Filters By:

T18 Ref No
Keyword
State
City
Agency
Tender ID
Due Date
Tender Source
Tender Type

10Results forLatest Wheel aligner Tenders List

Latest Wheel aligner Tenders in India – Verified Leads & Real-Time Insights by Tender18

Finding the right Wheel aligner tenders in India’s competitive e-procurement ecosystem requires more than just access—it demands accurate data, real-time monitoring, and expert analysis.

At Tender18 Infotech Private Limited, we bring deep industry experience in government procurement to help businesses identify, evaluate, and win Wheel aligner tenders efficiently. With a centralized platform aggregating 1100+ live tenders, we provide a single, trusted source for opportunities from central, state, and PSU departments.


Real-Time Wheel aligner Tender Intelligence & Monitoring

Our advanced dashboard delivers actionable insights and structured tender data, enabling you to make faster and smarter bidding decisions.

We categorize Wheel aligner tenders into:

  • Supply Tenders – BOQs and specifications sourced from GeM and PSUs
  • Service Tenders – NITs and scope of work from CPPP and state portals
  • EPC Projects – Large-scale infrastructure tenders with financial and design data

✔ This structured approach ensures complete transparency and deeper bid analysis before submission.


Comprehensive Sources of Wheel aligner Tenders

Tender18 acts as a centralized gateway by aggregating tenders from trusted and official sources:

  • Central Government Portals – CPPP, NIC, and Government e-Marketplace (GeM)
  • Railways & Transport – IREPS and Metro Rail projects
  • Power & Energy PSUs – NTPC, ONGC, NHPC, PowerGrid
  • Defense & Strategic Sectors – MES and DRDO tenders
  • State e-Procurement Portals – Gujarat, Maharashtra, Tamil Nadu, UP, and more

✔ Every listing is verified and regularly updated to maintain data accuracy and trust.


Step-by-Step Guide to Participate in Wheel aligner Tenders

1. Eligibility & Prequalification

Before bidding, ensure compliance with:

  • Financial turnover requirements (30–50% of tender value)
  • Past experience (2–3 similar projects)
  • Valid solvency certificate

2. Mandatory Documentation Checklist

Prepare the following to avoid disqualification:

  • Digital Signature Certificate (Class 3 DSC)
  • GST, PAN, MSME/Udyam registration
  • EMD (Earnest Money Deposit) or exemption proof
  • Technical bid with execution methodology

3. BOQ Analysis & Financial Bidding

The BOQ (Bill of Quantities) is the most critical component:

  • Analyze item-wise pricing
  • Ensure competitive yet sustainable quotes
  • Avoid underbidding risks (L1 pressure)

✔ Expert analysis can significantly improve your bid success ratio.


Why Tender18 is a Trusted Platform for Wheel aligner Tenders

✔ Proven Expertise in Government Procurement

We combine industry knowledge with practical bidding experience.

✔ Verified & Reliable Data

All Wheel aligner tenders are sourced from official portals and cross-checked for accuracy.

✔ Advanced Filtering Tools

Filter tenders by value, EMD, location, and category for precise targeting.

✔ Corrigendum & Update Tracking

Get instant alerts on deadline changes and specification updates.

✔ Historical Data Insights

Analyze past tender results to understand pricing trends and competition.

✔ End-to-End Bidding Support

From discovery to submission, including GeM onboarding and strategy.


Growth of Wheel aligner Sector in 2026

With the Government of India focusing on digital procurement and infrastructure expansion, the Wheel aligner sector has seen significant growth in e-tendering opportunities.

The rise of GeM-based procurement models like:

  • L1 Purchase
  • Direct Procurement
  • MSME-friendly policies

…has made it easier for startups and SMEs to participate and win contracts


Frequently Asked Questions (SEO Optimized)

How can I get daily Wheel aligner tender alerts?

You can register on Tender18 and select your preferred category. You will receive daily email alerts with all new Wheel aligner tenders.

Is EMD mandatory for all Wheel aligner tenders?

No, MSME and Udyam-registered businesses may get exemptions. Always check the NIT for specific conditions.

What is the difference between a Wheel aligner work tender and supply tender?

A supply tender involves delivering goods, while a work tender includes execution, labor, and project completion.

Can I access private Wheel aligner tenders on Tender18?

Yes, we also track major private sector and EPC tenders along with government opportunities.


Get Expert Support for Wheel aligner Tenders

Tender18 is more than a listing platform—we are your strategic partner in winning tenders.

Our services include:

  • Tender discovery & analysis
  • Documentation support
  • Bid strategy & submission
  • GeM registration & OEM onboarding

📞 Call / WhatsApp: +91 7069661818
🌐 Website: www.tender18.com

T18 Ref No : 15840464
Source : GEM Tenders

tender for item 1 , item 2 , item 3 , item 4 , item 5, augmentation of building, augmentation of building 1, augmentation of building 2, augmentation of building 3, augmentation of building 4, augmentation of building 5 supplying and placing in position main table,eru & pedestal of the following specifications. the main table shall be of size 3600 width mm x 1080 mm depth x 750 mm height. top surface of the table shall made up of mdf (medium density fibre ) board duly finished with veneer and final coating of pu. the main desk should contain in smart case - space slides effortlessly in style.the mobile pedestal shall be of size 480 width mm x 640 depth mm x 600 height mm. mobile pedestal shall be coated of mdf (medium density fiber) with veneer coating and pu coating.the eru top shall be of mdf (medium density fiber) board duly finished with veneer and final pu coating. size of eru top 1900 width mm x 480 depth mm x 550(not from ground with castors).the main desk is provided eith the wire management system also there is perfect storage side unit . 1 2 supplying and placing in position back unit of the following specifications. the size of the back unit shall be 1000 mm width x 480 mm depth x 2035 mm height. the back unit shall be made up of mdf board duly finished with veneer & final finish by pu coating. the mobile unit can be bought in multiples.pu coating hardness 1.5h. 2 3 providing, supplying and placing of 3 seater sofa. dimensions w x h x d (cm)222 x 103 x 89 .nomenclature & dimensions (mm): tolarence + / - 10 mm code description specification code description specification a total width 2220 b total depth 890 c total height 1030 d seating area width 1720 e seating area depth 520 f seating area height from ground 510 g arm height 645 h arm width 250 i back height from arm 420 j back width 2060 k arm depth 610 l leg height 70 m back height from seat 660 n lumbar height from seat 410 stitching: thread : polyester pitch :- 4 ( type of thread : nylon , polyester) ( pitch of thread i.e. stitch per inch) no. of ply in thread : 3 stitching tolarence : 10 mm minimum tex # (tkt #): 75 tkt leather/pvc/fabric: (pu/pvc/cotton/ polyester/ composite) pigmented leather + pvc thickness (mm) :leather=1.5mm / pvc=0.38mm weight (gsm) : pvc=750gsm tensile strength {wrap/weft} (kg/cm) : leather=300kg/cm2 + pvc=100kg/cm2 bursting strength (kg/cm2) : adhesion (pvc/pu backing) (kg/cm) : colour fastness to rubbing {dry /wet} (scale 1-5) : leather=5 / pvc=3 frame material (tropical wood / pine wood/ rubber wood): pine wood moisture content ( recommended 12 – 18 %) :15% anti – tremite treatment (recommended borex powder treatment) : kiln drying : conventional thickness of plywood used(mm) : 3mm/9mm/12mm/18mm standard of plywood used: commercial plywood seat foam: (density, type) * provide weight of recron filling used per seat* thickness (mm) : 127mm density (kg/m3): 27 kg/m3 + 30 kg/m3 type of foam (virgin/composite/moulded/ slabstock) : virgin * please provide layerwsie detail of foam used along with details of density & thickness* back foam: (density, type) * provide weight of recron filling used per seat* thickness (mm) : recron filling 1.0kg /seat density (kg/m3): n/a type of foam (virgin/composite/moulded/ slabstock) : n/a * please provide layerwsie 1 detail of foam used along with details of density & thickness* armrest foam: (density, type) * provide weight of recron filling used per seat* thickness (mm) : 38mm density (kg/m3): 27 kg/m3 + 30 kg/m3 type of foam (virgin/composite/moulded/ slabstock) : virgin * please provide layerwsie detail of foam used along with details of density & thickness* belt/ webbing material: width of belt (mm) : n/a. total length of belt used (mm): n/a. tensile strength (kg/cm) : n/a. recommended 3-4 vertical & 3 horizontal webbing mesh & 50 % stretch while fixing spring details ( s-spring / pocket spring): thickness of s-spring (mm) : 4.0mm & 34mm width number of springs used: -4 s-springs (zig-zag springs) + 1 tie rods/ seat length of s-spring used (mm) : n/a. number of pocket springs per seat: n/a. thickness of pocket spring (mm) : n/a. * provide details of number of pocket springs & pitch * leg material: * fixing of leg : (self tapping screw / insert with metric threading) :- n/a * material of leg : (plastic / insert moulding / wooden/ ms + chrome plating / ss) :- n/a * bush for leg bottom : (pvc bush / felt pad) :- n/a bonding solution: * type of glue used : (synthetic / rubber base/ water base/ solvent base) : rubber base glue * material handling data sheet (msds) for glue polyester fibre fill : * denier : 13 * fiber hollowness : 100% * siliconized fibre * conjugated fibre stapling pins: * size of pin : (zinc plated) yes * no. of pins : bottom non-woven cloth : * gsm : 100 gsm non woven cloth * colour : black colour metal under structure detail : * bedstead size : (in mm) * pipe / tube section : ( l x b x thickness) * mesh size : ( thickness & mesh square size) plating/ coating : type of plating : powder coating salt spray test : (in hours) recommended 96 hrs of salt spray for plating & 250 hrs for coating mechanism : manual / automatic : manual mechanism make : allstar warranty of mechanism : (recommended 3 years warranty on mechanism) actuator power rating : packing specs: carton ply gsm :- number of ply : bursting strength (kg/m2) : recommended 22 – 24 bs 5 ply gsm of paper : 200-180-180- 180-180 other remarks: as per specification or picture warranty : 2 years warranty for sofa upholstery 3 years warranty for recliner mechanism 4 providing, supplying and placing of 1 seater sofa. dimensions w x h x d (cm) 107 x 103 x 89. nomenclature & dimensions (mm): tolarence + / - 10 mm code description specification code description specification a total width 1070 b total depth 890 c total height 1030 d seating area width 580 e seating area depth 520 f seating area height from ground 510 g arm height 645 h arm width 250 i back height from arm 420 j back width 925 k arm depth 610 l leg height 70 m back height from seat 660 n lumbar height from seat 410 stitching: thread : polyester pitch :- 4 ( type of thread : nylon , polyester) ( pitch of thread i.e. stitch per inch) no. of ply in thread : 3 stitching tolarence : 10 mm minimum tex # (tkt #): 75 tkt leather/pvc/fabric: (pu/pvc/cotton/ polyester/ composite) pigmemted leather + pvc thickness (mm) :leather=1.5mm / pvc=0.38mm weight (gsm) : pvc=750gsm tensile strength {wrap/weft} (kg/cm) : leather=300kg/cm2 + pvc=100kg/cm2 bursting strength (kg/cm2) : adhesion (pvc/pu backing) (kg/cm) : colour fastness to rubbing {dry /wet} (scale 1-5) : leather=5 / pvc=3 frame material (tropical wood / pine wood/ rubber wood): pine wood moisture content ( recommended 12 – 18 %) :15% anti – tremite treatment (recommended borex powder treatment) : kiln drying : conventional thickness of plywood used(mm) : 3mm/9mm/12mm/18mm standard of plywood used: commercial plywood seat foam: (density, type) * provide weight of recron filling used per seat* thickness (mm) : 127mm density (kg/m3): 27 kg/m3 + 30 kg/m3 type of foam (virgin/composite/moulded/ slabstock) : virgin * please provide layerwsie detail of foam used along with details of density & thickness* back foam: (density, type) * provide weight of recron filling used per seat* thickness (mm) : recron filling 1.0kg /seat density (kg/m3): n/a type of foam (virgin/composite/moulded/ slabstock) : n/a * please provide layerwsie detail of foam used along with details of density & thickness* armrest foam: (density, type) * provide weight of recron filling used per seat* thickness (mm) : 38mm density (kg/m3): 27 kg/m3 + 30 kg/m3 type of foam (virgin/composite/moulded/ slabstock) : virgin * please provide layerwsie detail of foam used along with details of density & thickness* belt/ webbing material: width of belt (mm) : n/a. total length of belt used (mm): n/a. tensile strength (kg/cm) : n/a. recommended 3-4 vertical & 3 horizontal webbing mesh & 50 % stretch while fixing spring details ( s-spring / pocket spring): thickness of s-spring (mm) : 4.0mm & 34mm width number of springs used: 4 s-springs (zig-zag springs) + 1 tie rods per seat length of s-spring used (mm) : n/a. number of pocket springs per seat: n/a. thickness of pocket spring (mm) : n/a. * provide details of number of pocket springs & pitch * leg material: * fixing of leg : (self tapping screw / insert with metric threading) :- n/a * material of leg : (plastic / insert moulding / wooden/ ms + chrome plating / ss) :- n/a * bush for leg bottom : (pvc bush / felt pad) :- n/a bonding solution: * type of glue used : (synthetic / rubber base/ water base/ solvent base) : rubber base glue * material handling data sheet (msds) for glue polyester fibre fill : * denier : 13 * fiber hollowness : 100% * siliconized fibre * conjugated fibre stapling pins: * size of pin : (zinc plated) yes * 2 no. of pins : bottom non-woven cloth : * gsm : 100 gsm non woven cloth * colour : black colour metal under structure detail : * bedstead size : (in mm) * pipe / tube section : ( l x b x thickness) * mesh size : ( thickness & mesh square size) plating/ coating : type of plating : powder coating salt spray test : (in hours) recommended 96 hrs of salt spray for plating & 250 hrs for coating mechanism : manual / automatic : automatic mechanism make : allstar warranty of mechanism : (recommended 3 years warranty on mechanism) actuator power rating : 50w packing specs: carton ply gsm :- number of ply : bursting strength (kg/m2) : recommended 22 – 24 bs 5 ply gsm of paper : 200-180-180- 180-180 other remarks: as per specification or picture warranty : 2 years warranty for sofa upholstery 3 years warranty for recliner mechanism & actuator 5 providing, supplying and placing of coffee table overall size : width: 100cm depth : 65cm height : 43cm table materials: glass of 08 mm thk tempered, solid rubber woood legs and frame, ms sheet as bottom shelf .decoration materials & specifications: (density / type): pu coating to the rubber wood parts, clear glass rubber wood understructure with 12 mm tempered glass top. ms sheet at the base, with a laser-cut floral design, can be used as a display shelf.tapered legs with enhanced aesthetics 1 6 providing, supplying and placing of high back chair. seat assembly: the cushioned seat inner is made of injection moulded glass filled polyamide.upholstered seat sub-assembly consists of moulded high resilience (hr) polyurethane foam of density 45±2 kg/m³, and hardness load 16 ± 2 kgf as per is:7888 for 25% compression. *seat size: 45.5cm. (d) x 52.4cm. (w) back assembly: the cushioned back is made of pu foam with polypropylene injection molded plastic inner. *high back size: 50.5 cm. (w) x 76.7 cm. (d) armrests: the armrest having four range of adjustment · height adjustment sub assembly is inserted in the aluminum die cast arm body & all other adjustment are provided in adjustable arm top sub assembly. · up-down adjustment has 8 position (10.5±0.5cm range) · arm top swivel adjustment- 2 position, 12°±2° swivel inside · arm top width adjustment - any position (2.0±0.5cm range each arm top) · arm top to - fro adjustment- any position (4.0±0.5cm range) · armrest top is made up of high density pu molded over glass filled polyamide inner. posture perfect mechanism: the adjustable tilting mechanism is designed with the following features: · 360° revolving type. · forward tilt of sesat and back. · upright tilt lock. · tilt tension adjustment can be operated in seating position. · 3-position tilt limiter. seat depth adjustment: seat depth adjustment is housed below the seat and integrated with the mechanism with help of polypropene seat cover. seat depth can be adjusted in sitting position. seat depth adjustment range is of 5.0±0.5 cm. adjustable back support: back assembly is connected to buff polish die cast aluminum spine with an up-down mechanism assembly. back height can be adjusted in sitting position. it can be adjusted in the range of 7.5±0.5 cm. pneumatic height adjustment: the heavy duty class 4 pneumatic height adjustment has an adjustment stroke of 13.0±0.3 cm. pedestal: the pedestal is made of die-cast aluminium with buffing finish. it is fitted with 5nos. twin wheel castor. the pedestal is 67.0 ± 0.5cm pitchcenter dia. twin wheel castor: 5 nos. twin wheel soft castors are injection moulded in poly-amide with pu lining, having 6.5±0.1cm wheel diameter and assembled to pedestal. width (w): 74.0 cm. depth (d): 74.0 cm. height (h): 112.0 - 132.5 cm. seat height (sh): 44.5 - 58.0 cm. 2 7 providing, supplying and placing of visitor chair. chair upperstructure: it is a single shell 1.2 ±0.1cm. thick hot pressed plywood with moulded polyurethane foam on top & backing foam on rear side. it is upholstered with option of knitted & leatherette fabric.the seat has extra thick foam on front edge to give comfort to popliteal area.the foam backing done in back for extra fluffiness and comfort in chair. seat & back high resilience (hr) polyurethane foam :the hr polyurethane foam for seat and back is moulded with density 45 +/-2 kg/m³ and hardness load 16 ± 2 kgf as per is:7888 at 25% compression. m.s. visitor tubular frame : the powder coated (dft 40-60 micron) tubular frame is cantilever type & made of ø2.54±0.03 cm x 0.2±0.016 cm thk ms erw tube. armrests:the armrest top is moulded from polyurethane(pu) with metal insert and mounted on to a tubular frame. width (w): 60.5 cm. depth (d): 65.0 cm. height (h): 86.5 cm. seat height (sh): 46.0 cm 6 8 supplying and placing in position conference table of the following specifications. its size shall be 2400 width mm x 1200 depth mm x 750 height mm . top work surface shall be 12 mm thick tougher glass with back painted design on to under side and crystal edge polish finish . the construction shall be knock down construction . the understructure shall have all panels made from 36 mm thick pre-laminated board with 2 mm thick pvc edge beading . understructure also consists of storage for cpu , projector and paper storage . provision for glass adjustment for glass aligning . the wire management shall have legrand electricals used for wire management on tocentre support beam panel and cpu storage area for socket connections ,rj11,rj45 . 1 9 providing, supplying and placing of high back chair. seat/back assembly: the seat should be made up of 1.2 ±0.1cm. thick hot pressed plywood upholstered with fabric or synthetic leather and moulded polyurethane foam. the back should be made up 1.2 ±0.1cm. thick hot pressed plywood and upholstered with replaceable fabric or synthetic leather upholstery covers and moulded polyurethane foam. the back ply and foam should be designed with contoured lumber support for comfortable seating posture. back size: 48cm.(w) x 76.0cm.(h) seat size: 51.0cm.(w) x 48.0cm.(d) high resilience (hr) polyurethane foam: the hr polyurethane foam for seat and back should be moulded with density = 45 +/-2 kg/m³ and hardness load 16 ± 2 kgf for 25% compression. armrests :the armrest top should be made of moulded polyurethane (p.u) and mounted on to a drop lift height adjustable type m.s. tubular armrest support chrome plated. the armrest height should be adjustable up to 6.5±0.5cm. in 5 steps . knee tilt synchro mechanism with seat depth adjustment mechanism: the mechanism should be designed with the following features: • 360° revolving type single point control. • front pivot for tilt with feet resting on ground ensuring more comfort. • tilt tension adjustment. • 4-position locking with anti-shock feature. • seat back tilting ratio of 1:2 • seat depth adjustment of 6.0 ±0.5cm. can be locked in 6 positions adjustable backrest: the backrest consshould be ts of a sliding up down mechanism, which can be adjusted in the range of 7.5±0.5cm. and can be locked in 5 positions for correct position of lumber support. pneumatic height adjustment: the pneumatic height adjustment has an adjustment of 10.0±0.3cm. pedestal assembly: the pedestal should be fabricated from 0.2 ± 0.02 cm thick hr sheet . chrome plated and assembled with injection moulded black polypropylene hub cap and 5 nos. twin wheel castors. the pedestal should be 66.0±0.5cm. pitch-center dia. (76.0±1.0 cm with castors). twin wheel castors the twin wheel castors should be injection moulded in black nylon. overall dimensions of chair seat height - min 47.5 to max 57.5cm. height - min 103.5 to max 120.5cm. width & depth of chair as measured from pedestal - width-76.0 cm and depth-76.0 cm. 8 10 providing, placing and supplying of table: high-density high moisture resistance (hdhmr) worktop : worktop is made of 25mm thick pre-laminated hdhmr board. all edges of work surfaces shall provide with machinepessed 2mm thick pvc lipping glued with hot melt eva glue. the work tops are available in square (900x900). trio leg for 4 legged table: trio legs is fabricated from combination of 1.2 mm, 2 mm thk crca (as per is: 513), 3mm, 5mm thk hr (as per is: 2062) which has a triangular shape. argo shield welding is used for fabrication. this is a three dimensional leg which has inclination in 2 planes, it has a ball socket m8 leveler with bottom translucent cap, that allows adjustment up to 50 mm height. the whole structure is epoxy polyster powder coated (dft 40-60 microns). it is assembled using alloy steel hardware (ni / zn plated). cross member / connector : cross members in the upbeat system are made from 50 mm x 25 mm x 1.2mm thk (as per is: 7138 erw). cross members are assembled by friction fit pdc joinery and grub screws. the whole structure is epoxy polyster powder coated (dft 40-60 microns). it is assembled using alloy steel hardware (ni / zn plated). cross are available in 3 lengths, viz.: ( 350mm, 1100mm & 1700mm). 1 11 providing, placing and supplying of wood chair. wood understructure assembly: the under structure is made up of solid steamed beech wood of first grade and adjustable plinth screw. u/s assembly: 51.7cm (w) x 50cm (d) x 36.7cm (h) seat assembly: the seat is made up of 1.2 ± 0.1 cm thick hot - pressed plywood moulded by high resilience pu foam -density:65 ± 5kg/cu.m and upholstered with fabric. seat assembly: 49.5cm (w) x 47.6cm (d) x 8.3cm (h). back assembly: the back is made up of dia. 1cm ms rod -is:2062 and 0.6cm thk hr plate -is:2062 welded together and moulded by high resilience pu foam -density:65 ± 5kg/cu.m and upholstered with fabric. back assembly: 62.5cm (w) x 49.7cm (d) x 46.5cm (h). width: 62.5cm depth: 63.3cm height: 78.4cm seat height: 45cm


Tender Value : 40000000
Due Date : May 26, 2026

Unlock Full Tender Access

Start Free Trial to download documents before deadline

T18 Ref No : 15793345
Location : nashik , maharashtra
Source : GEM Tenders

tender for miscellaneous items spider , jaw coupling , carbon vanes of pumps , oil seal , flexible soft silicon pipe , loctite 638 bottle , anabond , rapida retainer rings , timing belt , narrow cogged v belt , bond tight , m seal , bearing , cylindrical roller bearing , needle roller bearing , rna 4902 rs rapida rollers , bearings , taper roller bearing , 6304 2z , hollow pins , rtv anabond silicon sealant , i scirclipplier , o scirclipplier , air blow gun , drill bit set , tap set , horizontal spirit level , chain delivery gripper for heidel berg g , hydraulic cylinder bore , self align coupling , pneumatic tube , pneumatic push , chain pulley block , r pin 60 mm , r pin 40 mm , stanley tool kit , hot air gun , socket set gedore , magnet pencil type , grinding wheel , bench grindng wheel, spider l110 6, spider l 110 m, 8 legs, jaw coupling l110 ( 3 jaws), jaw coupling l110 ( 4 jaws), carbon vanes of pumps 169.35 x 32.5 x 3., carbon vanes of pumps 76 x 39 x 5 mm (g, oil seal 40 x 52 x 7, oil seals 40 - 55-7, flexible soft silicon pipe (id 15 , od 2, loctite 638 bottle , 50 ml, anabond 5922 , 50 ml, rapida retainer rings snap ring use- ex, timing belt 1778 14 m , width 40 mm, timing belt(optic belt omega) 740-5m, narrow cogged v belt 3vx 400 / xpz 1012, timing belt 1160 8 m width 20 mm, timing belt m 113 4 , width 20 mm, timing belt 600 5 m, power grip 210l timing belt width-10mm, timing belt 950 5m, width 1 inch, bond tight, m seal (50gm-pack), bearing nu206e, cylindrical roller bearing nu205, bearing- 3206 2z- rotatek ru, needle roller bearing -nki 28/20_wista, rna 4902 rs rapida rollers, bearings bk 1816 ina, taper roller bearing 30203, 6304 2z, hollow pins various sizes( 3 mm to 8 mm), rtv anabond silicon sealant ( 100 gram ), i scirclipplier, o scirclipplier, air blow gun, drill bit set ( 1.5 mm - 10 mm), tap set ( 3 mm - 12 mm), horizontal spirit level, chain delivery gripper for heidel berg g, hydraulic cylinder bore 40,stroke 230 mm, self align coupling 8 x 30 mm rnm, pneumatic tube pun 8 red color, pneumatic tube pun 6 red color, pneumatic tube pun 8 green color, pneumatic push in male thread with inter, chain pulley block 1ton, length 3 to 6 m, r pin 60 mm, r pin 40 mm, stanley tool kit ( consists of adjutsabl, hot air gun, socket set gedore 1 4 + 1 2 r4600309, magnet pencil type, grinding wheel ag4 , 4, bench grindng wheel 4


Due Date : Jun 22, 2026
T18 Ref No : 15704014
Source : GEM Tenders

tender for main engine spares em6290b-000835008063 , em6290b-0011841425 , em6290b-0015361612 , em6290b-0015361712 , em6290b- 0035310083 , em6290b-0219976547 , em6290b- 0219976647 , em6290b-5005302678 , em6290b- 5030211080 , em6290b-5045300897-78 , em6290b- 5045309892-78 , em6290b-5110804320 , em6290b- 5240161580 , em6290b-5240332630 , em6290b- 5240333307 , em6290b-5260981220 , em6290b- 5261420331 , em6290b-5270900075 , em6290b- 5272001101 , em6290b-5275306822 , em6290b- 5295309312-78 , em6290b-5319972445 , em6290b- 5602030280 , em6290b-5849970440 , em6290b- 700429021001 , em6290b-700429038003 , em6290b- 700429185001 , em6290b-808c017032 , em6290b- 8692530095 , em6290b-e5240106920 , em6290b- ex00012174 , em6290b-ex52607300010-87 , em6290b- ex52620200081 , em6290b-ex59403800070-42 , em6290b- rx52407500050 , em6290b-x00010427 , em6290b- x00e50210307 , em6290b-x52403800001 , em6290b- x52404200052 , em6290b-x52418300026 , em6290b- x52608300039 , em6290b-x52705100010 , em6290b-z bzv-72rn2-pg , em6299b-0065314481 , em6299b- 25405497 , em6290b-xp59307500002 , em6290b- ex52407500039 , em6299b-8699970272 , em6290b-135- c06-025 3 , em6290b-5355302375 , em6290b-8590920100 , em6290b-001-184-14-25 , em6290b-5600770462 , em6290b-135d11005-1 , em6290b-000-n33-726 1 , em6290b-869-203-00-18 , em6290b-0000911790 , em6290b-0000943268 , em6290b-5240160321 , em6290b- 700429060002 , em6290b-005-535-23-31, main engine spares, stud bolt, bypass filter element, pressure gauge, mating plug no-1, radial lip shaft seal set w6, shaft rpm indicator, gasket, plug-in-board, plug-in board iib1-01, turbine wheel, gasket for set w5, crank shaft brg for set w6, crankshaft align brg.b11, intercooler right, valve sequential turbo exhaust, diverter valve, sea water pump, wiring harness for on-engine sensor, plug-in-board aib 1-02, sealing ring, sealing ring for set w6, o-ring, o ring, filter disposable, compensating washer, cylinder head, injection pump, coolant pump, conrod, injector, washer, position switch, conrod bearing size 0-0 s sx00040714, seal ring s s 5240160319, centrifugal oil filter, filter head for fuel filter, cam shaft, switch, separable connector, 4 2 way valve, ring sealing crank case, test unit, filter element, friction washer, rubber ring, nozzle element, heat element screw filling, hand pump, contam indicator, o-ring 60x4 for set w5, sensor pressure 0 - 4 bar


Agency / Dept :
Tender Value : 0
Due Date : Jun 26, 2026

Unlock Full Tender Access

Start Free Trial to download documents before deadline

T18 Ref No : 15982890
Source : GEM Tenders

tender for erection and fabrication work a erection and fabrication work a 1 , erection and fabrication work a 2 , erection and fabrication work a 3 , erection and fabrication work a 4 , erection and fabrication work a 5 , erection and fabrication work a 6 , erection and fabrication work a 7 , erection and fabrication work a 8 , erection and fabrication work a 9 , erection and fabrication work a 10 , erection and fabrication work a 11 , erection and fabrication work a 12 , erection and fabrication work a 13 , erection and fabrication work a 14 , erection and fabrication work a 15 , erection and fabrication work a 16 , erection and fabrication work a 17 , erection and fabrication work a 18 , erection and fabrication work a 19 , erection and fabrication work a 20 , erection and fabrication work a 21 , erection and fabrication work a 22 , erection and fabrication work a 23 , erection and fabrication work a 24 , erection and fabrication work a 25 , erection and fabrication work a 26 , erection and fabrication work a 27 , erection and fabrication work a 28 , erection and fabrication work a 29 , erection and fabrication work a 30 , erection and fabrication work a 31 , erection and fabrication work a 32 , erection and fabrication work a 33 , erection and fabrication work a 34 , erection and fabrication work a 35 , erection and fabrication work a 36 , erection and fabrication work a 37 , erection and fabrication work a 38 , erection and fabrication work a 39 , erection and fabrication work a 40 , erection and fabrication work a 41 , erection and fabrication work a 42 , erection and fabrication work a 43 , erection and fabrication work a 44 , erection and fabrication work a 45 , erection and fabrication work a 46 , erection and fabrication work a 47 , erection and fabrication work a 48 , erection and fabrication work a 49 , erection and fabrication work a 50 , erection and fabrication work a 51 , erection and fabrication work a 52 , erection and fabrication work a 53 , erection and fabrication work a 54 , erection and fabrication work a 55 , erection and fabrication work a 56 , erection and fabrication work a 57 , erection and fabrication work a 58 , erection and fabrication work a 59 , erection and fabrication work a 60 , erection and fabrication work a 61 , erection and fabrication work a 62 , erection and fabrication work a 63 , erection and fabrication work a 64 , erection and fabrication work a 65 , erection and fabrication work a 66, erection and fabrication work a, cutting and removing the weak/broken parts of the discharge chute for the scraper in the mill, fabricating new parts from 12 mm plate, reinstalling them, fixing hole plates as per profile by welding to secure the scraper, and conducting a trial after completion of work., cutting and removing the worn/weak runner base of the cane carrier, fabricating a box structure using 100 mm channel to installation the runner base, fitting it properly, and straightening and reusing the old channel by turning it over., cutting and removing the old worn/cut 40/50 mm square bars of the cane unloader and installing new square bars in their place as before, followed by a satisfactory trial., cutting and removing the worn/cut runners of the cane carrier/rake carrier/bagasse elevator/r.b.c., reinstalling them by either turning over the old ones or fitting new runners as per original design., cutting and removing the worn/cut/weak side plates of chains used in cane carrier/rake carrier/r.b.c., and installing old or new plates in their place., cutting and removing the worn/weak side plates of the fibrizer hood, installing new plates, welding inside and outside, and conducting a satisfactory trial., complete overhauling, testing, and trial of the bagasse baling machine., performing necessary repairs on the old racks of s.r.c./i.r.c., fabricating new racks as per sample for the chains of bagasse elevator/r.b.c., replacing the weak/broken bottom/top covers of t.r.p.f. by fabricating and installing new covers as per original design, and conducting a satisfactory trial., cutting and removing the weak/broken tail end boots of s.r.c./i.r.c., fabricating new ones from 8.0/10.0 mm old/new plate as per sample, installing, leak-proof welding, and conducting a satisfactory trial., dismantling various parts of the cane unloader grabs, repairing all parts, hardfacing the fingers as per instructions, and reassembling the grabs., cutting and removing the weak/broken juice tray used for compound imbibition in mills, fabricating a new tray from plate as per sample, installing it in place, and making all connections., cutting and removing the worn/weak guides that prevent chains of cane carrier/s.r.c./i.r.c. and bagasse elevator from lifting, fabricating new guides as per instructions, installing them, and conducting a satisfactory trial., welding the worn/cut wheels of the cane unloader bridge/trolley drive as per instructions., cutting and removing the weak/broken donali chutes of t.r.p.f., fabricating new donali chutes as per the old ones, and erecting them in place., fabricating and installing m.s. rings on the idler wheel of the cane carrier as per instructions., fabricating and installing a support using 25.0 mm plate between the mill head stock and t.r.p.f. head stock as per instructions., repairing and balancing the old hammer shanks of the fibrizer by welding and hardfacing as per instructions., cutting and removing the worn/weak hoods of the cane chopper/leveller and fabricating a new folding type from new plate and installing it., replacing the broken plates in the pockets of the fibrizer's pocketed type anvil plate with new plates, straightening bent plates, welding, and hardfacing as per instructions., welding and leveling the worn hubs of the cane leveller/chopper rotor assembly on the working side and top sides, and hardfacing as per instructions., cutting and removing the weak beds of reduction gears and motors on cane unloaders, modifying and fabricating new beds, installing them, aligning the gear and motor, and conducting a trial., strengthening the weak/broken columns of the cane carrier structure by welding plates as per instructions., fabricating and fitting juice rings in the mill rollers as per sample., performing necessary repairs on the pressure chutes installed between t.r.p.f. and the mill., cutting and removing the weak/broken juice receiving tank of the mills, fabricating a new tank from 8.0/10.0 mm plate as per sample, fitting it in place, making all connections, and conducting a leak-proof trial., cutting and removing the weak/broken bottom cone of the mill's juice receiving tank, fabricating a new cone as per sample, fitting it in place, making all connections as before, and conducting a leak-proof trial., cutting and removing the weak/broken 10 inch/12 inch pipes between the mill juice tray and gutter, fabricating and fitting new s.s. pipes in their place, and conducting a leak-proof trial., lining the bottom trough of s.r.c./i.r.c. with 3.00 mm thick s.s. plate and doing leak-proof welding., removing the shifted bed of feed pump no. 1 on the boiler, fabricating and installing a new bed, making related connections, and conducting a trial., making the damper in the old i.d. fan ducting at the boiler station leak-proof using new/old plate before the chimney and doing complete welding so that when the new i.d. runs, there is no back air from the chimney., cutting and removing the nipple reducers of all three wet scrubber pumps and their leaking pipe lines, installing new pipe lines, and making all connections as before with leak-proof welding., opening all nozzles inside the wet scrubber venturi, removing damaged nozzles, installing new nozzles, and making all connections as before., fabricating new pipes from old boiler tubes for backwash from the service tank to the wet scrubber, and making all connections with new valves and clamps in the pipeline., cutting and removing the weak and leaking juice tray from under the t.r.p.f. that brings juice to the mill juice tray, and fabricating and installing a new one., cutting and removing the weak/broken ash chutes of the boilers, and fabricating and fitting new chutes from old/new plate as per the old ones., performing necessary repairs on the weak/broken dampers of air heaters, economizers, and f.d./i.d. fans' inlets/outlets or suction/delivery., replacing the frames and grids of the internal steam filter fitted in the boiler drums by fabricating new frames and fitting grids., cutting and removing the weak/broken flue gas ducting between the i.d. fans and the chimney, fabricating and installing new ducting from 5.0/6.0 mm thick plate, and conducting a leak-proof trial., for the weak bagassilo fan, fabricating a new impeller as per sample, repairing the casing as necessary, and conducting a successful trial., cutting and removing the weak/broken suction cones in the casings of i.d./f.d. fans, fabricating and installing new cones as per sample, and conducting a successful trial., replacing the damaged weak grids/perforated sheets of the baffle plates inside the boiler feed tank., cutting and removing the weak/broken bagasse feeding chutes of boiler no. 1, 2, and 3, and performing necessary repairs., replacing the weak/broken air headers installed outside for supplying additional f.d. air in the furnace of 20-ton capacity boiler no. 1 and 2 with new headers., cutting the weak/broken ducting between the air heater and i.d. fans and fabricating and installing new ducting from 5/6 mm thick plate., removing damaged perforated grids in the bagasse elevator used for bagasse to bagassilo filtration and fitting new grids., lowering the economizer coils/tubes of 20-ton capacity boiler no. 1 and 2, cleaning them internally and externally, conducting hydraulic testing at standard pressure, and after testing, lifting and refitting them, making the economizer bands leak-proof, and conducting a satisfactory hydraulic test., cutting and removing the weak/broken channel/plate of the s.r.c./i.r.c. trough and fabricating and installing new ones as per instructions., fabricating and installing angle iron rings for strengthening the boiler chimney., strengthening the weak and damaged truss-type bridge structure of the cane unloader by adding new channels, angles, and plates to provide satisfactory strength., welding the oval/worn enlarged holes on both ends of the block-type chain links of s.r.c./i.r.c. chains, drilling pin-size holes in the attachment, and grinding the faces to level., cutting and removing the worn/weak attachment used for fixing racks on the block-type chain links of s.r.c./i.r.c. chains, fabricating new attachment links from 12 mm thick plate as before, welding them onto the links, and drilling holes as per drawing., constructing a separate platform path using old angle channels for access to all three unloaders., replacing the weak/broken parts of i.d. fan casing, air heater cell/ducting, and economizer cell., cutting and removing the old m.s. plate of the bottom trough and boot of s.r.c./i.r.c., installing new plate to make the trough and boot leak-proof, and lining the boot and trough with 3 mm thick s.s. plate, followed by a satisfactory trial., fabricating new racks from 25 mm thick plate as per sample for s.r.c./i.r.c. chains, drilling holes, cutting and supporting chain rollers on both ends, and preparing them., removing the bent 250 mm channel of the trolley in the cane unloader, leveling it, strengthening the structure, fitting worn/weak runner square bars, checking diagonals, and leveling the wheel., removing all four wheels of the mill and power house crane, cleaning, checking bearings, greasing all plumber blocks, replacing damaged bearings with mill spares, welding worn wheels to a uniform size, and conducting a satisfactory trial., performing necessary repairs and hardfacing on the worn shells/teeth of t.r.p.f. top/bottom rollers, and adding rings on both sides as needed to compensate for reduced shell length., cutting and removing the weak/leaking juice tray of the mill and fabricating a new one from 5 mm s.s. plate as per sample, and conducting a leak-proof trial., performing necessary repairs on the damaged s.s. juice tray of the mill., in case of head stock cracking or misalignment, removing the head stock, regrouting, aligning, and completing all related work., removing the shaft of the damaged t.r.p.f. roller and dismantling the shell using gas cutting., cutting the 63.5 mm old boiler tubes with bends, making a 5.1 meter straight line, preparing them for the air heater, and cleaning them by grinding.


Due Date : Jul 10, 2026
T18 Ref No : 16184140
Location : chandrapur , maharashtra

corrigendum tender for annual maintenance contract for mechanical works in zone-a of chp-b, cstps for 2 years., chp pf blade replacement 3 service from w058030090030011 chp pf ccrd gb 2.000 au alignement 4 service from w058030090050001 chp pf travel drive 4.000 au gb replacement 5 service from w058030090030013 chp pf wheel gb 2.000 au removal other associates 6 service from w058030090050002 chp pf ccrd /pcrd 12.000 au chain /bolt fitting 7 service from w058040060010004 chp wt sac mech rope18.000 au replace 8 service from w058040060010003 chp wt sac mech 15.000 au re-railing 9 service from w058040060010002 chp wt sac mech 8.000 au replace shaft 10 service from w058040050040001 removal and fixing 64.000 au pads for wagon tipple 11 service from, wt resting rubber replace 12 service from w058040050020002 hydraulics system 8.000 au replacement of one hyd 13 service from w058040050020003 chp wt lnt hyds sys 6.000 au hyd. mot wt 14 service from w058040050010004 mechanical system 4.000 au replacemnt of clamp br 15 service from w058080040060007 chp ser maint wt posn2.000 au rail table 16 service from w058080040060008 chp ser maint wt posn2.000 au resting beam 17 service from w058030030080001 prevantive maintance12.000 au prevantive maintanc 18 service from w058030030020002 drive shaft 2.000 au replacement of c.shaft along 19 service from w058030030020007 replacement of 2.000 au apron drive shaft assy 20 service from w058030030040002 non-drive shaft 2.000 au replacement of non drive 21 service from w058030030010001 chp fdr aprn chain 100.000 au link replace 22 service from, chp apron pan replacement 23 service from w058030030020003 chp fdr aprn dri 200.000 au shaft replac shear bolt 24 service from w058030030010004 apron chain set of 28 32.000 au links replacement 25 service from w058030030010002 chp fdr aprn chain 16.000 au link tensioning 26 service from w058030030100001 removal of out and 8.000 au tensioning 27 service from, chp af return roller replacement 28 service from w058030030050002 chp fdr aprn pan nut 3,000.000 au bolt replace 29 service from w058030030020001 chp fdr aprn dri 2.000 au shaft brg replace 30 service from, chp af carrying roller replacement 31 service from w058090070020002 chp crusher internal48.000 au inspection 32 service from w058090070030012 chp crusher jack 16.000 au shaft bolt checking 33 service from w058090070030013 chp crusher jack 8.000 au shaft pin bush replc 34 service from w058090070020003 chp crusher prev 48.000 au maint 35 service from w058090070020004 chp crusher top or 24.000 au side plate removal 36 service from w058090070030003 chp crush revers uni 4.000 au dri sys replace 37 service from w058090070030007 chp crusher shaft 2.000 au brg replcement 38 service from w058090070030014 chp crusher 349.000 au replacement of grate bar 39 service from w058090070030005 chp crusher jack 4.000 au shaft brg repl coup end 40 service from w058090070030006 chp crucher jack 4.000 au shft brg replc free end 41 service from w058090070030008 chp crucher 16.000 au complete v belt replacement 42 service from, chp crusher body liner replacement 43 service from w058090070030016 chp crusher 4.000 au replacement of drive pulley 44 service from w058090070030010 chp crusher 8.000 au replacement of driven pulley 45 service from w058090070030011 chp crusher jack 2.000 au shaft replacement 46 service from w058090070010002 chp crusher rotor 12.000 au replacement 47 service from w058090070030015 chp crusher broken 4.000 au hammer eplacement 48 service from, chp wobbler lower cage bar replcement 49 service from w058030070030001 wobbler sys 48.000 au preventive maintenance 50 service from w058030070010003 drive unit 6.000 au replacement of triplex chain 51 service from w058030070020003 replacement of 60.000 au wobbler bar drive end bea 52 service from w058030070010002 drive unit 6.000 au replacement of simplex chain 53 service from w058030070020001 wobbler shaft 36.000 au replacement of wobbler bar 54 service from w058030070020002 replacement of 60.000 au wobbler bar free end bear 55 service from w058030070010001 drive unit 200.000 au replacement of shear pin 56 service from w058030070020006 wobbler shaft 2.000 au replacement of bar set 57 service from w058030070010010 chp wobller 24.000 au adjustment of bars 58 service from w058030070010012 chp wobbler chain & 4.000 au sprocket replacement 59 service from w050020010270001 conv belt 1.6m chute 3,000.000 m ms plate patch&weld 60 service from w050020010270002 chute ms plate 3,000.000 m cutting for patching 61 service from w050020010170001 conv belt 1.6m deck 300.000 au plate replace 62 service from w050020010030001 conv belt 1.6m roller 4,500.000 au replace 63 service from w050020010040001 conv belt 1.6m return1,200.000 au roller replace 64 service from w050020010070001 conv belt 1.6m roller 300.000 au frm replace 65 service from w050020010050001 conv belt 1.6m 30.000 au transition roller replace 66 service from w050020010060001 conv belt 1.6m impact 350.000 au roller replace 67 service from w050020010090001 conv belt 1.6m return100.000 au roller frm replace 68 service from w050020010100001 conv belt 1.6m impact 100.000 au roller frm replace 69 service from w050020010110001 transition roller 40.000 au frames replacement 70 service from w050020010120001 conv belt 1.6m satr 60.000 au frm replace 71 service from w050020010130001 conv belt 1.6m sarr 50.000 au frm replace 72 service from w050020010010001 conv belt 1.6m 500.000 m stringer channel replace 73 service from w050020010020001 stringer channel 1,000.000 m support replacement 74 service from w050020010210001 conv belt 1.6m take up6.000 au frm guide replace 75 service from w050020010080001 conv belt 1.6m skirt 500.000 m rbr replace 76 service from w050020010080002 conv belt 1.6m skirt 500.000 m rbr adjustment 77 service from w050020010150002 conv belt 1.6m 25.000 au scrapper rbr ajdustment 78 service from w057010010130001 fab ms stru 72.000 to occasional in situ erect 79 service from w050020010310001 conv belt 1.6m acces 65.000 au pm 80 service from w050020010220002 t/ up trolley pos, 3.000 au align when tr fl\ dn 81 service from, adjust of carrying frame to remove r/out 82 service from w058080010010005 chp ser onm skilled 150.00 day 83 service from w058080010010006 chp ser onm 680.000 au semiskilled 84 service from w050020010180001 conv belt 1.6m seal 25.000 au plate replace 85 service from w050010050010001 replacement of 45.000 au bearing and bearing block 86 service from w050010050020001 replacement of 5.000 au bearing and bearing block 87 service from, chp conv1600mm nondrive pully replace 88 service from w050020010300003 chp conv1600mm drive6.00 ea pully replacemnt 89 service from w017520020010001 replacement of 12.000 au complete gb assly 90 service from w055010010040001 type fcu 26 ht 20.000 au coupling replacement 91 service from w055040090010002 cplg gear eleconed 10.000 au coup replace 92 service from w050010050030001 lifting & realising to 110.000 au put conveyor back 93 service from w050020010390003 conv belt 1.6m belt 8,000.000 m pulling of snapped 94 service from w050020010390004 conv belt 1.6m belt 120.000 au position for joint 95 service from w050020010390005 conv belt 1.6m 30.000 au position for pulley lagg. 96 service from w050020010230001 screw take up 50.000 au releasing and tensioning 97 service from w050020010390006 conv belt 1.6m belt 6,000.000 m replace of comp or i 98 service from w050020010350002 steel cord rope 1,500.000 m replace 99 service from w050020010240003 shuttle conveyor 3.000 au wheel replacement 100 service from w057010010310002 fab ms stru chp hood 5.000 au covers replace 101 service from w058030090030010 chp pf wheel drive 12.000 au brg greasing 102 service from w017960020010003 gb allen optmax 2.000 au geared motor oil replace 103 service from w058040050010002 chp wt lnt mech appl 24.000 au cardn to wt 104 service from w058040050010003 mechanical system 24.000 au greasing of w.t all gr 105 service from w058030030100002 servicing and 12.000 au greasing of shaft brgs 106 service from w058030030070001 chp fdr aprn 24.000 au bullgear cardn comnd 107 service from w058030030020004 drive shaft disel 24.000 au washing and hand pack 108 service from w058030030080002 apron feeder bearing12.00 ea clearence checking 109 service from w058090070020001 complete assy 48.000 au greasing 110 service from w017520020010002 gear box oil top up 500.000 l 111 service from w055010010030003 cplg fluid pembr ty 500.000 l fcu 20 oil topup 112 service from w050020010300001 conv belt 1.6m pulley 132.000 au greasing 113 service from w050010050020004 bearing clea 20.000 au checking&hand pack greasing 114 service from w017520010010003 gearbox assembly oil15.000 au replacement 115 service from w055010010020001 type fcu 17.75 30.000 au coupling replacement 116 service from w058030070020005 wobbler shaft 48.000 au greasing of wobbler feeder 117 service from w058040050030004 oil top up & level 2,500.000 au maintenance 118 outline 00:00:00 amc of bc 106a/b and 1.000 au bc107a/b for 1st yr 119 service from w050020010270001 conv belt 1.6m chute 700.000 m ms plate patch&weld 120 service from w050020010270002 chute ms plate 700.000 m cutting for patching 121 service from w050020010170001 conv belt 1.6m deck 350.000 au plate replace 122 service from w058050010110001 oil top up in stacker 210.000 lt gear box 123 service from w058050010100001 oil top up in fluid 105.000 lt coupling 124 service from w050020010300001 conv belt 1.6m pulley 25.000 au greasing 125 service from w050020010030001 conv belt 1.6m roller 1,540.000 au replace 126 service from w050020010040001 conv belt 1.6m return560.000 au roller replace 127 service from w050020010050001 conv belt 1.6m 63.000 au transition roller replace 128 service from w050020010060001 conv belt 1.6m impact 105.000 au roller replace 129 service from w050020010120001 conv belt 1.6m satr 63.000 au frm replace 130 service from w050020010080001 conv belt 1.6m skirt 175.000 m rbr replace 131 service from w050020010080002 conv belt 1.6m skirt 280.000 m rbr adjustment 132 service from w050020010150002 conv belt 1.6m 18.000 au scrapper rbr ajdustment 133 service from w033020010100004 coal handling plant 70.000 au replacement of ds pi 134 service from w050020010350001 cleaning and 4.000 au lubrication 135 service from w050020010310001 conv belt 1.6m acces 34.000 au pm 136 service from w050020010220002 t/ up trolley pos, 7.000 au align when tr fl\ dn 137 service from w050020010390002 conv belt 1.6m belt 53.000 au r/out removl, alignt 138 service from w058050010040001 elecon 2250 tph sys 17.000 au greasing 139 service from w057010010130001 fab ms stru 18.000 to occasional in situ erect 140 service from w033030180010001 ser gen work 210.00 d semiskilled services 141 service from w033030180010002 ser gen work skilled70.000 h services 142 service from w050020010180001 conv belt 1.6m seal 18.000 au plate replace 143 service from w050010050020003 replacement of 8.000 au coupling side brg & brg b 144 service from w058080040030003 chp ser maint repair 7.000 au n-dri pulley 145 service from w058080040030002 chp ser maint repair 2.000 au dri pulley 146 service from w055010190090002 elecon cdir584 3.00 nos replacement 147 service from w055040090010002 cplg gear eleconed 3.000 au coup replace 148 service from w050020010390003 conv belt 1.6m belt 4,200.000 m pulling of snapped 149 service from w050020010390004 conv belt 1.6m belt 21.000 au position for joint 150 service from w050020010390005 conv belt 1.6m 8.000 au position for pulley lagg. 151 service from w050020010220001 conv belt 1.6m take up21.000 au lifting 152 service from w050020010390006 conv belt 1.6m belt 2,100.000 m replace of comp or i 153 service from w050020010350002 steel cord rope 105.000 m replace 154 service from w058050010110002 stacker gear box 4.000 au replacement 155 service from w058050010050004 s/r boom con. 1.000 m-2 disc.chute hood remov & re 156 service from w058050010100002 f/c motor remog and 4.000 au refitg of motor for 157 service from w050020010020001 stringer channel 700.000 m support replacement 158 service from w050020010010001 conv belt 1.6m 350.000 m stringer channel replace 159 service from w050020010130001 conv belt 1.6m sarr 21.000 au frm replace 160 service from w050020010070001 conv belt 1.6m roller 210.000 au frm replace 161 service from w050020010090001 conv belt 1.6m return42.000 au roller frm replace 162 service from w050020010100001 conv belt 1.6m impact 35.000 au roller frm replace 163 service from w050020010110001 transition roller 18.000 au frames replacement 164 service from w033020010100005 coal handling plant 70.000 au ds pipe line nozzles 165 service from w033020010100003 coal handling plant 70.000 m dust supprssion pipe 166 outline 00:00:00 amc for mech. works 1.000 au zone-a for 2nd yr 167 service from, chp pf blade replacement 168 service from w058030090030011 chp pf ccrd gb 2.000 au alignement 169 service from w058030090050001 chp pf travel drive 4.000 au gb replacement 170 service from w058030090030013 chp pf wheel gb 2.000 au removal other associates 171 service from w058030090050002 chp pf ccrd /pcrd 12.000 au chain /bolt fitting 172 service from w058040060010004 chp wt sac mech rope18.000 au replace 173 service from w058040060010003 chp wt sac mech 15.000 au re-railing 174 service from w058040060010002 chp wt sac mech 8.000 au replace shaft 175 service from w058040050040001 removal and fixing 64.000 au pads for wagon tipple 176 service from, wt resting rubber replace 177 service from w058040050020002 hydraulics system 8.000 au replacement of one hyd 178 service from w058040050020003 chp wt lnt hyds sys 6.000 au hyd. mot wt 179 service from w058040050010004 mechanical system 4.000 au replacemnt of clamp br 180 service from w058080040060007 chp ser maint wt posn2.000 au rail table 181 service from w058080040060008 chp ser maint wt posn2.000 au resting beam 182 service from w058030030080001 prevantive maintance12.000 au prevantive maintanc 183 service from w058030030020002 drive shaft 2.000 au replacement of c.shaft along 184 service from w058030030020007 replacement of 2.000 au apron drive shaft assy 185 service from w058030030040002 non-drive shaft 2.000 au replacement of non drive 186 service from w058030030010001 chp fdr aprn chain 100.000 au link replace 187 service from, chp apron pan replacement 188 service from w058030030020003 chp fdr aprn dri 200.000 au shaft replac shear bolt 189 service from w058030030010004 apron chain set of 28 32.000 au links replacement 190 service from w058030030010002 chp fdr aprn chain 16.000 au link tensioning 191 service from w058030030100001 removal of out and 8.000 au tensioning 192 service from, chp af return roller replacement 193 service from w058030030050002 chp fdr aprn pan nut 3,000.000 au bolt replace 194 service from w058030030020001 chp fdr aprn dri 2.000 au shaft brg replace 195 service from, chp af carrying roller replacement 196 service from w058090070020002 chp crusher internal48.000 au inspection 197 service from w058090070030012 chp crusher jack 16.000 au shaft bolt checking 198 service from w058090070030013 chp crusher jack 8.000 au shaft pin bush replc 199 service from w058090070020003 chp crusher prev 48.000 au maint 200 service from w058090070020004 chp crusher top or 24.000 au side plate removal 201 service from w058090070030003 chp crush revers uni 4.000 au dri sys replace 202 service from w058090070030007 chp crusher shaft 2.000 au brg replcement 203 service from w058090070030014 chp crusher 349.000 au replacement of grate bar 204 service from w058090070030005 chp crusher jack 4.000 au shaft brg repl coup end 205 service from w058090070030006 chp crucher jack 4.000 au shft brg replc free end 206 service from w058090070030008 chp crucher 16.000 au complete v belt replacement 207 service from, chp crusher body liner replacement 208 service from w058090070030016 chp crusher 4.000 au replacement of drive pulley 209 service from w058090070030010 chp crusher 8.000 au replacement of driven pulley 210 service from w058090070030011 chp crusher jack 2.000 au shaft replacement 211 service from w058090070010002 chp crusher rotor 12.000 au replacement 212 service from w058090070030015 chp crusher broken 4.000 au hammer eplacement 213 service from, chp wobbler lower cage bar replcement 214 service from w058030070030001 wobbler sys 48.000 au preventive maintenance 215 service from w058030070010003 drive unit 6.000 au replacement of triplex chain 216 service from w058030070020003 replacement of 60.000 au wobbler bar drive end bea 217 service from w058030070010002 drive unit 6.000 au replacement of simplex chain 218 service from w058030070020001 wobbler shaft 36.000 au replacement of wobbler bar 219 service from w058030070020002 replacement of 60.000 au wobbler bar free end bear 220 service from w058030070010001 drive unit 200.000 au replacement of shear pin 221 service from w058030070020006 wobbler shaft 2.000 au replacement of bar set 222 service from w058030070010010 chp wobller 24.000 au adjustment of bars 223 service from w058030070010012 chp wobbler chain & 4.000 au sprocket replacement 224 service from w050020010270001 conv belt 1.6m chute 3,000.000 m ms plate patch&weld 225 service from w050020010270002 chute ms plate 3,000.000 m cutting for patching 226 service from w050020010170001 conv belt 1.6m deck 300.000 au plate replace 227 service from w050020010030001 conv belt 1.6m roller 4,500.000 au replace 228 service from w050020010040001 conv belt 1.6m return1,200.000 au roller replace 229 service from w050020010070001 conv belt 1.6m roller 300.000 au frm replace 230 service from w050020010050001 conv belt 1.6m 30.000 au transition roller replace 231 service from w050020010060001 conv belt 1.6m impact 350.000 au roller replace 232 service from w050020010090001 conv belt 1.6m return100.000 au roller frm replace 233 service from w050020010100001 conv belt 1.6m impact 100.000 au roller frm replace 234 service from w050020010110001 transition roller 40.000 au frames replacement 235 service from w050020010120001 conv belt 1.6m satr 60.000 au frm replace 236 service from w050020010130001 conv belt 1.6m sarr 50.000 au frm replace 237 service from w050020010010001 conv belt 1.6m 500.000 m stringer channel replace 238 service from w050020010020001 stringer channel 1,000.000 m support replacement 239 service from w050020010210001 conv belt 1.6m take up6.000 au frm guide replace 240 service from w050020010080001 conv belt 1.6m skirt 500.000 m rbr replace 241 service from w050020010080002 conv belt 1.6m skirt 500.000 m rbr adjustment 242 service from w050020010150002 conv belt 1.6m 25.000 au scrapper rbr ajdustment 243 service from w057010010130001 fab ms stru 72.000 to occasional in situ erect 244 service from w050020010310001 conv belt 1.6m acces 65.000 au pm 245 service from w050020010220002 t/ up trolley pos, 3.000 au align when tr fl\ dn 246 service from, adjust of carrying frame to remove r/out 247 service from w058080010010005 chp ser onm skilled 150.00 day 248 service from w058080010010006 chp ser onm 680.000 au semiskilled 249 service from w050020010180001 conv belt 1.6m seal 25.000 au plate replace 250 service from w050010050010001 replacement of 45.000 au bearing and bearing block 251 service from w050010050020001 replacement of 5.000 au bearing and bearing block 252 service from, chp conv1600mm nondrive pully replace 253 service from w050020010300003 chp conv1600mm drive6.00 ea pully replacemnt 254 service from w017520020010001 replacement of 12.000 au complete gb assly 255 service from w055010010040001 type fcu 26 ht 20.000 au coupling replacement 256 service from w055040090010002 cplg gear eleconed 10.000 au coup replace 257 service from w050010050030001 lifting & realising to 110.000 au put conveyor back 258 service from w050020010390003 conv belt 1.6m belt 8,000.000 m pulling of snapped 259 service from w050020010390004 conv belt 1.6m belt 120.000 au position for joint 260 service from w050020010390005 conv belt 1.6m 30.000 au position for pulley lagg. 261 service from w050020010230001 screw take up 50.000 au releasing and tensioning 262 service from w050020010390006 conv belt 1.6m belt 6,000.000 m replace of comp or i 263 service from w050020010350002 steel cord rope 1,500.000 m replace 264 service from w050020010240003 shuttle conveyor 3.000 au wheel replacement 265 service from w057010010310002 fab ms stru chp hood 5.000 au covers replace 266 service from w058030090030010 chp pf wheel drive 12.000 au brg greasing 267 service from w017960020010003 gb allen optmax 2.000 au geared motor oil replace 268 service from w058040050010002 chp wt lnt mech appl 24.000 au cardn to wt 269 service from w058040050010003 mechanical system 24.000 au greasing of w.t all gr 270 service from w058030030100002 servicing and 12.000 au greasing of shaft brgs 271 service from w058030030070001 chp fdr aprn 24.000 au bullgear cardn comnd 272 service from w058030030020004 drive shaft disel 24.000 au washing and hand pack 273 service from w058030030080002 apron feeder bearing12.00 ea clearence checking 274 service from w058090070020001 complete assy 48.000 au greasing 275 service from w017520020010002 gear box oil top up 500.000 l 276 service from w055010010030003 cplg fluid pembr ty 500.000 l fcu 20 oil topup 277 service from w050020010300001 conv belt 1.6m pulley 132.000 au greasing 278 service from w050010050020004 bearing clea 20.000 au checking&hand pack greasing 279 service from w017520010010003 gearbox assembly oil15.000 au replacement 280 service from w055010010020001 type fcu 17.75 30.000 au coupling replacement 281 service from w058030070020005 wobbler shaft 48.000 au greasing of wobbler feeder 282 service from w058040050030004 oil top up & level 2,500.000 au maintenance 283 outline 00:00:00 amc of bc 106a/b and 1.000 au bc107a/b for 2nd yr 284 service from w050020010270001 conv belt 1.6m chute 700.000 m ms plate patch&weld 285 service from w050020010270002 chute ms plate 700.000 m cutting for patching 286 service from w050020010170001 conv belt 1.6m deck 350.000 au plate replace 287 service from w058050010110001 oil top up in stacker 210.000 lt gear box 288 service from w058050010100001 oil top up in fluid 105.000 lt coupling 289 service from w050020010300001 conv belt 1.6m pulley 25.000 au greasing 290 service from w050020010030001 conv belt 1.6m roller 1,540.000 au replace 291 service from w050020010040001 conv belt 1.6m return560.000 au roller replace 292 service from w050020010050001 conv belt 1.6m 63.000 au transition roller replace 293 service from w050020010060001 conv belt 1.6m impact 105.000 au roller replace 294 service from w050020010120001 conv belt 1.6m satr 63.000 au frm replace 295 service from w050020010080001 conv belt 1.6m skirt 175.000 m rbr replace 296 service from w050020010080002 conv belt 1.6m skirt 280.000 m rbr adjustment 297 service from w050020010150002 conv belt 1.6m 18.000 au scrapper rbr ajdustment 298 service from w033020010100004 coal handling plant 70.000 au replacement of ds pi 299 service from w050020010350001 cleaning and 4.000 au lubrication 300 service from w050020010310001 conv belt 1.6m acces 34.000 au pm 301 service from w050020010220002 t/ up trolley pos, 7.000 au align when tr fl\ dn 302 service from w050020010390002 conv belt 1.6m belt 53.000 au r/out removl, alignt 303 service from w058050010040001 elecon 2250 tph sys 17.000 au greasing 304 service from w057010010130001 fab ms stru 18.000 to occasional in situ erect 305 service from w033030180010001 ser gen work 210.00 d semiskilled services 306 service from w033030180010002 ser gen work skilled70.000 h services 307 service from w050020010180001 conv belt 1.6m seal 18.000 au plate replace 308 service from w050010050020003 replacement of 8.000 au coupling side brg & brg b 309 service from w058080040030003 chp ser maint repair 7.000 au n-dri pulley 310 service from w058080040030002 chp ser maint repair 2.000 au dri pulley 311 service from w055010190090002 elecon cdir584 3.00 nos replacement 312 service from w055040090010002 cplg gear eleconed 3.000 au coup replace 313 service from w050020010390003 conv belt 1.6m belt 4,200.000 m pulling of snapped 314 service from w050020010390004 conv belt 1.6m belt 21.000 au position for joint 315 service from w050020010390005 conv belt 1.6m 8.000 au position for pulley lagg. 316 service from w050020010220001 conv belt 1.6m take up21.000 au lifting 317 service from w050020010390006 conv belt 1.6m belt 2,100.000 m replace of comp or i 318 service from w050020010350002 steel cord rope 105.000 m replace 319 service from w058050010110002 stacker gear box 4.000 au replacement 320 service from w058050010050004 s/r boom con. 1.000 m-2 disc.chute hood remov & re 321 service from w058050010100002 f/c motor remog and 4.000 au refitg of motor for 322 service from w050020010020001 stringer channel 700.000 m support replacement 323 service from w050020010010001 conv belt 1.6m 350.000 m stringer channel replace 324 service from w050020010130001 conv belt 1.6m sarr 21.000 au frm replace 325 service from w050020010070001 conv belt 1.6m roller 210.000 au frm replace 326 service from w050020010090001 conv belt 1.6m return42.000 au roller frm replace 327 service from w050020010100001 conv belt 1.6m impact 35.000 au roller frm replace 328 service from w050020010110001 transition roller 18.000 au frames replacement 329 service from w033020010100005 coal handling plant 70.000 au ds pipe line nozzles 330 service from w033020010100003 coal handling plant 70.000 m dust supprssion pipe


Tender Value : 27357821.88
Due Date : Jul 14, 2026

Unlock Full Tender Access

Start Free Trial to download documents before deadline

T18 Ref No : 16042325
Source : GEM Tenders

tender for erection and fabrication work c erection and fabrication work c 50 , erection and fabrication work c 51 , erection and fabrication work c 52 , erection and fabrication work c 53 , erection and fabrication work c 54 , erection and fabrication work c 55 , erection and fabrication work c 56 , erection and fabrication work c 57 , erection and fabrication work c 58 , erection and fabrication work c 59 , erection and fabrication work c 60 , erection and fabrication work c 61 , erection and fabrication work c 62 , erection and fabrication work c 63 , erection and fabrication work c 64 , erection and fabrication work c 65 , erection and fabrication work c 66 , erection and fabrication work c 67 , erection and fabrication work c 68 , erection and fabrication work c 69 , erection and fabrication work c 70 , erection and fabrication work c 71 , erection and fabrication work c 72 , erection and fabrication work c 73 , erection and fabrication work c 74 , erection and fabrication work c 75 , erection and fabrication work c 76 , erection and fabrication work c 77 , erection and fabrication work c 78 , erection and fabrication work c 79 , erection and fabrication work c 80 , erection and fabrication work c 81 , erection and fabrication work c 82 , erection and fabrication work c 83 , erection and fabrication work c 84 , erection and fabrication work c 85 , erection and fabrication work c 86 , erection and fabrication work c 87 , erection and fabrication work c 88 , erection and fabrication work c 89 , erection and fabrication work c 90 , erection and fabrication work c 91 , erection and fabrication work c 92 , erection and fabrication work c 93 , erection and fabrication work c 94 , erection and fabrication work c 95 , erection and fabrication work c 96 , erection and fabrication work c 97 , erection and fabrication work c 98 , erection and fabrication work c 99 , erection and fabrication work c 100 , erection and fabrication work c 101 , erection and fabrication work c 102 , erection and fabrication work c 103 , erection and fabrication work c 104 , erection and fabrication work c 105, erection and fabrication work c, cutting and removing the weak shells of pan/quad bodies, fabricating new ones from 10/12 mm thick plate and installing them in place, doing double coat welding from inside and outside, and conducting a leak-proof water/vacuum trial., dismantling the 600/1000 mm diameter right/angle type vapour valves installed on the vapour/steam lines of quad and pan, repairing the valves to make them leak-proof, and after testing, refitting them in place., replacing the weak/broken vapour pipe bends of pan/quad vapour pipes by fabricating new ones, ranging from 600 mm to 1100 mm diameter., providing support to the vapour pipes, vapour/exhaust steam lines of quad and pan by fabricating t/rings from angle iron or plate to strengthen them., removing the old leaking steam jackets of vapour cells, semi/kestner, pan, and quad bodies, fabricating new ones from 10/12 mm plate, installing them, and conducting a leak-proof trial., fitting fin-type cyclones on pan, quad, and vapour shells, fabricating new ones from 8/10 mm plate, installing them, welding, and conducting a satisfactory trial., cutting/removing the weak/broken/leaky valves installed on various steam lines of quad/pans, repairing the valves as necessary, and refitting them as per instructions., for replacing the worn/damaged worm wheel gland housing bushes of the drive of air cooled/dry seed/vacuum/twin vertical crystallizers, dismantling and separating the worm wheel and worm shaft housings, fitting new gun metal bushes in the gland housings, and after housing fitting, aligning and fitting the worm wheel and worm housings as before., cutting and removing the weak/broken parts of the vacuum crystallizer shell, repairing/modifying the shell from new/old plate, fitting it in place, doing leak-proof welding from inside and outside, and providing necessary strengthening from outside., dismantling and removing the damaged-tooth worm and worm wheel of the air/water cooled/vacuum/twin vertical crystallizer, fitting new worm and worm wheel in their place, installing the reduction gear and motor, aligning them, and conducting a trial., cutting and removing the weak gutters from various gutters installed on pans/crystallizers, and fabricating and installing new ones from old plate., dismantling the old/weak/broken shaft of air/water cooled crystallizers, fabricating a new shaft, installing it in place, fitting all arms, and conducting a satisfactory trial., cutting and removing the weak/broken parts of the shaft of air/water cooled crystallizers, fabricating a shaft from m.s. plate, fitting the new pipe shaft in place, installing all arms as before, and conducting a satisfactory trial., removing the loose/worn gun metal bush bearings on both sides of the crystallizer drive shaft, fitting new bushes, and conducting a trial., cutting and removing the weak arms on the shaft of the air/water cooled crystallizer, fabricating new arms from m.s. plate/pipe, installing them on the shaft, and conducting a successful trial., repairing the leaky/weak gate valve of the air/water cooled crystallizer and fitting it to be leak-proof., dismantling and removing the weak/broken section pipes from the elliptical suction pipes of mf 35x35 spray pumps installed for spraying, fabricating new ones with strainer from 8/10 mm thick m.s. plate as per sample, fitting them in place, and conducting a leak-proof trial., performing necessary repairs on the multi/jet spray boxes installed in the condenser of quad/pans., cutting the weak/broken parts of the main header, branch header, and branch lines of the spray pond, fabricating new ones from new/old plate as per instructions, fitting them in place, and conducting a leak-proof trial., cutting and removing the weak parts of the common injection header, fabricating a new one, erecting it in place, and conducting a leak-proof trial., fabricating the weak/broken resistance box of the drive motor of the injection/spray pump, fitting all internals, making connections, and conducting a satisfactory trial., dismantling the weak/broken base frame of the vertical spray pump, fabricating a new bed as per the old one, leveling it, installing it in place, fitting the pump, and aligning it., cutting and removing the weak/broken feed distribution headers of the pans, fabricating new headers from m.s. plate/pipe as per instructions, fitting them in place, making all connections as before, and conducting a successful water trial., cutting and removing the weak bottom/side plates of tanks built for storing syrup/melt and various molasses at the pan station, installing new/old plates as per


Due Date : Jul 15, 2026
Published By

Every year, central and state government departments release thousands of high-value contracts specifically dedicated to Wheel Aligner. Whether it involves bulk material supply, executing specialized operational services, or end-to-end turnkey project execution, the demand for capable vendors in the Wheel Aligner sector is massive.

At Tender18, we help businesses cut through the noise and exclusively target the exact work categories they specialize in. Instead of browsing through generic procurement sites, our platform isolates high-potential opportunities that match your specific industry capabilities.

Work Dynamics in the Wheel Aligner Sector

Government requirements for this specific vertical generally fall into distinct procurement patterns:

  • Product & Material Supply: Tenders focused strictly on sourcing, testing, and delivering high-quality items that meet the exact technical specifications of the buyer.
  • Service Level Agreements (SLAs): Long-term hiring of expert agencies for routine maintenance, manpower deployment, or continuous operational management.
  • Execution & Turnkey Projects: Comprehensive contracts where the bidder is responsible for everything from raw material procurement to final site installation and testing.

By focusing purely on your core strength in Wheel Aligner, you can build a highly profitable and stable pipeline of government clients.

Stop wasting time filtering through irrelevant notices. Our Wheel Aligner Tender Information Service is engineered for precision. We track exact product codes, service names, and specialized work terms across all government portals nationwide. When a buyer publishes a requirement that matches your specific business profile, our system alerts you instantly.

Deep Technical Insights & Documentation For Wheel Aligner Tenders

Bidding for specific works requires studying strict technical parameters. We provide immediate access to the core documents you need to evaluate the project:

  • Detailed Specifications & Drawings: Download the exact engineering guidelines, material testing standards, and quality benchmarks demanded by the buyer for Wheel Aligner.
  • Financial BOQ Spreadsheets: Access the official blank pricing formats where you need to input your unit rates, tax configurations, and total bid value.
  • Real-Time Technical Amendments: If the buying department changes the product specifications, alters the service scope, or shifts the delivery timeline, we instantly update the parent file so you are never caught off-guard.

Winning a contract for Wheel Aligner depends entirely on how perfectly your technical capabilities match the buyer’s demands. Even if you have the best product or service, a poorly formatted document or a missing compliance certificate will lead to instant technical rejection. Tender18’s Tender Bidding Service eliminates this risk by taking complete ownership of your digital submission.

Flawless Compliance & Portal Execution For Wheel Aligner Tenders

Under this service, Tender18 assigns a Dedicated Experienced Technical Person to your profile. This expert handles the heavy lifting of the entire bidding cycle:

  • Capability Mapping: We thoroughly cross-check your past completion certificates, ISO standard proofs, and financial turnover against the strict eligibility criteria required for Wheel Aligner bids.
  • Secure System Integration: Our technical desk seamlessly links your Class III Digital Signature Certificate (DSC) with the required e-procurement servers to securely encrypt your technical and financial envelopes.
  • Error-Free Financial Uploads: We audit your quoted BOQ pricing sheets for any formula or formatting errors before the final upload, ensuring your bid is successfully locked before the portal's closing hours.

Government buyers are aggressively using the Government e-Marketplace (GeM) for the direct procurement of Wheel Aligner. If your business profile is not accurately mapped on this portal, you remain practically invisible to these purchasing officers. Recognized as a trusted and expert GeM consultant, Tender18 offers specialized support to build, optimize, and maintain a highly visible vendor account for your business.

With an industry-leading support success ratio of over 95%, we handle the complex marketplace compliance so you can focus entirely on executing your orders

Expert Profile Management & Catalogue

Our dedicated consultants ensure your GeM presence is structurally perfect:

  • Precise Catalogue Listing: We upload and categorize your specific offerings under the exact search terms and parameters used by government buyers looking for Wheel Aligner, ensuring maximum search visibility.
  • OEM Dashboard & Assessment: For original manufacturers and creators, we guide you through the mandatory Quality Council of India (QCI) vendor assessments to successfully unlock your official OEM panel.
  • Profile Compliance & Caution Money: We manage your statutory documentation, brand approvals, and caution money limits to keep your account immune from technical suspensions.

Strategic Live Bid Participation

Beyond setup, we actively drive your market participation. Our team expertly handles the digital paperwork and rate configurations for GeM Custom Bids and Reverse Auctions (RA) related to Wheel Aligner, maximizing your chances of securing L1 status.

1.

How do I find government contracts exclusively matching my work in Wheel Aligner?

The easiest way is through the Tender18 platform. Instead of searching department by department, our system uses advanced keyword matching to gather all live supply, service, and execution tenders related directly to your core business in one place.

2.

Do I need specific testing or quality certificates to apply for these contracts?

It heavily depends on the nature of the work. For supply contracts, buyers often ask for ISO certifications, BIS marks, or specific lab testing reports. For service contracts, they may ask for labor licenses or past performance certificates (work orders).

3.

What is a BOQ and why is it important for my bid?

The Bill of Quantities (BOQ) is the official financial Excel sheet where you enter your competitive prices. Any mistake in this file—like adding extra rows, changing formulas, or saving it in the wrong format—will cause the portal server to reject your entire bid.

4.

Are samples required to be submitted physically before the digital bid opens?

For many product-based Wheel Aligner tenders, buying departments do ask bidders to submit physical samples to their office before the digital technical evaluation date. This requirement is always clearly mentioned in the official NIT document.

5.

How does the Dedicated Tender Expert from Tender18 help me?

Our assigned expert manages your total portal compliance. They extract the hidden rules from long tender PDFs, create a precise document checklist for your team, map your digital signature, and securely upload your technical and financial files onto the government servers.

6.

What is the role of a Digital Signature Certificate (DSC)?

A Class III DSC is a secure USB device that contains your digital identity. You cannot upload a bid without it. It is used to securely encrypt and lock your sensitive price data and technical documents so no one can view them before the official opening date.

7.

As an MSME, can I get financial benefits when bidding for Wheel Aligner?

Yes, the government strongly supports MSMEs. By uploading a valid Udyam Registration Certificate in the technical envelope, small businesses are frequently exempted from paying the initial Tender Document Fee and the Earnest Money Deposit (EMD).

8.

Why should I list my services or products on GeM for this category?

GeM is now the primary digital marketplace for all government agencies. If you are properly cataloged for Wheel Aligner, officers can view your profile and generate direct purchase orders or invite you to participate in exclusive Custom Bids.

9.

What makes Tender18 a reliable GeM support partner?

As a highly trusted and expert GeM consultant, Tender18 holds a proven support success ratio of over 95%. From flawless profile creation and complex catalogue mapping to OEM panel approvals and live Reverse Auction (RA) support, we handle it all seamlessly.

10.

What does "L1" mean in these government contracts?

"L1" stands for "Lowest Bidder 1". In government procurement, after all technical envelopes are approved, the financial sheets (BOQs) are opened. The bidder who has quoted the lowest compliant price for Wheel Aligner is declared L1 and is generally awarded the contract