Search Tenders
Filters
Reset All
Tender Status
T18 Ref No
All States
All Cities
All Agencies
Tender ID
Due Date
Tender Value
Tender Source (GeM, Cppp & Others)
Tender Type

19Latest Pcc tree guards Tenders List

Latest Pcc tree guards Tenders in India – Verified Leads & Real-Time Insights by Tender18

Finding the right Pcc tree guards tenders in India’s competitive e-procurement ecosystem requires more than just access—it demands accurate data, real-time monitoring, and expert analysis.

At Tender18 Infotech Private Limited, we bring deep industry experience in government procurement to help businesses identify, evaluate, and win Pcc tree guards tenders efficiently. With a centralized platform aggregating 1100+ live tenders, we provide a single, trusted source for opportunities from central, state, and PSU departments.


Real-Time Pcc tree guards Tender Intelligence & Monitoring

Our advanced dashboard delivers actionable insights and structured tender data, enabling you to make faster and smarter bidding decisions.

We categorize Pcc tree guards tenders into:

  • Supply Tenders – BOQs and specifications sourced from GeM and PSUs
  • Service Tenders – NITs and scope of work from CPPP and state portals
  • EPC Projects – Large-scale infrastructure tenders with financial and design data

✔ This structured approach ensures complete transparency and deeper bid analysis before submission.


Comprehensive Sources of Pcc tree guards Tenders

Tender18 acts as a centralized gateway by aggregating tenders from trusted and official sources:

  • Central Government Portals – CPPP, NIC, and Government e-Marketplace (GeM)
  • Railways & Transport – IREPS and Metro Rail projects
  • Power & Energy PSUs – NTPC, ONGC, NHPC, PowerGrid
  • Defense & Strategic Sectors – MES and DRDO tenders
  • State e-Procurement Portals – Gujarat, Maharashtra, Tamil Nadu, UP, and more

✔ Every listing is verified and regularly updated to maintain data accuracy and trust.


Step-by-Step Guide to Participate in Pcc tree guards Tenders

1. Eligibility & Prequalification

Before bidding, ensure compliance with:

  • Financial turnover requirements (30–50% of tender value)
  • Past experience (2–3 similar projects)
  • Valid solvency certificate

2. Mandatory Documentation Checklist

Prepare the following to avoid disqualification:

  • Digital Signature Certificate (Class 3 DSC)
  • GST, PAN, MSME/Udyam registration
  • EMD (Earnest Money Deposit) or exemption proof
  • Technical bid with execution methodology

3. BOQ Analysis & Financial Bidding

The BOQ (Bill of Quantities) is the most critical component:

  • Analyze item-wise pricing
  • Ensure competitive yet sustainable quotes
  • Avoid underbidding risks (L1 pressure)

✔ Expert analysis can significantly improve your bid success ratio.


Why Tender18 is a Trusted Platform for Pcc tree guards Tenders

✔ Proven Expertise in Government Procurement

We combine industry knowledge with practical bidding experience.

✔ Verified & Reliable Data

All Pcc tree guards tenders are sourced from official portals and cross-checked for accuracy.

✔ Advanced Filtering Tools

Filter tenders by value, EMD, location, and category for precise targeting.

✔ Corrigendum & Update Tracking

Get instant alerts on deadline changes and specification updates.

✔ Historical Data Insights

Analyze past tender results to understand pricing trends and competition.

✔ End-to-End Bidding Support

From discovery to submission, including GeM onboarding and strategy.


Growth of Pcc tree guards Sector in 2026

With the Government of India focusing on digital procurement and infrastructure expansion, the Pcc tree guards sector has seen significant growth in e-tendering opportunities.

The rise of GeM-based procurement models like:

  • L1 Purchase
  • Direct Procurement
  • MSME-friendly policies

…has made it easier for startups and SMEs to participate and win contracts


Frequently Asked Questions (SEO Optimized)

How can I get daily Pcc tree guards tender alerts?

You can register on Tender18 and select your preferred category. You will receive daily email alerts with all new Pcc tree guards tenders.

Is EMD mandatory for all Pcc tree guards tenders?

No, MSME and Udyam-registered businesses may get exemptions. Always check the NIT for specific conditions.

What is the difference between a Pcc tree guards work tender and supply tender?

A supply tender involves delivering goods, while a work tender includes execution, labor, and project completion.

Can I access private Pcc tree guards tenders on Tender18?

Yes, we also track major private sector and EPC tenders along with government opportunities.


Get Expert Support for Pcc tree guards Tenders

Tender18 is more than a listing platform—we are your strategic partner in winning tenders.

Our services include:

  • Tender discovery & analysis
  • Documentation support
  • Bid strategy & submission
  • GeM registration & OEM onboarding

📞 Call / WhatsApp: +91 7069661818
🌐 Website: www.tender18.com

T18 Ref No : 16579390
Source : GEM Tenders
NEW TENDER
tender for lt line shifting title-1 , title-2 , title-3 , title-4 , title-5 , title-6 , title-7 , title-8 , title-9 , title-10 , title-11 , title-12 , title-13 , title- 14 , title-15 , title-16 , title-17 , title-18 , title-19 , title-20 , title-21 , title-22 , title-23 , title-24 , title-25 , title-26 , title-27 , title-28 , title-29 , title-30 , title-31 , title-32 , title-33 , title-34 , title-35 , title-36 dismantling of 11 kv line with its dump at suitable place on site up to completion of work and its safe loading unloading/weithing carriage from dump site to jes store (including broken stp pcc pole), pcc pole 8.5 mtr long, acsr weasel conductor, lt cable (1x16+1x25) sq.mm, lt cable (3x95+1x35+1x16) sq.mm, 11 kv polymeric disc insulator, 11 kv polymeric pin insulator, 11 kv disk fitting, 11 kv pin with nut, distribution box 3 phase, distribution box 1 phase, other line material., dragging of st pole to pit site, digging of pit erection and grouting (as per respo norms) of single pole 8.5 m long pcc pole along with fixing of necessary hardware of single pole such as v type x arm f bracket 11kv pin disc insulator guarding angle & lt clamp etc (1 8 mm65x65x6) with nut & boltsas per respo specification and direction of e i, fixing and errection of double pole on 8.5 mtr. long pcc pole along with fixing of necessary hardware of doble pole alongwith necessery pin insulators and grouting as per respo specification and direction of e i, ordinary earthing by ms earth rod 2500mm long as per respo schedule. only gi wire& earth rod shall be supplied by the department, grouting and nuzzling of stay set complete including fixing of necessary clamps. accessories required including its grouting by civil material (sand brick ballast cement) only stay wire shall be supplied by the department, laying and stringing of 3 phase 3 wire 11 kv line on acsr weasel rabbit raccoon dog conductor as per respo specification and direction of e i, laying of abc (3x95 1x35 1 16) sqmm, laying of abc (1x25 1x16) sqmm, making section of 11 kv line by fixing of all necessary accessories such as t off channel disc insulator with fitting pin insulator with pin along with sagging jumpering and binding etc only insulator shall be provided by the dept, cutting and chopping of tree branches for clearance of ht lt line. after clearance line throughout pieces of tree branches of site, erection and installation of barbed wire danger board number plate gi pipe 6 dia, carriage errection and shifting of 10 kva tf, carriage errection and shifting of 25 kva tf, carriage errection and shifting of 100 kva tf, holding clamp, clamp for tf with nuts and bolts, lt clamp, stone pad, suspension clam, eyehook, 11 kv f clamp, dead end clamp, danger board with clamp, barbed wire, distribution box clamp

Unlock Full Tender Access

Start Free Trial to download documents before deadline

Unlock Full Tender Access

Start Free Trial to download documents before deadline

T18 Ref No : 15733182
Location : kasganj , uttar pradesh
Source : GEM Tenders
corrigendum tender for safe carriage of pcc pole , safe carriage of st pole , cartage of line material , erection of pcc pole , erection of st pole , erection of doubel pcc pole , erection of stay set , erection of earthing rod , safe carriage of xlpe cable , erection of cable , erection of xlpe cable , erection of conductor , erection of ab cable , erection of tf , safe carriage of 11 kv pilfer proof metering cubicle , erection of 11 kv pilfer proof metering cubicle , guarding of 11 kv line , cutting and chopping of tree , providing and fixing of dp clamps , safe carriage of 11 kv ct pt , erection of 11 kv ct pt , safe carriage of lt distribution box , fencing of 250 kva tf , plinth of 250 kva tf , safe carriage and installation of 250 kva tf , providing and fixing of nut bolt , providing and fixing of holding clamps , safe carriage and installation of 11 kv pilfer proof cubical, running tender under full deposit scheme in edd soron kasganj, safe carriage of following pcc pole 8.5 mtr store centre or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, t&p carrier etc. required for proper completion of work., st pole 9/11 mtr, cartage of line material viz weasal conductor, gi earth wire, cross arm, angle, channel, insulator, clamps & other line material from store centre or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, t&p carrier etc. required for proper completion of work., erection of single support pcc pole 8.5 mtr including complete h.t/l.t fittings with grouting , earthing, muffling and digging etc. as per respo norms manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work., stp 9/11 mtr., erection of double pole on pcc poles 8.5 mtr. including the work of complete line with grouting , earthing, muffling and digging etc. as per respo norms manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work., erection of stay set complete including the work of nuzzling etc. as per respo manual and also including the cost of arrangement of all grouting material, labour, t&p fixing of stay insulator etc. required for proper completion of work., fixing of earthing rod as per respo manual and as per direction of supervising engineer including the t&p, cost of labour., safe carriage of xlpe cable of size 3x(35/70/120/185) sq. m.m. from store to respective site of work including loading unloading at both ends., laying of 3x(35/70/120/185) sq.mm. 11 kv under ground cable after digging trench of 600 mm. wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable. the cable shall be duly protected by ist class bricks, two on either side and third on top of the cable, laid in series one after the other. the work includes supplying of fine sand and bricks, filling and ramming of the left out soil, closing the trench and levelling. spare cable shall be left and buried in the trench in the shape of rings at both ends. all material (except cable), labour, t&p carrier etc, required for proper completion of work will be arranged by the contractor at his own cost., filling of 3x70/120 sq. m.m. 11 kv xlpe heat shrinkable cable jointing kits outdoor/indoor type including the cost of labour t&p carrier etc for proper completion of work., laying sagging stringing, binding and jumpering etc. of acsr weasel conductor/ rabbit / dog conductoron the newly erected pole as per respo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t&p carrier etc. required for proper completion of work., lt abc 3x50+1x35+1x16 bunch conductor, lt abc 1x16 bunch conductor, carriage and installation from store to site of 10/16/25/63/100 kva t/f including the work of its loading & unloading, dragging etc. and also including the cost of labour and t&p etc. required for proper completion of work., safe carriage of 11 kv pilfer proof metering cubicle from store centre, soron (kasganj) to site of work including loading and unloading at both ends. average distance approx. 0 km to 50 km., erection & grouting of 11 kv pilfer-proof metering cubicle making connections with bus bar, tapping with empire tape with existing earthing. the above work includes the cost of labour, t&p, carrier & material etc. required for proper completion of work except cost of 11 kv vcbs., guarding of 11 kv line by laying two nos. gi wire parallel and fixing of lacings (tilli) at a distance at 2-3 mtr. as per respo manual and also including the cost of arragement of labour, t & p carrier etc. required for proper completion of work., cutting and chopping of tree branches which comes on ht/lt lines., providing and fixing of dp clamp on vendors cost., safe carriage of 11 kv ct/pt pole mounting unit of any other place or from site of work to the work of its loading and unloading at the respective ends including the cost of labour t&p and carrier etc. required for proper completion of work., installation of 11 kv ct-pt combined metering unit on double pole after fixing of channel with m.s. clamps and nuts bolts for holding the channel angle etc. the unit body shall be earthed by connecting m.s. strip of size 1/8x1 finally connected to earthing rod of size 20mm x2540 mm. 11 kv line shall be connected to unit as per instructions of sdo/ae(m). the m.s. strip & earth rod shall be included in the scope of work., safe carriage of lt distribution box (three phase) from store centre soron (kasganj) to pit site including loading and unloading at both ends mounting and fixing on pole also by making connections as per respo norms., providing and fixing of welded wire mesh fencing around 250 kva transformer plinth with ms angle of size 40x40x6 mm length and 1.20 mtrs height. such panels shall be supported on ms angle from of size 40x40x6 mm having 04 nos corner supports of height 1.65 mtrs including extended legs for grouting which will be used as a door for entry of the personel or removal/shifting of transformer with welded hinges, sliding belt etc for locking arrangement as per drawing and specifications. the fencing will be painted in the green colour synthetic enamel paint after painting with one coat of red oxide primer. the rates should be inclusive of all materials required for completion of above work. (length of each fencing approx. 11 mtrs) with t&p labour etc. by the contractor., making of plinth for 250 kva tf in all respect as per respo norms at vendors cost., safe carriage and installation from store to site of 250 kva transformer including the work of its loading & unloading, dragging etc. and also including the cost of labour and t&p etc. required for proper completion of work., providing and fixing of nut bolt off size as per site requirment on vendors cost, providing and fixing of various type lt ht holding clamp for st/pcc pole as per site requirment on vendors cost., safe carriage and installation from store to site of 11 kv pilfer proof metering cubicle including the work of its loading & unloading, dragging etc. and also including the cost of labour and t&p etc. required for proper completion of work.
T18 Ref No : 15806750
Location : aligarh , uttar pradesh
Source : GEM Tenders
corrigendum tender for carriage of pcc and stp poles 8.5, 11 and 13 mtr , carriage of line material , erection of pcc and stp poles 8.5, 11 and 13 mtr , erection of double poles 8.5, 11 and 13 mtr , installation and fixing of 11 kv to. , erection and grouting of stay set , providing and fixing of insulator , laying of acsr weasal, rabbit and dog conductor. , erection of abc conductor , grouting of pcc and stp poles , making of plinth , fixing of earthing rod , chopping of tree branches , providing and fixing of clps of lt , providing and fixing , carriage and installation of 25 kva transformer , carriage and installation of 63 kva transformer , carriage and installation of 100 kva transformer , carriage and installation of 400 kva transformer , dismantling of old pcc and stp poles , dismantling and removal of conductor , erection of section tee pole , carriage and installation of lt dist box , provding and fixing, filling cable joints , safe carriage of cables , laying of under ground cable , laying of overhead cable , guarding of 11 kv line by gi wire , safe carriage and installation of metering unit , safe carriage and installation of metering cubicle , provding and fixing wearing gi pipe, installation of distribution transformer and lines and poles, carriage of following poles from store centre or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends, also including the work of dragging etc and also including the cost of labour, t and p carrier etc required for proper completion of work dist 0 to 50 kms, carriage of line material viz lt cable, conductor, gi earth wire, barbed wire, cross arm, angle, channel, insulator, various clps, xlpe cable, cable, stone pad and other line material from store centre or from any other place to the respective site of work through the kachha pacca road including the work of its loading and unloading at the respective end, also including the work of dragging etc and also including the cost of labour, t and p carrier etc required for proper completion of work dist 0 to 50 kms, erection of single support including complete h.t and l.t fittings with drilling and cutting as per resspo manual and as per direction of engineer incharge including the cost of labour, t and p and carrier etc required for proper completion of work, erection of double and section pole on following poles including including complete h.t and l.t fittings with drilling and cutting and the work of complete line as per resspo norms manual and as per direction of engineer incharge including the cost of labour, t and p and carrier etc required for proper completion of work, erection of double and section pole on following poles including including complete h.t and l.t fittings with drilling & cutting and the work of complete line as per resspo norms manual and as per direction of engineer incharge including the cost of labour, t and p and carrier etc required for proper completion of work, erection and grouting of stay set including the work of nozzling etc as per resspo manual and also including the cost of arrangement of all grouting material, labour, t and p etc required for proper completion of work, providing and fixing of stay insulator, laying, sagging, stringing, binding and jumpering etc of line conductor on the newly erected pole as per resspo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t and p carrier etc required for proper completion of work, abc conductor 3x50+1x35+1x16 sqmm and 3x95+1x70+1x16 sqmm and 3x120+1x95+1x16 sqmm and 1x16+1x25 sqmm, grouting of pcc and stp poles 8.5, 11 and 13 mtr long as per resspo norms, making the plinth of steel poles, fixing of earthing rod as per resspo manual and as per direction of supervising engineer including the cost of labour, t and p etc required for proper completion of work, chopping of tree branches which are touching to ht and lt lines, providing and fixing of clps of lt, cross arm holding, f clp, stay clp, danger board clp and all type clps with nut and bolts as per actual site requirement, providing and fixing of lt shackle insulator, providing and fixing of missing nut bolts and washer, carriage and installation from site to store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and t and p etc required for proper completion earthing and jumphering of work, dismentling of old pcc and stp poles for shifting after dismentling of all accessories. it includes the work of cartage, cost of labour, t and p carrier etc required for proper completion of work, dismantling and removal of existing conductor, cable, gi wire from the various area preparing their coils and then stacking in the respective jeos store as per direction of supervising engineer it includes the work of cartage, cost of labour, t nad p carrier etc required for proper completion of work, erection of section tee pole including fixing of all fittings as per respo norms, carriage and installation of lt distribution box three phase distribution box from store centre sarsol to pit site including loading and unloading at both ends mounting and fixing on pole also by making connections as per resspo norms, provding and fixing and filling of 3x70,3x120,3x185 11 kv xlpe heat shrinkable cable jointing kits indoor and outdoor type including the cost of labour t and p carrier etc for proper completion of work, safe carriage of 3x70,3x120,3x185,3x300 sqmm 33 kv by 11 kv xlpe cable from store center to respective site of work including loading and unloading at both ends for proper completion of work, laying of 3x70,3x120,3x185,3x300 sqmm 33 kv and 11 kv under ground cable by straight through after digging trench of 600 mm wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable the cable shall be duly protected by ist class bricks, two on either side and third on top of the cable, laid in series one after the other. the work includes supplying of fine sand and bricks, filling and rming of the left out soil, closing the trench and levelling spare cable shall be left and buried in the trench in the shape of rings at both ends all material except cable, labour, t and p carrier etc, required for proper completion of work will be arranged by the contractor at his own cost, laying of 3x70,3x120,3x185,3x300 sqmm 33 kv and 11 kv overhead cable work includes labour, t and p carrier etc, required for proper completion of work will be arranged by the contractor at his own cost, guarding of 11 kv line by laying two nos gi wire parallel and fixing of lacings tilli at a distance at 2 to 3 mtr as per respo manual and also including the cost of arragement of labour, t and p etc required for proper completion of work, safe carriage and installation of 33kv by 11 kv ct and pt pole mounted metering unit on double pole after fixing of channel with m s clps and nuts bolts for holding the channel angle etc the unit body shall be earthed by connecting m s strip of size 1,8x1 finally connected to earthing rod of size 20mm x2540 mm 11 kv line shall be connected to unit as per instructions of sdo and ae m the m s strip and earth rod shall be included in the scope of work, safe carriage and installation of 33kv by 11 kv pilfer proof metering cubicle from store centre, sarsol to site of work, provding and fixing wearing gi pipe 6 o dia on the feeder cable before mounting the cable on the double pole lifting, mounting and clping of 11 kv feeder cable with boxes on the feeder double pole structure and making connections including supply
T18 Ref No : 15688564
Location : etah , uttar pradesh
Source : GEM Tenders
tender for safe carriage of 8.5 m pcc pole , safe carriage of 11 and 13 m stp , safe carriage of 9 m stp , safe carriage of line material , opening binding dog raccon rabbit conductor , opening binding weseal conductor gi wire , opening binding of ab cable , erection of 8.5 m pcc as single support , erection of 9 m stp as single support , erection of 11 and 13 m stp as single support , erecton of 8.5 m pcc double section pole , erecton of 9 m stp double section pole , laying stringing dog raccon rabbit , laying stringing acsr weseal gi wire , laying stringing ab cable , straightening of tilted pcc stp single support , straightening of tilted double pole , opening of ht lt 25 kva 63 kva tf connection , opening of ht lt 100 kva tf connection , dismantelling of old material , re sagging of ht lt conductor , re sagging of ab cable , replacement of brocken damaged accessories , retightening of stay rod , providing and fixing of stay rod , earthing of pcc rs joist stp , carriage of old material , mounting of 25 kva 63 kva tf , mounting of 100 kva tf , chopping of tree branches , repairing resagging new guarding ht line, replacement of conductor poles and associated work in daviya aapda edsd jaithra, safe carriage of 8.5 mtr. long pcc pole from store center etah/nearest 33/11 kv s/s to direct pit site in distance range 0 to 60 km. including loading & unloading at both ends., safe carriage of 11/13 mtr stp from store center etah/nearest 33/11 kv s/s to direct pit site in distance range 0 to 60 km. including loading & unloading at both ends., safe carriage of 9 mtr stp from store center etah/nearest 33/11 kv s/s to direct pit site in distance range 0 to 60 km. including loading & unloading at both ends., safe carriage of line material from store center etah/nearest substation to pit site in distance range 0 to 60 km. including loading & unloading at both ends., opening of binding & removal of dog/ raccoon/ rabbit conductor with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., opening of binding & removal of acsr weasel conductor/ gi wire with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., opening of binding & removal of abc 3x95+1x35+1x16/3x50mm with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., opening of binding & removal of abc 3x120+1x70+1x16 with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., erection of 8.5 mtr. long pcc poles as single support including fixing of all ht/lt accessories etc. complete.pole should be grouted properly as per dvvnl/respo normes, erection of 9 mtr. stp as single support including fixing of all ht/lt accessories etc. complete.pole should be grouted properly as per dvvnl/respo normes, erection of 11/13 mtr.stp as single support including fixing of all ht/lt accessories etc. complete.pole should be grouted properly as per dvvnl/respo normes, erection of 8.5 mtr. long pcc poles as double pole/ section pole including drilling,cutting etc. and fixing of all accessories etc. complete., erection of 11mtr. stp as double pole/ section pole including drilling,cutting etc. and fixing of all accessories etc. complete., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with dog/ raccoon/ rabbit conductor including binding & nozzling., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with acsr weasel conductor/ gi wire including binding & nozzling., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with abc 3x95 mm/3x50 mm. including binding & nozzling., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with abc 3x120+1x70+1x16 including binding & nozzling., straightening of tilted pcc poles/stp/rail single support of ht/lt line after opening of nuzzling, digging of pit applying anti direction force for making of proper alignment of line., straightening of tilted d/p after opening of connection applying anti direction force, digging of dug for proper alignment of line including reconnection etc. complete., opening of ht/lt connections & lowering of 25/63 kva t/f from d/p/plinth and shifting up to in safer place., opening of ht/lt connections & lowering of 100 kva t/f from d/p/plinth and shifting up to in safer place., dismanteling of old/damage stp/rs joist of ht/lt line and carriage to store centre etah, re-sagging of dog/ raccoon/ rabbit conductor loose 33/ht/lt conductor after opening, binding, nozzling etc., re-sagging of acsr weasel conductor/ gi wire loose 33/ht/lt conductor after opening, binding, nozzling etc., re-sagging of abc 3x120+1x70+1x16 loose 33/ht/lt cable after opening, binding, nozzling etc., re-sagging of abc 3x50/3x95 loose 33/ht/lt cable after opening, binding, nozzling etc., replacement of 11 kv cross arms v type broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 11 kv pin insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 11 kv pin with nut broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 11 kv disc insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of cross arms holding clamps broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of f clamps broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of lt shackle insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 33 kv cross arm broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 33 kv pin with nut broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 33 kv pin insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., retightening of stay rod. etc. complete., providing fixing of stay rod with nuzzling etc. complete., earthing of pcc/rs joist/stp as per respo norms., carriage of old material from pit site to je store/store center, etah in distance range 0 to 10 km including loading & unloading and proper stacking., mounting of 25/63 kva t/f on double pole/plinth including making of the connection etc complete., mounting of 100 kva t/f on double pole/plinth including making of the connection etc complete., chopping of tree branches, repairing/ resagging / new guarding of ht lines with gi wire as per respo norms

Unlock Full Tender Access

Start Free Trial to download documents before deadline

T18 Ref No : 15688565
Location : etah , uttar pradesh
Source : GEM Tenders
tender for safe carriage of 8.5 m pcc pole , safe carriage of 11 and 13 m stp , safe carriage of 9 m stp , safe carriage of line material , opening binding dog raccon rabbit conductor , opening binding weseal conductor gi wire , opening binding of ab cable , erection of 8.5 m pcc as single support , erection of 9 m stp as single support , erection of 11 and 13 m stp as single support , erecton of 8.5 m pcc double section pole , erecton of 9 m stp double section pole , laying stringing dog raccon rabbit , laying stringing acsr weseal gi wire , laying stringing ab cable , straightening of tilted pcc stp single support , straightening of tilted double pole , opening of ht lt 25 kva 63 kva tf connection , opening of ht lt 100 kva tf connection , dismantelling of old material , re sagging of ht lt conductor , re sagging of ab cable , replacement of brocken damaged accessories , retightening of stay rod , providing and fixing of stay rod , earthing of pcc rs joist stp , carriage of old material , mounting of 25 kva 63 kva tf , mounting of 100 kva tf , chopping of tree branches , repairing resagging new guarding ht line, replacement of conductor poles and associated work in daviya aapda edsd iv, safe carriage of 8.5 mtr. long pcc pole from store center etah/nearest 33/11 kv s/s to direct pit site in distance range 0 to 60 km. including loading & unloading at both ends., safe carriage of 11/13 mtr stp from store center etah/nearest 33/11 kv s/s to direct pit site in distance range 0 to 60 km. including loading & unloading at both ends., safe carriage of 9 mtr stp from store center etah/nearest 33/11 kv s/s to direct pit site in distance range 0 to 60 km. including loading & unloading at both ends., safe carriage of line material from store center etah/nearest substation to pit site in distance range 0 to 60 km. including loading & unloading at both ends., opening of binding & removal of dog/ raccoon/ rabbit conductor with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., opening of binding & removal of acsr weasel conductor/ gi wire with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., opening of binding & removal of abc 3x95+1x35+1x16/3x50mm with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., opening of binding & removal of abc 3x120+1x70+1x16 with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., erection of 8.5 mtr. long pcc poles as single support including fixing of all ht/lt accessories etc. complete.pole should be grouted properly as per dvvnl/respo normes, erection of 9 mtr. stp as single support including fixing of all ht/lt accessories etc. complete.pole should be grouted properly as per dvvnl/respo normes, erection of 11/13 mtr.stp as single support including fixing of all ht/lt accessories etc. complete.pole should be grouted properly as per dvvnl/respo normes, erection of 8.5 mtr. long pcc poles as double pole/ section pole including drilling,cutting etc. and fixing of all accessories etc. complete., erection of 11mtr. stp as double pole/ section pole including drilling,cutting etc. and fixing of all accessories etc. complete., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with dog/ raccoon/ rabbit conductor including binding & nozzling., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with acsr weasel conductor/ gi wire including binding & nozzling., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with abc 3x95 mm/3x50 mm. including binding & nozzling., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with abc 3x120+1x70+1x16 including binding & nozzling., straightening of tilted pcc poles/stp/rail single support of ht/lt line after opening of nuzzling, digging of pit applying anti direction force for making of proper alignment of line., straightening of tilted d/p after opening of connection applying anti direction force, digging of dug for proper alignment of line including reconnection etc. complete., opening of ht/lt connections & lowering of 25/63 kva t/f from d/p/plinth and shifting up to in safer place., opening of ht/lt connections & lowering of 100 kva t/f from d/p/plinth and shifting up to in safer place., dismanteling of old/damage stp/rs joist of ht/lt line and carriage to store centre etah, re-sagging of dog/ raccoon/ rabbit conductor loose 33/ht/lt conductor after opening, binding, nozzling etc., re-sagging of acsr weasel conductor/ gi wire loose 33/ht/lt conductor after opening, binding, nozzling etc., re-sagging of abc 3x120+1x70+1x16 loose 33/ht/lt cable after opening, binding, nozzling etc., re-sagging of abc 3x50/3x95 loose 33/ht/lt cable after opening, binding, nozzling etc., replacement of 11 kv cross arms v type broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 11 kv pin insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 11 kv pin with nut broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 11 kv disc insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of cross arms holding clamps broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of f clamps broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of lt shackle insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 33 kv cross arm broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 33 kv pin with nut broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 33 kv pin insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., retightening of stay rod. etc. complete., providing fixing of stay rod with nuzzling etc. complete., earthing of pcc/rs joist/stp as per respo norms., carriage of old material from pit site to je store/store center, etah in distance range 0 to 10 km including loading & unloading and proper stacking., mounting of 25/63 kva t/f on double pole/plinth including making of the connection etc complete., mounting of 100 kva t/f on double pole/plinth including making of the connection etc complete., chopping of tree branches, repairing/ resagging / new guarding of ht lines with gi wire as per respo norms

Every year, central and state government departments release thousands of high-value contracts specifically dedicated to Pcc Tree Guards. Whether it involves bulk material supply, executing specialized operational services, or end-to-end turnkey project execution, the demand for capable vendors in the Pcc Tree Guards sector is massive.

At Tender18, we help businesses cut through the noise and exclusively target the exact work categories they specialize in. Instead of browsing through generic procurement sites, our platform isolates high-potential opportunities that match your specific industry capabilities.

Work Dynamics in the Pcc Tree Guards Sector

Government requirements for this specific vertical generally fall into distinct procurement patterns:

  • Product & Material Supply: Tenders focused strictly on sourcing, testing, and delivering high-quality items that meet the exact technical specifications of the buyer.
  • Service Level Agreements (SLAs): Long-term hiring of expert agencies for routine maintenance, manpower deployment, or continuous operational management.
  • Execution & Turnkey Projects: Comprehensive contracts where the bidder is responsible for everything from raw material procurement to final site installation and testing.

By focusing purely on your core strength in Pcc Tree Guards, you can build a highly profitable and stable pipeline of government clients.

Stop wasting time filtering through irrelevant notices. Our Pcc Tree Guards Tender Information Service is engineered for precision. We track exact product codes, service names, and specialized work terms across all government portals nationwide. When a buyer publishes a requirement that matches your specific business profile, our system alerts you instantly.

Deep Technical Insights & Documentation For Pcc Tree Guards Tenders

Bidding for specific works requires studying strict technical parameters. We provide immediate access to the core documents you need to evaluate the project:

  • Detailed Specifications & Drawings: Download the exact engineering guidelines, material testing standards, and quality benchmarks demanded by the buyer for Pcc Tree Guards.
  • Financial BOQ Spreadsheets: Access the official blank pricing formats where you need to input your unit rates, tax configurations, and total bid value.
  • Real-Time Technical Amendments: If the buying department changes the product specifications, alters the service scope, or shifts the delivery timeline, we instantly update the parent file so you are never caught off-guard.

Winning a contract for Pcc Tree Guards depends entirely on how perfectly your technical capabilities match the buyer’s demands. Even if you have the best product or service, a poorly formatted document or a missing compliance certificate will lead to instant technical rejection. Tender18’s Tender Bidding Service eliminates this risk by taking complete ownership of your digital submission.

Flawless Compliance & Portal Execution For Pcc Tree Guards Tenders

Under this service, Tender18 assigns a Dedicated Experienced Technical Person to your profile. This expert handles the heavy lifting of the entire bidding cycle:

  • Capability Mapping: We thoroughly cross-check your past completion certificates, ISO standard proofs, and financial turnover against the strict eligibility criteria required for Pcc Tree Guards bids.
  • Secure System Integration: Our technical desk seamlessly links your Class III Digital Signature Certificate (DSC) with the required e-procurement servers to securely encrypt your technical and financial envelopes.
  • Error-Free Financial Uploads: We audit your quoted BOQ pricing sheets for any formula or formatting errors before the final upload, ensuring your bid is successfully locked before the portal's closing hours.

Government buyers are aggressively using the Government e-Marketplace (GeM) for the direct procurement of Pcc Tree Guards. If your business profile is not accurately mapped on this portal, you remain practically invisible to these purchasing officers. Recognized as a trusted and expert GeM consultant, Tender18 offers specialized support to build, optimize, and maintain a highly visible vendor account for your business.

With an industry-leading support success ratio of over 95%, we handle the complex marketplace compliance so you can focus entirely on executing your orders

Expert Profile Management & Catalogue

Our dedicated consultants ensure your GeM presence is structurally perfect:

  • Precise Catalogue Listing: We upload and categorize your specific offerings under the exact search terms and parameters used by government buyers looking for Pcc Tree Guards, ensuring maximum search visibility.
  • OEM Dashboard & Assessment: For original manufacturers and creators, we guide you through the mandatory Quality Council of India (QCI) vendor assessments to successfully unlock your official OEM panel.
  • Profile Compliance & Caution Money: We manage your statutory documentation, brand approvals, and caution money limits to keep your account immune from technical suspensions.

Strategic Live Bid Participation

Beyond setup, we actively drive your market participation. Our team expertly handles the digital paperwork and rate configurations for GeM Custom Bids and Reverse Auctions (RA) related to Pcc Tree Guards, maximizing your chances of securing L1 status.

1.

How do I find government contracts exclusively matching my work in Pcc Tree Guards?

The easiest way is through the Tender18 platform. Instead of searching department by department, our system uses advanced keyword matching to gather all live supply, service, and execution tenders related directly to your core business in one place.

2.

Do I need specific testing or quality certificates to apply for these contracts?

It heavily depends on the nature of the work. For supply contracts, buyers often ask for ISO certifications, BIS marks, or specific lab testing reports. For service contracts, they may ask for labor licenses or past performance certificates (work orders).

3.

What is a BOQ and why is it important for my bid?

The Bill of Quantities (BOQ) is the official financial Excel sheet where you enter your competitive prices. Any mistake in this file—like adding extra rows, changing formulas, or saving it in the wrong format—will cause the portal server to reject your entire bid.

4.

Are samples required to be submitted physically before the digital bid opens?

For many product-based Pcc Tree Guards tenders, buying departments do ask bidders to submit physical samples to their office before the digital technical evaluation date. This requirement is always clearly mentioned in the official NIT document.

5.

How does the Dedicated Tender Expert from Tender18 help me?

Our assigned expert manages your total portal compliance. They extract the hidden rules from long tender PDFs, create a precise document checklist for your team, map your digital signature, and securely upload your technical and financial files onto the government servers.

6.

What is the role of a Digital Signature Certificate (DSC)?

A Class III DSC is a secure USB device that contains your digital identity. You cannot upload a bid without it. It is used to securely encrypt and lock your sensitive price data and technical documents so no one can view them before the official opening date.

7.

As an MSME, can I get financial benefits when bidding for Pcc Tree Guards?

Yes, the government strongly supports MSMEs. By uploading a valid Udyam Registration Certificate in the technical envelope, small businesses are frequently exempted from paying the initial Tender Document Fee and the Earnest Money Deposit (EMD).

8.

Why should I list my services or products on GeM for this category?

GeM is now the primary digital marketplace for all government agencies. If you are properly cataloged for Pcc Tree Guards, officers can view your profile and generate direct purchase orders or invite you to participate in exclusive Custom Bids.

9.

What makes Tender18 a reliable GeM support partner?

As a highly trusted and expert GeM consultant, Tender18 holds a proven support success ratio of over 95%. From flawless profile creation and complex catalogue mapping to OEM panel approvals and live Reverse Auction (RA) support, we handle it all seamlessly.

10.

What does "L1" mean in these government contracts?

"L1" stands for "Lowest Bidder 1". In government procurement, after all technical envelopes are approved, the financial sheets (BOQs) are opened. The bidder who has quoted the lowest compliant price for Pcc Tree Guards is declared L1 and is generally awarded the contract