tender for supply of stone pad , supply of al lug long barrel off size , supply of holding clamp , supply of m s top channel 125x65x2240 mm , supply of ms dropper channel 100x50x2028 mm , supply of number plate , supply of ms angle t f base with clamp and nut bolt , supply of barbed wire , supply of danger board , supply of copper l piece , supply of henley type tailless unit protection cubicle panel 500a 650v , supply of lt fuse set protection unit for 25 kva dt with smc box , supply of insulated weasel conductor , supply of m s nut and bolt , supply of suspension clamp , supply of dead end clamp , supply of i hook j hook , carriage of pcc pole 8 5 mtr long , carriage of pcc pole 11 mtr long , carriage of 11 kv pin insulator with pin , carriage of 11 kv disc insulator with fitting , carriage of fuse set , carriage of earthing complete , carriage of stay set complete , carriage of 25 kva 11 0 4 kv t f , carriage of 250 kva 11 0 4 kv t f , carriage of lt xlpe pvc cable 3 5x70 sqmm , carriage of lt xlpe pvc cable 1x400 sqmm , carriage of lt xlpe pvc cable 1x240 sqmm , carriage of lt abc cable 3x120plus1x95plus1x16 sqmm , carriage of 11 kv tpmo with polymer insualator , errection of pcc pole 8 5 mtr long , errection of pcc pole 11 mtr long , fixing of stone pad , fixing of al lug long barrel off size , fixing of holding clamp , fixing of m s top channel 125x65x2240 mm , fixing of ms dropper channel 100x50x2028 mm , fixingof number plate , fixing of ms angle t f base with clamp and nut bolt , fixing of barbed wire , fixing of danger board , fixing of copper l piece , fixing of henley type tailless unit protection cubicle panel 500a 650v , fixing of lt fuse set protection unit for 25 kva dt with smc box , fixing of m s nut and bolt , fixing of 11 kv pin insulator with pin , fixing of 11 kv disc insulator with fitting , fixing of fuse set , fixing of 11 kv tpmo with polymer insualator , fixing of suspension clamp , errection of dead end clamp , fixing of i hook j hook , installation of 25 kva 11 0 4 kv t f on newly constructed double pole in proper alignment , installation of 250 kva t f on newly old constructed plinth in proper alignment , dismenteling of 10 16 kva t f , dismenteling of 100 kva t f , errection and grouting of stays , fixing of earthing rod , laying lt xlpe pvc cable 3 5x70 sqmm , laying lt xlpe pvc cable 1x400 sqmm , laying lt xlpe pvc cable 1x240 sqmm , laying lt abc cable 3x120 plus 1x95 plus 1x16 sqmm , laying insulated weasel conductor , construction of plinth of size 2x2x1 point 5 m , pipe and water level earthing of 250 kva medium power transformers , net fencing shall be 1150x1200 mm made of 35x35 mm ms angle , back cartage of 10 16 kva t f , back cartage of 100 kva t f, boqbp, supply of stone pad as per relevent iss, supply of al lug long barrel off size as per relevent iss, supply of holding clamp as per relevent iss, supply of m s top channel 125x65x2240 mm as per relevent iss, supply of ms dropper channel 100x50x2028 mm as per relevent iss, supply of number plate as per relevent iss, supply of ms angle t f base with clamp and nut bolt as per relevent iss, supply of barbed wire as per relevent iss, supply of danger board as per relevent iss, supply of copper l piece as per relevent iss, supply of henley type tailless unit protection cubicle panel 500a 650v as per relevent iss, supply of lt fuse set protection unit for 25 kva dt with smc box, supply of insulated weasel conductor as per relevent iss, supply of m s nut and bolt as per relevent iss, supply of suspension clamp as per relevent iss, supply of dead end clamp as per relevent iss, supply of i hook j hook as per relevent iss, carriage of pcc pole 8 5 mtr long from electricty store center hts to pit site of work through the kacha and pakka road including loading and unloading at the respective ends including the cost of arrangement of labour t&p etc which required for proper completion of work (distance 00 50 kms ), carriage of pcc pole 11 mtr long from electricty store center hts to pit site of work through the kacha and pakka road including loading and unloading at the respective ends including the cost of arrangement of labour t&p etc which required for proper completion of work (distance 00 50 kms ), carriage of 11 kv pin insulator with pin, carriage of 11 kv disc insulator with fitting, carriage of fuse set, carriage of earthing complete, carriage of stay set complete, carriage of 25 kva 11 0 4 kv t f from electricty store center hts to pit site of work through the kacha and pakka road including loading and unloading at the respective ends including the cost of arrangement of labour t&p etc which required for proper completion of work (distance 00 50 kms ), carriage of 250 kva 11 0 4 kv t f from electricty store center hts to pit site of work through the kacha and pakka road including loading and unloading at the respective ends including the cost of arrangement of labour t&p etc which required for proper completion of work (distance 00 50 kms ), carriage of lt xlpe pvc cable 3 5x70 sqmm from electricty store center hts to pit site of work through the kacha and pakka road including loading and unloading at the respective ends including the cost of arrangement of labour t&p etc which required for proper completion of work (distance 00 50 kms ), carriage of lt xlpe pvc cable 1x400 sqmm from electricty store center hts to pit site of work through the kacha and pakka road including loading and unloading at the respective ends including the cost of arrangement of labour t&p etc which required for proper completion of work (distance 00 50 kms ), carriage of lt xlpe pvc cable 1x240 sqmm from electricty store center hts to pit site of work through the kacha and pakka road including loading and unloading at the respective ends including the cost of arrangement of labour t&p etc which required for proper completion of work (distance 00 50 kms ), carriage of lt abc cable 3x120+1x95+1x16 sqmm from electricty store center hts to pit site of work through the kacha and pakka road including loading and unloading at the respective ends including the cost of arrangement of labour t&p etc which required for proper completion of work (distance 00 50 kms ), carriage of 11 kv tpmo with polymer insualator, errection of pcc pole 8 5 mtr long with grouting including cutting of kharanja mettalic road concrete portion while digging pit & complete h t l t fittings as per respo manual and as per direction of engineer incharge including the cost of labour t&p and carrier etc required for proper completion of work, errection of pcc pole 11 mtr long with grouting including cutting of kharanja mettalic road concrete portion while digging pit & complete h t l t fittings as per respo manual and as per direction of engineer incharge including the cost of labour t&p and carrier etc required for proper completion of work, fixing of stone pad, fixing of al lug long barrel off size, fixing of holding clamp, fixing of m s top channel 125x65x2240 mm, fixing of ms dropper channel 100x50x2028 mm, fixingof number plate, fixing of ms angle t f base with clamp and nut bolt, fixing of barbed wire, fixing of danger board, fixing of copper l piece, fixing of henley type tailless unit protection cubicle panel 500a 650v, fixing of lt fuse set protection unit for 25 kva dt with smc box, fixing of m s nut & bolt, fixing of 11 kv pin insulator with pin, fixing of 11 kv disc insulator with fitting, fixing of fuse set, fixing of 11 kv tpmo with polymer insualator, fixing of suspension clamp, errection of dead end clamp, fixing of i hook j hook, installation of 25 kva 11 0 4 kv t f on newly constructed double pole in proper alignment direction & making ht lt connection, installation of 250 kva t f on newly old constructed plinth in proper alignment direction & making ht lt connection all cost of labour and t&p which required for completion of work, dismenteling of 10 16 kva t f from double pole with opening of all ht lt jumpers all works which required for dismentling of t f, dismenteling of 100 kva t f from double pole with opening of all ht lt jumpers all works which required for dismentling of t f, errection and grouting of stays as per respo norms and as per direction of supervising engineer grouting material i e cement sand brick ballast stone ballast etc shall be arranged by the contractor at his own cost, fixing of earthing rod as per respo norms and as per direction of supervising engineer, laying lt xlpe pvc cable 3 5x70 sqmm, laying lt xlpe pvc cable 1x400 sqmm, laying lt xlpe pvc cable 1x240 sqmm, laying lt abc cable 3x120 plus 1x95 plus 1x16 sqmm, laying insulated weasel conductor, construction of plinth of size 2x2x1 5 m above ground level one ft below the ground level of 9 inch after exavation of 4 inch earth brick ballast shall be provided and rammering will be done properly after ballast shall be provided and rammering will be done properly after that a retaining wall 9 inchwidth by fist class brick in ratio 1 ratio 4 of cement & sand shall be made the earth shall be filled up to one ft below the top of the plinth after this brick ballast shall be provided upto 6 inch from the earth level and proper rammering shall be done one no jall of 12 mm ms tor shall be fixed in the hollow of plinth and one ft thick rcc in ratio of cement sand & stone ballast shall be laid on the top of the plinth the 12 mm thick plastering shall be done all round the plinth in 1 4 ratio of cement and sand, pipe & water level earthing of 250 kva medium power transformers, net fencing shall be 1150x1200 mm made of 35x35 mm ms angle covered by expended netal 14 swg up to full height 1200 mm duly steftened by ms flat by an 8 swg dia bolt and nut, back cartage of 10 16 kva t f and carriage it up to store hathras j e store all cost of labour and t and p which required for completion of work, back cartage of 100 kva t f and carriage it up to store hathras j e store all cost of labour and t&p which required for completion of work