Search Tenders
Filters
Reset All
Tender Status
T18 Ref No
All States
All Cities
All Agencies
Tender ID
Due Date
Tender Value
Tender Source (GeM, Cppp & Others)
Tender Type

17Latest Polymeric insulating material Tenders List

Latest Polymeric insulating material Tenders in India – Verified Leads & Real-Time Insights by Tender18

Finding the right Polymeric insulating material tenders in India’s competitive e-procurement ecosystem requires more than just access—it demands accurate data, real-time monitoring, and expert analysis.

At Tender18 Infotech Private Limited, we bring deep industry experience in government procurement to help businesses identify, evaluate, and win Polymeric insulating material tenders efficiently. With a centralized platform aggregating 1100+ live tenders, we provide a single, trusted source for opportunities from central, state, and PSU departments.


Real-Time Polymeric insulating material Tender Intelligence & Monitoring

Our advanced dashboard delivers actionable insights and structured tender data, enabling you to make faster and smarter bidding decisions.

We categorize Polymeric insulating material tenders into:

  • Supply Tenders – BOQs and specifications sourced from GeM and PSUs
  • Service Tenders – NITs and scope of work from CPPP and state portals
  • EPC Projects – Large-scale infrastructure tenders with financial and design data

✔ This structured approach ensures complete transparency and deeper bid analysis before submission.


Comprehensive Sources of Polymeric insulating material Tenders

Tender18 acts as a centralized gateway by aggregating tenders from trusted and official sources:

  • Central Government Portals – CPPP, NIC, and Government e-Marketplace (GeM)
  • Railways & Transport – IREPS and Metro Rail projects
  • Power & Energy PSUs – NTPC, ONGC, NHPC, PowerGrid
  • Defense & Strategic Sectors – MES and DRDO tenders
  • State e-Procurement Portals – Gujarat, Maharashtra, Tamil Nadu, UP, and more

✔ Every listing is verified and regularly updated to maintain data accuracy and trust.


Step-by-Step Guide to Participate in Polymeric insulating material Tenders

1. Eligibility & Prequalification

Before bidding, ensure compliance with:

  • Financial turnover requirements (30–50% of tender value)
  • Past experience (2–3 similar projects)
  • Valid solvency certificate

2. Mandatory Documentation Checklist

Prepare the following to avoid disqualification:

  • Digital Signature Certificate (Class 3 DSC)
  • GST, PAN, MSME/Udyam registration
  • EMD (Earnest Money Deposit) or exemption proof
  • Technical bid with execution methodology

3. BOQ Analysis & Financial Bidding

The BOQ (Bill of Quantities) is the most critical component:

  • Analyze item-wise pricing
  • Ensure competitive yet sustainable quotes
  • Avoid underbidding risks (L1 pressure)

✔ Expert analysis can significantly improve your bid success ratio.


Why Tender18 is a Trusted Platform for Polymeric insulating material Tenders

✔ Proven Expertise in Government Procurement

We combine industry knowledge with practical bidding experience.

✔ Verified & Reliable Data

All Polymeric insulating material tenders are sourced from official portals and cross-checked for accuracy.

✔ Advanced Filtering Tools

Filter tenders by value, EMD, location, and category for precise targeting.

✔ Corrigendum & Update Tracking

Get instant alerts on deadline changes and specification updates.

✔ Historical Data Insights

Analyze past tender results to understand pricing trends and competition.

✔ End-to-End Bidding Support

From discovery to submission, including GeM onboarding and strategy.


Growth of Polymeric insulating material Sector in 2026

With the Government of India focusing on digital procurement and infrastructure expansion, the Polymeric insulating material sector has seen significant growth in e-tendering opportunities.

The rise of GeM-based procurement models like:

  • L1 Purchase
  • Direct Procurement
  • MSME-friendly policies

…has made it easier for startups and SMEs to participate and win contracts


Frequently Asked Questions (SEO Optimized)

How can I get daily Polymeric insulating material tender alerts?

You can register on Tender18 and select your preferred category. You will receive daily email alerts with all new Polymeric insulating material tenders.

Is EMD mandatory for all Polymeric insulating material tenders?

No, MSME and Udyam-registered businesses may get exemptions. Always check the NIT for specific conditions.

What is the difference between a Polymeric insulating material work tender and supply tender?

A supply tender involves delivering goods, while a work tender includes execution, labor, and project completion.

Can I access private Polymeric insulating material tenders on Tender18?

Yes, we also track major private sector and EPC tenders along with government opportunities.


Get Expert Support for Polymeric insulating material Tenders

Tender18 is more than a listing platform—we are your strategic partner in winning tenders.

Our services include:

  • Tender discovery & analysis
  • Documentation support
  • Bid strategy & submission
  • GeM registration & OEM onboarding

📞 Call / WhatsApp: +91 7069661818
🌐 Website: www.tender18.com

Due Date
T18 Ref No : 15749249
Location : mainpuri , uttar pradesh
Source : GEM Tenders
corrigendum tender for carriage of distribution transformer 100 kva from esc mnp , carriage of distribution transformer 250 kva from esc mnp , carriage of acsr weasel conductor from esc mnp , carriage of m s earthing rod 20 x2540 mm from esc mnp , carriage of lt al. xlpe cable size 1x240 sq.mm. from esc mnp , carriage of lt xlpe cable 1x120 sq.mm. for dtr from esc mnp , carriage of lt xlpe cable 1x400 sq.mm. for dtr from esc mnp , carriage of lt xlpe cable size 3.5x70 or 35 sq.mm. from esc mnp , carriage of lt ab cable 3x120 1x95 1x16 sq.mm. from esc mnp , carriage of lt ab cable 3x50 1x35 1x16 sq.mm. from esc mnp , carriage of lt ab cable 3x95 1x70 1x16 sq.mm. from esc mnp , carriage of 33 kv xlpe cable 3x300 sq.mm. from esc mnp , carriage of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. from esc mnp , carriage of 33 kv straight through size 3x300 sq.mm. from esc mnp , carriage of g.i. wire 6 or 8 swg for guarding from esc mnp , carriage of three phase distribution box from esc mnp , erection of fixing of lt fuse set protection box with all respective accessories as per norms , execution of chemical earthing with g.i. patti clamp nut and bolts as per norms , erection of l.t. tail less unit with all respective material as grouted angel with fabrication work etc. , laying of acsr weasel conductor , laying of lt ab cable 3x120 1x95 1x16 sq.mm. , laying of lt ab cable 3x50 1x35 1x16 sq.mm. , laying of lt ab cable 3x95 1x70 1x16 sq.mm. , mounting of three phase distribution box , erection of double pole structure 8.5 mtr pcc pole , erection of single pole structure 8.5 mtrs pcc pole , erection of tri pole structure 33 kv 13 mtr st pole , grouting of pcc or stp pole , grouting of stay , earthing of pole , guarding of 11 kv line , fencing of 250 kva distribution transformers , plinth for 250 kva transformer , installation of 11by0.4 kv tf 25 kva , installation of 11by0.4 kv tf 63 kva , installation of 11by0.4 kv tf 100 kva , installation of 11by0.4 kv tf 250 kva , laying of 33 kv xlpe cable 3x300 sq.mm. , installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms. , dismentlling, received back and safe carriage of jarjar g.i. wire and weasel conducter including with rolling from pit site to esc, mainpuri , received back of distribution transformer after, boqbhogaon, clamp for 11 kv v type cross arm with bolts and nuts, three phase distribution box clamp with nut and bolts, connecting cable for distribution box 1x35 sq.mm., l.t. fuse set protection box with all accessories, tinned copper fuse wire different size, hdpe pipe 140 mm., stone pad 300x300x75, holding clamp for doulble pole unit with nut and bolts, ms angle 75x75x6x2028mm with clamp and bolt and nut t or f base, t off chhanel and t off clamp with nut and bolts, top chhanel 125x65x240, dropper channel 100x50x2028 mm., danger board with clamp and nut and bolt, chemical earthing with g.i. patti clamp nut and bolts as per norms, l.t. tail less unit with all respective material angel, patti and other material, copper l pieace 62x225x12mm., 11 kv f clamp with nut and bolts, suspension clamp, dead end clamp, eye i hook, eye bolts for guarding, j hook, lt clamp for pcc or stp with bolts and nuts, pearcing connector, alluminium lug 120 sq.mm., alluminium lug 240 sq.mm., alluminium lug 400 sq.mm., nut bolts and washers off size, guarding angel, guarding angel clamp, m.s. angel iron 65x65x6 mm. 2700 mm long bracing with 4 nos clamp with nut and bolts, 13 m stp pole sp55 galvanised, 8.5 m pcc pole, v type cross arm for 11 kv, 11 kv pin insulator with pin, disc insulator with fitting t and c 45 kn 114 nos and 70kn 27 nos, 11 kv fuse set, 11 kv tpmo with polymer insulator, complete stay 9gi stay rod 20x1800 mm stay wire 7 and 8 swg 10 kg stay clamp bolt nut and washer, distribution transformer 25 kva, distribution transformer 63 kva, distribution transformer 100 kva, distribution transformer 250 kva, acsr weasel conductor or insulated conductor as provided by department, m s earthing rod 20 x2540 mm, lt al. xlpe cable size 1x240 sq.mm., lt xlpe cable 1x120 sq.mm. for dtr, lt xlpe cable 1x400 sq.mm. for dtr, lt xlpe cable size 3.5x70 or 35 sq.mm., lt ab cable 3x120 1x95 1x16 sq.mm., lt ab cable 3x50 1x35 1x16 sq.mm., lt ab cable 3x95 1x70 1x16 sq.mm., 33 kv xlpe cable 3x300 sq.mm., 33 kv indoor or outdoor jointing kit size 3x300 sq.mm., 33 kv straight through size 3x300 sq.mm., g.i. wire 6 or 8 swg for guarding, three phase distribution box, fixing of l.t. fuse set protection box with all respective accessories as per norms, l.t. tail less unit with all respective material as grouted angel with fabrication work etc., laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr weasel conductor or insulated conductor as provided by department, laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x120 1x95 1x16 sq.mm., laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x50 1x35 1x16 sq.mm, laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x95 1x70 1x16 sq.mm., mounting of three phase distribution box with clamp nut & bolts and make proper connection with connecting cable., erection of double pole structure 8.5 mtr pcc pole by digging of pits fitting of all relevant accessories as per respo norms. 34 nos pole at different location under concern division., erection of single pole structure 8.5 mtrs pcc pole by digging of pits fitting of all relevant accessories as per respo norms. at different location under concern division., erection of tri pole structure 33 kv 13 mtr st pole by digging of pits fitting of all relevant accessories as per respo norms. 3 nos pole at different location under concern division., grouting of pcc or stp pole long as per respo norms with material cement, sand, blast stone with the ratio 0.268 cu.m. each will be provided by conractor, grouting of stay as per respo norms cement, sand, blast stone material will be provided by conractor, earthing of pole by m s earthing rod 20 x2540 mm with 6 swg earthing wire etc and make proper connection., guarding of 11 kv line with gaurding angel, clamp eye bolts and gaurding g.i. wire 6 or 8 swg 30 span, fencing of distribution transformers with enamel in proper alignment as per respo manual and as per direction of executive engineer including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work., plinth for 250 kva transformer proper size as per resspo norms, installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 25 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 63 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 100 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 250 kva with l.t. xlpe cable suitable size with all respective material as per norms., laying of following cable by hdd method with hdpe pipe (140 mm.) including digging and restoring along with brick and sand including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work. 33 kv xlpe cable 3x300 sq.mm., installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms., dismentlling of jarjar g.i. wire and weasel conducter including with rolling received back and safe carriage from pit site to esc, mainpuri, received back of distribution transformer after increasing capacity from pit site to esc, mainpuri ( 17 nos 100 kva)
T18 Ref No : 15763006
Location : mainpuri , uttar pradesh
Source : GEM Tenders
corrigendum tender for supply of 11 kv v type cross arm clamp , supply of 3 phase dis. box clamp with nut and bolts , supply of connecting cable , supply of l.t. fuse set protection box , supply of tinned copper fuse wire different size , supply of hdpe pipe , supply of stone pad , supply of holding clamp , supply of ms angle , supply of t-off chhanel , supply of top chhanel 125x65x240 , supply of dropper channel 100x50x2028 mm. , supply of danger board with clamp and nut and bolt , supply of g.i. patti clamp nut and bolts , supply of l.t. tail less unit , supply of copper l-pieace , supply of 11 kv f clamp , supply of suspension clamp , supply of dead end clamp , supply of eye i hook , supply of eye bolts for guarding , supply of j hook , supply of lt clamp , supply of pearcing connector , supply of alluminium lug 120 sq.mm. , supply of alluminium lug 240 sq.mm. , supply of alluminium lug 70 sq.mm. , supply of nut bolts and washers off size , supply of guarding angel , supply of guarding angel clamp , supply of m.s. angel iron 65x65x6 mm. , carriage of 9 m stp pole-sp- 55 galvanised , carriage of 11 m stp pole-sp- 55 galvanised , carriage of 8.5 m pcc pole , carriage of v type cross arm for 11 kv , carriage of 11 kv pin insulator with pin , carriage of disc insulator with fitting t and c 45 kn , carriage of 11 kv fuse set , carriage of 11 kv tpmo with polymer insulator , carriage of complete stay , carriage of distribution transformer 25 kva , carriage of distribution transformer 63 kva , carriage of distribution transformer 100 kva , carriage of distribution transformer 250 kva , carriage of acsr dog conductor , carriage of acsr weasel conductor , carriage of m s earthing rod 20 x2540 mm , carriage of lt al. xlpe cable size 1x240 sq.mm. , carriage of lt pvc cable 1x120 sq.mm. for dtr , carriage of lt pvc armoured cable size 3.5x70 or 35 sq.mm. , carriage of 11, boqbpkarhalmnp, supply of clamp for 11 kv v type cross arm with bolts and nuts, supply of three phase distribution box clamp with nut and bolts, supply of connecting cable for distribution box 1x35 sq.mm., supply of l.t. fuse set protection box with all accessories, supply of tinned copper fuse wire different size, supply of hdpe pipe 140 mm., supply of stone pad300x300x75, supply of holding clamp for doulble pole unit with nut and bolts, supply of ms angle 75x75x6x2028mm with clamp and bolt and nutt or f base, supply of t-off chhanel+ t or f clamp with nut and bolts, supply of top chhanel 125x65x240, supply of dropper channel 100x50x2028 mm., supply of danger board with clamp and nut bolt, supply of chemical earthing with g.i. patti clamp nut and bolts as per norms, supply of pipe earthing with g.i. patti clamp nut and bolts as per norms, supply of l.t. tail less unit with all respective material angel, patti and other material, supply of copper l-pieace 62x225x12mm., supply of 11 kv f clamp with nut and bolts, supply of suspension clamp, supply of dead end clamp, supply of eye i hook, supply of eye bolts for guarding, supply of j hook, supply of lt clamp for pcc or stp with bolts and nuts, supply of pearcing connector, supply of alluminium lug 120 sq.mm., supply of alluminium lug 240 sq.mm., supply of alluminium lug 70 sq.mm., supply of nut bolts and washers off size, supply of guarding angel, supply of guarding angel clamp, supply of m.s. angel iron 65x65x6 mm., 2700 mm long bracing with 4 nos clamp with nut and bolts, carriage of 9 m stp pole-sp- 55 galvanised, carriage of 11 m stp pole-sp- 55 galvanised, carriage of 8.5 m pcc pole, carriage of v type cross arm for 11 kv, carriage of 11 kv pin insulator with pin, carriage of disc insulator with fitting tandc 45 kn, carriage of 11 kv fuse set, carriage of 11 kv tpmo with polymer insulator, carriage of complete stay 9gi stay rod 20x1800 mm, stay wire 7 or 8 swg, 10 kg, stay clamp, bolt, nut and washer, carriage of distribution transformer 25 kva, carriage of distribution transformer 63 kva, carriage of distribution transformer 100 kva, carriage of distribution transformer 250 kva, carriage of acsr dog conductor, carriage of acsr weasel conductor or or insulated conductor as provided by department, carriage of m s earthing rod 20 x2540 mm, carriage of lt al. xlpe cable size 1x240 sq.mm., carriage of lt pvc cable 1x120 sq.mm. for dtr, carriage of lt pvc armoured cable size 3.5x70 or 35 sq.mm., carriage of 11 kv xlpe cable 3x185 sq.mm., carriage of lt ab cable 3x120+1x95+1x16 sq.mm., carriage of lt ab cable 3x50+1x35+1x16 sq.mm., carriage of lt ab cable 3x95+1x70+1x16 sq.mm., carriage of lt pvc armoured cable size 4x25 sq.mm., carriage of 33 kv xlpe cable 3x300 sq.mm., carriage of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm., carriage of 11 kv indoor or outdoor jointing kit size 3x185 sq.mm., carriage of 33 kv straight through size 3x300 sq.mm., carriage of 11 kv straight through size 3x185 sq.mm., carriage of 11 kv vcb for o or g ctr 200 or 100 or 5a 350 mva1250 amp., carriage of g.i. wire 6 or 8 swg for guarding, carriage of three phase distribution box, fixing of l.t. fuse set protection box with all respective accessories as per norms, chemical earthing with g.i. patti clamp nut and bolts as per norms, pipe earthing with g.i. patti clamp nut and bolts as per norms, l.t. tail less unit with all respective material as grouted angel with fabrication work etc., laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr dog conductor., laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr weasel conductor, laying, stringing, sagging, with all respective materialclamp with nut and bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable3x120+1x95+1x16 sq.mm., laying, stringing, sagging, with all respective materialclamp with nut and bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable3x50+1x35+1x16 sq.mm., laying, stringing, sagging, with all respective materialclamp with nut and bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable3x95+1x70+1x16 sq.mm., mounting of three phase distribution box with clamp nut and bolts and make proper connection with connecting cable., erection of double pole structure 11 mtr stp pole by digging of pits fitting of all relevant accessories as per respo norms.26 nos pole at different location under concern division., erection of single pole structure 8.5 mtrs pcc pole, 9 mtr st and 11 mtr st pole by digging of pits fitting of all relevant accessories as per respo norms. at different location under concern division., grouting of pcc or stp pole long as per respo norms with materialcement, sand, blast stone with the ratio 0.268 cu.m. each will be provided by conractor, grouting of stay as per respo normscement, sand, blast stone material will be provided by conractor, earthing of pole by m s earthing rod 20 x2540 mm with 6 swg earthing wire etc and make proper connection., guarding of 11 kv line with gaurding angel, clamp eye bolts and gaurding g.i. wire 6 or 8 swg86 span, fencing of distribution transformers with enamel in proper alignment as per respo manual and as per direction of executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work., plinth for 250 kva transformer proper size as per resspo norms, installation of the following new transformers at various 11 or 0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper ht or lt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11 or 0.4 kv t or f 25 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11 or 0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper ht or lt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11 or 0.4 kv t or f 63 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11 or 0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper ht or lt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11 or 0.4 kv t or f 100 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11 or 0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper ht or lt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11 or 0.4 kv t or f 250 kva with l.t. xlpe cable suitable size with all respective material as per norms., laying of following cable including digging and restoring along with brick and sand including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work. at different location under concern division.11 kv xlpe cable 3x185 sq.mm., laying of following cable by hdd method with hdpe pipe140 mm. including digging and restoring along with brick and sand including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work. 33 kv xlpe cable 3x300 sq.mm., installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms., installation of 11 kv indoor or outdoor jointing kit size 3x185 sq.mm. as per norms., installation of 33 kv straight through size 3x300 sq.mm. as per norms., installation of 11 kv straight through size 3x185 sq.mm. as per norms., installation of 11 kv vcb and make proper connection as per norms., dismentlling of jarjar g.i. wire and weasel conducter including with rolling and safe carriage from pit site to esc, mainpuri, received back of distribution transformer after increasing capacity from pit site to esc, mainpuri 4 nos 10 or 16 kva
T18 Ref No : 15763007
Location : mainpuri , uttar pradesh
Source : GEM Tenders
corrigendum tender for , carriage of distribution transformer 250 kva from esc mnp , carriage of acsr rabbit conductor from esc mnp , carriage of acsr weasel conductor or insulated conductor as provided by department from esc mnp , carriage of m s earthing rod 20 x2540 mm from esc mnp , carriage of lt al. xlpe cable size 1x240 sq.mm. from esc mnp , carriage of lt xlpe cable 1x120 sq.mm. from esc mnp , carriage of 11 kv xlpe cable 3x185 sq.mm. from esc mnp , carriage of lt ab cable 3x120 1x95 1x16 sq.mm. from esc mnp , carriage of 33 kv xlpe cable 3x300 sq.mm. from esc mnp , carriage of 11 kv xlpe cable 3x300 sq.mm. from esc mnp , carriage of 11 kv indoor or outdoor jointing kit size 3x300 sq.mm. from esc mnp , carriage of 11 kv indoor or outdoor jointing kit size 3x185 sq.mm. from esc mnp , carriage of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. from esc mnp , carriage of 11 kv straight through size 3x185 sq.mm. from esc mnp , carriage of 11 kv vcb for og ctr 200by100by5a 350 mva 1250 amp. from esc mnp , carriage of 11 kv vcb ic ctr 600by300by5a 350 mva 1250 amp. from esc mnp , carriage of g.i. wire 6or8 swg for guarding from esc mnp , carriage of three phase distribution box from esc mnp , erection of fixing of l.t. fuse set protection box with all respective accessories as per norms , execution of chemical earthing with g.i. patti clamp nut and bolts as per norms , erection of l.t. tail less unit with all respective material as grouted angel with fabrication work etc. , laying of acsr rabbit conductor , laying of acsr weasel conductor or insulated conductor as provided by department , laying of lt ab cable 3x120 1x95 1x16 sq.mm. , mounting of three phase distribution box , erection of double pole structure , erection of single pole structure , grouting of pcc or stp pole , grouting of stay , earthing of pole , guarding of 11 kv line with gaurding angel etc , fencing of distribution transformers , make plinth for 250 kva transformer proper size as per resspo norms , installation of 11by0.4 kv tf 100 kva , installation of 11by0.4 kv tf 250 kva , laying of 11 kv xlpe cable 3x185 sq.mm. , laying of 11 kv xlpe cable 3x300 sq.mm. , laying of 33 kv xlpe cable 3x300 sq.mm. , installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms. , installation of 11 kv indoor or outdoor jointing kit size 3x185 sq.mm. as per norms. , installation of 11 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms. , installation of 11 kv straight through size 3x185 sq.mm. as per norms. , installation of 11 kv vcb og ctr 200by100by5a 350 mva 1250 amp. , installation of 11 kv vcb ic ctr 600by300by5a 350 mva 1250 amp. , dismentlling of old and damaged cable of different size , received back of distribution transformer after increasing, boqeudd, 11 kv v type cross arm clamp with bolts and nuts, three phase distribution box clamp with nut and bolts, connecting cable for distribution box 1x35 sq.mm., l.t. fuse set protection box with all accessories, tinned copper fuse wire different size, hdpe pipe 140 mm., stone pad 300x300x75, ms angle 75x75x6x2028mm with clamp and bolt and nut tf base, t off chhanel and t off clamp with nut and bolts, top chhanel 125x65x240, dropper channel 100x50x2028 mm., chemical earthing with g.i. patti clamp nut and bolts as per norms, l.t. tail less unit with all respective material angel, patti and other material, copper l pieace 62x225x12mm., 4 core lt mcb with box for 250 kva tf, 11 kv f clamp with nut and bolts, al. pg clamp weasel to weasel conductor, al. pg clamp rabbit to rabbit conductor, suspension clamp, dead end clamp, eye i hook, eye bolts for guarding, j hook, lt clamp for pcc or stp with bolts and nuts, pearcing connector, alluminium lug 120 sq.mm., alluminium lug 240 sq.mm., guarding angel, guarding angel clamp, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 8.5 m pcc pole, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 9 m stp pole sp 55 galvanised, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 m stp pole sp 55 galvanised, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 13 m stp pole sp 55 galvanised, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department v type cross arm for 11 kv, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv pin insulator with pin, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department disc insulator with fitting tandc 45 kn, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv fuse set, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv tpmo with polymer insulator, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department complete stay 9gi stay rod 20x1800 mm, stay wire 7 or 8 swg, 10 kg, stay clamp, bolt, nut and washer, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department distribution transformer 100 kva, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department distribution transformer 250 kva, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department acsr rabbit conductor, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department acsr weasel conductor or insulated conductor as provided by department, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department m s earthing rod 20 x2540 mm, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department lt al. xlpe cable size 1x240 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department lt xlpe cable 1x120 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv xlpe cable 3x185 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department lt ab cable 3x120 1x95 1x16 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 33 kv xlpe cable 3x300 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv xlpe cable 3x300 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv indoor or outdoor jointing kit size 3x300 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv indoor or outdoor jointing kit size 3x185 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 33 kv indoor or outdoor jointing kit size 3x300 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv straight through size 3x185 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv vcb for og ctr 200by100by5a 350 mva 1250 amp., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv vcb ic ctr 600by300by5a 350 mva 1250 amp., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department g.i. wire 6 or 8 swg for guarding, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department three phase distribution box, fixing of l.t. fuse set protection box with all respective accessories as per norms, l.t. tail less unit with all respective material as grouted angel with fabrication work etc., laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr rabbit conductor, laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr weasel conductor or insulated conductor as provided by department, laying, stringing, sagging, with all respective material clamp with nut and bolts suspension clamp eye j hook pearcing connector etc of following conductor cable on the erected supports, as per respo norms. lt ab cable 3x120 1x95 1x16 sq.mm., mounting of three phase distribution box with clamp nut & bolts and make proper connection with connecting cable., erection of double pole structure 11 mtr stp pole by digging of pits fitting of all relevant accessories as per respo norms. 22 nos pole at different location under concern division., erection of single pole structure 8.5 mtrs pcc pole, 9 mtr st, 11 mtr st pole, 13 mtr st by digging of pits fitting of all relevant accessories as per respo norms. at different location under concern division., grouting of pcc or stp pole long as per respo norms with material cement, sand, blast stone with the ratio 0.268 cu.m. each will be provided by conractor, grouting of stay as per respo norms cement, sand, blast stone material will be provided by conractor, earthing of pole by m s earthing rod 20 x2540 mm with 6 swg earthing wire etc and make proper connection., guarding of 11 kv line with gaurding angel, clamp eye bolts and gaurding g.i. wire 6 or 8 swg 60 span, fencing of distribution transformers with enamel in proper alignment as per respo manual and as per direction of executive engineer including the cost of arrangement of labour, t and p, carrier etc. required for proper completion of work., make plinth for 250 kva transformer proper size as per resspo norms, installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work. 11by0.4 kv tf 100 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work. 11by0.4 kv tf 250 kva with l.t. xlpe cable suitable size with all respective material as per norms., laying of following cable including digging and restoring along with brick and sand including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work. at different location under concern division.11 kv xlpe cable 3x185 sq.mm., laying of following cable including digging and restoring along with brick and sand including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work. at different location under concern division. 11 kv xlpe cable 3x300 sq.mm., laying of following cable by hdd method with hdpe pipe 140 mm. including digging and restoring along with brick and sand including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work. 33 kv xlpe cable 3x300 sq.mm., installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms., installation of 11 kv indoor or outdoor jointing kit size 3x185 sq.mm. as per norms., installation of 11 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms., installation of 11 kv straight through size 3x185 sq.mm. as per norms., installation of 11 kv vcb og ctr 200by100by5a 350 mva 1250 amp. and make proper connection as per norms., installation of 11 kv vcb ic ctr 600by300by5a 350 mva 1250 amp. and make proper connection as per norms., dismentlling of old and damaged cable of different size including with rolling received back and safe carriage from pit site to esc, mainpuri, received back of distribution transformer after increasing capacity from pit site to esc, mainpuri 30 nos 100 kva

Unlock Full Tender Access

Start Free Trial to download documents before deadline

T18 Ref No : 15779644
Location : mainpuri , uttar pradesh
Source : GEM Tenders
corrigendum tender for supply of 11 kv v type cross arm clamp , supply of 3 phase dis. box clamp with nut and bolts , supply of connecting cable , supply of l.t. fuse set protection box , supply of tinned copper fuse wire different size , supply of hdpe pipe , supply of stone pad , supply of holding clamp , supply of ms angle , supply of t-off chhanel , supply of top chhanel 125x65x240 , supply of dropper channel 100x50x2028 mm. , supply of danger board with clamp and nut and bolt , supply of g.i. patti clamp nut and bolts , supply of l.t. tail less unit , supply of copper l-pieace , supply of 11 kv f clamp , supply of suspension clamp , supply of dead end clamp , supply of eye i hook , supply of eye bolts for guarding , supply of j hook , supply of lt clamp , supply of pearcing connector , supply of alluminium lug 120 sq.mm. , supply of alluminium lug 240 sq.mm. , supply of alluminium lug 70 sq.mm. , supply of nut bolts and washers off size , supply of guarding angel , supply of guarding angel clamp , supply of m.s. angel iron 65x65x6 mm. , carriage of 9 m stp pole-sp- 55 galvanised , carriage of 11 m stp pole-sp- 55 galvanised , carriage of 8.5 m pcc pole , carriage of v type cross arm for 11 kv , carriage of 11 kv pin insulator with pin , carriage of disc insulator with fitting t and c 45 kn , carriage of 11 kv fuse set , carriage of 11 kv tpmo with polymer insulator , carriage of complete stay , carriage of distribution transformer 25 kva , carriage of distribution transformer 63 kva , carriage of distribution transformer 100 kva , carriage of distribution transformer 250 kva , carriage of acsr dog conductor , carriage of acsr weasel conductor , carriage of m s earthing rod 20 x2540 mm , carriage of lt al. xlpe cable size 1x240 sq.mm. , carriage of lt pvc cable 1x120 sq.mm. for dtr , carriage of lt pvc armoured cable size 3.5x70 or 35 sq.mm. , carriage of 11, boqbpkarhalmnp, supply of clamp for 11 kv v type cross arm with bolts and nuts, supply of three phase distribution box clamp with nut and bolts, supply of connecting cable for distribution box 1x35 sq.mm., supply of l.t. fuse set protection box with all accessories, supply of tinned copper fuse wire different size, supply of hdpe pipe 140 mm., supply of stone pad300x300x75, supply of holding clamp for doulble pole unit with nut and bolts, supply of ms angle 75x75x6x2028mm with clamp and bolt and nutt or f base, supply of t-off chhanel+ t or f clamp with nut and bolts, supply of top chhanel 125x65x240, supply of dropper channel 100x50x2028 mm., supply of danger board with clamp and nut bolt, supply of chemical earthing with g.i. patti clamp nut and bolts as per norms, supply of pipe earthing with g.i. patti clamp nut and bolts as per norms, supply of l.t. tail less unit with all respective material angel, patti and other material, supply of copper l-pieace 62x225x12mm., supply of 11 kv f clamp with nut and bolts, supply of suspension clamp, supply of dead end clamp, supply of eye i hook, supply of eye bolts for guarding, supply of j hook, supply of lt clamp for pcc or stp with bolts and nuts, supply of pearcing connector, supply of alluminium lug 120 sq.mm., supply of alluminium lug 240 sq.mm., supply of alluminium lug 70 sq.mm., supply of nut bolts and washers off size, supply of guarding angel, supply of guarding angel clamp, supply of m.s. angel iron 65x65x6 mm., 2700 mm long bracing with 4 nos clamp with nut and bolts, carriage of 9 m stp pole-sp- 55 galvanised, carriage of 11 m stp pole-sp- 55 galvanised, carriage of 8.5 m pcc pole, carriage of v type cross arm for 11 kv, carriage of 11 kv pin insulator with pin, carriage of disc insulator with fitting tandc 45 kn, carriage of 11 kv fuse set, carriage of 11 kv tpmo with polymer insulator, carriage of complete stay 9gi stay rod 20x1800 mm, stay wire 7 or 8 swg, 10 kg, stay clamp, bolt, nut and washer, carriage of distribution transformer 25 kva, carriage of distribution transformer 63 kva, carriage of distribution transformer 100 kva, carriage of distribution transformer 250 kva, carriage of acsr dog conductor, carriage of acsr weasel conductor or or insulated conductor as provided by department, carriage of m s earthing rod 20 x2540 mm, carriage of lt al. xlpe cable size 1x240 sq.mm., carriage of lt pvc cable 1x120 sq.mm. for dtr, carriage of lt pvc armoured cable size 3.5x70 or 35 sq.mm., carriage of 11 kv xlpe cable 3x185 sq.mm., carriage of lt ab cable 3x120+1x95+1x16 sq.mm., carriage of lt ab cable 3x50+1x35+1x16 sq.mm., carriage of lt ab cable 3x95+1x70+1x16 sq.mm., carriage of lt pvc armoured cable size 4x25 sq.mm., carriage of 33 kv xlpe cable 3x300 sq.mm., carriage of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm., carriage of 11 kv indoor or outdoor jointing kit size 3x185 sq.mm., carriage of 33 kv straight through size 3x300 sq.mm., carriage of 11 kv straight through size 3x185 sq.mm., carriage of 11 kv vcb for o or g ctr 200 or 100 or 5a 350 mva1250 amp., carriage of g.i. wire 6 or 8 swg for guarding, carriage of three phase distribution box, fixing of l.t. fuse set protection box with all respective accessories as per norms, chemical earthing with g.i. patti clamp nut and bolts as per norms, pipe earthing with g.i. patti clamp nut and bolts as per norms, l.t. tail less unit with all respective material as grouted angel with fabrication work etc., laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr dog conductor., laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr weasel conductor, laying, stringing, sagging, with all respective materialclamp with nut and bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable3x120+1x95+1x16 sq.mm., laying, stringing, sagging, with all respective materialclamp with nut and bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable3x50+1x35+1x16 sq.mm., laying, stringing, sagging, with all respective materialclamp with nut and bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable3x95+1x70+1x16 sq.mm., mounting of three phase distribution box with clamp nut and bolts and make proper connection with connecting cable., erection of double pole structure 11 mtr stp pole by digging of pits fitting of all relevant accessories as per respo norms.26 nos pole at different location under concern division., erection of single pole structure 8.5 mtrs pcc pole, 9 mtr st and 11 mtr st pole by digging of pits fitting of all relevant accessories as per respo norms. at different location under concern division., grouting of pcc or stp pole long as per respo norms with materialcement, sand, blast stone with the ratio 0.268 cu.m. each will be provided by conractor, grouting of stay as per respo normscement, sand, blast stone material will be provided by conractor, earthing of pole by m s earthing rod 20 x2540 mm with 6 swg earthing wire etc and make proper connection., guarding of 11 kv line with gaurding angel, clamp eye bolts and gaurding g.i. wire 6 or 8 swg86 span, fencing of distribution transformers with enamel in proper alignment as per respo manual and as per direction of executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work., plinth for 250 kva transformer proper size as per resspo norms, installation of the following new transformers at various 11 or 0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper ht or lt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11 or 0.4 kv t or f 25 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11 or 0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper ht or lt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11 or 0.4 kv t or f 63 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11 or 0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper ht or lt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11 or 0.4 kv t or f 100 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11 or 0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper ht or lt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11 or 0.4 kv t or f 250 kva with l.t. xlpe cable suitable size with all respective material as per norms., laying of following cable including digging and restoring along with brick and sand including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work. at different location under concern division.11 kv xlpe cable 3x185 sq.mm., laying of following cable by hdd method with hdpe pipe140 mm. including digging and restoring along with brick and sand including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work. 33 kv xlpe cable 3x300 sq.mm., installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms., installation of 11 kv indoor or outdoor jointing kit size 3x185 sq.mm. as per norms., installation of 33 kv straight through size 3x300 sq.mm. as per norms., installation of 11 kv straight through size 3x185 sq.mm. as per norms., installation of 11 kv vcb and make proper connection as per norms., dismentlling of jarjar g.i. wire and weasel conducter including with rolling and safe carriage from pit site to esc, mainpuri, received back of distribution transformer after increasing capacity from pit site to esc, mainpuri 4 nos 10 or 16 kva
T18 Ref No : 15779645
Location : mainpuri , uttar pradesh
Source : GEM Tenders
corrigendum tender for carriage of distribution transformer 100 kva from esc mnp , carriage of distribution transformer 250 kva from esc mnp , carriage of acsr weasel conductor from esc mnp , carriage of m s earthing rod 20 x2540 mm from esc mnp , carriage of lt al. xlpe cable size 1x240 sq.mm. from esc mnp , carriage of lt xlpe cable 1x120 sq.mm. for dtr from esc mnp , carriage of lt xlpe cable 1x400 sq.mm. for dtr from esc mnp , carriage of lt xlpe cable size 3.5x70 or 35 sq.mm. from esc mnp , carriage of lt ab cable 3x120 1x95 1x16 sq.mm. from esc mnp , carriage of lt ab cable 3x50 1x35 1x16 sq.mm. from esc mnp , carriage of lt ab cable 3x95 1x70 1x16 sq.mm. from esc mnp , carriage of 33 kv xlpe cable 3x300 sq.mm. from esc mnp , carriage of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. from esc mnp , carriage of 33 kv straight through size 3x300 sq.mm. from esc mnp , carriage of g.i. wire 6 or 8 swg for guarding from esc mnp , carriage of three phase distribution box from esc mnp , erection of fixing of lt fuse set protection box with all respective accessories as per norms , execution of chemical earthing with g.i. patti clamp nut and bolts as per norms , erection of l.t. tail less unit with all respective material as grouted angel with fabrication work etc. , laying of acsr weasel conductor , laying of lt ab cable 3x120 1x95 1x16 sq.mm. , laying of lt ab cable 3x50 1x35 1x16 sq.mm. , laying of lt ab cable 3x95 1x70 1x16 sq.mm. , mounting of three phase distribution box , erection of double pole structure 8.5 mtr pcc pole , erection of single pole structure 8.5 mtrs pcc pole , erection of tri pole structure 33 kv 13 mtr st pole , grouting of pcc or stp pole , grouting of stay , earthing of pole , guarding of 11 kv line , fencing of 250 kva distribution transformers , plinth for 250 kva transformer , installation of 11by0.4 kv tf 25 kva , installation of 11by0.4 kv tf 63 kva , installation of 11by0.4 kv tf 100 kva , installation of 11by0.4 kv tf 250 kva , laying of 33 kv xlpe cable 3x300 sq.mm. , installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms. , dismentlling, received back and safe carriage of jarjar g.i. wire and weasel conducter including with rolling from pit site to esc, mainpuri , received back of distribution transformer after, boqbhogaon, clamp for 11 kv v type cross arm with bolts and nuts, three phase distribution box clamp with nut and bolts, connecting cable for distribution box 1x35 sq.mm., l.t. fuse set protection box with all accessories, tinned copper fuse wire different size, hdpe pipe 140 mm., stone pad 300x300x75, holding clamp for doulble pole unit with nut and bolts, ms angle 75x75x6x2028mm with clamp and bolt and nut t or f base, t off chhanel and t off clamp with nut and bolts, top chhanel 125x65x240, dropper channel 100x50x2028 mm., danger board with clamp and nut and bolt, chemical earthing with g.i. patti clamp nut and bolts as per norms, l.t. tail less unit with all respective material angel, patti and other material, copper l pieace 62x225x12mm., 11 kv f clamp with nut and bolts, suspension clamp, dead end clamp, eye i hook, eye bolts for guarding, j hook, lt clamp for pcc or stp with bolts and nuts, pearcing connector, alluminium lug 120 sq.mm., alluminium lug 240 sq.mm., alluminium lug 400 sq.mm., nut bolts and washers off size, guarding angel, guarding angel clamp, m.s. angel iron 65x65x6 mm. 2700 mm long bracing with 4 nos clamp with nut and bolts, 13 m stp pole sp55 galvanised, 8.5 m pcc pole, v type cross arm for 11 kv, 11 kv pin insulator with pin, disc insulator with fitting t and c 45 kn 114 nos and 70kn 27 nos, 11 kv fuse set, 11 kv tpmo with polymer insulator, complete stay 9gi stay rod 20x1800 mm stay wire 7 and 8 swg 10 kg stay clamp bolt nut and washer, distribution transformer 25 kva, distribution transformer 63 kva, distribution transformer 100 kva, distribution transformer 250 kva, acsr weasel conductor or insulated conductor as provided by department, m s earthing rod 20 x2540 mm, lt al. xlpe cable size 1x240 sq.mm., lt xlpe cable 1x120 sq.mm. for dtr, lt xlpe cable 1x400 sq.mm. for dtr, lt xlpe cable size 3.5x70 or 35 sq.mm., lt ab cable 3x120 1x95 1x16 sq.mm., lt ab cable 3x50 1x35 1x16 sq.mm., lt ab cable 3x95 1x70 1x16 sq.mm., 33 kv xlpe cable 3x300 sq.mm., 33 kv indoor or outdoor jointing kit size 3x300 sq.mm., 33 kv straight through size 3x300 sq.mm., g.i. wire 6 or 8 swg for guarding, three phase distribution box, fixing of l.t. fuse set protection box with all respective accessories as per norms, l.t. tail less unit with all respective material as grouted angel with fabrication work etc., laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr weasel conductor or insulated conductor as provided by department, laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x120 1x95 1x16 sq.mm., laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x50 1x35 1x16 sq.mm, laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x95 1x70 1x16 sq.mm., mounting of three phase distribution box with clamp nut & bolts and make proper connection with connecting cable., erection of double pole structure 8.5 mtr pcc pole by digging of pits fitting of all relevant accessories as per respo norms. 34 nos pole at different location under concern division., erection of single pole structure 8.5 mtrs pcc pole by digging of pits fitting of all relevant accessories as per respo norms. at different location under concern division., erection of tri pole structure 33 kv 13 mtr st pole by digging of pits fitting of all relevant accessories as per respo norms. 3 nos pole at different location under concern division., grouting of pcc or stp pole long as per respo norms with material cement, sand, blast stone with the ratio 0.268 cu.m. each will be provided by conractor, grouting of stay as per respo norms cement, sand, blast stone material will be provided by conractor, earthing of pole by m s earthing rod 20 x2540 mm with 6 swg earthing wire etc and make proper connection., guarding of 11 kv line with gaurding angel, clamp eye bolts and gaurding g.i. wire 6 or 8 swg 30 span, fencing of distribution transformers with enamel in proper alignment as per respo manual and as per direction of executive engineer including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work., plinth for 250 kva transformer proper size as per resspo norms, installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 25 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 63 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 100 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 250 kva with l.t. xlpe cable suitable size with all respective material as per norms., laying of following cable by hdd method with hdpe pipe (140 mm.) including digging and restoring along with brick and sand including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work. 33 kv xlpe cable 3x300 sq.mm., installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms., dismentlling of jarjar g.i. wire and weasel conducter including with rolling received back and safe carriage from pit site to esc, mainpuri, received back of distribution transformer after increasing capacity from pit site to esc, mainpuri ( 17 nos 100 kva)
T18 Ref No : 15779646
Location : mainpuri , uttar pradesh
Source : GEM Tenders
corrigendum tender for , carriage of distribution transformer 250 kva from esc mnp , carriage of acsr rabbit conductor from esc mnp , carriage of acsr weasel conductor or insulated conductor as provided by department from esc mnp , carriage of m s earthing rod 20 x2540 mm from esc mnp , carriage of lt al. xlpe cable size 1x240 sq.mm. from esc mnp , carriage of lt xlpe cable 1x120 sq.mm. from esc mnp , carriage of 11 kv xlpe cable 3x185 sq.mm. from esc mnp , carriage of lt ab cable 3x120 1x95 1x16 sq.mm. from esc mnp , carriage of 33 kv xlpe cable 3x300 sq.mm. from esc mnp , carriage of 11 kv xlpe cable 3x300 sq.mm. from esc mnp , carriage of 11 kv indoor or outdoor jointing kit size 3x300 sq.mm. from esc mnp , carriage of 11 kv indoor or outdoor jointing kit size 3x185 sq.mm. from esc mnp , carriage of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. from esc mnp , carriage of 11 kv straight through size 3x185 sq.mm. from esc mnp , carriage of 11 kv vcb for og ctr 200by100by5a 350 mva 1250 amp. from esc mnp , carriage of 11 kv vcb ic ctr 600by300by5a 350 mva 1250 amp. from esc mnp , carriage of g.i. wire 6or8 swg for guarding from esc mnp , carriage of three phase distribution box from esc mnp , erection of fixing of l.t. fuse set protection box with all respective accessories as per norms , execution of chemical earthing with g.i. patti clamp nut and bolts as per norms , erection of l.t. tail less unit with all respective material as grouted angel with fabrication work etc. , laying of acsr rabbit conductor , laying of acsr weasel conductor or insulated conductor as provided by department , laying of lt ab cable 3x120 1x95 1x16 sq.mm. , mounting of three phase distribution box , erection of double pole structure , erection of single pole structure , grouting of pcc or stp pole , grouting of stay , earthing of pole , guarding of 11 kv line with gaurding angel etc , fencing of distribution transformers , make plinth for 250 kva transformer proper size as per resspo norms , installation of 11by0.4 kv tf 100 kva , installation of 11by0.4 kv tf 250 kva , laying of 11 kv xlpe cable 3x185 sq.mm. , laying of 11 kv xlpe cable 3x300 sq.mm. , laying of 33 kv xlpe cable 3x300 sq.mm. , installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms. , installation of 11 kv indoor or outdoor jointing kit size 3x185 sq.mm. as per norms. , installation of 11 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms. , installation of 11 kv straight through size 3x185 sq.mm. as per norms. , installation of 11 kv vcb og ctr 200by100by5a 350 mva 1250 amp. , installation of 11 kv vcb ic ctr 600by300by5a 350 mva 1250 amp. , dismentlling of old and damaged cable of different size , received back of distribution transformer after increasing, boqeudd, 11 kv v type cross arm clamp with bolts and nuts, three phase distribution box clamp with nut and bolts, connecting cable for distribution box 1x35 sq.mm., l.t. fuse set protection box with all accessories, tinned copper fuse wire different size, hdpe pipe 140 mm., stone pad 300x300x75, ms angle 75x75x6x2028mm with clamp and bolt and nut tf base, t off chhanel and t off clamp with nut and bolts, top chhanel 125x65x240, dropper channel 100x50x2028 mm., chemical earthing with g.i. patti clamp nut and bolts as per norms, l.t. tail less unit with all respective material angel, patti and other material, copper l pieace 62x225x12mm., 4 core lt mcb with box for 250 kva tf, 11 kv f clamp with nut and bolts, al. pg clamp weasel to weasel conductor, al. pg clamp rabbit to rabbit conductor, suspension clamp, dead end clamp, eye i hook, eye bolts for guarding, j hook, lt clamp for pcc or stp with bolts and nuts, pearcing connector, alluminium lug 120 sq.mm., alluminium lug 240 sq.mm., guarding angel, guarding angel clamp, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 8.5 m pcc pole, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 9 m stp pole sp 55 galvanised, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 m stp pole sp 55 galvanised, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 13 m stp pole sp 55 galvanised, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department v type cross arm for 11 kv, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv pin insulator with pin, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department disc insulator with fitting tandc 45 kn, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv fuse set, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv tpmo with polymer insulator, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department complete stay 9gi stay rod 20x1800 mm, stay wire 7 or 8 swg, 10 kg, stay clamp, bolt, nut and washer, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department distribution transformer 100 kva, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department distribution transformer 250 kva, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department acsr rabbit conductor, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department acsr weasel conductor or insulated conductor as provided by department, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department m s earthing rod 20 x2540 mm, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department lt al. xlpe cable size 1x240 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department lt xlpe cable 1x120 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv xlpe cable 3x185 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department lt ab cable 3x120 1x95 1x16 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 33 kv xlpe cable 3x300 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv xlpe cable 3x300 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv indoor or outdoor jointing kit size 3x300 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv indoor or outdoor jointing kit size 3x185 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 33 kv indoor or outdoor jointing kit size 3x300 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv straight through size 3x185 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv vcb for og ctr 200by100by5a 350 mva 1250 amp., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv vcb ic ctr 600by300by5a 350 mva 1250 amp., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department g.i. wire 6 or 8 swg for guarding, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department three phase distribution box, fixing of l.t. fuse set protection box with all respective accessories as per norms, l.t. tail less unit with all respective material as grouted angel with fabrication work etc., laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr rabbit conductor, laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr weasel conductor or insulated conductor as provided by department, laying, stringing, sagging, with all respective material clamp with nut and bolts suspension clamp eye j hook pearcing connector etc of following conductor cable on the erected supports, as per respo norms. lt ab cable 3x120 1x95 1x16 sq.mm., mounting of three phase distribution box with clamp nut & bolts and make proper connection with connecting cable., erection of double pole structure 11 mtr stp pole by digging of pits fitting of all relevant accessories as per respo norms. 22 nos pole at different location under concern division., erection of single pole structure 8.5 mtrs pcc pole, 9 mtr st, 11 mtr st pole, 13 mtr st by digging of pits fitting of all relevant accessories as per respo norms. at different location under concern division., grouting of pcc or stp pole long as per respo norms with material cement, sand, blast stone with the ratio 0.268 cu.m. each will be provided by conractor, grouting of stay as per respo norms cement, sand, blast stone material will be provided by conractor, earthing of pole by m s earthing rod 20 x2540 mm with 6 swg earthing wire etc and make proper connection., guarding of 11 kv line with gaurding angel, clamp eye bolts and gaurding g.i. wire 6 or 8 swg 60 span, fencing of distribution transformers with enamel in proper alignment as per respo manual and as per direction of executive engineer including the cost of arrangement of labour, t and p, carrier etc. required for proper completion of work., make plinth for 250 kva transformer proper size as per resspo norms, installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work. 11by0.4 kv tf 100 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work. 11by0.4 kv tf 250 kva with l.t. xlpe cable suitable size with all respective material as per norms., laying of following cable including digging and restoring along with brick and sand including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work. at different location under concern division.11 kv xlpe cable 3x185 sq.mm., laying of following cable including digging and restoring along with brick and sand including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work. at different location under concern division. 11 kv xlpe cable 3x300 sq.mm., laying of following cable by hdd method with hdpe pipe 140 mm. including digging and restoring along with brick and sand including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work. 33 kv xlpe cable 3x300 sq.mm., installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms., installation of 11 kv indoor or outdoor jointing kit size 3x185 sq.mm. as per norms., installation of 11 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms., installation of 11 kv straight through size 3x185 sq.mm. as per norms., installation of 11 kv vcb og ctr 200by100by5a 350 mva 1250 amp. and make proper connection as per norms., installation of 11 kv vcb ic ctr 600by300by5a 350 mva 1250 amp. and make proper connection as per norms., dismentlling of old and damaged cable of different size including with rolling received back and safe carriage from pit site to esc, mainpuri, received back of distribution transformer after increasing capacity from pit site to esc, mainpuri 30 nos 100 kva

Unlock Full Tender Access

Start Free Trial to download documents before deadline

T18 Ref No : 16684232
Location : hathras , uttar pradesh
Source : GEM Tenders
tender for supply of stone pad , supply of al lug long barrel off size , supply of holding clamp , supply of m s top channel 125x65x2240 mm , supply of ms dropper channel 100x50x2028 mm , supply of number plate , supply of ms angle t f base with clamp and nut bolt , supply of barbed wire , supply of danger board , supply of copper l piece , supply of henley type tailless unit protection cubicle panel 500a 650v , supply of lt fuse set protection unit for 25 kva dt with smc box , supply of insulated weasel conductor , supply of m s nut and bolt , supply of suspension clamp , supply of dead end clamp , supply of i hook j hook , carriage of pcc pole 8 5 mtr long , carriage of pcc pole 11 mtr long , carriage of 11 kv pin insulator with pin , carriage of 11 kv disc insulator with fitting , carriage of fuse set , carriage of earthing complete , carriage of stay set complete , carriage of 25 kva 11 0 4 kv t f , carriage of 250 kva 11 0 4 kv t f , carriage of lt xlpe pvc cable 3 5x70 sqmm , carriage of lt xlpe pvc cable 1x400 sqmm , carriage of lt xlpe pvc cable 1x240 sqmm , carriage of lt abc cable 3x120plus1x95plus1x16 sqmm , carriage of 11 kv tpmo with polymer insualator , errection of pcc pole 8 5 mtr long , errection of pcc pole 11 mtr long , fixing of stone pad , fixing of al lug long barrel off size , fixing of holding clamp , fixing of m s top channel 125x65x2240 mm , fixing of ms dropper channel 100x50x2028 mm , fixingof number plate , fixing of ms angle t f base with clamp and nut bolt , fixing of barbed wire , fixing of danger board , fixing of copper l piece , fixing of henley type tailless unit protection cubicle panel 500a 650v , fixing of lt fuse set protection unit for 25 kva dt with smc box , fixing of m s nut and bolt , fixing of 11 kv pin insulator with pin , fixing of 11 kv disc insulator with fitting , fixing of fuse set , fixing of 11 kv tpmo with polymer insualator , fixing of suspension clamp , errection of dead end clamp , fixing of i hook j hook , installation of 25 kva 11 0 4 kv t f on newly constructed double pole in proper alignment , installation of 250 kva t f on newly old constructed plinth in proper alignment , dismenteling of 10 16 kva t f , dismenteling of 100 kva t f , errection and grouting of stays , fixing of earthing rod , laying lt xlpe pvc cable 3 5x70 sqmm , laying lt xlpe pvc cable 1x400 sqmm , laying lt xlpe pvc cable 1x240 sqmm , laying lt abc cable 3x120 plus 1x95 plus 1x16 sqmm , laying insulated weasel conductor , construction of plinth of size 2x2x1 point 5 m , pipe and water level earthing of 250 kva medium power transformers , net fencing shall be 1150x1200 mm made of 35x35 mm ms angle , back cartage of 10 16 kva t f , back cartage of 100 kva t f, boqbp, supply of stone pad as per relevent iss, supply of al lug long barrel off size as per relevent iss, supply of holding clamp as per relevent iss, supply of m s top channel 125x65x2240 mm as per relevent iss, supply of ms dropper channel 100x50x2028 mm as per relevent iss, supply of number plate as per relevent iss, supply of ms angle t f base with clamp and nut bolt as per relevent iss, supply of barbed wire as per relevent iss, supply of danger board as per relevent iss, supply of copper l piece as per relevent iss, supply of henley type tailless unit protection cubicle panel 500a 650v as per relevent iss, supply of lt fuse set protection unit for 25 kva dt with smc box, supply of insulated weasel conductor as per relevent iss, supply of m s nut and bolt as per relevent iss, supply of suspension clamp as per relevent iss, supply of dead end clamp as per relevent iss, supply of i hook j hook as per relevent iss, carriage of pcc pole 8 5 mtr long from electricty store center hts to pit site of work through the kacha and pakka road including loading and unloading at the respective ends including the cost of arrangement of labour t&p etc which required for proper completion of work (distance 00 50 kms ), carriage of pcc pole 11 mtr long from electricty store center hts to pit site of work through the kacha and pakka road including loading and unloading at the respective ends including the cost of arrangement of labour t&p etc which required for proper completion of work (distance 00 50 kms ), carriage of 11 kv pin insulator with pin, carriage of 11 kv disc insulator with fitting, carriage of fuse set, carriage of earthing complete, carriage of stay set complete, carriage of 25 kva 11 0 4 kv t f from electricty store center hts to pit site of work through the kacha and pakka road including loading and unloading at the respective ends including the cost of arrangement of labour t&p etc which required for proper completion of work (distance 00 50 kms ), carriage of 250 kva 11 0 4 kv t f from electricty store center hts to pit site of work through the kacha and pakka road including loading and unloading at the respective ends including the cost of arrangement of labour t&p etc which required for proper completion of work (distance 00 50 kms ), carriage of lt xlpe pvc cable 3 5x70 sqmm from electricty store center hts to pit site of work through the kacha and pakka road including loading and unloading at the respective ends including the cost of arrangement of labour t&p etc which required for proper completion of work (distance 00 50 kms ), carriage of lt xlpe pvc cable 1x400 sqmm from electricty store center hts to pit site of work through the kacha and pakka road including loading and unloading at the respective ends including the cost of arrangement of labour t&p etc which required for proper completion of work (distance 00 50 kms ), carriage of lt xlpe pvc cable 1x240 sqmm from electricty store center hts to pit site of work through the kacha and pakka road including loading and unloading at the respective ends including the cost of arrangement of labour t&p etc which required for proper completion of work (distance 00 50 kms ), carriage of lt abc cable 3x120+1x95+1x16 sqmm from electricty store center hts to pit site of work through the kacha and pakka road including loading and unloading at the respective ends including the cost of arrangement of labour t&p etc which required for proper completion of work (distance 00 50 kms ), carriage of 11 kv tpmo with polymer insualator, errection of pcc pole 8 5 mtr long with grouting including cutting of kharanja mettalic road concrete portion while digging pit & complete h t l t fittings as per respo manual and as per direction of engineer incharge including the cost of labour t&p and carrier etc required for proper completion of work, errection of pcc pole 11 mtr long with grouting including cutting of kharanja mettalic road concrete portion while digging pit & complete h t l t fittings as per respo manual and as per direction of engineer incharge including the cost of labour t&p and carrier etc required for proper completion of work, fixing of stone pad, fixing of al lug long barrel off size, fixing of holding clamp, fixing of m s top channel 125x65x2240 mm, fixing of ms dropper channel 100x50x2028 mm, fixingof number plate, fixing of ms angle t f base with clamp and nut bolt, fixing of barbed wire, fixing of danger board, fixing of copper l piece, fixing of henley type tailless unit protection cubicle panel 500a 650v, fixing of lt fuse set protection unit for 25 kva dt with smc box, fixing of m s nut & bolt, fixing of 11 kv pin insulator with pin, fixing of 11 kv disc insulator with fitting, fixing of fuse set, fixing of 11 kv tpmo with polymer insualator, fixing of suspension clamp, errection of dead end clamp, fixing of i hook j hook, installation of 25 kva 11 0 4 kv t f on newly constructed double pole in proper alignment direction & making ht lt connection, installation of 250 kva t f on newly old constructed plinth in proper alignment direction & making ht lt connection all cost of labour and t&p which required for completion of work, dismenteling of 10 16 kva t f from double pole with opening of all ht lt jumpers all works which required for dismentling of t f, dismenteling of 100 kva t f from double pole with opening of all ht lt jumpers all works which required for dismentling of t f, errection and grouting of stays as per respo norms and as per direction of supervising engineer grouting material i e cement sand brick ballast stone ballast etc shall be arranged by the contractor at his own cost, fixing of earthing rod as per respo norms and as per direction of supervising engineer, laying lt xlpe pvc cable 3 5x70 sqmm, laying lt xlpe pvc cable 1x400 sqmm, laying lt xlpe pvc cable 1x240 sqmm, laying lt abc cable 3x120 plus 1x95 plus 1x16 sqmm, laying insulated weasel conductor, construction of plinth of size 2x2x1 5 m above ground level one ft below the ground level of 9 inch after exavation of 4 inch earth brick ballast shall be provided and rammering will be done properly after ballast shall be provided and rammering will be done properly after that a retaining wall 9 inchwidth by fist class brick in ratio 1 ratio 4 of cement & sand shall be made the earth shall be filled up to one ft below the top of the plinth after this brick ballast shall be provided upto 6 inch from the earth level and proper rammering shall be done one no jall of 12 mm ms tor shall be fixed in the hollow of plinth and one ft thick rcc in ratio of cement sand & stone ballast shall be laid on the top of the plinth the 12 mm thick plastering shall be done all round the plinth in 1 4 ratio of cement and sand, pipe & water level earthing of 250 kva medium power transformers, net fencing shall be 1150x1200 mm made of 35x35 mm ms angle covered by expended netal 14 swg up to full height 1200 mm duly steftened by ms flat by an 8 swg dia bolt and nut, back cartage of 10 16 kva t f and carriage it up to store hathras j e store all cost of labour and t and p which required for completion of work, back cartage of 100 kva t f and carriage it up to store hathras j e store all cost of labour and t&p which required for completion of work
T18 Ref No : 15914143
Location : gangtok , sikkim
Source : GEM Tenders
tender for puf insulated hdpe water storage tank 500 ltr , puf insulated hdpe water storage tank 750 ltr , puf insulated hdpe water storage tank 2000 ltr , puf insulated ppr pipe of size 32 mm- pn 20, 3 layer, puf insulation-40mm thick , puf insulated ppr pipe 32 mm od with self regulating heat tape 35 watt per mtr and m 20 connectors ppr pipe - pn 20 , puf insulation - 40 mm. , puf insulated ppr pipe 20 mm od with self regulating heat tape 35 watt per mtr and m 20 connectors ppr pipe - pn 20 , puf insulation - 40 mm. , ppr elbow pn 20pipe 3 layer -32 mm size , ppr elbow pn 20pipe 3 layer -20 mm size , ppr tee pn 20pipe 3 layer -32 mm size , ppr tee pn 20pipe 3 layer -20 mm size , ppr union pn 20pipe 3 layer -32 mm size , ppr union pn 20pipe 3 layer -20 mm size , ppr half bend- 32 mm size , ppr half bend- 20 mm size , temperature differential controller for automatic on and off operation of heat tape , pt 100 sensor with 10 mtr signal wire , 3 core 1.5 sqmm copper wire , aluminum tape , 2.5 hp single phase open well submersible pump set complete , direct-on-line starter control panel for 2.5 hp single phase openwell submersible pump set, supply of materials, 500 litre capacity tank multi-layered hdpe tank with uv stabilized 100 food-grade virgin inner liner. pre insulated with high-pressure machine-injected minimum 40mm thick cfc-free rigid puf core insulation layer (density min 48 kg per qm). includes threaded self-locking lid with heavy-duty hexa-bolts to withstand extreme wind or snow loads. suitable for -40 degree c to 40 degree c thermal stability (max temp 0.5 degree or -0.5 degree over 6 hours)., 750 litre capacity tank multi-layered hdpe tank with uv stabilized 100 food-grade virgin inner liner. pre insulated with high-pressure machine-injected minimum 40mm thick cfc-free rigid puf core insulation layer (density min 48 kg per qm). includes threaded self-locking lid with heavy-duty hexa-bolts to withstand extreme wind or snow loads. suitable for -40 degree c to 40 degree c thermal stability (max temp 0.5 degree or -0.5 degree over 6 hours)., 2000 litre capacity tank multi-layered hdpe tank with uv stabilized 100 food-grade virgin inner liner. pre insulated with high-pressure machine-injected minimum 40mm thick cfc-free rigid puf core insulation layer (density min 48 kg per qm). includes threaded self-locking lid with heavy-duty hexa-bolts to withstand extreme wind or snow loads. suitable for -40 degree c to 40 degree c thermal stability (max temp 0.5 degree or -0.5 degree over 6 hours)., puf insulated ppr pipe of size 32 mm- pn 20, 3 layer, puf insulation-40mm thick 48 kg/cum dense, with outer protective layer of 3 mm pvc, puf insulated ppr pipe 32 mm od with self regulating heat tape (35 w/mtr) and m20 connectors for termination at both ends , ppr pipe - pn 20 , 3 layer , puf insulation - 40 mm, puf density 48 kg/cum with 3 mm thick outer pvc protective layer, puf insulated ppr pipe 20 mm od with self regulating heat tape (35 w/mtr) and m20 connectors for termination at both ends , ppr pipe - pn 20 , 3 layer , puf insulation - 40 mm, puf density 48 kg/cum with 3 mm thick outer pvc protective layer, ppr elbow (for pn 20pipe 3 layer)-32 mm size, ppr elbow (for pn 20pipe 3 layer)-20 mm size, ppr tee (for pn 20pipe 3 layer)-32 mm size, ppr tee (for pn 20pipe 3 layer)-20 mm size, ppr union (for pn 20pipe 3 layer)-32 mm size, ppr union (for pn 20pipe 3 layer)-20 mm size, ppr half bend- 32 mm size, ppr half bend- 20 mm size, temperature differential controller for automatic on/off operation of heat tape, programmable on below 10 degree c, cut off at 15 degree c. additional 2 pole 16a mcb for heating element load(manual operation), pt 100 sensor with 10 mtr signal wire, 3 core 1.5 sqmm pvc copper wire, aluminum tape for cladding of nitrile foam joints backing material thickened aluminium foil (typically reinforced for tear resistance and grid protection). adhesive layer high-polymer synthesis butyl rubber. total thickness ranges from 1.0 mm to 1.5 mm (with the aluminium layer typically 30 to 70 m). temperature range -40 degree c to 120 degree c (some specialized versions handle up to 260 degree c). elongation rate up to 1000 to accommodate surface expansion, contraction, and structural displacement. shelf life typically up to 12 months before application., supply of 2.5 hp single phase open well submersible pump set complete, suitable for operation on 220-240 volts, 50 hz ac supply, having motor output not less than 1.85 kw (2.5 hp), speed 2800-2900 rpm, fitted with 100 insulated copper winding, water cooled/oil cooled motor, capable of delivering discharge ranging from 50 to 100 lpm at total head varying from 100 m to 150 m. the pump shall be of single stage/two stage design as required, with discharge outlet size 32mm to 40 mm diameter. the pump set shall consist of high-grade stainless steel (ss) and cast iron (ci) body, corrosion resistant construction, stainless steel shaft, noryl/bronze/cast iron impeller, heavy duty water lubricated thrust bearings designed to withstand axial thrust loads and suitable mechanical seals. the pump and motor shall be mounted on a common shaft ensuring perfect alignment and efficient operation., supply of direct-on-line (dol) starter control panel for 2.5 hp single phase openwell/submersible pump set, suitable for operation on 220-240 volts, 50 hz ac supply, designed to handle full load current of 16-18 amperes, complete with heavy-duty contactor, thermal overload relay, single phasing protection, start and stop push buttons, capacitor start and capacitor run arrangement, indicating lamps, voltmeter, ammeter, mcb/mccb protection, terminal blocks, internal wiring, sheet steel enclosure duly powder coated, suitable for indoor/outdoor installation.
T18 Ref No : 15914144
Location : gangtok , sikkim
Source : GEM Tenders
tender for puf insulated hdpe water storage tank 500 ltr , puf insulated hdpe water storage tank 750 ltr , puf insulated hdpe water storage tank 2000 ltr , puf insulated ppr pipe of size 32 mm- pn 20, 3 layer, puf insulation-40mm thick , puf insulated ppr pipe 32 mm od with self regulating heat tape 35 watt per mtr and m 20 connectors ppr pipe - pn 20 , puf insulation - 40 mm. , puf insulated ppr pipe 20 mm od with self regulating heat tape 35 watt per mtr and m 20 connectors ppr pipe - pn 20 , puf insulation - 40 mm. , ppr elbow pn 20pipe 3 layer -32 mm size , ppr elbow pn 20pipe 3 layer -20 mm size , ppr tee pn 20pipe 3 layer -32 mm size , ppr tee pn 20pipe 3 layer -20 mm size , ppr union pn 20pipe 3 layer -32 mm size , ppr union pn 20pipe 3 layer -20 mm size , ppr half bend- 32 mm size , ppr half bend- 20 mm size , temperature differential controller for automatic on and off operation of heat tape , pt 100 sensor with 10 mtr signal wire , 3 core 1.5 sqmm copper wire , aluminum tape , 2.5 hp single phase open well submersible pump set complete , direct-on-line starter control panel for 2.5 hp single phase openwell submersible pump set, supply of material, 500 litre capacity tank multi-layered hdpe tank with uv stabilized 100 food-grade virgin inner liner. pre insulated with high-pressure machine-injected minimum 40mm thick cfc-free rigid puf core insulation layer (density min 48 kg per qm). includes threaded self-locking lid with heavy-duty hexa-bolts to withstand extreme wind or snow loads. suitable for -40 degree c to 40 degree c thermal stability (max temp 0.5 degree or -0.5 degree over 6 hours)., 750 litre capacity tank multi-layered hdpe tank with uv stabilized 100 food-grade virgin inner liner. pre insulated with high-pressure machine-injected minimum 40mm thick cfc-free rigid puf core insulation layer (density min 48 kg per qm). includes threaded self-locking lid with heavy-duty hexa-bolts to withstand extreme wind or snow loads. suitable for -40 degree c to 40 degree c thermal stability (max temp 0.5 degree or -0.5 degree over 6 hours)., 2000 litre capacity tank multi-layered hdpe tank with uv stabilized 100 food-grade virgin inner liner. pre insulated with high-pressure machine-injected minimum 40mm thick cfc-free rigid puf core insulation layer (density min 48 kg per qm). includes threaded self-locking lid with heavy-duty hexa-bolts to withstand extreme wind or snow loads. suitable for -40 degree c to 40 degree c thermal stability (max temp 0.5 degree or -0.5 degree over 6 hours)., puf insulated ppr pipe of size 32 mm- pn 20, 3 layer, puf insulation-40mm thick 48 kg/cum dense, with outer protective layer of 3 mm pvc, puf insulated ppr pipe 32 mm od with self regulating heat tape (35 w/mtr) and m20 connectors for termination at both ends , ppr pipe - pn 20 , 3 layer , puf insulation - 40 mm, puf density 48 kg/cum with 3 mm thick outer pvc protective layer, puf insulated ppr pipe 20 mm od with self regulating heat tape (35 w/mtr) and m20 connectors for termination at both ends , ppr pipe - pn 20 , 3 layer , puf insulation - 40 mm, puf density 48 kg/cum with 3 mm thick outer pvc protective layer, ppr elbow (for pn 20pipe 3 layer)-32 mm size, ppr elbow (for pn 20pipe 3 layer)-20 mm size, ppr tee (for pn 20pipe 3 layer)-32 mm size, ppr tee (for pn 20pipe 3 layer)-20 mm size, ppr union (for pn 20pipe 3 layer)-32 mm size, ppr union (for pn 20pipe 3 layer)-20 mm size, ppr half bend- 32 mm size, ppr half bend- 20 mm size, temperature differential controller for automatic on/off operation of heat tape, programmable on below 10 degree c, cut off at 15 degree c. additional 2 pole 16a mcb for heating element load(manual operation), pt 100 sensor with 10 mtr signal wire, 3 core 1.5 sqmm pvc copper wire, aluminum tape for cladding of nitrile foam joints backing material thickened aluminium foil (typically reinforced for tear resistance and grid protection). adhesive layer high-polymer synthesis butyl rubber. total thickness ranges from 1.0 mm to 1.5 mm (with the aluminium layer typically 30 to 70 m). temperature range -40 degree c to 120 degree c (some specialized versions handle up to 260 degree c). elongation rate up to 1000 to accommodate surface expansion, contraction, and structural displacement. shelf life typically up to 12 months before application., supply of 2.5 hp single phase open well submersible pump set complete, suitable for operation on 220-240 volts, 50 hz ac supply, having motor output not less than 1.85 kw (2.5 hp), speed 2800-2900 rpm, fitted with 100 insulated copper winding, water cooled/oil cooled motor, capable of delivering discharge ranging from 50 to 100 lpm at total head varying from 100 m to 150 m. the pump shall be of single stage/two stage design as required, with discharge outlet size 32mm to 40 mm diameter. the pump set shall consist of high-grade stainless steel (ss) and cast iron (ci) body, corrosion resistant construction, stainless steel shaft, noryl/bronze/cast iron impeller, heavy duty water lubricated thrust bearings designed to withstand axial thrust loads and suitable mechanical seals. the pump and motor shall be mounted on a common shaft ensuring perfect alignment and efficient operation., supply of direct-on-line (dol) starter control panel for 2.5 hp single phase openwell/submersible pump set, suitable for operation on 220-240 volts, 50 hz ac supply, designed to handle full load current of 16-18 amperes, complete with heavy-duty contactor, thermal overload relay, single phasing protection, start and stop push buttons, capacitor start and capacitor run arrangement, indicating lamps, voltmeter, ammeter, mcb/mccb protection, terminal blocks, internal wiring, sheet steel enclosure duly powder coated, suitable for indoor/outdoor installation.

Unlock Full Tender Access

Start Free Trial to download documents before deadline

T18 Ref No : 16170943
Location : mainpuri , uttar pradesh
Source : GEM Tenders
corrigendum tender for 9gi stay rod 20x1800 mm etc material from esc mnp , carriage of distribution transformer 25 kva from esc mnp , carriage of distribution transformer 63 kva from esc mnp , carriage of distribution transformer 100 kva from esc mnp , carriage of distribution transformer 250 kva from esc mnp , carriage of acsr weasel conductor from esc mnp , carriage of m s earthing rod 20 x2540 mm from esc mnp , carriage of lt al. xlpe cable size 1x240 sq.mm. from esc mnp , carriage of lt xlpe cable 1x120 sq.mm. for dtr from esc mnp , carriage of lt xlpe cable 1x400 sq.mm. for dtr from esc mnp , carriage of lt xlpe cable size 3.5x70 or 35 sq.mm. from esc mnp , carriage of lt ab cable 3x120 1x95 1x16 sq.mm. from esc mnp , carriage of lt ab cable 3x50 1x35 1x16 sq.mm. from esc mnp , carriage of lt ab cable 3x95 1x70 1x16 sq.mm. from esc mnp , carriage of 33 kv xlpe cable 3x300 sq.mm. from esc mnp , carriage of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. from esc mnp , carriage of 33 kv straight through size 3x300 sq.mm. from esc mnp , carriage of g.i. wire 6 or 8 swg for guarding from esc mnp , carriage of three phase distribution box from esc mnp , erection of fixing of lt fuse set protection box with all respective accessories as per norms , execution of chemical earthing with g.i. patti clamp nut and bolts as per norms , erection of l.t. tail less unit with all respective material as grouted angel with fabrication work etc. , laying of acsr weasel conductor , laying of lt ab cable 3x120 1x95 1x16 sq.mm. , laying of lt ab cable 3x50 1x35 1x16 sq.mm. , laying of lt ab cable 3x95 1x70 1x16 sq.mm. , mounting of three phase distribution box , erection of double pole structure 8.5 mtr pcc pole , erection of single pole structure 8.5 mtrs pcc pole , erection of tri pole structure 33 kv 13 mtr st pole , grouting of pcc or stp pole , grouting of stay , earthing of pole , guarding of 11 kv line , fencing of 250 kva distribution transformers , plinth for 250 kva transformer , installation of 11by0.4 kv tf 25 kva , installation of 11by0.4 kv tf 63 kva , installation of 11by0.4 kv tf 100 kva , installation of 11by0.4 kv tf 250 kva , laying of 33 kv xlpe cable 3x300 sq.mm. , installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms. , dismentlling, received back and safe carriage of jarjar g.i. wire and weasel conducter including with rolling from pit site to esc, mainpuri , received back of distribution transformer after, boqbp2627, clamp for 11 kv v type cross arm with bolts and nuts, three phase distribution box clamp with nut and bolts, connecting cable for distribution box 1x35 sq.mm., l.t. fuse set protection box with all accessories, tinned copper fuse wire different size, hdpe pipe 140 mm., stone pad 300x300x75, holding clamp for doulble pole unit with nut and bolts, ms angle 75x75x6x2028mm with clamp and bolt and nut t or f base, t off chhanel and t off clamp with nut and bolts, top chhanel 125x65x240, dropper channel 100x50x2028 mm., danger board with clamp and nut and bolt, chemical earthing with g.i. patti clamp nut and bolts as per norms, l.t. tail less unit with all respective material angel, patti and other material, copper l pieace 62x225x12mm., 11 kv f clamp with nut and bolts, suspension clamp, dead end clamp, eye i hook, eye bolts for guarding, j hook, lt clamp for pcc or stp with bolts and nuts, pearcing connector, alluminium lug 120 sq.mm., alluminium lug 240 sq.mm., alluminium lug 400 sq.mm., nut bolts and washers off size, guarding angel, guarding angel clamp, m.s. angel iron 65x65x6 mm. 2700 mm long bracing with 4 nos clamp with nut and bolts, 13 m stp pole sp55 galvanised, 8.5 m pcc pole, v type cross arm for 11 kv, 11 kv pin insulator with pin, disc insulator with fitting t and c 45 kn 114 nos and 70kn 27 nos, 11 kv fuse set, 11 kv tpmo with polymer insulator, complete stay 9gi stay rod 20x1800 mm stay wire 7 and 8 swg 10 kg stay clamp bolt nut and washer, distribution transformer 25 kva, distribution transformer 63 kva, distribution transformer 100 kva, distribution transformer 250 kva, acsr weasel conductor or insulated conductor as provided by department, m s earthing rod 20 x2540 mm, lt al. xlpe cable size 1x240 sq.mm., lt xlpe cable 1x120 sq.mm. for dtr, lt xlpe cable 1x400 sq.mm. for dtr, lt xlpe cable size 3.5x70 or 35 sq.mm., lt ab cable 3x120 1x95 1x16 sq.mm., lt ab cable 3x50 1x35 1x16 sq.mm., lt ab cable 3x95 1x70 1x16 sq.mm., 33 kv xlpe cable 3x300 sq.mm., 33 kv indoor or outdoor jointing kit size 3x300 sq.mm., 33 kv straight through size 3x300 sq.mm., g.i. wire 6 or 8 swg for guarding, three phase distribution box, fixing of l.t. fuse set protection box with all respective accessories as per norms, l.t. tail less unit with all respective material as grouted angel with fabrication work etc., laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr weasel conductor or insulated conductor as provided by department, laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x120 1x95 1x16 sq.mm., laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x50 1x35 1x16 sq.mm, laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x95 1x70 1x16 sq.mm., mounting of three phase distribution box with clamp nut & bolts and make proper connection with connecting cable., erection of double pole structure 8.5 mtr pcc pole by digging of pits fitting of all relevant accessories as per respo norms. 34 nos pole at different location under concern division., erection of single pole structure 8.5 mtrs pcc pole by digging of pits fitting of all relevant accessories as per respo norms. at different location under concern division., erection of tri pole structure 33 kv 13 mtr st pole by digging of pits fitting of all relevant accessories as per respo norms. 3 nos pole at different location under concern division., grouting of pcc or stp pole long as per respo norms with material cement, sand, blast stone with the ratio 0.268 cu.m. each will be provided by conractor, grouting of stay as per respo norms cement, sand, blast stone material will be provided by conractor, earthing of pole by m s earthing rod 20 x2540 mm with 6 swg earthing wire etc and make proper connection., guarding of 11 kv line with gaurding angel, clamp eye bolts and gaurding g.i. wire 6 or 8 swg 30 span, fencing of distribution transformers with enamel in proper alignment as per respo manual and as per direction of executive engineer including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work., plinth for 250 kva transformer proper size as per resspo norms, installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 25 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 63 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 100 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 250 kva with l.t. xlpe cable suitable size with all respective material as per norms., laying of following cable by hdd method with hdpe pipe (140 mm.) including digging and restoring along with brick and sand including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work. 33 kv xlpe cable 3x300 sq.mm., installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms., dismentlling of jarjar g.i. wire and weasel conducter including with rolling received back and safe carriage from pit site to esc, mainpuri, received back of distribution transformer after increasing capacity from pit site to esc, mainpuri ( 17 nos 100 kva)

Every year, central and state government departments release thousands of high-value contracts specifically dedicated to Polymeric Insulating Material. Whether it involves bulk material supply, executing specialized operational services, or end-to-end turnkey project execution, the demand for capable vendors in the Polymeric Insulating Material sector is massive.

At Tender18, we help businesses cut through the noise and exclusively target the exact work categories they specialize in. Instead of browsing through generic procurement sites, our platform isolates high-potential opportunities that match your specific industry capabilities.

Work Dynamics in the Polymeric Insulating Material Sector

Government requirements for this specific vertical generally fall into distinct procurement patterns:

  • Product & Material Supply: Tenders focused strictly on sourcing, testing, and delivering high-quality items that meet the exact technical specifications of the buyer.
  • Service Level Agreements (SLAs): Long-term hiring of expert agencies for routine maintenance, manpower deployment, or continuous operational management.
  • Execution & Turnkey Projects: Comprehensive contracts where the bidder is responsible for everything from raw material procurement to final site installation and testing.

By focusing purely on your core strength in Polymeric Insulating Material, you can build a highly profitable and stable pipeline of government clients.

Stop wasting time filtering through irrelevant notices. Our Polymeric Insulating Material Tender Information Service is engineered for precision. We track exact product codes, service names, and specialized work terms across all government portals nationwide. When a buyer publishes a requirement that matches your specific business profile, our system alerts you instantly.

Deep Technical Insights & Documentation For Polymeric Insulating Material Tenders

Bidding for specific works requires studying strict technical parameters. We provide immediate access to the core documents you need to evaluate the project:

  • Detailed Specifications & Drawings: Download the exact engineering guidelines, material testing standards, and quality benchmarks demanded by the buyer for Polymeric Insulating Material.
  • Financial BOQ Spreadsheets: Access the official blank pricing formats where you need to input your unit rates, tax configurations, and total bid value.
  • Real-Time Technical Amendments: If the buying department changes the product specifications, alters the service scope, or shifts the delivery timeline, we instantly update the parent file so you are never caught off-guard.

Winning a contract for Polymeric Insulating Material depends entirely on how perfectly your technical capabilities match the buyer’s demands. Even if you have the best product or service, a poorly formatted document or a missing compliance certificate will lead to instant technical rejection. Tender18’s Tender Bidding Service eliminates this risk by taking complete ownership of your digital submission.

Flawless Compliance & Portal Execution For Polymeric Insulating Material Tenders

Under this service, Tender18 assigns a Dedicated Experienced Technical Person to your profile. This expert handles the heavy lifting of the entire bidding cycle:

  • Capability Mapping: We thoroughly cross-check your past completion certificates, ISO standard proofs, and financial turnover against the strict eligibility criteria required for Polymeric Insulating Material bids.
  • Secure System Integration: Our technical desk seamlessly links your Class III Digital Signature Certificate (DSC) with the required e-procurement servers to securely encrypt your technical and financial envelopes.
  • Error-Free Financial Uploads: We audit your quoted BOQ pricing sheets for any formula or formatting errors before the final upload, ensuring your bid is successfully locked before the portal's closing hours.

Government buyers are aggressively using the Government e-Marketplace (GeM) for the direct procurement of Polymeric Insulating Material. If your business profile is not accurately mapped on this portal, you remain practically invisible to these purchasing officers. Recognized as a trusted and expert GeM consultant, Tender18 offers specialized support to build, optimize, and maintain a highly visible vendor account for your business.

With an industry-leading support success ratio of over 95%, we handle the complex marketplace compliance so you can focus entirely on executing your orders

Expert Profile Management & Catalogue

Our dedicated consultants ensure your GeM presence is structurally perfect:

  • Precise Catalogue Listing: We upload and categorize your specific offerings under the exact search terms and parameters used by government buyers looking for Polymeric Insulating Material, ensuring maximum search visibility.
  • OEM Dashboard & Assessment: For original manufacturers and creators, we guide you through the mandatory Quality Council of India (QCI) vendor assessments to successfully unlock your official OEM panel.
  • Profile Compliance & Caution Money: We manage your statutory documentation, brand approvals, and caution money limits to keep your account immune from technical suspensions.

Strategic Live Bid Participation

Beyond setup, we actively drive your market participation. Our team expertly handles the digital paperwork and rate configurations for GeM Custom Bids and Reverse Auctions (RA) related to Polymeric Insulating Material, maximizing your chances of securing L1 status.

1.

How do I find government contracts exclusively matching my work in Polymeric Insulating Material?

The easiest way is through the Tender18 platform. Instead of searching department by department, our system uses advanced keyword matching to gather all live supply, service, and execution tenders related directly to your core business in one place.

2.

Do I need specific testing or quality certificates to apply for these contracts?

It heavily depends on the nature of the work. For supply contracts, buyers often ask for ISO certifications, BIS marks, or specific lab testing reports. For service contracts, they may ask for labor licenses or past performance certificates (work orders).

3.

What is a BOQ and why is it important for my bid?

The Bill of Quantities (BOQ) is the official financial Excel sheet where you enter your competitive prices. Any mistake in this file—like adding extra rows, changing formulas, or saving it in the wrong format—will cause the portal server to reject your entire bid.

4.

Are samples required to be submitted physically before the digital bid opens?

For many product-based Polymeric Insulating Material tenders, buying departments do ask bidders to submit physical samples to their office before the digital technical evaluation date. This requirement is always clearly mentioned in the official NIT document.

5.

How does the Dedicated Tender Expert from Tender18 help me?

Our assigned expert manages your total portal compliance. They extract the hidden rules from long tender PDFs, create a precise document checklist for your team, map your digital signature, and securely upload your technical and financial files onto the government servers.

6.

What is the role of a Digital Signature Certificate (DSC)?

A Class III DSC is a secure USB device that contains your digital identity. You cannot upload a bid without it. It is used to securely encrypt and lock your sensitive price data and technical documents so no one can view them before the official opening date.

7.

As an MSME, can I get financial benefits when bidding for Polymeric Insulating Material?

Yes, the government strongly supports MSMEs. By uploading a valid Udyam Registration Certificate in the technical envelope, small businesses are frequently exempted from paying the initial Tender Document Fee and the Earnest Money Deposit (EMD).

8.

Why should I list my services or products on GeM for this category?

GeM is now the primary digital marketplace for all government agencies. If you are properly cataloged for Polymeric Insulating Material, officers can view your profile and generate direct purchase orders or invite you to participate in exclusive Custom Bids.

9.

What makes Tender18 a reliable GeM support partner?

As a highly trusted and expert GeM consultant, Tender18 holds a proven support success ratio of over 95%. From flawless profile creation and complex catalogue mapping to OEM panel approvals and live Reverse Auction (RA) support, we handle it all seamlessly.

10.

What does "L1" mean in these government contracts?

"L1" stands for "Lowest Bidder 1". In government procurement, after all technical envelopes are approved, the financial sheets (BOQs) are opened. The bidder who has quoted the lowest compliant price for Polymeric Insulating Material is declared L1 and is generally awarded the contract