tender for supply and installation of ceiling arrangement, supply and installation of ceiling arrangement to drg no.le44100,alt-i(mdt s-133, rev.05, mdts-118, rev.01 and ltr no. md46271 dt.12/11/2003 areapplicable. traceabili ty mark as per design ltr no. md46231 dt. 05/06/2006) and alu. extrusions to drg no: le64 001, alt-f , item no: 1 to a length of 16600 mm-2nos; item no:2 to a length of 16600 mm-1n o including hardware required. - warranty period: 30 months after the date of delivery -quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs
Latest Tender Detail from integral coach factory ICF for the tender for supply and installation of ceiling arrangement, supply and installation of ceiling arrangement to drg no.le44100,alt-i(mdt s-133, rev.05, mdts-118, rev.01 and ltr no. md46271 dt.12/11/2003 areapplicable. traceabili ty mark as per design ltr no. md46231 dt. 05/06/2006) and alu. extrusions to drg no: le64 001, alt-f , item no: 1 to a length of 16600 mm-2nos; item no:2 to a length of 16600 mm-1n o including hardware required. - warranty period: 30 months after the date of delivery -quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs in chennai, tamil nadu,. Reference number 15686535. Don't miss out on this chance to be part of a significant project. Register for free today to access the complete tender details and download the necessary documents. Seize the opportunity with Tender 18!