corrigendum tender for pcc and stp poles 8.5, 11 and 13 mtr , carriage of line material , installation and fixing of 11 kv tpmo. , erection and grouting of stay set , providing and fixing , acsr weasal, rabbit and dog conductor. , abc conductor , grouting of pcc and stp poles , plinth , fixing of earthing rod , chopping of tree branches , providing and fixing of clamps of lt , providing and fixing , 25 kva transformer , 63 kva transformer , 100 kva transformer , 400 kva transformer , dismentling of old pcc and stp poles , dismantling and removal , erection of section , carriage and installation , provding and fixing, filling , safe carriage , laying of under ground cable , laying of overhead cable , guarding of 11 kv line by laying two nos , safe carriage and installation , safe carriage and installation , provding and fixing wearing, erection and commissioning of transformer and line and poles, carriage of following poles from store centre or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends, also including the work of dragging etc and also including the cost of labour, t and p carrier etc required for proper completion of work dist 0 to 50 kms, carriage of line material viz lt cable, conductor, gi earth wire, barbed wire, cross arm, angle, channel, insulator, various clamps, xlpe cable, cable, stone pad and other line material from store centre or from any other place to the respective site of work through the kachha pacca road including the work of its loading and unloading at the respective end, also including the work of dragging etc and also including the cost of labour, t and p carrier etc required for proper completion of work dist 0 to 50 kms, erection of single support including complete h.t and l.t fittings with drilling and cutting as per resspo manual and as per direction of engineer incharge including the cost of labour, t and p and carrier etc required for proper completion of work, erection of double and section pole on following poles including including complete h.t and l.t fittings with drilling and cutting and the work of complete line as per resspo norms manual and as per direction of engineer incharge including the cost of labour, t and p and carrier etc required for proper completion of work, erection of double and section pole on following poles including including complete h.t and l.t fittings with drilling & cutting and the work of complete line as per resspo norms manual and as per direction of engineer incharge including the cost of labour, t and p and carrier etc required for proper completion of work, erection and grouting of stay set including the work of nozzling etc as per resspo manual and also including the cost of arrangement of all grouting material, labour, t and p etc required for proper completion of work, providing and fixing of stay insulator, laying, sagging, stringing, binding and jumpering etc of line conductor on the newly erected pole as per resspo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t and p carrier etc required for proper completion of work, abc conductor 3x50+1x35+1x16 sqmm and 3x95+1x70+1x16 sqmm and 3x120+1x95+1x16 sqmm and 1x16+1x25 sqmm, grouting of pcc and stp poles 8.5, 11 and 13 mtr long as per resspo norms, making the plinth of steel poles, fixing of earthing rod as per resspo manual and as per direction of supervising engineer including the cost of labour, t and p etc required for proper completion of work, chopping of tree branches which are touching to ht and lt lines, providing and fixing of clamps of lt, cross arm holding, f clamp, stay clamp, danger board clamp and all type clamps with nut and bolts as per actual site requirement, providing and fixing of lt shackle insulator, providing and fixing of missing nut bolts and washer, carriage and installation from site to store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and t and p etc required for proper completion earthing and jumphering of work, dismentling of old pcc and stp poles for shifting after dismentling of all accessories. it includes the work of cartage, cost of labour, t and p carrier etc required for proper completion of work, dismantling and removal of existing conductor, cable, gi wire from the various area preparing their coils and then stacking in the respective jeos store as per direction of supervising engineer it includes the work of cartage, cost of labour, t nad p carrier etc required for proper completion of work, erection of section tee pole including fixing of all fittings as per respo norms, carriage and installation of lt distribution box three phase distribution box from store centre sarsol to pit site including loading and unloading at both ends mounting and fixing on pole also by making connections as per resspo norms, provding and fixing and filling of 3x70,3x120,3x185 11 kv xlpe heat shrinkable cable jointing kits indoor and outdoor type including the cost of labour t and p carrier etc for proper completion of work, safe carriage of 3x70,3x120,3x185,3x300 sqmm 33 kv by 11 kv xlpe cable from store center to respective site of work including loading and unloading at both ends for proper completion of work, laying of 3x70,3x120,3x185,3x300 sqmm 33 kv and 11 kv under ground cable by straight through after digging trench of 600 mm wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable the cable shall be duly protected by ist class bricks, two on either side and third on top of the cable, laid in series one after the other. the work includes supplying of fine sand and bricks, filling and ramming of the left out soil, closing the trench and levelling spare cable shall be left and buried in the trench in the shape of rings at both ends all material except cable, labour, t and p carrier etc, required for proper completion of work will be arranged by the contractor at his own cost, laying of 3x70,3x120,3x185,3x300 sqmm 33 kv and 11 kv overhead cable work includes labour, t and p carrier etc, required for proper completion of work will be arranged by the contractor at his own cost, guarding of 11 kv line by laying two nos gi wire parallel and fixing of lacings tilli at a distance at 2 to 3 mtr as per respo manual and also including the cost of arragement of labour, t and p etc required for proper completion of work, safe carriage and installation of 33kv by 11 kv ct and pt pole mounted metering unit on double pole after fixing of channel with m s clamps and nuts bolts for holding the channel angle etc the unit body shall be earthed by connecting m s strip of size 1,8x1 finally connected to earthing rod of size 20mm x2540 mm 11 kv line shall be connected to unit as per instructions of sdo and ae m the m s strip and earth rod shall be included in the scope of work, safe carriage and installation of 33kv by 11 kv pilfer proof metering cubicle from store centre, sarsol to site of work, provding and fixing wearing gi pipe 6 o dia on the feeder cable before mounting the cable on the double pole lifting, mounting and clamping of 11 kv feeder cable with boxes on the feeder double pole structure and making connections including supply

Latest Tender Detail from uttar pradesh power corporation limited UPPCL for the corrigendum tender for pcc and stp poles 8.5, 11 and 13 mtr , carriage of line material , installation and fixing of 11 kv tpmo. , erection and grouting of stay set , providing and fixing , acsr weasal, rabbit and dog conductor. , abc conductor , grouting of pcc and stp poles , plinth , fixing of earthing rod , chopping of tree branches , providing and fixing of clamps of lt , providing and fixing , 25 kva transformer , 63 kva transformer , 100 kva transformer , 400 kva transformer , dismentling of old pcc and stp poles , dismantling and removal , erection of section , carriage and installation , provding and fixing, filling , safe carriage , laying of under ground cable , laying of overhead cable , guarding of 11 kv line by laying two nos , safe carriage and installation , safe carriage and installation , provding and fixing wearing, erection and commissioning of transformer and line and poles, carriage of following poles from store centre or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends, also including the work of dragging etc and also including the cost of labour, t and p carrier etc required for proper completion of work dist 0 to 50 kms, carriage of line material viz lt cable, conductor, gi earth wire, barbed wire, cross arm, angle, channel, insulator, various clamps, xlpe cable, cable, stone pad and other line material from store centre or from any other place to the respective site of work through the kachha pacca road including the work of its loading and unloading at the respective end, also including the work of dragging etc and also including the cost of labour, t and p carrier etc required for proper completion of work dist 0 to 50 kms, erection of single support including complete h.t and l.t fittings with drilling and cutting as per resspo manual and as per direction of engineer incharge including the cost of labour, t and p and carrier etc required for proper completion of work, erection of double and section pole on following poles including including complete h.t and l.t fittings with drilling and cutting and the work of complete line as per resspo norms manual and as per direction of engineer incharge including the cost of labour, t and p and carrier etc required for proper completion of work, erection of double and section pole on following poles including including complete h.t and l.t fittings with drilling & cutting and the work of complete line as per resspo norms manual and as per direction of engineer incharge including the cost of labour, t and p and carrier etc required for proper completion of work, erection and grouting of stay set including the work of nozzling etc as per resspo manual and also including the cost of arrangement of all grouting material, labour, t and p etc required for proper completion of work, providing and fixing of stay insulator, laying, sagging, stringing, binding and jumpering etc of line conductor on the newly erected pole as per resspo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t and p carrier etc required for proper completion of work, abc conductor 3x50+1x35+1x16 sqmm and 3x95+1x70+1x16 sqmm and 3x120+1x95+1x16 sqmm and 1x16+1x25 sqmm, grouting of pcc and stp poles 8.5, 11 and 13 mtr long as per resspo norms, making the plinth of steel poles, fixing of earthing rod as per resspo manual and as per direction of supervising engineer including the cost of labour, t and p etc required for proper completion of work, chopping of tree branches which are touching to ht and lt lines, providing and fixing of clamps of lt, cross arm holding, f clamp, stay clamp, danger board clamp and all type clamps with nut and bolts as per actual site requirement, providing and fixing of lt shackle insulator, providing and fixing of missing nut bolts and washer, carriage and installation from site to store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and t and p etc required for proper completion earthing and jumphering of work, dismentling of old pcc and stp poles for shifting after dismentling of all accessories. it includes the work of cartage, cost of labour, t and p carrier etc required for proper completion of work, dismantling and removal of existing conductor, cable, gi wire from the various area preparing their coils and then stacking in the respective jeos store as per direction of supervising engineer it includes the work of cartage, cost of labour, t nad p carrier etc required for proper completion of work, erection of section tee pole including fixing of all fittings as per respo norms, carriage and installation of lt distribution box three phase distribution box from store centre sarsol to pit site including loading and unloading at both ends mounting and fixing on pole also by making connections as per resspo norms, provding and fixing and filling of 3x70,3x120,3x185 11 kv xlpe heat shrinkable cable jointing kits indoor and outdoor type including the cost of labour t and p carrier etc for proper completion of work, safe carriage of 3x70,3x120,3x185,3x300 sqmm 33 kv by 11 kv xlpe cable from store center to respective site of work including loading and unloading at both ends for proper completion of work, laying of 3x70,3x120,3x185,3x300 sqmm 33 kv and 11 kv under ground cable by straight through after digging trench of 600 mm wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable the cable shall be duly protected by ist class bricks, two on either side and third on top of the cable, laid in series one after the other. the work includes supplying of fine sand and bricks, filling and ramming of the left out soil, closing the trench and levelling spare cable shall be left and buried in the trench in the shape of rings at both ends all material except cable, labour, t and p carrier etc, required for proper completion of work will be arranged by the contractor at his own cost, laying of 3x70,3x120,3x185,3x300 sqmm 33 kv and 11 kv overhead cable work includes labour, t and p carrier etc, required for proper completion of work will be arranged by the contractor at his own cost, guarding of 11 kv line by laying two nos gi wire parallel and fixing of lacings tilli at a distance at 2 to 3 mtr as per respo manual and also including the cost of arragement of labour, t and p etc required for proper completion of work, safe carriage and installation of 33kv by 11 kv ct and pt pole mounted metering unit on double pole after fixing of channel with m s clamps and nuts bolts for holding the channel angle etc the unit body shall be earthed by connecting m s strip of size 1,8x1 finally connected to earthing rod of size 20mm x2540 mm 11 kv line shall be connected to unit as per instructions of sdo and ae m the m s strip and earth rod shall be included in the scope of work, safe carriage and installation of 33kv by 11 kv pilfer proof metering cubicle from store centre, sarsol to site of work, provding and fixing wearing gi pipe 6 o dia on the feeder cable before mounting the cable on the double pole lifting, mounting and clamping of 11 kv feeder cable with boxes on the feeder double pole structure and making connections including supply in aligarh, uttar pradesh,. Reference number 15228635. Don't miss out on this chance to be part of a significant project. Register for free today to access the complete tender details and download the necessary documents. Seize the opportunity with Tender 18!

T18 Ref No:15228635
Tender ID:GEM/2026/B/7412231
Tender Agency:uttar pradesh power corporation limited UPPCL
City:aligarh
State:uttar pradesh
Description :
total quantity = 32394 ----- document required from seller = experience criteria,past performance,bidder turnover,certificate (requested in atc),oem annual turnover,additional doc 1 (requested in atc) ----- evaluation method = total value wise evaluation
T18 Ref No:15228635Tender Value:Refer Document
Tender ID:GEM/2026/B/7412231Tender EMD:20000
Tender Agency:uttar pradesh power corporation limited UPPCLTender Fee:Refer Document
City:aligarhPublished Date:May 04, 2026
State:uttar pradeshDue Date:May 07, 2026
Tender Related Keywords :-Tender Opening Date:May 07, 2026
Description :total quantity = 32394 ----- document required from seller = experience criteria,past performance,bidder turnover,certificate (requested in atc),oem annual turnover,additional doc 1 (requested in atc) ----- evaluation method = total value wise evaluation

Get Complete Tender Documents to Participate

Tender NoticeBOQEligibilityEMD DetailsImportant Dates
We take all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.

Browse GeM Portal Tenders

This Government Tender has been Published  by Uttar Pradesh Power Corporation Limited UPPCL for work related to in Aligarh, Uttar Pradesh. The Tender work is corrigendum tender for pcc and stp poles 8.5, 11 and 13 mtr , carriage of line material , installation and fixing of 11 kv tpmo. , erection and grouting of stay set , providing and fixing , acsr weasal, rabbit and dog conductor. , abc conductor , grouting of pcc and stp poles , plinth , fixing of earthing rod , chopping of tree branches , providing and fixing of clamps of lt , providing and fixing , 25 kva transformer , 63 kva transformer , 100 kva transformer , 400 kva transformer , dismentling of old pcc and stp poles , dismantling and removal , erection of section , carriage and installation , provding and fixing, filling , safe carriage , laying of under ground cable , laying of overhead cable , guarding of 11 kv line by laying two nos , safe carriage and installation , safe carriage and installation , provding and fixing wearing, erection and commissioning of transformer and line and poles, carriage of following poles from store centre or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends, also including the work of dragging etc and also including the cost of labour, t and p carrier etc required for proper completion of work dist 0 to 50 kms, carriage of line material viz lt cable, conductor, gi earth wire, barbed wire, cross arm, angle, channel, insulator, various clamps, xlpe cable, cable, stone pad and other line material from store centre or from any other place to the respective site of work through the kachha pacca road including the work of its loading and unloading at the respective end, also including the work of dragging etc and also including the cost of labour, t and p carrier etc required for proper completion of work dist 0 to 50 kms, erection of single support including complete h.t and l.t fittings with drilling and cutting as per resspo manual and as per direction of engineer incharge including the cost of labour, t and p and carrier etc required for proper completion of work, erection of double and section pole on following poles including including complete h.t and l.t fittings with drilling and cutting and the work of complete line as per resspo norms manual and as per direction of engineer incharge including the cost of labour, t and p and carrier etc required for proper completion of work, erection of double and section pole on following poles including including complete h.t and l.t fittings with drilling & cutting and the work of complete line as per resspo norms manual and as per direction of engineer incharge including the cost of labour, t and p and carrier etc required for proper completion of work, erection and grouting of stay set including the work of nozzling etc as per resspo manual and also including the cost of arrangement of all grouting material, labour, t and p etc required for proper completion of work, providing and fixing of stay insulator, laying, sagging, stringing, binding and jumpering etc of line conductor on the newly erected pole as per resspo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t and p carrier etc required for proper completion of work, abc conductor 3x50+1x35+1x16 sqmm and 3x95+1x70+1x16 sqmm and 3x120+1x95+1x16 sqmm and 1x16+1x25 sqmm, grouting of pcc and stp poles 8.5, 11 and 13 mtr long as per resspo norms, making the plinth of steel poles, fixing of earthing rod as per resspo manual and as per direction of supervising engineer including the cost of labour, t and p etc required for proper completion of work, chopping of tree branches which are touching to ht and lt lines, providing and fixing of clamps of lt, cross arm holding, f clamp, stay clamp, danger board clamp and all type clamps with nut and bolts as per actual site requirement, providing and fixing of lt shackle insulator, providing and fixing of missing nut bolts and washer, carriage and installation from site to store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and t and p etc required for proper completion earthing and jumphering of work, dismentling of old pcc and stp poles for shifting after dismentling of all accessories. it includes the work of cartage, cost of labour, t and p carrier etc required for proper completion of work, dismantling and removal of existing conductor, cable, gi wire from the various area preparing their coils and then stacking in the respective jeos store as per direction of supervising engineer it includes the work of cartage, cost of labour, t nad p carrier etc required for proper completion of work, erection of section tee pole including fixing of all fittings as per respo norms, carriage and installation of lt distribution box three phase distribution box from store centre sarsol to pit site including loading and unloading at both ends mounting and fixing on pole also by making connections as per resspo norms, provding and fixing and filling of 3x70,3x120,3x185 11 kv xlpe heat shrinkable cable jointing kits indoor and outdoor type including the cost of labour t and p carrier etc for proper completion of work, safe carriage of 3x70,3x120,3x185,3x300 sqmm 33 kv by 11 kv xlpe cable from store center to respective site of work including loading and unloading at both ends for proper completion of work, laying of 3x70,3x120,3x185,3x300 sqmm 33 kv and 11 kv under ground cable by straight through after digging trench of 600 mm wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable the cable shall be duly protected by ist class bricks, two on either side and third on top of the cable, laid in series one after the other. the work includes supplying of fine sand and bricks, filling and ramming of the left out soil, closing the trench and levelling spare cable shall be left and buried in the trench in the shape of rings at both ends all material except cable, labour, t and p carrier etc, required for proper completion of work will be arranged by the contractor at his own cost, laying of 3x70,3x120,3x185,3x300 sqmm 33 kv and 11 kv overhead cable work includes labour, t and p carrier etc, required for proper completion of work will be arranged by the contractor at his own cost, guarding of 11 kv line by laying two nos gi wire parallel and fixing of lacings tilli at a distance at 2 to 3 mtr as per respo manual and also including the cost of arragement of labour, t and p etc required for proper completion of work, safe carriage and installation of 33kv by 11 kv ct and pt pole mounted metering unit on double pole after fixing of channel with m s clamps and nuts bolts for holding the channel angle etc the unit body shall be earthed by connecting m s strip of size 1,8x1 finally connected to earthing rod of size 20mm x2540 mm 11 kv line shall be connected to unit as per instructions of sdo and ae m the m s strip and earth rod shall be included in the scope of work, safe carriage and installation of 33kv by 11 kv pilfer proof metering cubicle from store centre, sarsol to site of work, provding and fixing wearing gi pipe 6 o dia on the feeder cable before mounting the cable on the double pole lifting, mounting and clamping of 11 kv feeder cable with boxes on the feeder double pole structure and making connections including supply. Tender18 Provide this type Government Tender Information on daily basis.


This tender invites eligible contractors, suppliers, manufacturers, consultants, Startups, Msmes, traders and service providers to submit bids for the specified project, supply, service, or work requirement.


Before applying, interested bidders should review the tender scope, eligibility criteria, estimated contract value, important dates, technical requirements, reqired docuent list for bidder and bid submission instructions as per provided in the official tender documents. 


This Verified Information Provide By Tender18 in this page so Bidder Can Easiy  Understanding tender  requirements and bidders can prepare a compliant and competitive tender proposal.

To participate in the corrigendum tender for pcc and stp poles 8.5, 11 and 13 mtr , carriage of line material , installation and fixing of 11 kv tpmo. , erection and grouting of stay set , providing and fixing , acsr weasal, rabbit and dog conductor. , abc conductor , grouting of pcc and stp poles , plinth , fixing of earthing rod , chopping of tree branches , providing and fixing of clamps of lt , providing and fixing , 25 kva transformer , 63 kva transformer , 100 kva transformer , 400 kva transformer , dismentling of old pcc and stp poles , dismantling and removal , erection of section , carriage and installation , provding and fixing, filling , safe carriage , laying of under ground cable , laying of overhead cable , guarding of 11 kv line by laying two nos , safe carriage and installation , safe carriage and installation , provding and fixing wearing, erection and commissioning of transformer and line and poles, carriage of following poles from store centre or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends, also including the work of dragging etc and also including the cost of labour, t and p carrier etc required for proper completion of work dist 0 to 50 kms, carriage of line material viz lt cable, conductor, gi earth wire, barbed wire, cross arm, angle, channel, insulator, various clamps, xlpe cable, cable, stone pad and other line material from store centre or from any other place to the respective site of work through the kachha pacca road including the work of its loading and unloading at the respective end, also including the work of dragging etc and also including the cost of labour, t and p carrier etc required for proper completion of work dist 0 to 50 kms, erection of single support including complete h.t and l.t fittings with drilling and cutting as per resspo manual and as per direction of engineer incharge including the cost of labour, t and p and carrier etc required for proper completion of work, erection of double and section pole on following poles including including complete h.t and l.t fittings with drilling and cutting and the work of complete line as per resspo norms manual and as per direction of engineer incharge including the cost of labour, t and p and carrier etc required for proper completion of work, erection of double and section pole on following poles including including complete h.t and l.t fittings with drilling & cutting and the work of complete line as per resspo norms manual and as per direction of engineer incharge including the cost of labour, t and p and carrier etc required for proper completion of work, erection and grouting of stay set including the work of nozzling etc as per resspo manual and also including the cost of arrangement of all grouting material, labour, t and p etc required for proper completion of work, providing and fixing of stay insulator, laying, sagging, stringing, binding and jumpering etc of line conductor on the newly erected pole as per resspo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t and p carrier etc required for proper completion of work, abc conductor 3x50+1x35+1x16 sqmm and 3x95+1x70+1x16 sqmm and 3x120+1x95+1x16 sqmm and 1x16+1x25 sqmm, grouting of pcc and stp poles 8.5, 11 and 13 mtr long as per resspo norms, making the plinth of steel poles, fixing of earthing rod as per resspo manual and as per direction of supervising engineer including the cost of labour, t and p etc required for proper completion of work, chopping of tree branches which are touching to ht and lt lines, providing and fixing of clamps of lt, cross arm holding, f clamp, stay clamp, danger board clamp and all type clamps with nut and bolts as per actual site requirement, providing and fixing of lt shackle insulator, providing and fixing of missing nut bolts and washer, carriage and installation from site to store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and t and p etc required for proper completion earthing and jumphering of work, dismentling of old pcc and stp poles for shifting after dismentling of all accessories. it includes the work of cartage, cost of labour, t and p carrier etc required for proper completion of work, dismantling and removal of existing conductor, cable, gi wire from the various area preparing their coils and then stacking in the respective jeos store as per direction of supervising engineer it includes the work of cartage, cost of labour, t nad p carrier etc required for proper completion of work, erection of section tee pole including fixing of all fittings as per respo norms, carriage and installation of lt distribution box three phase distribution box from store centre sarsol to pit site including loading and unloading at both ends mounting and fixing on pole also by making connections as per resspo norms, provding and fixing and filling of 3x70,3x120,3x185 11 kv xlpe heat shrinkable cable jointing kits indoor and outdoor type including the cost of labour t and p carrier etc for proper completion of work, safe carriage of 3x70,3x120,3x185,3x300 sqmm 33 kv by 11 kv xlpe cable from store center to respective site of work including loading and unloading at both ends for proper completion of work, laying of 3x70,3x120,3x185,3x300 sqmm 33 kv and 11 kv under ground cable by straight through after digging trench of 600 mm wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable the cable shall be duly protected by ist class bricks, two on either side and third on top of the cable, laid in series one after the other. the work includes supplying of fine sand and bricks, filling and ramming of the left out soil, closing the trench and levelling spare cable shall be left and buried in the trench in the shape of rings at both ends all material except cable, labour, t and p carrier etc, required for proper completion of work will be arranged by the contractor at his own cost, laying of 3x70,3x120,3x185,3x300 sqmm 33 kv and 11 kv overhead cable work includes labour, t and p carrier etc, required for proper completion of work will be arranged by the contractor at his own cost, guarding of 11 kv line by laying two nos gi wire parallel and fixing of lacings tilli at a distance at 2 to 3 mtr as per respo manual and also including the cost of arragement of labour, t and p etc required for proper completion of work, safe carriage and installation of 33kv by 11 kv ct and pt pole mounted metering unit on double pole after fixing of channel with m s clamps and nuts bolts for holding the channel angle etc the unit body shall be earthed by connecting m s strip of size 1,8x1 finally connected to earthing rod of size 20mm x2540 mm 11 kv line shall be connected to unit as per instructions of sdo and ae m the m s strip and earth rod shall be included in the scope of work, safe carriage and installation of 33kv by 11 kv pilfer proof metering cubicle from store centre, sarsol to site of work, provding and fixing wearing gi pipe 6 o dia on the feeder cable before mounting the cable on the double pole lifting, mounting and clamping of 11 kv feeder cable with boxes on the feeder double pole structure and making connections including supply, bidders should first download and review all available tender documents. These documents generally include the Notice Inviting Tender (NIT), Bill of Quantities (BOQ), technical specifications, eligibility criteria, scope of work, and bid submission instructions.


Tender Governemnt Authorities like Uttar Pradesh Power Corporation Limited UPPCL usually publish these documents on their official eProcurement portals, departmental tender portals, the GeM Tender Portal, or other government procurement platforms or on newspapre. Finding and accessing the correct tender documents across multiple portals can sometimes be time-consuming for bidders. 


To make the process easier, Tender18 provides quick access to the available tender documents related to this Aligarh , Uttar Pradesh tender on a single page. Businesses involved in related products, services, or works can conveniently download the relevant documents and review the tender requirements without spending time searching across different procurement portals.

The corrigendum tender for pcc and stp poles 8.5, 11 and 13 mtr , carriage of line material , installation and fixing of 11 kv tpmo. , erection and grouting of stay set , providing and fixing , acsr weasal, rabbit and dog conductor. , abc conductor , grouting of pcc and stp poles , plinth , fixing of earthing rod , chopping of tree branches , providing and fixing of clamps of lt , providing and fixing , 25 kva transformer , 63 kva transformer , 100 kva transformer , 400 kva transformer , dismentling of old pcc and stp poles , dismantling and removal , erection of section , carriage and installation , provding and fixing, filling , safe carriage , laying of under ground cable , laying of overhead cable , guarding of 11 kv line by laying two nos , safe carriage and installation , safe carriage and installation , provding and fixing wearing, erection and commissioning of transformer and line and poles, carriage of following poles from store centre or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends, also including the work of dragging etc and also including the cost of labour, t and p carrier etc required for proper completion of work dist 0 to 50 kms, carriage of line material viz lt cable, conductor, gi earth wire, barbed wire, cross arm, angle, channel, insulator, various clamps, xlpe cable, cable, stone pad and other line material from store centre or from any other place to the respective site of work through the kachha pacca road including the work of its loading and unloading at the respective end, also including the work of dragging etc and also including the cost of labour, t and p carrier etc required for proper completion of work dist 0 to 50 kms, erection of single support including complete h.t and l.t fittings with drilling and cutting as per resspo manual and as per direction of engineer incharge including the cost of labour, t and p and carrier etc required for proper completion of work, erection of double and section pole on following poles including including complete h.t and l.t fittings with drilling and cutting and the work of complete line as per resspo norms manual and as per direction of engineer incharge including the cost of labour, t and p and carrier etc required for proper completion of work, erection of double and section pole on following poles including including complete h.t and l.t fittings with drilling & cutting and the work of complete line as per resspo norms manual and as per direction of engineer incharge including the cost of labour, t and p and carrier etc required for proper completion of work, erection and grouting of stay set including the work of nozzling etc as per resspo manual and also including the cost of arrangement of all grouting material, labour, t and p etc required for proper completion of work, providing and fixing of stay insulator, laying, sagging, stringing, binding and jumpering etc of line conductor on the newly erected pole as per resspo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t and p carrier etc required for proper completion of work, abc conductor 3x50+1x35+1x16 sqmm and 3x95+1x70+1x16 sqmm and 3x120+1x95+1x16 sqmm and 1x16+1x25 sqmm, grouting of pcc and stp poles 8.5, 11 and 13 mtr long as per resspo norms, making the plinth of steel poles, fixing of earthing rod as per resspo manual and as per direction of supervising engineer including the cost of labour, t and p etc required for proper completion of work, chopping of tree branches which are touching to ht and lt lines, providing and fixing of clamps of lt, cross arm holding, f clamp, stay clamp, danger board clamp and all type clamps with nut and bolts as per actual site requirement, providing and fixing of lt shackle insulator, providing and fixing of missing nut bolts and washer, carriage and installation from site to store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and t and p etc required for proper completion earthing and jumphering of work, dismentling of old pcc and stp poles for shifting after dismentling of all accessories. it includes the work of cartage, cost of labour, t and p carrier etc required for proper completion of work, dismantling and removal of existing conductor, cable, gi wire from the various area preparing their coils and then stacking in the respective jeos store as per direction of supervising engineer it includes the work of cartage, cost of labour, t nad p carrier etc required for proper completion of work, erection of section tee pole including fixing of all fittings as per respo norms, carriage and installation of lt distribution box three phase distribution box from store centre sarsol to pit site including loading and unloading at both ends mounting and fixing on pole also by making connections as per resspo norms, provding and fixing and filling of 3x70,3x120,3x185 11 kv xlpe heat shrinkable cable jointing kits indoor and outdoor type including the cost of labour t and p carrier etc for proper completion of work, safe carriage of 3x70,3x120,3x185,3x300 sqmm 33 kv by 11 kv xlpe cable from store center to respective site of work including loading and unloading at both ends for proper completion of work, laying of 3x70,3x120,3x185,3x300 sqmm 33 kv and 11 kv under ground cable by straight through after digging trench of 600 mm wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable the cable shall be duly protected by ist class bricks, two on either side and third on top of the cable, laid in series one after the other. the work includes supplying of fine sand and bricks, filling and ramming of the left out soil, closing the trench and levelling spare cable shall be left and buried in the trench in the shape of rings at both ends all material except cable, labour, t and p carrier etc, required for proper completion of work will be arranged by the contractor at his own cost, laying of 3x70,3x120,3x185,3x300 sqmm 33 kv and 11 kv overhead cable work includes labour, t and p carrier etc, required for proper completion of work will be arranged by the contractor at his own cost, guarding of 11 kv line by laying two nos gi wire parallel and fixing of lacings tilli at a distance at 2 to 3 mtr as per respo manual and also including the cost of arragement of labour, t and p etc required for proper completion of work, safe carriage and installation of 33kv by 11 kv ct and pt pole mounted metering unit on double pole after fixing of channel with m s clamps and nuts bolts for holding the channel angle etc the unit body shall be earthed by connecting m s strip of size 1,8x1 finally connected to earthing rod of size 20mm x2540 mm 11 kv line shall be connected to unit as per instructions of sdo and ae m the m s strip and earth rod shall be included in the scope of work, safe carriage and installation of 33kv by 11 kv pilfer proof metering cubicle from store centre, sarsol to site of work, provding and fixing wearing gi pipe 6 o dia on the feeder cable before mounting the cable on the double pole lifting, mounting and clamping of 11 kv feeder cable with boxes on the feeder double pole structure and making connections including supply from Aligarh, Uttar Pradesh may be relevant for contractors, suppliers, vendors, manufacturers, consultants, service providers, startups, MSMEs, and other organizations involved in related products, services, or works. However, eligibility to participate depends on the qualification criteria specified by Uttar Pradesh Power Corporation Limited UPPCL in the official tender documents.

Before submitting a bid, interested applicants should carefully review the eligibility conditions, technical requirements, financial criteria, work experience requirements, annual turnover conditions, registrations, certifications, and any other supporting documents required by the tendering authority. The detailed qualification requirements and bidder eligibility criteria are available in the tender notice and related documents provided on this page. 

Ensuring compliance with all eligibility and qualification requirements before bid submission can help bidders avoid disqualification and improve their chances of successful participation in the tender process.

Tende18 provides comprehensive tender bidding services, including a complete tender summary along with a detailed analysis of the Tender Qualification and Eligibility Criteria.

Interested in participating in the corrigendum tender for pcc and stp poles 8.5, 11 and 13 mtr , carriage of line material , installation and fixing of 11 kv tpmo. , erection and grouting of stay set , providing and fixing , acsr weasal, rabbit and dog conductor. , abc conductor , grouting of pcc and stp poles , plinth , fixing of earthing rod , chopping of tree branches , providing and fixing of clamps of lt , providing and fixing , 25 kva transformer , 63 kva transformer , 100 kva transformer , 400 kva transformer , dismentling of old pcc and stp poles , dismantling and removal , erection of section , carriage and installation , provding and fixing, filling , safe carriage , laying of under ground cable , laying of overhead cable , guarding of 11 kv line by laying two nos , safe carriage and installation , safe carriage and installation , provding and fixing wearing, erection and commissioning of transformer and line and poles, carriage of following poles from store centre or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends, also including the work of dragging etc and also including the cost of labour, t and p carrier etc required for proper completion of work dist 0 to 50 kms, carriage of line material viz lt cable, conductor, gi earth wire, barbed wire, cross arm, angle, channel, insulator, various clamps, xlpe cable, cable, stone pad and other line material from store centre or from any other place to the respective site of work through the kachha pacca road including the work of its loading and unloading at the respective end, also including the work of dragging etc and also including the cost of labour, t and p carrier etc required for proper completion of work dist 0 to 50 kms, erection of single support including complete h.t and l.t fittings with drilling and cutting as per resspo manual and as per direction of engineer incharge including the cost of labour, t and p and carrier etc required for proper completion of work, erection of double and section pole on following poles including including complete h.t and l.t fittings with drilling and cutting and the work of complete line as per resspo norms manual and as per direction of engineer incharge including the cost of labour, t and p and carrier etc required for proper completion of work, erection of double and section pole on following poles including including complete h.t and l.t fittings with drilling & cutting and the work of complete line as per resspo norms manual and as per direction of engineer incharge including the cost of labour, t and p and carrier etc required for proper completion of work, erection and grouting of stay set including the work of nozzling etc as per resspo manual and also including the cost of arrangement of all grouting material, labour, t and p etc required for proper completion of work, providing and fixing of stay insulator, laying, sagging, stringing, binding and jumpering etc of line conductor on the newly erected pole as per resspo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t and p carrier etc required for proper completion of work, abc conductor 3x50+1x35+1x16 sqmm and 3x95+1x70+1x16 sqmm and 3x120+1x95+1x16 sqmm and 1x16+1x25 sqmm, grouting of pcc and stp poles 8.5, 11 and 13 mtr long as per resspo norms, making the plinth of steel poles, fixing of earthing rod as per resspo manual and as per direction of supervising engineer including the cost of labour, t and p etc required for proper completion of work, chopping of tree branches which are touching to ht and lt lines, providing and fixing of clamps of lt, cross arm holding, f clamp, stay clamp, danger board clamp and all type clamps with nut and bolts as per actual site requirement, providing and fixing of lt shackle insulator, providing and fixing of missing nut bolts and washer, carriage and installation from site to store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and t and p etc required for proper completion earthing and jumphering of work, dismentling of old pcc and stp poles for shifting after dismentling of all accessories. it includes the work of cartage, cost of labour, t and p carrier etc required for proper completion of work, dismantling and removal of existing conductor, cable, gi wire from the various area preparing their coils and then stacking in the respective jeos store as per direction of supervising engineer it includes the work of cartage, cost of labour, t nad p carrier etc required for proper completion of work, erection of section tee pole including fixing of all fittings as per respo norms, carriage and installation of lt distribution box three phase distribution box from store centre sarsol to pit site including loading and unloading at both ends mounting and fixing on pole also by making connections as per resspo norms, provding and fixing and filling of 3x70,3x120,3x185 11 kv xlpe heat shrinkable cable jointing kits indoor and outdoor type including the cost of labour t and p carrier etc for proper completion of work, safe carriage of 3x70,3x120,3x185,3x300 sqmm 33 kv by 11 kv xlpe cable from store center to respective site of work including loading and unloading at both ends for proper completion of work, laying of 3x70,3x120,3x185,3x300 sqmm 33 kv and 11 kv under ground cable by straight through after digging trench of 600 mm wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable the cable shall be duly protected by ist class bricks, two on either side and third on top of the cable, laid in series one after the other. the work includes supplying of fine sand and bricks, filling and ramming of the left out soil, closing the trench and levelling spare cable shall be left and buried in the trench in the shape of rings at both ends all material except cable, labour, t and p carrier etc, required for proper completion of work will be arranged by the contractor at his own cost, laying of 3x70,3x120,3x185,3x300 sqmm 33 kv and 11 kv overhead cable work includes labour, t and p carrier etc, required for proper completion of work will be arranged by the contractor at his own cost, guarding of 11 kv line by laying two nos gi wire parallel and fixing of lacings tilli at a distance at 2 to 3 mtr as per respo manual and also including the cost of arragement of labour, t and p etc required for proper completion of work, safe carriage and installation of 33kv by 11 kv ct and pt pole mounted metering unit on double pole after fixing of channel with m s clamps and nuts bolts for holding the channel angle etc the unit body shall be earthed by connecting m s strip of size 1,8x1 finally connected to earthing rod of size 20mm x2540 mm 11 kv line shall be connected to unit as per instructions of sdo and ae m the m s strip and earth rod shall be included in the scope of work, safe carriage and installation of 33kv by 11 kv pilfer proof metering cubicle from store centre, sarsol to site of work, provding and fixing wearing gi pipe 6 o dia on the feeder cable before mounting the cable on the double pole lifting, mounting and clamping of 11 kv feeder cable with boxes on the feeder double pole structure and making connections including supply issued by Uttar Pradesh Power Corporation Limited UPPCL for related work in Aligarh, Uttar Pradesh? TENDER18 provides complete assistance to help businesses understand tender requirements, access tender documents, review eligibility criteria, qualification requirements, important dates, and bid submission guidelines associated with this tender.

Our Tender18 Expert Technical team can assist with vendor and GeM registration on the relevant departmental, eProcurement, GeM, or government tender portal, preparation of technical and financial bid documents, compliance with qualification criteria, document verification, and complete online tender submission support. Whether you are a contractor, supplier, manufacturer, consultant, startup, or MSME working in the field of , Tender18 can help simplify the tender participation process and support you throughout every stage of bidding for this tender. so that tender18 is one the top leading tender consultant in Inda.

1.

Whom should I contact if I have further queries about the Tender scope?

You can fill out the integrated inquiry form below on this detail page to share your company profile. Our consultancy desk will review your query regarding parameters and guide you on how to coordinate efficiently with the procurement team of Uttar Pradesh Power Corporation Limited UPPCL

2.

How can Tender18 assist my business in winning this government contract?

Tender18 provides end-to-end professional bidding support and documentation advisory for Corrigendum Tender For Pcc And Stp Poles 8.5, 11 And 13 Mtr , Carriage Of Line Material , Installation And Fixing Of 11 Kv Tpmo. , Erection And Grouting Of Stay Set , Providing And Fixing , Acsr Weasal, Rabbit And Dog Conductor. , Abc Conductor , Grouting Of Pcc And Stp Poles , Plinth , Fixing Of Earthing Rod , Chopping Of Tree Branches , Providing And Fixing Of Clamps Of Lt , Providing And Fixing , 25 Kva Transformer , 63 Kva Transformer , 100 Kva Transformer , 400 Kva Transformer , Dismentling Of Old Pcc And Stp Poles , Dismantling And Removal , Erection Of Section , Carriage And Installation , Provding And Fixing, Filling , Safe Carriage , Laying Of Under Ground Cable , Laying Of Overhead Cable , Guarding Of 11 Kv Line By Laying Two Nos , Safe Carriage And Installation , Safe Carriage And Installation , Provding And Fixing Wearing, Erection And Commissioning Of Transformer And Line And Poles, Carriage Of Following Poles From Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective Ends, Also Including The Work Of Dragging Etc And Also Including The Cost Of Labour, T And P Carrier Etc Required For Proper Completion Of Work Dist 0 To 50 Kms, Carriage Of Line Material Viz Lt Cable, Conductor, Gi Earth Wire, Barbed Wire, Cross Arm, Angle, Channel, Insulator, Various Clamps, Xlpe Cable, Cable, Stone Pad And Other Line Material From Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading And Unloading At The Respective End, Also Including The Work Of Dragging Etc And Also Including The Cost Of Labour, T And P Carrier Etc Required For Proper Completion Of Work Dist 0 To 50 Kms, Erection Of Single Support Including Complete H.t And L.t Fittings With Drilling And Cutting As Per Resspo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T And P And Carrier Etc Required For Proper Completion Of Work, Erection Of Double And Section Pole On Following Poles Including Including Complete H.t And L.t Fittings With Drilling And Cutting And The Work Of Complete Line As Per Resspo Norms Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T And P And Carrier Etc Required For Proper Completion Of Work, Erection Of Double And Section Pole On Following Poles Including Including Complete H.t And L.t Fittings With Drilling & Cutting And The Work Of Complete Line As Per Resspo Norms Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T And P And Carrier Etc Required For Proper Completion Of Work, Erection And Grouting Of Stay Set Including The Work Of Nozzling Etc As Per Resspo Manual And Also Including The Cost Of Arrangement Of All Grouting Material, Labour, T And P Etc Required For Proper Completion Of Work, Providing And Fixing Of Stay Insulator, Laying, Sagging, Stringing, Binding And Jumpering Etc Of Line Conductor On The Newly Erected Pole As Per Resspo Manual And As Per Direction Of Supervising Engineer, Including The Cost Of Arrangement Of Labour, T And P Carrier Etc Required For Proper Completion Of Work, Abc Conductor 3x50+1x35+1x16 Sqmm And 3x95+1x70+1x16 Sqmm And 3x120+1x95+1x16 Sqmm And 1x16+1x25 Sqmm, Grouting Of Pcc And Stp Poles 8.5, 11 And 13 Mtr Long As Per Resspo Norms, Making The Plinth Of Steel Poles, Fixing Of Earthing Rod As Per Resspo Manual And As Per Direction Of Supervising Engineer Including The Cost Of Labour, T And P Etc Required For Proper Completion Of Work, Chopping Of Tree Branches Which Are Touching To Ht And Lt Lines, Providing And Fixing Of Clamps Of Lt, Cross Arm Holding, F Clamp, Stay Clamp, Danger Board Clamp And All Type Clamps With Nut And Bolts As Per Actual Site Requirement, Providing And Fixing Of Lt Shackle Insulator, Providing And Fixing Of Missing Nut Bolts And Washer, Carriage And Installation From Site To Store And Store To Site Following Capacity Transformer Including The Work Of Its Loading And Unloading, Dragging Etc And Also Including The Cost Of Labour And T And P Etc Required For Proper Completion Earthing And Jumphering Of Work, Dismentling Of Old Pcc And Stp Poles For Shifting After Dismentling Of All Accessories. It Includes The Work Of Cartage, Cost Of Labour, T And P Carrier Etc Required For Proper Completion Of Work, Dismantling And Removal Of Existing Conductor, Cable, Gi Wire From The Various Area Preparing Their Coils And Then Stacking In The Respective Jeos Store As Per Direction Of Supervising Engineer It Includes The Work Of Cartage, Cost Of Labour, T Nad P Carrier Etc Required For Proper Completion Of Work, Erection Of Section Tee Pole Including Fixing Of All Fittings As Per Respo Norms, Carriage And Installation Of Lt Distribution Box Three Phase Distribution Box From Store Centre Sarsol To Pit Site Including Loading And Unloading At Both Ends Mounting And Fixing On Pole Also By Making Connections As Per Resspo Norms, Provding And Fixing And Filling Of 3x70,3x120,3x185 11 Kv Xlpe Heat Shrinkable Cable Jointing Kits Indoor And Outdoor Type Including The Cost Of Labour T And P Carrier Etc For Proper Completion Of Work, Safe Carriage Of 3x70,3x120,3x185,3x300 Sqmm 33 Kv By 11 Kv Xlpe Cable From Store Center To Respective Site Of Work Including Loading And Unloading At Both Ends For Proper Completion Of Work, Laying Of 3x70,3x120,3x185,3x300 Sqmm 33 Kv And 11 Kv Under Ground Cable By Straight Through After Digging Trench Of 600 Mm Wide, 1500 Mm Deep, Providing The Fine Sand Cushion Beneath And Above The Cable The Cable Shall Be Duly Protected By Ist Class Bricks, Two On Either Side And Third On Top Of The Cable, Laid In Series One After The Other. The Work Includes Supplying Of Fine Sand And Bricks, Filling And Ramming Of The Left Out Soil, Closing The Trench And Levelling Spare Cable Shall Be Left And Buried In The Trench In The Shape Of Rings At Both Ends All Material Except Cable, Labour, T And P Carrier Etc, Required For Proper Completion Of Work Will Be Arranged By The Contractor At His Own Cost, Laying Of 3x70,3x120,3x185,3x300 Sqmm 33 Kv And 11 Kv Overhead Cable Work Includes Labour, T And P Carrier Etc, Required For Proper Completion Of Work Will Be Arranged By The Contractor At His Own Cost, Guarding Of 11 Kv Line By Laying Two Nos Gi Wire Parallel And Fixing Of Lacings Tilli At A Distance At 2 To 3 Mtr As Per Respo Manual And Also Including The Cost Of Arragement Of Labour, T And P Etc Required For Proper Completion Of Work, Safe Carriage And Installation Of 33kv By 11 Kv Ct And Pt Pole Mounted Metering Unit On Double Pole After Fixing Of Channel With M S Clamps And Nuts Bolts For Holding The Channel Angle Etc The Unit Body Shall Be Earthed By Connecting M S Strip Of Size 1,8x1 Finally Connected To Earthing Rod Of Size 20mm X2540 Mm 11 Kv Line Shall Be Connected To Unit As Per Instructions Of Sdo And Ae M The M S Strip And Earth Rod Shall Be Included In The Scope Of Work, Safe Carriage And Installation Of 33kv By 11 Kv Pilfer Proof Metering Cubicle From Store Centre, Sarsol To Site Of Work, Provding And Fixing Wearing Gi Pipe 6 O Dia On The Feeder Cable Before Mounting The Cable On The Double Pole Lifting, Mounting And Clamping Of 11 Kv Feeder Cable With Boxes On The Feeder Double Pole Structure And Making Connections Including Supply . Our senior analysts help you decode the complete project guidelines, manage accurate costing sheets, and complete error-free submissions on the official platform used by Uttar Pradesh Power Corporation Limited UPPCL.

3.

What are the main reasons for a technical tender rejection?

Most online bids face rejection during the initial evaluation round due to avoidable errors like uploading blurred document scans, submitting expired DSCs, or missing critical experience papers required for Corrigendum Tender For Pcc And Stp Poles 8.5, 11 And 13 Mtr , Carriage Of Line Material , Installation And Fixing Of 11 Kv Tpmo. , Erection And Grouting Of Stay Set , Providing And Fixing , Acsr Weasal, Rabbit And Dog Conductor. , Abc Conductor , Grouting Of Pcc And Stp Poles , Plinth , Fixing Of Earthing Rod , Chopping Of Tree Branches , Providing And Fixing Of Clamps Of Lt , Providing And Fixing , 25 Kva Transformer , 63 Kva Transformer , 100 Kva Transformer , 400 Kva Transformer , Dismentling Of Old Pcc And Stp Poles , Dismantling And Removal , Erection Of Section , Carriage And Installation , Provding And Fixing, Filling , Safe Carriage , Laying Of Under Ground Cable , Laying Of Overhead Cable , Guarding Of 11 Kv Line By Laying Two Nos , Safe Carriage And Installation , Safe Carriage And Installation , Provding And Fixing Wearing, Erection And Commissioning Of Transformer And Line And Poles, Carriage Of Following Poles From Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective Ends, Also Including The Work Of Dragging Etc And Also Including The Cost Of Labour, T And P Carrier Etc Required For Proper Completion Of Work Dist 0 To 50 Kms, Carriage Of Line Material Viz Lt Cable, Conductor, Gi Earth Wire, Barbed Wire, Cross Arm, Angle, Channel, Insulator, Various Clamps, Xlpe Cable, Cable, Stone Pad And Other Line Material From Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading And Unloading At The Respective End, Also Including The Work Of Dragging Etc And Also Including The Cost Of Labour, T And P Carrier Etc Required For Proper Completion Of Work Dist 0 To 50 Kms, Erection Of Single Support Including Complete H.t And L.t Fittings With Drilling And Cutting As Per Resspo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T And P And Carrier Etc Required For Proper Completion Of Work, Erection Of Double And Section Pole On Following Poles Including Including Complete H.t And L.t Fittings With Drilling And Cutting And The Work Of Complete Line As Per Resspo Norms Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T And P And Carrier Etc Required For Proper Completion Of Work, Erection Of Double And Section Pole On Following Poles Including Including Complete H.t And L.t Fittings With Drilling & Cutting And The Work Of Complete Line As Per Resspo Norms Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T And P And Carrier Etc Required For Proper Completion Of Work, Erection And Grouting Of Stay Set Including The Work Of Nozzling Etc As Per Resspo Manual And Also Including The Cost Of Arrangement Of All Grouting Material, Labour, T And P Etc Required For Proper Completion Of Work, Providing And Fixing Of Stay Insulator, Laying, Sagging, Stringing, Binding And Jumpering Etc Of Line Conductor On The Newly Erected Pole As Per Resspo Manual And As Per Direction Of Supervising Engineer, Including The Cost Of Arrangement Of Labour, T And P Carrier Etc Required For Proper Completion Of Work, Abc Conductor 3x50+1x35+1x16 Sqmm And 3x95+1x70+1x16 Sqmm And 3x120+1x95+1x16 Sqmm And 1x16+1x25 Sqmm, Grouting Of Pcc And Stp Poles 8.5, 11 And 13 Mtr Long As Per Resspo Norms, Making The Plinth Of Steel Poles, Fixing Of Earthing Rod As Per Resspo Manual And As Per Direction Of Supervising Engineer Including The Cost Of Labour, T And P Etc Required For Proper Completion Of Work, Chopping Of Tree Branches Which Are Touching To Ht And Lt Lines, Providing And Fixing Of Clamps Of Lt, Cross Arm Holding, F Clamp, Stay Clamp, Danger Board Clamp And All Type Clamps With Nut And Bolts As Per Actual Site Requirement, Providing And Fixing Of Lt Shackle Insulator, Providing And Fixing Of Missing Nut Bolts And Washer, Carriage And Installation From Site To Store And Store To Site Following Capacity Transformer Including The Work Of Its Loading And Unloading, Dragging Etc And Also Including The Cost Of Labour And T And P Etc Required For Proper Completion Earthing And Jumphering Of Work, Dismentling Of Old Pcc And Stp Poles For Shifting After Dismentling Of All Accessories. It Includes The Work Of Cartage, Cost Of Labour, T And P Carrier Etc Required For Proper Completion Of Work, Dismantling And Removal Of Existing Conductor, Cable, Gi Wire From The Various Area Preparing Their Coils And Then Stacking In The Respective Jeos Store As Per Direction Of Supervising Engineer It Includes The Work Of Cartage, Cost Of Labour, T Nad P Carrier Etc Required For Proper Completion Of Work, Erection Of Section Tee Pole Including Fixing Of All Fittings As Per Respo Norms, Carriage And Installation Of Lt Distribution Box Three Phase Distribution Box From Store Centre Sarsol To Pit Site Including Loading And Unloading At Both Ends Mounting And Fixing On Pole Also By Making Connections As Per Resspo Norms, Provding And Fixing And Filling Of 3x70,3x120,3x185 11 Kv Xlpe Heat Shrinkable Cable Jointing Kits Indoor And Outdoor Type Including The Cost Of Labour T And P Carrier Etc For Proper Completion Of Work, Safe Carriage Of 3x70,3x120,3x185,3x300 Sqmm 33 Kv By 11 Kv Xlpe Cable From Store Center To Respective Site Of Work Including Loading And Unloading At Both Ends For Proper Completion Of Work, Laying Of 3x70,3x120,3x185,3x300 Sqmm 33 Kv And 11 Kv Under Ground Cable By Straight Through After Digging Trench Of 600 Mm Wide, 1500 Mm Deep, Providing The Fine Sand Cushion Beneath And Above The Cable The Cable Shall Be Duly Protected By Ist Class Bricks, Two On Either Side And Third On Top Of The Cable, Laid In Series One After The Other. The Work Includes Supplying Of Fine Sand And Bricks, Filling And Ramming Of The Left Out Soil, Closing The Trench And Levelling Spare Cable Shall Be Left And Buried In The Trench In The Shape Of Rings At Both Ends All Material Except Cable, Labour, T And P Carrier Etc, Required For Proper Completion Of Work Will Be Arranged By The Contractor At His Own Cost, Laying Of 3x70,3x120,3x185,3x300 Sqmm 33 Kv And 11 Kv Overhead Cable Work Includes Labour, T And P Carrier Etc, Required For Proper Completion Of Work Will Be Arranged By The Contractor At His Own Cost, Guarding Of 11 Kv Line By Laying Two Nos Gi Wire Parallel And Fixing Of Lacings Tilli At A Distance At 2 To 3 Mtr As Per Respo Manual And Also Including The Cost Of Arragement Of Labour, T And P Etc Required For Proper Completion Of Work, Safe Carriage And Installation Of 33kv By 11 Kv Ct And Pt Pole Mounted Metering Unit On Double Pole After Fixing Of Channel With M S Clamps And Nuts Bolts For Holding The Channel Angle Etc The Unit Body Shall Be Earthed By Connecting M S Strip Of Size 1,8x1 Finally Connected To Earthing Rod Of Size 20mm X2540 Mm 11 Kv Line Shall Be Connected To Unit As Per Instructions Of Sdo And Ae M The M S Strip And Earth Rod Shall Be Included In The Scope Of Work, Safe Carriage And Installation Of 33kv By 11 Kv Pilfer Proof Metering Cubicle From Store Centre, Sarsol To Site Of Work, Provding And Fixing Wearing Gi Pipe 6 O Dia On The Feeder Cable Before Mounting The Cable On The Double Pole Lifting, Mounting And Clamping Of 11 Kv Feeder Cable With Boxes On The Feeder Double Pole Structure And Making Connections Including Supply in Uttar Pradesh.

4.

Can contractors located outside the local region participate in this bid?

Eligibility for outstation bidders depends entirely on the terms set inside the document for Corrigendum Tender For Pcc And Stp Poles 8.5, 11 And 13 Mtr , Carriage Of Line Material , Installation And Fixing Of 11 Kv Tpmo. , Erection And Grouting Of Stay Set , Providing And Fixing , Acsr Weasal, Rabbit And Dog Conductor. , Abc Conductor , Grouting Of Pcc And Stp Poles , Plinth , Fixing Of Earthing Rod , Chopping Of Tree Branches , Providing And Fixing Of Clamps Of Lt , Providing And Fixing , 25 Kva Transformer , 63 Kva Transformer , 100 Kva Transformer , 400 Kva Transformer , Dismentling Of Old Pcc And Stp Poles , Dismantling And Removal , Erection Of Section , Carriage And Installation , Provding And Fixing, Filling , Safe Carriage , Laying Of Under Ground Cable , Laying Of Overhead Cable , Guarding Of 11 Kv Line By Laying Two Nos , Safe Carriage And Installation , Safe Carriage And Installation , Provding And Fixing Wearing, Erection And Commissioning Of Transformer And Line And Poles, Carriage Of Following Poles From Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective Ends, Also Including The Work Of Dragging Etc And Also Including The Cost Of Labour, T And P Carrier Etc Required For Proper Completion Of Work Dist 0 To 50 Kms, Carriage Of Line Material Viz Lt Cable, Conductor, Gi Earth Wire, Barbed Wire, Cross Arm, Angle, Channel, Insulator, Various Clamps, Xlpe Cable, Cable, Stone Pad And Other Line Material From Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading And Unloading At The Respective End, Also Including The Work Of Dragging Etc And Also Including The Cost Of Labour, T And P Carrier Etc Required For Proper Completion Of Work Dist 0 To 50 Kms, Erection Of Single Support Including Complete H.t And L.t Fittings With Drilling And Cutting As Per Resspo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T And P And Carrier Etc Required For Proper Completion Of Work, Erection Of Double And Section Pole On Following Poles Including Including Complete H.t And L.t Fittings With Drilling And Cutting And The Work Of Complete Line As Per Resspo Norms Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T And P And Carrier Etc Required For Proper Completion Of Work, Erection Of Double And Section Pole On Following Poles Including Including Complete H.t And L.t Fittings With Drilling & Cutting And The Work Of Complete Line As Per Resspo Norms Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T And P And Carrier Etc Required For Proper Completion Of Work, Erection And Grouting Of Stay Set Including The Work Of Nozzling Etc As Per Resspo Manual And Also Including The Cost Of Arrangement Of All Grouting Material, Labour, T And P Etc Required For Proper Completion Of Work, Providing And Fixing Of Stay Insulator, Laying, Sagging, Stringing, Binding And Jumpering Etc Of Line Conductor On The Newly Erected Pole As Per Resspo Manual And As Per Direction Of Supervising Engineer, Including The Cost Of Arrangement Of Labour, T And P Carrier Etc Required For Proper Completion Of Work, Abc Conductor 3x50+1x35+1x16 Sqmm And 3x95+1x70+1x16 Sqmm And 3x120+1x95+1x16 Sqmm And 1x16+1x25 Sqmm, Grouting Of Pcc And Stp Poles 8.5, 11 And 13 Mtr Long As Per Resspo Norms, Making The Plinth Of Steel Poles, Fixing Of Earthing Rod As Per Resspo Manual And As Per Direction Of Supervising Engineer Including The Cost Of Labour, T And P Etc Required For Proper Completion Of Work, Chopping Of Tree Branches Which Are Touching To Ht And Lt Lines, Providing And Fixing Of Clamps Of Lt, Cross Arm Holding, F Clamp, Stay Clamp, Danger Board Clamp And All Type Clamps With Nut And Bolts As Per Actual Site Requirement, Providing And Fixing Of Lt Shackle Insulator, Providing And Fixing Of Missing Nut Bolts And Washer, Carriage And Installation From Site To Store And Store To Site Following Capacity Transformer Including The Work Of Its Loading And Unloading, Dragging Etc And Also Including The Cost Of Labour And T And P Etc Required For Proper Completion Earthing And Jumphering Of Work, Dismentling Of Old Pcc And Stp Poles For Shifting After Dismentling Of All Accessories. It Includes The Work Of Cartage, Cost Of Labour, T And P Carrier Etc Required For Proper Completion Of Work, Dismantling And Removal Of Existing Conductor, Cable, Gi Wire From The Various Area Preparing Their Coils And Then Stacking In The Respective Jeos Store As Per Direction Of Supervising Engineer It Includes The Work Of Cartage, Cost Of Labour, T Nad P Carrier Etc Required For Proper Completion Of Work, Erection Of Section Tee Pole Including Fixing Of All Fittings As Per Respo Norms, Carriage And Installation Of Lt Distribution Box Three Phase Distribution Box From Store Centre Sarsol To Pit Site Including Loading And Unloading At Both Ends Mounting And Fixing On Pole Also By Making Connections As Per Resspo Norms, Provding And Fixing And Filling Of 3x70,3x120,3x185 11 Kv Xlpe Heat Shrinkable Cable Jointing Kits Indoor And Outdoor Type Including The Cost Of Labour T And P Carrier Etc For Proper Completion Of Work, Safe Carriage Of 3x70,3x120,3x185,3x300 Sqmm 33 Kv By 11 Kv Xlpe Cable From Store Center To Respective Site Of Work Including Loading And Unloading At Both Ends For Proper Completion Of Work, Laying Of 3x70,3x120,3x185,3x300 Sqmm 33 Kv And 11 Kv Under Ground Cable By Straight Through After Digging Trench Of 600 Mm Wide, 1500 Mm Deep, Providing The Fine Sand Cushion Beneath And Above The Cable The Cable Shall Be Duly Protected By Ist Class Bricks, Two On Either Side And Third On Top Of The Cable, Laid In Series One After The Other. The Work Includes Supplying Of Fine Sand And Bricks, Filling And Ramming Of The Left Out Soil, Closing The Trench And Levelling Spare Cable Shall Be Left And Buried In The Trench In The Shape Of Rings At Both Ends All Material Except Cable, Labour, T And P Carrier Etc, Required For Proper Completion Of Work Will Be Arranged By The Contractor At His Own Cost, Laying Of 3x70,3x120,3x185,3x300 Sqmm 33 Kv And 11 Kv Overhead Cable Work Includes Labour, T And P Carrier Etc, Required For Proper Completion Of Work Will Be Arranged By The Contractor At His Own Cost, Guarding Of 11 Kv Line By Laying Two Nos Gi Wire Parallel And Fixing Of Lacings Tilli At A Distance At 2 To 3 Mtr As Per Respo Manual And Also Including The Cost Of Arragement Of Labour, T And P Etc Required For Proper Completion Of Work, Safe Carriage And Installation Of 33kv By 11 Kv Ct And Pt Pole Mounted Metering Unit On Double Pole After Fixing Of Channel With M S Clamps And Nuts Bolts For Holding The Channel Angle Etc The Unit Body Shall Be Earthed By Connecting M S Strip Of Size 1,8x1 Finally Connected To Earthing Rod Of Size 20mm X2540 Mm 11 Kv Line Shall Be Connected To Unit As Per Instructions Of Sdo And Ae M The M S Strip And Earth Rod Shall Be Included In The Scope Of Work, Safe Carriage And Installation Of 33kv By 11 Kv Pilfer Proof Metering Cubicle From Store Centre, Sarsol To Site Of Work, Provding And Fixing Wearing Gi Pipe 6 O Dia On The Feeder Cable Before Mounting The Cable On The Double Pole Lifting, Mounting And Clamping Of 11 Kv Feeder Cable With Boxes On The Feeder Double Pole Structure And Making Connections Including Supply. While many public sector projects allow national competitive bidding, certain localized works require local offices or specific registration metrics in Aligarh.

5.

Do I need an active GeM Portal registration to apply for this work?

If this procurement is routed through the central marketplace, an active GeM Seller ID is mandatory to supply items. Tender18 offers complete assistance for brand cataloging, profile creation, and vendor assessment required officially by Uttar Pradesh Power Corporation Limited UPPCL

6.

What are the primary legal documents required to submit a valid bid?

To register an eligible bid for these contracts, companies must prepare their core compliance documents. Vendors operating across Uttar Pradesh must ensure they possess a valid GST registration, permanent account number (PAN), and active Class-3 Digital Signature Certificates.

7.

What products or services are required for this active work?

This public procurement cycle is specifically looking for qualified vendors and suppliers who can provide high-quality solutions. The operational execution, delivery, and deployment of these materials must be managed locally within the Aligarh region.

8.

Where can I review the estimated cost or budget details for this Tender?

The estimated project cost and budget thresholds can be reviewed directly inside the tender document. Bidders can analyze these qualification files to check if their firm meets the financial capability criteria specified for Corrigendum Tender For Pcc And Stp Poles 8.5, 11 And 13 Mtr , Carriage Of Line Material , Installation And Fixing Of 11 Kv Tpmo. , Erection And Grouting Of Stay Set , Providing And Fixing , Acsr Weasal, Rabbit And Dog Conductor. , Abc Conductor , Grouting Of Pcc And Stp Poles , Plinth , Fixing Of Earthing Rod , Chopping Of Tree Branches , Providing And Fixing Of Clamps Of Lt , Providing And Fixing , 25 Kva Transformer , 63 Kva Transformer , 100 Kva Transformer , 400 Kva Transformer , Dismentling Of Old Pcc And Stp Poles , Dismantling And Removal , Erection Of Section , Carriage And Installation , Provding And Fixing, Filling , Safe Carriage , Laying Of Under Ground Cable , Laying Of Overhead Cable , Guarding Of 11 Kv Line By Laying Two Nos , Safe Carriage And Installation , Safe Carriage And Installation , Provding And Fixing Wearing, Erection And Commissioning Of Transformer And Line And Poles, Carriage Of Following Poles From Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective Ends, Also Including The Work Of Dragging Etc And Also Including The Cost Of Labour, T And P Carrier Etc Required For Proper Completion Of Work Dist 0 To 50 Kms, Carriage Of Line Material Viz Lt Cable, Conductor, Gi Earth Wire, Barbed Wire, Cross Arm, Angle, Channel, Insulator, Various Clamps, Xlpe Cable, Cable, Stone Pad And Other Line Material From Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading And Unloading At The Respective End, Also Including The Work Of Dragging Etc And Also Including The Cost Of Labour, T And P Carrier Etc Required For Proper Completion Of Work Dist 0 To 50 Kms, Erection Of Single Support Including Complete H.t And L.t Fittings With Drilling And Cutting As Per Resspo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T And P And Carrier Etc Required For Proper Completion Of Work, Erection Of Double And Section Pole On Following Poles Including Including Complete H.t And L.t Fittings With Drilling And Cutting And The Work Of Complete Line As Per Resspo Norms Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T And P And Carrier Etc Required For Proper Completion Of Work, Erection Of Double And Section Pole On Following Poles Including Including Complete H.t And L.t Fittings With Drilling & Cutting And The Work Of Complete Line As Per Resspo Norms Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T And P And Carrier Etc Required For Proper Completion Of Work, Erection And Grouting Of Stay Set Including The Work Of Nozzling Etc As Per Resspo Manual And Also Including The Cost Of Arrangement Of All Grouting Material, Labour, T And P Etc Required For Proper Completion Of Work, Providing And Fixing Of Stay Insulator, Laying, Sagging, Stringing, Binding And Jumpering Etc Of Line Conductor On The Newly Erected Pole As Per Resspo Manual And As Per Direction Of Supervising Engineer, Including The Cost Of Arrangement Of Labour, T And P Carrier Etc Required For Proper Completion Of Work, Abc Conductor 3x50+1x35+1x16 Sqmm And 3x95+1x70+1x16 Sqmm And 3x120+1x95+1x16 Sqmm And 1x16+1x25 Sqmm, Grouting Of Pcc And Stp Poles 8.5, 11 And 13 Mtr Long As Per Resspo Norms, Making The Plinth Of Steel Poles, Fixing Of Earthing Rod As Per Resspo Manual And As Per Direction Of Supervising Engineer Including The Cost Of Labour, T And P Etc Required For Proper Completion Of Work, Chopping Of Tree Branches Which Are Touching To Ht And Lt Lines, Providing And Fixing Of Clamps Of Lt, Cross Arm Holding, F Clamp, Stay Clamp, Danger Board Clamp And All Type Clamps With Nut And Bolts As Per Actual Site Requirement, Providing And Fixing Of Lt Shackle Insulator, Providing And Fixing Of Missing Nut Bolts And Washer, Carriage And Installation From Site To Store And Store To Site Following Capacity Transformer Including The Work Of Its Loading And Unloading, Dragging Etc And Also Including The Cost Of Labour And T And P Etc Required For Proper Completion Earthing And Jumphering Of Work, Dismentling Of Old Pcc And Stp Poles For Shifting After Dismentling Of All Accessories. It Includes The Work Of Cartage, Cost Of Labour, T And P Carrier Etc Required For Proper Completion Of Work, Dismantling And Removal Of Existing Conductor, Cable, Gi Wire From The Various Area Preparing Their Coils And Then Stacking In The Respective Jeos Store As Per Direction Of Supervising Engineer It Includes The Work Of Cartage, Cost Of Labour, T Nad P Carrier Etc Required For Proper Completion Of Work, Erection Of Section Tee Pole Including Fixing Of All Fittings As Per Respo Norms, Carriage And Installation Of Lt Distribution Box Three Phase Distribution Box From Store Centre Sarsol To Pit Site Including Loading And Unloading At Both Ends Mounting And Fixing On Pole Also By Making Connections As Per Resspo Norms, Provding And Fixing And Filling Of 3x70,3x120,3x185 11 Kv Xlpe Heat Shrinkable Cable Jointing Kits Indoor And Outdoor Type Including The Cost Of Labour T And P Carrier Etc For Proper Completion Of Work, Safe Carriage Of 3x70,3x120,3x185,3x300 Sqmm 33 Kv By 11 Kv Xlpe Cable From Store Center To Respective Site Of Work Including Loading And Unloading At Both Ends For Proper Completion Of Work, Laying Of 3x70,3x120,3x185,3x300 Sqmm 33 Kv And 11 Kv Under Ground Cable By Straight Through After Digging Trench Of 600 Mm Wide, 1500 Mm Deep, Providing The Fine Sand Cushion Beneath And Above The Cable The Cable Shall Be Duly Protected By Ist Class Bricks, Two On Either Side And Third On Top Of The Cable, Laid In Series One After The Other. The Work Includes Supplying Of Fine Sand And Bricks, Filling And Ramming Of The Left Out Soil, Closing The Trench And Levelling Spare Cable Shall Be Left And Buried In The Trench In The Shape Of Rings At Both Ends All Material Except Cable, Labour, T And P Carrier Etc, Required For Proper Completion Of Work Will Be Arranged By The Contractor At His Own Cost, Laying Of 3x70,3x120,3x185,3x300 Sqmm 33 Kv And 11 Kv Overhead Cable Work Includes Labour, T And P Carrier Etc, Required For Proper Completion Of Work Will Be Arranged By The Contractor At His Own Cost, Guarding Of 11 Kv Line By Laying Two Nos Gi Wire Parallel And Fixing Of Lacings Tilli At A Distance At 2 To 3 Mtr As Per Respo Manual And Also Including The Cost Of Arragement Of Labour, T And P Etc Required For Proper Completion Of Work, Safe Carriage And Installation Of 33kv By 11 Kv Ct And Pt Pole Mounted Metering Unit On Double Pole After Fixing Of Channel With M S Clamps And Nuts Bolts For Holding The Channel Angle Etc The Unit Body Shall Be Earthed By Connecting M S Strip Of Size 1,8x1 Finally Connected To Earthing Rod Of Size 20mm X2540 Mm 11 Kv Line Shall Be Connected To Unit As Per Instructions Of Sdo And Ae M The M S Strip And Earth Rod Shall Be Included In The Scope Of Work, Safe Carriage And Installation Of 33kv By 11 Kv Pilfer Proof Metering Cubicle From Store Centre, Sarsol To Site Of Work, Provding And Fixing Wearing Gi Pipe 6 O Dia On The Feeder Cable Before Mounting The Cable On The Double Pole Lifting, Mounting And Clamping Of 11 Kv Feeder Cable With Boxes On The Feeder Double Pole Structure And Making Connections Including Supply by Uttar Pradesh Power Corporation Limited UPPCL

9.

How can I download the official BOQ file for this opportunity?

You can download the commercial Bill of Quantities (BOQ) spreadsheet directly using the secure link provided on this page. The BOQ file contains the item descriptions and rate filling forms officially validated for Corrigendum Tender For Pcc And Stp Poles 8.5, 11 And 13 Mtr , Carriage Of Line Material , Installation And Fixing Of 11 Kv Tpmo. , Erection And Grouting Of Stay Set , Providing And Fixing , Acsr Weasal, Rabbit And Dog Conductor. , Abc Conductor , Grouting Of Pcc And Stp Poles , Plinth , Fixing Of Earthing Rod , Chopping Of Tree Branches , Providing And Fixing Of Clamps Of Lt , Providing And Fixing , 25 Kva Transformer , 63 Kva Transformer , 100 Kva Transformer , 400 Kva Transformer , Dismentling Of Old Pcc And Stp Poles , Dismantling And Removal , Erection Of Section , Carriage And Installation , Provding And Fixing, Filling , Safe Carriage , Laying Of Under Ground Cable , Laying Of Overhead Cable , Guarding Of 11 Kv Line By Laying Two Nos , Safe Carriage And Installation , Safe Carriage And Installation , Provding And Fixing Wearing, Erection And Commissioning Of Transformer And Line And Poles, Carriage Of Following Poles From Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective Ends, Also Including The Work Of Dragging Etc And Also Including The Cost Of Labour, T And P Carrier Etc Required For Proper Completion Of Work Dist 0 To 50 Kms, Carriage Of Line Material Viz Lt Cable, Conductor, Gi Earth Wire, Barbed Wire, Cross Arm, Angle, Channel, Insulator, Various Clamps, Xlpe Cable, Cable, Stone Pad And Other Line Material From Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading And Unloading At The Respective End, Also Including The Work Of Dragging Etc And Also Including The Cost Of Labour, T And P Carrier Etc Required For Proper Completion Of Work Dist 0 To 50 Kms, Erection Of Single Support Including Complete H.t And L.t Fittings With Drilling And Cutting As Per Resspo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T And P And Carrier Etc Required For Proper Completion Of Work, Erection Of Double And Section Pole On Following Poles Including Including Complete H.t And L.t Fittings With Drilling And Cutting And The Work Of Complete Line As Per Resspo Norms Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T And P And Carrier Etc Required For Proper Completion Of Work, Erection Of Double And Section Pole On Following Poles Including Including Complete H.t And L.t Fittings With Drilling & Cutting And The Work Of Complete Line As Per Resspo Norms Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T And P And Carrier Etc Required For Proper Completion Of Work, Erection And Grouting Of Stay Set Including The Work Of Nozzling Etc As Per Resspo Manual And Also Including The Cost Of Arrangement Of All Grouting Material, Labour, T And P Etc Required For Proper Completion Of Work, Providing And Fixing Of Stay Insulator, Laying, Sagging, Stringing, Binding And Jumpering Etc Of Line Conductor On The Newly Erected Pole As Per Resspo Manual And As Per Direction Of Supervising Engineer, Including The Cost Of Arrangement Of Labour, T And P Carrier Etc Required For Proper Completion Of Work, Abc Conductor 3x50+1x35+1x16 Sqmm And 3x95+1x70+1x16 Sqmm And 3x120+1x95+1x16 Sqmm And 1x16+1x25 Sqmm, Grouting Of Pcc And Stp Poles 8.5, 11 And 13 Mtr Long As Per Resspo Norms, Making The Plinth Of Steel Poles, Fixing Of Earthing Rod As Per Resspo Manual And As Per Direction Of Supervising Engineer Including The Cost Of Labour, T And P Etc Required For Proper Completion Of Work, Chopping Of Tree Branches Which Are Touching To Ht And Lt Lines, Providing And Fixing Of Clamps Of Lt, Cross Arm Holding, F Clamp, Stay Clamp, Danger Board Clamp And All Type Clamps With Nut And Bolts As Per Actual Site Requirement, Providing And Fixing Of Lt Shackle Insulator, Providing And Fixing Of Missing Nut Bolts And Washer, Carriage And Installation From Site To Store And Store To Site Following Capacity Transformer Including The Work Of Its Loading And Unloading, Dragging Etc And Also Including The Cost Of Labour And T And P Etc Required For Proper Completion Earthing And Jumphering Of Work, Dismentling Of Old Pcc And Stp Poles For Shifting After Dismentling Of All Accessories. It Includes The Work Of Cartage, Cost Of Labour, T And P Carrier Etc Required For Proper Completion Of Work, Dismantling And Removal Of Existing Conductor, Cable, Gi Wire From The Various Area Preparing Their Coils And Then Stacking In The Respective Jeos Store As Per Direction Of Supervising Engineer It Includes The Work Of Cartage, Cost Of Labour, T Nad P Carrier Etc Required For Proper Completion Of Work, Erection Of Section Tee Pole Including Fixing Of All Fittings As Per Respo Norms, Carriage And Installation Of Lt Distribution Box Three Phase Distribution Box From Store Centre Sarsol To Pit Site Including Loading And Unloading At Both Ends Mounting And Fixing On Pole Also By Making Connections As Per Resspo Norms, Provding And Fixing And Filling Of 3x70,3x120,3x185 11 Kv Xlpe Heat Shrinkable Cable Jointing Kits Indoor And Outdoor Type Including The Cost Of Labour T And P Carrier Etc For Proper Completion Of Work, Safe Carriage Of 3x70,3x120,3x185,3x300 Sqmm 33 Kv By 11 Kv Xlpe Cable From Store Center To Respective Site Of Work Including Loading And Unloading At Both Ends For Proper Completion Of Work, Laying Of 3x70,3x120,3x185,3x300 Sqmm 33 Kv And 11 Kv Under Ground Cable By Straight Through After Digging Trench Of 600 Mm Wide, 1500 Mm Deep, Providing The Fine Sand Cushion Beneath And Above The Cable The Cable Shall Be Duly Protected By Ist Class Bricks, Two On Either Side And Third On Top Of The Cable, Laid In Series One After The Other. The Work Includes Supplying Of Fine Sand And Bricks, Filling And Ramming Of The Left Out Soil, Closing The Trench And Levelling Spare Cable Shall Be Left And Buried In The Trench In The Shape Of Rings At Both Ends All Material Except Cable, Labour, T And P Carrier Etc, Required For Proper Completion Of Work Will Be Arranged By The Contractor At His Own Cost, Laying Of 3x70,3x120,3x185,3x300 Sqmm 33 Kv And 11 Kv Overhead Cable Work Includes Labour, T And P Carrier Etc, Required For Proper Completion Of Work Will Be Arranged By The Contractor At His Own Cost, Guarding Of 11 Kv Line By Laying Two Nos Gi Wire Parallel And Fixing Of Lacings Tilli At A Distance At 2 To 3 Mtr As Per Respo Manual And Also Including The Cost Of Arragement Of Labour, T And P Etc Required For Proper Completion Of Work, Safe Carriage And Installation Of 33kv By 11 Kv Ct And Pt Pole Mounted Metering Unit On Double Pole After Fixing Of Channel With M S Clamps And Nuts Bolts For Holding The Channel Angle Etc The Unit Body Shall Be Earthed By Connecting M S Strip Of Size 1,8x1 Finally Connected To Earthing Rod Of Size 20mm X2540 Mm 11 Kv Line Shall Be Connected To Unit As Per Instructions Of Sdo And Ae M The M S Strip And Earth Rod Shall Be Included In The Scope Of Work, Safe Carriage And Installation Of 33kv By 11 Kv Pilfer Proof Metering Cubicle From Store Centre, Sarsol To Site Of Work, Provding And Fixing Wearing Gi Pipe 6 O Dia On The Feeder Cable Before Mounting The Cable On The Double Pole Lifting, Mounting And Clamping Of 11 Kv Feeder Cable With Boxes On The Feeder Double Pole Structure And Making Connections Including Supply within the Uttar Pradesh jurisdiction

10.

How can I find the submission closing date for this contract?

The official timeline and deadline details for Corrigendum Tender For Pcc And Stp Poles 8.5, 11 And 13 Mtr , Carriage Of Line Material , Installation And Fixing Of 11 Kv Tpmo. , Erection And Grouting Of Stay Set , Providing And Fixing , Acsr Weasal, Rabbit And Dog Conductor. , Abc Conductor , Grouting Of Pcc And Stp Poles , Plinth , Fixing Of Earthing Rod , Chopping Of Tree Branches , Providing And Fixing Of Clamps Of Lt , Providing And Fixing , 25 Kva Transformer , 63 Kva Transformer , 100 Kva Transformer , 400 Kva Transformer , Dismentling Of Old Pcc And Stp Poles , Dismantling And Removal , Erection Of Section , Carriage And Installation , Provding And Fixing, Filling , Safe Carriage , Laying Of Under Ground Cable , Laying Of Overhead Cable , Guarding Of 11 Kv Line By Laying Two Nos , Safe Carriage And Installation , Safe Carriage And Installation , Provding And Fixing Wearing, Erection And Commissioning Of Transformer And Line And Poles, Carriage Of Following Poles From Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective Ends, Also Including The Work Of Dragging Etc And Also Including The Cost Of Labour, T And P Carrier Etc Required For Proper Completion Of Work Dist 0 To 50 Kms, Carriage Of Line Material Viz Lt Cable, Conductor, Gi Earth Wire, Barbed Wire, Cross Arm, Angle, Channel, Insulator, Various Clamps, Xlpe Cable, Cable, Stone Pad And Other Line Material From Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading And Unloading At The Respective End, Also Including The Work Of Dragging Etc And Also Including The Cost Of Labour, T And P Carrier Etc Required For Proper Completion Of Work Dist 0 To 50 Kms, Erection Of Single Support Including Complete H.t And L.t Fittings With Drilling And Cutting As Per Resspo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T And P And Carrier Etc Required For Proper Completion Of Work, Erection Of Double And Section Pole On Following Poles Including Including Complete H.t And L.t Fittings With Drilling And Cutting And The Work Of Complete Line As Per Resspo Norms Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T And P And Carrier Etc Required For Proper Completion Of Work, Erection Of Double And Section Pole On Following Poles Including Including Complete H.t And L.t Fittings With Drilling & Cutting And The Work Of Complete Line As Per Resspo Norms Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T And P And Carrier Etc Required For Proper Completion Of Work, Erection And Grouting Of Stay Set Including The Work Of Nozzling Etc As Per Resspo Manual And Also Including The Cost Of Arrangement Of All Grouting Material, Labour, T And P Etc Required For Proper Completion Of Work, Providing And Fixing Of Stay Insulator, Laying, Sagging, Stringing, Binding And Jumpering Etc Of Line Conductor On The Newly Erected Pole As Per Resspo Manual And As Per Direction Of Supervising Engineer, Including The Cost Of Arrangement Of Labour, T And P Carrier Etc Required For Proper Completion Of Work, Abc Conductor 3x50+1x35+1x16 Sqmm And 3x95+1x70+1x16 Sqmm And 3x120+1x95+1x16 Sqmm And 1x16+1x25 Sqmm, Grouting Of Pcc And Stp Poles 8.5, 11 And 13 Mtr Long As Per Resspo Norms, Making The Plinth Of Steel Poles, Fixing Of Earthing Rod As Per Resspo Manual And As Per Direction Of Supervising Engineer Including The Cost Of Labour, T And P Etc Required For Proper Completion Of Work, Chopping Of Tree Branches Which Are Touching To Ht And Lt Lines, Providing And Fixing Of Clamps Of Lt, Cross Arm Holding, F Clamp, Stay Clamp, Danger Board Clamp And All Type Clamps With Nut And Bolts As Per Actual Site Requirement, Providing And Fixing Of Lt Shackle Insulator, Providing And Fixing Of Missing Nut Bolts And Washer, Carriage And Installation From Site To Store And Store To Site Following Capacity Transformer Including The Work Of Its Loading And Unloading, Dragging Etc And Also Including The Cost Of Labour And T And P Etc Required For Proper Completion Earthing And Jumphering Of Work, Dismentling Of Old Pcc And Stp Poles For Shifting After Dismentling Of All Accessories. It Includes The Work Of Cartage, Cost Of Labour, T And P Carrier Etc Required For Proper Completion Of Work, Dismantling And Removal Of Existing Conductor, Cable, Gi Wire From The Various Area Preparing Their Coils And Then Stacking In The Respective Jeos Store As Per Direction Of Supervising Engineer It Includes The Work Of Cartage, Cost Of Labour, T Nad P Carrier Etc Required For Proper Completion Of Work, Erection Of Section Tee Pole Including Fixing Of All Fittings As Per Respo Norms, Carriage And Installation Of Lt Distribution Box Three Phase Distribution Box From Store Centre Sarsol To Pit Site Including Loading And Unloading At Both Ends Mounting And Fixing On Pole Also By Making Connections As Per Resspo Norms, Provding And Fixing And Filling Of 3x70,3x120,3x185 11 Kv Xlpe Heat Shrinkable Cable Jointing Kits Indoor And Outdoor Type Including The Cost Of Labour T And P Carrier Etc For Proper Completion Of Work, Safe Carriage Of 3x70,3x120,3x185,3x300 Sqmm 33 Kv By 11 Kv Xlpe Cable From Store Center To Respective Site Of Work Including Loading And Unloading At Both Ends For Proper Completion Of Work, Laying Of 3x70,3x120,3x185,3x300 Sqmm 33 Kv And 11 Kv Under Ground Cable By Straight Through After Digging Trench Of 600 Mm Wide, 1500 Mm Deep, Providing The Fine Sand Cushion Beneath And Above The Cable The Cable Shall Be Duly Protected By Ist Class Bricks, Two On Either Side And Third On Top Of The Cable, Laid In Series One After The Other. The Work Includes Supplying Of Fine Sand And Bricks, Filling And Ramming Of The Left Out Soil, Closing The Trench And Levelling Spare Cable Shall Be Left And Buried In The Trench In The Shape Of Rings At Both Ends All Material Except Cable, Labour, T And P Carrier Etc, Required For Proper Completion Of Work Will Be Arranged By The Contractor At His Own Cost, Laying Of 3x70,3x120,3x185,3x300 Sqmm 33 Kv And 11 Kv Overhead Cable Work Includes Labour, T And P Carrier Etc, Required For Proper Completion Of Work Will Be Arranged By The Contractor At His Own Cost, Guarding Of 11 Kv Line By Laying Two Nos Gi Wire Parallel And Fixing Of Lacings Tilli At A Distance At 2 To 3 Mtr As Per Respo Manual And Also Including The Cost Of Arragement Of Labour, T And P Etc Required For Proper Completion Of Work, Safe Carriage And Installation Of 33kv By 11 Kv Ct And Pt Pole Mounted Metering Unit On Double Pole After Fixing Of Channel With M S Clamps And Nuts Bolts For Holding The Channel Angle Etc The Unit Body Shall Be Earthed By Connecting M S Strip Of Size 1,8x1 Finally Connected To Earthing Rod Of Size 20mm X2540 Mm 11 Kv Line Shall Be Connected To Unit As Per Instructions Of Sdo And Ae M The M S Strip And Earth Rod Shall Be Included In The Scope Of Work, Safe Carriage And Installation Of 33kv By 11 Kv Pilfer Proof Metering Cubicle From Store Centre, Sarsol To Site Of Work, Provding And Fixing Wearing Gi Pipe 6 O Dia On The Feeder Cable Before Mounting The Cable On The Double Pole Lifting, Mounting And Clamping Of 11 Kv Feeder Cable With Boxes On The Feeder Double Pole Structure And Making Connections Including Supply are available inside the detailed notification files. Bidders planning to target this contract in Aligarh should check the official portal schedule early to complete their online technical and financial submission well before the closing hours.

Get Expert Tender Bidding Support

Looking For Complete Tender Bidding Consultancy? Our Technical Experts Will Help You Prepare And Submit Your Tender Successfully.

Call Our Expert: +91 7069661818
Your Information Is 100% Secure & Confidential