Latest Tender Detail from uttar pradesh power corporation limited UPPCL for the tender for , carriage of distribution transformer 250 kva from esc mnp , carriage of acsr rabbit conductor from esc mnp , carriage of acsr weasel conductor or insulated conductor as provided by department from esc mnp , carriage of m s earthing rod 20 x2540 mm from esc mnp , carriage of lt al. xlpe cable size 1x240 sq.mm. from esc mnp , carriage of lt xlpe cable 1x120 sq.mm. from esc mnp , carriage of 11 kv xlpe cable 3x185 sq.mm. from esc mnp , carriage of lt ab cable 3x120 1x95 1x16 sq.mm. from esc mnp , carriage of 33 kv xlpe cable 3x300 sq.mm. from esc mnp , carriage of 11 kv xlpe cable 3x300 sq.mm. from esc mnp , carriage of 11 kv indoor or outdoor jointing kit size 3x300 sq.mm. from esc mnp , carriage of 11 kv indoor or outdoor jointing kit size 3x185 sq.mm. from esc mnp , carriage of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. from esc mnp , carriage of 11 kv straight through size 3x185 sq.mm. from esc mnp , carriage of 11 kv vcb for og ctr 200by100by5a 350 mva 1250 amp. from esc mnp , carriage of 11 kv vcb ic ctr 600by300by5a 350 mva 1250 amp. from esc mnp , carriage of g.i. wire 6or8 swg for guarding from esc mnp , carriage of three phase distribution box from esc mnp , erection of fixing of l.t. fuse set protection box with all respective accessories as per norms , execution of chemical earthing with g.i. patti clamp nut and bolts as per norms , erection of l.t. tail less unit with all respective material as grouted angel with fabrication work etc. , laying of acsr rabbit conductor , laying of acsr weasel conductor or insulated conductor as provided by department , laying of lt ab cable 3x120 1x95 1x16 sq.mm. , mounting of three phase distribution box , erection of double pole structure , erection of single pole structure , grouting of pcc or stp pole , grouting of stay , earthing of pole , guarding of 11 kv line with gaurding angel etc , fencing of distribution transformers , make plinth for 250 kva transformer proper size as per resspo norms , installation of 11by0.4 kv tf 100 kva , installation of 11by0.4 kv tf 250 kva , laying of 11 kv xlpe cable 3x185 sq.mm. , laying of 11 kv xlpe cable 3x300 sq.mm. , laying of 33 kv xlpe cable 3x300 sq.mm. , installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms. , installation of 11 kv indoor or outdoor jointing kit size 3x185 sq.mm. as per norms. , installation of 11 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms. , installation of 11 kv straight through size 3x185 sq.mm. as per norms. , installation of 11 kv vcb og ctr 200by100by5a 350 mva 1250 amp. , installation of 11 kv vcb ic ctr 600by300by5a 350 mva 1250 amp. , dismentlling of old and damaged cable of different size , received back of distribution transformer after increasing, boqeudd, 11 kv v type cross arm clamp with bolts and nuts, three phase distribution box clamp with nut and bolts, connecting cable for distribution box 1x35 sq.mm., l.t. fuse set protection box with all accessories, tinned copper fuse wire different size, hdpe pipe 140 mm., stone pad 300x300x75, ms angle 75x75x6x2028mm with clamp and bolt and nut tf base, t off chhanel and t off clamp with nut and bolts, top chhanel 125x65x240, dropper channel 100x50x2028 mm., chemical earthing with g.i. patti clamp nut and bolts as per norms, l.t. tail less unit with all respective material angel, patti and other material, copper l pieace 62x225x12mm., 4 core lt mcb with box for 250 kva tf, 11 kv f clamp with nut and bolts, al. pg clamp weasel to weasel conductor, al. pg clamp rabbit to rabbit conductor, suspension clamp, dead end clamp, eye i hook, eye bolts for guarding, j hook, lt clamp for pcc or stp with bolts and nuts, pearcing connector, alluminium lug 120 sq.mm., alluminium lug 240 sq.mm., guarding angel, guarding angel clamp, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 8.5 m pcc pole, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 9 m stp pole sp 55 galvanised, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 m stp pole sp 55 galvanised, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 13 m stp pole sp 55 galvanised, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department v type cross arm for 11 kv, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv pin insulator with pin, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department disc insulator with fitting tandc 45 kn, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv fuse set, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv tpmo with polymer insulator, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department complete stay 9gi stay rod 20x1800 mm, stay wire 7 or 8 swg, 10 kg, stay clamp, bolt, nut and washer, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department distribution transformer 100 kva, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department distribution transformer 250 kva, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department acsr rabbit conductor, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department acsr weasel conductor or insulated conductor as provided by department, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department m s earthing rod 20 x2540 mm, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department lt al. xlpe cable size 1x240 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department lt xlpe cable 1x120 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv xlpe cable 3x185 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department lt ab cable 3x120 1x95 1x16 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 33 kv xlpe cable 3x300 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv xlpe cable 3x300 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv indoor or outdoor jointing kit size 3x300 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv indoor or outdoor jointing kit size 3x185 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 33 kv indoor or outdoor jointing kit size 3x300 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv straight through size 3x185 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv vcb for og ctr 200by100by5a 350 mva 1250 amp., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv vcb ic ctr 600by300by5a 350 mva 1250 amp., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department g.i. wire 6 or 8 swg for guarding, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department three phase distribution box, fixing of l.t. fuse set protection box with all respective accessories as per norms, l.t. tail less unit with all respective material as grouted angel with fabrication work etc., laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr rabbit conductor, laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr weasel conductor or insulated conductor as provided by department, laying, stringing, sagging, with all respective material clamp with nut and bolts suspension clamp eye j hook pearcing connector etc of following conductor cable on the erected supports, as per respo norms. lt ab cable 3x120 1x95 1x16 sq.mm., mounting of three phase distribution box with clamp nut & bolts and make proper connection with connecting cable., erection of double pole structure 11 mtr stp pole by digging of pits fitting of all relevant accessories as per respo norms. 22 nos pole at different location under concern division., erection of single pole structure 8.5 mtrs pcc pole, 9 mtr st, 11 mtr st pole, 13 mtr st by digging of pits fitting of all relevant accessories as per respo norms. at different location under concern division., grouting of pcc or stp pole long as per respo norms with material cement, sand, blast stone with the ratio 0.268 cu.m. each will be provided by conractor, grouting of stay as per respo norms cement, sand, blast stone material will be provided by conractor, earthing of pole by m s earthing rod 20 x2540 mm with 6 swg earthing wire etc and make proper connection., guarding of 11 kv line with gaurding angel, clamp eye bolts and gaurding g.i. wire 6 or 8 swg 60 span, fencing of distribution transformers with enamel in proper alignment as per respo manual and as per direction of executive engineer including the cost of arrangement of labour, t and p, carrier etc. required for proper completion of work., make plinth for 250 kva transformer proper size as per resspo norms, installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work. 11by0.4 kv tf 100 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work. 11by0.4 kv tf 250 kva with l.t. xlpe cable suitable size with all respective material as per norms., laying of following cable including digging and restoring along with brick and sand including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work. at different location under concern division.11 kv xlpe cable 3x185 sq.mm., laying of following cable including digging and restoring along with brick and sand including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work. at different location under concern division. 11 kv xlpe cable 3x300 sq.mm., laying of following cable by hdd method with hdpe pipe 140 mm. including digging and restoring along with brick and sand including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work. 33 kv xlpe cable 3x300 sq.mm., installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms., installation of 11 kv indoor or outdoor jointing kit size 3x185 sq.mm. as per norms., installation of 11 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms., installation of 11 kv straight through size 3x185 sq.mm. as per norms., installation of 11 kv vcb og ctr 200by100by5a 350 mva 1250 amp. and make proper connection as per norms., installation of 11 kv vcb ic ctr 600by300by5a 350 mva 1250 amp. and make proper connection as per norms., dismentlling of old and damaged cable of different size including with rolling received back and safe carriage from pit site to esc, mainpuri, received back of distribution transformer after increasing capacity from pit site to esc, mainpuri 30 nos 100 kva in mainpuri, uttar pradesh,. Reference number 15443971. Don't miss out on this chance to be part of a significant project. Register for free today to access the complete tender details and download the necessary documents. Seize the opportunity with Tender 18!
| T18 Ref No: | 15443971 |
|---|---|
| Tender ID: | GEM/2026/B/7554793 |
| Tender Agency: | uttar pradesh power corporation limited UPPCL |
| City: | mainpuri |
| State: | uttar pradesh |
| Description : | total quantity = 25732 ----- document required from seller = experience criteria,past performance,bidder turnover,certificate (requested in atc),oem authorization certificate,oem annual turnover,additional doc 1 (requested in atc) |
| T18 Ref No: | 15443971 | Tender Value: | Refer Document |
|---|---|---|---|
| Tender ID: | GEM/2026/B/7554793 | Tender EMD: | Refer Document |
| Tender Agency: | uttar pradesh power corporation limited UPPCL | Tender Fee: | Refer Document |
| City: | mainpuri | Published Date: | May 20, 2026 |
| State: | uttar pradesh | Due Date: | Jun 10, 2026 |
| Tender Related Keywords : | - | Tender Opening Date: | Jun 10, 2026 |
| Description : | total quantity = 25732 ----- document required from seller = experience criteria,past performance,bidder turnover,certificate (requested in atc),oem authorization certificate,oem annual turnover,additional doc 1 (requested in atc) | ||
Looking For Complete Tender Bidding Consultancy? Our Technical Experts Will Help You Prepare And Submit Your Tender Successfully.