fall into distinct procurement patterns:

  • Product & Material Supply: Tenders focused strictly on sourcing, testing, and delivering high-quality items that meet the exact technical specifications of the buyer.
  • Service Level Agreements (SLAs): Long-term hiring of expert agencies for routine maintenance, manpower deployment, or continuous operational management.
  • Execution & Turnkey Projects: Comprehensive contracts where the bidder is responsible for everything from raw material procurement to final site installation and testing.

By focusing purely on your core strength in Wax Injection Machine, you can build a highly profitable and stable pipeline of government clients.

Stop wasting time filtering through irrelevant notices. Our Wax Injection Machine Tender Information Service is engineered for precision. We track exact product codes, service names, and specialized work terms across all government portals nationwide. When a buyer publishes a requirement that matches your specific business profile, our system alerts you instantly.

Deep Technical Insights & Documentation For Wax Injection Machine Tenders

Bidding for specific works requires studying strict technical parameters. We provide immediate access to the core documents you need to evaluate the project:

  • Detailed Specifications & Drawings: Download the exact engineering guidelines, material testing standards, and quality benchmarks demanded by the buyer for Wax Injection Machine.
  • Financial BOQ Spreadsheets: Access the official blank pricing formats where you need to input your unit rates, tax configurations, and total bid value.
  • Real-Time Technical Amendments: If the buying department changes the product specifications, alters the service scope, or shifts the delivery timeline, we instantly update the parent file so you are never caught off-guard.

Winning a contract for Wax Injection Machine depends entirely on how perfectly your technical capabilities match the buyer’s demands. Even if you have the best product or service, a poorly formatted document or a missing compliance certificate will lead to instant technical rejection. Tender18’s Tender Bidding Service eliminates this risk by taking complete ownership of your digital submission.

Flawless Compliance & Portal Execution For Wax Injection Machine Tenders

Under this service, Tender18 assigns a Dedicated Experienced Technical Person to your profile. This expert handles the heavy lifting of the entire bidding cycle:

  • Capability Mapping: We thoroughly cross-check your past completion certificates, ISO standard proofs, and financial turnover against the strict eligibility criteria required for Wax Injection Machine bids.
  • Secure System Integration: Our technical desk seamlessly links your Class III Digital Signature Certificate (DSC) with the required e-procurement servers to securely encrypt your technical and financial envelopes.
  • Error-Free Financial Uploads: We audit your quoted BOQ pricing sheets for any formula or formatting errors before the final upload, ensuring your bid is successfully locked before the portal's closing hours.

Government buyers are aggressively using the Government e-Marketplace (GeM) for the direct procurement of Wax Injection Machine. If your business profile is not accurately mapped on this portal, you remain practically invisible to these purchasing officers. Recognized as a trusted and expert GeM consultant, Tender18 offers specialized support to build, optimize, and maintain a highly visible vendor account for your business.

With an industry-leading support success ratio of over 95%, we handle the complex marketplace compliance so you can focus entirely on executing your orders

Expert Profile Management & Catalogue

Our dedicated consultants ensure your GeM presence is structurally perfect:

  • Precise Catalogue Listing: We upload and categorize your specific offerings under the exact search terms and parameters used by government buyers looking for Wax Injection Machine, ensuring maximum search visibility.
  • OEM Dashboard & Assessment: For original manufacturers and creators, we guide you through the mandatory Quality Council of India (QCI) vendor assessments to successfully unlock your official OEM panel.
  • Profile Compliance & Caution Money: We manage your statutory documentation, brand approvals, and caution money limits to keep your account immune from technical suspensions.

Strategic Live Bid Participation

Beyond setup, we actively drive your market participation. Our team expertly handles the digital paperwork and rate configurations for GeM Custom Bids and Reverse Auctions (RA) related to Wax Injection Machine, maximizing your chances of securing L1 status.

1.

How do I find government contracts exclusively matching my work in Wax Injection Machine?

The easiest way is through the Tender18 platform. Instead of searching department by department, our system uses advanced keyword matching to gather all live supply, service, and execution tenders related directly to your core business in one place.

2.

Do I need specific testing or quality certificates to apply for these contracts?

It heavily depends on the nature of the work. For supply contracts, buyers often ask for ISO certifications, BIS marks, or specific lab testing reports. For service contracts, they may ask for labor licenses or past performance certificates (work orders).

3.

What is a BOQ and why is it important for my bid?

The Bill of Quantities (BOQ) is the official financial Excel sheet where you enter your competitive prices. Any mistake in this file—like adding extra rows, changing formulas, or saving it in the wrong format—will cause the portal server to reject your entire bid.

4.

Are samples required to be submitted physically before the digital bid opens?

For many product-based Wax Injection Machine tenders, buying departments do ask bidders to submit physical samples to their office before the digital technical evaluation date. This requirement is always clearly mentioned in the official NIT document.

5.

How does the Dedicated Tender Expert from Tender18 help me?

Our assigned expert manages your total portal compliance. They extract the hidden rules from long tender PDFs, create a precise document checklist for your team, map your digital signature, and securely upload your technical and financial files onto the government servers.

6.

What is the role of a Digital Signature Certificate (DSC)?

A Class III DSC is a secure USB device that contains your digital identity. You cannot upload a bid without it. It is used to securely encrypt and lock your sensitive price data and technical documents so no one can view them before the official opening date.

7.

As an MSME, can I get financial benefits when bidding for Wax Injection Machine?

Yes, the government strongly supports MSMEs. By uploading a valid Udyam Registration Certificate in the technical envelope, small businesses are frequently exempted from paying the initial Tender Document Fee and the Earnest Money Deposit (EMD).

8.

Why should I list my services or products on GeM for this category?

GeM is now the primary digital marketplace for all government agencies. If you are properly cataloged for Wax Injection Machine, officers can view your profile and generate direct purchase orders or invite you to participate in exclusive Custom Bids.

9.

What makes Tender18 a reliable GeM support partner?

As a highly trusted and expert GeM consultant, Tender18 holds a proven support success ratio of over 95%. From flawless profile creation and complex catalogue mapping to OEM panel approvals and live Reverse Auction (RA) support, we handle it all seamlessly.

10.

What does "L1" mean in these government contracts?

"L1" stands for "Lowest Bidder 1". In government procurement, after all technical envelopes are approved, the financial sheets (BOQs) are opened. The bidder who has quoted the lowest compliant price for Wax Injection Machine is declared L1 and is generally awarded the contract