tender for works related to semikestner 1000 msq pipeline , wash out pipeline header to new quad body no 1 , raw juice pump pipeline , syrup pipeline cleaning work , syrup sulphiter pipeline , new quad no 4 extension catcher vapour body , bagassilo fan repair , big filter mud tray repair , vacuum air line work , pipe fabrication , clear juice tank repair , pump and motor alignment , juice heater repair , condensate bottle fabrication , clarifier repair , cane carrier repair , secondary rack carrier repair , rack carrier repair , cane carrier runner replacement , secondary rack carrier runner replacement , rack carrier runner replacement , cane carrier structural repair , rack carrier structural repair , cane carrier chain beam repair , inter rack carrier trough repair , mill trough repair , trpf lower plate repair , mill roller repair , leveler repair , fiberizer repair , secondary rack carrier trough repair , tail shaft bed repair , mill pinion repair , cane carrier angle replacement , secondary rack carrier angle replacement , trpf roller juice plate repair , cold water pipeline work , bearing cooling line replacement , pipe fittings , mill juice pipeline work , hot water pipeline work , screen juice pipeline work , flange work , nipple work , mill fabrication work , header fabrication , delivery header fabrication , trpf tank repair , transmission gear repair , juice pump pipeline work , reducer fabrication , flange fabrication , band fabrication , trpf cover fabrication , trpl chute repair , crane unloader rail replacement , bearing housing repair , juice distribution tray fabrication , trpf roller repair , rack repair work , crown pinion guard repair , tail bar repair , trpf water cover repair , mill roller grooving , chain link forging work, fabrication and installation of 6 inch tee in the pipeline complete as required, dismantling of existing 8 inch ms pipeline complete, reinstallation of 8 inch ms pipeline at the designated position including alignment welding testing and successful trial run, opening/removal of existing 8 inch valve, installation of 8 inch valve at the designated location complete, supply fabrication and installation of 8 inch flange complete, supply and installation of 8 inch nipple complete, dismantling of existing 8 inch and 6 inch pipelines including removal from site, reinstallation of 8 inch and 6 inch pipelines at the designated position including alignment welding testing and successful trial run, dismantling of existing 8 inch raw juice pump pipeline and disposal of dismantled material at the designated scrap yard, reinstallation of 8 inch ms pipeline including alignment welding testing and successful trial run, fabrication and installation of 8 inch x 6 inch reducer complete, fabrication and installation of 8 inch flange complete, removal and reinstallation of 8 inch valve at the designated location complete, fabrication and installation of 8 inch nipple complete, dismantling of existing 6 inch syrup pipeline from syrup pump to syrup tank complete, fabrication and installation of 6 inch x 3 inch reducer complete, fabrication and installation of 2 inch flange complete, fabrication of 6 inch nipple complete, opening/removal of existing 6 inch valve, refitting and fastening of 6 inch valve after maintenance complete, fabrication and installation of 6 inch tee complete, fabrication and installation of 8 inch bend complete, fabrication and installation of 800 mm diameter nipple complete, dismantling of existing 8 inch pipeline complete, reinstallation of 8 inch pipeline at the designated position including alignment welding testing and successful trial run, fabrication and installation of 8 inch tee complete, dismantling of damaged extension catcher vapour body of new quad no 4 removal of corroded angle channels disposal of scrap at the designated scrap yard fabrication of a new catcher from 10 mm thick ms plate by bending installation at site completion of all necessary connections and successful trial run approximate size diameter 160 m x length 620 m, cutting and removing damaged casing of bagassilo fan fabrication using supplied 8/10 mm ms plate installation and satisfactory trial, cutting and removing damaged mud tray of big filter disposal of scrap fabrication using supplied 8/10 mm ms plate installation and satisfactory trial (approx dia 375 m x length 860 m), dismantling of 6 inch vacuum air line with filter, fixing of 6 inch vacuum air line in position including alignment and satisfactory trial, fabrication and installation of 6 inch ms flange, fabrication and installation of 6 inch ms tee, fabrication and installation of 6 inch ms nipple, cutting and removing corroded box of clear juice liquidation tank door fabrication using 8 mm ms plate installation all connections and satisfactory trial (approx size 10 m x 10 m), fitting fixing alignment of ms band for 120 hp clear juice pump and motor including satisfactory trial, replacement of strip and flat iron for top and bottom header rubber packing fixing new rubber packing and satisfactory trial, removal of condensate bottle of juice heater/quad semicaser/vapor cell fabrication of new bottle using supplied 8/10 mm ms plate and installation, removal of corroded distributor from clarifier compartment disposal of scrap fabrication of new distributor using 6/8 mm ms plate installation and satisfactory trial, replacement of damaged side and bottom plates of cane carrier using supplied 6 mm ms plate, replacement of damaged side and bottom plates using supplied 6 mm ms plate, replacement of damaged side and bottom plates of rack carrier no1 2 & 3 using supplied 6 mm ms plate, cutting and removing old runner and fixing new runner for cane carrier, cutting and removing old runner and fixing new runner, cutting and removing old runner and fixing new runner for rack carrier no1 2 & 3, removal of corroded supporting angles/channels and installation of new supporting angle, removal of corroded angles/channels and installation of new angle, replacement of 150 mm chain beam, removal of old trough of inter rack carrier no1 2 & 3 fabrication using supplied 8/10 mm ms plate and installation, cutting and replacing damaged trough of mill no3 & 4 including satisfactory trial, removal of damaged lower plate under trpf of mill no2 & 3 fabrication using supplied 10/12 mm ms plate and installation, fabrication of new juice rings for mill rollers using supplied 6/8 mm ms plate as per sample, dismantling damaged side plates of leveler disposal of scrap fabrication and installation of new 8/10 mm ms side plates, dismantling damaged side plate of fiberizer disposal of scrap fabrication and installation of new 8/10 mm ms side plate, removal of old trough fabrication using supplied 8/10/12 mm ms plate and installation, cutting and removing worn tail shaft bed of secondary rack carrier fabrication using supplied 200 mm beam and installation, fabrication and installation of new pinion gear for mill no3 removal of old gear and disposal to scrap yard, removal of damaged angles from cane carrier side plate/inter rack carrier 2 & 3 and installation of new angles, removal of damaged angles from secondary rack carrier/inter rack carrier 2 & 3 fabrication and installation of new angles, removal of damaged juice plate of trpf rollers fabrication using supplied 8/10 mm ms plate and installation, dismantling of existing 4 inch cold water pipeline from mill no1 to mill no3 and installation of new pipeline, removal of worn bearing cooling line from mill no1 to 4 and installation of new 3 inch pipeline complete with flange and nipple, supply/fabrication and installation of 3 inch flange, supply/fabrication and installation of 1 inch nipple, cutting and removing old 6 inch mill juice pipeline from mill juice pump no 3 to mill no 1 and installing new 6 inch ms pipeline complete with fitting and testing, dismantling existing 4 inch dia hot water pipeline from mill no 3 to mill no 4 and installing new pipeline complete with fittings and testing, cutting and removing old pipeline from mill juice pump no 4 to mill no 2 and installing new 6 inch ms pipeline complete with fittings and testing, cutting and removing old pipeline from mill screen juice pump to raw juice tank and installing new 6 inch & 8 inch pipeline complete with fittings and testing, dismantling and installation of 6 inch flange, dismantling and installation of 8 inch flange, dismantling and installation of 10 inch flange, dismantling and installation of 4 inch nipple, dismantling and installation of 6 inch nipple, dismantling and installation of 8 inch nipple, fabrication and preparation of mill beds complete as required, removing existing 12 inch screen juice header fabricating new header as per sample erection reconnection and satisfactory trial, fabrication and installation of new 10 inch delivery header (21 m long) for screen juice tank including 8 inch & 10 inch nipples erection and testing, cutting damaged top cover of trpf tank fabrication using supplied 8/10 mm ms plate installation and satisfactory trial, inspection and repair/checking of bottom cover of transmission gear of mill no 4 as per sample, installation of 6 inch juice pump pipeline complete with fitting and testing, fabrication and installation of 6 inch reducer in the pipeline, fabrication and installation of 8 inch reducer in the pipeline, fabrication and installation of 6 inch flange in the pipeline, fabrication and installation of 4 inch flange in the pipeline, fabrication and installation of 6 inch pipe band/support, fabrication of top cover for trpf sluice installed in mill house, removing damaged angles of cane carrier side plate and inter rack carrier no 2 & 3 and installing new angles, removing damaged angles of secondary rack carrier and inter rack carrier no 2 & 3 and installing new angles, dismantling damaged side and back plates of trpl chute of mill no 2 fabrication using supplied 10/12 mm ms plate installation and satisfactory trial, removing damaged rail of crane unloader trolley installing new 40 x 40 mm rail strengthening and testing, fabrication and installation of new cover for mill bearing housing, fabrication and installation of juice distribution trays in mill juice pipeline at designated locations, welding and repair of trpf rollers including welding and correction of damaged side plates, repair of secondary rack carrier and inter rack carrier racks, removing damaged water guard of crown pinion of mill no 3 fabrication of new guard from supplied 2/3 mm plate and installation, welding and fabrication of cut tail bars of mill no 1 & 3 as per required dimensions, dismantling damaged trpf water cover of mill no 2 fabrication using supplied 8/10 mm ms plate installation and satisfactory trial, carrying out pineapple (chevron) grooving/cutting work on mill rollers, forging of side links of cane carrier bagasse carrier elevator and rbc chain including fitting of pins and bushes profiling and finishing to required size