tender for 9gi stay rod 20x1800 mm etc material from esc mnp , carriage of distribution transformer 25 kva from esc mnp , carriage of distribution transformer 63 kva from esc mnp , carriage of distribution transformer 100 kva from esc mnp , carriage of distribution transformer 250 kva from esc mnp , carriage of acsr weasel conductor from esc mnp , carriage of m s earthing rod 20 x2540 mm from esc mnp , carriage of lt al. xlpe cable size 1x240 sq.mm. from esc mnp , carriage of lt xlpe cable 1x120 sq.mm. for dtr from esc mnp , carriage of lt xlpe cable 1x400 sq.mm. for dtr from esc mnp , carriage of lt xlpe cable size 3.5x70 or 35 sq.mm. from esc mnp , carriage of lt ab cable 3x120 1x95 1x16 sq.mm. from esc mnp , carriage of lt ab cable 3x50 1x35 1x16 sq.mm. from esc mnp , carriage of lt ab cable 3x95 1x70 1x16 sq.mm. from esc mnp , carriage of 33 kv xlpe cable 3x300 sq.mm. from esc mnp , carriage of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. from esc mnp , carriage of 33 kv straight through size 3x300 sq.mm. from esc mnp , carriage of g.i. wire 6 or 8 swg for guarding from esc mnp , carriage of three phase distribution box from esc mnp , erection of fixing of lt fuse set protection box with all respective accessories as per norms , execution of chemical earthing with g.i. patti clamp nut and bolts as per norms , erection of l.t. tail less unit with all respective material as grouted angel with fabrication work etc. , laying of acsr weasel conductor , laying of lt ab cable 3x120 1x95 1x16 sq.mm. , laying of lt ab cable 3x50 1x35 1x16 sq.mm. , laying of lt ab cable 3x95 1x70 1x16 sq.mm. , mounting of three phase distribution box , erection of double pole structure 8.5 mtr pcc pole , erection of single pole structure 8.5 mtrs pcc pole , erection of tri pole structure 33 kv 13 mtr st pole , grouting of pcc or stp pole , grouting of stay , earthing of pole , guarding of 11 kv line , fencing of 250 kva distribution transformers , plinth for 250 kva transformer , installation of 11by0.4 kv tf 25 kva , installation of 11by0.4 kv tf 63 kva , installation of 11by0.4 kv tf 100 kva , installation of 11by0.4 kv tf 250 kva , laying of 33 kv xlpe cable 3x300 sq.mm. , installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms. , dismentlling, received back and safe carriage of jarjar g.i. wire and weasel conducter including with rolling from pit site to esc, mainpuri , received back of distribution transformer after, boqbp2627, clamp for 11 kv v type cross arm with bolts and nuts, three phase distribution box clamp with nut and bolts, connecting cable for distribution box 1x35 sq.mm., l.t. fuse set protection box with all accessories, tinned copper fuse wire different size, hdpe pipe 140 mm., stone pad 300x300x75, holding clamp for doulble pole unit with nut and bolts, ms angle 75x75x6x2028mm with clamp and bolt and nut t or f base, t off chhanel and t off clamp with nut and bolts, top chhanel 125x65x240, dropper channel 100x50x2028 mm., danger board with clamp and nut and bolt, chemical earthing with g.i. patti clamp nut and bolts as per norms, l.t. tail less unit with all respective material angel, patti and other material, copper l pieace 62x225x12mm., 11 kv f clamp with nut and bolts, suspension clamp, dead end clamp, eye i hook, eye bolts for guarding, j hook, lt clamp for pcc or stp with bolts and nuts, pearcing connector, alluminium lug 120 sq.mm., alluminium lug 240 sq.mm., alluminium lug 400 sq.mm., nut bolts and washers off size, guarding angel, guarding angel clamp, m.s. angel iron 65x65x6 mm. 2700 mm long bracing with 4 nos clamp with nut and bolts, 13 m stp pole sp55 galvanised, 8.5 m pcc pole, v type cross arm for 11 kv, 11 kv pin insulator with pin, disc insulator with fitting t and c 45 kn 114 nos and 70kn 27 nos, 11 kv fuse set, 11 kv tpmo with polymer insulator, complete stay 9gi stay rod 20x1800 mm stay wire 7 and 8 swg 10 kg stay clamp bolt nut and washer, distribution transformer 25 kva, distribution transformer 63 kva, distribution transformer 100 kva, distribution transformer 250 kva, acsr weasel conductor or insulated conductor as provided by department, m s earthing rod 20 x2540 mm, lt al. xlpe cable size 1x240 sq.mm., lt xlpe cable 1x120 sq.mm. for dtr, lt xlpe cable 1x400 sq.mm. for dtr, lt xlpe cable size 3.5x70 or 35 sq.mm., lt ab cable 3x120 1x95 1x16 sq.mm., lt ab cable 3x50 1x35 1x16 sq.mm., lt ab cable 3x95 1x70 1x16 sq.mm., 33 kv xlpe cable 3x300 sq.mm., 33 kv indoor or outdoor jointing kit size 3x300 sq.mm., 33 kv straight through size 3x300 sq.mm., g.i. wire 6 or 8 swg for guarding, three phase distribution box, fixing of l.t. fuse set protection box with all respective accessories as per norms, l.t. tail less unit with all respective material as grouted angel with fabrication work etc., laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr weasel conductor or insulated conductor as provided by department, laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x120 1x95 1x16 sq.mm., laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x50 1x35 1x16 sq.mm, laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x95 1x70 1x16 sq.mm., mounting of three phase distribution box with clamp nut & bolts and make proper connection with connecting cable., erection of double pole structure 8.5 mtr pcc pole by digging of pits fitting of all relevant accessories as per respo norms. 34 nos pole at different location under concern division., erection of single pole structure 8.5 mtrs pcc pole by digging of pits fitting of all relevant accessories as per respo norms. at different location under concern division., erection of tri pole structure 33 kv 13 mtr st pole by digging of pits fitting of all relevant accessories as per respo norms. 3 nos pole at different location under concern division., grouting of pcc or stp pole long as per respo norms with material cement, sand, blast stone with the ratio 0.268 cu.m. each will be provided by conractor, grouting of stay as per respo norms cement, sand, blast stone material will be provided by conractor, earthing of pole by m s earthing rod 20 x2540 mm with 6 swg earthing wire etc and make proper connection., guarding of 11 kv line with gaurding angel, clamp eye bolts and gaurding g.i. wire 6 or 8 swg 30 span, fencing of distribution transformers with enamel in proper alignment as per respo manual and as per direction of executive engineer including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work., plinth for 250 kva transformer proper size as per resspo norms, installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 25 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 63 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 100 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 250 kva with l.t. xlpe cable suitable size with all respective material as per norms., laying of following cable by hdd method with hdpe pipe (140 mm.) including digging and restoring along with brick and sand including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work. 33 kv xlpe cable 3x300 sq.mm., installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms., dismentlling of jarjar g.i. wire and weasel conducter including with rolling received back and safe carriage from pit site to esc, mainpuri, received back of distribution transformer after increasing capacity from pit site to esc, mainpuri ( 17 nos 100 kva)

Latest Tender Detail from uttar pradesh power corporation limited UPPCL for the tender for 9gi stay rod 20x1800 mm etc material from esc mnp , carriage of distribution transformer 25 kva from esc mnp , carriage of distribution transformer 63 kva from esc mnp , carriage of distribution transformer 100 kva from esc mnp , carriage of distribution transformer 250 kva from esc mnp , carriage of acsr weasel conductor from esc mnp , carriage of m s earthing rod 20 x2540 mm from esc mnp , carriage of lt al. xlpe cable size 1x240 sq.mm. from esc mnp , carriage of lt xlpe cable 1x120 sq.mm. for dtr from esc mnp , carriage of lt xlpe cable 1x400 sq.mm. for dtr from esc mnp , carriage of lt xlpe cable size 3.5x70 or 35 sq.mm. from esc mnp , carriage of lt ab cable 3x120 1x95 1x16 sq.mm. from esc mnp , carriage of lt ab cable 3x50 1x35 1x16 sq.mm. from esc mnp , carriage of lt ab cable 3x95 1x70 1x16 sq.mm. from esc mnp , carriage of 33 kv xlpe cable 3x300 sq.mm. from esc mnp , carriage of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. from esc mnp , carriage of 33 kv straight through size 3x300 sq.mm. from esc mnp , carriage of g.i. wire 6 or 8 swg for guarding from esc mnp , carriage of three phase distribution box from esc mnp , erection of fixing of lt fuse set protection box with all respective accessories as per norms , execution of chemical earthing with g.i. patti clamp nut and bolts as per norms , erection of l.t. tail less unit with all respective material as grouted angel with fabrication work etc. , laying of acsr weasel conductor , laying of lt ab cable 3x120 1x95 1x16 sq.mm. , laying of lt ab cable 3x50 1x35 1x16 sq.mm. , laying of lt ab cable 3x95 1x70 1x16 sq.mm. , mounting of three phase distribution box , erection of double pole structure 8.5 mtr pcc pole , erection of single pole structure 8.5 mtrs pcc pole , erection of tri pole structure 33 kv 13 mtr st pole , grouting of pcc or stp pole , grouting of stay , earthing of pole , guarding of 11 kv line , fencing of 250 kva distribution transformers , plinth for 250 kva transformer , installation of 11by0.4 kv tf 25 kva , installation of 11by0.4 kv tf 63 kva , installation of 11by0.4 kv tf 100 kva , installation of 11by0.4 kv tf 250 kva , laying of 33 kv xlpe cable 3x300 sq.mm. , installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms. , dismentlling, received back and safe carriage of jarjar g.i. wire and weasel conducter including with rolling from pit site to esc, mainpuri , received back of distribution transformer after, boqbp2627, clamp for 11 kv v type cross arm with bolts and nuts, three phase distribution box clamp with nut and bolts, connecting cable for distribution box 1x35 sq.mm., l.t. fuse set protection box with all accessories, tinned copper fuse wire different size, hdpe pipe 140 mm., stone pad 300x300x75, holding clamp for doulble pole unit with nut and bolts, ms angle 75x75x6x2028mm with clamp and bolt and nut t or f base, t off chhanel and t off clamp with nut and bolts, top chhanel 125x65x240, dropper channel 100x50x2028 mm., danger board with clamp and nut and bolt, chemical earthing with g.i. patti clamp nut and bolts as per norms, l.t. tail less unit with all respective material angel, patti and other material, copper l pieace 62x225x12mm., 11 kv f clamp with nut and bolts, suspension clamp, dead end clamp, eye i hook, eye bolts for guarding, j hook, lt clamp for pcc or stp with bolts and nuts, pearcing connector, alluminium lug 120 sq.mm., alluminium lug 240 sq.mm., alluminium lug 400 sq.mm., nut bolts and washers off size, guarding angel, guarding angel clamp, m.s. angel iron 65x65x6 mm. 2700 mm long bracing with 4 nos clamp with nut and bolts, 13 m stp pole sp55 galvanised, 8.5 m pcc pole, v type cross arm for 11 kv, 11 kv pin insulator with pin, disc insulator with fitting t and c 45 kn 114 nos and 70kn 27 nos, 11 kv fuse set, 11 kv tpmo with polymer insulator, complete stay 9gi stay rod 20x1800 mm stay wire 7 and 8 swg 10 kg stay clamp bolt nut and washer, distribution transformer 25 kva, distribution transformer 63 kva, distribution transformer 100 kva, distribution transformer 250 kva, acsr weasel conductor or insulated conductor as provided by department, m s earthing rod 20 x2540 mm, lt al. xlpe cable size 1x240 sq.mm., lt xlpe cable 1x120 sq.mm. for dtr, lt xlpe cable 1x400 sq.mm. for dtr, lt xlpe cable size 3.5x70 or 35 sq.mm., lt ab cable 3x120 1x95 1x16 sq.mm., lt ab cable 3x50 1x35 1x16 sq.mm., lt ab cable 3x95 1x70 1x16 sq.mm., 33 kv xlpe cable 3x300 sq.mm., 33 kv indoor or outdoor jointing kit size 3x300 sq.mm., 33 kv straight through size 3x300 sq.mm., g.i. wire 6 or 8 swg for guarding, three phase distribution box, fixing of l.t. fuse set protection box with all respective accessories as per norms, l.t. tail less unit with all respective material as grouted angel with fabrication work etc., laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr weasel conductor or insulated conductor as provided by department, laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x120 1x95 1x16 sq.mm., laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x50 1x35 1x16 sq.mm, laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x95 1x70 1x16 sq.mm., mounting of three phase distribution box with clamp nut & bolts and make proper connection with connecting cable., erection of double pole structure 8.5 mtr pcc pole by digging of pits fitting of all relevant accessories as per respo norms. 34 nos pole at different location under concern division., erection of single pole structure 8.5 mtrs pcc pole by digging of pits fitting of all relevant accessories as per respo norms. at different location under concern division., erection of tri pole structure 33 kv 13 mtr st pole by digging of pits fitting of all relevant accessories as per respo norms. 3 nos pole at different location under concern division., grouting of pcc or stp pole long as per respo norms with material cement, sand, blast stone with the ratio 0.268 cu.m. each will be provided by conractor, grouting of stay as per respo norms cement, sand, blast stone material will be provided by conractor, earthing of pole by m s earthing rod 20 x2540 mm with 6 swg earthing wire etc and make proper connection., guarding of 11 kv line with gaurding angel, clamp eye bolts and gaurding g.i. wire 6 or 8 swg 30 span, fencing of distribution transformers with enamel in proper alignment as per respo manual and as per direction of executive engineer including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work., plinth for 250 kva transformer proper size as per resspo norms, installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 25 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 63 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 100 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 250 kva with l.t. xlpe cable suitable size with all respective material as per norms., laying of following cable by hdd method with hdpe pipe (140 mm.) including digging and restoring along with brick and sand including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work. 33 kv xlpe cable 3x300 sq.mm., installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms., dismentlling of jarjar g.i. wire and weasel conducter including with rolling received back and safe carriage from pit site to esc, mainpuri, received back of distribution transformer after increasing capacity from pit site to esc, mainpuri ( 17 nos 100 kva) in mainpuri, uttar pradesh,. Reference number 15912316. Don't miss out on this chance to be part of a significant project. Register for free today to access the complete tender details and download the necessary documents. Seize the opportunity with Tender 18!

T18 Ref No:15912316
Tender ID:GEM/2026/B/7686437
Tender Agency:uttar pradesh power corporation limited UPPCL
City:mainpuri
State:uttar pradesh
Tender Related Keywords :distribution transformers, distribution transformer, transformer installation, acsr weasel conductor, insulated conductor, chemical earthing, polymer insulator, distribution box, fabrication work, conductor laying, copper fuse wire, suspension clamp, kva transformer, protection box, disc insulator, pin insulator, earthing wire, earthing rod, copper fuse, xlpe cable, clamp bolt, fuse wire, hdpe pipe, end clamp, nut bolts, stay wire, stay rod, ab cable, pcc pole, ms angle, bolt nut, gi wire, bolts
Description :total quantity = 21191 ----- document required from seller = experience criteria,past performance,bidder turnover,certificate (requested in atc),oem authorization certificate,oem annual turnover,additional doc 1 (requested in atc)
Tender Value:Refer Document
Tender EMD:Refer Document
Tender Fee:Refer Document
Published Date:Jun 20, 2026
Due Date:Jul 06, 2026
Tender Opening Date:Jul 06, 2026
Tender DocumentsDownload Document
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.

This Government Tender has been Published  by Uttar pradesh power corporation limited UPPCL for work related to distribution transformers,distribution transformer,transformer installation,acsr weasel conductor,insulated conductor,chemical earthing,polymer insulator,distribution box,fabrication work,conductor laying,copper fuse wire,suspension clamp,kva transformer,protection box,disc insulator,pin insulator,earthing wire,earthing rod,copper fuse,xlpe cable,clamp bolt,fuse wire,hdpe pipe,end clamp,nut bolts,stay wire,stay rod,ab cable,pcc pole,ms angle,bolt nut,gi wire,bolts in Mainpuri, Uttar pradesh. The Tender work is tender for 9gi stay rod 20x1800 mm etc material from esc mnp , carriage of distribution transformer 25 kva from esc mnp , carriage of distribution transformer 63 kva from esc mnp , carriage of distribution transformer 100 kva from esc mnp , carriage of distribution transformer 250 kva from esc mnp , carriage of acsr weasel conductor from esc mnp , carriage of m s earthing rod 20 x2540 mm from esc mnp , carriage of lt al. xlpe cable size 1x240 sq.mm. from esc mnp , carriage of lt xlpe cable 1x120 sq.mm. for dtr from esc mnp , carriage of lt xlpe cable 1x400 sq.mm. for dtr from esc mnp , carriage of lt xlpe cable size 3.5x70 or 35 sq.mm. from esc mnp , carriage of lt ab cable 3x120 1x95 1x16 sq.mm. from esc mnp , carriage of lt ab cable 3x50 1x35 1x16 sq.mm. from esc mnp , carriage of lt ab cable 3x95 1x70 1x16 sq.mm. from esc mnp , carriage of 33 kv xlpe cable 3x300 sq.mm. from esc mnp , carriage of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. from esc mnp , carriage of 33 kv straight through size 3x300 sq.mm. from esc mnp , carriage of g.i. wire 6 or 8 swg for guarding from esc mnp , carriage of three phase distribution box from esc mnp , erection of fixing of lt fuse set protection box with all respective accessories as per norms , execution of chemical earthing with g.i. patti clamp nut and bolts as per norms , erection of l.t. tail less unit with all respective material as grouted angel with fabrication work etc. , laying of acsr weasel conductor , laying of lt ab cable 3x120 1x95 1x16 sq.mm. , laying of lt ab cable 3x50 1x35 1x16 sq.mm. , laying of lt ab cable 3x95 1x70 1x16 sq.mm. , mounting of three phase distribution box , erection of double pole structure 8.5 mtr pcc pole , erection of single pole structure 8.5 mtrs pcc pole , erection of tri pole structure 33 kv 13 mtr st pole , grouting of pcc or stp pole , grouting of stay , earthing of pole , guarding of 11 kv line , fencing of 250 kva distribution transformers , plinth for 250 kva transformer , installation of 11by0.4 kv tf 25 kva , installation of 11by0.4 kv tf 63 kva , installation of 11by0.4 kv tf 100 kva , installation of 11by0.4 kv tf 250 kva , laying of 33 kv xlpe cable 3x300 sq.mm. , installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms. , dismentlling, received back and safe carriage of jarjar g.i. wire and weasel conducter including with rolling from pit site to esc, mainpuri , received back of distribution transformer after, boqbp2627, clamp for 11 kv v type cross arm with bolts and nuts, three phase distribution box clamp with nut and bolts, connecting cable for distribution box 1x35 sq.mm., l.t. fuse set protection box with all accessories, tinned copper fuse wire different size, hdpe pipe 140 mm., stone pad 300x300x75, holding clamp for doulble pole unit with nut and bolts, ms angle 75x75x6x2028mm with clamp and bolt and nut t or f base, t off chhanel and t off clamp with nut and bolts, top chhanel 125x65x240, dropper channel 100x50x2028 mm., danger board with clamp and nut and bolt, chemical earthing with g.i. patti clamp nut and bolts as per norms, l.t. tail less unit with all respective material angel, patti and other material, copper l pieace 62x225x12mm., 11 kv f clamp with nut and bolts, suspension clamp, dead end clamp, eye i hook, eye bolts for guarding, j hook, lt clamp for pcc or stp with bolts and nuts, pearcing connector, alluminium lug 120 sq.mm., alluminium lug 240 sq.mm., alluminium lug 400 sq.mm., nut bolts and washers off size, guarding angel, guarding angel clamp, m.s. angel iron 65x65x6 mm. 2700 mm long bracing with 4 nos clamp with nut and bolts, 13 m stp pole sp55 galvanised, 8.5 m pcc pole, v type cross arm for 11 kv, 11 kv pin insulator with pin, disc insulator with fitting t and c 45 kn 114 nos and 70kn 27 nos, 11 kv fuse set, 11 kv tpmo with polymer insulator, complete stay 9gi stay rod 20x1800 mm stay wire 7 and 8 swg 10 kg stay clamp bolt nut and washer, distribution transformer 25 kva, distribution transformer 63 kva, distribution transformer 100 kva, distribution transformer 250 kva, acsr weasel conductor or insulated conductor as provided by department, m s earthing rod 20 x2540 mm, lt al. xlpe cable size 1x240 sq.mm., lt xlpe cable 1x120 sq.mm. for dtr, lt xlpe cable 1x400 sq.mm. for dtr, lt xlpe cable size 3.5x70 or 35 sq.mm., lt ab cable 3x120 1x95 1x16 sq.mm., lt ab cable 3x50 1x35 1x16 sq.mm., lt ab cable 3x95 1x70 1x16 sq.mm., 33 kv xlpe cable 3x300 sq.mm., 33 kv indoor or outdoor jointing kit size 3x300 sq.mm., 33 kv straight through size 3x300 sq.mm., g.i. wire 6 or 8 swg for guarding, three phase distribution box, fixing of l.t. fuse set protection box with all respective accessories as per norms, l.t. tail less unit with all respective material as grouted angel with fabrication work etc., laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr weasel conductor or insulated conductor as provided by department, laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x120 1x95 1x16 sq.mm., laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x50 1x35 1x16 sq.mm, laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x95 1x70 1x16 sq.mm., mounting of three phase distribution box with clamp nut & bolts and make proper connection with connecting cable., erection of double pole structure 8.5 mtr pcc pole by digging of pits fitting of all relevant accessories as per respo norms. 34 nos pole at different location under concern division., erection of single pole structure 8.5 mtrs pcc pole by digging of pits fitting of all relevant accessories as per respo norms. at different location under concern division., erection of tri pole structure 33 kv 13 mtr st pole by digging of pits fitting of all relevant accessories as per respo norms. 3 nos pole at different location under concern division., grouting of pcc or stp pole long as per respo norms with material cement, sand, blast stone with the ratio 0.268 cu.m. each will be provided by conractor, grouting of stay as per respo norms cement, sand, blast stone material will be provided by conractor, earthing of pole by m s earthing rod 20 x2540 mm with 6 swg earthing wire etc and make proper connection., guarding of 11 kv line with gaurding angel, clamp eye bolts and gaurding g.i. wire 6 or 8 swg 30 span, fencing of distribution transformers with enamel in proper alignment as per respo manual and as per direction of executive engineer including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work., plinth for 250 kva transformer proper size as per resspo norms, installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 25 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 63 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 100 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 250 kva with l.t. xlpe cable suitable size with all respective material as per norms., laying of following cable by hdd method with hdpe pipe (140 mm.) including digging and restoring along with brick and sand including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work. 33 kv xlpe cable 3x300 sq.mm., installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms., dismentlling of jarjar g.i. wire and weasel conducter including with rolling received back and safe carriage from pit site to esc, mainpuri, received back of distribution transformer after increasing capacity from pit site to esc, mainpuri ( 17 nos 100 kva). Tender18 Provide this type Government Tender Information on daily basis.


This tender invites eligible contractors, suppliers, manufacturers, consultants, Startups, Msmes, traders and service providers to submit bids for the specified project, supply, service, or work requirement.


Before applying, interested bidders should review the tender scope, eligibility criteria, estimated contract value, important dates, technical requirements, reqired docuent list for bidder and bid submission instructions as per provided in the official tender documents. 


This Verified Information Provide By Tender18 in this page so Bidder Can Easiy  Understanding tender  requirements and bidders can prepare a compliant and competitive tender proposal.

To participate in the tender for 9gi stay rod 20x1800 mm etc material from esc mnp , carriage of distribution transformer 25 kva from esc mnp , carriage of distribution transformer 63 kva from esc mnp , carriage of distribution transformer 100 kva from esc mnp , carriage of distribution transformer 250 kva from esc mnp , carriage of acsr weasel conductor from esc mnp , carriage of m s earthing rod 20 x2540 mm from esc mnp , carriage of lt al. xlpe cable size 1x240 sq.mm. from esc mnp , carriage of lt xlpe cable 1x120 sq.mm. for dtr from esc mnp , carriage of lt xlpe cable 1x400 sq.mm. for dtr from esc mnp , carriage of lt xlpe cable size 3.5x70 or 35 sq.mm. from esc mnp , carriage of lt ab cable 3x120 1x95 1x16 sq.mm. from esc mnp , carriage of lt ab cable 3x50 1x35 1x16 sq.mm. from esc mnp , carriage of lt ab cable 3x95 1x70 1x16 sq.mm. from esc mnp , carriage of 33 kv xlpe cable 3x300 sq.mm. from esc mnp , carriage of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. from esc mnp , carriage of 33 kv straight through size 3x300 sq.mm. from esc mnp , carriage of g.i. wire 6 or 8 swg for guarding from esc mnp , carriage of three phase distribution box from esc mnp , erection of fixing of lt fuse set protection box with all respective accessories as per norms , execution of chemical earthing with g.i. patti clamp nut and bolts as per norms , erection of l.t. tail less unit with all respective material as grouted angel with fabrication work etc. , laying of acsr weasel conductor , laying of lt ab cable 3x120 1x95 1x16 sq.mm. , laying of lt ab cable 3x50 1x35 1x16 sq.mm. , laying of lt ab cable 3x95 1x70 1x16 sq.mm. , mounting of three phase distribution box , erection of double pole structure 8.5 mtr pcc pole , erection of single pole structure 8.5 mtrs pcc pole , erection of tri pole structure 33 kv 13 mtr st pole , grouting of pcc or stp pole , grouting of stay , earthing of pole , guarding of 11 kv line , fencing of 250 kva distribution transformers , plinth for 250 kva transformer , installation of 11by0.4 kv tf 25 kva , installation of 11by0.4 kv tf 63 kva , installation of 11by0.4 kv tf 100 kva , installation of 11by0.4 kv tf 250 kva , laying of 33 kv xlpe cable 3x300 sq.mm. , installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms. , dismentlling, received back and safe carriage of jarjar g.i. wire and weasel conducter including with rolling from pit site to esc, mainpuri , received back of distribution transformer after, boqbp2627, clamp for 11 kv v type cross arm with bolts and nuts, three phase distribution box clamp with nut and bolts, connecting cable for distribution box 1x35 sq.mm., l.t. fuse set protection box with all accessories, tinned copper fuse wire different size, hdpe pipe 140 mm., stone pad 300x300x75, holding clamp for doulble pole unit with nut and bolts, ms angle 75x75x6x2028mm with clamp and bolt and nut t or f base, t off chhanel and t off clamp with nut and bolts, top chhanel 125x65x240, dropper channel 100x50x2028 mm., danger board with clamp and nut and bolt, chemical earthing with g.i. patti clamp nut and bolts as per norms, l.t. tail less unit with all respective material angel, patti and other material, copper l pieace 62x225x12mm., 11 kv f clamp with nut and bolts, suspension clamp, dead end clamp, eye i hook, eye bolts for guarding, j hook, lt clamp for pcc or stp with bolts and nuts, pearcing connector, alluminium lug 120 sq.mm., alluminium lug 240 sq.mm., alluminium lug 400 sq.mm., nut bolts and washers off size, guarding angel, guarding angel clamp, m.s. angel iron 65x65x6 mm. 2700 mm long bracing with 4 nos clamp with nut and bolts, 13 m stp pole sp55 galvanised, 8.5 m pcc pole, v type cross arm for 11 kv, 11 kv pin insulator with pin, disc insulator with fitting t and c 45 kn 114 nos and 70kn 27 nos, 11 kv fuse set, 11 kv tpmo with polymer insulator, complete stay 9gi stay rod 20x1800 mm stay wire 7 and 8 swg 10 kg stay clamp bolt nut and washer, distribution transformer 25 kva, distribution transformer 63 kva, distribution transformer 100 kva, distribution transformer 250 kva, acsr weasel conductor or insulated conductor as provided by department, m s earthing rod 20 x2540 mm, lt al. xlpe cable size 1x240 sq.mm., lt xlpe cable 1x120 sq.mm. for dtr, lt xlpe cable 1x400 sq.mm. for dtr, lt xlpe cable size 3.5x70 or 35 sq.mm., lt ab cable 3x120 1x95 1x16 sq.mm., lt ab cable 3x50 1x35 1x16 sq.mm., lt ab cable 3x95 1x70 1x16 sq.mm., 33 kv xlpe cable 3x300 sq.mm., 33 kv indoor or outdoor jointing kit size 3x300 sq.mm., 33 kv straight through size 3x300 sq.mm., g.i. wire 6 or 8 swg for guarding, three phase distribution box, fixing of l.t. fuse set protection box with all respective accessories as per norms, l.t. tail less unit with all respective material as grouted angel with fabrication work etc., laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr weasel conductor or insulated conductor as provided by department, laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x120 1x95 1x16 sq.mm., laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x50 1x35 1x16 sq.mm, laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x95 1x70 1x16 sq.mm., mounting of three phase distribution box with clamp nut & bolts and make proper connection with connecting cable., erection of double pole structure 8.5 mtr pcc pole by digging of pits fitting of all relevant accessories as per respo norms. 34 nos pole at different location under concern division., erection of single pole structure 8.5 mtrs pcc pole by digging of pits fitting of all relevant accessories as per respo norms. at different location under concern division., erection of tri pole structure 33 kv 13 mtr st pole by digging of pits fitting of all relevant accessories as per respo norms. 3 nos pole at different location under concern division., grouting of pcc or stp pole long as per respo norms with material cement, sand, blast stone with the ratio 0.268 cu.m. each will be provided by conractor, grouting of stay as per respo norms cement, sand, blast stone material will be provided by conractor, earthing of pole by m s earthing rod 20 x2540 mm with 6 swg earthing wire etc and make proper connection., guarding of 11 kv line with gaurding angel, clamp eye bolts and gaurding g.i. wire 6 or 8 swg 30 span, fencing of distribution transformers with enamel in proper alignment as per respo manual and as per direction of executive engineer including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work., plinth for 250 kva transformer proper size as per resspo norms, installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 25 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 63 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 100 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 250 kva with l.t. xlpe cable suitable size with all respective material as per norms., laying of following cable by hdd method with hdpe pipe (140 mm.) including digging and restoring along with brick and sand including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work. 33 kv xlpe cable 3x300 sq.mm., installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms., dismentlling of jarjar g.i. wire and weasel conducter including with rolling received back and safe carriage from pit site to esc, mainpuri, received back of distribution transformer after increasing capacity from pit site to esc, mainpuri ( 17 nos 100 kva), bidders should first download and review all available tender documents. These documents generally include the Notice Inviting Tender (NIT), Bill of Quantities (BOQ), technical specifications, eligibility criteria, scope of work, and bid submission instructions.


Tender Governemnt Authorities like Uttar pradesh power corporation limited UPPCL usually publish these documents on their official eProcurement portals, departmental tender portals, the GeM Tender Portal, or other government procurement platforms or on newspapre. Finding and accessing the correct tender documents across multiple portals can sometimes be time-consuming for bidders. 


To make the process easier, Tender18 provides quick access to the available tender documents related to this Mainpuri , Uttar pradesh tender on a single page. Businesses involved in distribution transformers,distribution transformer,transformer installation,acsr weasel conductor,insulated conductor,chemical earthing,polymer insulator,distribution box,fabrication work,conductor laying,copper fuse wire,suspension clamp,kva transformer,protection box,disc insulator,pin insulator,earthing wire,earthing rod,copper fuse,xlpe cable,clamp bolt,fuse wire,hdpe pipe,end clamp,nut bolts,stay wire,stay rod,ab cable,pcc pole,ms angle,bolt nut,gi wire,bolts related products, services, or works can conveniently download the relevant documents and review the tender requirements without spending time searching across different procurement portals.

The tender for 9gi stay rod 20x1800 mm etc material from esc mnp , carriage of distribution transformer 25 kva from esc mnp , carriage of distribution transformer 63 kva from esc mnp , carriage of distribution transformer 100 kva from esc mnp , carriage of distribution transformer 250 kva from esc mnp , carriage of acsr weasel conductor from esc mnp , carriage of m s earthing rod 20 x2540 mm from esc mnp , carriage of lt al. xlpe cable size 1x240 sq.mm. from esc mnp , carriage of lt xlpe cable 1x120 sq.mm. for dtr from esc mnp , carriage of lt xlpe cable 1x400 sq.mm. for dtr from esc mnp , carriage of lt xlpe cable size 3.5x70 or 35 sq.mm. from esc mnp , carriage of lt ab cable 3x120 1x95 1x16 sq.mm. from esc mnp , carriage of lt ab cable 3x50 1x35 1x16 sq.mm. from esc mnp , carriage of lt ab cable 3x95 1x70 1x16 sq.mm. from esc mnp , carriage of 33 kv xlpe cable 3x300 sq.mm. from esc mnp , carriage of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. from esc mnp , carriage of 33 kv straight through size 3x300 sq.mm. from esc mnp , carriage of g.i. wire 6 or 8 swg for guarding from esc mnp , carriage of three phase distribution box from esc mnp , erection of fixing of lt fuse set protection box with all respective accessories as per norms , execution of chemical earthing with g.i. patti clamp nut and bolts as per norms , erection of l.t. tail less unit with all respective material as grouted angel with fabrication work etc. , laying of acsr weasel conductor , laying of lt ab cable 3x120 1x95 1x16 sq.mm. , laying of lt ab cable 3x50 1x35 1x16 sq.mm. , laying of lt ab cable 3x95 1x70 1x16 sq.mm. , mounting of three phase distribution box , erection of double pole structure 8.5 mtr pcc pole , erection of single pole structure 8.5 mtrs pcc pole , erection of tri pole structure 33 kv 13 mtr st pole , grouting of pcc or stp pole , grouting of stay , earthing of pole , guarding of 11 kv line , fencing of 250 kva distribution transformers , plinth for 250 kva transformer , installation of 11by0.4 kv tf 25 kva , installation of 11by0.4 kv tf 63 kva , installation of 11by0.4 kv tf 100 kva , installation of 11by0.4 kv tf 250 kva , laying of 33 kv xlpe cable 3x300 sq.mm. , installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms. , dismentlling, received back and safe carriage of jarjar g.i. wire and weasel conducter including with rolling from pit site to esc, mainpuri , received back of distribution transformer after, boqbp2627, clamp for 11 kv v type cross arm with bolts and nuts, three phase distribution box clamp with nut and bolts, connecting cable for distribution box 1x35 sq.mm., l.t. fuse set protection box with all accessories, tinned copper fuse wire different size, hdpe pipe 140 mm., stone pad 300x300x75, holding clamp for doulble pole unit with nut and bolts, ms angle 75x75x6x2028mm with clamp and bolt and nut t or f base, t off chhanel and t off clamp with nut and bolts, top chhanel 125x65x240, dropper channel 100x50x2028 mm., danger board with clamp and nut and bolt, chemical earthing with g.i. patti clamp nut and bolts as per norms, l.t. tail less unit with all respective material angel, patti and other material, copper l pieace 62x225x12mm., 11 kv f clamp with nut and bolts, suspension clamp, dead end clamp, eye i hook, eye bolts for guarding, j hook, lt clamp for pcc or stp with bolts and nuts, pearcing connector, alluminium lug 120 sq.mm., alluminium lug 240 sq.mm., alluminium lug 400 sq.mm., nut bolts and washers off size, guarding angel, guarding angel clamp, m.s. angel iron 65x65x6 mm. 2700 mm long bracing with 4 nos clamp with nut and bolts, 13 m stp pole sp55 galvanised, 8.5 m pcc pole, v type cross arm for 11 kv, 11 kv pin insulator with pin, disc insulator with fitting t and c 45 kn 114 nos and 70kn 27 nos, 11 kv fuse set, 11 kv tpmo with polymer insulator, complete stay 9gi stay rod 20x1800 mm stay wire 7 and 8 swg 10 kg stay clamp bolt nut and washer, distribution transformer 25 kva, distribution transformer 63 kva, distribution transformer 100 kva, distribution transformer 250 kva, acsr weasel conductor or insulated conductor as provided by department, m s earthing rod 20 x2540 mm, lt al. xlpe cable size 1x240 sq.mm., lt xlpe cable 1x120 sq.mm. for dtr, lt xlpe cable 1x400 sq.mm. for dtr, lt xlpe cable size 3.5x70 or 35 sq.mm., lt ab cable 3x120 1x95 1x16 sq.mm., lt ab cable 3x50 1x35 1x16 sq.mm., lt ab cable 3x95 1x70 1x16 sq.mm., 33 kv xlpe cable 3x300 sq.mm., 33 kv indoor or outdoor jointing kit size 3x300 sq.mm., 33 kv straight through size 3x300 sq.mm., g.i. wire 6 or 8 swg for guarding, three phase distribution box, fixing of l.t. fuse set protection box with all respective accessories as per norms, l.t. tail less unit with all respective material as grouted angel with fabrication work etc., laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr weasel conductor or insulated conductor as provided by department, laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x120 1x95 1x16 sq.mm., laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x50 1x35 1x16 sq.mm, laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x95 1x70 1x16 sq.mm., mounting of three phase distribution box with clamp nut & bolts and make proper connection with connecting cable., erection of double pole structure 8.5 mtr pcc pole by digging of pits fitting of all relevant accessories as per respo norms. 34 nos pole at different location under concern division., erection of single pole structure 8.5 mtrs pcc pole by digging of pits fitting of all relevant accessories as per respo norms. at different location under concern division., erection of tri pole structure 33 kv 13 mtr st pole by digging of pits fitting of all relevant accessories as per respo norms. 3 nos pole at different location under concern division., grouting of pcc or stp pole long as per respo norms with material cement, sand, blast stone with the ratio 0.268 cu.m. each will be provided by conractor, grouting of stay as per respo norms cement, sand, blast stone material will be provided by conractor, earthing of pole by m s earthing rod 20 x2540 mm with 6 swg earthing wire etc and make proper connection., guarding of 11 kv line with gaurding angel, clamp eye bolts and gaurding g.i. wire 6 or 8 swg 30 span, fencing of distribution transformers with enamel in proper alignment as per respo manual and as per direction of executive engineer including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work., plinth for 250 kva transformer proper size as per resspo norms, installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 25 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 63 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 100 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 250 kva with l.t. xlpe cable suitable size with all respective material as per norms., laying of following cable by hdd method with hdpe pipe (140 mm.) including digging and restoring along with brick and sand including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work. 33 kv xlpe cable 3x300 sq.mm., installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms., dismentlling of jarjar g.i. wire and weasel conducter including with rolling received back and safe carriage from pit site to esc, mainpuri, received back of distribution transformer after increasing capacity from pit site to esc, mainpuri ( 17 nos 100 kva) from Mainpuri, Uttar pradesh may be relevant for contractors, suppliers, vendors, manufacturers, consultants, service providers, startups, MSMEs, and other organizations involved in distribution transformers,distribution transformer,transformer installation,acsr weasel conductor,insulated conductor,chemical earthing,polymer insulator,distribution box,fabrication work,conductor laying,copper fuse wire,suspension clamp,kva transformer,protection box,disc insulator,pin insulator,earthing wire,earthing rod,copper fuse,xlpe cable,clamp bolt,fuse wire,hdpe pipe,end clamp,nut bolts,stay wire,stay rod,ab cable,pcc pole,ms angle,bolt nut,gi wire,bolts related products, services, or works. However, eligibility to participate depends on the qualification criteria specified by Uttar pradesh power corporation limited UPPCL in the official tender documents.

Before submitting a bid, interested applicants should carefully review the eligibility conditions, technical requirements, financial criteria, work experience requirements, annual turnover conditions, registrations, certifications, and any other supporting documents required by the tendering authority. The detailed qualification requirements and bidder eligibility criteria are available in the tender notice and related documents provided on this page. 

Ensuring compliance with all eligibility and qualification requirements before bid submission can help bidders avoid disqualification and improve their chances of successful participation in the tender process.

Tende18 provides comprehensive tender bidding services, including a complete tender summary along with a detailed analysis of the Tender Qualification and Eligibility Criteria.

Interested in participating in the tender for 9gi stay rod 20x1800 mm etc material from esc mnp , carriage of distribution transformer 25 kva from esc mnp , carriage of distribution transformer 63 kva from esc mnp , carriage of distribution transformer 100 kva from esc mnp , carriage of distribution transformer 250 kva from esc mnp , carriage of acsr weasel conductor from esc mnp , carriage of m s earthing rod 20 x2540 mm from esc mnp , carriage of lt al. xlpe cable size 1x240 sq.mm. from esc mnp , carriage of lt xlpe cable 1x120 sq.mm. for dtr from esc mnp , carriage of lt xlpe cable 1x400 sq.mm. for dtr from esc mnp , carriage of lt xlpe cable size 3.5x70 or 35 sq.mm. from esc mnp , carriage of lt ab cable 3x120 1x95 1x16 sq.mm. from esc mnp , carriage of lt ab cable 3x50 1x35 1x16 sq.mm. from esc mnp , carriage of lt ab cable 3x95 1x70 1x16 sq.mm. from esc mnp , carriage of 33 kv xlpe cable 3x300 sq.mm. from esc mnp , carriage of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. from esc mnp , carriage of 33 kv straight through size 3x300 sq.mm. from esc mnp , carriage of g.i. wire 6 or 8 swg for guarding from esc mnp , carriage of three phase distribution box from esc mnp , erection of fixing of lt fuse set protection box with all respective accessories as per norms , execution of chemical earthing with g.i. patti clamp nut and bolts as per norms , erection of l.t. tail less unit with all respective material as grouted angel with fabrication work etc. , laying of acsr weasel conductor , laying of lt ab cable 3x120 1x95 1x16 sq.mm. , laying of lt ab cable 3x50 1x35 1x16 sq.mm. , laying of lt ab cable 3x95 1x70 1x16 sq.mm. , mounting of three phase distribution box , erection of double pole structure 8.5 mtr pcc pole , erection of single pole structure 8.5 mtrs pcc pole , erection of tri pole structure 33 kv 13 mtr st pole , grouting of pcc or stp pole , grouting of stay , earthing of pole , guarding of 11 kv line , fencing of 250 kva distribution transformers , plinth for 250 kva transformer , installation of 11by0.4 kv tf 25 kva , installation of 11by0.4 kv tf 63 kva , installation of 11by0.4 kv tf 100 kva , installation of 11by0.4 kv tf 250 kva , laying of 33 kv xlpe cable 3x300 sq.mm. , installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms. , dismentlling, received back and safe carriage of jarjar g.i. wire and weasel conducter including with rolling from pit site to esc, mainpuri , received back of distribution transformer after, boqbp2627, clamp for 11 kv v type cross arm with bolts and nuts, three phase distribution box clamp with nut and bolts, connecting cable for distribution box 1x35 sq.mm., l.t. fuse set protection box with all accessories, tinned copper fuse wire different size, hdpe pipe 140 mm., stone pad 300x300x75, holding clamp for doulble pole unit with nut and bolts, ms angle 75x75x6x2028mm with clamp and bolt and nut t or f base, t off chhanel and t off clamp with nut and bolts, top chhanel 125x65x240, dropper channel 100x50x2028 mm., danger board with clamp and nut and bolt, chemical earthing with g.i. patti clamp nut and bolts as per norms, l.t. tail less unit with all respective material angel, patti and other material, copper l pieace 62x225x12mm., 11 kv f clamp with nut and bolts, suspension clamp, dead end clamp, eye i hook, eye bolts for guarding, j hook, lt clamp for pcc or stp with bolts and nuts, pearcing connector, alluminium lug 120 sq.mm., alluminium lug 240 sq.mm., alluminium lug 400 sq.mm., nut bolts and washers off size, guarding angel, guarding angel clamp, m.s. angel iron 65x65x6 mm. 2700 mm long bracing with 4 nos clamp with nut and bolts, 13 m stp pole sp55 galvanised, 8.5 m pcc pole, v type cross arm for 11 kv, 11 kv pin insulator with pin, disc insulator with fitting t and c 45 kn 114 nos and 70kn 27 nos, 11 kv fuse set, 11 kv tpmo with polymer insulator, complete stay 9gi stay rod 20x1800 mm stay wire 7 and 8 swg 10 kg stay clamp bolt nut and washer, distribution transformer 25 kva, distribution transformer 63 kva, distribution transformer 100 kva, distribution transformer 250 kva, acsr weasel conductor or insulated conductor as provided by department, m s earthing rod 20 x2540 mm, lt al. xlpe cable size 1x240 sq.mm., lt xlpe cable 1x120 sq.mm. for dtr, lt xlpe cable 1x400 sq.mm. for dtr, lt xlpe cable size 3.5x70 or 35 sq.mm., lt ab cable 3x120 1x95 1x16 sq.mm., lt ab cable 3x50 1x35 1x16 sq.mm., lt ab cable 3x95 1x70 1x16 sq.mm., 33 kv xlpe cable 3x300 sq.mm., 33 kv indoor or outdoor jointing kit size 3x300 sq.mm., 33 kv straight through size 3x300 sq.mm., g.i. wire 6 or 8 swg for guarding, three phase distribution box, fixing of l.t. fuse set protection box with all respective accessories as per norms, l.t. tail less unit with all respective material as grouted angel with fabrication work etc., laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr weasel conductor or insulated conductor as provided by department, laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x120 1x95 1x16 sq.mm., laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x50 1x35 1x16 sq.mm, laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x95 1x70 1x16 sq.mm., mounting of three phase distribution box with clamp nut & bolts and make proper connection with connecting cable., erection of double pole structure 8.5 mtr pcc pole by digging of pits fitting of all relevant accessories as per respo norms. 34 nos pole at different location under concern division., erection of single pole structure 8.5 mtrs pcc pole by digging of pits fitting of all relevant accessories as per respo norms. at different location under concern division., erection of tri pole structure 33 kv 13 mtr st pole by digging of pits fitting of all relevant accessories as per respo norms. 3 nos pole at different location under concern division., grouting of pcc or stp pole long as per respo norms with material cement, sand, blast stone with the ratio 0.268 cu.m. each will be provided by conractor, grouting of stay as per respo norms cement, sand, blast stone material will be provided by conractor, earthing of pole by m s earthing rod 20 x2540 mm with 6 swg earthing wire etc and make proper connection., guarding of 11 kv line with gaurding angel, clamp eye bolts and gaurding g.i. wire 6 or 8 swg 30 span, fencing of distribution transformers with enamel in proper alignment as per respo manual and as per direction of executive engineer including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work., plinth for 250 kva transformer proper size as per resspo norms, installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 25 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 63 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 100 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 250 kva with l.t. xlpe cable suitable size with all respective material as per norms., laying of following cable by hdd method with hdpe pipe (140 mm.) including digging and restoring along with brick and sand including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work. 33 kv xlpe cable 3x300 sq.mm., installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms., dismentlling of jarjar g.i. wire and weasel conducter including with rolling received back and safe carriage from pit site to esc, mainpuri, received back of distribution transformer after increasing capacity from pit site to esc, mainpuri ( 17 nos 100 kva) issued by Uttar pradesh power corporation limited UPPCL for distribution transformers,distribution transformer,transformer installation,acsr weasel conductor,insulated conductor,chemical earthing,polymer insulator,distribution box,fabrication work,conductor laying,copper fuse wire,suspension clamp,kva transformer,protection box,disc insulator,pin insulator,earthing wire,earthing rod,copper fuse,xlpe cable,clamp bolt,fuse wire,hdpe pipe,end clamp,nut bolts,stay wire,stay rod,ab cable,pcc pole,ms angle,bolt nut,gi wire,bolts related work in Mainpuri, Uttar pradesh? TENDER18 provides complete assistance to help businesses understand tender requirements, access tender documents, review eligibility criteria, qualification requirements, important dates, and bid submission guidelines associated with this tender.

Our Tender18 Expert Technical team can assist with vendor and GeM registration on the relevant departmental, eProcurement, GeM, or government tender portal, preparation of technical and financial bid documents, compliance with qualification criteria, document verification, and complete online tender submission support. Whether you are a contractor, supplier, manufacturer, consultant, startup, or MSME working in the field of distribution transformers,distribution transformer,transformer installation,acsr weasel conductor,insulated conductor,chemical earthing,polymer insulator,distribution box,fabrication work,conductor laying,copper fuse wire,suspension clamp,kva transformer,protection box,disc insulator,pin insulator,earthing wire,earthing rod,copper fuse,xlpe cable,clamp bolt,fuse wire,hdpe pipe,end clamp,nut bolts,stay wire,stay rod,ab cable,pcc pole,ms angle,bolt nut,gi wire,bolts, Tender18 can help simplify the tender participation process and support you throughout every stage of bidding for this tender. so that tender18 is one the top leading tender consultant in Inda.

1.

Whom should I contact if I have further queries about the Tender scope?

You can fill out the integrated inquiry form below on this detail page to share your company profile. Our consultancy desk will review your query regarding distribution transformers,distribution transformer,transformer installation,acsr weasel conductor,insulated conductor,chemical earthing,polymer insulator,distribution box,fabrication work,conductor laying,copper fuse wire,suspension clamp,kva transformer,protection box,disc insulator,pin insulator,earthing wire,earthing rod,copper fuse,xlpe cable,clamp bolt,fuse wire,hdpe pipe,end clamp,nut bolts,stay wire,stay rod,ab cable,pcc pole,ms angle,bolt nut,gi wire,bolts parameters and guide you on how to coordinate efficiently with the procurement team of Uttar pradesh power corporation limited UPPCL

2.

How can Tender18 assist my business in winning this government contract?

Tender18 provides end-to-end professional bidding support and documentation advisory for tender for 9gi stay rod 20x1800 mm etc material from esc mnp , carriage of distribution transformer 25 kva from esc mnp , carriage of distribution transformer 63 kva from esc mnp , carriage of distribution transformer 100 kva from esc mnp , carriage of distribution transformer 250 kva from esc mnp , carriage of acsr weasel conductor from esc mnp , carriage of m s earthing rod 20 x2540 mm from esc mnp , carriage of lt al. xlpe cable size 1x240 sq.mm. from esc mnp , carriage of lt xlpe cable 1x120 sq.mm. for dtr from esc mnp , carriage of lt xlpe cable 1x400 sq.mm. for dtr from esc mnp , carriage of lt xlpe cable size 3.5x70 or 35 sq.mm. from esc mnp , carriage of lt ab cable 3x120 1x95 1x16 sq.mm. from esc mnp , carriage of lt ab cable 3x50 1x35 1x16 sq.mm. from esc mnp , carriage of lt ab cable 3x95 1x70 1x16 sq.mm. from esc mnp , carriage of 33 kv xlpe cable 3x300 sq.mm. from esc mnp , carriage of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. from esc mnp , carriage of 33 kv straight through size 3x300 sq.mm. from esc mnp , carriage of g.i. wire 6 or 8 swg for guarding from esc mnp , carriage of three phase distribution box from esc mnp , erection of fixing of lt fuse set protection box with all respective accessories as per norms , execution of chemical earthing with g.i. patti clamp nut and bolts as per norms , erection of l.t. tail less unit with all respective material as grouted angel with fabrication work etc. , laying of acsr weasel conductor , laying of lt ab cable 3x120 1x95 1x16 sq.mm. , laying of lt ab cable 3x50 1x35 1x16 sq.mm. , laying of lt ab cable 3x95 1x70 1x16 sq.mm. , mounting of three phase distribution box , erection of double pole structure 8.5 mtr pcc pole , erection of single pole structure 8.5 mtrs pcc pole , erection of tri pole structure 33 kv 13 mtr st pole , grouting of pcc or stp pole , grouting of stay , earthing of pole , guarding of 11 kv line , fencing of 250 kva distribution transformers , plinth for 250 kva transformer , installation of 11by0.4 kv tf 25 kva , installation of 11by0.4 kv tf 63 kva , installation of 11by0.4 kv tf 100 kva , installation of 11by0.4 kv tf 250 kva , laying of 33 kv xlpe cable 3x300 sq.mm. , installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms. , dismentlling, received back and safe carriage of jarjar g.i. wire and weasel conducter including with rolling from pit site to esc, mainpuri , received back of distribution transformer after, boqbp2627, clamp for 11 kv v type cross arm with bolts and nuts, three phase distribution box clamp with nut and bolts, connecting cable for distribution box 1x35 sq.mm., l.t. fuse set protection box with all accessories, tinned copper fuse wire different size, hdpe pipe 140 mm., stone pad 300x300x75, holding clamp for doulble pole unit with nut and bolts, ms angle 75x75x6x2028mm with clamp and bolt and nut t or f base, t off chhanel and t off clamp with nut and bolts, top chhanel 125x65x240, dropper channel 100x50x2028 mm., danger board with clamp and nut and bolt, chemical earthing with g.i. patti clamp nut and bolts as per norms, l.t. tail less unit with all respective material angel, patti and other material, copper l pieace 62x225x12mm., 11 kv f clamp with nut and bolts, suspension clamp, dead end clamp, eye i hook, eye bolts for guarding, j hook, lt clamp for pcc or stp with bolts and nuts, pearcing connector, alluminium lug 120 sq.mm., alluminium lug 240 sq.mm., alluminium lug 400 sq.mm., nut bolts and washers off size, guarding angel, guarding angel clamp, m.s. angel iron 65x65x6 mm. 2700 mm long bracing with 4 nos clamp with nut and bolts, 13 m stp pole sp55 galvanised, 8.5 m pcc pole, v type cross arm for 11 kv, 11 kv pin insulator with pin, disc insulator with fitting t and c 45 kn 114 nos and 70kn 27 nos, 11 kv fuse set, 11 kv tpmo with polymer insulator, complete stay 9gi stay rod 20x1800 mm stay wire 7 and 8 swg 10 kg stay clamp bolt nut and washer, distribution transformer 25 kva, distribution transformer 63 kva, distribution transformer 100 kva, distribution transformer 250 kva, acsr weasel conductor or insulated conductor as provided by department, m s earthing rod 20 x2540 mm, lt al. xlpe cable size 1x240 sq.mm., lt xlpe cable 1x120 sq.mm. for dtr, lt xlpe cable 1x400 sq.mm. for dtr, lt xlpe cable size 3.5x70 or 35 sq.mm., lt ab cable 3x120 1x95 1x16 sq.mm., lt ab cable 3x50 1x35 1x16 sq.mm., lt ab cable 3x95 1x70 1x16 sq.mm., 33 kv xlpe cable 3x300 sq.mm., 33 kv indoor or outdoor jointing kit size 3x300 sq.mm., 33 kv straight through size 3x300 sq.mm., g.i. wire 6 or 8 swg for guarding, three phase distribution box, fixing of l.t. fuse set protection box with all respective accessories as per norms, l.t. tail less unit with all respective material as grouted angel with fabrication work etc., laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr weasel conductor or insulated conductor as provided by department, laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x120 1x95 1x16 sq.mm., laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x50 1x35 1x16 sq.mm, laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x95 1x70 1x16 sq.mm., mounting of three phase distribution box with clamp nut & bolts and make proper connection with connecting cable., erection of double pole structure 8.5 mtr pcc pole by digging of pits fitting of all relevant accessories as per respo norms. 34 nos pole at different location under concern division., erection of single pole structure 8.5 mtrs pcc pole by digging of pits fitting of all relevant accessories as per respo norms. at different location under concern division., erection of tri pole structure 33 kv 13 mtr st pole by digging of pits fitting of all relevant accessories as per respo norms. 3 nos pole at different location under concern division., grouting of pcc or stp pole long as per respo norms with material cement, sand, blast stone with the ratio 0.268 cu.m. each will be provided by conractor, grouting of stay as per respo norms cement, sand, blast stone material will be provided by conractor, earthing of pole by m s earthing rod 20 x2540 mm with 6 swg earthing wire etc and make proper connection., guarding of 11 kv line with gaurding angel, clamp eye bolts and gaurding g.i. wire 6 or 8 swg 30 span, fencing of distribution transformers with enamel in proper alignment as per respo manual and as per direction of executive engineer including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work., plinth for 250 kva transformer proper size as per resspo norms, installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 25 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 63 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 100 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 250 kva with l.t. xlpe cable suitable size with all respective material as per norms., laying of following cable by hdd method with hdpe pipe (140 mm.) including digging and restoring along with brick and sand including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work. 33 kv xlpe cable 3x300 sq.mm., installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms., dismentlling of jarjar g.i. wire and weasel conducter including with rolling received back and safe carriage from pit site to esc, mainpuri, received back of distribution transformer after increasing capacity from pit site to esc, mainpuri ( 17 nos 100 kva) . Our senior analysts help you decode the complete project guidelines, manage accurate costing sheets, and complete error-free submissions on the official platform used by Uttar pradesh power corporation limited UPPCL.

3.

What are the main reasons for a technical tender rejection?

Most online bids face rejection during the initial evaluation round due to avoidable errors like uploading blurred document scans, submitting expired DSCs, or missing critical experience papers required for tender for 9gi stay rod 20x1800 mm etc material from esc mnp , carriage of distribution transformer 25 kva from esc mnp , carriage of distribution transformer 63 kva from esc mnp , carriage of distribution transformer 100 kva from esc mnp , carriage of distribution transformer 250 kva from esc mnp , carriage of acsr weasel conductor from esc mnp , carriage of m s earthing rod 20 x2540 mm from esc mnp , carriage of lt al. xlpe cable size 1x240 sq.mm. from esc mnp , carriage of lt xlpe cable 1x120 sq.mm. for dtr from esc mnp , carriage of lt xlpe cable 1x400 sq.mm. for dtr from esc mnp , carriage of lt xlpe cable size 3.5x70 or 35 sq.mm. from esc mnp , carriage of lt ab cable 3x120 1x95 1x16 sq.mm. from esc mnp , carriage of lt ab cable 3x50 1x35 1x16 sq.mm. from esc mnp , carriage of lt ab cable 3x95 1x70 1x16 sq.mm. from esc mnp , carriage of 33 kv xlpe cable 3x300 sq.mm. from esc mnp , carriage of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. from esc mnp , carriage of 33 kv straight through size 3x300 sq.mm. from esc mnp , carriage of g.i. wire 6 or 8 swg for guarding from esc mnp , carriage of three phase distribution box from esc mnp , erection of fixing of lt fuse set protection box with all respective accessories as per norms , execution of chemical earthing with g.i. patti clamp nut and bolts as per norms , erection of l.t. tail less unit with all respective material as grouted angel with fabrication work etc. , laying of acsr weasel conductor , laying of lt ab cable 3x120 1x95 1x16 sq.mm. , laying of lt ab cable 3x50 1x35 1x16 sq.mm. , laying of lt ab cable 3x95 1x70 1x16 sq.mm. , mounting of three phase distribution box , erection of double pole structure 8.5 mtr pcc pole , erection of single pole structure 8.5 mtrs pcc pole , erection of tri pole structure 33 kv 13 mtr st pole , grouting of pcc or stp pole , grouting of stay , earthing of pole , guarding of 11 kv line , fencing of 250 kva distribution transformers , plinth for 250 kva transformer , installation of 11by0.4 kv tf 25 kva , installation of 11by0.4 kv tf 63 kva , installation of 11by0.4 kv tf 100 kva , installation of 11by0.4 kv tf 250 kva , laying of 33 kv xlpe cable 3x300 sq.mm. , installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms. , dismentlling, received back and safe carriage of jarjar g.i. wire and weasel conducter including with rolling from pit site to esc, mainpuri , received back of distribution transformer after, boqbp2627, clamp for 11 kv v type cross arm with bolts and nuts, three phase distribution box clamp with nut and bolts, connecting cable for distribution box 1x35 sq.mm., l.t. fuse set protection box with all accessories, tinned copper fuse wire different size, hdpe pipe 140 mm., stone pad 300x300x75, holding clamp for doulble pole unit with nut and bolts, ms angle 75x75x6x2028mm with clamp and bolt and nut t or f base, t off chhanel and t off clamp with nut and bolts, top chhanel 125x65x240, dropper channel 100x50x2028 mm., danger board with clamp and nut and bolt, chemical earthing with g.i. patti clamp nut and bolts as per norms, l.t. tail less unit with all respective material angel, patti and other material, copper l pieace 62x225x12mm., 11 kv f clamp with nut and bolts, suspension clamp, dead end clamp, eye i hook, eye bolts for guarding, j hook, lt clamp for pcc or stp with bolts and nuts, pearcing connector, alluminium lug 120 sq.mm., alluminium lug 240 sq.mm., alluminium lug 400 sq.mm., nut bolts and washers off size, guarding angel, guarding angel clamp, m.s. angel iron 65x65x6 mm. 2700 mm long bracing with 4 nos clamp with nut and bolts, 13 m stp pole sp55 galvanised, 8.5 m pcc pole, v type cross arm for 11 kv, 11 kv pin insulator with pin, disc insulator with fitting t and c 45 kn 114 nos and 70kn 27 nos, 11 kv fuse set, 11 kv tpmo with polymer insulator, complete stay 9gi stay rod 20x1800 mm stay wire 7 and 8 swg 10 kg stay clamp bolt nut and washer, distribution transformer 25 kva, distribution transformer 63 kva, distribution transformer 100 kva, distribution transformer 250 kva, acsr weasel conductor or insulated conductor as provided by department, m s earthing rod 20 x2540 mm, lt al. xlpe cable size 1x240 sq.mm., lt xlpe cable 1x120 sq.mm. for dtr, lt xlpe cable 1x400 sq.mm. for dtr, lt xlpe cable size 3.5x70 or 35 sq.mm., lt ab cable 3x120 1x95 1x16 sq.mm., lt ab cable 3x50 1x35 1x16 sq.mm., lt ab cable 3x95 1x70 1x16 sq.mm., 33 kv xlpe cable 3x300 sq.mm., 33 kv indoor or outdoor jointing kit size 3x300 sq.mm., 33 kv straight through size 3x300 sq.mm., g.i. wire 6 or 8 swg for guarding, three phase distribution box, fixing of l.t. fuse set protection box with all respective accessories as per norms, l.t. tail less unit with all respective material as grouted angel with fabrication work etc., laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr weasel conductor or insulated conductor as provided by department, laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x120 1x95 1x16 sq.mm., laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x50 1x35 1x16 sq.mm, laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x95 1x70 1x16 sq.mm., mounting of three phase distribution box with clamp nut & bolts and make proper connection with connecting cable., erection of double pole structure 8.5 mtr pcc pole by digging of pits fitting of all relevant accessories as per respo norms. 34 nos pole at different location under concern division., erection of single pole structure 8.5 mtrs pcc pole by digging of pits fitting of all relevant accessories as per respo norms. at different location under concern division., erection of tri pole structure 33 kv 13 mtr st pole by digging of pits fitting of all relevant accessories as per respo norms. 3 nos pole at different location under concern division., grouting of pcc or stp pole long as per respo norms with material cement, sand, blast stone with the ratio 0.268 cu.m. each will be provided by conractor, grouting of stay as per respo norms cement, sand, blast stone material will be provided by conractor, earthing of pole by m s earthing rod 20 x2540 mm with 6 swg earthing wire etc and make proper connection., guarding of 11 kv line with gaurding angel, clamp eye bolts and gaurding g.i. wire 6 or 8 swg 30 span, fencing of distribution transformers with enamel in proper alignment as per respo manual and as per direction of executive engineer including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work., plinth for 250 kva transformer proper size as per resspo norms, installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 25 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 63 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 100 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 250 kva with l.t. xlpe cable suitable size with all respective material as per norms., laying of following cable by hdd method with hdpe pipe (140 mm.) including digging and restoring along with brick and sand including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work. 33 kv xlpe cable 3x300 sq.mm., installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms., dismentlling of jarjar g.i. wire and weasel conducter including with rolling received back and safe carriage from pit site to esc, mainpuri, received back of distribution transformer after increasing capacity from pit site to esc, mainpuri ( 17 nos 100 kva) in Uttar pradesh.

4.

Can contractors located outside the local region participate in this bid?

Eligibility for outstation bidders depends entirely on the terms set inside the document for tender for 9gi stay rod 20x1800 mm etc material from esc mnp , carriage of distribution transformer 25 kva from esc mnp , carriage of distribution transformer 63 kva from esc mnp , carriage of distribution transformer 100 kva from esc mnp , carriage of distribution transformer 250 kva from esc mnp , carriage of acsr weasel conductor from esc mnp , carriage of m s earthing rod 20 x2540 mm from esc mnp , carriage of lt al. xlpe cable size 1x240 sq.mm. from esc mnp , carriage of lt xlpe cable 1x120 sq.mm. for dtr from esc mnp , carriage of lt xlpe cable 1x400 sq.mm. for dtr from esc mnp , carriage of lt xlpe cable size 3.5x70 or 35 sq.mm. from esc mnp , carriage of lt ab cable 3x120 1x95 1x16 sq.mm. from esc mnp , carriage of lt ab cable 3x50 1x35 1x16 sq.mm. from esc mnp , carriage of lt ab cable 3x95 1x70 1x16 sq.mm. from esc mnp , carriage of 33 kv xlpe cable 3x300 sq.mm. from esc mnp , carriage of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. from esc mnp , carriage of 33 kv straight through size 3x300 sq.mm. from esc mnp , carriage of g.i. wire 6 or 8 swg for guarding from esc mnp , carriage of three phase distribution box from esc mnp , erection of fixing of lt fuse set protection box with all respective accessories as per norms , execution of chemical earthing with g.i. patti clamp nut and bolts as per norms , erection of l.t. tail less unit with all respective material as grouted angel with fabrication work etc. , laying of acsr weasel conductor , laying of lt ab cable 3x120 1x95 1x16 sq.mm. , laying of lt ab cable 3x50 1x35 1x16 sq.mm. , laying of lt ab cable 3x95 1x70 1x16 sq.mm. , mounting of three phase distribution box , erection of double pole structure 8.5 mtr pcc pole , erection of single pole structure 8.5 mtrs pcc pole , erection of tri pole structure 33 kv 13 mtr st pole , grouting of pcc or stp pole , grouting of stay , earthing of pole , guarding of 11 kv line , fencing of 250 kva distribution transformers , plinth for 250 kva transformer , installation of 11by0.4 kv tf 25 kva , installation of 11by0.4 kv tf 63 kva , installation of 11by0.4 kv tf 100 kva , installation of 11by0.4 kv tf 250 kva , laying of 33 kv xlpe cable 3x300 sq.mm. , installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms. , dismentlling, received back and safe carriage of jarjar g.i. wire and weasel conducter including with rolling from pit site to esc, mainpuri , received back of distribution transformer after, boqbp2627, clamp for 11 kv v type cross arm with bolts and nuts, three phase distribution box clamp with nut and bolts, connecting cable for distribution box 1x35 sq.mm., l.t. fuse set protection box with all accessories, tinned copper fuse wire different size, hdpe pipe 140 mm., stone pad 300x300x75, holding clamp for doulble pole unit with nut and bolts, ms angle 75x75x6x2028mm with clamp and bolt and nut t or f base, t off chhanel and t off clamp with nut and bolts, top chhanel 125x65x240, dropper channel 100x50x2028 mm., danger board with clamp and nut and bolt, chemical earthing with g.i. patti clamp nut and bolts as per norms, l.t. tail less unit with all respective material angel, patti and other material, copper l pieace 62x225x12mm., 11 kv f clamp with nut and bolts, suspension clamp, dead end clamp, eye i hook, eye bolts for guarding, j hook, lt clamp for pcc or stp with bolts and nuts, pearcing connector, alluminium lug 120 sq.mm., alluminium lug 240 sq.mm., alluminium lug 400 sq.mm., nut bolts and washers off size, guarding angel, guarding angel clamp, m.s. angel iron 65x65x6 mm. 2700 mm long bracing with 4 nos clamp with nut and bolts, 13 m stp pole sp55 galvanised, 8.5 m pcc pole, v type cross arm for 11 kv, 11 kv pin insulator with pin, disc insulator with fitting t and c 45 kn 114 nos and 70kn 27 nos, 11 kv fuse set, 11 kv tpmo with polymer insulator, complete stay 9gi stay rod 20x1800 mm stay wire 7 and 8 swg 10 kg stay clamp bolt nut and washer, distribution transformer 25 kva, distribution transformer 63 kva, distribution transformer 100 kva, distribution transformer 250 kva, acsr weasel conductor or insulated conductor as provided by department, m s earthing rod 20 x2540 mm, lt al. xlpe cable size 1x240 sq.mm., lt xlpe cable 1x120 sq.mm. for dtr, lt xlpe cable 1x400 sq.mm. for dtr, lt xlpe cable size 3.5x70 or 35 sq.mm., lt ab cable 3x120 1x95 1x16 sq.mm., lt ab cable 3x50 1x35 1x16 sq.mm., lt ab cable 3x95 1x70 1x16 sq.mm., 33 kv xlpe cable 3x300 sq.mm., 33 kv indoor or outdoor jointing kit size 3x300 sq.mm., 33 kv straight through size 3x300 sq.mm., g.i. wire 6 or 8 swg for guarding, three phase distribution box, fixing of l.t. fuse set protection box with all respective accessories as per norms, l.t. tail less unit with all respective material as grouted angel with fabrication work etc., laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr weasel conductor or insulated conductor as provided by department, laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x120 1x95 1x16 sq.mm., laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x50 1x35 1x16 sq.mm, laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x95 1x70 1x16 sq.mm., mounting of three phase distribution box with clamp nut & bolts and make proper connection with connecting cable., erection of double pole structure 8.5 mtr pcc pole by digging of pits fitting of all relevant accessories as per respo norms. 34 nos pole at different location under concern division., erection of single pole structure 8.5 mtrs pcc pole by digging of pits fitting of all relevant accessories as per respo norms. at different location under concern division., erection of tri pole structure 33 kv 13 mtr st pole by digging of pits fitting of all relevant accessories as per respo norms. 3 nos pole at different location under concern division., grouting of pcc or stp pole long as per respo norms with material cement, sand, blast stone with the ratio 0.268 cu.m. each will be provided by conractor, grouting of stay as per respo norms cement, sand, blast stone material will be provided by conractor, earthing of pole by m s earthing rod 20 x2540 mm with 6 swg earthing wire etc and make proper connection., guarding of 11 kv line with gaurding angel, clamp eye bolts and gaurding g.i. wire 6 or 8 swg 30 span, fencing of distribution transformers with enamel in proper alignment as per respo manual and as per direction of executive engineer including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work., plinth for 250 kva transformer proper size as per resspo norms, installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 25 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 63 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 100 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 250 kva with l.t. xlpe cable suitable size with all respective material as per norms., laying of following cable by hdd method with hdpe pipe (140 mm.) including digging and restoring along with brick and sand including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work. 33 kv xlpe cable 3x300 sq.mm., installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms., dismentlling of jarjar g.i. wire and weasel conducter including with rolling received back and safe carriage from pit site to esc, mainpuri, received back of distribution transformer after increasing capacity from pit site to esc, mainpuri ( 17 nos 100 kva). While many public sector projects allow national competitive bidding, certain localized works require local offices or specific registration metrics in Mainpuri.

5.

Do I need an active GeM Portal registration to apply for this work?

If this procurement is routed through the central marketplace, an active GeM Seller ID is mandatory to supply distribution transformers,distribution transformer,transformer installation,acsr weasel conductor,insulated conductor,chemical earthing,polymer insulator,distribution box,fabrication work,conductor laying,copper fuse wire,suspension clamp,kva transformer,protection box,disc insulator,pin insulator,earthing wire,earthing rod,copper fuse,xlpe cable,clamp bolt,fuse wire,hdpe pipe,end clamp,nut bolts,stay wire,stay rod,ab cable,pcc pole,ms angle,bolt nut,gi wire,bolts items. Tender18 offers complete assistance for brand cataloging, profile creation, and vendor assessment required officially by Uttar pradesh power corporation limited UPPCL

6.

What are the primary legal documents required to submit a valid bid?

To register an eligible bid for these distribution transformers,distribution transformer,transformer installation,acsr weasel conductor,insulated conductor,chemical earthing,polymer insulator,distribution box,fabrication work,conductor laying,copper fuse wire,suspension clamp,kva transformer,protection box,disc insulator,pin insulator,earthing wire,earthing rod,copper fuse,xlpe cable,clamp bolt,fuse wire,hdpe pipe,end clamp,nut bolts,stay wire,stay rod,ab cable,pcc pole,ms angle,bolt nut,gi wire,bolts contracts, companies must prepare their core compliance documents. Vendors operating across Uttar pradesh must ensure they possess a valid GST registration, permanent account number (PAN), and active Class-3 Digital Signature Certificates.

7.

What products or services are required for this active work?

This public procurement cycle is specifically looking for qualified vendors and suppliers who can provide high-quality distribution transformers,distribution transformer,transformer installation,acsr weasel conductor,insulated conductor,chemical earthing,polymer insulator,distribution box,fabrication work,conductor laying,copper fuse wire,suspension clamp,kva transformer,protection box,disc insulator,pin insulator,earthing wire,earthing rod,copper fuse,xlpe cable,clamp bolt,fuse wire,hdpe pipe,end clamp,nut bolts,stay wire,stay rod,ab cable,pcc pole,ms angle,bolt nut,gi wire,bolts solutions. The operational execution, delivery, and deployment of these materials must be managed locally within the Mainpuri region.

8.

Where can I review the estimated cost or budget details for this Tender?

The estimated project cost and budget thresholds can be reviewed directly inside the tender document. Bidders can analyze these qualification files to check if their firm meets the financial capability criteria specified for tender for 9gi stay rod 20x1800 mm etc material from esc mnp , carriage of distribution transformer 25 kva from esc mnp , carriage of distribution transformer 63 kva from esc mnp , carriage of distribution transformer 100 kva from esc mnp , carriage of distribution transformer 250 kva from esc mnp , carriage of acsr weasel conductor from esc mnp , carriage of m s earthing rod 20 x2540 mm from esc mnp , carriage of lt al. xlpe cable size 1x240 sq.mm. from esc mnp , carriage of lt xlpe cable 1x120 sq.mm. for dtr from esc mnp , carriage of lt xlpe cable 1x400 sq.mm. for dtr from esc mnp , carriage of lt xlpe cable size 3.5x70 or 35 sq.mm. from esc mnp , carriage of lt ab cable 3x120 1x95 1x16 sq.mm. from esc mnp , carriage of lt ab cable 3x50 1x35 1x16 sq.mm. from esc mnp , carriage of lt ab cable 3x95 1x70 1x16 sq.mm. from esc mnp , carriage of 33 kv xlpe cable 3x300 sq.mm. from esc mnp , carriage of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. from esc mnp , carriage of 33 kv straight through size 3x300 sq.mm. from esc mnp , carriage of g.i. wire 6 or 8 swg for guarding from esc mnp , carriage of three phase distribution box from esc mnp , erection of fixing of lt fuse set protection box with all respective accessories as per norms , execution of chemical earthing with g.i. patti clamp nut and bolts as per norms , erection of l.t. tail less unit with all respective material as grouted angel with fabrication work etc. , laying of acsr weasel conductor , laying of lt ab cable 3x120 1x95 1x16 sq.mm. , laying of lt ab cable 3x50 1x35 1x16 sq.mm. , laying of lt ab cable 3x95 1x70 1x16 sq.mm. , mounting of three phase distribution box , erection of double pole structure 8.5 mtr pcc pole , erection of single pole structure 8.5 mtrs pcc pole , erection of tri pole structure 33 kv 13 mtr st pole , grouting of pcc or stp pole , grouting of stay , earthing of pole , guarding of 11 kv line , fencing of 250 kva distribution transformers , plinth for 250 kva transformer , installation of 11by0.4 kv tf 25 kva , installation of 11by0.4 kv tf 63 kva , installation of 11by0.4 kv tf 100 kva , installation of 11by0.4 kv tf 250 kva , laying of 33 kv xlpe cable 3x300 sq.mm. , installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms. , dismentlling, received back and safe carriage of jarjar g.i. wire and weasel conducter including with rolling from pit site to esc, mainpuri , received back of distribution transformer after, boqbp2627, clamp for 11 kv v type cross arm with bolts and nuts, three phase distribution box clamp with nut and bolts, connecting cable for distribution box 1x35 sq.mm., l.t. fuse set protection box with all accessories, tinned copper fuse wire different size, hdpe pipe 140 mm., stone pad 300x300x75, holding clamp for doulble pole unit with nut and bolts, ms angle 75x75x6x2028mm with clamp and bolt and nut t or f base, t off chhanel and t off clamp with nut and bolts, top chhanel 125x65x240, dropper channel 100x50x2028 mm., danger board with clamp and nut and bolt, chemical earthing with g.i. patti clamp nut and bolts as per norms, l.t. tail less unit with all respective material angel, patti and other material, copper l pieace 62x225x12mm., 11 kv f clamp with nut and bolts, suspension clamp, dead end clamp, eye i hook, eye bolts for guarding, j hook, lt clamp for pcc or stp with bolts and nuts, pearcing connector, alluminium lug 120 sq.mm., alluminium lug 240 sq.mm., alluminium lug 400 sq.mm., nut bolts and washers off size, guarding angel, guarding angel clamp, m.s. angel iron 65x65x6 mm. 2700 mm long bracing with 4 nos clamp with nut and bolts, 13 m stp pole sp55 galvanised, 8.5 m pcc pole, v type cross arm for 11 kv, 11 kv pin insulator with pin, disc insulator with fitting t and c 45 kn 114 nos and 70kn 27 nos, 11 kv fuse set, 11 kv tpmo with polymer insulator, complete stay 9gi stay rod 20x1800 mm stay wire 7 and 8 swg 10 kg stay clamp bolt nut and washer, distribution transformer 25 kva, distribution transformer 63 kva, distribution transformer 100 kva, distribution transformer 250 kva, acsr weasel conductor or insulated conductor as provided by department, m s earthing rod 20 x2540 mm, lt al. xlpe cable size 1x240 sq.mm., lt xlpe cable 1x120 sq.mm. for dtr, lt xlpe cable 1x400 sq.mm. for dtr, lt xlpe cable size 3.5x70 or 35 sq.mm., lt ab cable 3x120 1x95 1x16 sq.mm., lt ab cable 3x50 1x35 1x16 sq.mm., lt ab cable 3x95 1x70 1x16 sq.mm., 33 kv xlpe cable 3x300 sq.mm., 33 kv indoor or outdoor jointing kit size 3x300 sq.mm., 33 kv straight through size 3x300 sq.mm., g.i. wire 6 or 8 swg for guarding, three phase distribution box, fixing of l.t. fuse set protection box with all respective accessories as per norms, l.t. tail less unit with all respective material as grouted angel with fabrication work etc., laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr weasel conductor or insulated conductor as provided by department, laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x120 1x95 1x16 sq.mm., laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x50 1x35 1x16 sq.mm, laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x95 1x70 1x16 sq.mm., mounting of three phase distribution box with clamp nut & bolts and make proper connection with connecting cable., erection of double pole structure 8.5 mtr pcc pole by digging of pits fitting of all relevant accessories as per respo norms. 34 nos pole at different location under concern division., erection of single pole structure 8.5 mtrs pcc pole by digging of pits fitting of all relevant accessories as per respo norms. at different location under concern division., erection of tri pole structure 33 kv 13 mtr st pole by digging of pits fitting of all relevant accessories as per respo norms. 3 nos pole at different location under concern division., grouting of pcc or stp pole long as per respo norms with material cement, sand, blast stone with the ratio 0.268 cu.m. each will be provided by conractor, grouting of stay as per respo norms cement, sand, blast stone material will be provided by conractor, earthing of pole by m s earthing rod 20 x2540 mm with 6 swg earthing wire etc and make proper connection., guarding of 11 kv line with gaurding angel, clamp eye bolts and gaurding g.i. wire 6 or 8 swg 30 span, fencing of distribution transformers with enamel in proper alignment as per respo manual and as per direction of executive engineer including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work., plinth for 250 kva transformer proper size as per resspo norms, installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 25 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 63 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 100 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 250 kva with l.t. xlpe cable suitable size with all respective material as per norms., laying of following cable by hdd method with hdpe pipe (140 mm.) including digging and restoring along with brick and sand including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work. 33 kv xlpe cable 3x300 sq.mm., installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms., dismentlling of jarjar g.i. wire and weasel conducter including with rolling received back and safe carriage from pit site to esc, mainpuri, received back of distribution transformer after increasing capacity from pit site to esc, mainpuri ( 17 nos 100 kva) by Uttar pradesh power corporation limited UPPCL

9.

How can I download the official BOQ file for this opportunity?

You can download the commercial Bill of Quantities (BOQ) spreadsheet directly using the secure link provided on this page. The BOQ file contains the item descriptions and rate filling forms officially validated for tender for 9gi stay rod 20x1800 mm etc material from esc mnp , carriage of distribution transformer 25 kva from esc mnp , carriage of distribution transformer 63 kva from esc mnp , carriage of distribution transformer 100 kva from esc mnp , carriage of distribution transformer 250 kva from esc mnp , carriage of acsr weasel conductor from esc mnp , carriage of m s earthing rod 20 x2540 mm from esc mnp , carriage of lt al. xlpe cable size 1x240 sq.mm. from esc mnp , carriage of lt xlpe cable 1x120 sq.mm. for dtr from esc mnp , carriage of lt xlpe cable 1x400 sq.mm. for dtr from esc mnp , carriage of lt xlpe cable size 3.5x70 or 35 sq.mm. from esc mnp , carriage of lt ab cable 3x120 1x95 1x16 sq.mm. from esc mnp , carriage of lt ab cable 3x50 1x35 1x16 sq.mm. from esc mnp , carriage of lt ab cable 3x95 1x70 1x16 sq.mm. from esc mnp , carriage of 33 kv xlpe cable 3x300 sq.mm. from esc mnp , carriage of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. from esc mnp , carriage of 33 kv straight through size 3x300 sq.mm. from esc mnp , carriage of g.i. wire 6 or 8 swg for guarding from esc mnp , carriage of three phase distribution box from esc mnp , erection of fixing of lt fuse set protection box with all respective accessories as per norms , execution of chemical earthing with g.i. patti clamp nut and bolts as per norms , erection of l.t. tail less unit with all respective material as grouted angel with fabrication work etc. , laying of acsr weasel conductor , laying of lt ab cable 3x120 1x95 1x16 sq.mm. , laying of lt ab cable 3x50 1x35 1x16 sq.mm. , laying of lt ab cable 3x95 1x70 1x16 sq.mm. , mounting of three phase distribution box , erection of double pole structure 8.5 mtr pcc pole , erection of single pole structure 8.5 mtrs pcc pole , erection of tri pole structure 33 kv 13 mtr st pole , grouting of pcc or stp pole , grouting of stay , earthing of pole , guarding of 11 kv line , fencing of 250 kva distribution transformers , plinth for 250 kva transformer , installation of 11by0.4 kv tf 25 kva , installation of 11by0.4 kv tf 63 kva , installation of 11by0.4 kv tf 100 kva , installation of 11by0.4 kv tf 250 kva , laying of 33 kv xlpe cable 3x300 sq.mm. , installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms. , dismentlling, received back and safe carriage of jarjar g.i. wire and weasel conducter including with rolling from pit site to esc, mainpuri , received back of distribution transformer after, boqbp2627, clamp for 11 kv v type cross arm with bolts and nuts, three phase distribution box clamp with nut and bolts, connecting cable for distribution box 1x35 sq.mm., l.t. fuse set protection box with all accessories, tinned copper fuse wire different size, hdpe pipe 140 mm., stone pad 300x300x75, holding clamp for doulble pole unit with nut and bolts, ms angle 75x75x6x2028mm with clamp and bolt and nut t or f base, t off chhanel and t off clamp with nut and bolts, top chhanel 125x65x240, dropper channel 100x50x2028 mm., danger board with clamp and nut and bolt, chemical earthing with g.i. patti clamp nut and bolts as per norms, l.t. tail less unit with all respective material angel, patti and other material, copper l pieace 62x225x12mm., 11 kv f clamp with nut and bolts, suspension clamp, dead end clamp, eye i hook, eye bolts for guarding, j hook, lt clamp for pcc or stp with bolts and nuts, pearcing connector, alluminium lug 120 sq.mm., alluminium lug 240 sq.mm., alluminium lug 400 sq.mm., nut bolts and washers off size, guarding angel, guarding angel clamp, m.s. angel iron 65x65x6 mm. 2700 mm long bracing with 4 nos clamp with nut and bolts, 13 m stp pole sp55 galvanised, 8.5 m pcc pole, v type cross arm for 11 kv, 11 kv pin insulator with pin, disc insulator with fitting t and c 45 kn 114 nos and 70kn 27 nos, 11 kv fuse set, 11 kv tpmo with polymer insulator, complete stay 9gi stay rod 20x1800 mm stay wire 7 and 8 swg 10 kg stay clamp bolt nut and washer, distribution transformer 25 kva, distribution transformer 63 kva, distribution transformer 100 kva, distribution transformer 250 kva, acsr weasel conductor or insulated conductor as provided by department, m s earthing rod 20 x2540 mm, lt al. xlpe cable size 1x240 sq.mm., lt xlpe cable 1x120 sq.mm. for dtr, lt xlpe cable 1x400 sq.mm. for dtr, lt xlpe cable size 3.5x70 or 35 sq.mm., lt ab cable 3x120 1x95 1x16 sq.mm., lt ab cable 3x50 1x35 1x16 sq.mm., lt ab cable 3x95 1x70 1x16 sq.mm., 33 kv xlpe cable 3x300 sq.mm., 33 kv indoor or outdoor jointing kit size 3x300 sq.mm., 33 kv straight through size 3x300 sq.mm., g.i. wire 6 or 8 swg for guarding, three phase distribution box, fixing of l.t. fuse set protection box with all respective accessories as per norms, l.t. tail less unit with all respective material as grouted angel with fabrication work etc., laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr weasel conductor or insulated conductor as provided by department, laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x120 1x95 1x16 sq.mm., laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x50 1x35 1x16 sq.mm, laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x95 1x70 1x16 sq.mm., mounting of three phase distribution box with clamp nut & bolts and make proper connection with connecting cable., erection of double pole structure 8.5 mtr pcc pole by digging of pits fitting of all relevant accessories as per respo norms. 34 nos pole at different location under concern division., erection of single pole structure 8.5 mtrs pcc pole by digging of pits fitting of all relevant accessories as per respo norms. at different location under concern division., erection of tri pole structure 33 kv 13 mtr st pole by digging of pits fitting of all relevant accessories as per respo norms. 3 nos pole at different location under concern division., grouting of pcc or stp pole long as per respo norms with material cement, sand, blast stone with the ratio 0.268 cu.m. each will be provided by conractor, grouting of stay as per respo norms cement, sand, blast stone material will be provided by conractor, earthing of pole by m s earthing rod 20 x2540 mm with 6 swg earthing wire etc and make proper connection., guarding of 11 kv line with gaurding angel, clamp eye bolts and gaurding g.i. wire 6 or 8 swg 30 span, fencing of distribution transformers with enamel in proper alignment as per respo manual and as per direction of executive engineer including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work., plinth for 250 kva transformer proper size as per resspo norms, installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 25 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 63 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 100 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 250 kva with l.t. xlpe cable suitable size with all respective material as per norms., laying of following cable by hdd method with hdpe pipe (140 mm.) including digging and restoring along with brick and sand including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work. 33 kv xlpe cable 3x300 sq.mm., installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms., dismentlling of jarjar g.i. wire and weasel conducter including with rolling received back and safe carriage from pit site to esc, mainpuri, received back of distribution transformer after increasing capacity from pit site to esc, mainpuri ( 17 nos 100 kva) within the Uttar pradesh jurisdiction

10.

How can I find the submission closing date for this contract?

The official timeline and deadline details for tender for 9gi stay rod 20x1800 mm etc material from esc mnp , carriage of distribution transformer 25 kva from esc mnp , carriage of distribution transformer 63 kva from esc mnp , carriage of distribution transformer 100 kva from esc mnp , carriage of distribution transformer 250 kva from esc mnp , carriage of acsr weasel conductor from esc mnp , carriage of m s earthing rod 20 x2540 mm from esc mnp , carriage of lt al. xlpe cable size 1x240 sq.mm. from esc mnp , carriage of lt xlpe cable 1x120 sq.mm. for dtr from esc mnp , carriage of lt xlpe cable 1x400 sq.mm. for dtr from esc mnp , carriage of lt xlpe cable size 3.5x70 or 35 sq.mm. from esc mnp , carriage of lt ab cable 3x120 1x95 1x16 sq.mm. from esc mnp , carriage of lt ab cable 3x50 1x35 1x16 sq.mm. from esc mnp , carriage of lt ab cable 3x95 1x70 1x16 sq.mm. from esc mnp , carriage of 33 kv xlpe cable 3x300 sq.mm. from esc mnp , carriage of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. from esc mnp , carriage of 33 kv straight through size 3x300 sq.mm. from esc mnp , carriage of g.i. wire 6 or 8 swg for guarding from esc mnp , carriage of three phase distribution box from esc mnp , erection of fixing of lt fuse set protection box with all respective accessories as per norms , execution of chemical earthing with g.i. patti clamp nut and bolts as per norms , erection of l.t. tail less unit with all respective material as grouted angel with fabrication work etc. , laying of acsr weasel conductor , laying of lt ab cable 3x120 1x95 1x16 sq.mm. , laying of lt ab cable 3x50 1x35 1x16 sq.mm. , laying of lt ab cable 3x95 1x70 1x16 sq.mm. , mounting of three phase distribution box , erection of double pole structure 8.5 mtr pcc pole , erection of single pole structure 8.5 mtrs pcc pole , erection of tri pole structure 33 kv 13 mtr st pole , grouting of pcc or stp pole , grouting of stay , earthing of pole , guarding of 11 kv line , fencing of 250 kva distribution transformers , plinth for 250 kva transformer , installation of 11by0.4 kv tf 25 kva , installation of 11by0.4 kv tf 63 kva , installation of 11by0.4 kv tf 100 kva , installation of 11by0.4 kv tf 250 kva , laying of 33 kv xlpe cable 3x300 sq.mm. , installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms. , dismentlling, received back and safe carriage of jarjar g.i. wire and weasel conducter including with rolling from pit site to esc, mainpuri , received back of distribution transformer after, boqbp2627, clamp for 11 kv v type cross arm with bolts and nuts, three phase distribution box clamp with nut and bolts, connecting cable for distribution box 1x35 sq.mm., l.t. fuse set protection box with all accessories, tinned copper fuse wire different size, hdpe pipe 140 mm., stone pad 300x300x75, holding clamp for doulble pole unit with nut and bolts, ms angle 75x75x6x2028mm with clamp and bolt and nut t or f base, t off chhanel and t off clamp with nut and bolts, top chhanel 125x65x240, dropper channel 100x50x2028 mm., danger board with clamp and nut and bolt, chemical earthing with g.i. patti clamp nut and bolts as per norms, l.t. tail less unit with all respective material angel, patti and other material, copper l pieace 62x225x12mm., 11 kv f clamp with nut and bolts, suspension clamp, dead end clamp, eye i hook, eye bolts for guarding, j hook, lt clamp for pcc or stp with bolts and nuts, pearcing connector, alluminium lug 120 sq.mm., alluminium lug 240 sq.mm., alluminium lug 400 sq.mm., nut bolts and washers off size, guarding angel, guarding angel clamp, m.s. angel iron 65x65x6 mm. 2700 mm long bracing with 4 nos clamp with nut and bolts, 13 m stp pole sp55 galvanised, 8.5 m pcc pole, v type cross arm for 11 kv, 11 kv pin insulator with pin, disc insulator with fitting t and c 45 kn 114 nos and 70kn 27 nos, 11 kv fuse set, 11 kv tpmo with polymer insulator, complete stay 9gi stay rod 20x1800 mm stay wire 7 and 8 swg 10 kg stay clamp bolt nut and washer, distribution transformer 25 kva, distribution transformer 63 kva, distribution transformer 100 kva, distribution transformer 250 kva, acsr weasel conductor or insulated conductor as provided by department, m s earthing rod 20 x2540 mm, lt al. xlpe cable size 1x240 sq.mm., lt xlpe cable 1x120 sq.mm. for dtr, lt xlpe cable 1x400 sq.mm. for dtr, lt xlpe cable size 3.5x70 or 35 sq.mm., lt ab cable 3x120 1x95 1x16 sq.mm., lt ab cable 3x50 1x35 1x16 sq.mm., lt ab cable 3x95 1x70 1x16 sq.mm., 33 kv xlpe cable 3x300 sq.mm., 33 kv indoor or outdoor jointing kit size 3x300 sq.mm., 33 kv straight through size 3x300 sq.mm., g.i. wire 6 or 8 swg for guarding, three phase distribution box, fixing of l.t. fuse set protection box with all respective accessories as per norms, l.t. tail less unit with all respective material as grouted angel with fabrication work etc., laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr weasel conductor or insulated conductor as provided by department, laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x120 1x95 1x16 sq.mm., laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x50 1x35 1x16 sq.mm, laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x95 1x70 1x16 sq.mm., mounting of three phase distribution box with clamp nut & bolts and make proper connection with connecting cable., erection of double pole structure 8.5 mtr pcc pole by digging of pits fitting of all relevant accessories as per respo norms. 34 nos pole at different location under concern division., erection of single pole structure 8.5 mtrs pcc pole by digging of pits fitting of all relevant accessories as per respo norms. at different location under concern division., erection of tri pole structure 33 kv 13 mtr st pole by digging of pits fitting of all relevant accessories as per respo norms. 3 nos pole at different location under concern division., grouting of pcc or stp pole long as per respo norms with material cement, sand, blast stone with the ratio 0.268 cu.m. each will be provided by conractor, grouting of stay as per respo norms cement, sand, blast stone material will be provided by conractor, earthing of pole by m s earthing rod 20 x2540 mm with 6 swg earthing wire etc and make proper connection., guarding of 11 kv line with gaurding angel, clamp eye bolts and gaurding g.i. wire 6 or 8 swg 30 span, fencing of distribution transformers with enamel in proper alignment as per respo manual and as per direction of executive engineer including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work., plinth for 250 kva transformer proper size as per resspo norms, installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 25 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 63 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 100 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 250 kva with l.t. xlpe cable suitable size with all respective material as per norms., laying of following cable by hdd method with hdpe pipe (140 mm.) including digging and restoring along with brick and sand including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work. 33 kv xlpe cable 3x300 sq.mm., installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms., dismentlling of jarjar g.i. wire and weasel conducter including with rolling received back and safe carriage from pit site to esc, mainpuri, received back of distribution transformer after increasing capacity from pit site to esc, mainpuri ( 17 nos 100 kva) are available inside the detailed notification files. Bidders planning to target this contract in Mainpuri should check the official portal schedule early to complete their online technical and financial submission well before the closing hours.

Tender Inquiry