tender for disconnecting of fittings , degassing of bullets , providing ms tubular ladder and scaffolding , providing flame proof lighting arrangement and exhaust fan , thorough cleaning of the inner surface , carrying out external inspection , fixing back all the liquid and vapour lines , ultrasonic thickness measurement on shell plates , wet fluorescent magnetic particle test , ultrasonic flaw detection , dye penetration test , hardness testing , radiography test , wet type calibaration of bullets , settlement of mounded bullets , settlement of mounded bullets during hydrotesting , replacement of nuts, bolts, washers and gaskets , hydrotest and stretchtest , certification and documentation, statutory inspection and ndt testing and certification of all three msvs at allahabad lpg plant, disconnecting the inlet, outlet of the lpg liquid and vapour line, srv, hla, servo gauge, radar gauge manhole, water drain line, globe valves, rov and other fittings of the bullets, removal of fire proof coating wherever necessary and disconnection of electrical cables without any damage as per the directions of the bpcl site engineer / third party inspection agency official. any damage for the fittings or any equipments during removal & fixing of the connection has to be made good by the tenderer - for 900 mt mounded storage vessel, degassing of bullets with bpcl supplied water after making necessary connections for in and out flow with suitable pipelines / hose arrangements as directed on site. the water used for degassing should be disposed off safely in the drainage and the sludge if any coming along with water should be carefully removed and disposed / kept in safe place as directed at site. the sludge should be buried if necessary as per directions of location in charge or his representative. a sample of all sludge collected should be handed over to the lic / site engineer. deboxing / boxing, dismantling / pitting back all gadgets on bullet, also all jobs related to blind flanging up to 1st isolation valve -- for 900 mt mounded storage vessel, providing ms tubular ladder/scaffolding inside the bullet suitable for cleaning of inner surface and suitable for carrying out all inspections like ultrasonic testing, mpi and all allied jobs as directed. ladder / scaffolding(s) shall have to be retained at site till the completion of all three bullets testing and the same scaffolding(s) may be used for providing in the other bullets by turn. the contractor shall also provide oxygen meter and ensure oxygen level is as prescribed norms before vessel entry. oxygen metre can be taken back by contractor after the work is over for 900 mt mounded storage vessel, providing flame proof lighting arrangement and exhaust fan inside the bullet for carrying out necessary inspection, cleaning and ndt tests. contractor to supply the flame proof lightfittings, junction boxes, required cables etc, as directed at site. lighting arrangement shall have to be retained at site till completion of all the bullets and the same lighting arrangement may be used in the other bullets by turn - for 900 mt mounded storage vessel, thorough cleaning of the inner surface with water jet and clearing the sludge / rust materials followed by thorough cleaning of inner surface to remove the scales, oil and dust by wire brushes to expose the metal surfaces and thorough buffing of weld joints. cleaning of minimum 50 mm on both sides of each weld joint including nozzle welds by thorough cleaning using rotary brushes to expose bare metal (shinning surface) with care to entire weld joints of nozzles and weld area of support legs and other areas as directed at site. the contractor has to provide all equipments and consumables for carrying out the cleaning jobs. localized grinding of the welds to be done if required as directed by our site engineer / third party inspection agency official. dispose off the sludge of bullet at designated place after excavation as per direction of bpcl - for 900 mt mounded storage vessel, carrying out external inspection on mound, retaining wall, inspection tunnel, bottom nozzle & its suspension/ supports, accessible top nozzles etc - for 900 mt mounded storage vessel, fixing back all the liquid and vapour lines after servicing the valves, efcv and fixing all removed fittings like hla, srv, pressure/ temp/ servo/ rochester gauges, manhole cover etc. after completing the testing, purging/fresh gas in is to be carried out with assistance from & under supervision of & as instructed by bpcl/third party inspection agency - for 900 mt mounded storage vessel, ultrasonic thickness measurement on shell plates, dished end plates, lpg pipelines and nozzles as per applicable code and as per the instructions of third party agency / bpcl site engineer - for 900 mt mounded storage vessel, wet fluorescent magnetic particle test of welds using ac yoke ,magnaflux ,tiede,y6 black light and white washable distemper as background and as per applicable codes and as instructed by bpcl or third party agency. internal complete .all weld joints from inside, nozzle welds internal & external for 900 mt mounded storage vessel, complete ultrasonic flaw detection of welds as per applicable code from inside the bullets and as instructed by bpcl or third party agency for 900 mt mounded storage vessel, dye penetration test at all accessible areas and as pe applicable code and as instructed by bpcl or third party agency for 900 mt mounded storage vessel, hardness testing on selected spots on welds, haz and parent metal in each accessible area as per applicable codes and as instructed by bpcl and third party agency - for 900 mt mounded storage vessel, radiography test for weld joints at selected locations as problem defects,flaws observed during other tests subject to a maximum of 10 perncent of total weld length as per applicable code and as instructed by third party inspecting agency. oonly to be conducted where defects, flaws are observed for 900 mt mounded storage vessel, wet type calibaration of bullets. calibration table will be in 10 mm height intervals with 1 mm proportional part tables or as decided by bpcl. approval & stamping of calibration charts by cpwd shall be done by the party. before start of calibration adetailed procedure has to be submitted - for 900 mt mounded storage vessel, settlement of mounded bullets checking of settlement of mounded bullets by using laser technique for horizontal plain shift and plumb line theodolit technique for vertical plain shift. the person performing settlement shall be experienced in the relevant field. settlement analysis for all three msvs shall be carried out every six months for a period of three years. this excludes the settlement analysis to be carried out during hydrotesting. during hydrotesting, settlement monitoring shall be done as specified in line item no. 16., settlement of mounded bullets, checking of settlement of mounded bullets by using laser technique for horizontal plain shift and plumb line ,theodolit technique for vertical plain shift. the person performing settlement shall be experienced in the relevant field. settlement reading shall be taken during filling of water before hydrotest at 0, 25, 50 and after hydrotesting for 900 mt mounded storage vessel, replacement of nuts, bolts, washers and gaskets supply and fixing of all gaskets, studs and nuts for all fittings after the isolation valve near to water drain line provided in bullets - for 900mt mounded storage vessel, hydrotest and stretchtest, to conduct hydrotest test of vessel and also connected pipings in total as required and as directed at site, after successful of all nd test as per smpv rules and relevant codes for 900 mt mounded storage vessel, certification and documentation for 900 mt lpg storage bullets to submit 3 sets of testing and inspection certificates and reports and documents for all tests and inspection covered in the scope of work as per smpv rule no.19 .issue of online certificate of test alongwith annexure giving the details of ndt inspection

Latest Tender Detail from bharat petroleum corporation limited BPCL for the tender for disconnecting of fittings , degassing of bullets , providing ms tubular ladder and scaffolding , providing flame proof lighting arrangement and exhaust fan , thorough cleaning of the inner surface , carrying out external inspection , fixing back all the liquid and vapour lines , ultrasonic thickness measurement on shell plates , wet fluorescent magnetic particle test , ultrasonic flaw detection , dye penetration test , hardness testing , radiography test , wet type calibaration of bullets , settlement of mounded bullets , settlement of mounded bullets during hydrotesting , replacement of nuts, bolts, washers and gaskets , hydrotest and stretchtest , certification and documentation, statutory inspection and ndt testing and certification of all three msvs at allahabad lpg plant, disconnecting the inlet, outlet of the lpg liquid and vapour line, srv, hla, servo gauge, radar gauge manhole, water drain line, globe valves, rov and other fittings of the bullets, removal of fire proof coating wherever necessary and disconnection of electrical cables without any damage as per the directions of the bpcl site engineer / third party inspection agency official. any damage for the fittings or any equipments during removal & fixing of the connection has to be made good by the tenderer - for 900 mt mounded storage vessel, degassing of bullets with bpcl supplied water after making necessary connections for in and out flow with suitable pipelines / hose arrangements as directed on site. the water used for degassing should be disposed off safely in the drainage and the sludge if any coming along with water should be carefully removed and disposed / kept in safe place as directed at site. the sludge should be buried if necessary as per directions of location in charge or his representative. a sample of all sludge collected should be handed over to the lic / site engineer. deboxing / boxing, dismantling / pitting back all gadgets on bullet, also all jobs related to blind flanging up to 1st isolation valve -- for 900 mt mounded storage vessel, providing ms tubular ladder/scaffolding inside the bullet suitable for cleaning of inner surface and suitable for carrying out all inspections like ultrasonic testing, mpi and all allied jobs as directed. ladder / scaffolding(s) shall have to be retained at site till the completion of all three bullets testing and the same scaffolding(s) may be used for providing in the other bullets by turn. the contractor shall also provide oxygen meter and ensure oxygen level is as prescribed norms before vessel entry. oxygen metre can be taken back by contractor after the work is over for 900 mt mounded storage vessel, providing flame proof lighting arrangement and exhaust fan inside the bullet for carrying out necessary inspection, cleaning and ndt tests. contractor to supply the flame proof lightfittings, junction boxes, required cables etc, as directed at site. lighting arrangement shall have to be retained at site till completion of all the bullets and the same lighting arrangement may be used in the other bullets by turn - for 900 mt mounded storage vessel, thorough cleaning of the inner surface with water jet and clearing the sludge / rust materials followed by thorough cleaning of inner surface to remove the scales, oil and dust by wire brushes to expose the metal surfaces and thorough buffing of weld joints. cleaning of minimum 50 mm on both sides of each weld joint including nozzle welds by thorough cleaning using rotary brushes to expose bare metal (shinning surface) with care to entire weld joints of nozzles and weld area of support legs and other areas as directed at site. the contractor has to provide all equipments and consumables for carrying out the cleaning jobs. localized grinding of the welds to be done if required as directed by our site engineer / third party inspection agency official. dispose off the sludge of bullet at designated place after excavation as per direction of bpcl - for 900 mt mounded storage vessel, carrying out external inspection on mound, retaining wall, inspection tunnel, bottom nozzle & its suspension/ supports, accessible top nozzles etc - for 900 mt mounded storage vessel, fixing back all the liquid and vapour lines after servicing the valves, efcv and fixing all removed fittings like hla, srv, pressure/ temp/ servo/ rochester gauges, manhole cover etc. after completing the testing, purging/fresh gas in is to be carried out with assistance from & under supervision of & as instructed by bpcl/third party inspection agency - for 900 mt mounded storage vessel, ultrasonic thickness measurement on shell plates, dished end plates, lpg pipelines and nozzles as per applicable code and as per the instructions of third party agency / bpcl site engineer - for 900 mt mounded storage vessel, wet fluorescent magnetic particle test of welds using ac yoke ,magnaflux ,tiede,y6 black light and white washable distemper as background and as per applicable codes and as instructed by bpcl or third party agency. internal complete .all weld joints from inside, nozzle welds internal & external for 900 mt mounded storage vessel, complete ultrasonic flaw detection of welds as per applicable code from inside the bullets and as instructed by bpcl or third party agency for 900 mt mounded storage vessel, dye penetration test at all accessible areas and as pe applicable code and as instructed by bpcl or third party agency for 900 mt mounded storage vessel, hardness testing on selected spots on welds, haz and parent metal in each accessible area as per applicable codes and as instructed by bpcl and third party agency - for 900 mt mounded storage vessel, radiography test for weld joints at selected locations as problem defects,flaws observed during other tests subject to a maximum of 10 perncent of total weld length as per applicable code and as instructed by third party inspecting agency. oonly to be conducted where defects, flaws are observed for 900 mt mounded storage vessel, wet type calibaration of bullets. calibration table will be in 10 mm height intervals with 1 mm proportional part tables or as decided by bpcl. approval & stamping of calibration charts by cpwd shall be done by the party. before start of calibration adetailed procedure has to be submitted - for 900 mt mounded storage vessel, settlement of mounded bullets checking of settlement of mounded bullets by using laser technique for horizontal plain shift and plumb line theodolit technique for vertical plain shift. the person performing settlement shall be experienced in the relevant field. settlement analysis for all three msvs shall be carried out every six months for a period of three years. this excludes the settlement analysis to be carried out during hydrotesting. during hydrotesting, settlement monitoring shall be done as specified in line item no. 16., settlement of mounded bullets, checking of settlement of mounded bullets by using laser technique for horizontal plain shift and plumb line ,theodolit technique for vertical plain shift. the person performing settlement shall be experienced in the relevant field. settlement reading shall be taken during filling of water before hydrotest at 0, 25, 50 and after hydrotesting for 900 mt mounded storage vessel, replacement of nuts, bolts, washers and gaskets supply and fixing of all gaskets, studs and nuts for all fittings after the isolation valve near to water drain line provided in bullets - for 900mt mounded storage vessel, hydrotest and stretchtest, to conduct hydrotest test of vessel and also connected pipings in total as required and as directed at site, after successful of all nd test as per smpv rules and relevant codes for 900 mt mounded storage vessel, certification and documentation for 900 mt lpg storage bullets to submit 3 sets of testing and inspection certificates and reports and documents for all tests and inspection covered in the scope of work as per smpv rule no.19 .issue of online certificate of test alongwith annexure giving the details of ndt inspection in prayagraj, uttar pradesh,. Reference number 15603112. Don't miss out on this chance to be part of a significant project. Register for free today to access the complete tender details and download the necessary documents. Seize the opportunity with Tender 18!

T18 Ref No:15603112
Tender ID:GEM/2026/B/7607616
Tender Agency:bharat petroleum corporation limited BPCL
City:prayagraj
State:uttar pradesh
Description :
total quantity = 72 ----- document required from seller = experience criteria,past performance,bidder turnover,certificate (requested in atc),oem authorization certificate,oem annual turnover,additional doc 1 (requested in atc),additional doc 2 (requested in atc),additional doc 3 (requested in atc) ----- evaluation method = total value wise evaluation
T18 Ref No:15603112Tender Value:Refer Document
Tender ID:GEM/2026/B/7607616Tender EMD:Refer Document
Tender Agency:bharat petroleum corporation limited BPCLTender Fee:Refer Document
City:prayagrajPublished Date:Jun 01, 2026
State:uttar pradeshDue Date:Jun 22, 2026
Tender Related Keywords :-Tender Opening Date:Jun 22, 2026
Description :total quantity = 72 ----- document required from seller = experience criteria,past performance,bidder turnover,certificate (requested in atc),oem authorization certificate,oem annual turnover,additional doc 1 (requested in atc),additional doc 2 (requested in atc),additional doc 3 (requested in atc) ----- evaluation method = total value wise evaluation

Get Complete Tender Documents to Participate

Tender NoticeBOQEligibilityEMD DetailsImportant Dates
We take all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.

Browse GeM Portal Tenders

This Government Tender has been Published  by Bharat Petroleum Corporation Limited BPCL for work related to lighting arrangement,washable distemper,junction boxes,retaining wall,exhaust fan,dismantling,calibration,cleaning,clearing,grinding,washers,brushes,nozzles,ladder,valves,cables,nozzle,bolts,valve,studs,nuts,wire,fan in Prayagraj, Uttar Pradesh. The Tender work is tender for disconnecting of fittings , degassing of bullets , providing ms tubular ladder and scaffolding , providing flame proof lighting arrangement and exhaust fan , thorough cleaning of the inner surface , carrying out external inspection , fixing back all the liquid and vapour lines , ultrasonic thickness measurement on shell plates , wet fluorescent magnetic particle test , ultrasonic flaw detection , dye penetration test , hardness testing , radiography test , wet type calibaration of bullets , settlement of mounded bullets , settlement of mounded bullets during hydrotesting , replacement of nuts, bolts, washers and gaskets , hydrotest and stretchtest , certification and documentation, statutory inspection and ndt testing and certification of all three msvs at allahabad lpg plant, disconnecting the inlet, outlet of the lpg liquid and vapour line, srv, hla, servo gauge, radar gauge manhole, water drain line, globe valves, rov and other fittings of the bullets, removal of fire proof coating wherever necessary and disconnection of electrical cables without any damage as per the directions of the bpcl site engineer / third party inspection agency official. any damage for the fittings or any equipments during removal & fixing of the connection has to be made good by the tenderer - for 900 mt mounded storage vessel, degassing of bullets with bpcl supplied water after making necessary connections for in and out flow with suitable pipelines / hose arrangements as directed on site. the water used for degassing should be disposed off safely in the drainage and the sludge if any coming along with water should be carefully removed and disposed / kept in safe place as directed at site. the sludge should be buried if necessary as per directions of location in charge or his representative. a sample of all sludge collected should be handed over to the lic / site engineer. deboxing / boxing, dismantling / pitting back all gadgets on bullet, also all jobs related to blind flanging up to 1st isolation valve -- for 900 mt mounded storage vessel, providing ms tubular ladder/scaffolding inside the bullet suitable for cleaning of inner surface and suitable for carrying out all inspections like ultrasonic testing, mpi and all allied jobs as directed. ladder / scaffolding(s) shall have to be retained at site till the completion of all three bullets testing and the same scaffolding(s) may be used for providing in the other bullets by turn. the contractor shall also provide oxygen meter and ensure oxygen level is as prescribed norms before vessel entry. oxygen metre can be taken back by contractor after the work is over for 900 mt mounded storage vessel, providing flame proof lighting arrangement and exhaust fan inside the bullet for carrying out necessary inspection, cleaning and ndt tests. contractor to supply the flame proof lightfittings, junction boxes, required cables etc, as directed at site. lighting arrangement shall have to be retained at site till completion of all the bullets and the same lighting arrangement may be used in the other bullets by turn - for 900 mt mounded storage vessel, thorough cleaning of the inner surface with water jet and clearing the sludge / rust materials followed by thorough cleaning of inner surface to remove the scales, oil and dust by wire brushes to expose the metal surfaces and thorough buffing of weld joints. cleaning of minimum 50 mm on both sides of each weld joint including nozzle welds by thorough cleaning using rotary brushes to expose bare metal (shinning surface) with care to entire weld joints of nozzles and weld area of support legs and other areas as directed at site. the contractor has to provide all equipments and consumables for carrying out the cleaning jobs. localized grinding of the welds to be done if required as directed by our site engineer / third party inspection agency official. dispose off the sludge of bullet at designated place after excavation as per direction of bpcl - for 900 mt mounded storage vessel, carrying out external inspection on mound, retaining wall, inspection tunnel, bottom nozzle & its suspension/ supports, accessible top nozzles etc - for 900 mt mounded storage vessel, fixing back all the liquid and vapour lines after servicing the valves, efcv and fixing all removed fittings like hla, srv, pressure/ temp/ servo/ rochester gauges, manhole cover etc. after completing the testing, purging/fresh gas in is to be carried out with assistance from & under supervision of & as instructed by bpcl/third party inspection agency - for 900 mt mounded storage vessel, ultrasonic thickness measurement on shell plates, dished end plates, lpg pipelines and nozzles as per applicable code and as per the instructions of third party agency / bpcl site engineer - for 900 mt mounded storage vessel, wet fluorescent magnetic particle test of welds using ac yoke ,magnaflux ,tiede,y6 black light and white washable distemper as background and as per applicable codes and as instructed by bpcl or third party agency. internal complete .all weld joints from inside, nozzle welds internal & external for 900 mt mounded storage vessel, complete ultrasonic flaw detection of welds as per applicable code from inside the bullets and as instructed by bpcl or third party agency for 900 mt mounded storage vessel, dye penetration test at all accessible areas and as pe applicable code and as instructed by bpcl or third party agency for 900 mt mounded storage vessel, hardness testing on selected spots on welds, haz and parent metal in each accessible area as per applicable codes and as instructed by bpcl and third party agency - for 900 mt mounded storage vessel, radiography test for weld joints at selected locations as problem defects,flaws observed during other tests subject to a maximum of 10 perncent of total weld length as per applicable code and as instructed by third party inspecting agency. oonly to be conducted where defects, flaws are observed for 900 mt mounded storage vessel, wet type calibaration of bullets. calibration table will be in 10 mm height intervals with 1 mm proportional part tables or as decided by bpcl. approval & stamping of calibration charts by cpwd shall be done by the party. before start of calibration adetailed procedure has to be submitted - for 900 mt mounded storage vessel, settlement of mounded bullets checking of settlement of mounded bullets by using laser technique for horizontal plain shift and plumb line theodolit technique for vertical plain shift. the person performing settlement shall be experienced in the relevant field. settlement analysis for all three msvs shall be carried out every six months for a period of three years. this excludes the settlement analysis to be carried out during hydrotesting. during hydrotesting, settlement monitoring shall be done as specified in line item no. 16., settlement of mounded bullets, checking of settlement of mounded bullets by using laser technique for horizontal plain shift and plumb line ,theodolit technique for vertical plain shift. the person performing settlement shall be experienced in the relevant field. settlement reading shall be taken during filling of water before hydrotest at 0, 25, 50 and after hydrotesting for 900 mt mounded storage vessel, replacement of nuts, bolts, washers and gaskets supply and fixing of all gaskets, studs and nuts for all fittings after the isolation valve near to water drain line provided in bullets - for 900mt mounded storage vessel, hydrotest and stretchtest, to conduct hydrotest test of vessel and also connected pipings in total as required and as directed at site, after successful of all nd test as per smpv rules and relevant codes for 900 mt mounded storage vessel, certification and documentation for 900 mt lpg storage bullets to submit 3 sets of testing and inspection certificates and reports and documents for all tests and inspection covered in the scope of work as per smpv rule no.19 .issue of online certificate of test alongwith annexure giving the details of ndt inspection. Tender18 Provide this type Government Tender Information on daily basis.


This tender invites eligible contractors, suppliers, manufacturers, consultants, Startups, Msmes, traders and service providers to submit bids for the specified project, supply, service, or work requirement.


Before applying, interested bidders should review the tender scope, eligibility criteria, estimated contract value, important dates, technical requirements, reqired docuent list for bidder and bid submission instructions as per provided in the official tender documents. 


This Verified Information Provide By Tender18 in this page so Bidder Can Easiy  Understanding tender  requirements and bidders can prepare a compliant and competitive tender proposal.

To participate in the tender for disconnecting of fittings , degassing of bullets , providing ms tubular ladder and scaffolding , providing flame proof lighting arrangement and exhaust fan , thorough cleaning of the inner surface , carrying out external inspection , fixing back all the liquid and vapour lines , ultrasonic thickness measurement on shell plates , wet fluorescent magnetic particle test , ultrasonic flaw detection , dye penetration test , hardness testing , radiography test , wet type calibaration of bullets , settlement of mounded bullets , settlement of mounded bullets during hydrotesting , replacement of nuts, bolts, washers and gaskets , hydrotest and stretchtest , certification and documentation, statutory inspection and ndt testing and certification of all three msvs at allahabad lpg plant, disconnecting the inlet, outlet of the lpg liquid and vapour line, srv, hla, servo gauge, radar gauge manhole, water drain line, globe valves, rov and other fittings of the bullets, removal of fire proof coating wherever necessary and disconnection of electrical cables without any damage as per the directions of the bpcl site engineer / third party inspection agency official. any damage for the fittings or any equipments during removal & fixing of the connection has to be made good by the tenderer - for 900 mt mounded storage vessel, degassing of bullets with bpcl supplied water after making necessary connections for in and out flow with suitable pipelines / hose arrangements as directed on site. the water used for degassing should be disposed off safely in the drainage and the sludge if any coming along with water should be carefully removed and disposed / kept in safe place as directed at site. the sludge should be buried if necessary as per directions of location in charge or his representative. a sample of all sludge collected should be handed over to the lic / site engineer. deboxing / boxing, dismantling / pitting back all gadgets on bullet, also all jobs related to blind flanging up to 1st isolation valve -- for 900 mt mounded storage vessel, providing ms tubular ladder/scaffolding inside the bullet suitable for cleaning of inner surface and suitable for carrying out all inspections like ultrasonic testing, mpi and all allied jobs as directed. ladder / scaffolding(s) shall have to be retained at site till the completion of all three bullets testing and the same scaffolding(s) may be used for providing in the other bullets by turn. the contractor shall also provide oxygen meter and ensure oxygen level is as prescribed norms before vessel entry. oxygen metre can be taken back by contractor after the work is over for 900 mt mounded storage vessel, providing flame proof lighting arrangement and exhaust fan inside the bullet for carrying out necessary inspection, cleaning and ndt tests. contractor to supply the flame proof lightfittings, junction boxes, required cables etc, as directed at site. lighting arrangement shall have to be retained at site till completion of all the bullets and the same lighting arrangement may be used in the other bullets by turn - for 900 mt mounded storage vessel, thorough cleaning of the inner surface with water jet and clearing the sludge / rust materials followed by thorough cleaning of inner surface to remove the scales, oil and dust by wire brushes to expose the metal surfaces and thorough buffing of weld joints. cleaning of minimum 50 mm on both sides of each weld joint including nozzle welds by thorough cleaning using rotary brushes to expose bare metal (shinning surface) with care to entire weld joints of nozzles and weld area of support legs and other areas as directed at site. the contractor has to provide all equipments and consumables for carrying out the cleaning jobs. localized grinding of the welds to be done if required as directed by our site engineer / third party inspection agency official. dispose off the sludge of bullet at designated place after excavation as per direction of bpcl - for 900 mt mounded storage vessel, carrying out external inspection on mound, retaining wall, inspection tunnel, bottom nozzle & its suspension/ supports, accessible top nozzles etc - for 900 mt mounded storage vessel, fixing back all the liquid and vapour lines after servicing the valves, efcv and fixing all removed fittings like hla, srv, pressure/ temp/ servo/ rochester gauges, manhole cover etc. after completing the testing, purging/fresh gas in is to be carried out with assistance from & under supervision of & as instructed by bpcl/third party inspection agency - for 900 mt mounded storage vessel, ultrasonic thickness measurement on shell plates, dished end plates, lpg pipelines and nozzles as per applicable code and as per the instructions of third party agency / bpcl site engineer - for 900 mt mounded storage vessel, wet fluorescent magnetic particle test of welds using ac yoke ,magnaflux ,tiede,y6 black light and white washable distemper as background and as per applicable codes and as instructed by bpcl or third party agency. internal complete .all weld joints from inside, nozzle welds internal & external for 900 mt mounded storage vessel, complete ultrasonic flaw detection of welds as per applicable code from inside the bullets and as instructed by bpcl or third party agency for 900 mt mounded storage vessel, dye penetration test at all accessible areas and as pe applicable code and as instructed by bpcl or third party agency for 900 mt mounded storage vessel, hardness testing on selected spots on welds, haz and parent metal in each accessible area as per applicable codes and as instructed by bpcl and third party agency - for 900 mt mounded storage vessel, radiography test for weld joints at selected locations as problem defects,flaws observed during other tests subject to a maximum of 10 perncent of total weld length as per applicable code and as instructed by third party inspecting agency. oonly to be conducted where defects, flaws are observed for 900 mt mounded storage vessel, wet type calibaration of bullets. calibration table will be in 10 mm height intervals with 1 mm proportional part tables or as decided by bpcl. approval & stamping of calibration charts by cpwd shall be done by the party. before start of calibration adetailed procedure has to be submitted - for 900 mt mounded storage vessel, settlement of mounded bullets checking of settlement of mounded bullets by using laser technique for horizontal plain shift and plumb line theodolit technique for vertical plain shift. the person performing settlement shall be experienced in the relevant field. settlement analysis for all three msvs shall be carried out every six months for a period of three years. this excludes the settlement analysis to be carried out during hydrotesting. during hydrotesting, settlement monitoring shall be done as specified in line item no. 16., settlement of mounded bullets, checking of settlement of mounded bullets by using laser technique for horizontal plain shift and plumb line ,theodolit technique for vertical plain shift. the person performing settlement shall be experienced in the relevant field. settlement reading shall be taken during filling of water before hydrotest at 0, 25, 50 and after hydrotesting for 900 mt mounded storage vessel, replacement of nuts, bolts, washers and gaskets supply and fixing of all gaskets, studs and nuts for all fittings after the isolation valve near to water drain line provided in bullets - for 900mt mounded storage vessel, hydrotest and stretchtest, to conduct hydrotest test of vessel and also connected pipings in total as required and as directed at site, after successful of all nd test as per smpv rules and relevant codes for 900 mt mounded storage vessel, certification and documentation for 900 mt lpg storage bullets to submit 3 sets of testing and inspection certificates and reports and documents for all tests and inspection covered in the scope of work as per smpv rule no.19 .issue of online certificate of test alongwith annexure giving the details of ndt inspection, bidders should first download and review all available tender documents. These documents generally include the Notice Inviting Tender (NIT), Bill of Quantities (BOQ), technical specifications, eligibility criteria, scope of work, and bid submission instructions.


Tender Governemnt Authorities like Bharat Petroleum Corporation Limited BPCL usually publish these documents on their official eProcurement portals, departmental tender portals, the GeM Tender Portal, or other government procurement platforms or on newspapre. Finding and accessing the correct tender documents across multiple portals can sometimes be time-consuming for bidders. 


To make the process easier, Tender18 provides quick access to the available tender documents related to this Prayagraj , Uttar Pradesh tender on a single page. Businesses involved in lighting arrangement,washable distemper,junction boxes,retaining wall,exhaust fan,dismantling,calibration,cleaning,clearing,grinding,washers,brushes,nozzles,ladder,valves,cables,nozzle,bolts,valve,studs,nuts,wire,fan related products, services, or works can conveniently download the relevant documents and review the tender requirements without spending time searching across different procurement portals.

The tender for disconnecting of fittings , degassing of bullets , providing ms tubular ladder and scaffolding , providing flame proof lighting arrangement and exhaust fan , thorough cleaning of the inner surface , carrying out external inspection , fixing back all the liquid and vapour lines , ultrasonic thickness measurement on shell plates , wet fluorescent magnetic particle test , ultrasonic flaw detection , dye penetration test , hardness testing , radiography test , wet type calibaration of bullets , settlement of mounded bullets , settlement of mounded bullets during hydrotesting , replacement of nuts, bolts, washers and gaskets , hydrotest and stretchtest , certification and documentation, statutory inspection and ndt testing and certification of all three msvs at allahabad lpg plant, disconnecting the inlet, outlet of the lpg liquid and vapour line, srv, hla, servo gauge, radar gauge manhole, water drain line, globe valves, rov and other fittings of the bullets, removal of fire proof coating wherever necessary and disconnection of electrical cables without any damage as per the directions of the bpcl site engineer / third party inspection agency official. any damage for the fittings or any equipments during removal & fixing of the connection has to be made good by the tenderer - for 900 mt mounded storage vessel, degassing of bullets with bpcl supplied water after making necessary connections for in and out flow with suitable pipelines / hose arrangements as directed on site. the water used for degassing should be disposed off safely in the drainage and the sludge if any coming along with water should be carefully removed and disposed / kept in safe place as directed at site. the sludge should be buried if necessary as per directions of location in charge or his representative. a sample of all sludge collected should be handed over to the lic / site engineer. deboxing / boxing, dismantling / pitting back all gadgets on bullet, also all jobs related to blind flanging up to 1st isolation valve -- for 900 mt mounded storage vessel, providing ms tubular ladder/scaffolding inside the bullet suitable for cleaning of inner surface and suitable for carrying out all inspections like ultrasonic testing, mpi and all allied jobs as directed. ladder / scaffolding(s) shall have to be retained at site till the completion of all three bullets testing and the same scaffolding(s) may be used for providing in the other bullets by turn. the contractor shall also provide oxygen meter and ensure oxygen level is as prescribed norms before vessel entry. oxygen metre can be taken back by contractor after the work is over for 900 mt mounded storage vessel, providing flame proof lighting arrangement and exhaust fan inside the bullet for carrying out necessary inspection, cleaning and ndt tests. contractor to supply the flame proof lightfittings, junction boxes, required cables etc, as directed at site. lighting arrangement shall have to be retained at site till completion of all the bullets and the same lighting arrangement may be used in the other bullets by turn - for 900 mt mounded storage vessel, thorough cleaning of the inner surface with water jet and clearing the sludge / rust materials followed by thorough cleaning of inner surface to remove the scales, oil and dust by wire brushes to expose the metal surfaces and thorough buffing of weld joints. cleaning of minimum 50 mm on both sides of each weld joint including nozzle welds by thorough cleaning using rotary brushes to expose bare metal (shinning surface) with care to entire weld joints of nozzles and weld area of support legs and other areas as directed at site. the contractor has to provide all equipments and consumables for carrying out the cleaning jobs. localized grinding of the welds to be done if required as directed by our site engineer / third party inspection agency official. dispose off the sludge of bullet at designated place after excavation as per direction of bpcl - for 900 mt mounded storage vessel, carrying out external inspection on mound, retaining wall, inspection tunnel, bottom nozzle & its suspension/ supports, accessible top nozzles etc - for 900 mt mounded storage vessel, fixing back all the liquid and vapour lines after servicing the valves, efcv and fixing all removed fittings like hla, srv, pressure/ temp/ servo/ rochester gauges, manhole cover etc. after completing the testing, purging/fresh gas in is to be carried out with assistance from & under supervision of & as instructed by bpcl/third party inspection agency - for 900 mt mounded storage vessel, ultrasonic thickness measurement on shell plates, dished end plates, lpg pipelines and nozzles as per applicable code and as per the instructions of third party agency / bpcl site engineer - for 900 mt mounded storage vessel, wet fluorescent magnetic particle test of welds using ac yoke ,magnaflux ,tiede,y6 black light and white washable distemper as background and as per applicable codes and as instructed by bpcl or third party agency. internal complete .all weld joints from inside, nozzle welds internal & external for 900 mt mounded storage vessel, complete ultrasonic flaw detection of welds as per applicable code from inside the bullets and as instructed by bpcl or third party agency for 900 mt mounded storage vessel, dye penetration test at all accessible areas and as pe applicable code and as instructed by bpcl or third party agency for 900 mt mounded storage vessel, hardness testing on selected spots on welds, haz and parent metal in each accessible area as per applicable codes and as instructed by bpcl and third party agency - for 900 mt mounded storage vessel, radiography test for weld joints at selected locations as problem defects,flaws observed during other tests subject to a maximum of 10 perncent of total weld length as per applicable code and as instructed by third party inspecting agency. oonly to be conducted where defects, flaws are observed for 900 mt mounded storage vessel, wet type calibaration of bullets. calibration table will be in 10 mm height intervals with 1 mm proportional part tables or as decided by bpcl. approval & stamping of calibration charts by cpwd shall be done by the party. before start of calibration adetailed procedure has to be submitted - for 900 mt mounded storage vessel, settlement of mounded bullets checking of settlement of mounded bullets by using laser technique for horizontal plain shift and plumb line theodolit technique for vertical plain shift. the person performing settlement shall be experienced in the relevant field. settlement analysis for all three msvs shall be carried out every six months for a period of three years. this excludes the settlement analysis to be carried out during hydrotesting. during hydrotesting, settlement monitoring shall be done as specified in line item no. 16., settlement of mounded bullets, checking of settlement of mounded bullets by using laser technique for horizontal plain shift and plumb line ,theodolit technique for vertical plain shift. the person performing settlement shall be experienced in the relevant field. settlement reading shall be taken during filling of water before hydrotest at 0, 25, 50 and after hydrotesting for 900 mt mounded storage vessel, replacement of nuts, bolts, washers and gaskets supply and fixing of all gaskets, studs and nuts for all fittings after the isolation valve near to water drain line provided in bullets - for 900mt mounded storage vessel, hydrotest and stretchtest, to conduct hydrotest test of vessel and also connected pipings in total as required and as directed at site, after successful of all nd test as per smpv rules and relevant codes for 900 mt mounded storage vessel, certification and documentation for 900 mt lpg storage bullets to submit 3 sets of testing and inspection certificates and reports and documents for all tests and inspection covered in the scope of work as per smpv rule no.19 .issue of online certificate of test alongwith annexure giving the details of ndt inspection from Prayagraj, Uttar Pradesh may be relevant for contractors, suppliers, vendors, manufacturers, consultants, service providers, startups, MSMEs, and other organizations involved in lighting arrangement,washable distemper,junction boxes,retaining wall,exhaust fan,dismantling,calibration,cleaning,clearing,grinding,washers,brushes,nozzles,ladder,valves,cables,nozzle,bolts,valve,studs,nuts,wire,fan related products, services, or works. However, eligibility to participate depends on the qualification criteria specified by Bharat Petroleum Corporation Limited BPCL in the official tender documents.

Before submitting a bid, interested applicants should carefully review the eligibility conditions, technical requirements, financial criteria, work experience requirements, annual turnover conditions, registrations, certifications, and any other supporting documents required by the tendering authority. The detailed qualification requirements and bidder eligibility criteria are available in the tender notice and related documents provided on this page. 

Ensuring compliance with all eligibility and qualification requirements before bid submission can help bidders avoid disqualification and improve their chances of successful participation in the tender process.

Tende18 provides comprehensive tender bidding services, including a complete tender summary along with a detailed analysis of the Tender Qualification and Eligibility Criteria.

Interested in participating in the tender for disconnecting of fittings , degassing of bullets , providing ms tubular ladder and scaffolding , providing flame proof lighting arrangement and exhaust fan , thorough cleaning of the inner surface , carrying out external inspection , fixing back all the liquid and vapour lines , ultrasonic thickness measurement on shell plates , wet fluorescent magnetic particle test , ultrasonic flaw detection , dye penetration test , hardness testing , radiography test , wet type calibaration of bullets , settlement of mounded bullets , settlement of mounded bullets during hydrotesting , replacement of nuts, bolts, washers and gaskets , hydrotest and stretchtest , certification and documentation, statutory inspection and ndt testing and certification of all three msvs at allahabad lpg plant, disconnecting the inlet, outlet of the lpg liquid and vapour line, srv, hla, servo gauge, radar gauge manhole, water drain line, globe valves, rov and other fittings of the bullets, removal of fire proof coating wherever necessary and disconnection of electrical cables without any damage as per the directions of the bpcl site engineer / third party inspection agency official. any damage for the fittings or any equipments during removal & fixing of the connection has to be made good by the tenderer - for 900 mt mounded storage vessel, degassing of bullets with bpcl supplied water after making necessary connections for in and out flow with suitable pipelines / hose arrangements as directed on site. the water used for degassing should be disposed off safely in the drainage and the sludge if any coming along with water should be carefully removed and disposed / kept in safe place as directed at site. the sludge should be buried if necessary as per directions of location in charge or his representative. a sample of all sludge collected should be handed over to the lic / site engineer. deboxing / boxing, dismantling / pitting back all gadgets on bullet, also all jobs related to blind flanging up to 1st isolation valve -- for 900 mt mounded storage vessel, providing ms tubular ladder/scaffolding inside the bullet suitable for cleaning of inner surface and suitable for carrying out all inspections like ultrasonic testing, mpi and all allied jobs as directed. ladder / scaffolding(s) shall have to be retained at site till the completion of all three bullets testing and the same scaffolding(s) may be used for providing in the other bullets by turn. the contractor shall also provide oxygen meter and ensure oxygen level is as prescribed norms before vessel entry. oxygen metre can be taken back by contractor after the work is over for 900 mt mounded storage vessel, providing flame proof lighting arrangement and exhaust fan inside the bullet for carrying out necessary inspection, cleaning and ndt tests. contractor to supply the flame proof lightfittings, junction boxes, required cables etc, as directed at site. lighting arrangement shall have to be retained at site till completion of all the bullets and the same lighting arrangement may be used in the other bullets by turn - for 900 mt mounded storage vessel, thorough cleaning of the inner surface with water jet and clearing the sludge / rust materials followed by thorough cleaning of inner surface to remove the scales, oil and dust by wire brushes to expose the metal surfaces and thorough buffing of weld joints. cleaning of minimum 50 mm on both sides of each weld joint including nozzle welds by thorough cleaning using rotary brushes to expose bare metal (shinning surface) with care to entire weld joints of nozzles and weld area of support legs and other areas as directed at site. the contractor has to provide all equipments and consumables for carrying out the cleaning jobs. localized grinding of the welds to be done if required as directed by our site engineer / third party inspection agency official. dispose off the sludge of bullet at designated place after excavation as per direction of bpcl - for 900 mt mounded storage vessel, carrying out external inspection on mound, retaining wall, inspection tunnel, bottom nozzle & its suspension/ supports, accessible top nozzles etc - for 900 mt mounded storage vessel, fixing back all the liquid and vapour lines after servicing the valves, efcv and fixing all removed fittings like hla, srv, pressure/ temp/ servo/ rochester gauges, manhole cover etc. after completing the testing, purging/fresh gas in is to be carried out with assistance from & under supervision of & as instructed by bpcl/third party inspection agency - for 900 mt mounded storage vessel, ultrasonic thickness measurement on shell plates, dished end plates, lpg pipelines and nozzles as per applicable code and as per the instructions of third party agency / bpcl site engineer - for 900 mt mounded storage vessel, wet fluorescent magnetic particle test of welds using ac yoke ,magnaflux ,tiede,y6 black light and white washable distemper as background and as per applicable codes and as instructed by bpcl or third party agency. internal complete .all weld joints from inside, nozzle welds internal & external for 900 mt mounded storage vessel, complete ultrasonic flaw detection of welds as per applicable code from inside the bullets and as instructed by bpcl or third party agency for 900 mt mounded storage vessel, dye penetration test at all accessible areas and as pe applicable code and as instructed by bpcl or third party agency for 900 mt mounded storage vessel, hardness testing on selected spots on welds, haz and parent metal in each accessible area as per applicable codes and as instructed by bpcl and third party agency - for 900 mt mounded storage vessel, radiography test for weld joints at selected locations as problem defects,flaws observed during other tests subject to a maximum of 10 perncent of total weld length as per applicable code and as instructed by third party inspecting agency. oonly to be conducted where defects, flaws are observed for 900 mt mounded storage vessel, wet type calibaration of bullets. calibration table will be in 10 mm height intervals with 1 mm proportional part tables or as decided by bpcl. approval & stamping of calibration charts by cpwd shall be done by the party. before start of calibration adetailed procedure has to be submitted - for 900 mt mounded storage vessel, settlement of mounded bullets checking of settlement of mounded bullets by using laser technique for horizontal plain shift and plumb line theodolit technique for vertical plain shift. the person performing settlement shall be experienced in the relevant field. settlement analysis for all three msvs shall be carried out every six months for a period of three years. this excludes the settlement analysis to be carried out during hydrotesting. during hydrotesting, settlement monitoring shall be done as specified in line item no. 16., settlement of mounded bullets, checking of settlement of mounded bullets by using laser technique for horizontal plain shift and plumb line ,theodolit technique for vertical plain shift. the person performing settlement shall be experienced in the relevant field. settlement reading shall be taken during filling of water before hydrotest at 0, 25, 50 and after hydrotesting for 900 mt mounded storage vessel, replacement of nuts, bolts, washers and gaskets supply and fixing of all gaskets, studs and nuts for all fittings after the isolation valve near to water drain line provided in bullets - for 900mt mounded storage vessel, hydrotest and stretchtest, to conduct hydrotest test of vessel and also connected pipings in total as required and as directed at site, after successful of all nd test as per smpv rules and relevant codes for 900 mt mounded storage vessel, certification and documentation for 900 mt lpg storage bullets to submit 3 sets of testing and inspection certificates and reports and documents for all tests and inspection covered in the scope of work as per smpv rule no.19 .issue of online certificate of test alongwith annexure giving the details of ndt inspection issued by Bharat Petroleum Corporation Limited BPCL for lighting arrangement,washable distemper,junction boxes,retaining wall,exhaust fan,dismantling,calibration,cleaning,clearing,grinding,washers,brushes,nozzles,ladder,valves,cables,nozzle,bolts,valve,studs,nuts,wire,fan related work in Prayagraj, Uttar Pradesh? TENDER18 provides complete assistance to help businesses understand tender requirements, access tender documents, review eligibility criteria, qualification requirements, important dates, and bid submission guidelines associated with this tender.

Our Tender18 Expert Technical team can assist with vendor and GeM registration on the relevant departmental, eProcurement, GeM, or government tender portal, preparation of technical and financial bid documents, compliance with qualification criteria, document verification, and complete online tender submission support. Whether you are a contractor, supplier, manufacturer, consultant, startup, or MSME working in the field of lighting arrangement,washable distemper,junction boxes,retaining wall,exhaust fan,dismantling,calibration,cleaning,clearing,grinding,washers,brushes,nozzles,ladder,valves,cables,nozzle,bolts,valve,studs,nuts,wire,fan, Tender18 can help simplify the tender participation process and support you throughout every stage of bidding for this tender. so that tender18 is one the top leading tender consultant in Inda.

1.

Whom should I contact if I have further queries about the Tender scope?

You can fill out the integrated inquiry form below on this detail page to share your company profile. Our consultancy desk will review your query regarding lighting arrangement,washable distemper,junction boxes,retaining wall,exhaust fan,dismantling,calibration,cleaning,clearing,grinding,washers,brushes,nozzles,ladder,valves,cables,nozzle,bolts,valve,studs,nuts,wire,fan parameters and guide you on how to coordinate efficiently with the procurement team of Bharat Petroleum Corporation Limited BPCL

2.

How can Tender18 assist my business in winning this government contract?

Tender18 provides end-to-end professional bidding support and documentation advisory for Tender For Disconnecting Of Fittings , Degassing Of Bullets , Providing Ms Tubular Ladder And Scaffolding , Providing Flame Proof Lighting Arrangement And Exhaust Fan , Thorough Cleaning Of The Inner Surface , Carrying Out External Inspection , Fixing Back All The Liquid And Vapour Lines , Ultrasonic Thickness Measurement On Shell Plates , Wet Fluorescent Magnetic Particle Test , Ultrasonic Flaw Detection , Dye Penetration Test , Hardness Testing , Radiography Test , Wet Type Calibaration Of Bullets , Settlement Of Mounded Bullets , Settlement Of Mounded Bullets During Hydrotesting , Replacement Of Nuts, Bolts, Washers And Gaskets , Hydrotest And Stretchtest , Certification And Documentation, Statutory Inspection And Ndt Testing And Certification Of All Three Msvs At Allahabad Lpg Plant, Disconnecting The Inlet, Outlet Of The Lpg Liquid And Vapour Line, Srv, Hla, Servo Gauge, Radar Gauge Manhole, Water Drain Line, Globe Valves, Rov And Other Fittings Of The Bullets, Removal Of Fire Proof Coating Wherever Necessary And Disconnection Of Electrical Cables Without Any Damage As Per The Directions Of The Bpcl Site Engineer / Third Party Inspection Agency Official. Any Damage For The Fittings Or Any Equipments During Removal & Fixing Of The Connection Has To Be Made Good By The Tenderer - For 900 Mt Mounded Storage Vessel, Degassing Of Bullets With Bpcl Supplied Water After Making Necessary Connections For In And Out Flow With Suitable Pipelines / Hose Arrangements As Directed On Site. The Water Used For Degassing Should Be Disposed Off Safely In The Drainage And The Sludge If Any Coming Along With Water Should Be Carefully Removed And Disposed / Kept In Safe Place As Directed At Site. The Sludge Should Be Buried If Necessary As Per Directions Of Location In Charge Or His Representative. A Sample Of All Sludge Collected Should Be Handed Over To The Lic / Site Engineer. Deboxing / Boxing, Dismantling / Pitting Back All Gadgets On Bullet, Also All Jobs Related To Blind Flanging Up To 1st Isolation Valve -- For 900 Mt Mounded Storage Vessel, Providing Ms Tubular Ladder/scaffolding Inside The Bullet Suitable For Cleaning Of Inner Surface And Suitable For Carrying Out All Inspections Like Ultrasonic Testing, Mpi And All Allied Jobs As Directed. Ladder / Scaffolding(s) Shall Have To Be Retained At Site Till The Completion Of All Three Bullets Testing And The Same Scaffolding(s) May Be Used For Providing In The Other Bullets By Turn. The Contractor Shall Also Provide Oxygen Meter And Ensure Oxygen Level Is As Prescribed Norms Before Vessel Entry. Oxygen Metre Can Be Taken Back By Contractor After The Work Is Over For 900 Mt Mounded Storage Vessel, Providing Flame Proof Lighting Arrangement And Exhaust Fan Inside The Bullet For Carrying Out Necessary Inspection, Cleaning And Ndt Tests. Contractor To Supply The Flame Proof Lightfittings, Junction Boxes, Required Cables Etc, As Directed At Site. Lighting Arrangement Shall Have To Be Retained At Site Till Completion Of All The Bullets And The Same Lighting Arrangement May Be Used In The Other Bullets By Turn - For 900 Mt Mounded Storage Vessel, Thorough Cleaning Of The Inner Surface With Water Jet And Clearing The Sludge / Rust Materials Followed By Thorough Cleaning Of Inner Surface To Remove The Scales, Oil And Dust By Wire Brushes To Expose The Metal Surfaces And Thorough Buffing Of Weld Joints. Cleaning Of Minimum 50 Mm On Both Sides Of Each Weld Joint Including Nozzle Welds By Thorough Cleaning Using Rotary Brushes To Expose Bare Metal (shinning Surface) With Care To Entire Weld Joints Of Nozzles And Weld Area Of Support Legs And Other Areas As Directed At Site. The Contractor Has To Provide All Equipments And Consumables For Carrying Out The Cleaning Jobs. Localized Grinding Of The Welds To Be Done If Required As Directed By Our Site Engineer / Third Party Inspection Agency Official. Dispose Off The Sludge Of Bullet At Designated Place After Excavation As Per Direction Of Bpcl - For 900 Mt Mounded Storage Vessel, Carrying Out External Inspection On Mound, Retaining Wall, Inspection Tunnel, Bottom Nozzle & Its Suspension/ Supports, Accessible Top Nozzles Etc - For 900 Mt Mounded Storage Vessel, Fixing Back All The Liquid And Vapour Lines After Servicing The Valves, Efcv And Fixing All Removed Fittings Like Hla, Srv, Pressure/ Temp/ Servo/ Rochester Gauges, Manhole Cover Etc. After Completing The Testing, Purging/fresh Gas In Is To Be Carried Out With Assistance From & Under Supervision Of & As Instructed By Bpcl/third Party Inspection Agency - For 900 Mt Mounded Storage Vessel, Ultrasonic Thickness Measurement On Shell Plates, Dished End Plates, Lpg Pipelines And Nozzles As Per Applicable Code And As Per The Instructions Of Third Party Agency / Bpcl Site Engineer - For 900 Mt Mounded Storage Vessel, Wet Fluorescent Magnetic Particle Test Of Welds Using Ac Yoke ,magnaflux ,tiede,y6 Black Light And White Washable Distemper As Background And As Per Applicable Codes And As Instructed By Bpcl Or Third Party Agency. Internal Complete .all Weld Joints From Inside, Nozzle Welds Internal & External For 900 Mt Mounded Storage Vessel, Complete Ultrasonic Flaw Detection Of Welds As Per Applicable Code From Inside The Bullets And As Instructed By Bpcl Or Third Party Agency For 900 Mt Mounded Storage Vessel, Dye Penetration Test At All Accessible Areas And As Pe Applicable Code And As Instructed By Bpcl Or Third Party Agency For 900 Mt Mounded Storage Vessel, Hardness Testing On Selected Spots On Welds, Haz And Parent Metal In Each Accessible Area As Per Applicable Codes And As Instructed By Bpcl And Third Party Agency - For 900 Mt Mounded Storage Vessel, Radiography Test For Weld Joints At Selected Locations As Problem Defects,flaws Observed During Other Tests Subject To A Maximum Of 10 Perncent Of Total Weld Length As Per Applicable Code And As Instructed By Third Party Inspecting Agency. Oonly To Be Conducted Where Defects, Flaws Are Observed For 900 Mt Mounded Storage Vessel, Wet Type Calibaration Of Bullets. Calibration Table Will Be In 10 Mm Height Intervals With 1 Mm Proportional Part Tables Or As Decided By Bpcl. Approval & Stamping Of Calibration Charts By Cpwd Shall Be Done By The Party. Before Start Of Calibration Adetailed Procedure Has To Be Submitted - For 900 Mt Mounded Storage Vessel, Settlement Of Mounded Bullets Checking Of Settlement Of Mounded Bullets By Using Laser Technique For Horizontal Plain Shift And Plumb Line Theodolit Technique For Vertical Plain Shift. The Person Performing Settlement Shall Be Experienced In The Relevant Field. Settlement Analysis For All Three Msvs Shall Be Carried Out Every Six Months For A Period Of Three Years. This Excludes The Settlement Analysis To Be Carried Out During Hydrotesting. During Hydrotesting, Settlement Monitoring Shall Be Done As Specified In Line Item No. 16., Settlement Of Mounded Bullets, Checking Of Settlement Of Mounded Bullets By Using Laser Technique For Horizontal Plain Shift And Plumb Line ,theodolit Technique For Vertical Plain Shift. The Person Performing Settlement Shall Be Experienced In The Relevant Field. Settlement Reading Shall Be Taken During Filling Of Water Before Hydrotest At 0, 25, 50 And After Hydrotesting For 900 Mt Mounded Storage Vessel, Replacement Of Nuts, Bolts, Washers And Gaskets Supply And Fixing Of All Gaskets, Studs And Nuts For All Fittings After The Isolation Valve Near To Water Drain Line Provided In Bullets - For 900mt Mounded Storage Vessel, Hydrotest And Stretchtest, To Conduct Hydrotest Test Of Vessel And Also Connected Pipings In Total As Required And As Directed At Site, After Successful Of All Nd Test As Per Smpv Rules And Relevant Codes For 900 Mt Mounded Storage Vessel, Certification And Documentation For 900 Mt Lpg Storage Bullets To Submit 3 Sets Of Testing And Inspection Certificates And Reports And Documents For All Tests And Inspection Covered In The Scope Of Work As Per Smpv Rule No.19 .issue Of Online Certificate Of Test Alongwith Annexure Giving The Details Of Ndt Inspection . Our senior analysts help you decode the complete project guidelines, manage accurate costing sheets, and complete error-free submissions on the official platform used by Bharat Petroleum Corporation Limited BPCL.

3.

What are the main reasons for a technical tender rejection?

Most online bids face rejection during the initial evaluation round due to avoidable errors like uploading blurred document scans, submitting expired DSCs, or missing critical experience papers required for Tender For Disconnecting Of Fittings , Degassing Of Bullets , Providing Ms Tubular Ladder And Scaffolding , Providing Flame Proof Lighting Arrangement And Exhaust Fan , Thorough Cleaning Of The Inner Surface , Carrying Out External Inspection , Fixing Back All The Liquid And Vapour Lines , Ultrasonic Thickness Measurement On Shell Plates , Wet Fluorescent Magnetic Particle Test , Ultrasonic Flaw Detection , Dye Penetration Test , Hardness Testing , Radiography Test , Wet Type Calibaration Of Bullets , Settlement Of Mounded Bullets , Settlement Of Mounded Bullets During Hydrotesting , Replacement Of Nuts, Bolts, Washers And Gaskets , Hydrotest And Stretchtest , Certification And Documentation, Statutory Inspection And Ndt Testing And Certification Of All Three Msvs At Allahabad Lpg Plant, Disconnecting The Inlet, Outlet Of The Lpg Liquid And Vapour Line, Srv, Hla, Servo Gauge, Radar Gauge Manhole, Water Drain Line, Globe Valves, Rov And Other Fittings Of The Bullets, Removal Of Fire Proof Coating Wherever Necessary And Disconnection Of Electrical Cables Without Any Damage As Per The Directions Of The Bpcl Site Engineer / Third Party Inspection Agency Official. Any Damage For The Fittings Or Any Equipments During Removal & Fixing Of The Connection Has To Be Made Good By The Tenderer - For 900 Mt Mounded Storage Vessel, Degassing Of Bullets With Bpcl Supplied Water After Making Necessary Connections For In And Out Flow With Suitable Pipelines / Hose Arrangements As Directed On Site. The Water Used For Degassing Should Be Disposed Off Safely In The Drainage And The Sludge If Any Coming Along With Water Should Be Carefully Removed And Disposed / Kept In Safe Place As Directed At Site. The Sludge Should Be Buried If Necessary As Per Directions Of Location In Charge Or His Representative. A Sample Of All Sludge Collected Should Be Handed Over To The Lic / Site Engineer. Deboxing / Boxing, Dismantling / Pitting Back All Gadgets On Bullet, Also All Jobs Related To Blind Flanging Up To 1st Isolation Valve -- For 900 Mt Mounded Storage Vessel, Providing Ms Tubular Ladder/scaffolding Inside The Bullet Suitable For Cleaning Of Inner Surface And Suitable For Carrying Out All Inspections Like Ultrasonic Testing, Mpi And All Allied Jobs As Directed. Ladder / Scaffolding(s) Shall Have To Be Retained At Site Till The Completion Of All Three Bullets Testing And The Same Scaffolding(s) May Be Used For Providing In The Other Bullets By Turn. The Contractor Shall Also Provide Oxygen Meter And Ensure Oxygen Level Is As Prescribed Norms Before Vessel Entry. Oxygen Metre Can Be Taken Back By Contractor After The Work Is Over For 900 Mt Mounded Storage Vessel, Providing Flame Proof Lighting Arrangement And Exhaust Fan Inside The Bullet For Carrying Out Necessary Inspection, Cleaning And Ndt Tests. Contractor To Supply The Flame Proof Lightfittings, Junction Boxes, Required Cables Etc, As Directed At Site. Lighting Arrangement Shall Have To Be Retained At Site Till Completion Of All The Bullets And The Same Lighting Arrangement May Be Used In The Other Bullets By Turn - For 900 Mt Mounded Storage Vessel, Thorough Cleaning Of The Inner Surface With Water Jet And Clearing The Sludge / Rust Materials Followed By Thorough Cleaning Of Inner Surface To Remove The Scales, Oil And Dust By Wire Brushes To Expose The Metal Surfaces And Thorough Buffing Of Weld Joints. Cleaning Of Minimum 50 Mm On Both Sides Of Each Weld Joint Including Nozzle Welds By Thorough Cleaning Using Rotary Brushes To Expose Bare Metal (shinning Surface) With Care To Entire Weld Joints Of Nozzles And Weld Area Of Support Legs And Other Areas As Directed At Site. The Contractor Has To Provide All Equipments And Consumables For Carrying Out The Cleaning Jobs. Localized Grinding Of The Welds To Be Done If Required As Directed By Our Site Engineer / Third Party Inspection Agency Official. Dispose Off The Sludge Of Bullet At Designated Place After Excavation As Per Direction Of Bpcl - For 900 Mt Mounded Storage Vessel, Carrying Out External Inspection On Mound, Retaining Wall, Inspection Tunnel, Bottom Nozzle & Its Suspension/ Supports, Accessible Top Nozzles Etc - For 900 Mt Mounded Storage Vessel, Fixing Back All The Liquid And Vapour Lines After Servicing The Valves, Efcv And Fixing All Removed Fittings Like Hla, Srv, Pressure/ Temp/ Servo/ Rochester Gauges, Manhole Cover Etc. After Completing The Testing, Purging/fresh Gas In Is To Be Carried Out With Assistance From & Under Supervision Of & As Instructed By Bpcl/third Party Inspection Agency - For 900 Mt Mounded Storage Vessel, Ultrasonic Thickness Measurement On Shell Plates, Dished End Plates, Lpg Pipelines And Nozzles As Per Applicable Code And As Per The Instructions Of Third Party Agency / Bpcl Site Engineer - For 900 Mt Mounded Storage Vessel, Wet Fluorescent Magnetic Particle Test Of Welds Using Ac Yoke ,magnaflux ,tiede,y6 Black Light And White Washable Distemper As Background And As Per Applicable Codes And As Instructed By Bpcl Or Third Party Agency. Internal Complete .all Weld Joints From Inside, Nozzle Welds Internal & External For 900 Mt Mounded Storage Vessel, Complete Ultrasonic Flaw Detection Of Welds As Per Applicable Code From Inside The Bullets And As Instructed By Bpcl Or Third Party Agency For 900 Mt Mounded Storage Vessel, Dye Penetration Test At All Accessible Areas And As Pe Applicable Code And As Instructed By Bpcl Or Third Party Agency For 900 Mt Mounded Storage Vessel, Hardness Testing On Selected Spots On Welds, Haz And Parent Metal In Each Accessible Area As Per Applicable Codes And As Instructed By Bpcl And Third Party Agency - For 900 Mt Mounded Storage Vessel, Radiography Test For Weld Joints At Selected Locations As Problem Defects,flaws Observed During Other Tests Subject To A Maximum Of 10 Perncent Of Total Weld Length As Per Applicable Code And As Instructed By Third Party Inspecting Agency. Oonly To Be Conducted Where Defects, Flaws Are Observed For 900 Mt Mounded Storage Vessel, Wet Type Calibaration Of Bullets. Calibration Table Will Be In 10 Mm Height Intervals With 1 Mm Proportional Part Tables Or As Decided By Bpcl. Approval & Stamping Of Calibration Charts By Cpwd Shall Be Done By The Party. Before Start Of Calibration Adetailed Procedure Has To Be Submitted - For 900 Mt Mounded Storage Vessel, Settlement Of Mounded Bullets Checking Of Settlement Of Mounded Bullets By Using Laser Technique For Horizontal Plain Shift And Plumb Line Theodolit Technique For Vertical Plain Shift. The Person Performing Settlement Shall Be Experienced In The Relevant Field. Settlement Analysis For All Three Msvs Shall Be Carried Out Every Six Months For A Period Of Three Years. This Excludes The Settlement Analysis To Be Carried Out During Hydrotesting. During Hydrotesting, Settlement Monitoring Shall Be Done As Specified In Line Item No. 16., Settlement Of Mounded Bullets, Checking Of Settlement Of Mounded Bullets By Using Laser Technique For Horizontal Plain Shift And Plumb Line ,theodolit Technique For Vertical Plain Shift. The Person Performing Settlement Shall Be Experienced In The Relevant Field. Settlement Reading Shall Be Taken During Filling Of Water Before Hydrotest At 0, 25, 50 And After Hydrotesting For 900 Mt Mounded Storage Vessel, Replacement Of Nuts, Bolts, Washers And Gaskets Supply And Fixing Of All Gaskets, Studs And Nuts For All Fittings After The Isolation Valve Near To Water Drain Line Provided In Bullets - For 900mt Mounded Storage Vessel, Hydrotest And Stretchtest, To Conduct Hydrotest Test Of Vessel And Also Connected Pipings In Total As Required And As Directed At Site, After Successful Of All Nd Test As Per Smpv Rules And Relevant Codes For 900 Mt Mounded Storage Vessel, Certification And Documentation For 900 Mt Lpg Storage Bullets To Submit 3 Sets Of Testing And Inspection Certificates And Reports And Documents For All Tests And Inspection Covered In The Scope Of Work As Per Smpv Rule No.19 .issue Of Online Certificate Of Test Alongwith Annexure Giving The Details Of Ndt Inspection in Uttar Pradesh.

4.

Can contractors located outside the local region participate in this bid?

Eligibility for outstation bidders depends entirely on the terms set inside the document for Tender For Disconnecting Of Fittings , Degassing Of Bullets , Providing Ms Tubular Ladder And Scaffolding , Providing Flame Proof Lighting Arrangement And Exhaust Fan , Thorough Cleaning Of The Inner Surface , Carrying Out External Inspection , Fixing Back All The Liquid And Vapour Lines , Ultrasonic Thickness Measurement On Shell Plates , Wet Fluorescent Magnetic Particle Test , Ultrasonic Flaw Detection , Dye Penetration Test , Hardness Testing , Radiography Test , Wet Type Calibaration Of Bullets , Settlement Of Mounded Bullets , Settlement Of Mounded Bullets During Hydrotesting , Replacement Of Nuts, Bolts, Washers And Gaskets , Hydrotest And Stretchtest , Certification And Documentation, Statutory Inspection And Ndt Testing And Certification Of All Three Msvs At Allahabad Lpg Plant, Disconnecting The Inlet, Outlet Of The Lpg Liquid And Vapour Line, Srv, Hla, Servo Gauge, Radar Gauge Manhole, Water Drain Line, Globe Valves, Rov And Other Fittings Of The Bullets, Removal Of Fire Proof Coating Wherever Necessary And Disconnection Of Electrical Cables Without Any Damage As Per The Directions Of The Bpcl Site Engineer / Third Party Inspection Agency Official. Any Damage For The Fittings Or Any Equipments During Removal & Fixing Of The Connection Has To Be Made Good By The Tenderer - For 900 Mt Mounded Storage Vessel, Degassing Of Bullets With Bpcl Supplied Water After Making Necessary Connections For In And Out Flow With Suitable Pipelines / Hose Arrangements As Directed On Site. The Water Used For Degassing Should Be Disposed Off Safely In The Drainage And The Sludge If Any Coming Along With Water Should Be Carefully Removed And Disposed / Kept In Safe Place As Directed At Site. The Sludge Should Be Buried If Necessary As Per Directions Of Location In Charge Or His Representative. A Sample Of All Sludge Collected Should Be Handed Over To The Lic / Site Engineer. Deboxing / Boxing, Dismantling / Pitting Back All Gadgets On Bullet, Also All Jobs Related To Blind Flanging Up To 1st Isolation Valve -- For 900 Mt Mounded Storage Vessel, Providing Ms Tubular Ladder/scaffolding Inside The Bullet Suitable For Cleaning Of Inner Surface And Suitable For Carrying Out All Inspections Like Ultrasonic Testing, Mpi And All Allied Jobs As Directed. Ladder / Scaffolding(s) Shall Have To Be Retained At Site Till The Completion Of All Three Bullets Testing And The Same Scaffolding(s) May Be Used For Providing In The Other Bullets By Turn. The Contractor Shall Also Provide Oxygen Meter And Ensure Oxygen Level Is As Prescribed Norms Before Vessel Entry. Oxygen Metre Can Be Taken Back By Contractor After The Work Is Over For 900 Mt Mounded Storage Vessel, Providing Flame Proof Lighting Arrangement And Exhaust Fan Inside The Bullet For Carrying Out Necessary Inspection, Cleaning And Ndt Tests. Contractor To Supply The Flame Proof Lightfittings, Junction Boxes, Required Cables Etc, As Directed At Site. Lighting Arrangement Shall Have To Be Retained At Site Till Completion Of All The Bullets And The Same Lighting Arrangement May Be Used In The Other Bullets By Turn - For 900 Mt Mounded Storage Vessel, Thorough Cleaning Of The Inner Surface With Water Jet And Clearing The Sludge / Rust Materials Followed By Thorough Cleaning Of Inner Surface To Remove The Scales, Oil And Dust By Wire Brushes To Expose The Metal Surfaces And Thorough Buffing Of Weld Joints. Cleaning Of Minimum 50 Mm On Both Sides Of Each Weld Joint Including Nozzle Welds By Thorough Cleaning Using Rotary Brushes To Expose Bare Metal (shinning Surface) With Care To Entire Weld Joints Of Nozzles And Weld Area Of Support Legs And Other Areas As Directed At Site. The Contractor Has To Provide All Equipments And Consumables For Carrying Out The Cleaning Jobs. Localized Grinding Of The Welds To Be Done If Required As Directed By Our Site Engineer / Third Party Inspection Agency Official. Dispose Off The Sludge Of Bullet At Designated Place After Excavation As Per Direction Of Bpcl - For 900 Mt Mounded Storage Vessel, Carrying Out External Inspection On Mound, Retaining Wall, Inspection Tunnel, Bottom Nozzle & Its Suspension/ Supports, Accessible Top Nozzles Etc - For 900 Mt Mounded Storage Vessel, Fixing Back All The Liquid And Vapour Lines After Servicing The Valves, Efcv And Fixing All Removed Fittings Like Hla, Srv, Pressure/ Temp/ Servo/ Rochester Gauges, Manhole Cover Etc. After Completing The Testing, Purging/fresh Gas In Is To Be Carried Out With Assistance From & Under Supervision Of & As Instructed By Bpcl/third Party Inspection Agency - For 900 Mt Mounded Storage Vessel, Ultrasonic Thickness Measurement On Shell Plates, Dished End Plates, Lpg Pipelines And Nozzles As Per Applicable Code And As Per The Instructions Of Third Party Agency / Bpcl Site Engineer - For 900 Mt Mounded Storage Vessel, Wet Fluorescent Magnetic Particle Test Of Welds Using Ac Yoke ,magnaflux ,tiede,y6 Black Light And White Washable Distemper As Background And As Per Applicable Codes And As Instructed By Bpcl Or Third Party Agency. Internal Complete .all Weld Joints From Inside, Nozzle Welds Internal & External For 900 Mt Mounded Storage Vessel, Complete Ultrasonic Flaw Detection Of Welds As Per Applicable Code From Inside The Bullets And As Instructed By Bpcl Or Third Party Agency For 900 Mt Mounded Storage Vessel, Dye Penetration Test At All Accessible Areas And As Pe Applicable Code And As Instructed By Bpcl Or Third Party Agency For 900 Mt Mounded Storage Vessel, Hardness Testing On Selected Spots On Welds, Haz And Parent Metal In Each Accessible Area As Per Applicable Codes And As Instructed By Bpcl And Third Party Agency - For 900 Mt Mounded Storage Vessel, Radiography Test For Weld Joints At Selected Locations As Problem Defects,flaws Observed During Other Tests Subject To A Maximum Of 10 Perncent Of Total Weld Length As Per Applicable Code And As Instructed By Third Party Inspecting Agency. Oonly To Be Conducted Where Defects, Flaws Are Observed For 900 Mt Mounded Storage Vessel, Wet Type Calibaration Of Bullets. Calibration Table Will Be In 10 Mm Height Intervals With 1 Mm Proportional Part Tables Or As Decided By Bpcl. Approval & Stamping Of Calibration Charts By Cpwd Shall Be Done By The Party. Before Start Of Calibration Adetailed Procedure Has To Be Submitted - For 900 Mt Mounded Storage Vessel, Settlement Of Mounded Bullets Checking Of Settlement Of Mounded Bullets By Using Laser Technique For Horizontal Plain Shift And Plumb Line Theodolit Technique For Vertical Plain Shift. The Person Performing Settlement Shall Be Experienced In The Relevant Field. Settlement Analysis For All Three Msvs Shall Be Carried Out Every Six Months For A Period Of Three Years. This Excludes The Settlement Analysis To Be Carried Out During Hydrotesting. During Hydrotesting, Settlement Monitoring Shall Be Done As Specified In Line Item No. 16., Settlement Of Mounded Bullets, Checking Of Settlement Of Mounded Bullets By Using Laser Technique For Horizontal Plain Shift And Plumb Line ,theodolit Technique For Vertical Plain Shift. The Person Performing Settlement Shall Be Experienced In The Relevant Field. Settlement Reading Shall Be Taken During Filling Of Water Before Hydrotest At 0, 25, 50 And After Hydrotesting For 900 Mt Mounded Storage Vessel, Replacement Of Nuts, Bolts, Washers And Gaskets Supply And Fixing Of All Gaskets, Studs And Nuts For All Fittings After The Isolation Valve Near To Water Drain Line Provided In Bullets - For 900mt Mounded Storage Vessel, Hydrotest And Stretchtest, To Conduct Hydrotest Test Of Vessel And Also Connected Pipings In Total As Required And As Directed At Site, After Successful Of All Nd Test As Per Smpv Rules And Relevant Codes For 900 Mt Mounded Storage Vessel, Certification And Documentation For 900 Mt Lpg Storage Bullets To Submit 3 Sets Of Testing And Inspection Certificates And Reports And Documents For All Tests And Inspection Covered In The Scope Of Work As Per Smpv Rule No.19 .issue Of Online Certificate Of Test Alongwith Annexure Giving The Details Of Ndt Inspection. While many public sector projects allow national competitive bidding, certain localized works require local offices or specific registration metrics in Prayagraj.

5.

Do I need an active GeM Portal registration to apply for this work?

If this procurement is routed through the central marketplace, an active GeM Seller ID is mandatory to supply lighting arrangement,washable distemper,junction boxes,retaining wall,exhaust fan,dismantling,calibration,cleaning,clearing,grinding,washers,brushes,nozzles,ladder,valves,cables,nozzle,bolts,valve,studs,nuts,wire,fan items. Tender18 offers complete assistance for brand cataloging, profile creation, and vendor assessment required officially by Bharat Petroleum Corporation Limited BPCL

6.

What are the primary legal documents required to submit a valid bid?

To register an eligible bid for these lighting arrangement,washable distemper,junction boxes,retaining wall,exhaust fan,dismantling,calibration,cleaning,clearing,grinding,washers,brushes,nozzles,ladder,valves,cables,nozzle,bolts,valve,studs,nuts,wire,fan contracts, companies must prepare their core compliance documents. Vendors operating across Uttar Pradesh must ensure they possess a valid GST registration, permanent account number (PAN), and active Class-3 Digital Signature Certificates.

7.

What products or services are required for this active work?

This public procurement cycle is specifically looking for qualified vendors and suppliers who can provide high-quality lighting arrangement,washable distemper,junction boxes,retaining wall,exhaust fan,dismantling,calibration,cleaning,clearing,grinding,washers,brushes,nozzles,ladder,valves,cables,nozzle,bolts,valve,studs,nuts,wire,fan solutions. The operational execution, delivery, and deployment of these materials must be managed locally within the Prayagraj region.

8.

Where can I review the estimated cost or budget details for this Tender?

The estimated project cost and budget thresholds can be reviewed directly inside the tender document. Bidders can analyze these qualification files to check if their firm meets the financial capability criteria specified for Tender For Disconnecting Of Fittings , Degassing Of Bullets , Providing Ms Tubular Ladder And Scaffolding , Providing Flame Proof Lighting Arrangement And Exhaust Fan , Thorough Cleaning Of The Inner Surface , Carrying Out External Inspection , Fixing Back All The Liquid And Vapour Lines , Ultrasonic Thickness Measurement On Shell Plates , Wet Fluorescent Magnetic Particle Test , Ultrasonic Flaw Detection , Dye Penetration Test , Hardness Testing , Radiography Test , Wet Type Calibaration Of Bullets , Settlement Of Mounded Bullets , Settlement Of Mounded Bullets During Hydrotesting , Replacement Of Nuts, Bolts, Washers And Gaskets , Hydrotest And Stretchtest , Certification And Documentation, Statutory Inspection And Ndt Testing And Certification Of All Three Msvs At Allahabad Lpg Plant, Disconnecting The Inlet, Outlet Of The Lpg Liquid And Vapour Line, Srv, Hla, Servo Gauge, Radar Gauge Manhole, Water Drain Line, Globe Valves, Rov And Other Fittings Of The Bullets, Removal Of Fire Proof Coating Wherever Necessary And Disconnection Of Electrical Cables Without Any Damage As Per The Directions Of The Bpcl Site Engineer / Third Party Inspection Agency Official. Any Damage For The Fittings Or Any Equipments During Removal & Fixing Of The Connection Has To Be Made Good By The Tenderer - For 900 Mt Mounded Storage Vessel, Degassing Of Bullets With Bpcl Supplied Water After Making Necessary Connections For In And Out Flow With Suitable Pipelines / Hose Arrangements As Directed On Site. The Water Used For Degassing Should Be Disposed Off Safely In The Drainage And The Sludge If Any Coming Along With Water Should Be Carefully Removed And Disposed / Kept In Safe Place As Directed At Site. The Sludge Should Be Buried If Necessary As Per Directions Of Location In Charge Or His Representative. A Sample Of All Sludge Collected Should Be Handed Over To The Lic / Site Engineer. Deboxing / Boxing, Dismantling / Pitting Back All Gadgets On Bullet, Also All Jobs Related To Blind Flanging Up To 1st Isolation Valve -- For 900 Mt Mounded Storage Vessel, Providing Ms Tubular Ladder/scaffolding Inside The Bullet Suitable For Cleaning Of Inner Surface And Suitable For Carrying Out All Inspections Like Ultrasonic Testing, Mpi And All Allied Jobs As Directed. Ladder / Scaffolding(s) Shall Have To Be Retained At Site Till The Completion Of All Three Bullets Testing And The Same Scaffolding(s) May Be Used For Providing In The Other Bullets By Turn. The Contractor Shall Also Provide Oxygen Meter And Ensure Oxygen Level Is As Prescribed Norms Before Vessel Entry. Oxygen Metre Can Be Taken Back By Contractor After The Work Is Over For 900 Mt Mounded Storage Vessel, Providing Flame Proof Lighting Arrangement And Exhaust Fan Inside The Bullet For Carrying Out Necessary Inspection, Cleaning And Ndt Tests. Contractor To Supply The Flame Proof Lightfittings, Junction Boxes, Required Cables Etc, As Directed At Site. Lighting Arrangement Shall Have To Be Retained At Site Till Completion Of All The Bullets And The Same Lighting Arrangement May Be Used In The Other Bullets By Turn - For 900 Mt Mounded Storage Vessel, Thorough Cleaning Of The Inner Surface With Water Jet And Clearing The Sludge / Rust Materials Followed By Thorough Cleaning Of Inner Surface To Remove The Scales, Oil And Dust By Wire Brushes To Expose The Metal Surfaces And Thorough Buffing Of Weld Joints. Cleaning Of Minimum 50 Mm On Both Sides Of Each Weld Joint Including Nozzle Welds By Thorough Cleaning Using Rotary Brushes To Expose Bare Metal (shinning Surface) With Care To Entire Weld Joints Of Nozzles And Weld Area Of Support Legs And Other Areas As Directed At Site. The Contractor Has To Provide All Equipments And Consumables For Carrying Out The Cleaning Jobs. Localized Grinding Of The Welds To Be Done If Required As Directed By Our Site Engineer / Third Party Inspection Agency Official. Dispose Off The Sludge Of Bullet At Designated Place After Excavation As Per Direction Of Bpcl - For 900 Mt Mounded Storage Vessel, Carrying Out External Inspection On Mound, Retaining Wall, Inspection Tunnel, Bottom Nozzle & Its Suspension/ Supports, Accessible Top Nozzles Etc - For 900 Mt Mounded Storage Vessel, Fixing Back All The Liquid And Vapour Lines After Servicing The Valves, Efcv And Fixing All Removed Fittings Like Hla, Srv, Pressure/ Temp/ Servo/ Rochester Gauges, Manhole Cover Etc. After Completing The Testing, Purging/fresh Gas In Is To Be Carried Out With Assistance From & Under Supervision Of & As Instructed By Bpcl/third Party Inspection Agency - For 900 Mt Mounded Storage Vessel, Ultrasonic Thickness Measurement On Shell Plates, Dished End Plates, Lpg Pipelines And Nozzles As Per Applicable Code And As Per The Instructions Of Third Party Agency / Bpcl Site Engineer - For 900 Mt Mounded Storage Vessel, Wet Fluorescent Magnetic Particle Test Of Welds Using Ac Yoke ,magnaflux ,tiede,y6 Black Light And White Washable Distemper As Background And As Per Applicable Codes And As Instructed By Bpcl Or Third Party Agency. Internal Complete .all Weld Joints From Inside, Nozzle Welds Internal & External For 900 Mt Mounded Storage Vessel, Complete Ultrasonic Flaw Detection Of Welds As Per Applicable Code From Inside The Bullets And As Instructed By Bpcl Or Third Party Agency For 900 Mt Mounded Storage Vessel, Dye Penetration Test At All Accessible Areas And As Pe Applicable Code And As Instructed By Bpcl Or Third Party Agency For 900 Mt Mounded Storage Vessel, Hardness Testing On Selected Spots On Welds, Haz And Parent Metal In Each Accessible Area As Per Applicable Codes And As Instructed By Bpcl And Third Party Agency - For 900 Mt Mounded Storage Vessel, Radiography Test For Weld Joints At Selected Locations As Problem Defects,flaws Observed During Other Tests Subject To A Maximum Of 10 Perncent Of Total Weld Length As Per Applicable Code And As Instructed By Third Party Inspecting Agency. Oonly To Be Conducted Where Defects, Flaws Are Observed For 900 Mt Mounded Storage Vessel, Wet Type Calibaration Of Bullets. Calibration Table Will Be In 10 Mm Height Intervals With 1 Mm Proportional Part Tables Or As Decided By Bpcl. Approval & Stamping Of Calibration Charts By Cpwd Shall Be Done By The Party. Before Start Of Calibration Adetailed Procedure Has To Be Submitted - For 900 Mt Mounded Storage Vessel, Settlement Of Mounded Bullets Checking Of Settlement Of Mounded Bullets By Using Laser Technique For Horizontal Plain Shift And Plumb Line Theodolit Technique For Vertical Plain Shift. The Person Performing Settlement Shall Be Experienced In The Relevant Field. Settlement Analysis For All Three Msvs Shall Be Carried Out Every Six Months For A Period Of Three Years. This Excludes The Settlement Analysis To Be Carried Out During Hydrotesting. During Hydrotesting, Settlement Monitoring Shall Be Done As Specified In Line Item No. 16., Settlement Of Mounded Bullets, Checking Of Settlement Of Mounded Bullets By Using Laser Technique For Horizontal Plain Shift And Plumb Line ,theodolit Technique For Vertical Plain Shift. The Person Performing Settlement Shall Be Experienced In The Relevant Field. Settlement Reading Shall Be Taken During Filling Of Water Before Hydrotest At 0, 25, 50 And After Hydrotesting For 900 Mt Mounded Storage Vessel, Replacement Of Nuts, Bolts, Washers And Gaskets Supply And Fixing Of All Gaskets, Studs And Nuts For All Fittings After The Isolation Valve Near To Water Drain Line Provided In Bullets - For 900mt Mounded Storage Vessel, Hydrotest And Stretchtest, To Conduct Hydrotest Test Of Vessel And Also Connected Pipings In Total As Required And As Directed At Site, After Successful Of All Nd Test As Per Smpv Rules And Relevant Codes For 900 Mt Mounded Storage Vessel, Certification And Documentation For 900 Mt Lpg Storage Bullets To Submit 3 Sets Of Testing And Inspection Certificates And Reports And Documents For All Tests And Inspection Covered In The Scope Of Work As Per Smpv Rule No.19 .issue Of Online Certificate Of Test Alongwith Annexure Giving The Details Of Ndt Inspection by Bharat Petroleum Corporation Limited BPCL

9.

How can I download the official BOQ file for this opportunity?

You can download the commercial Bill of Quantities (BOQ) spreadsheet directly using the secure link provided on this page. The BOQ file contains the item descriptions and rate filling forms officially validated for Tender For Disconnecting Of Fittings , Degassing Of Bullets , Providing Ms Tubular Ladder And Scaffolding , Providing Flame Proof Lighting Arrangement And Exhaust Fan , Thorough Cleaning Of The Inner Surface , Carrying Out External Inspection , Fixing Back All The Liquid And Vapour Lines , Ultrasonic Thickness Measurement On Shell Plates , Wet Fluorescent Magnetic Particle Test , Ultrasonic Flaw Detection , Dye Penetration Test , Hardness Testing , Radiography Test , Wet Type Calibaration Of Bullets , Settlement Of Mounded Bullets , Settlement Of Mounded Bullets During Hydrotesting , Replacement Of Nuts, Bolts, Washers And Gaskets , Hydrotest And Stretchtest , Certification And Documentation, Statutory Inspection And Ndt Testing And Certification Of All Three Msvs At Allahabad Lpg Plant, Disconnecting The Inlet, Outlet Of The Lpg Liquid And Vapour Line, Srv, Hla, Servo Gauge, Radar Gauge Manhole, Water Drain Line, Globe Valves, Rov And Other Fittings Of The Bullets, Removal Of Fire Proof Coating Wherever Necessary And Disconnection Of Electrical Cables Without Any Damage As Per The Directions Of The Bpcl Site Engineer / Third Party Inspection Agency Official. Any Damage For The Fittings Or Any Equipments During Removal & Fixing Of The Connection Has To Be Made Good By The Tenderer - For 900 Mt Mounded Storage Vessel, Degassing Of Bullets With Bpcl Supplied Water After Making Necessary Connections For In And Out Flow With Suitable Pipelines / Hose Arrangements As Directed On Site. The Water Used For Degassing Should Be Disposed Off Safely In The Drainage And The Sludge If Any Coming Along With Water Should Be Carefully Removed And Disposed / Kept In Safe Place As Directed At Site. The Sludge Should Be Buried If Necessary As Per Directions Of Location In Charge Or His Representative. A Sample Of All Sludge Collected Should Be Handed Over To The Lic / Site Engineer. Deboxing / Boxing, Dismantling / Pitting Back All Gadgets On Bullet, Also All Jobs Related To Blind Flanging Up To 1st Isolation Valve -- For 900 Mt Mounded Storage Vessel, Providing Ms Tubular Ladder/scaffolding Inside The Bullet Suitable For Cleaning Of Inner Surface And Suitable For Carrying Out All Inspections Like Ultrasonic Testing, Mpi And All Allied Jobs As Directed. Ladder / Scaffolding(s) Shall Have To Be Retained At Site Till The Completion Of All Three Bullets Testing And The Same Scaffolding(s) May Be Used For Providing In The Other Bullets By Turn. The Contractor Shall Also Provide Oxygen Meter And Ensure Oxygen Level Is As Prescribed Norms Before Vessel Entry. Oxygen Metre Can Be Taken Back By Contractor After The Work Is Over For 900 Mt Mounded Storage Vessel, Providing Flame Proof Lighting Arrangement And Exhaust Fan Inside The Bullet For Carrying Out Necessary Inspection, Cleaning And Ndt Tests. Contractor To Supply The Flame Proof Lightfittings, Junction Boxes, Required Cables Etc, As Directed At Site. Lighting Arrangement Shall Have To Be Retained At Site Till Completion Of All The Bullets And The Same Lighting Arrangement May Be Used In The Other Bullets By Turn - For 900 Mt Mounded Storage Vessel, Thorough Cleaning Of The Inner Surface With Water Jet And Clearing The Sludge / Rust Materials Followed By Thorough Cleaning Of Inner Surface To Remove The Scales, Oil And Dust By Wire Brushes To Expose The Metal Surfaces And Thorough Buffing Of Weld Joints. Cleaning Of Minimum 50 Mm On Both Sides Of Each Weld Joint Including Nozzle Welds By Thorough Cleaning Using Rotary Brushes To Expose Bare Metal (shinning Surface) With Care To Entire Weld Joints Of Nozzles And Weld Area Of Support Legs And Other Areas As Directed At Site. The Contractor Has To Provide All Equipments And Consumables For Carrying Out The Cleaning Jobs. Localized Grinding Of The Welds To Be Done If Required As Directed By Our Site Engineer / Third Party Inspection Agency Official. Dispose Off The Sludge Of Bullet At Designated Place After Excavation As Per Direction Of Bpcl - For 900 Mt Mounded Storage Vessel, Carrying Out External Inspection On Mound, Retaining Wall, Inspection Tunnel, Bottom Nozzle & Its Suspension/ Supports, Accessible Top Nozzles Etc - For 900 Mt Mounded Storage Vessel, Fixing Back All The Liquid And Vapour Lines After Servicing The Valves, Efcv And Fixing All Removed Fittings Like Hla, Srv, Pressure/ Temp/ Servo/ Rochester Gauges, Manhole Cover Etc. After Completing The Testing, Purging/fresh Gas In Is To Be Carried Out With Assistance From & Under Supervision Of & As Instructed By Bpcl/third Party Inspection Agency - For 900 Mt Mounded Storage Vessel, Ultrasonic Thickness Measurement On Shell Plates, Dished End Plates, Lpg Pipelines And Nozzles As Per Applicable Code And As Per The Instructions Of Third Party Agency / Bpcl Site Engineer - For 900 Mt Mounded Storage Vessel, Wet Fluorescent Magnetic Particle Test Of Welds Using Ac Yoke ,magnaflux ,tiede,y6 Black Light And White Washable Distemper As Background And As Per Applicable Codes And As Instructed By Bpcl Or Third Party Agency. Internal Complete .all Weld Joints From Inside, Nozzle Welds Internal & External For 900 Mt Mounded Storage Vessel, Complete Ultrasonic Flaw Detection Of Welds As Per Applicable Code From Inside The Bullets And As Instructed By Bpcl Or Third Party Agency For 900 Mt Mounded Storage Vessel, Dye Penetration Test At All Accessible Areas And As Pe Applicable Code And As Instructed By Bpcl Or Third Party Agency For 900 Mt Mounded Storage Vessel, Hardness Testing On Selected Spots On Welds, Haz And Parent Metal In Each Accessible Area As Per Applicable Codes And As Instructed By Bpcl And Third Party Agency - For 900 Mt Mounded Storage Vessel, Radiography Test For Weld Joints At Selected Locations As Problem Defects,flaws Observed During Other Tests Subject To A Maximum Of 10 Perncent Of Total Weld Length As Per Applicable Code And As Instructed By Third Party Inspecting Agency. Oonly To Be Conducted Where Defects, Flaws Are Observed For 900 Mt Mounded Storage Vessel, Wet Type Calibaration Of Bullets. Calibration Table Will Be In 10 Mm Height Intervals With 1 Mm Proportional Part Tables Or As Decided By Bpcl. Approval & Stamping Of Calibration Charts By Cpwd Shall Be Done By The Party. Before Start Of Calibration Adetailed Procedure Has To Be Submitted - For 900 Mt Mounded Storage Vessel, Settlement Of Mounded Bullets Checking Of Settlement Of Mounded Bullets By Using Laser Technique For Horizontal Plain Shift And Plumb Line Theodolit Technique For Vertical Plain Shift. The Person Performing Settlement Shall Be Experienced In The Relevant Field. Settlement Analysis For All Three Msvs Shall Be Carried Out Every Six Months For A Period Of Three Years. This Excludes The Settlement Analysis To Be Carried Out During Hydrotesting. During Hydrotesting, Settlement Monitoring Shall Be Done As Specified In Line Item No. 16., Settlement Of Mounded Bullets, Checking Of Settlement Of Mounded Bullets By Using Laser Technique For Horizontal Plain Shift And Plumb Line ,theodolit Technique For Vertical Plain Shift. The Person Performing Settlement Shall Be Experienced In The Relevant Field. Settlement Reading Shall Be Taken During Filling Of Water Before Hydrotest At 0, 25, 50 And After Hydrotesting For 900 Mt Mounded Storage Vessel, Replacement Of Nuts, Bolts, Washers And Gaskets Supply And Fixing Of All Gaskets, Studs And Nuts For All Fittings After The Isolation Valve Near To Water Drain Line Provided In Bullets - For 900mt Mounded Storage Vessel, Hydrotest And Stretchtest, To Conduct Hydrotest Test Of Vessel And Also Connected Pipings In Total As Required And As Directed At Site, After Successful Of All Nd Test As Per Smpv Rules And Relevant Codes For 900 Mt Mounded Storage Vessel, Certification And Documentation For 900 Mt Lpg Storage Bullets To Submit 3 Sets Of Testing And Inspection Certificates And Reports And Documents For All Tests And Inspection Covered In The Scope Of Work As Per Smpv Rule No.19 .issue Of Online Certificate Of Test Alongwith Annexure Giving The Details Of Ndt Inspection within the Uttar Pradesh jurisdiction

10.

How can I find the submission closing date for this contract?

The official timeline and deadline details for Tender For Disconnecting Of Fittings , Degassing Of Bullets , Providing Ms Tubular Ladder And Scaffolding , Providing Flame Proof Lighting Arrangement And Exhaust Fan , Thorough Cleaning Of The Inner Surface , Carrying Out External Inspection , Fixing Back All The Liquid And Vapour Lines , Ultrasonic Thickness Measurement On Shell Plates , Wet Fluorescent Magnetic Particle Test , Ultrasonic Flaw Detection , Dye Penetration Test , Hardness Testing , Radiography Test , Wet Type Calibaration Of Bullets , Settlement Of Mounded Bullets , Settlement Of Mounded Bullets During Hydrotesting , Replacement Of Nuts, Bolts, Washers And Gaskets , Hydrotest And Stretchtest , Certification And Documentation, Statutory Inspection And Ndt Testing And Certification Of All Three Msvs At Allahabad Lpg Plant, Disconnecting The Inlet, Outlet Of The Lpg Liquid And Vapour Line, Srv, Hla, Servo Gauge, Radar Gauge Manhole, Water Drain Line, Globe Valves, Rov And Other Fittings Of The Bullets, Removal Of Fire Proof Coating Wherever Necessary And Disconnection Of Electrical Cables Without Any Damage As Per The Directions Of The Bpcl Site Engineer / Third Party Inspection Agency Official. Any Damage For The Fittings Or Any Equipments During Removal & Fixing Of The Connection Has To Be Made Good By The Tenderer - For 900 Mt Mounded Storage Vessel, Degassing Of Bullets With Bpcl Supplied Water After Making Necessary Connections For In And Out Flow With Suitable Pipelines / Hose Arrangements As Directed On Site. The Water Used For Degassing Should Be Disposed Off Safely In The Drainage And The Sludge If Any Coming Along With Water Should Be Carefully Removed And Disposed / Kept In Safe Place As Directed At Site. The Sludge Should Be Buried If Necessary As Per Directions Of Location In Charge Or His Representative. A Sample Of All Sludge Collected Should Be Handed Over To The Lic / Site Engineer. Deboxing / Boxing, Dismantling / Pitting Back All Gadgets On Bullet, Also All Jobs Related To Blind Flanging Up To 1st Isolation Valve -- For 900 Mt Mounded Storage Vessel, Providing Ms Tubular Ladder/scaffolding Inside The Bullet Suitable For Cleaning Of Inner Surface And Suitable For Carrying Out All Inspections Like Ultrasonic Testing, Mpi And All Allied Jobs As Directed. Ladder / Scaffolding(s) Shall Have To Be Retained At Site Till The Completion Of All Three Bullets Testing And The Same Scaffolding(s) May Be Used For Providing In The Other Bullets By Turn. The Contractor Shall Also Provide Oxygen Meter And Ensure Oxygen Level Is As Prescribed Norms Before Vessel Entry. Oxygen Metre Can Be Taken Back By Contractor After The Work Is Over For 900 Mt Mounded Storage Vessel, Providing Flame Proof Lighting Arrangement And Exhaust Fan Inside The Bullet For Carrying Out Necessary Inspection, Cleaning And Ndt Tests. Contractor To Supply The Flame Proof Lightfittings, Junction Boxes, Required Cables Etc, As Directed At Site. Lighting Arrangement Shall Have To Be Retained At Site Till Completion Of All The Bullets And The Same Lighting Arrangement May Be Used In The Other Bullets By Turn - For 900 Mt Mounded Storage Vessel, Thorough Cleaning Of The Inner Surface With Water Jet And Clearing The Sludge / Rust Materials Followed By Thorough Cleaning Of Inner Surface To Remove The Scales, Oil And Dust By Wire Brushes To Expose The Metal Surfaces And Thorough Buffing Of Weld Joints. Cleaning Of Minimum 50 Mm On Both Sides Of Each Weld Joint Including Nozzle Welds By Thorough Cleaning Using Rotary Brushes To Expose Bare Metal (shinning Surface) With Care To Entire Weld Joints Of Nozzles And Weld Area Of Support Legs And Other Areas As Directed At Site. The Contractor Has To Provide All Equipments And Consumables For Carrying Out The Cleaning Jobs. Localized Grinding Of The Welds To Be Done If Required As Directed By Our Site Engineer / Third Party Inspection Agency Official. Dispose Off The Sludge Of Bullet At Designated Place After Excavation As Per Direction Of Bpcl - For 900 Mt Mounded Storage Vessel, Carrying Out External Inspection On Mound, Retaining Wall, Inspection Tunnel, Bottom Nozzle & Its Suspension/ Supports, Accessible Top Nozzles Etc - For 900 Mt Mounded Storage Vessel, Fixing Back All The Liquid And Vapour Lines After Servicing The Valves, Efcv And Fixing All Removed Fittings Like Hla, Srv, Pressure/ Temp/ Servo/ Rochester Gauges, Manhole Cover Etc. After Completing The Testing, Purging/fresh Gas In Is To Be Carried Out With Assistance From & Under Supervision Of & As Instructed By Bpcl/third Party Inspection Agency - For 900 Mt Mounded Storage Vessel, Ultrasonic Thickness Measurement On Shell Plates, Dished End Plates, Lpg Pipelines And Nozzles As Per Applicable Code And As Per The Instructions Of Third Party Agency / Bpcl Site Engineer - For 900 Mt Mounded Storage Vessel, Wet Fluorescent Magnetic Particle Test Of Welds Using Ac Yoke ,magnaflux ,tiede,y6 Black Light And White Washable Distemper As Background And As Per Applicable Codes And As Instructed By Bpcl Or Third Party Agency. Internal Complete .all Weld Joints From Inside, Nozzle Welds Internal & External For 900 Mt Mounded Storage Vessel, Complete Ultrasonic Flaw Detection Of Welds As Per Applicable Code From Inside The Bullets And As Instructed By Bpcl Or Third Party Agency For 900 Mt Mounded Storage Vessel, Dye Penetration Test At All Accessible Areas And As Pe Applicable Code And As Instructed By Bpcl Or Third Party Agency For 900 Mt Mounded Storage Vessel, Hardness Testing On Selected Spots On Welds, Haz And Parent Metal In Each Accessible Area As Per Applicable Codes And As Instructed By Bpcl And Third Party Agency - For 900 Mt Mounded Storage Vessel, Radiography Test For Weld Joints At Selected Locations As Problem Defects,flaws Observed During Other Tests Subject To A Maximum Of 10 Perncent Of Total Weld Length As Per Applicable Code And As Instructed By Third Party Inspecting Agency. Oonly To Be Conducted Where Defects, Flaws Are Observed For 900 Mt Mounded Storage Vessel, Wet Type Calibaration Of Bullets. Calibration Table Will Be In 10 Mm Height Intervals With 1 Mm Proportional Part Tables Or As Decided By Bpcl. Approval & Stamping Of Calibration Charts By Cpwd Shall Be Done By The Party. Before Start Of Calibration Adetailed Procedure Has To Be Submitted - For 900 Mt Mounded Storage Vessel, Settlement Of Mounded Bullets Checking Of Settlement Of Mounded Bullets By Using Laser Technique For Horizontal Plain Shift And Plumb Line Theodolit Technique For Vertical Plain Shift. The Person Performing Settlement Shall Be Experienced In The Relevant Field. Settlement Analysis For All Three Msvs Shall Be Carried Out Every Six Months For A Period Of Three Years. This Excludes The Settlement Analysis To Be Carried Out During Hydrotesting. During Hydrotesting, Settlement Monitoring Shall Be Done As Specified In Line Item No. 16., Settlement Of Mounded Bullets, Checking Of Settlement Of Mounded Bullets By Using Laser Technique For Horizontal Plain Shift And Plumb Line ,theodolit Technique For Vertical Plain Shift. The Person Performing Settlement Shall Be Experienced In The Relevant Field. Settlement Reading Shall Be Taken During Filling Of Water Before Hydrotest At 0, 25, 50 And After Hydrotesting For 900 Mt Mounded Storage Vessel, Replacement Of Nuts, Bolts, Washers And Gaskets Supply And Fixing Of All Gaskets, Studs And Nuts For All Fittings After The Isolation Valve Near To Water Drain Line Provided In Bullets - For 900mt Mounded Storage Vessel, Hydrotest And Stretchtest, To Conduct Hydrotest Test Of Vessel And Also Connected Pipings In Total As Required And As Directed At Site, After Successful Of All Nd Test As Per Smpv Rules And Relevant Codes For 900 Mt Mounded Storage Vessel, Certification And Documentation For 900 Mt Lpg Storage Bullets To Submit 3 Sets Of Testing And Inspection Certificates And Reports And Documents For All Tests And Inspection Covered In The Scope Of Work As Per Smpv Rule No.19 .issue Of Online Certificate Of Test Alongwith Annexure Giving The Details Of Ndt Inspection are available inside the detailed notification files. Bidders planning to target this contract in Prayagraj should check the official portal schedule early to complete their online technical and financial submission well before the closing hours.

Get Expert Tender Bidding Support

Looking For Complete Tender Bidding Consultancy? Our Technical Experts Will Help You Prepare And Submit Your Tender Successfully.

Call Our Expert: +91 7069661818
Your Information Is 100% Secure & Confidential