Search Tenders
Filters
Reset All
Tender Status
T18 Ref No
All States
All Cities
All Agencies
Tender ID
Due Date
Tender Value
Tender Source (GeM, Cppp & Others)
Tender Type

6Latest Track alignment machine Tenders List

Latest Track alignment machine Tenders in India – Verified Leads & Real-Time Insights by Tender18

Finding the right Track alignment machine tenders in India’s competitive e-procurement ecosystem requires more than just access—it demands accurate data, real-time monitoring, and expert analysis.

At Tender18 Infotech Private Limited, we bring deep industry experience in government procurement to help businesses identify, evaluate, and win Track alignment machine tenders efficiently. With a centralized platform aggregating 1100+ live tenders, we provide a single, trusted source for opportunities from central, state, and PSU departments.


Real-Time Track alignment machine Tender Intelligence & Monitoring

Our advanced dashboard delivers actionable insights and structured tender data, enabling you to make faster and smarter bidding decisions.

We categorize Track alignment machine tenders into:

  • Supply Tenders – BOQs and specifications sourced from GeM and PSUs
  • Service Tenders – NITs and scope of work from CPPP and state portals
  • EPC Projects – Large-scale infrastructure tenders with financial and design data

✔ This structured approach ensures complete transparency and deeper bid analysis before submission.


Comprehensive Sources of Track alignment machine Tenders

Tender18 acts as a centralized gateway by aggregating tenders from trusted and official sources:

  • Central Government Portals – CPPP, NIC, and Government e-Marketplace (GeM)
  • Railways & Transport – IREPS and Metro Rail projects
  • Power & Energy PSUs – NTPC, ONGC, NHPC, PowerGrid
  • Defense & Strategic Sectors – MES and DRDO tenders
  • State e-Procurement Portals – Gujarat, Maharashtra, Tamil Nadu, UP, and more

✔ Every listing is verified and regularly updated to maintain data accuracy and trust.


Step-by-Step Guide to Participate in Track alignment machine Tenders

1. Eligibility & Prequalification

Before bidding, ensure compliance with:

  • Financial turnover requirements (30–50% of tender value)
  • Past experience (2–3 similar projects)
  • Valid solvency certificate

2. Mandatory Documentation Checklist

Prepare the following to avoid disqualification:

  • Digital Signature Certificate (Class 3 DSC)
  • GST, PAN, MSME/Udyam registration
  • EMD (Earnest Money Deposit) or exemption proof
  • Technical bid with execution methodology

3. BOQ Analysis & Financial Bidding

The BOQ (Bill of Quantities) is the most critical component:

  • Analyze item-wise pricing
  • Ensure competitive yet sustainable quotes
  • Avoid underbidding risks (L1 pressure)

✔ Expert analysis can significantly improve your bid success ratio.


Why Tender18 is a Trusted Platform for Track alignment machine Tenders

✔ Proven Expertise in Government Procurement

We combine industry knowledge with practical bidding experience.

✔ Verified & Reliable Data

All Track alignment machine tenders are sourced from official portals and cross-checked for accuracy.

✔ Advanced Filtering Tools

Filter tenders by value, EMD, location, and category for precise targeting.

✔ Corrigendum & Update Tracking

Get instant alerts on deadline changes and specification updates.

✔ Historical Data Insights

Analyze past tender results to understand pricing trends and competition.

✔ End-to-End Bidding Support

From discovery to submission, including GeM onboarding and strategy.


Growth of Track alignment machine Sector in 2026

With the Government of India focusing on digital procurement and infrastructure expansion, the Track alignment machine sector has seen significant growth in e-tendering opportunities.

The rise of GeM-based procurement models like:

  • L1 Purchase
  • Direct Procurement
  • MSME-friendly policies

…has made it easier for startups and SMEs to participate and win contracts


Frequently Asked Questions (SEO Optimized)

How can I get daily Track alignment machine tender alerts?

You can register on Tender18 and select your preferred category. You will receive daily email alerts with all new Track alignment machine tenders.

Is EMD mandatory for all Track alignment machine tenders?

No, MSME and Udyam-registered businesses may get exemptions. Always check the NIT for specific conditions.

What is the difference between a Track alignment machine work tender and supply tender?

A supply tender involves delivering goods, while a work tender includes execution, labor, and project completion.

Can I access private Track alignment machine tenders on Tender18?

Yes, we also track major private sector and EPC tenders along with government opportunities.


Get Expert Support for Track alignment machine Tenders

Tender18 is more than a listing platform—we are your strategic partner in winning tenders.

Our services include:

  • Tender discovery & analysis
  • Documentation support
  • Bid strategy & submission
  • GeM registration & OEM onboarding

📞 Call / WhatsApp: +91 7069661818
🌐 Website: www.tender18.com

Due Date
T18 Ref No : 17500113
Location : imphal , manipur
Source : GEM Tenders
LIVE TENDER
tender for x ray view box size 28 x 17 inch , elliptical trainer , seated horizontal leg press , dual lat pull and mid row , assisted pull up and dip machine , hip adductor machine , dual ab and back machine , biceps and triceps machine , recumbent bike , shoulder press machine , arcadia functional trainer , fms test kit , y balance test kit, sports science phase ii, double film led x ray view box with black frame and automatic film activation sensor with variable brightness controller viewing area 43 point 5 x 34 point 5 cm led display 12 v 50 to 60 hz power requirement high glossy led bulbs with dimmer for brightness adjustment power consumption 20 w dimensions length 59 cm width 50 cm weight 4 point 8 kg, led display with dot matrix size 340 x 440 mm display readings including speed time distance calories resistance level watts and pulse stride length 500 x 220 mm magnetic resistance with minimum 20 levels crank arm 254 mm support for preset programmes suitable for elite athletes maximum user weight 150 kg assembly area 2150 x 770 x 1940 mm usb charger and ac power supply product shall have valid bs en iso certification, dual function machine allowing users to work at least two major muscle groups with efficient use of space angle designed for optimal lower body alignment and proper biomechanics weight stack with sound dampeners and magnetized selector 5 inch deep groove pom pulleys for consistent cable tracking 14 gauge machine welded frame stainless steel guide rods heavy duty marine grade cushions multiple adjustment points step through design for safe access unit weight 242 point 5 kg dimensions 92 x 43 x 67 inch maximum weight stack 200 kg with 1 to 2 pulley ratio maximum user weight 227 kg plate increments 5 kg and 7 point 5 kg starting weight for leg press and calf extension 26 kg, dual function machine allowing users to work at least two major muscle groups dual cam system for improved biomechanics and reduced cable slack 14 gauge machine welded frame stainless steel guide rods heavy duty marine grade cushions multiple adjustment points direct drive system with two opposing cams fully adjustable chest and back pad multiple foot supports plate increments 5 kg unit weight 215 kg dimensions 44 x 42 x 57 inch weight stack 100 kg maximum user weight 227 kg, dual function machine for pull ups and dips integrated weight assisted platform to offset user body weight weight stack with sound dampeners and magnetized selector fork 14 gauge machine welded frame stainless steel guide rods heavy duty marine grade cushions multiple adjustment points fold away assist pad plate increments 5 kg unit weight 217 kg dimensions 49 x 41 x 76 inch weight stack 100 kg maximum user weight 227 kg starting weight 6 point 5 kg, combined functionality for hip adduction and abduction length 1406 mm width 850 mm height 1195 mm standard weight stack 70 kg plus weight stack 100 kg machine weight 208 kg knee pads and dual foot positions for leg support and reduced torque around knees robotic welding two coated powder coating pipe gauge more than 3 mm oval or round pipe construction, dual function machine allowing users to work at least two major muscle groups dual cam system for improved biomechanics and reduced cable slack 14 gauge machine welded frame stainless steel guide rods heavy duty marine grade cushions multiple adjustment points direct drive system with two opposing cams fully adjustable chest and back pad multiple foot supports plate increments 5 kg unit weight 215 kg dimensions 44 x 42 x 57 inch weight stack 100 kg maximum user weight 227 kg starting weight for ab crunch and back extension 3 point 5 kg, dual function machine for biceps and triceps training system designed for improved biomechanics and reduced cable slack weight stack with sound dampeners and magnetized selector fork 14 gauge machine welded frame stainless steel guide rods heavy duty marine grade cushions multiple adjustment points adjustable seat back and bottom heavy duty arm pad with chest support plate increments 5 kg unit weight 220 kg dimensions 54 point 5 x 41 point 6 x 57 inch weight stack 100 kg maximum user weight 227 kg starting weight for biceps 5 kg and triceps 3 kg, power operated recumbent bike with 14 resistance levels oversized padded seat step through design for easy access white backlit display with multiple programmes adjustable pedal straps multiple workout programmes display readings including calories time rpm and workout level workout programmes including track hill random and interval maximum user weight 150 kg unit weight 61 kg dimensions 66 x 25 point 9 x 51 inch, plate increments 5 kg unit weight 227 point 5 kg dimensions 55 point 7 x 56 point 6 x 65 point 1 inch weight stack 100 kg maximum user weight 227 kg starting weight 9 kg 5 inch deep groove pom pulleys for consistent cable tracking 14 gauge machine welded frame stainless steel guide rods heavy duty marine grade cushions multiple adjustment points multi position grip for improved biomechanics adjustable starting position for targeting different muscle groups, dual adjustable pulley system with independent weight stacks for bilateral and unilateral exercises digitally controlled resistance or integrated digital display for tracking load repetitions tempo and power output smooth and precise cable movement with high quality pulleys and coated steel cables adjustable pulley height positions heavy duty steel frame integrated touchscreen or digital interface for workout selection data monitoring and user feedback bluetooth and wi fi connectivity ergonomic handles and attachments including d handles triceps rope straight bar and ankle strap built in safety features smooth weight transition minimum resistance range of 0 point 5 kg increments up to at least 100 kg per stack or equivalent digital load space efficient design suitable for sports science and high performance training setups, kit shall include equipment required to conduct all seven original fms tests shall include meter measuring stick or dowel rope for hurdle step test and mcs slide box, test kit developed by functional movement systems grey cook three directional arms extending from a central point in the shape of the letter y minimum arm length 1 point 5 m in each direction arm configuration for anterior posteromedial and posterolateral reach testing lightweight durable plastic or rubber construction non slip surface texture markers or indicator flags on platforms and arms to indicate starting point and measure reach distance calibrated for accuracy full coating coverage across platform surface for consistent traction carrying case suitable for platform and kit components printed instructional materials for setup administration and interpretation of test results on site installation and training shall be provided
T18 Ref No : 17632439
Location : new delhi , delhi
Source : GEM Tenders
LIVE TENDER
tender for sports equipment tender 4 indian archery complete set , archery wooden arrow , archery target buttress , archery compound complete set , archery target buttress , archery recurve complete set , archery telescope , archery string zig , archery string spool 8125 , archery compound bow bag , archery in out nock 2 no for x10 , archery in out nock 1 no , archery spin vanes , archery plastic flex fletch , archery buttress stand , archerytarget face 122 cms , archery target face 80 cms 6 ring , archery target face 80 cms , archery arrow easton x 10 , archery tungston point , athletics high jump upright , athletics high jump pit , athletics high jump cross bar , athletics discuss 1kg , athletics discuss 1 point 5kg , athletics discuss 1point 75kg , athletics discuss 2kg , athletics ring for discuss , athlectics shotput 3kg , athletics shotput 4kg , athletics shotput 5kg , athletics shotput 6kg , athletics shotput 7 26kg , athletics ring for shotput , athletics hammer 4kg , athletics hammer 5kg , athletics hammer 6kg , athletics hammer 7point26kg , athletics javelin 600gms for competition , athletics javelin 700gms for competition , athletics javelin 800gms for competition , athletics javelin 500gms for practice , athletics javelin 600gms for practice , athletics javelin 700gms for practice , athletics javelin 800gms for practice , athletics starting block , athletics hurdel , athletics relay battons , athletics take off board , athletics toe board , athletics distance measuring tape , athletics spring board , athletics iron ball 600gram , athletics iron ball 800gram , athletics clapper , athletics drag run , athletics iron shoes , cycling track cycle carbon , cycling road cycle carbon , cycling track wheels , cycling aero bar , cycling seat post clamp , cycling water bottle , cycling paddle shimano , cycling speedometer , cycling cleat , cycling tyre competition tyre , cycling pump , cycling wheel set , cycling disc rear , cycling disc front , cycling tube , cycling helmet , cycling shoes , cycling seat , cycling dreluier , cycling chain , cycling sproket s , cycling tool kit , cycling front fourspoke carbon wheel , cycling back road disk carbon , gymnastic rhythmic gymnastic ball , gymnastic rhythmic gymnastic ribbon , gymnastic rhythmic gymnastic rope , gymnastic rhythmic gymnastic club , gymnastic rhythmic gymnastic hoops , gymnastic parallel bar heavy base , gymnastic balancing beam standard size , gymnastic balancing beam junior size , gymnastic trampoline 3 mtrx 3 mtr , gymnastic horizontal bar , gymnastic crash mat , gymnastic uneven bar , gymnastic vaulting table , gymnastic spring board , gymnastic mushroom horse , gymnastic wall bar , gymnastic bench , gymnastic mats for competition , gymnastic helping box , gymnastic runway , gymnastic carpet cover , gymnastic magnesium powder , gymnastic seftycoler mat , gymnastic uneven bar , gymnasticmini horizontal bar , gymnasium items treadmill , gymnasium items exercise cycle , gymnasium items cross trainer , gymnasium items rowing machine , gymnasium items stair climber , gymnasium items abdominal board , gymnasium items adjustable bench chest , gymnasium items cable crossover pully , gymnasium items smith machine , gymnasium items seated leg press , gymnasium items ez bar , gymnasium items triceps bar and rope , gymnasium items cross fit , gymnasium items multi gym 8 stations , gymnasium items thigh machine , gymnasium items cable crossover over , gymnasium items t bar , gymnasium items leg extension , shooting pallets , shooting 10m paper roll , shooting 10m air pistol rubber template , shooting 10m air rifle rubber template , shooting 10m roll stick , shooting 15 target safety acrylic, made of fine quality wooden with proper grip as per international standard and norms, made of fine quality wooden as per international standard and norms, made of munj grass and hard rubber as per international standard and norms, made of carbon complete set as per international standard and norms, munj grass and hard rubber as per international standard and norms, made of carbon, complete set as per international standard and norms, 45 degree as per international standard and norms, fully ajustable as per international standard and norms, hmpe 75percent as per international standard and norms, made of fine fabric with wheels as per international standard and norms, made of polycarbonate as per international standard and norms, 1 inch size as per international standard and norms, 187 ffp as per international standard and norms, wooden made as per international standard and norms, threaded fita face as per international standard and norms, carbon made as per international standard and norms, tungston 120 grains as per international standard and norms, semi hollow extruded aluminium profile 140mm x 59mm 5 5mm thickness telescopic tube is made out of 41 5mm square aluminium profile of 3mm thickness and capped with high quality plastic heavy duty powder coated steel base with wheels and leveles sleeve is welded on base iaaf certified, iaaf certified international high jump landing area skins are made from both side vinyl coated non tearing weather proof fabric the top pad is encased in a non tearing, spike proof breather mesh the dual folded multi layered stitching, top quality velcro and zippers, made of fine and durable fiberglass material as per standards approved by iaaf, made of fince material with proper grip as per standards, made of fine rim material with proper grip as per standards approved by iaaf, made of fine rim material with proper grip as per standards approved by iaaf, made of fine and durable material as per standards approved by iaaf, made of fine material with accurate diameter and balance, made of fine material with accurate diameter and balance as per standards approved by iaaf, made of fine material for extra durability and stability as per standards approved by iaaf, aluminium pipe smoothly turned from both the ends as per standards approved by iaaf, measuring large surfaces external and internal spaces single handedly as per standards approved by iaaf, made of fine & durable material with spring as per standards approved by iaaf, made of fine material with accurate diameter & balance as per standards approved by iaaf, made of fine & durable material with proper sound as per standards approved by iaaf, made of fine & durable materialas per standards approved by iaaf, made of fine & durable material as per standards approved by iaaf, lightweight carbon cycle, designed aerodynamic for veleodorme, to optimised wind resistance, perfect weight for balance, made up of durable material to avoid leakage, almunium or composite for proper knee alignment, accurate speeding, used to adjust stack heihgt, designed for speed,gripand minimal rolling, made of fine & durable material, designed for maximum aerodynamics,stiffnes and power, designed for maximum aerodynamics stiffnes and power, epoxy based, with apt safety of players, fine grip and anti skid, fine and comfortable material, smooth shifiting of chain across different gears, perfect to transfer power from the crankset to the rear cog, engage with the chain to transfer power from pedals to rear wheels, consisiting of neccesary items for tool kit, made of fine and durable material specification as per international stanadards & norms, heavy duty powder coated steel base with anti skid non marking pads for floor protection, balance beam with height adjustment from 90cm to 125cm powder coated finish comfortable soft top simple to adjust in height anti skid non marking pads for floor protection, heavy duty powder coated steel base with anti skid non marking pads for floor protection as per international stanadards & norms, mat size 1x2 mtr color blue yellow red surface one side rice grain texture & 1 side antiskid rubber surface density 220 kg per cubic mtr thickness 50mm material bonded pu foam as per international stanadards & norms, powder coated finish rapidly assembled and disassembled for training complies with official dimensions easy to adjust bars made of fibre glass with wood high bar 218 to 266cm steps of 5cm low bar 143 to 193cm steps of 5cm width 130 to 205cm as per international stanadards & norms, equal rebound over the entire surface for high run in speed 120cm x 60cm x 21cm top 10mm as per international stanadards & norms, height 60cm top 60x60 base pipe 100x50x3 mm support pipe 80mm square as per international standards and norms, made of superior wood as per international stanadards & norms, made of fine & durable material as per international stanadards & norms, made of fine & durable material as per international norms and standards, motor 6 h p 12 h p speed 1 0-20 kmh walk area 600 x 1530mm incline 0 to 20 percentage 20 diffenrent levels readouts time distance calories heart rate stop speed incline screen 21 point 5 inch led screen user w t 200kg dimension 2080mm x 950mm x 1750mm l x w x h n w 175kgs g w 225kgs anti shock double phenolic cushioned deck for shock absorption, features 1 spd racing pedals 2 universal pivot joint for crank 3 axle for gym fitness, seat & handle bar adjustment 4 seat can be adjusted horizontally and verticlly 5 handles can be adjusted horizontally and verticlly 6 full body cover fly wheel 30kg dimension 1120 x 500 x 120mm n w 70kg, int display 6 window lcd displays programable transmission smooth belt drive system power high tech self power generator resistance friction free magnetic resistance motorized adjustable workout tension for fitness levels deluxe computer console with book holder ergonomically built in hand grip pulse sensor design wide and custom-molded foot platform front transport wheels dual action upper and lower body aerobic workout two way magnetic wheel crank 3 pc crank flywheel two way magnetic wheel user weight 350 lbs / 160 kg product size 1980 x 650 x 1640 mm n w by g w 80 16 kg by 103 kg, chain technology with air resistance 10 resistance levels lcd display, input power voltage ac22ov step area 56cm x 23 5cm x 22cm max loaded 160kg heart rate 0 to 999 time 0 00 to 99 59 kilo meter 0 to 999 calories 0 to 999 degree 0 to 15 power line 10a ac250v speed 15 to 164 net weight 190kg gross weight 240kg product size 145cm x 82cm x 208cm, made of fine & durable material as per international stanadards & norms, as per international standard and norms
T18 Ref No : 16639060
Location : vemula , andhra pradesh
Source : GEM Tenders
tender for bitumenlayingwork2 , kerbstonelayingwork1 , tailingexcavationwork1 , borrowearthsoilwork3 , removinghdpeliningwork1 , dismantlingstonepitching1 , backfillingoftailing1 , laboratorytestwork15 , humepipework1 , humepipework2 , humepipework3 , humepipework4 , humepipework5 , humepipework6 , earthworkfillingforbund1 , stonepitchingwork5 , brickwork1 , brickwork2 , plasteringwork1 , plasteringwork2 , plasteringwork3 , paitingwork1 , paitingwork2 , paitingwork3 , handrailingwork3 , ccforflooringwork1 , plasteringwork4 , glasssstripswork1 , cementpunning1 , aluminumwork1 , shutterworks1 , glasspaneswork1 , siliconsealantwork1 , doorworks1 , mechanicalinstallationpumps1 , mechanicalinstallationpipes1 , mechanicalinstallationpipes2 , mechanicalinstallationpipes3 , electricallinstallation5 , mechanicalerections1 , disposalareappep1 , slimedisposalareappep1 , slimedisposalareappep2 , constructionofelectricalfacilityworklumpsum1 , panelneartaillingpond , automaticpowerfactorcorrectionpanel1 , batterychargerdcboard , lcsmushroomheadstay1 , lcsmushroomheadstay2 , lcsmushroomheadstay3 , distributiontransformer1 , dieselgeneratorset1 , dieselgeneratorfounation1 , ltbusduct1 , htswitchgearincomingpanel1 , htswitchgearincomingpanel2 , mainlightingdistributionboard1 , sublightingdistributionboard , highmastlighting1 , highmastlighting2 , lighteningfixture1 , ltpowercables1 , htpowercables1 , htpowercables2 , ltcontrolcables , junctionboxes1 , earthinglightningitems1 , aircondition1 ,, construction of 4th stage tailing pond, stripping and clearing the site of jungles, bushes, shrubs, wood etc., uprooting of rank vegetation, trees and saplings of girth upto 30 cm measured at a height of 1m above ground level, removal of undesirable materials etc. including removal and disposal of debris at suitable locations with all leads and lifts, as decided by the engineer-in-charge., felling trees of girth (measured at a height of 1m above ground level) including cutting of trunks and branches, removing the roots and stacking of servicable material and disposal of unserviceable material at suitable ocations as decided by the engineer-in-charge. beyond 30 cm girth upto and including 60 cm girth, felling trees of girth (measured at a height of 1m above ground level) including cutting of trunks and branches, removing the roots and stacking of servicable material and disposal of unserviceable material at suitable ocations as decided by the engineer-in-charge. beyond 60 cm girth upto and including 120 cm girth, felling trees of girth (measured at a height of 1m above ground level) including cutting of trunks and branches, removing the roots and stacking of servicable material and disposal of unserviceable material at suitable ocations as decided by the engineer-in-charge. beyond 120 cm girth upto and including 240 cm girth, earth work in excavation in development of embankment profile in the following types of soils for all lifts, including taking adequate protection during excavation, drilling and transporting the excavated spoil / material after stripping of top soil as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead within acquired area of tailing dam & pond. all kinds of soils including hard and dense soils, earth work in excavation in development of embankment profile in the following types of soils for all lifts, including taking adequate protection during excavation, drilling and transporting the excavated spoil / material after stripping of top soil as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead within acquired area of tailing dam & pond. ordinary rock, earth work in excavation in development of embankment profile in the following types of soils for all lifts, including taking adequate protection during excavation, drilling and transporting the excavated spoil / material after stripping of top soil as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead within acquired area of tailing dam & pond.hard rock (blasting prohibited), earth work in excavation of hillocks within existing pond area in the following types of soils for all lifts, transporting the excavated spoil / material as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead and lift within acquired area of tailing dam & pond. all kinds of soils including hard and dense soils, earth work in excavation of hillocks within existing pond area in the following types of soils for all lifts, transporting the excavated spoil / material as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead and lift within acquired area of tailing dam & pond. ordinary rock, earth work in excavation of hillocks within existing pond area in the following types of soils for all lifts, transporting the excavated spoil / material as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead and lift within acquired area of tailing dam & pond. hard rock (blasting prohibited), earth work in excavation in bed layer -1 in the following types of soils for all lifts, including bailing / pumping out any water accumulating inside the excavation, taking adequate protection during excavation, transporting the excavated soil as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of the engineer-in-charge for any lead within acquired area of tailing dam & pond. all kinds of soils including hard and dense soils, earth work in excavation in bed layer -1 in the following types of soils for all lifts, including bailing / pumping out any water accumulating inside the excavation, taking adequate protection during excavation, transporting the excavated soil as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of the engineer-in-charge for any lead within acquired area of tailing dam & pond. ordinary rock, earth work in excavation in pipe-support foundations, peripheral drains, culverts, diversion drain, watch towers, miscellaneous equipment foundations etc. in the following types of soils for all lifts, including bailing / pumping out any water accumulating inside the excavation, taking adequate protection during excavation, drilling and transporting the excavated spoil / material as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead within acquired area of tailing dam & pond. all kinds of soils including hard and dense soils, earth work in excavation in pipe-support foundations, peripheral drains, culverts, diversion drain, watch towers, miscellaneous equipment foundations etc. in the following types of soils for all lifts, including bailing / pumping out any water accumulating inside the excavation, taking adequate protection during excavation, drilling and transporting the excavated spoil / material as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead within acquired area of tailing dam & pond. ordinary rock, earth work in excavation in pipe-support foundations, peripheral drains, culverts, diversion drain, watch towers, miscellaneous equipment foundations etc. in the following types of soils for all lifts, including bailing / pumping out any water accumulating inside the excavation, taking adequate protection during excavation, drilling and transporting the excavated spoil / material as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead within acquired area of tailing dam & pond. hard rock (blasting prohibited), supplying and transporting earth of specified quality (as per specification and drawing) from borrow-pit i.e. the source not owned by ucil but arranged by the contractor at his own cost including all taxes, royalty etc and filling the same in bed later - 1 in layers not exceeding 250 mm above existing ground level, watering of each layer in the stipulated manner as per specification and / or direction of the engineer-in-charge and compaction by mechanical means to achieve required degree of compaction as per specification, all complete as per drawing, specification and direction of the engineer-in-charge., supplying and transporting earth of specified quality (as per specification and drawing) from borrow-pit i.e. the source not owned by ucil but arranged by the contractor at his own cost including all taxes, royalty etc and filling the same in embankment in random fill zone in layers not exceeding 250 mm in proper profile to various heights above existing ground level, watering of each layer in the stipulated manner as per specification and / or direction of the engineer-in-charge and compaction by mechanical means to acheive required degree of compaction as per specification, disposal of excess of unusable material all complete as per drawing, specification and direction of the engineer-in-charge for any lead and lift (sectional measurement for compacted filling will only be paid)., supplying and transporting clay of specified quality and property (as per specification and drawing) from borrow-pit i.e. the source not owned by ucil but arranged by the contractor at his own cost including all taxes, royalty etc and laying the same over random fill on upstream side of embankment in layers not exceeding 150 mm measured loose in proper profile, watering of each layer in stipulated manner to various heights and compacting each layer by mechanical means to achieve required degree of compaction as per specification and / or direction of the engineer-in-charge, all complete as per drawing, specification and direction of the engineer-in-charge for any lead and lift (sectional measurement for compacted thickness will only be paid)., supplying, transporting and laying stone pitching with approved stone (average 300 mm thick) over clay lining on upstream side of dam with voids filler with stone dust with all lead and lift including cutwork, curing, scaffolding with all bye-work, all complete as per drawing, specification and direction of the engineer-in-charge. note - payment shall be made for the actual area of coverage of stone pitching. wastage shall not be payable., supplying, transporting and laying stone pitching with approved stone (average 300 mm thick) over random fill on downstream side of dam with voids filler with stone dust with all lead and lift including cutwork, curing, scaffolding with all bye-work, all complete as per drawing, specification and direction of the engineer-in-charge. note payment shall be made for the actual area of coverage of stone pitching. wastage shall not be payable., supplying, transporting, spreading and compacting sand (average 100 mm thick) over stone pitching on upstream side of dam with all lead and lift including all bye-work, all complete as per drawing, specification and direction of the engineer-in-charge., supplying, transporting and laying 1500 micron thick high density polyethelene (hdpe) sheet (textured on both sides) as lining over sand cushion layer on upstream side of dam, laid in position by qualified and skilled installer certified by the manufacturer and approved by the engineer-in-charge, with all lead and lift including sealing of joints (hot wedge single and dual track seaming and / or extrusion fillet seaming method or any other specialized method e.g. robotic two stitch welding etc.) of new sheets and sealing of new lining sheet with existing lining sheet with an overlap of approximately 1.0m, anchoring the new lining sheet on top of new embankment, maintaining quality control, conducting tests as per requirement of the specification, all complete as per drawing, provisions of specification and direction of the engineer-in-charge. note payment shall be made for the actual area of coverage of hdpe lining sheet. overlapping area, wastage etc. shall not be payable., supplying, transporting, laying and compacting uniformly graded stone aggregate filters within new embankment at all levels,incl shuttering, tools tackles all complete as per drawing, specification and direction of the engineer-in-charge., supplying, transporting, laying and compacting uniformly graded coarse sand filters within new embankment at all levels incl shuttering, tools tackles all complete as per drawing, specification and direction of the engineer-in-charge. (sand shall conform to is383). laying and compacting rock-fill toe dam on downstream side of embankment with following materials at all levels, all complete as per drawing, specification and direction of the engineer-in-charge., with rocks arranged by the contractor at his own cost (rate to include supply and transport also), earth work in back-filling including watering, ramming and compaction at all elevation around pipe support foundations, drain trenches etc. as per specifications and drawings and as directed by the engineer-in-charge with selected soils obtained from stacks under item no. 6 above for any lead within acquired area of tailing pond and dam. (filling shall be done in layers not exceeding 250 mm in loose thickness and watered as necessary. each layer of filling to be compacted to acheive a dry density of not less than 95% of the proctor density)., supplying, transporting and laying stone pitching with approved stone (average 300 mm thick) in diversion drain and at outfall locations with interstices between adjacent stones filled-in with stones of proper size well-driven in order to ensure tight packing and complete filling of all interstices so that no chip can be removed by hand, with all lead and lift including cutwork, curing, scaffolding with all bye-work, all complete as per drawing, specification and direction of the engineer-in-charge. note payment shall be made for the actual area of coverage of stone pitching. wastage shall not be payable., earthwork in filling using earth obtained from item nos. 3, 4, 5 and 6 above in construction of embankment of access roads (total four nos. access roads) connecting top of new tailing pond embankment in layers not exceeding 250 mm in proper profile to various heights above existing ground level, watering of each layer in the stipulated manner as per specification and / or direction of the engineer-in-charge and compaction by mechanical means to acheive required degree of compaction as per specification, all complete as per drawing, specification and direction of the engineer-in-charge for any lead and lift (sectional measurement for compacted filling will only be paid)., supplying, transporting and laying stone pitching with approved stone (average 300 mm thick) on sides of embankments of access roads with voids filler with stone dust with all lead and lift including cutwork, curing, scaffolding with all bye-work, all complete as per drawing, specification and direction of the engineer-in-charge., supplying site machine batched plain cement concrete of 136 nominal mix (1 cement 3 coarse sand 6 graded stone aggregate with 20 mm and down aggregates) below foundations, walls, drains, pits etc. including mixing, transporting, placing in position, compacting to proper thickness and level, curirg, maintaining proper quality control including cost of admixtures in recommended proportions as per is 9103 to accelerate/retard setting of concrete, improve workability without impairing strength and durability but excluding cost of shuttering work, all complete as per specifications, drawings and direction of the engineer-in-charge and including cost of form work., extra over item 30 bove for using ready mixed concrete (rmc) manufactured in fully automated batching plant and transported to site of work in transit mixer for all leads, having continuous agitator mixer including pumping of concrete from transit mixer to site of laying. note (i) cost of shuttering and reinforcement shall be paid in respective items. (note the bidder has to quote only extra cost above the item 30 in the line item of 31, for example- if the cost of item 30 i.e normal mix is rs. 3000 and cost of rmc mix is rs.3500 then the bidder has to quote only the extra cost amount i.e rs.500 (3500-3000) in the line item 31 of the price part), providing, mixing, laying in position in substructure upto plinth level, site machine batched design mix cement concrete for all types of reinforced cement concrete work, using coarse aggregate and fine aggregate derived from natural sources, cement, admixtures in recommended proportionsas per is 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength, including speading, laying, compacting to proper size/thickness and level, curing, maintaing proper quality control, carriage for all leads, trial mix and laboratory testing but excluding the cost of centering, shuttering, finishing and reinforcement as per drawings, specification and direction of the enginner-in-charge, for the following grades of concrete concrete of m25 grade with minimum cement content of 330 kg/cum, providing, mixing, laying in position in substructure upto plinth level, site machine batched design mix cement concrete for all types of reinforced cement concrete work, using coarse aggregate and fine aggregate derived from natural sources, cement, admixtures in recommended proportionsas per is 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength, including speading, laying, compacting to proper size/thickness and level, curing, maintaing proper quality control, carriage for all leads, trial mix and laboratory testing but excluding the cost of centering, shuttering, finishing and reinforcement as per drawings, specification and direction of the enginner-in-charge, for the following grades of concrete concrete of m30 grade with minimum cement content of 350 kg/cum, extra over item 32 above for using ready mixed concrete (rmc) manufactured in fully automated batching plant and transported to site of work in transit mixer for all leads, having continuous agitator mixer including pumping of concrete from transit mixer to site of laying. concrete of m25 grade with minimum cement content of 330 kg/cum (note the bidder has to quote only extra cost above the item 32 in the line item of 34, for example- if the cost of item 32 i.e normal mix is rs. 3000 and cost of rmc mix is rs.3500 then the bidder has to quote only the extra cost amount i.e rs.500 (3500-3000) in the line item 34 of the price part), extra over item 33 above for using ready mixed concrete (rmc) manufactured in fully automated batching plant and transported to site of work in transit mixer for all leads, having continuous agitator mixer including pumping of concrete from transit mixer to site of laying.concrete of m30 grade with minimum cement content of 350 kg/cum. (note the bidder has to quote only extra cost above the item 33 in the line item of 35, for example- if the cost of item 33 i.e normal mix is rs. 3000 and cost of rmc mix is rs.3500 then the bidder has to quote only the extra cost amount i.e rs.500 (3500-3000) in the line item 35 of the price part), providing, mixing, laying in position in superstructure above plinth level, site machine batched design mix cement concrete for all types of reinforced cement concrete work, using coarse aggregate and fine aggregate derived from natural sources, cement, admixtures in recommended proportionsas per is 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength, including speading, laying, compacting to proper size/thickness and level, curing, maintaing proper quality control, carriage for all leads, trial mix and laboratory testing but excluding the cost of centering, shuttering, finishing and reinforcement as per drawings, specification and direction of the enginner-in-charge, for the following grades of concrete concrete of m25 grade with minimum cement content of 330 kg/cum, providing, mixing, laying in position in superstructure above plinth level, site machine batched design mix cement concrete for all types of reinforced cement concrete work, using coarse aggregate and fine aggregate derived from natural sources, cement, admixtures in recommended proportionsas per is 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength, including speading, laying, compacting to proper size/thickness and level, curing, maintaing proper quality control, carriage for all leads, trial mix and laboratory testing but excluding the cost of centering, shuttering, finishing and reinforcement as per drawings, specification and direction of the enginner-in-charge, for the following grades of concrete concrete of m30 grade with minimum cement content of 350 kg/cum, extra over item 36 above for using ready mixed concrete (rmc) manufactured in fully automated batching plant and transported to site of work in transit mixer for all leads, having continuous agitator mixer including pumping of concrete from transit mixer to site of laying. concrete of m25 grade with minimum cement content of 330 kg/cum (note the bidder has to quote only extra cost above the item 36 in the line item of 38, for example- if the cost of item 36 i.e normal mix is rs. 3000 and cost of rmc mix is rs.3500 then the bidder has to quote only the extra cost amount i.e rs.500 (3500-3000) in the line item 38 of the price part), extra over item 37 above for using ready mixed concrete (rmc) manufactured in fully automated batching plant and transported to site of work in transit mixer for all leads, having continuous agitator mixer including pumping of concrete from transit mixer to site of laying. concrete of m30 grade with minimum cement content of 350 kg/cum (note the bidder has to quote only extra cost above the item 37 in the line item of 39, for example- if the cost of item 37 i.e normal mix is rs. 3000 and cost of rmc mix is rs.3500 then the bidder has to quote only the extra cost amount i.e rs.500 (3500-3000) in the line item 39 of the price part) (another note-2 for item nos. 23, 24, 25 and 26 (i) excess cement, if required in design mix, with respect to the minimum cement content mentioned above, shall be paid under respective item. (ii) cost of shuttering and reinforcement shall be paid through respective items.(iii) rendering of treatment at construction joint shall be carried out under supervision of manufacturer, cost of which shall be included in rate of these items. (iv) design of pipe support foundations, high mast foundations, miscellaneous pump foundations, transformer and other equipment foundations shall be under scope of the contractor. (v) contractor shall prepare design drawings and bar bending schedules for all rcc structures and submit the same to ucil for approval., supplying and laying precast reinforced cement concrete elements at any level using 20 mm and down graded crushed stones as coarse aggregate as per approved design mix including supply of materials / labour / tools and tackles etc. as required, formwork, mixing, laying, compacting to proper size and thickness, curing, storing, handling, transporting, erection without damage etc. but excluding cost of shuttering and reinforcement, all complete as per drawings, specifications and direction of the engineer-in-charge. concrete of m25 grade with minimum cement content of 330 kg/cum note (i) excess cement, if required in design mix, with respect to the minimum cement content mentioned above, shall be paid under respective item. (ii) cost of shuttering and reinforcement shall be paid in respective items., add for consumption of extra / excess cement, if required, in design mix concrete (item no. 23 to 26 above) over the specified minimum cement content in respective items mentioned above. note i) requirement of extra cement with respect to the minimum cement content mentioned against respective items of approved design mix of concrete to achieve the characteristic strength for each design mix must be approved by engineer-in-charge during mix design stage based on laboratory test results which must also be approved by the engineer-in-charge..(ii) payment shall be on the basis of actual quantity of cement used in mix concrete executed., supplying, installing, dismantling and removing shuttering for foundations and substructures upto plinth level in all kinds of rcc work for all leads and lifts including necessary rendering of concrete surfaces after exposure, maintaining proper quality control, supervision etc., all complete as per drawings, specification and direction of engineer-in-charge. notes for the above item nos. i) the design of formwork/staging shall be submitted by the contractor to ucil for approval before commencement of work., supplying, installing, dismantling and removing shuttering for superstructures above plinth level in all kinds of rcc work for all leads and lifts including necessary rendering of concrete surfaces after exposure, maintaining proper quality control, supervision etc., all completer as per drawings, specification and direction of engineer-in-charge. notes for the above item nos. i) the design of formwork/staging shall be submitted by the contractor to ucil for approval before commencement of work., supplying, straightening, cutting, bending, binding with 2 nos. 20 gauge annealed soft iron wire and placing in position following types of reinforcement, of all diameters to all types of rcc members in substructure upto plinth level including all lifts and leads, maintaining proper quality control, supervision, provision of necessary chairs/spacers, tying and bending of dowel bars, cover blocks of same grade of concrete, preparation of bar bending schedule and getting the same approved from ucil before construction, all complete as per drawings, specification and direction of the engineer-in-charge. thermo-mechanically treated (tmt) bars of grade fe-500d conforming to is1786. note for above items. i) the supply of fe 500d tmt bars conforming to is 1786 (latest) shall be fromm/s sail, iisco, rinl, tata steel and jindal from their own plants rolled from virgin material only.ii) reinforcement steel bars from rerollers of the above manufacturers will not be accepted iii) no extra payment shall be made on account of rolling margin and wastage iv) contractor shall supply copies of the documentary evidence of purchase of steel, test certificates from these manufacturers (steel either directly purchased or through their dealers)and also tests from third party, if required, to be arranged at no extra cost.v) welding weights, weight of binding wires etc. shall not be measured for payment but the cost of the same shall be deemed to have been included in the quoted rate.vi) chairs and spacers provided will not be paid extra.vii) preparation of bar bending schedule for reinforcement in all types of rcc structures will be prepared by the contractor and submitted to ucil for approval., supplying, straightening, cutting, bending, binding with 2 nos. 20 gauge annealed soft iron wire and placing in position following types of reinforcement, of all diameters to all types of rcc members in superstructure above plinth level including all lifts and leads, maintaining proper quality control, supervision, provision of necessary chairs/spacers, tying and bending of dowel bars, cover blocks of same grade of concrete, preparation of bar bending schedule and getting the same approved from ucil before construction, all complete as per drawings, specification and direction of the engineer-in-charge. thermo-mechanically treated (tmt) bars of grade fe-500d conforming to is1786. note for above items. i) the supply of fe 500d tmt bars conforming to is 1786 (latest) shall be fromm/s sail, iisco, rinl, tata steel and jindal from their own plants rolled from virgin material only.ii) reinforcement steel bars from rerollers of the above manufacturers will not be accepted iii) no extra payment shall be made on account of rolling margin and wastage iv) contractor shall supply copies of the documentary evidence of purchase of steel, test certificates from these manufacturers (steel either directly purchased or through their dealers)and also tests from third party, if required, to be arranged at no extra cost.v) welding weights, weight of binding wires etc. shall not be measured for payment but the cost of the same shall be deemed to have been included in the quoted rate.vi) chairs and spacers provided will not be paid extra.vii) preparation of bar bending schedule for reinforcement in all types of rcc structures will be prepared by the contractor and submitted to ucil for approval., supplying, fabricating and installing mild steel anchor bolts / holding down bolts, pipes, sleeves, inserts, hangers, conduits and any other mild steel, cast iron, g.i.cast steel and other fixures including lugs in cement concrete, including necessary templates for keeping them in position and with welding, bending to the required shape, if necessary and prime coat and final painting whereever necessary/applicable, cost of scaffolding, as required, at all leads and lifts, storing, handling, transporting, erection without damage, placing in position, maintaining proper quality control etc. all complete as per drawings, specification and direction of engineer-in-charge. note i) all materials shall be from m/s sail, iisco, rinl and tata steel from their own plants rolled from virgin material only. ii) welding weights, connections, bolts and nuts etc. shall not be measured for payment but the cost of which shall be deemed to have been included in the quoted rate. iii) contractor shall supply copies of the documentary evidence of purchase of steel, test certificates from these manufacturers and also tests from third party, if required, to be arranged at no extra cost. iv) all holes will be made by drilling only. gas cutting of holes will not be permitted. v) electrodes manufactured by m/s advani oerlikon, esab india, indian oxygen and dandh secheron only shall be used., taking delivery from ucil, handling, transporting and installing in cement concrete at all elevations anchor bolts, anchors, pipes, sleeves, inserts, hangers, conduits and any other mild steel, cast iron, g.i.cast steel and other fixures, cost of scaffolding, as required, placing in position, maintaining proper quality control etc. all complete as per drawings, specification and direction of engineer-in-charge.. note i) the fabricated embedded items including lugs etc. shall be supplied by ucil., supplying, fabricating and installing structural steel work conforming to is 2062 (grade e250, quality b0) in all kinds of work for pipe and cable supports at top of dam/embankment at all elevations including straightening of raw steel (if required), cutting, making edge preparation, making connections at fabrication yard by welding / bolting, hoisting, fixing in position by welding / bolting, cleaning and preparation of all steel, storing, loading, transportation, unloading, delivery at erection site, maintening proper quality control, surface preparation for painting, erection, alignment and connections of all structures true to line, level, plumb and dimension including rectification, if any, splicing, applying a primer coat of approved make before erection and two coats of final paint of approved make after erection and final alignment, preparation of design drawings, fab

Unlock Full Tender Access

Start Free Trial to download documents before deadline

T18 Ref No : 16953018
Location : vemula , andhra pradesh
Source : GEM Tenders
corrigendum tender for bitumenlayingwork2 , kerbstonelayingwork1 , tailingexcavationwork1 , borrowearthsoilwork3 , removinghdpeliningwork1 , dismantlingstonepitching1 , backfillingoftailing1 , laboratorytestwork15 , humepipework1 , humepipework2 , humepipework3 , humepipework4 , humepipework5 , humepipework6 , earthworkfillingforbund1 , stonepitchingwork5 , brickwork1 , brickwork2 , plasteringwork1 , plasteringwork2 , plasteringwork3 , paitingwork1 , paitingwork2 , paitingwork3 , handrailingwork3 , ccforflooringwork1 , plasteringwork4 , glasssstripswork1 , cementpunning1 , aluminumwork1 , shutterworks1 , glasspaneswork1 , siliconsealantwork1 , doorworks1 , mechanicalinstallationpumps1 , mechanicalinstallationpipes1 , mechanicalinstallationpipes2 , mechanicalinstallationpipes3 , electricallinstallation5 , mechanicalerections1 , disposalareappep1 , slimedisposalareappep1 , slimedisposalareappep2 , constructionofelectricalfacilityworklumpsum1 , panelneartaillingpond , automaticpowerfactorcorrectionpanel1 , batterychargerdcboard , lcsmushroomheadstay1 , lcsmushroomheadstay2 , lcsmushroomheadstay3 , distributiontransformer1 , dieselgeneratorset1 , dieselgeneratorfounation1 , ltbusduct1 , htswitchgearincomingpanel1 , htswitchgearincomingpanel2 , mainlightingdistributionboard1 , sublightingdistributionboard , highmastlighting1 , highmastlighting2 , lighteningfixture1 , ltpowercables1 , htpowercables1 , htpowercables2 , ltcontrolcables , junctionboxes1 , earthinglightningitems1 , aircondition1 ,, construction of 4th stage tailing pond, stripping and clearing the site of jungles, bushes, shrubs, wood etc., uprooting of rank vegetation, trees and saplings of girth upto 30 cm measured at a height of 1m above ground level, removal of undesirable materials etc. including removal and disposal of debris at suitable locations with all leads and lifts, as decided by the engineer-in-charge., felling trees of girth (measured at a height of 1m above ground level) including cutting of trunks and branches, removing the roots and stacking of servicable material and disposal of unserviceable material at suitable ocations as decided by the engineer-in-charge. beyond 30 cm girth upto and including 60 cm girth, felling trees of girth (measured at a height of 1m above ground level) including cutting of trunks and branches, removing the roots and stacking of servicable material and disposal of unserviceable material at suitable ocations as decided by the engineer-in-charge. beyond 60 cm girth upto and including 120 cm girth, felling trees of girth (measured at a height of 1m above ground level) including cutting of trunks and branches, removing the roots and stacking of servicable material and disposal of unserviceable material at suitable ocations as decided by the engineer-in-charge. beyond 120 cm girth upto and including 240 cm girth, earth work in excavation in development of embankment profile in the following types of soils for all lifts, including taking adequate protection during excavation, drilling and transporting the excavated spoil / material after stripping of top soil as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead within acquired area of tailing dam & pond. all kinds of soils including hard and dense soils, earth work in excavation in development of embankment profile in the following types of soils for all lifts, including taking adequate protection during excavation, drilling and transporting the excavated spoil / material after stripping of top soil as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead within acquired area of tailing dam & pond. ordinary rock, earth work in excavation in development of embankment profile in the following types of soils for all lifts, including taking adequate protection during excavation, drilling and transporting the excavated spoil / material after stripping of top soil as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead within acquired area of tailing dam & pond.hard rock (blasting prohibited), earth work in excavation of hillocks within existing pond area in the following types of soils for all lifts, transporting the excavated spoil / material as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead and lift within acquired area of tailing dam & pond. all kinds of soils including hard and dense soils, earth work in excavation of hillocks within existing pond area in the following types of soils for all lifts, transporting the excavated spoil / material as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead and lift within acquired area of tailing dam & pond. ordinary rock, earth work in excavation of hillocks within existing pond area in the following types of soils for all lifts, transporting the excavated spoil / material as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead and lift within acquired area of tailing dam & pond. hard rock (blasting prohibited), earth work in excavation in bed layer -1 in the following types of soils for all lifts, including bailing / pumping out any water accumulating inside the excavation, taking adequate protection during excavation, transporting the excavated soil as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of the engineer-in-charge for any lead within acquired area of tailing dam & pond. all kinds of soils including hard and dense soils, earth work in excavation in bed layer -1 in the following types of soils for all lifts, including bailing / pumping out any water accumulating inside the excavation, taking adequate protection during excavation, transporting the excavated soil as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of the engineer-in-charge for any lead within acquired area of tailing dam & pond. ordinary rock, earth work in excavation in pipe-support foundations, peripheral drains, culverts, diversion drain, watch towers, miscellaneous equipment foundations etc. in the following types of soils for all lifts, including bailing / pumping out any water accumulating inside the excavation, taking adequate protection during excavation, drilling and transporting the excavated spoil / material as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead within acquired area of tailing dam & pond. all kinds of soils including hard and dense soils, earth work in excavation in pipe-support foundations, peripheral drains, culverts, diversion drain, watch towers, miscellaneous equipment foundations etc. in the following types of soils for all lifts, including bailing / pumping out any water accumulating inside the excavation, taking adequate protection during excavation, drilling and transporting the excavated spoil / material as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead within acquired area of tailing dam & pond. ordinary rock, earth work in excavation in pipe-support foundations, peripheral drains, culverts, diversion drain, watch towers, miscellaneous equipment foundations etc. in the following types of soils for all lifts, including bailing / pumping out any water accumulating inside the excavation, taking adequate protection during excavation, drilling and transporting the excavated spoil / material as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead within acquired area of tailing dam & pond. hard rock (blasting prohibited), supplying and transporting earth of specified quality (as per specification and drawing) from borrow-pit i.e. the source not owned by ucil but arranged by the contractor at his own cost including all taxes, royalty etc and filling the same in bed later - 1 in layers not exceeding 250 mm above existing ground level, watering of each layer in the stipulated manner as per specification and / or direction of the engineer-in-charge and compaction by mechanical means to achieve required degree of compaction as per specification, all complete as per drawing, specification and direction of the engineer-in-charge., supplying and transporting earth of specified quality (as per specification and drawing) from borrow-pit i.e. the source not owned by ucil but arranged by the contractor at his own cost including all taxes, royalty etc and filling the same in embankment in random fill zone in layers not exceeding 250 mm in proper profile to various heights above existing ground level, watering of each layer in the stipulated manner as per specification and / or direction of the engineer-in-charge and compaction by mechanical means to acheive required degree of compaction as per specification, disposal of excess of unusable material all complete as per drawing, specification and direction of the engineer-in-charge for any lead and lift (sectional measurement for compacted filling will only be paid)., supplying and transporting clay of specified quality and property (as per specification and drawing) from borrow-pit i.e. the source not owned by ucil but arranged by the contractor at his own cost including all taxes, royalty etc and laying the same over random fill on upstream side of embankment in layers not exceeding 150 mm measured loose in proper profile, watering of each layer in stipulated manner to various heights and compacting each layer by mechanical means to achieve required degree of compaction as per specification and / or direction of the engineer-in-charge, all complete as per drawing, specification and direction of the engineer-in-charge for any lead and lift (sectional measurement for compacted thickness will only be paid)., supplying, transporting and laying stone pitching with approved stone (average 300 mm thick) over clay lining on upstream side of dam with voids filler with stone dust with all lead and lift including cutwork, curing, scaffolding with all bye-work, all complete as per drawing, specification and direction of the engineer-in-charge. note - payment shall be made for the actual area of coverage of stone pitching. wastage shall not be payable., supplying, transporting and laying stone pitching with approved stone (average 300 mm thick) over random fill on downstream side of dam with voids filler with stone dust with all lead and lift including cutwork, curing, scaffolding with all bye-work, all complete as per drawing, specification and direction of the engineer-in-charge. note payment shall be made for the actual area of coverage of stone pitching. wastage shall not be payable., supplying, transporting, spreading and compacting sand (average 100 mm thick) over stone pitching on upstream side of dam with all lead and lift including all bye-work, all complete as per drawing, specification and direction of the engineer-in-charge., supplying, transporting and laying 1500 micron thick high density polyethelene (hdpe) sheet (textured on both sides) as lining over sand cushion layer on upstream side of dam, laid in position by qualified and skilled installer certified by the manufacturer and approved by the engineer-in-charge, with all lead and lift including sealing of joints (hot wedge single and dual track seaming and / or extrusion fillet seaming method or any other specialized method e.g. robotic two stitch welding etc.) of new sheets and sealing of new lining sheet with existing lining sheet with an overlap of approximately 1.0m, anchoring the new lining sheet on top of new embankment, maintaining quality control, conducting tests as per requirement of the specification, all complete as per drawing, provisions of specification and direction of the engineer-in-charge. note payment shall be made for the actual area of coverage of hdpe lining sheet. overlapping area, wastage etc. shall not be payable., supplying, transporting, laying and compacting uniformly graded stone aggregate filters within new embankment at all levels,incl shuttering, tools tackles all complete as per drawing, specification and direction of the engineer-in-charge., supplying, transporting, laying and compacting uniformly graded coarse sand filters within new embankment at all levels incl shuttering, tools tackles all complete as per drawing, specification and direction of the engineer-in-charge. (sand shall conform to is383). laying and compacting rock-fill toe dam on downstream side of embankment with following materials at all levels, all complete as per drawing, specification and direction of the engineer-in-charge., with rocks arranged by the contractor at his own cost (rate to include supply and transport also), earth work in back-filling including watering, ramming and compaction at all elevation around pipe support foundations, drain trenches etc. as per specifications and drawings and as directed by the engineer-in-charge with selected soils obtained from stacks under item no. 6 above for any lead within acquired area of tailing pond and dam. (filling shall be done in layers not exceeding 250 mm in loose thickness and watered as necessary. each layer of filling to be compacted to acheive a dry density of not less than 95% of the proctor density)., supplying, transporting and laying stone pitching with approved stone (average 300 mm thick) in diversion drain and at outfall locations with interstices between adjacent stones filled-in with stones of proper size well-driven in order to ensure tight packing and complete filling of all interstices so that no chip can be removed by hand, with all lead and lift including cutwork, curing, scaffolding with all bye-work, all complete as per drawing, specification and direction of the engineer-in-charge. note payment shall be made for the actual area of coverage of stone pitching. wastage shall not be payable., earthwork in filling using earth obtained from item nos. 3, 4, 5 and 6 above in construction of embankment of access roads (total four nos. access roads) connecting top of new tailing pond embankment in layers not exceeding 250 mm in proper profile to various heights above existing ground level, watering of each layer in the stipulated manner as per specification and / or direction of the engineer-in-charge and compaction by mechanical means to acheive required degree of compaction as per specification, all complete as per drawing, specification and direction of the engineer-in-charge for any lead and lift (sectional measurement for compacted filling will only be paid)., supplying, transporting and laying stone pitching with approved stone (average 300 mm thick) on sides of embankments of access roads with voids filler with stone dust with all lead and lift including cutwork, curing, scaffolding with all bye-work, all complete as per drawing, specification and direction of the engineer-in-charge., supplying site machine batched plain cement concrete of 136 nominal mix (1 cement 3 coarse sand 6 graded stone aggregate with 20 mm and down aggregates) below foundations, walls, drains, pits etc. including mixing, transporting, placing in position, compacting to proper thickness and level, curirg, maintaining proper quality control including cost of admixtures in recommended proportions as per is 9103 to accelerate/retard setting of concrete, improve workability without impairing strength and durability but excluding cost of shuttering work, all complete as per specifications, drawings and direction of the engineer-in-charge and including cost of form work., extra over item 30 bove for using ready mixed concrete (rmc) manufactured in fully automated batching plant and transported to site of work in transit mixer for all leads, having continuous agitator mixer including pumping of concrete from transit mixer to site of laying. note (i) cost of shuttering and reinforcement shall be paid in respective items. (note the bidder has to quote only extra cost above the item 30 in the line item of 31, for example- if the cost of item 30 i.e normal mix is rs. 3000 and cost of rmc mix is rs.3500 then the bidder has to quote only the extra cost amount i.e rs.500 (3500-3000) in the line item 31 of the price part), providing, mixing, laying in position in substructure upto plinth level, site machine batched design mix cement concrete for all types of reinforced cement concrete work, using coarse aggregate and fine aggregate derived from natural sources, cement, admixtures in recommended proportionsas per is 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength, including speading, laying, compacting to proper size/thickness and level, curing, maintaing proper quality control, carriage for all leads, trial mix and laboratory testing but excluding the cost of centering, shuttering, finishing and reinforcement as per drawings, specification and direction of the enginner-in-charge, for the following grades of concrete concrete of m25 grade with minimum cement content of 330 kg/cum, providing, mixing, laying in position in substructure upto plinth level, site machine batched design mix cement concrete for all types of reinforced cement concrete work, using coarse aggregate and fine aggregate derived from natural sources, cement, admixtures in recommended proportionsas per is 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength, including speading, laying, compacting to proper size/thickness and level, curing, maintaing proper quality control, carriage for all leads, trial mix and laboratory testing but excluding the cost of centering, shuttering, finishing and reinforcement as per drawings, specification and direction of the enginner-in-charge, for the following grades of concrete concrete of m30 grade with minimum cement content of 350 kg/cum, extra over item 32 above for using ready mixed concrete (rmc) manufactured in fully automated batching plant and transported to site of work in transit mixer for all leads, having continuous agitator mixer including pumping of concrete from transit mixer to site of laying. concrete of m25 grade with minimum cement content of 330 kg/cum (note the bidder has to quote only extra cost above the item 32 in the line item of 34, for example- if the cost of item 32 i.e normal mix is rs. 3000 and cost of rmc mix is rs.3500 then the bidder has to quote only the extra cost amount i.e rs.500 (3500-3000) in the line item 34 of the price part), extra over item 33 above for using ready mixed concrete (rmc) manufactured in fully automated batching plant and transported to site of work in transit mixer for all leads, having continuous agitator mixer including pumping of concrete from transit mixer to site of laying.concrete of m30 grade with minimum cement content of 350 kg/cum. (note the bidder has to quote only extra cost above the item 33 in the line item of 35, for example- if the cost of item 33 i.e normal mix is rs. 3000 and cost of rmc mix is rs.3500 then the bidder has to quote only the extra cost amount i.e rs.500 (3500-3000) in the line item 35 of the price part), providing, mixing, laying in position in superstructure above plinth level, site machine batched design mix cement concrete for all types of reinforced cement concrete work, using coarse aggregate and fine aggregate derived from natural sources, cement, admixtures in recommended proportionsas per is 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength, including speading, laying, compacting to proper size/thickness and level, curing, maintaing proper quality control, carriage for all leads, trial mix and laboratory testing but excluding the cost of centering, shuttering, finishing and reinforcement as per drawings, specification and direction of the enginner-in-charge, for the following grades of concrete concrete of m25 grade with minimum cement content of 330 kg/cum, providing, mixing, laying in position in superstructure above plinth level, site machine batched design mix cement concrete for all types of reinforced cement concrete work, using coarse aggregate and fine aggregate derived from natural sources, cement, admixtures in recommended proportionsas per is 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength, including speading, laying, compacting to proper size/thickness and level, curing, maintaing proper quality control, carriage for all leads, trial mix and laboratory testing but excluding the cost of centering, shuttering, finishing and reinforcement as per drawings, specification and direction of the enginner-in-charge, for the following grades of concrete concrete of m30 grade with minimum cement content of 350 kg/cum, extra over item 36 above for using ready mixed concrete (rmc) manufactured in fully automated batching plant and transported to site of work in transit mixer for all leads, having continuous agitator mixer including pumping of concrete from transit mixer to site of laying. concrete of m25 grade with minimum cement content of 330 kg/cum (note the bidder has to quote only extra cost above the item 36 in the line item of 38, for example- if the cost of item 36 i.e normal mix is rs. 3000 and cost of rmc mix is rs.3500 then the bidder has to quote only the extra cost amount i.e rs.500 (3500-3000) in the line item 38 of the price part), extra over item 37 above for using ready mixed concrete (rmc) manufactured in fully automated batching plant and transported to site of work in transit mixer for all leads, having continuous agitator mixer including pumping of concrete from transit mixer to site of laying. concrete of m30 grade with minimum cement content of 350 kg/cum (note the bidder has to quote only extra cost above the item 37 in the line item of 39, for example- if the cost of item 37 i.e normal mix is rs. 3000 and cost of rmc mix is rs.3500 then the bidder has to quote only the extra cost amount i.e rs.500 (3500-3000) in the line item 39 of the price part) (another note-2 for item nos. 23, 24, 25 and 26 (i) excess cement, if required in design mix, with respect to the minimum cement content mentioned above, shall be paid under respective item. (ii) cost of shuttering and reinforcement shall be paid through respective items.(iii) rendering of treatment at construction joint shall be carried out under supervision of manufacturer, cost of which shall be included in rate of these items. (iv) design of pipe support foundations, high mast foundations, miscellaneous pump foundations, transformer and other equipment foundations shall be under scope of the contractor. (v) contractor shall prepare design drawings and bar bending schedules for all rcc structures and submit the same to ucil for approval., supplying and laying precast reinforced cement concrete elements at any level using 20 mm and down graded crushed stones as coarse aggregate as per approved design mix including supply of materials / labour / tools and tackles etc. as required, formwork, mixing, laying, compacting to proper size and thickness, curing, storing, handling, transporting, erection without damage etc. but excluding cost of shuttering and reinforcement, all complete as per drawings, specifications and direction of the engineer-in-charge. concrete of m25 grade with minimum cement content of 330 kg/cum note (i) excess cement, if required in design mix, with respect to the minimum cement content mentioned above, shall be paid under respective item. (ii) cost of shuttering and reinforcement shall be paid in respective items., add for consumption of extra / excess cement, if required, in design mix concrete (item no. 23 to 26 above) over the specified minimum cement content in respective items mentioned above. note i) requirement of extra cement with respect to the minimum cement content mentioned against respective items of approved design mix of concrete to achieve the characteristic strength for each design mix must be approved by engineer-in-charge during mix design stage based on laboratory test results which must also be approved by the engineer-in-charge..(ii) payment shall be on the basis of actual quantity of cement used in mix concrete executed., supplying, installing, dismantling and removing shuttering for foundations and substructures upto plinth level in all kinds of rcc work for all leads and lifts including necessary rendering of concrete surfaces after exposure, maintaining proper quality control, supervision etc., all complete as per drawings, specification and direction of engineer-in-charge. notes for the above item nos. i) the design of formwork/staging shall be submitted by the contractor to ucil for approval before commencement of work., supplying, installing, dismantling and removing shuttering for superstructures above plinth level in all kinds of rcc work for all leads and lifts including necessary rendering of concrete surfaces after exposure, maintaining proper quality control, supervision etc., all completer as per drawings, specification and direction of engineer-in-charge. notes for the above item nos. i) the design of formwork/staging shall be submitted by the contractor to ucil for approval before commencement of work., supplying, straightening, cutting, bending, binding with 2 nos. 20 gauge annealed soft iron wire and placing in position following types of reinforcement, of all diameters to all types of rcc members in substructure upto plinth level including all lifts and leads, maintaining proper quality control, supervision, provision of necessary chairs/spacers, tying and bending of dowel bars, cover blocks of same grade of concrete, preparation of bar bending schedule and getting the same approved from ucil before construction, all complete as per drawings, specification and direction of the engineer-in-charge. thermo-mechanically treated (tmt) bars of grade fe-500d conforming to is1786. note for above items. i) the supply of fe 500d tmt bars conforming to is 1786 (latest) shall be fromm/s sail, iisco, rinl, tata steel and jindal from their own plants rolled from virgin material only.ii) reinforcement steel bars from rerollers of the above manufacturers will not be accepted iii) no extra payment shall be made on account of rolling margin and wastage iv) contractor shall supply copies of the documentary evidence of purchase of steel, test certificates from these manufacturers (steel either directly purchased or through their dealers)and also tests from third party, if required, to be arranged at no extra cost.v) welding weights, weight of binding wires etc. shall not be measured for payment but the cost of the same shall be deemed to have been included in the quoted rate.vi) chairs and spacers provided will not be paid extra.vii) preparation of bar bending schedule for reinforcement in all types of rcc structures will be prepared by the contractor and submitted to ucil for approval., supplying, straightening, cutting, bending, binding with 2 nos. 20 gauge annealed soft iron wire and placing in position following types of reinforcement, of all diameters to all types of rcc members in superstructure above plinth level including all lifts and leads, maintaining proper quality control, supervision, provision of necessary chairs/spacers, tying and bending of dowel bars, cover blocks of same grade of concrete, preparation of bar bending schedule and getting the same approved from ucil before construction, all complete as per drawings, specification and direction of the engineer-in-charge. thermo-mechanically treated (tmt) bars of grade fe-500d conforming to is1786. note for above items. i) the supply of fe 500d tmt bars conforming to is 1786 (latest) shall be fromm/s sail, iisco, rinl, tata steel and jindal from their own plants rolled from virgin material only.ii) reinforcement steel bars from rerollers of the above manufacturers will not be accepted iii) no extra payment shall be made on account of rolling margin and wastage iv) contractor shall supply copies of the documentary evidence of purchase of steel, test certificates from these manufacturers (steel either directly purchased or through their dealers)and also tests from third party, if required, to be arranged at no extra cost.v) welding weights, weight of binding wires etc. shall not be measured for payment but the cost of the same shall be deemed to have been included in the quoted rate.vi) chairs and spacers provided will not be paid extra.vii) preparation of bar bending schedule for reinforcement in all types of rcc structures will be prepared by the contractor and submitted to ucil for approval., supplying, fabricating and installing mild steel anchor bolts / holding down bolts, pipes, sleeves, inserts, hangers, conduits and any other mild steel, cast iron, g.i.cast steel and other fixures including lugs in cement concrete, including necessary templates for keeping them in position and with welding, bending to the required shape, if necessary and prime coat and final painting whereever necessary/applicable, cost of scaffolding, as required, at all leads and lifts, storing, handling, transporting, erection without damage, placing in position, maintaining proper quality control etc. all complete as per drawings, specification and direction of engineer-in-charge. note i) all materials shall be from m/s sail, iisco, rinl and tata steel from their own plants rolled from virgin material only. ii) welding weights, connections, bolts and nuts etc. shall not be measured for payment but the cost of which shall be deemed to have been included in the quoted rate. iii) contractor shall supply copies of the documentary evidence of purchase of steel, test certificates from these manufacturers and also tests from third party, if required, to be arranged at no extra cost. iv) all holes will be made by drilling only. gas cutting of holes will not be permitted. v) electrodes manufactured by m/s advani oerlikon, esab india, indian oxygen and dandh secheron only shall be used., taking delivery from ucil, handling, transporting and installing in cement concrete at all elevations anchor bolts, anchors, pipes, sleeves, inserts, hangers, conduits and any other mild steel, cast iron, g.i.cast steel and other fixures, cost of scaffolding, as required, placing in position, maintaining proper quality control etc. all complete as per drawings, specification and direction of engineer-in-charge.. note i) the fabricated embedded items including lugs etc. shall be supplied by ucil., supplying, fabricating and installing structural steel work conforming to is 2062 (grade e250, quality b0) in all kinds of work for pipe and cable supports at top of dam/embankment at all elevations including straightening of raw steel (if required), cutting, making edge preparation, making connections at fabrication yard by welding / bolting, hoisting, fixing in position by welding / bolting, cleaning and preparation of all steel, storing, loading, transportation, unloading, delivery at erection site, maintening proper quality control, surface preparation for painting, erection, alignment and connections of all structures true to line, level, plumb and dimension including rectification, if any, splicing, applying a primer coat of approved make before erection and two coats of final paint of approved make after erection and final alignment, preparation of design d
T18 Ref No : 17094207
Location : vemula , andhra pradesh
Source : GEM Tenders
corrigendum tender for bitumenlayingwork2 , kerbstonelayingwork1 , tailingexcavationwork1 , borrowearthsoilwork3 , removinghdpeliningwork1 , dismantlingstonepitching1 , backfillingoftailing1 , laboratorytestwork15 , humepipework1 , humepipework2 , humepipework3 , humepipework4 , humepipework5 , humepipework6 , earthworkfillingforbund1 , stonepitchingwork5 , brickwork1 , brickwork2 , plasteringwork1 , plasteringwork2 , plasteringwork3 , paitingwork1 , paitingwork2 , paitingwork3 , handrailingwork3 , ccforflooringwork1 , plasteringwork4 , glasssstripswork1 , cementpunning1 , aluminumwork1 , shutterworks1 , glasspaneswork1 , siliconsealantwork1 , doorworks1 , mechanicalinstallationpumps1 , mechanicalinstallationpipes1 , mechanicalinstallationpipes2 , mechanicalinstallationpipes3 , electricallinstallation5 , mechanicalerections1 , disposalareappep1 , slimedisposalareappep1 , slimedisposalareappep2 , constructionofelectricalfacilityworklumpsum1 , panelneartaillingpond , automaticpowerfactorcorrectionpanel1 , batterychargerdcboard , lcsmushroomheadstay1 , lcsmushroomheadstay2 , lcsmushroomheadstay3 , distributiontransformer1 , dieselgeneratorset1 , dieselgeneratorfounation1 , ltbusduct1 , htswitchgearincomingpanel1 , htswitchgearincomingpanel2 , mainlightingdistributionboard1 , sublightingdistributionboard , highmastlighting1 , highmastlighting2 , lighteningfixture1 , ltpowercables1 , htpowercables1 , htpowercables2 , ltcontrolcables , junctionboxes1 , earthinglightningitems1 , aircondition1 ,, construction of 4th stage tailing pond, stripping and clearing the site of jungles, bushes, shrubs, wood etc., uprooting of rank vegetation, trees and saplings of girth upto 30 cm measured at a height of 1m above ground level, removal of undesirable materials etc. including removal and disposal of debris at suitable locations with all leads and lifts, as decided by the engineer-in-charge., felling trees of girth (measured at a height of 1m above ground level) including cutting of trunks and branches, removing the roots and stacking of servicable material and disposal of unserviceable material at suitable ocations as decided by the engineer-in-charge. beyond 30 cm girth upto and including 60 cm girth, felling trees of girth (measured at a height of 1m above ground level) including cutting of trunks and branches, removing the roots and stacking of servicable material and disposal of unserviceable material at suitable ocations as decided by the engineer-in-charge. beyond 60 cm girth upto and including 120 cm girth, felling trees of girth (measured at a height of 1m above ground level) including cutting of trunks and branches, removing the roots and stacking of servicable material and disposal of unserviceable material at suitable ocations as decided by the engineer-in-charge. beyond 120 cm girth upto and including 240 cm girth, earth work in excavation in development of embankment profile in the following types of soils for all lifts, including taking adequate protection during excavation, drilling and transporting the excavated spoil / material after stripping of top soil as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead within acquired area of tailing dam & pond. all kinds of soils including hard and dense soils, earth work in excavation in development of embankment profile in the following types of soils for all lifts, including taking adequate protection during excavation, drilling and transporting the excavated spoil / material after stripping of top soil as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead within acquired area of tailing dam & pond. ordinary rock, earth work in excavation in development of embankment profile in the following types of soils for all lifts, including taking adequate protection during excavation, drilling and transporting the excavated spoil / material after stripping of top soil as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead within acquired area of tailing dam & pond.hard rock (blasting prohibited), earth work in excavation of hillocks within existing pond area in the following types of soils for all lifts, transporting the excavated spoil / material as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead and lift within acquired area of tailing dam & pond. all kinds of soils including hard and dense soils, earth work in excavation of hillocks within existing pond area in the following types of soils for all lifts, transporting the excavated spoil / material as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead and lift within acquired area of tailing dam & pond. ordinary rock, earth work in excavation of hillocks within existing pond area in the following types of soils for all lifts, transporting the excavated spoil / material as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead and lift within acquired area of tailing dam & pond. hard rock (blasting prohibited), earth work in excavation in bed layer -1 in the following types of soils for all lifts, including bailing / pumping out any water accumulating inside the excavation, taking adequate protection during excavation, transporting the excavated soil as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of the engineer-in-charge for any lead within acquired area of tailing dam & pond. all kinds of soils including hard and dense soils, earth work in excavation in bed layer -1 in the following types of soils for all lifts, including bailing / pumping out any water accumulating inside the excavation, taking adequate protection during excavation, transporting the excavated soil as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of the engineer-in-charge for any lead within acquired area of tailing dam & pond. ordinary rock, earth work in excavation in pipe-support foundations, peripheral drains, culverts, diversion drain, watch towers, miscellaneous equipment foundations etc. in the following types of soils for all lifts, including bailing / pumping out any water accumulating inside the excavation, taking adequate protection during excavation, drilling and transporting the excavated spoil / material as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead within acquired area of tailing dam & pond. all kinds of soils including hard and dense soils, earth work in excavation in pipe-support foundations, peripheral drains, culverts, diversion drain, watch towers, miscellaneous equipment foundations etc. in the following types of soils for all lifts, including bailing / pumping out any water accumulating inside the excavation, taking adequate protection during excavation, drilling and transporting the excavated spoil / material as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead within acquired area of tailing dam & pond. ordinary rock, earth work in excavation in pipe-support foundations, peripheral drains, culverts, diversion drain, watch towers, miscellaneous equipment foundations etc. in the following types of soils for all lifts, including bailing / pumping out any water accumulating inside the excavation, taking adequate protection during excavation, drilling and transporting the excavated spoil / material as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead within acquired area of tailing dam & pond. hard rock (blasting prohibited), supplying and transporting earth of specified quality (as per specification and drawing) from borrow-pit i.e. the source not owned by ucil but arranged by the contractor at his own cost including all taxes, royalty etc and filling the same in bed later - 1 in layers not exceeding 250 mm above existing ground level, watering of each layer in the stipulated manner as per specification and / or direction of the engineer-in-charge and compaction by mechanical means to achieve required degree of compaction as per specification, all complete as per drawing, specification and direction of the engineer-in-charge., supplying and transporting earth of specified quality (as per specification and drawing) from borrow-pit i.e. the source not owned by ucil but arranged by the contractor at his own cost including all taxes, royalty etc and filling the same in embankment in random fill zone in layers not exceeding 250 mm in proper profile to various heights above existing ground level, watering of each layer in the stipulated manner as per specification and / or direction of the engineer-in-charge and compaction by mechanical means to acheive required degree of compaction as per specification, disposal of excess of unusable material all complete as per drawing, specification and direction of the engineer-in-charge for any lead and lift (sectional measurement for compacted filling will only be paid)., supplying and transporting clay of specified quality and property (as per specification and drawing) from borrow-pit i.e. the source not owned by ucil but arranged by the contractor at his own cost including all taxes, royalty etc and laying the same over random fill on upstream side of embankment in layers not exceeding 150 mm measured loose in proper profile, watering of each layer in stipulated manner to various heights and compacting each layer by mechanical means to achieve required degree of compaction as per specification and / or direction of the engineer-in-charge, all complete as per drawing, specification and direction of the engineer-in-charge for any lead and lift (sectional measurement for compacted thickness will only be paid)., supplying, transporting and laying stone pitching with approved stone (average 300 mm thick) over clay lining on upstream side of dam with voids filler with stone dust with all lead and lift including cutwork, curing, scaffolding with all bye-work, all complete as per drawing, specification and direction of the engineer-in-charge. note - payment shall be made for the actual area of coverage of stone pitching. wastage shall not be payable., supplying, transporting and laying stone pitching with approved stone (average 300 mm thick) over random fill on downstream side of dam with voids filler with stone dust with all lead and lift including cutwork, curing, scaffolding with all bye-work, all complete as per drawing, specification and direction of the engineer-in-charge. note payment shall be made for the actual area of coverage of stone pitching. wastage shall not be payable., supplying, transporting, spreading and compacting sand (average 100 mm thick) over stone pitching on upstream side of dam with all lead and lift including all bye-work, all complete as per drawing, specification and direction of the engineer-in-charge., supplying, transporting and laying 1500 micron thick high density polyethelene (hdpe) sheet (textured on both sides) as lining over sand cushion layer on upstream side of dam, laid in position by qualified and skilled installer certified by the manufacturer and approved by the engineer-in-charge, with all lead and lift including sealing of joints (hot wedge single and dual track seaming and / or extrusion fillet seaming method or any other specialized method e.g. robotic two stitch welding etc.) of new sheets and sealing of new lining sheet with existing lining sheet with an overlap of approximately 1.0m, anchoring the new lining sheet on top of new embankment, maintaining quality control, conducting tests as per requirement of the specification, all complete as per drawing, provisions of specification and direction of the engineer-in-charge. note payment shall be made for the actual area of coverage of hdpe lining sheet. overlapping area, wastage etc. shall not be payable., supplying, transporting, laying and compacting uniformly graded stone aggregate filters within new embankment at all levels,incl shuttering, tools tackles all complete as per drawing, specification and direction of the engineer-in-charge., supplying, transporting, laying and compacting uniformly graded coarse sand filters within new embankment at all levels incl shuttering, tools tackles all complete as per drawing, specification and direction of the engineer-in-charge. (sand shall conform to is383). laying and compacting rock-fill toe dam on downstream side of embankment with following materials at all levels, all complete as per drawing, specification and direction of the engineer-in-charge., with rocks arranged by the contractor at his own cost (rate to include supply and transport also), earth work in back-filling including watering, ramming and compaction at all elevation around pipe support foundations, drain trenches etc. as per specifications and drawings and as directed by the engineer-in-charge with selected soils obtained from stacks under item no. 6 above for any lead within acquired area of tailing pond and dam. (filling shall be done in layers not exceeding 250 mm in loose thickness and watered as necessary. each layer of filling to be compacted to acheive a dry density of not less than 95% of the proctor density)., supplying, transporting and laying stone pitching with approved stone (average 300 mm thick) in diversion drain and at outfall locations with interstices between adjacent stones filled-in with stones of proper size well-driven in order to ensure tight packing and complete filling of all interstices so that no chip can be removed by hand, with all lead and lift including cutwork, curing, scaffolding with all bye-work, all complete as per drawing, specification and direction of the engineer-in-charge. note payment shall be made for the actual area of coverage of stone pitching. wastage shall not be payable., earthwork in filling using earth obtained from item nos. 3, 4, 5 and 6 above in construction of embankment of access roads (total four nos. access roads) connecting top of new tailing pond embankment in layers not exceeding 250 mm in proper profile to various heights above existing ground level, watering of each layer in the stipulated manner as per specification and / or direction of the engineer-in-charge and compaction by mechanical means to acheive required degree of compaction as per specification, all complete as per drawing, specification and direction of the engineer-in-charge for any lead and lift (sectional measurement for compacted filling will only be paid)., supplying, transporting and laying stone pitching with approved stone (average 300 mm thick) on sides of embankments of access roads with voids filler with stone dust with all lead and lift including cutwork, curing, scaffolding with all bye-work, all complete as per drawing, specification and direction of the engineer-in-charge., supplying site machine batched plain cement concrete of 136 nominal mix (1 cement 3 coarse sand 6 graded stone aggregate with 20 mm and down aggregates) below foundations, walls, drains, pits etc. including mixing, transporting, placing in position, compacting to proper thickness and level, curirg, maintaining proper quality control including cost of admixtures in recommended proportions as per is 9103 to accelerate/retard setting of concrete, improve workability without impairing strength and durability but excluding cost of shuttering work, all complete as per specifications, drawings and direction of the engineer-in-charge and including cost of form work., extra over item 30 bove for using ready mixed concrete (rmc) manufactured in fully automated batching plant and transported to site of work in transit mixer for all leads, having continuous agitator mixer including pumping of concrete from transit mixer to site of laying. note (i) cost of shuttering and reinforcement shall be paid in respective items. (note the bidder has to quote only extra cost above the item 30 in the line item of 31, for example- if the cost of item 30 i.e normal mix is rs. 3000 and cost of rmc mix is rs.3500 then the bidder has to quote only the extra cost amount i.e rs.500 (3500-3000) in the line item 31 of the price part), providing, mixing, laying in position in substructure upto plinth level, site machine batched design mix cement concrete for all types of reinforced cement concrete work, using coarse aggregate and fine aggregate derived from natural sources, cement, admixtures in recommended proportionsas per is 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength, including speading, laying, compacting to proper size/thickness and level, curing, maintaing proper quality control, carriage for all leads, trial mix and laboratory testing but excluding the cost of centering, shuttering, finishing and reinforcement as per drawings, specification and direction of the enginner-in-charge, for the following grades of concrete concrete of m25 grade with minimum cement content of 330 kg/cum, providing, mixing, laying in position in substructure upto plinth level, site machine batched design mix cement concrete for all types of reinforced cement concrete work, using coarse aggregate and fine aggregate derived from natural sources, cement, admixtures in recommended proportionsas per is 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength, including speading, laying, compacting to proper size/thickness and level, curing, maintaing proper quality control, carriage for all leads, trial mix and laboratory testing but excluding the cost of centering, shuttering, finishing and reinforcement as per drawings, specification and direction of the enginner-in-charge, for the following grades of concrete concrete of m30 grade with minimum cement content of 350 kg/cum, extra over item 32 above for using ready mixed concrete (rmc) manufactured in fully automated batching plant and transported to site of work in transit mixer for all leads, having continuous agitator mixer including pumping of concrete from transit mixer to site of laying. concrete of m25 grade with minimum cement content of 330 kg/cum (note the bidder has to quote only extra cost above the item 32 in the line item of 34, for example- if the cost of item 32 i.e normal mix is rs. 3000 and cost of rmc mix is rs.3500 then the bidder has to quote only the extra cost amount i.e rs.500 (3500-3000) in the line item 34 of the price part), extra over item 33 above for using ready mixed concrete (rmc) manufactured in fully automated batching plant and transported to site of work in transit mixer for all leads, having continuous agitator mixer including pumping of concrete from transit mixer to site of laying.concrete of m30 grade with minimum cement content of 350 kg/cum. (note the bidder has to quote only extra cost above the item 33 in the line item of 35, for example- if the cost of item 33 i.e normal mix is rs. 3000 and cost of rmc mix is rs.3500 then the bidder has to quote only the extra cost amount i.e rs.500 (3500-3000) in the line item 35 of the price part), providing, mixing, laying in position in superstructure above plinth level, site machine batched design mix cement concrete for all types of reinforced cement concrete work, using coarse aggregate and fine aggregate derived from natural sources, cement, admixtures in recommended proportionsas per is 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength, including speading, laying, compacting to proper size/thickness and level, curing, maintaing proper quality control, carriage for all leads, trial mix and laboratory testing but excluding the cost of centering, shuttering, finishing and reinforcement as per drawings, specification and direction of the enginner-in-charge, for the following grades of concrete concrete of m25 grade with minimum cement content of 330 kg/cum, providing, mixing, laying in position in superstructure above plinth level, site machine batched design mix cement concrete for all types of reinforced cement concrete work, using coarse aggregate and fine aggregate derived from natural sources, cement, admixtures in recommended proportionsas per is 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength, including speading, laying, compacting to proper size/thickness and level, curing, maintaing proper quality control, carriage for all leads, trial mix and laboratory testing but excluding the cost of centering, shuttering, finishing and reinforcement as per drawings, specification and direction of the enginner-in-charge, for the following grades of concrete concrete of m30 grade with minimum cement content of 350 kg/cum, extra over item 36 above for using ready mixed concrete (rmc) manufactured in fully automated batching plant and transported to site of work in transit mixer for all leads, having continuous agitator mixer including pumping of concrete from transit mixer to site of laying. concrete of m25 grade with minimum cement content of 330 kg/cum (note the bidder has to quote only extra cost above the item 36 in the line item of 38, for example- if the cost of item 36 i.e normal mix is rs. 3000 and cost of rmc mix is rs.3500 then the bidder has to quote only the extra cost amount i.e rs.500 (3500-3000) in the line item 38 of the price part), extra over item 37 above for using ready mixed concrete (rmc) manufactured in fully automated batching plant and transported to site of work in transit mixer for all leads, having continuous agitator mixer including pumping of concrete from transit mixer to site of laying. concrete of m30 grade with minimum cement content of 350 kg/cum (note the bidder has to quote only extra cost above the item 37 in the line item of 39, for example- if the cost of item 37 i.e normal mix is rs. 3000 and cost of rmc mix is rs.3500 then the bidder has to quote only the extra cost amount i.e rs.500 (3500-3000) in the line item 39 of the price part) (another note-2 for item nos. 23, 24, 25 and 26 (i) excess cement, if required in design mix, with respect to the minimum cement content mentioned above, shall be paid under respective item. (ii) cost of shuttering and reinforcement shall be paid through respective items.(iii) rendering of treatment at construction joint shall be carried out under supervision of manufacturer, cost of which shall be included in rate of these items. (iv) design of pipe support foundations, high mast foundations, miscellaneous pump foundations, transformer and other equipment foundations shall be under scope of the contractor. (v) contractor shall prepare design drawings and bar bending schedules for all rcc structures and submit the same to ucil for approval., supplying and laying precast reinforced cement concrete elements at any level using 20 mm and down graded crushed stones as coarse aggregate as per approved design mix including supply of materials / labour / tools and tackles etc. as required, formwork, mixing, laying, compacting to proper size and thickness, curing, storing, handling, transporting, erection without damage etc. but excluding cost of shuttering and reinforcement, all complete as per drawings, specifications and direction of the engineer-in-charge. concrete of m25 grade with minimum cement content of 330 kg/cum note (i) excess cement, if required in design mix, with respect to the minimum cement content mentioned above, shall be paid under respective item. (ii) cost of shuttering and reinforcement shall be paid in respective items., add for consumption of extra / excess cement, if required, in design mix concrete (item no. 23 to 26 above) over the specified minimum cement content in respective items mentioned above. note i) requirement of extra cement with respect to the minimum cement content mentioned against respective items of approved design mix of concrete to achieve the characteristic strength for each design mix must be approved by engineer-in-charge during mix design stage based on laboratory test results which must also be approved by the engineer-in-charge..(ii) payment shall be on the basis of actual quantity of cement used in mix concrete executed., supplying, installing, dismantling and removing shuttering for foundations and substructures upto plinth level in all kinds of rcc work for all leads and lifts including necessary rendering of concrete surfaces after exposure, maintaining proper quality control, supervision etc., all complete as per drawings, specification and direction of engineer-in-charge. notes for the above item nos. i) the design of formwork/staging shall be submitted by the contractor to ucil for approval before commencement of work., supplying, installing, dismantling and removing shuttering for superstructures above plinth level in all kinds of rcc work for all leads and lifts including necessary rendering of concrete surfaces after exposure, maintaining proper quality control, supervision etc., all completer as per drawings, specification and direction of engineer-in-charge. notes for the above item nos. i) the design of formwork/staging shall be submitted by the contractor to ucil for approval before commencement of work., supplying, straightening, cutting, bending, binding with 2 nos. 20 gauge annealed soft iron wire and placing in position following types of reinforcement, of all diameters to all types of rcc members in substructure upto plinth level including all lifts and leads, maintaining proper quality control, supervision, provision of necessary chairs/spacers, tying and bending of dowel bars, cover blocks of same grade of concrete, preparation of bar bending schedule and getting the same approved from ucil before construction, all complete as per drawings, specification and direction of the engineer-in-charge. thermo-mechanically treated (tmt) bars of grade fe-500d conforming to is1786. note for above items. i) the supply of fe 500d tmt bars conforming to is 1786 (latest) shall be fromm/s sail, iisco, rinl, tata steel and jindal from their own plants rolled from virgin material only.ii) reinforcement steel bars from rerollers of the above manufacturers will not be accepted iii) no extra payment shall be made on account of rolling margin and wastage iv) contractor shall supply copies of the documentary evidence of purchase of steel, test certificates from these manufacturers (steel either directly purchased or through their dealers)and also tests from third party, if required, to be arranged at no extra cost.v) welding weights, weight of binding wires etc. shall not be measured for payment but the cost of the same shall be deemed to have been included in the quoted rate.vi) chairs and spacers provided will not be paid extra.vii) preparation of bar bending schedule for reinforcement in all types of rcc structures will be prepared by the contractor and submitted to ucil for approval., supplying, straightening, cutting, bending, binding with 2 nos. 20 gauge annealed soft iron wire and placing in position following types of reinforcement, of all diameters to all types of rcc members in superstructure above plinth level including all lifts and leads, maintaining proper quality control, supervision, provision of necessary chairs/spacers, tying and bending of dowel bars, cover blocks of same grade of concrete, preparation of bar bending schedule and getting the same approved from ucil before construction, all complete as per drawings, specification and direction of the engineer-in-charge. thermo-mechanically treated (tmt) bars of grade fe-500d conforming to is1786. note for above items. i) the supply of fe 500d tmt bars conforming to is 1786 (latest) shall be fromm/s sail, iisco, rinl, tata steel and jindal from their own plants rolled from virgin material only.ii) reinforcement steel bars from rerollers of the above manufacturers will not be accepted iii) no extra payment shall be made on account of rolling margin and wastage iv) contractor shall supply copies of the documentary evidence of purchase of steel, test certificates from these manufacturers (steel either directly purchased or through their dealers)and also tests from third party, if required, to be arranged at no extra cost.v) welding weights, weight of binding wires etc. shall not be measured for payment but the cost of the same shall be deemed to have been included in the quoted rate.vi) chairs and spacers provided will not be paid extra.vii) preparation of bar bending schedule for reinforcement in all types of rcc structures will be prepared by the contractor and submitted to ucil for approval., supplying, fabricating and installing mild steel anchor bolts / holding down bolts, pipes, sleeves, inserts, hangers, conduits and any other mild steel, cast iron, g.i.cast steel and other fixures including lugs in cement concrete, including necessary templates for keeping them in position and with welding, bending to the required shape, if necessary and prime coat and final painting whereever necessary/applicable, cost of scaffolding, as required, at all leads and lifts, storing, handling, transporting, erection without damage, placing in position, maintaining proper quality control etc. all complete as per drawings, specification and direction of engineer-in-charge. note i) all materials shall be from m/s sail, iisco, rinl and tata steel from their own plants rolled from virgin material only. ii) welding weights, connections, bolts and nuts etc. shall not be measured for payment but the cost of which shall be deemed to have been included in the quoted rate. iii) contractor shall supply copies of the documentary evidence of purchase of steel, test certificates from these manufacturers and also tests from third party, if required, to be arranged at no extra cost. iv) all holes will be made by drilling only. gas cutting of holes will not be permitted. v) electrodes manufactured by m/s advani oerlikon, esab india, indian oxygen and dandh secheron only shall be used., taking delivery from ucil, handling, transporting and installing in cement concrete at all elevations anchor bolts, anchors, pipes, sleeves, inserts, hangers, conduits and any other mild steel, cast iron, g.i.cast steel and other fixures, cost of scaffolding, as required, placing in position, maintaining proper quality control etc. all complete as per drawings, specification and direction of engineer-in-charge.. note i) the fabricated embedded items including lugs etc. shall be supplied by ucil., supplying, fabricating and installing structural steel work conforming to is 2062 (grade e250, quality b0) in all kinds of work for pipe and cable supports at top of dam/embankment at all elevations including straightening of raw steel (if required), cutting, making edge preparation, making connections at fabrication yard by welding / bolting, hoisting, fixing in position by welding / bolting, cleaning and preparation of all steel, storing, loading, transportation, unloading, delivery at erection site, maintening proper quality control, surface preparation for painting, erection, alignment and connections of all structures true to line, level, plumb and dimension including rectification, if any, splicing, applying a primer coat of approved make before erection and two coats of final paint of approved make after erection and final alignment, preparation of design d
T18 Ref No : 17632455
Location : pathankot , punjab
Source : GEM Tenders
tender for iron angle 2inch length 20feet , chain 3inch length 20feet , glow sign boards size 3feet x 2feet with iron frame , glow sign board size 8feet x 5feet with iron frame , glow sign board size 9feet x 9feet with iron frame and light , acrylic info board size 4feet x 3feet , acrylic info board size 1feet x 1 by 2feet , iron angle 4inch length 2feet , iron angle 4inch 24feet length , iron angle 4inch 23feet width , star printing , trainer receiver 2.7ghz , training drone , tool kit for dron , pi 4gb resbery pi , lora module , laser lights , air warrier gun , power bank 10000mah , professional station with 512gb ssd and 8gb ram and 4gb graphic card , real flight rc simulator, procurement of various items, 20 feet length piece ideal for building structural frames or mounting supports, 20 feet total length heavy duty link chain for anchoring securing or lifting, custom backlit display units built for outdoor or storefront branding., custom backlit display units built for outdoor or storefront branding, rigid premium acrylic panels for mounting directional text or room identification maps, rigid premium acrylic panels for mounting directional text or room identification maps good quality, deal for structural frames or mounting supports, high quality wide-format printing service intended for flex banner prints or promotional hoarding layouts, dedicated radio frequency receiver link module used to bind your trainer transmitter to the main drone flight controller, a lightweight multi rotor drone designed for beginner flight practice, featuring durable crash guards and stable firmware, precision assembly kit packed with hex drivers, prop wrenches, a soldering iron, and tweezers for field maintenance, small single board computer running on a 1point 5ghz quad core processor features dual 4k micro hdmi outputs and high speed usb 3point zero ports for robotics automation, long range low power telemetry radio frequency module designed for tracking flight data or sending remote sensor data over miles, high visibility alignment lasers or structural pointer systems used to aid automated drone navigation tests., mechanical or foam-projectile toy mechanism utilized for object-dropping simulations or aerial targeting exercises, pocket sized 10000mah lithium polymer portable battery backup outputs up to 22w fast charging through dual usb a and usb c power delivery ports, main rendering machine configured with a 512gb ssd 8gb of ram and a 4gb dedicated graphics card for processing drone telemetry or 3d mapping data., industry standard desktop flight simulator bundle. includes an authentic spektrum inter link dx multi-channel radio controller to practice piloting safely without crash costs

Unlock Full Tender Access

Start Free Trial to download documents before deadline

Every year, central and state government departments release thousands of high-value contracts specifically dedicated to Track Alignment Machine. Whether it involves bulk material supply, executing specialized operational services, or end-to-end turnkey project execution, the demand for capable vendors in the Track Alignment Machine sector is massive.

At Tender18, we help businesses cut through the noise and exclusively target the exact work categories they specialize in. Instead of browsing through generic procurement sites, our platform isolates high-potential opportunities that match your specific industry capabilities.

Work Dynamics in the Track Alignment Machine Sector

Government requirements for this specific vertical generally fall into distinct procurement patterns:

  • Product & Material Supply: Tenders focused strictly on sourcing, testing, and delivering high-quality items that meet the exact technical specifications of the buyer.
  • Service Level Agreements (SLAs): Long-term hiring of expert agencies for routine maintenance, manpower deployment, or continuous operational management.
  • Execution & Turnkey Projects: Comprehensive contracts where the bidder is responsible for everything from raw material procurement to final site installation and testing.

By focusing purely on your core strength in Track Alignment Machine, you can build a highly profitable and stable pipeline of government clients.

Stop wasting time filtering through irrelevant notices. Our Track Alignment Machine Tender Information Service is engineered for precision. We track exact product codes, service names, and specialized work terms across all government portals nationwide. When a buyer publishes a requirement that matches your specific business profile, our system alerts you instantly.

Deep Technical Insights & Documentation For Track Alignment Machine Tenders

Bidding for specific works requires studying strict technical parameters. We provide immediate access to the core documents you need to evaluate the project:

  • Detailed Specifications & Drawings: Download the exact engineering guidelines, material testing standards, and quality benchmarks demanded by the buyer for Track Alignment Machine.
  • Financial BOQ Spreadsheets: Access the official blank pricing formats where you need to input your unit rates, tax configurations, and total bid value.
  • Real-Time Technical Amendments: If the buying department changes the product specifications, alters the service scope, or shifts the delivery timeline, we instantly update the parent file so you are never caught off-guard.

Winning a contract for Track Alignment Machine depends entirely on how perfectly your technical capabilities match the buyer’s demands. Even if you have the best product or service, a poorly formatted document or a missing compliance certificate will lead to instant technical rejection. Tender18’s Tender Bidding Service eliminates this risk by taking complete ownership of your digital submission.

Flawless Compliance & Portal Execution For Track Alignment Machine Tenders

Under this service, Tender18 assigns a Dedicated Experienced Technical Person to your profile. This expert handles the heavy lifting of the entire bidding cycle:

  • Capability Mapping: We thoroughly cross-check your past completion certificates, ISO standard proofs, and financial turnover against the strict eligibility criteria required for Track Alignment Machine bids.
  • Secure System Integration: Our technical desk seamlessly links your Class III Digital Signature Certificate (DSC) with the required e-procurement servers to securely encrypt your technical and financial envelopes.
  • Error-Free Financial Uploads: We audit your quoted BOQ pricing sheets for any formula or formatting errors before the final upload, ensuring your bid is successfully locked before the portal's closing hours.

Government buyers are aggressively using the Government e-Marketplace (GeM) for the direct procurement of Track Alignment Machine. If your business profile is not accurately mapped on this portal, you remain practically invisible to these purchasing officers. Recognized as a trusted and expert GeM consultant, Tender18 offers specialized support to build, optimize, and maintain a highly visible vendor account for your business.

With an industry-leading support success ratio of over 95%, we handle the complex marketplace compliance so you can focus entirely on executing your orders

Expert Profile Management & Catalogue

Our dedicated consultants ensure your GeM presence is structurally perfect:

  • Precise Catalogue Listing: We upload and categorize your specific offerings under the exact search terms and parameters used by government buyers looking for Track Alignment Machine, ensuring maximum search visibility.
  • OEM Dashboard & Assessment: For original manufacturers and creators, we guide you through the mandatory Quality Council of India (QCI) vendor assessments to successfully unlock your official OEM panel.
  • Profile Compliance & Caution Money: We manage your statutory documentation, brand approvals, and caution money limits to keep your account immune from technical suspensions.

Strategic Live Bid Participation

Beyond setup, we actively drive your market participation. Our team expertly handles the digital paperwork and rate configurations for GeM Custom Bids and Reverse Auctions (RA) related to Track Alignment Machine, maximizing your chances of securing L1 status.

1.

How do I find government contracts exclusively matching my work in Track Alignment Machine?

The easiest way is through the Tender18 platform. Instead of searching department by department, our system uses advanced keyword matching to gather all live supply, service, and execution tenders related directly to your core business in one place.

2.

Do I need specific testing or quality certificates to apply for these contracts?

It heavily depends on the nature of the work. For supply contracts, buyers often ask for ISO certifications, BIS marks, or specific lab testing reports. For service contracts, they may ask for labor licenses or past performance certificates (work orders).

3.

What is a BOQ and why is it important for my bid?

The Bill of Quantities (BOQ) is the official financial Excel sheet where you enter your competitive prices. Any mistake in this file—like adding extra rows, changing formulas, or saving it in the wrong format—will cause the portal server to reject your entire bid.

4.

Are samples required to be submitted physically before the digital bid opens?

For many product-based Track Alignment Machine tenders, buying departments do ask bidders to submit physical samples to their office before the digital technical evaluation date. This requirement is always clearly mentioned in the official NIT document.

5.

How does the Dedicated Tender Expert from Tender18 help me?

Our assigned expert manages your total portal compliance. They extract the hidden rules from long tender PDFs, create a precise document checklist for your team, map your digital signature, and securely upload your technical and financial files onto the government servers.

6.

What is the role of a Digital Signature Certificate (DSC)?

A Class III DSC is a secure USB device that contains your digital identity. You cannot upload a bid without it. It is used to securely encrypt and lock your sensitive price data and technical documents so no one can view them before the official opening date.

7.

As an MSME, can I get financial benefits when bidding for Track Alignment Machine?

Yes, the government strongly supports MSMEs. By uploading a valid Udyam Registration Certificate in the technical envelope, small businesses are frequently exempted from paying the initial Tender Document Fee and the Earnest Money Deposit (EMD).

8.

Why should I list my services or products on GeM for this category?

GeM is now the primary digital marketplace for all government agencies. If you are properly cataloged for Track Alignment Machine, officers can view your profile and generate direct purchase orders or invite you to participate in exclusive Custom Bids.

9.

What makes Tender18 a reliable GeM support partner?

As a highly trusted and expert GeM consultant, Tender18 holds a proven support success ratio of over 95%. From flawless profile creation and complex catalogue mapping to OEM panel approvals and live Reverse Auction (RA) support, we handle it all seamlessly.

10.

What does "L1" mean in these government contracts?

"L1" stands for "Lowest Bidder 1". In government procurement, after all technical envelopes are approved, the financial sheets (BOQs) are opened. The bidder who has quoted the lowest compliant price for Track Alignment Machine is declared L1 and is generally awarded the contract