Filters By:

T18 Ref No
Keyword
State
City
Agency
Tender ID
Due Date
Tender Source
Tender Type

12Results forTransformer cooler repair Tenders List

Latest Transformer cooler repair Tenders in India – Verified Leads & Real-Time Insights by Tender18

Finding the right Transformer cooler repair tenders in India’s competitive e-procurement ecosystem requires more than just access—it demands accurate data, real-time monitoring, and expert analysis.

At Tender18 Infotech Private Limited, we bring deep industry experience in government procurement to help businesses identify, evaluate, and win Transformer cooler repair tenders efficiently. With a centralized platform aggregating 1100+ live tenders, we provide a single, trusted source for opportunities from central, state, and PSU departments.


Real-Time Transformer cooler repair Tender Intelligence & Monitoring

Our advanced dashboard delivers actionable insights and structured tender data, enabling you to make faster and smarter bidding decisions.

We categorize Transformer cooler repair tenders into:

  • Supply Tenders – BOQs and specifications sourced from GeM and PSUs
  • Service Tenders – NITs and scope of work from CPPP and state portals
  • EPC Projects – Large-scale infrastructure tenders with financial and design data

✔ This structured approach ensures complete transparency and deeper bid analysis before submission.


Comprehensive Sources of Transformer cooler repair Tenders

Tender18 acts as a centralized gateway by aggregating tenders from trusted and official sources:

  • Central Government Portals – CPPP, NIC, and Government e-Marketplace (GeM)
  • Railways & Transport – IREPS and Metro Rail projects
  • Power & Energy PSUs – NTPC, ONGC, NHPC, PowerGrid
  • Defense & Strategic Sectors – MES and DRDO tenders
  • State e-Procurement Portals – Gujarat, Maharashtra, Tamil Nadu, UP, and more

✔ Every listing is verified and regularly updated to maintain data accuracy and trust.


Step-by-Step Guide to Participate in Transformer cooler repair Tenders

1. Eligibility & Prequalification

Before bidding, ensure compliance with:

  • Financial turnover requirements (30–50% of tender value)
  • Past experience (2–3 similar projects)
  • Valid solvency certificate

2. Mandatory Documentation Checklist

Prepare the following to avoid disqualification:

  • Digital Signature Certificate (Class 3 DSC)
  • GST, PAN, MSME/Udyam registration
  • EMD (Earnest Money Deposit) or exemption proof
  • Technical bid with execution methodology

3. BOQ Analysis & Financial Bidding

The BOQ (Bill of Quantities) is the most critical component:

  • Analyze item-wise pricing
  • Ensure competitive yet sustainable quotes
  • Avoid underbidding risks (L1 pressure)

✔ Expert analysis can significantly improve your bid success ratio.


Why Tender18 is a Trusted Platform for Transformer cooler repair Tenders

✔ Proven Expertise in Government Procurement

We combine industry knowledge with practical bidding experience.

✔ Verified & Reliable Data

All Transformer cooler repair tenders are sourced from official portals and cross-checked for accuracy.

✔ Advanced Filtering Tools

Filter tenders by value, EMD, location, and category for precise targeting.

✔ Corrigendum & Update Tracking

Get instant alerts on deadline changes and specification updates.

✔ Historical Data Insights

Analyze past tender results to understand pricing trends and competition.

✔ End-to-End Bidding Support

From discovery to submission, including GeM onboarding and strategy.


Growth of Transformer cooler repair Sector in 2026

With the Government of India focusing on digital procurement and infrastructure expansion, the Transformer cooler repair sector has seen significant growth in e-tendering opportunities.

The rise of GeM-based procurement models like:

  • L1 Purchase
  • Direct Procurement
  • MSME-friendly policies

…has made it easier for startups and SMEs to participate and win contracts


Frequently Asked Questions (SEO Optimized)

How can I get daily Transformer cooler repair tender alerts?

You can register on Tender18 and select your preferred category. You will receive daily email alerts with all new Transformer cooler repair tenders.

Is EMD mandatory for all Transformer cooler repair tenders?

No, MSME and Udyam-registered businesses may get exemptions. Always check the NIT for specific conditions.

What is the difference between a Transformer cooler repair work tender and supply tender?

A supply tender involves delivering goods, while a work tender includes execution, labor, and project completion.

Can I access private Transformer cooler repair tenders on Tender18?

Yes, we also track major private sector and EPC tenders along with government opportunities.


Get Expert Support for Transformer cooler repair Tenders

Tender18 is more than a listing platform—we are your strategic partner in winning tenders.

Our services include:

  • Tender discovery & analysis
  • Documentation support
  • Bid strategy & submission
  • GeM registration & OEM onboarding

📞 Call / WhatsApp: +91 7069661818
🌐 Website: www.tender18.com

T18 Ref No : 15912481
live Tender
Source : GEM Tenders
live Tender

tender for 3phase induction motor stator rewinding 5hp 960rpm , 3phaseinduction motor stator rewinding 7 point 5 hp 960rpm , 3phase induction motor stator rewinding 10hp 960rpm , 3phase induction motor rotor rewinding 10hp 960rpm , 3phase induction motor stator rewinding 15hp 960rpm , 3phase induction motor rotor rewinding 15hp 960rpm , 3phase induction motor stator rewinding 25hp 960rpm , 3phase induction motor rotor rewinding 25hp 960rpm , 3phase induction motor stator rewinding 5hp 1440rpm , 3phaseinduction motor stator rewinding 7 point 5 hp 1440rpm , 3phaseinduction motor stator rewinding 10hp 1440rpm , 3phase induction motor rotor rewinding 10hp 1440rpm , 3phase induction motor stator rewinding 15hp 1440rpm , 3phaseinduction motor rotor rewinding 15hp 1440rpm , 3phaseinduction motor stator rewinding 25hp 1440rpm , 3phase induction motor rotor rewinding 25hp 1440rpm , 3phase induction motor rotor rewinding 100hp 1440rpm , 3phase induction otor stator rewinding 100hp 1440rpm , slipring and squaral cage induction motor stator rewinding 120hp 1440 rpm , slipring and squaral cage induction motor rotor rewinding 120hp 1440 rpm , slipring and squaral cage induction motor stator rewinding 100hp 960 rpm , slipring and squaral cage induction motor rotor rewinding 100hp 960 rpm , excitor armature field for 1500 kw ac alternator armature 45point 9kw , excitor armature field for 1500 kw ac alternator armature 25 kw , three speed cf motor 200 or 400 or 960 rpm jyoti land make three speed , sumersable pump squarel cage motor 15 hp 2900 rpm , sumersable pump squarel cage motor 20 hp 2900 rpm , air cooler welding transformer primary coil , air cooled welding transformer secondary coil aluminium , rewinding of celling fan , rewinding of tuloo fan , single phase 3phase exhasust fan size 16inch , single phase 3phase exhasust fan size 18inch , single phase 3phase exhasust fan size 24inch , dyno drive coil rewinding with material , 250 hp motor stator repairing rewainding, motor rewinding, 3phase motor stator rewinding 5hp 960rpm, 3phase motor stator rewinding 7 point 5 hp 960rpm, 3phase motor stator rewinding 10hp 960rpm, 3phase motor rotor rewinding 10hp 960rpm, 3phase motor stator rewinding 15hp 960rpm, 3phase motor rotor rewinding 15hp 960rpm, 3phase motor stator rewinding 25hp 960rpm, 3phase motor rotor rewinding 25hp 960rpm, 3phase motor stator rewinding 5hp 1440rpm, 3phase motor stator rewinding 7 point 5 hp 1440rpm, 3phase motor stator rewinding 10hp 1440rpm, 3phase motor rotor rewinding 10hp 1440rpm, 3phase motor stator rewinding 15hp 1440rpm, 3phase motor rotor rewinding 15hp 1440rpm, 3phase motor stator rewinding 25hp 1440rpm, 3phase motor rotor rewinding 25hp 1440rpm, 3phase motor rotor rewinding 100hp 1440rpm, 3phase motor stator rewinding 100hp 1440rpm, slipring and squaral cage induction motor stator rewinding 120hp 1440 rpm, slipring and squaral cage induction motor rotor rewinding 120hp 1440 rpm, slipring and squaral cage induction motor stator rewinding 100hp 960 rpm, slipring and squaral cage induction motor rotor rewinding 100hp 960 rpm, excitor armature field for 1500 kw ac alternator armature 45point 9kw, excitor armature field for 1500 kw ac alternator armature 25 kw, three speed cf motor 200 or 400 or 960 rpm jyoti land make three speed, sumersable pump squarel cage motor 15 hp 2900 rpm, sumersable pump squarel cage motor 20 hp 2900 rpm, air cooler welding transformer primary coil, air cooled welding transformer secondary coil (aluminium), rewinding of celling fan, rewinding of tuloo fan, single phase 3phase exhasust fan size 16inch, single phase 3phase exhasust fan size 18inch, single phase 3phase exhasust fan size 24inch, dyno drive coil rewinding with material, 251 hp motor stator repairing rewainding


Due Date : Jul 06, 2026
T18 Ref No : 15393154
Location : dhanbad , jharkhand
Source : GEM Tenders

corrigendum tender for installation of ac , serviceing of ac with minor repair , supply of , labour charge of ac machine checking minor repair dismantling and after fitting , gas charging , rewinding of , repairing of , water cooler and fridge , geyser, arc of ac water cooler and geyser, window type, split type, air filter, gas filter, capillary tube, compressor, indoor motor split type, outdoor motor split type, combined capacitor, fan net, fan capacitor, outdoor heat condenser, swing motor, display, pcb wire, single sensor, double sensor, remote, pcb board non inverter type, ac flap, indoor water pipe, pcb board transformer, contactor 2 phase, compressor oil, indoor stand, outdoor stand, cotton tape insulation, blower window type, blower split type, nut 1 by 2 inch split type, nut 1 by 4 in split type, nut 3 by 8 in split type, nut 5 by 8 in split type, indoor pcb board inverter type, outdoor pcb board inverter type, indoor dc motor inverter type, outdoor dc motor inverter type, 1 by 2 inch diameter copper pipe, 1 by 4 inch diameter copper pipe, 3 by 8 inch diameter copper pipe, 5 by 8 inch diameter copper pipe, 1 by 2 inch diameter insulation pipe, 1 by 4 inch diameter insulation pipe, 3 by 8 inch diameter insulation pipe, 5 by 8 inch diameter insulation pipe, r22, r32, r410, fan motor window type, outdoor fan motor split type, pcb, indoor leakage split type, indoor leakage window type, indoor pcb board inverter ac, outdoor pcb board inverter ac, servicing of water cooler with minor repair, capacitor, fan motor, fan blade, relay overload, drayer, filter, nrv, condensor coil, evaprator coil, thermostate, gas charging r600, gas charging r134, servicing of gyser with minor repair, thermostat, element, auto cut switch, safety valve, assembly, connecting pipe, indicator led, capillary thermal switch


Tender Value : 271464.9
Due Date : May 23, 2026
T18 Ref No : 15061048
Location : rawatbhata , rajasthan
Source : GEM Tenders

corrigendum tender for repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 1 rewinding of three phase 415 v 50hz motors of less than 1 point 1kw rating as per part a scope of work for further detail refer scope of work and bo.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 2 rewinding of three phase 415 v 50hz motors of more than 1 point 1 kw up to 2 point 2 kw rating as per part a scope of work for further detail refer .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 3 rewinding of three phase 415 v 50hz, motors of more than 2 point 2 kw up to 5 point 5 kw rating as per part a scope of work for further detail refer.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 4 rewinding of three phase, 415 v 50hz motors of more than 5 point 5 kw up to 11 kw rating as per part a scope of work for further detail refer scope .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 5 rewinding of three phase 415 v 50hz motors of more than 11 kw up to 22 kw rating as per part a scope of work for further detail refer scope of work .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 6 rewinding of three phase 415 v 50hz motors of more than 22 kw up to 55 kw rating as per part a scope of work for further detail refer scope of work .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 7 rewinding of three phase 415 v 50hz motors of more than 55 kw up to 75 kw rating as per part a scope of work for further detail refer scope of work .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 8 rewinding of three phase 415 v 50hz motors of more than 75 kw up to 90 kw rating as per part a scope of work for further detail refer scope of work .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 9 rewinding of three phase 415 v 50hz motors of more than 90 kw up to 110 kw rating as per part a scope of work for further detail refer scope of work.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 10 rewinding of three phase, 415 v 50hz motors of more than 110 kw up to 132 kw rating as per part a scope of work for further detail refer scope of w.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 11 rewinding of three phase, 415 v 50hz motors of more than 132 kw up to 140 kw rating as per part a scope of work for further detail refer scope of w.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 12 rewinding of three phase 415 v 50hz motors of more than 140 kw up to 180 kw rating as per part a scope of work for further detail refer scope of wo.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 13 rewinding of three phase, 415 v 50hz submersible pump motors up to 2 point 5 kw rating as per part a scope of work for further detail refer scope o.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 14 rewinding of three phase 415 v 50hz submersible pump motors more than 2 point 5 kw up to 5 point 5 kw rating as per part a scope of work for furthe.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 15 rewinding of three phase, 415 v 50hz submersible pump motors more than 5 point 5 kw up to 11 kw rating as per part a scope of work for further deta.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 16 rewinding of three phase 415 v 50hz submersible pump motors more than 11 kw up to 15 kw rating as per part a scope of work for further detail refer.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 17 rewinding of three phase 415 v 50hz submersible pump motors more than 30 kw up to 37 kw rating as per part a scope of work for further detail refer.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 18 rewinding of single phase 230 v 50hz motors of pedestal fan by wall mounted fan by exhaust fan up to 450 mm sweep as per part a scope of work for f.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 19 rewinding of single phase 230 v 50hz motors of exhaust fan by cooler fan above 400 mm sweep as per part a scope of work for further detail refer sc.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 20 rewinding of 2000 va control transformer as per part a scope of work for further detail refer scope of work and boq attached total quantity 1 is eq.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 21 rewinding of 1000 va control transformer as per part a scope of work for further detail refer scope of work and boq attached total quantity 1 is eq.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 22 rewinding of 500 va control transformer as per part a scope of work for further detail refer scope of work and boq attached total quantity 1 is equ.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp- 7 and 8; cart 23 rewinding of control coil 415v diameter up to 300mm including bobbin as per part a scope of work for further detail refer scope of work and boq att.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 24 rewinding of single phase 230 v 50hz submersible pump motors up to 1 point 5 kw rating as per part a scope of work for further detail refer scope o.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 25 repair of hot spot in three phase 415 v 50hz motors up to 1 point 5 kw rating as per part b scope of work for further detail refer scope of work an.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 26 repair of hot spot in three phase 415 v 50hz motors of more than 1 point 5 kw up to 7 point 5 kw rating as per part b scope of work for further det.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 27 repair of hot spot in three phase 415 v 50hz motors of more than 7 point 5 kw up to 22 kw rating as per part b scope of work for further detail ref.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 28 repair of hot spot in three phase 415 v 50hz motors of more than 22 kw up to 45 kw rating as per part b scope of work for further detail refer scop.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 29 repair of hot spot in three phase 415 v 50hz motors of more than 45 kw up to 90 kw rating as per part b scope of work for further detail refer scop.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 30 repair of hot spot in three phase 415 v 50hz motors of more than 90 kw up to 180kw rating as per part b scope of work for further detail refer scop.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 31 removal of hot spot by dismantling of total stampings in three phase 415 v 50hz motors up to 22 kw rating as per part b scope of work for further d.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 32 removal of hot spot by dismantling of total stampings in three phase 415 v 50hz motors of more than 22 kw up to 45 kw rating as per part b scope of.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 33 removal of hot spot by dismantling of total stampings in three phase 415 v 50hz motors of more than 45 kw up to 90 kw rating as per part b scope of.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 34 removal of hot spot by dismantling of total stampings in three phase 415 v 50hz motors of more than 90 kw up to 180 kw rating as per part b scope o.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 35 remetalizing of shaft using tafa arc technique after preparation of surface and machining to proper size up to 1 point 5 kw motor as per part b sc.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 36 re-metalizing of shaft using tafa arc technique after preparation of surface and machining to proper size more than 1 point 5kw up to 7 point 5 kw .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 37 remetalizing of shaft using tafa arc technique after preparation of surface and machining to proper size more than 7 point 5 kw up to 15kw motor a.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 38 re-metalizing of shaft using tafa arc technique after preparation of surface and machining to proper size more than 15 up to 45 kw motor as per par.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 39 remetalizing of shaft using tafa arc technique after preparation of surface and machining to proper size more than 45kw up to 90 kw motor as per p.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 40 re-metalizing of shaft using tafa arc technique after preparation of surface and machining to proper size more than 90kw to 180kw motor as per part.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 41 remetalizing of end covers using tafa arc technique after preparation of surface and machining to proper size up to 1 point 5 kw motor as per part.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 42 re-metalizing of end covers using tafa arc technique after preparation of surface and machining to proper size more than 1 point 5 kw up to 7 point.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 43 re-metalizing of end covers using tafa arc technique after preparation of surface and machining to proper size more than 7 point 5 kw to 15kw motor.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 44 re-metalizing of end covers using tafa arc technique after preparation of surface and machining to proper size more than 15 kw up to 45 kw motor as.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 45 re metalizing of end covers using tafa arc technique after preparation of surface and machining to proper size more than 45kw up to 90 kw motor as .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 46 re-metalizing of end covers using tafa arc technique after preparation of surface and machining to proper size more than 90 kw to 180kw motor as pe.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 47 replacement of pvc cooling fan for motors size up to 1 point 5 kw as per part b scope of work for further detail refer scope of work and boq attach.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 48 replacement of pvc cooling fan for motors size more than 1 point 5kw up to 7 point 5 kw as per part b scope of work for further detail refer scope .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 49 replacement of pvc cooling fan for motors size more than 7 point 5kw unto 15kw as per part b scope of work for further detail refer scope of work a.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 50 replacement of pvc cooling fan for motors size more than 15kw up to 45kw as per part b scope of work for further detail refer scope of work and boq.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 51 dynamic balancing of rotor with 2 point 5 microns accuracy size more than 1kg up to 4 kg as per part b scope of work for further detail refer scope.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 52 dynamic balancing of rotor with 2 point 5 microns accuracy size more than 4 kg up to 16 kg as per part b scope of work for further detail refer sco.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 53 dynamic balancing of rotor with 2 point 5 microns accuracy size more than 16 kg up to 48 kg as per part b scope of work for further detail refer sc.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 54 dynamic balancing of rotor with 2 point 5 microns accuracy size more than 48 kg up to 96 kg as per part-b scope of work for further detail refer sc.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 55 dynamic balancing of rotor with 2 point 5 microns accuracy size more than 96 kg up to 192 kg as per part b scope of work for further detail refer s.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 56 dynamic balancing of rotor with 2 point 5 microns accuracy size more than 192 kg up to 378 kg as per part b scope of work for further detail refer .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 57 dynamic balancing of rotor with 2 point 5 microns accuracy size more than 378 kg up to 500 kg as per part b scope of work for further detail refer .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 58 dynamic balancing of rotor with 2 point 5 microns accuracy size more than 500 kg up to 1000 kg as per part b scope of work for further detail refer.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 59 dynamic balancing of rotor with 2 point 5 microns accuracy size more than 1000 kg up to 1500 kg as per part b scope of work for further detail refe.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 60 dynamic balancing of rotor with 2 point 5 microns accuracy size more than 1500 kg up to 3000 kg as per part b scope of work for further detail refe.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 61 supply and installation of terminal plate by terminal studs with insulators one quantity includes terminal studs for all three phases size up to 1 .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 62 supply and installation of terminal plate by terminal studs with insulators one quantity includes terminal studs for all three phases size more tha.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 63 supply and installation of terminal plate by terminal studs with insulators one quantity includes terminal studs for all three phases size more tha.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 64 supply and installation of terminal plate by terminal studs with insulators one quantity includes terminal studs for all three phases size more tha.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 65 supply and installation of terminal plate by terminal studs with insulators one quantity includes terminal studs for all three phases size more tha.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 66 supply and installation of terminal plate by terminal studs with insulators one quantity includes terminal studs for all three phases size more tha.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 67 removing of shaft making of new shaft and refitting of shaft with key way material used shall be same as original and material is in contractor sco.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 68 removing of shaft making of new shaft and refitting of shaft with key way material used shall be same as original and material is in contractor sco.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 69 removing of shaft making of new shaft and refitting of shaft with key way material used shall be same as original and material is in contractor sco.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 70 removing of shaft making of new shaft and refitting of shaft with key way material used shall be same as original and material is in contractor sco.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 71 making of end cover including machining drilling and threading etc to size up to 1 point 5 kw material cast iron for above end cover is in contract.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 72 making of end cover including machining drilling and threading etc to size more than 1 point 5kw up to 7 point 5 kw material cast iron for above en.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 73 making of end cover including machining drilling and threading etc to size more than 7 point 5kw up to 15kw material cast iron for above end cover .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 74 making of end cover including machining drilling and threading etc to size more than 15kw up to 45kw material cast iron for above end cover is in c.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 75 making of end cover including machining drilling and threading etc to size more than 45kw up to 90kw material cast iron for above end cover is in c.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 76 making of end cover including machining drilling and threading etc to size more than 90kw up to 180kw material cast iron for above end cover is in .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 77 making of cooling fan including machining keyway and key hub excluding material size up to 1 point 5 kw as per part b scope of work for further det.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 78 making of cooling fan including machining keyway and key hub excluding material size more than 1 point 5kw up to 7 point 5 kw as per part b scope o.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 79 making of cooling fan including machining keyway and key hub excluding material size more than 7 point 5kw up to 15kw as per part b scope of work f.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 80 making of cooling fan including machining keyway and key hub excluding material size more than 15kw up to 45kw as per part b scope of work for furt.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 81 making of cooling fan including machining keyway and key hub excluding material size more than 45kw up to 90kw as per part b scope of work for furt.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 82 making of cooling fan including machining keyway and key hub excluding material size more than 90kw up to 180kw as per part b scope of work for fur.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 83 material cost iron for making of cooling fan end cover as per part b scope of work for further detail refer scope of work and boq attached total qu.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 84 providing and fixing of bearing plates with material same as original size up to 1 point 5 kw as per part b scope of work for further detail refer .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 85 providing and fixing of bearing plates with material same as original size more than 1 point 5kw up to 7 point 5 kw as per part b scope of work for.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 86 providing and fixing of bearing plates with material same as original size more than 7 point 5kw up to 15kw as per part b scope of work for further.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 87 providing and fixing of bearing plates with material same as original size more than 15kw up to 45kw as per part b scope of work for further detail.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 88 providing and fixing of bearing plates with material same as original size more than 45kw up to 90kw as per part b scope of work for further detail.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 89 providing and fixing of bearing plates with material same as original size more than 90kw up to 180kw as per part b scope of work for further detai.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 90 providing and fixing of bearing locks duly machined threaded and drilled with material same as original size up to 15kw as per part b scope of work.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 91 providing and fixing of bearing locks duly machined threaded and drilled with material same as original size more than 15kw up to 45kw as per part .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 92 providing and fixing of bearing locks duly machined threaded and drilled with material same as original size more than 45kw up to 90kw as per part .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 93 providing and fixing of bearing locks duly machined threaded and drilled with material same as original size more than 90kw to 180kw as per part b .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 94 providing and fixing of foundation legs including machining drilling and levelling etc material shall be in contractor scope size up to 1 point 5 k.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 95 providing and fixing of foundation legs including machining drilling and levelling etc material shall be in contractor scope size more than 1 point.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 96 providing and fixing of foundation legs including machining drilling and levelling etc material shall be in contractor scope size more than 7 point.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 97 providing and fixing of foundation legs including machining drilling and levelling etc material shall be in contractor scope size more than 15 up t.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 98 dismantling and refitting without varnish and baking size up to 1 point 5 kw as per part b scope of work for further detail refer scope of work and.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 99 dismantling and refitting without varnish and baking size more than 1 point 5kw up to 7 point 5kw as per part b scope of work for further detail re.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 100 dismantling and refitting without varnish and baking size more than 7 point 5kw up to 15kw as per part b scope of work for further detail refer sc.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 101 dismantling and refitting without varnish and baking size more than 15kw up to 45kw as per part b scope of work for further detail refer scope of .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 102 dismantling and refitting without varnish and baking size more than 45kw up to 90kw as per part b scope of work for further detail refer scope of .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 103 dismantling and refitting without varnish and baking size more than 90kw up to 180kw as per part b scope of work for further detail refer scope of.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 104 dismantling and refitting with varnish and baking size up to 1 point 5 kw as per part b scope of work for further detail refer scope of work and b.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 105 dismantling and refitting with varnish and baking size more than 1 point 5kw up to 7 point 5kw as per part b scope of work for further detail refe.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 106 dismantling and refitting with varnish and baking size more than 7 point 5kw up to 15kw as per part b scope of work for further detail refer scope.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 107 dismantling and refitting with varnish and baking size more than 15kw up to 45kw as per part b scope of work for further detail refer scope of wor.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 108 dismantling and refitting with varnish and baking size more than 45kw up to 90kw as per part b scope of work for further detail refer scope of wor.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 109 dismantling and refitting with varnish and baking size more than 90kw up to 180kw as per part b scope of work for further detail refer scope of wo.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 110 providing and fixing of oil seal size less than 1 point 1 kw as per part b scope of work for further detail refer scope of work and boq attached t.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 111 providing and fixing of oil seal size 1 point 1 kw to 2 point 2 kw as per part b scope of work for further detail refer scope of work and boq atta.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 112 providing and fixing of oil seal size more than 2 point 2 kw up to 5 point 5 kw as per part b scope of work for further detail refer scope of work.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 113 providing and fixing of oil seal size more than 5 point 5 kw up to 15 kw as per part b scope of work for further detail refer scope of work and bo.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 114 providing and fixing of oil seal size more than 15kw up to 30kw as per part b scope of work for further detail refer scope of work and boq attache.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 115 providing and fixing of space heater size more than 30 up to 45kw as per part b scope of work for further detail refer scope of work and boq attac.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 116 providing and fixing of space heater size more than 45kw up to 90kw as per part b scope of work for further detail refer scope of work and boq att.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 117 providing and fixing of space heater size more than 90kw up to 180kw as per part b scope of work for further detail refer scope of work and boq at.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 118 providing of skf make bearing 6203 zz as per part b scope of work for further detail refer scope of work and boq attached total quantity 1 is equa.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 119 providing of skf make bearing 6204 zz as per part b scope of work for further detail refer scope of work and boq attached total quantity 1 is equa.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 120 providing of skf make bearing 6205 zz as per part b scope of work for further detail refer scope of work and boq attached total quantity 1 is equa.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 121 providing of skf make bearing 6206 zz as per part b scope of work for further detail refer scope of work and boq attached total quantity 1 is equa.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 122 providing of skf make bearing 6208 zz as per part b scope of work for further detail refer scope of work and boq attached total quantity 1 is equa.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 123 providing of skf make bearing 6209 zz as per part b scope of work for further detail refer scope of work and boq attached total quantity 1 is equa.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 124 providing of skf make bearing 6310 zz as per part b scope of work total quantity 1 is equal to 10 nos for two years for further detail refer scope.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 125 providing of skf make bearing 6312 as per part b scope of work for further detail refer scope of work and boq attached total quantity 1 is equal t.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 126 providing of skf make bearing 6312 zz as per part b scope of work for further detail refer scope of work and boq attached total quantity 1 is equa.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 127 providing of skf make bearing 6313 c3 as per part b scope of work for further detail refer scope of work and boq attached total quantity 1 is equa.


Tender Value : 6411231
Due Date : May 07, 2026
T18 Ref No : 15156897
Source : GEM Tenders

tender for ac pcb , facial kit silver golden , face pack , face powder , mobil oil per ltr , grease per kg , wall paint per ltr , face bleach , street light 50watt , hair colour , nail paint , lipistick , cotton 500gm , printed cloth per mtr , white cloth per mtr , sewing machine repairing , wall putty per kg , white paint per ltr , nail paint remover , brush 4 inch , comercial sewing machine needle per pkt , 6 inch patti , copper wire 2.5mm per coil 90mtr , copper wire 1.5mm per coil 90mtr , pvc garden pipe 3-4 inch per bundle , copper wire 1mm per coil 90mtr , casing caping 25mm per lenth , hair oil 200ml , mcb 63a , milton chalk , a4 paper per pkt , machine oil per ltr , copper wire 4mm per coil 90mtr , thread multicolour , door curtains 7 x 4 , eyebro threding daga , wire 6mm per coil 90mtr , copper pipe 5-8 per mtr , copper pipe 1-4 per mtr , hand mehndi , modular single way switch 6a , transformer 9-0-9 500mi , modular socket 6a , transformer 6-0-6 500mi , pvc tape 19mm , modular socket 16a , modular switch 16a , seek jhadu , phool jhadu , phenyl 1ltr , harpic toilet cleaner 500ml , dustbin big , plastic mug , plastic jug , plastic bucket 20ltr , drawing sheet , pcb genral purpose , pencil hb per pkt , sharpner , eraser , transformer 12-0-12 , kraft paper per pcs , pvc board 8x10 , solder wire 60- 40 per kg , pvc board 7x4 , plug top 16a , plug top 6a , batten holder 6a , pendent holder 6a , acid 500ml , solder paste , tubelight 20w , massage cream 200gm , water tank 500ltr , resistance diffrent size , hair shampoo , diode different size , bread board , patch card , relay 18v , diode in 4007 , pendrive 64gb , smart class repairing , ro machine , ssd 512gb , mother board repairing , cat- 6 cable 305mtr , capacitor different size , wire 23-76 per coil 90mtr , ir lead , ms round rod 40mm per kg , ms round rod 32mm per kg , ic 555 , ic 7404 , watter cooler , ms flats 65x10 per kg , r 134a gas , r 22 gas , copper pipe 1-2 per mtr, ac pcb, facial kit silver golden, face pack, face powder, mobil oil per ltr, grease per kg, wall paint per ltr, face bleach, street light 50watt, hair colour, nail paint, lipistick, cotton 500gm, printed cloth per mtr, white cloth per mtr, sewing machine repairing, wall putty per kg, white paint per ltr, nail paint remover, brush 4 inch, comercial sewing machine needle per pkt, 6 inch patti, copper wire 2.5mm per coil 90mtr, copper wire 1.5mm per coil 90mtr, pvc garden pipe 3-4 inch per bundle, copper wire 1mm per coil 90mtr, casing caping 25mm per lenth, hair oil 200ml, mcb 63a, milton chalk, a4 paper per pkt, machine oil per ltr, copper wire 4mm per coil 90mtr, thread multicolour, door curtains 7 x 4, eyebro threding daga, wire 6mm per coil 90mtr, copper pipe 5/8 per mtr, copper pipe 1/4 per mtr, hand mehndi, modular single way switch 6a, transformer 9-0-9 500mi, modular socket 6a, transformer 6-0-6 500mi, pvc tape 19mm, modular socket 16a, modular switch 16a, seek jhadu, phool jhadu, phenyl 1ltr, harpic toilet cleaner 500ml, dustbin big, plastic mug, plastic jug, plastic bucket 20ltr, drawing sheet, pcb genral purpose, pencil hb per pkt, sharpner, eraser, transformer 12-0-12, kraft paper per pcs, pvc board 8x10, solder wire 60 40 per kg, pvc board 7x4, plug top 16a, plug top 6a, batten holder 6a, pendent holder 6a, acid 500ml, solder paste, tubelight 20w, massage cream 200gm, water tank 500ltr, resistance diffrent size, hair shampoo, diode different size, bread board, patch card, relay 18v, diode in 4007, pendrive 64gb, smart class repairing, ro machine, ssd 512gb, mother board repairing, cat- 6 cable 305mtr, capacitor different size, wire 23-76 per coil 90mtr, ir lead, ms round rod 40mm per kg, ms round rod 32mm per kg, ic 555, ic 7404, watter cooler, ms flats 65x10 per kg, r 134a gas, r 22 gas, copper pipe 1-2 per mtr


Tender Value : 0
Due Date : May 12, 2026
T18 Ref No : 15266964
Location : dhanbad , jharkhand
Source : GEM Tenders

tender for installation of ac , serviceing of ac with minor repair , supply of , labour charge of ac machine checking minor repair dismantling and after fitting , gas charging , rewinding of , repairing of , water cooler and fridge , geyser, arc of ac water cooler and geyser, window type, split type, air filter, gas filter, capillary tube, compressor, indoor motor split type, outdoor motor split type, combined capacitor, fan net, fan capacitor, outdoor heat condenser, swing motor, display, pcb wire, single sensor, double sensor, remote, pcb board non inverter type, ac flap, indoor water pipe, pcb board transformer, contactor 2 phase, compressor oil, indoor stand, outdoor stand, cotton tape insulation, blower window type, blower split type, nut 1 by 2 inch split type, nut 1 by 4 in split type, nut 3 by 8 in split type, nut 5 by 8 in split type, indoor pcb board inverter type, outdoor pcb board inverter type, indoor dc motor inverter type, outdoor dc motor inverter type, 1 by 2 inch diameter copper pipe, 1 by 4 inch diameter copper pipe, 3 by 8 inch diameter copper pipe, 5 by 8 inch diameter copper pipe, 1 by 2 inch diameter insulation pipe, 1 by 4 inch diameter insulation pipe, 3 by 8 inch diameter insulation pipe, 5 by 8 inch diameter insulation pipe, r22, r32, r410, fan motor window type, outdoor fan motor split type, pcb, indoor leakage split type, indoor leakage window type, indoor pcb board inverter ac, outdoor pcb board inverter ac, servicing of water cooler with minor repair, capacitor, fan motor, fan blade, relay overload, drayer, filter, nrv, condensor coil, evaprator coil, thermostate, gas charging r600, gas charging r134, servicing of gyser with minor repair, thermostat, element, auto cut switch, safety valve, assembly, connecting pipe, indicator led, capillary thermal switch


Tender Value : 271464.9
Due Date : May 16, 2026
T18 Ref No : 15284604
Location : rawatbhata , rajasthan
Source : GEM Tenders

corrigendum tender for repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 1 rewinding of three phase 415 v 50hz motors of less than 1 point 1kw rating as per part a scope of work for further detail refer scope of work and bo.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 2 rewinding of three phase 415 v 50hz motors of more than 1 point 1 kw up to 2 point 2 kw rating as per part a scope of work for further detail refer .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 3 rewinding of three phase 415 v 50hz, motors of more than 2 point 2 kw up to 5 point 5 kw rating as per part a scope of work for further detail refer.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 4 rewinding of three phase, 415 v 50hz motors of more than 5 point 5 kw up to 11 kw rating as per part a scope of work for further detail refer scope .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 5 rewinding of three phase 415 v 50hz motors of more than 11 kw up to 22 kw rating as per part a scope of work for further detail refer scope of work .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 6 rewinding of three phase 415 v 50hz motors of more than 22 kw up to 55 kw rating as per part a scope of work for further detail refer scope of work .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 7 rewinding of three phase 415 v 50hz motors of more than 55 kw up to 75 kw rating as per part a scope of work for further detail refer scope of work .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 8 rewinding of three phase 415 v 50hz motors of more than 75 kw up to 90 kw rating as per part a scope of work for further detail refer scope of work .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 9 rewinding of three phase 415 v 50hz motors of more than 90 kw up to 110 kw rating as per part a scope of work for further detail refer scope of work.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 10 rewinding of three phase, 415 v 50hz motors of more than 110 kw up to 132 kw rating as per part a scope of work for further detail refer scope of w.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 11 rewinding of three phase, 415 v 50hz motors of more than 132 kw up to 140 kw rating as per part a scope of work for further detail refer scope of w.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 12 rewinding of three phase 415 v 50hz motors of more than 140 kw up to 180 kw rating as per part a scope of work for further detail refer scope of wo.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 13 rewinding of three phase, 415 v 50hz submersible pump motors up to 2 point 5 kw rating as per part a scope of work for further detail refer scope o.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 14 rewinding of three phase 415 v 50hz submersible pump motors more than 2 point 5 kw up to 5 point 5 kw rating as per part a scope of work for furthe.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 15 rewinding of three phase, 415 v 50hz submersible pump motors more than 5 point 5 kw up to 11 kw rating as per part a scope of work for further deta.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 16 rewinding of three phase 415 v 50hz submersible pump motors more than 11 kw up to 15 kw rating as per part a scope of work for further detail refer.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 17 rewinding of three phase 415 v 50hz submersible pump motors more than 30 kw up to 37 kw rating as per part a scope of work for further detail refer.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 18 rewinding of single phase 230 v 50hz motors of pedestal fan by wall mounted fan by exhaust fan up to 450 mm sweep as per part a scope of work for f.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 19 rewinding of single phase 230 v 50hz motors of exhaust fan by cooler fan above 400 mm sweep as per part a scope of work for further detail refer sc.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 20 rewinding of 2000 va control transformer as per part a scope of work for further detail refer scope of work and boq attached total quantity 1 is eq.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 21 rewinding of 1000 va control transformer as per part a scope of work for further detail refer scope of work and boq attached total quantity 1 is eq.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 22 rewinding of 500 va control transformer as per part a scope of work for further detail refer scope of work and boq attached total quantity 1 is equ.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp- 7 and 8; cart 23 rewinding of control coil 415v diameter up to 300mm including bobbin as per part a scope of work for further detail refer scope of work and boq att.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 24 rewinding of single phase 230 v 50hz submersible pump motors up to 1 point 5 kw rating as per part a scope of work for further detail refer scope o.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 25 repair of hot spot in three phase 415 v 50hz motors up to 1 point 5 kw rating as per part b scope of work for further detail refer scope of work an.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 26 repair of hot spot in three phase 415 v 50hz motors of more than 1 point 5 kw up to 7 point 5 kw rating as per part b scope of work for further det.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 27 repair of hot spot in three phase 415 v 50hz motors of more than 7 point 5 kw up to 22 kw rating as per part b scope of work for further detail ref.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 28 repair of hot spot in three phase 415 v 50hz motors of more than 22 kw up to 45 kw rating as per part b scope of work for further detail refer scop.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 29 repair of hot spot in three phase 415 v 50hz motors of more than 45 kw up to 90 kw rating as per part b scope of work for further detail refer scop.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 30 repair of hot spot in three phase 415 v 50hz motors of more than 90 kw up to 180kw rating as per part b scope of work for further detail refer scop.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 31 removal of hot spot by dismantling of total stampings in three phase 415 v 50hz motors up to 22 kw rating as per part b scope of work for further d.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 32 removal of hot spot by dismantling of total stampings in three phase 415 v 50hz motors of more than 22 kw up to 45 kw rating as per part b scope of.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 33 removal of hot spot by dismantling of total stampings in three phase 415 v 50hz motors of more than 45 kw up to 90 kw rating as per part b scope of.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 34 removal of hot spot by dismantling of total stampings in three phase 415 v 50hz motors of more than 90 kw up to 180 kw rating as per part b scope o.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 35 remetalizing of shaft using tafa arc technique after preparation of surface and machining to proper size up to 1 point 5 kw motor as per part b sc.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 36 re-metalizing of shaft using tafa arc technique after preparation of surface and machining to proper size more than 1 point 5kw up to 7 point 5 kw .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 37 remetalizing of shaft using tafa arc technique after preparation of surface and machining to proper size more than 7 point 5 kw up to 15kw motor a.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 38 re-metalizing of shaft using tafa arc technique after preparation of surface and machining to proper size more than 15 up to 45 kw motor as per par.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 39 remetalizing of shaft using tafa arc technique after preparation of surface and machining to proper size more than 45kw up to 90 kw motor as per p.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 40 re-metalizing of shaft using tafa arc technique after preparation of surface and machining to proper size more than 90kw to 180kw motor as per part.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 41 remetalizing of end covers using tafa arc technique after preparation of surface and machining to proper size up to 1 point 5 kw motor as per part.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 42 re-metalizing of end covers using tafa arc technique after preparation of surface and machining to proper size more than 1 point 5 kw up to 7 point.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 43 re-metalizing of end covers using tafa arc technique after preparation of surface and machining to proper size more than 7 point 5 kw to 15kw motor.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 44 re-metalizing of end covers using tafa arc technique after preparation of surface and machining to proper size more than 15 kw up to 45 kw motor as.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 45 re metalizing of end covers using tafa arc technique after preparation of surface and machining to proper size more than 45kw up to 90 kw motor as .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 46 re-metalizing of end covers using tafa arc technique after preparation of surface and machining to proper size more than 90 kw to 180kw motor as pe.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 47 replacement of pvc cooling fan for motors size up to 1 point 5 kw as per part b scope of work for further detail refer scope of work and boq attach.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 48 replacement of pvc cooling fan for motors size more than 1 point 5kw up to 7 point 5 kw as per part b scope of work for further detail refer scope .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 49 replacement of pvc cooling fan for motors size more than 7 point 5kw unto 15kw as per part b scope of work for further detail refer scope of work a.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 50 replacement of pvc cooling fan for motors size more than 15kw up to 45kw as per part b scope of work for further detail refer scope of work and boq.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 51 dynamic balancing of rotor with 2 point 5 microns accuracy size more than 1kg up to 4 kg as per part b scope of work for further detail refer scope.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 52 dynamic balancing of rotor with 2 point 5 microns accuracy size more than 4 kg up to 16 kg as per part b scope of work for further detail refer sco.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 53 dynamic balancing of rotor with 2 point 5 microns accuracy size more than 16 kg up to 48 kg as per part b scope of work for further detail refer sc.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 54 dynamic balancing of rotor with 2 point 5 microns accuracy size more than 48 kg up to 96 kg as per part-b scope of work for further detail refer sc.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 55 dynamic balancing of rotor with 2 point 5 microns accuracy size more than 96 kg up to 192 kg as per part b scope of work for further detail refer s.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 56 dynamic balancing of rotor with 2 point 5 microns accuracy size more than 192 kg up to 378 kg as per part b scope of work for further detail refer .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 57 dynamic balancing of rotor with 2 point 5 microns accuracy size more than 378 kg up to 500 kg as per part b scope of work for further detail refer .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 58 dynamic balancing of rotor with 2 point 5 microns accuracy size more than 500 kg up to 1000 kg as per part b scope of work for further detail refer.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 59 dynamic balancing of rotor with 2 point 5 microns accuracy size more than 1000 kg up to 1500 kg as per part b scope of work for further detail refe.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 60 dynamic balancing of rotor with 2 point 5 microns accuracy size more than 1500 kg up to 3000 kg as per part b scope of work for further detail refe.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 61 supply and installation of terminal plate by terminal studs with insulators one quantity includes terminal studs for all three phases size up to 1 .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 62 supply and installation of terminal plate by terminal studs with insulators one quantity includes terminal studs for all three phases size more tha.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 63 supply and installation of terminal plate by terminal studs with insulators one quantity includes terminal studs for all three phases size more tha.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 64 supply and installation of terminal plate by terminal studs with insulators one quantity includes terminal studs for all three phases size more tha.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 65 supply and installation of terminal plate by terminal studs with insulators one quantity includes terminal studs for all three phases size more tha.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 66 supply and installation of terminal plate by terminal studs with insulators one quantity includes terminal studs for all three phases size more tha.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 67 removing of shaft making of new shaft and refitting of shaft with key way material used shall be same as original and material is in contractor sco.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 68 removing of shaft making of new shaft and refitting of shaft with key way material used shall be same as original and material is in contractor sco.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 69 removing of shaft making of new shaft and refitting of shaft with key way material used shall be same as original and material is in contractor sco.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 70 removing of shaft making of new shaft and refitting of shaft with key way material used shall be same as original and material is in contractor sco.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 71 making of end cover including machining drilling and threading etc to size up to 1 point 5 kw material cast iron for above end cover is in contract.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 72 making of end cover including machining drilling and threading etc to size more than 1 point 5kw up to 7 point 5 kw material cast iron for above en.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 73 making of end cover including machining drilling and threading etc to size more than 7 point 5kw up to 15kw material cast iron for above end cover .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 74 making of end cover including machining drilling and threading etc to size more than 15kw up to 45kw material cast iron for above end cover is in c.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 75 making of end cover including machining drilling and threading etc to size more than 45kw up to 90kw material cast iron for above end cover is in c.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 76 making of end cover including machining drilling and threading etc to size more than 90kw up to 180kw material cast iron for above end cover is in .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 77 making of cooling fan including machining keyway and key hub excluding material size up to 1 point 5 kw as per part b scope of work for further det.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 78 making of cooling fan including machining keyway and key hub excluding material size more than 1 point 5kw up to 7 point 5 kw as per part b scope o.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 79 making of cooling fan including machining keyway and key hub excluding material size more than 7 point 5kw up to 15kw as per part b scope of work f.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 80 making of cooling fan including machining keyway and key hub excluding material size more than 15kw up to 45kw as per part b scope of work for furt.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 81 making of cooling fan including machining keyway and key hub excluding material size more than 45kw up to 90kw as per part b scope of work for furt.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 82 making of cooling fan including machining keyway and key hub excluding material size more than 90kw up to 180kw as per part b scope of work for fur.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 83 material cost iron for making of cooling fan end cover as per part b scope of work for further detail refer scope of work and boq attached total qu.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 84 providing and fixing of bearing plates with material same as original size up to 1 point 5 kw as per part b scope of work for further detail refer .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 85 providing and fixing of bearing plates with material same as original size more than 1 point 5kw up to 7 point 5 kw as per part b scope of work for.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 86 providing and fixing of bearing plates with material same as original size more than 7 point 5kw up to 15kw as per part b scope of work for further.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 87 providing and fixing of bearing plates with material same as original size more than 15kw up to 45kw as per part b scope of work for further detail.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 88 providing and fixing of bearing plates with material same as original size more than 45kw up to 90kw as per part b scope of work for further detail.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 89 providing and fixing of bearing plates with material same as original size more than 90kw up to 180kw as per part b scope of work for further detai.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 90 providing and fixing of bearing locks duly machined threaded and drilled with material same as original size up to 15kw as per part b scope of work.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 91 providing and fixing of bearing locks duly machined threaded and drilled with material same as original size more than 15kw up to 45kw as per part .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 92 providing and fixing of bearing locks duly machined threaded and drilled with material same as original size more than 45kw up to 90kw as per part .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 93 providing and fixing of bearing locks duly machined threaded and drilled with material same as original size more than 90kw to 180kw as per part b .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 94 providing and fixing of foundation legs including machining drilling and levelling etc material shall be in contractor scope size up to 1 point 5 k.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 95 providing and fixing of foundation legs including machining drilling and levelling etc material shall बड ववरण/bid details be in contractor scope size more than 1 point.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 96 providing and fixing of foundation legs including machining drilling and levelling etc material shall be in contractor scope size more than 7 point.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 97 providing and fixing of foundation legs including machining drilling and levelling etc material shall be in contractor scope size more than 15 up t.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 98 dismantling and refitting without varnish and baking size up to 1 point 5 kw as per part b scope of work for further detail refer scope of work and.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 99 dismantling and refitting without varnish and baking size more than 1 point 5kw up to 7 point 5kw as per part b scope of work for further detail re.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 100 dismantling and refitting without varnish and baking size more than 7 point 5kw up to 15kw as per part b scope of work for further detail refer sc.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 101 dismantling and refitting without varnish and baking size more than 15kw up to 45kw as per part b scope of work for further detail refer scope of .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 102 dismantling and refitting without varnish and baking size more than 45kw up to 90kw as per part b scope of work for further detail refer scope of .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 103 dismantling and refitting without varnish and baking size more than 90kw up to 180kw as per part b scope of work for further detail refer scope of.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 104 dismantling and refitting with varnish and baking size up to 1 point 5 kw as per part b scope of work for further detail refer scope of work and b.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 105 dismantling and refitting with varnish and baking size more than 1 point 5kw up to 7 point 5kw as per part b scope of work for further detail refe.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 106 dismantling and refitting with varnish and baking size more than 7 point 5kw up to 15kw as per part b scope of work for further detail refer scope.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 107 dismantling and refitting with varnish and baking size more than 15kw up to 45kw as per part b scope of work for further detail refer scope of wor.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 108 dismantling and refitting with varnish and baking size more than 45kw up to 90kw as per part b scope of work for further detail refer scope of wor.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 109 dismantling and refitting with varnish and baking size more than 90kw up to 180kw as per part b scope of work for further detail refer scope of wo.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 110 providing and fixing of oil seal size less than 1 point 1 kw as per part b scope of work for further detail refer scope of work and boq attached t.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 111 providing and fixing of oil seal size 1 point 1 kw to 2 point 2 kw as per part b scope of work for further detail refer scope of work and boq atta.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 112 providing and fixing of oil seal size more than 2 point 2 kw up to 5 point 5 kw as per part b scope of work for further detail refer scope of work.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 113 providing and fixing of oil seal size more than 5 point 5 kw up to 15 kw as per part b scope of work for further detail refer scope of work and bo.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 114 providing and fixing of oil seal size more than 15kw up to 30kw as per part b scope of work for further detail refer scope of work and boq attache.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 115 providing and fixing of space heater size more than 30 up to 45kw as per part b scope of work for further detail refer scope of work and boq attac.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 116 providing and fixing of space heater size more than 45kw up to 90kw as per part b scope of work for further detail refer scope of work and boq att.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 117 providing and fixing of space heater size more than 90kw up to 180kw as per part b scope of work for further detail refer scope of work and boq at.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 118 providing of skf make bearing 6203 zz as per part b scope of work for further detail refer scope of work and boq attached total quantity 1 is equa.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 119 providing of skf make bearing 6204 zz as per part b scope of work for further detail refer scope of work and boq attached total quantity 1 is equa.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 120 providing of skf make bearing 6205 zz as per part b scope of work for further detail refer scope of work and boq attached total quantity 1 is equa.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 121 providing of skf make bearing 6206 zz as per part b scope of work for further detail refer scope of work and boq attached total quantity 1 is equa.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 122 providing of skf make bearing 6208 zz as per part b scope of work for further detail refer scope of work and boq attached total quantity 1 is equa.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 123 providing of skf make bearing 6209 zz as per part b scope of work for further detail refer scope of work and boq attached total quantity 1 is equa.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 124 providing of skf make bearing 6310 zz as per part b scope of work total quantity 1 is equal to 10 nos for two years for further detail refer scope.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 125 providing of skf make bearing 6312 as per part b scope of work for further detail refer scope of work and boq attached total quantity 1 is equal t.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 126 providing of skf make bearing 6312 zz as per part b scope of work for further detail refer scope of work and boq attached total quantity 1 is equa.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 127 providing of skf make bearing 6313 c3 as per part b scope of work for further detail refer scope of work and boq attached total quantity 1 is equa..


Tender Value : 6411231
Due Date : May 14, 2026
Published By

Every year, central and state government departments release thousands of high-value contracts specifically dedicated to transformer cooler repair. Whether it involves bulk material supply, executing specialized operational services, or end-to-end turnkey project execution, the demand for capable vendors in the transformer cooler repair sector is massive.

At Tender18, we help businesses cut through the noise and exclusively target the exact work categories they specialize in. Instead of browsing through generic procurement sites, our platform isolates high-potential opportunities that match your specific industry capabilities.

Work Dynamics in the transformer cooler repair Sector

Government requirements for this specific vertical generally fall into distinct procurement patterns:

  • Product & Material Supply: Tenders focused strictly on sourcing, testing, and delivering high-quality items that meet the exact technical specifications of the buyer.
  • Service Level Agreements (SLAs): Long-term hiring of expert agencies for routine maintenance, manpower deployment, or continuous operational management.
  • Execution & Turnkey Projects: Comprehensive contracts where the bidder is responsible for everything from raw material procurement to final site installation and testing.

By focusing purely on your core strength in transformer cooler repair, you can build a highly profitable and stable pipeline of government clients.

Stop wasting time filtering through irrelevant notices. Our transformer cooler repair Tender Information Service is engineered for precision. We track exact product codes, service names, and specialized work terms across all government portals nationwide. When a buyer publishes a requirement that matches your specific business profile, our system alerts you instantly.

Deep Technical Insights & Documentation For transformer cooler repair Tenders

Bidding for specific works requires studying strict technical parameters. We provide immediate access to the core documents you need to evaluate the project:

  • Detailed Specifications & Drawings: Download the exact engineering guidelines, material testing standards, and quality benchmarks demanded by the buyer for transformer cooler repair.
  • Financial BOQ Spreadsheets: Access the official blank pricing formats where you need to input your unit rates, tax configurations, and total bid value.
  • Real-Time Technical Amendments: If the buying department changes the product specifications, alters the service scope, or shifts the delivery timeline, we instantly update the parent file so you are never caught off-guard.

Winning a contract for transformer cooler repair depends entirely on how perfectly your technical capabilities match the buyer’s demands. Even if you have the best product or service, a poorly formatted document or a missing compliance certificate will lead to instant technical rejection. Tender18’s Tender Bidding Service eliminates this risk by taking complete ownership of your digital submission.

Flawless Compliance & Portal Execution For transformer cooler repair Tenders

Under this service, Tender18 assigns a Dedicated Experienced Technical Person to your profile. This expert handles the heavy lifting of the entire bidding cycle:

  • Capability Mapping: We thoroughly cross-check your past completion certificates, ISO standard proofs, and financial turnover against the strict eligibility criteria required for transformer cooler repair bids.
  • Secure System Integration: Our technical desk seamlessly links your Class III Digital Signature Certificate (DSC) with the required e-procurement servers to securely encrypt your technical and financial envelopes.
  • Error-Free Financial Uploads: We audit your quoted BOQ pricing sheets for any formula or formatting errors before the final upload, ensuring your bid is successfully locked before the portal's closing hours.

Government buyers are aggressively using the Government e-Marketplace (GeM) for the direct procurement of transformer cooler repair. If your business profile is not accurately mapped on this portal, you remain practically invisible to these purchasing officers. Recognized as a trusted and expert GeM consultant, Tender18 offers specialized support to build, optimize, and maintain a highly visible vendor account for your business.

With an industry-leading support success ratio of over 95%, we handle the complex marketplace compliance so you can focus entirely on executing your orders

Expert Profile Management & Catalogue

Our dedicated consultants ensure your GeM presence is structurally perfect:

  • Precise Catalogue Listing: We upload and categorize your specific offerings under the exact search terms and parameters used by government buyers looking for transformer cooler repair, ensuring maximum search visibility.
  • OEM Dashboard & Assessment: For original manufacturers and creators, we guide you through the mandatory Quality Council of India (QCI) vendor assessments to successfully unlock your official OEM panel.
  • Profile Compliance & Caution Money: We manage your statutory documentation, brand approvals, and caution money limits to keep your account immune from technical suspensions.

Strategic Live Bid Participation

Beyond setup, we actively drive your market participation. Our team expertly handles the digital paperwork and rate configurations for GeM Custom Bids and Reverse Auctions (RA) related to transformer cooler repair, maximizing your chances of securing L1 status.

1.

How do I find government contracts exclusively matching my work in transformer cooler repair?

The easiest way is through the Tender18 platform. Instead of searching department by department, our system uses advanced keyword matching to gather all live supply, service, and execution tenders related directly to your core business in one place.

2.

Do I need specific testing or quality certificates to apply for these contracts?

It heavily depends on the nature of the work. For supply contracts, buyers often ask for ISO certifications, BIS marks, or specific lab testing reports. For service contracts, they may ask for labor licenses or past performance certificates (work orders).

3.

What is a BOQ and why is it important for my bid?

The Bill of Quantities (BOQ) is the official financial Excel sheet where you enter your competitive prices. Any mistake in this file—like adding extra rows, changing formulas, or saving it in the wrong format—will cause the portal server to reject your entire bid.

4.

Are samples required to be submitted physically before the digital bid opens?

For many product-based transformer cooler repair tenders, buying departments do ask bidders to submit physical samples to their office before the digital technical evaluation date. This requirement is always clearly mentioned in the official NIT document.

5.

How does the Dedicated Tender Expert from Tender18 help me?

Our assigned expert manages your total portal compliance. They extract the hidden rules from long tender PDFs, create a precise document checklist for your team, map your digital signature, and securely upload your technical and financial files onto the government servers.

6.

What is the role of a Digital Signature Certificate (DSC)?

A Class III DSC is a secure USB device that contains your digital identity. You cannot upload a bid without it. It is used to securely encrypt and lock your sensitive price data and technical documents so no one can view them before the official opening date.

7.

As an MSME, can I get financial benefits when bidding for transformer cooler repair?

Yes, the government strongly supports MSMEs. By uploading a valid Udyam Registration Certificate in the technical envelope, small businesses are frequently exempted from paying the initial Tender Document Fee and the Earnest Money Deposit (EMD).

8.

Why should I list my services or products on GeM for this category?

GeM is now the primary digital marketplace for all government agencies. If you are properly cataloged for transformer cooler repair, officers can view your profile and generate direct purchase orders or invite you to participate in exclusive Custom Bids.

9.

What makes Tender18 a reliable GeM support partner?

As a highly trusted and expert GeM consultant, Tender18 holds a proven support success ratio of over 95%. From flawless profile creation and complex catalogue mapping to OEM panel approvals and live Reverse Auction (RA) support, we handle it all seamlessly.

10.

What does "L1" mean in these government contracts?

"L1" stands for "Lowest Bidder 1". In government procurement, after all technical envelopes are approved, the financial sheets (BOQs) are opened. The bidder who has quoted the lowest compliant price for transformer cooler repair is declared L1 and is generally awarded the contract