Search Tenders
Filters
Reset All
Tender Status
T18 Ref No
All States
All Cities
All Agencies
Tender ID
Due Date
Tender Value
Tender Source (GeM, Cppp & Others)
Tender Type

8Latest Bar straightening machine Tenders List

Latest Bar straightening machine Tenders in India – Verified Leads & Real-Time Insights by Tender18

Finding the right Bar straightening machine tenders in India’s competitive e-procurement ecosystem requires more than just access—it demands accurate data, real-time monitoring, and expert analysis.

At Tender18 Infotech Private Limited, we bring deep industry experience in government procurement to help businesses identify, evaluate, and win Bar straightening machine tenders efficiently. With a centralized platform aggregating 1100+ live tenders, we provide a single, trusted source for opportunities from central, state, and PSU departments.


Real-Time Bar straightening machine Tender Intelligence & Monitoring

Our advanced dashboard delivers actionable insights and structured tender data, enabling you to make faster and smarter bidding decisions.

We categorize Bar straightening machine tenders into:

  • Supply Tenders – BOQs and specifications sourced from GeM and PSUs
  • Service Tenders – NITs and scope of work from CPPP and state portals
  • EPC Projects – Large-scale infrastructure tenders with financial and design data

✔ This structured approach ensures complete transparency and deeper bid analysis before submission.


Comprehensive Sources of Bar straightening machine Tenders

Tender18 acts as a centralized gateway by aggregating tenders from trusted and official sources:

  • Central Government Portals – CPPP, NIC, and Government e-Marketplace (GeM)
  • Railways & Transport – IREPS and Metro Rail projects
  • Power & Energy PSUs – NTPC, ONGC, NHPC, PowerGrid
  • Defense & Strategic Sectors – MES and DRDO tenders
  • State e-Procurement Portals – Gujarat, Maharashtra, Tamil Nadu, UP, and more

✔ Every listing is verified and regularly updated to maintain data accuracy and trust.


Step-by-Step Guide to Participate in Bar straightening machine Tenders

1. Eligibility & Prequalification

Before bidding, ensure compliance with:

  • Financial turnover requirements (30–50% of tender value)
  • Past experience (2–3 similar projects)
  • Valid solvency certificate

2. Mandatory Documentation Checklist

Prepare the following to avoid disqualification:

  • Digital Signature Certificate (Class 3 DSC)
  • GST, PAN, MSME/Udyam registration
  • EMD (Earnest Money Deposit) or exemption proof
  • Technical bid with execution methodology

3. BOQ Analysis & Financial Bidding

The BOQ (Bill of Quantities) is the most critical component:

  • Analyze item-wise pricing
  • Ensure competitive yet sustainable quotes
  • Avoid underbidding risks (L1 pressure)

✔ Expert analysis can significantly improve your bid success ratio.


Why Tender18 is a Trusted Platform for Bar straightening machine Tenders

✔ Proven Expertise in Government Procurement

We combine industry knowledge with practical bidding experience.

✔ Verified & Reliable Data

All Bar straightening machine tenders are sourced from official portals and cross-checked for accuracy.

✔ Advanced Filtering Tools

Filter tenders by value, EMD, location, and category for precise targeting.

✔ Corrigendum & Update Tracking

Get instant alerts on deadline changes and specification updates.

✔ Historical Data Insights

Analyze past tender results to understand pricing trends and competition.

✔ End-to-End Bidding Support

From discovery to submission, including GeM onboarding and strategy.


Growth of Bar straightening machine Sector in 2026

With the Government of India focusing on digital procurement and infrastructure expansion, the Bar straightening machine sector has seen significant growth in e-tendering opportunities.

The rise of GeM-based procurement models like:

  • L1 Purchase
  • Direct Procurement
  • MSME-friendly policies

…has made it easier for startups and SMEs to participate and win contracts


Frequently Asked Questions (SEO Optimized)

How can I get daily Bar straightening machine tender alerts?

You can register on Tender18 and select your preferred category. You will receive daily email alerts with all new Bar straightening machine tenders.

Is EMD mandatory for all Bar straightening machine tenders?

No, MSME and Udyam-registered businesses may get exemptions. Always check the NIT for specific conditions.

What is the difference between a Bar straightening machine work tender and supply tender?

A supply tender involves delivering goods, while a work tender includes execution, labor, and project completion.

Can I access private Bar straightening machine tenders on Tender18?

Yes, we also track major private sector and EPC tenders along with government opportunities.


Get Expert Support for Bar straightening machine Tenders

Tender18 is more than a listing platform—we are your strategic partner in winning tenders.

Our services include:

  • Tender discovery & analysis
  • Documentation support
  • Bid strategy & submission
  • GeM registration & OEM onboarding

📞 Call / WhatsApp: +91 7069661818
🌐 Website: www.tender18.com

Due Date
T18 Ref No : 16835395
Location : ghatshila , jharkhand
Source : GEM Tenders
LIVE TENDER
tender for demolishing r.c.c work , demolishing cement concrete , earth work , filling available excavated earth , filling in plinth with sand , plain cement concrete 1 isto 3 isto 6 , laying position cement concrete 1 isto 2 isto 4 , reinforced cement concrete work 1 isto 1.5 isto 3 , steel reinforcement , providing and fixing centering and shuttering , lintels or beams or plinth beams or chujja or griders or bressumers and cantilevers , structural steel work , brick work foundation and plinth , brick work in super structure , half brick masonry , 12 mm thick cement plaster 1 isto 6 , 15 mm thick cement plaster , 12 mm thick cement plaster 1 isto 4 , providing and fixing concertina coil , premium acrlic smooth exterior paint , chain link , supplying and laying painting with synthetic enamel paint , steel work in built up tubular , transportation of building rubbish , transportation of excavated earth , surface dressing , cleaning jungle , providing and applying priming coat with ready mixed wood, construction of boundary wall from sitadanga to jaduguda thana in ucil housing colony jaduguda, demolishing r.c.c work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material within 2 km lead as per direction of engineer in charge ., demolishing cement concrete mix 1 / 3 /6 as richer mix manually or by mechanical means including disposal of material within 1 km lead as per directions of engineer in charge ., earth work in excavation in foundation, trenches or drains not exceeding 1.50m in width or 10.00 sqm on plain including dressing of sites and ramming of bottoms, lift upto 1.50m including getting out the excavated soil and disposal of surplus excavated soil, including dewatering and directed with a lead of 500 m ., filling available excavated earth (excluding rock) in trenches plinth sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering lead upto 50m and lift upto 1.50 m., supplying and filling in plinth with sand under floors including watering ramming consolidating and dressing complete of direction of the engineer in charge., providing and laying plain cement concrete1/3/6 - 1 cement /3 coarse sand / 6 graded stone aggregate 40mm nominal size in foundation plinth wherever necessary including desalinating finishing curing etc as per specification all complete but excluding the cost of centering and shuttering etc, providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level 1 isto 2 isto 4 (1 cement / 2 coarse sand / 4 graded stone aggregate 20mm nominal size), providing and laying reinforced cement concrete work 1 isto 1.5 isto 3 - 1 cement /1.5 coarse sand / 3 graded stone aggregate 20mm down screened and washed including machine mixing placing in position and mechanically vibrating in columns pillars etc to any level and anywhere and like including preparing of the top surface finishing curing etc complete in all respects as per specification and direction of the engineer-in-charge, steel reinforcement for reinforced cement concrete work including transporting decoiling straightening derusting placing cutting to requiste length hooking bending to correct shape placing in proper position and binding with 16 gauge black annealed wire at every intersection including removal of loos rust and applying a coat of cement wash if necessary complete in all respects as per drawing and as directed, providing and fixing centering and shuttering including strutting, propping etc. and removal of form for foundation, footings, bases of column etc. for mass concrete., providing and fixing centering and shuttering including strutting propping etc and removal of form for - lintels beams plinth beams chujja girders bressumers and cantilevers, providing and laying structural steel work riveted bolted or welded in built up sections trusses and framed work including cutting hoisting fixing in position and applying a priming coat of approved steel primer all complete., providing and laying 1st class brick work with bricks of class designation 75 in foundation and plinth in cement mortar 1/6 -1 cement / 6 coarse sand including all complete as per specification drawing and direction of the eic., providing and laying best quality brick work in super structure upto floor two level 1/6- 1 cement / 6 coarse sand including curing scaffolding shuttering etc all complete. all materials including cement etc to be supplied by the contractor, half brick masonry with common burnt clay f.p.s non modular bricks of class designation 7.5 in foundations and plinth in cement mortar 1/4 - 1 cement / 4 coarse sand, providing and laying 12 mm thick cement plaster 1/6 -1 cement /6 fine sand all complete as per specifications. all materials including cement etc to be supplied by the contractor, providing 15 mm thick cement plaster to a rough side in cement mortar 1/6 - 1 cement / 6 fine sand including scaffolding ,raking the joints backing the surface finishing to correct lines, levels plumb curing as required ., providing and laying 12 mm thick cement plaster 1/4 - 1 cement / 4 fine sand with a floating coat of neat cement punning with redoxided powder all complete as per specification. all materials including cement etc. to be supplied by the contractor., providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre openable length ( total length 90 m), having 50 nos rounds per 6 metre length, upto 3 m height of wall with existing angle iron - y shaped placed 2.4 m or 3.00 m apart and with 9 horizontal r.b.t. reinforced barbed wire, stud tied with g.i. staples and g.i. clips to retain horizontal, including necessary bolts or g.i. barbed wire tied to angle iron, all complete as per direction of engineer in charge, with reinforced barbed tape (r.b.t.) / spring core (2.5mm thick) wire of high tensile strength of 165 kg per sq. mm with tape (0.52 mm thick) and weight 43.478 gm per metre (cost of m.s. angle, c.c. blocks shall be paid separately) ., finishing walls with premium acrlic smooth exterior paint - whether coat with silicone additives of required shade - new work - two or more coats applied at the rate 1.43ltr per 10 sqm over and including priming coat of exterior primer applied at the rate 2.20 kg per 10 sqm as approved by engineer in charge, providing and fixing g.i chain link fabric fencing of required width in mesh size 50 x 50 mm including straightening with 2 mm dia wire or nuts. bolts and washers as required complete as per the direction of engineer in charge. made of g i wire of dia 4mm ., supplying and laying painting with synthetic enamel paint / over two coats primer of approved brand and manufacturer two or more coats ., steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer and two coat of synthetic enamel paint including welding and bolted with special shaped washers, locking arrangement etc. all complete. hot finished welded type tubes for single and double leaf entrance gates. size of gate - 3.50 m x 1.80 m -3 nos. size of gate - 1.20 m x 1.80 m -8 nos., transportation of building rubbish from working site to other area upto 2 km by mechanical transport including loading unloading and lift upto 2.20 m disposal of same to be leveled and neatly dressed as per instruction of engineer in charge ., transportation of excavated earth from working site to other area load upto 1 km by mechanical transport including loading unloading and lift upto 2 20 m disposal earth to be levelled and neatly dressed as per instruction of engineer in charge, surface dressing of the ground including removing vegetation and inequalities, clay etc., not exceeding 15cm deep and disposal of rubbish lead upto 500 m and lift upto 1 km, cleaning jungle including uprooting of rank vegetation , grass , brush wood ,trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50m outside the periphery of the area cleared., providing and applying priming coat with ready mixed wood/ iron primer of approved brand (asian/berger/nerolac/ ici dulux) - iron work
T18 Ref No : 16953018
Location : vemula , andhra pradesh
Source : GEM Tenders
LIVE TENDER
corrigendum tender for bitumenlayingwork2 , kerbstonelayingwork1 , tailingexcavationwork1 , borrowearthsoilwork3 , removinghdpeliningwork1 , dismantlingstonepitching1 , backfillingoftailing1 , laboratorytestwork15 , humepipework1 , humepipework2 , humepipework3 , humepipework4 , humepipework5 , humepipework6 , earthworkfillingforbund1 , stonepitchingwork5 , brickwork1 , brickwork2 , plasteringwork1 , plasteringwork2 , plasteringwork3 , paitingwork1 , paitingwork2 , paitingwork3 , handrailingwork3 , ccforflooringwork1 , plasteringwork4 , glasssstripswork1 , cementpunning1 , aluminumwork1 , shutterworks1 , glasspaneswork1 , siliconsealantwork1 , doorworks1 , mechanicalinstallationpumps1 , mechanicalinstallationpipes1 , mechanicalinstallationpipes2 , mechanicalinstallationpipes3 , electricallinstallation5 , mechanicalerections1 , disposalareappep1 , slimedisposalareappep1 , slimedisposalareappep2 , constructionofelectricalfacilityworklumpsum1 , panelneartaillingpond , automaticpowerfactorcorrectionpanel1 , batterychargerdcboard , lcsmushroomheadstay1 , lcsmushroomheadstay2 , lcsmushroomheadstay3 , distributiontransformer1 , dieselgeneratorset1 , dieselgeneratorfounation1 , ltbusduct1 , htswitchgearincomingpanel1 , htswitchgearincomingpanel2 , mainlightingdistributionboard1 , sublightingdistributionboard , highmastlighting1 , highmastlighting2 , lighteningfixture1 , ltpowercables1 , htpowercables1 , htpowercables2 , ltcontrolcables , junctionboxes1 , earthinglightningitems1 , aircondition1 ,, construction of 4th stage tailing pond, stripping and clearing the site of jungles, bushes, shrubs, wood etc., uprooting of rank vegetation, trees and saplings of girth upto 30 cm measured at a height of 1m above ground level, removal of undesirable materials etc. including removal and disposal of debris at suitable locations with all leads and lifts, as decided by the engineer-in-charge., felling trees of girth (measured at a height of 1m above ground level) including cutting of trunks and branches, removing the roots and stacking of servicable material and disposal of unserviceable material at suitable ocations as decided by the engineer-in-charge. beyond 30 cm girth upto and including 60 cm girth, felling trees of girth (measured at a height of 1m above ground level) including cutting of trunks and branches, removing the roots and stacking of servicable material and disposal of unserviceable material at suitable ocations as decided by the engineer-in-charge. beyond 60 cm girth upto and including 120 cm girth, felling trees of girth (measured at a height of 1m above ground level) including cutting of trunks and branches, removing the roots and stacking of servicable material and disposal of unserviceable material at suitable ocations as decided by the engineer-in-charge. beyond 120 cm girth upto and including 240 cm girth, earth work in excavation in development of embankment profile in the following types of soils for all lifts, including taking adequate protection during excavation, drilling and transporting the excavated spoil / material after stripping of top soil as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead within acquired area of tailing dam & pond. all kinds of soils including hard and dense soils, earth work in excavation in development of embankment profile in the following types of soils for all lifts, including taking adequate protection during excavation, drilling and transporting the excavated spoil / material after stripping of top soil as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead within acquired area of tailing dam & pond. ordinary rock, earth work in excavation in development of embankment profile in the following types of soils for all lifts, including taking adequate protection during excavation, drilling and transporting the excavated spoil / material after stripping of top soil as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead within acquired area of tailing dam & pond.hard rock (blasting prohibited), earth work in excavation of hillocks within existing pond area in the following types of soils for all lifts, transporting the excavated spoil / material as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead and lift within acquired area of tailing dam & pond. all kinds of soils including hard and dense soils, earth work in excavation of hillocks within existing pond area in the following types of soils for all lifts, transporting the excavated spoil / material as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead and lift within acquired area of tailing dam & pond. ordinary rock, earth work in excavation of hillocks within existing pond area in the following types of soils for all lifts, transporting the excavated spoil / material as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead and lift within acquired area of tailing dam & pond. hard rock (blasting prohibited), earth work in excavation in bed layer -1 in the following types of soils for all lifts, including bailing / pumping out any water accumulating inside the excavation, taking adequate protection during excavation, transporting the excavated soil as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of the engineer-in-charge for any lead within acquired area of tailing dam & pond. all kinds of soils including hard and dense soils, earth work in excavation in bed layer -1 in the following types of soils for all lifts, including bailing / pumping out any water accumulating inside the excavation, taking adequate protection during excavation, transporting the excavated soil as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of the engineer-in-charge for any lead within acquired area of tailing dam & pond. ordinary rock, earth work in excavation in pipe-support foundations, peripheral drains, culverts, diversion drain, watch towers, miscellaneous equipment foundations etc. in the following types of soils for all lifts, including bailing / pumping out any water accumulating inside the excavation, taking adequate protection during excavation, drilling and transporting the excavated spoil / material as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead within acquired area of tailing dam & pond. all kinds of soils including hard and dense soils, earth work in excavation in pipe-support foundations, peripheral drains, culverts, diversion drain, watch towers, miscellaneous equipment foundations etc. in the following types of soils for all lifts, including bailing / pumping out any water accumulating inside the excavation, taking adequate protection during excavation, drilling and transporting the excavated spoil / material as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead within acquired area of tailing dam & pond. ordinary rock, earth work in excavation in pipe-support foundations, peripheral drains, culverts, diversion drain, watch towers, miscellaneous equipment foundations etc. in the following types of soils for all lifts, including bailing / pumping out any water accumulating inside the excavation, taking adequate protection during excavation, drilling and transporting the excavated spoil / material as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead within acquired area of tailing dam & pond. hard rock (blasting prohibited), supplying and transporting earth of specified quality (as per specification and drawing) from borrow-pit i.e. the source not owned by ucil but arranged by the contractor at his own cost including all taxes, royalty etc and filling the same in bed later - 1 in layers not exceeding 250 mm above existing ground level, watering of each layer in the stipulated manner as per specification and / or direction of the engineer-in-charge and compaction by mechanical means to achieve required degree of compaction as per specification, all complete as per drawing, specification and direction of the engineer-in-charge., supplying and transporting earth of specified quality (as per specification and drawing) from borrow-pit i.e. the source not owned by ucil but arranged by the contractor at his own cost including all taxes, royalty etc and filling the same in embankment in random fill zone in layers not exceeding 250 mm in proper profile to various heights above existing ground level, watering of each layer in the stipulated manner as per specification and / or direction of the engineer-in-charge and compaction by mechanical means to acheive required degree of compaction as per specification, disposal of excess of unusable material all complete as per drawing, specification and direction of the engineer-in-charge for any lead and lift (sectional measurement for compacted filling will only be paid)., supplying and transporting clay of specified quality and property (as per specification and drawing) from borrow-pit i.e. the source not owned by ucil but arranged by the contractor at his own cost including all taxes, royalty etc and laying the same over random fill on upstream side of embankment in layers not exceeding 150 mm measured loose in proper profile, watering of each layer in stipulated manner to various heights and compacting each layer by mechanical means to achieve required degree of compaction as per specification and / or direction of the engineer-in-charge, all complete as per drawing, specification and direction of the engineer-in-charge for any lead and lift (sectional measurement for compacted thickness will only be paid)., supplying, transporting and laying stone pitching with approved stone (average 300 mm thick) over clay lining on upstream side of dam with voids filler with stone dust with all lead and lift including cutwork, curing, scaffolding with all bye-work, all complete as per drawing, specification and direction of the engineer-in-charge. note - payment shall be made for the actual area of coverage of stone pitching. wastage shall not be payable., supplying, transporting and laying stone pitching with approved stone (average 300 mm thick) over random fill on downstream side of dam with voids filler with stone dust with all lead and lift including cutwork, curing, scaffolding with all bye-work, all complete as per drawing, specification and direction of the engineer-in-charge. note payment shall be made for the actual area of coverage of stone pitching. wastage shall not be payable., supplying, transporting, spreading and compacting sand (average 100 mm thick) over stone pitching on upstream side of dam with all lead and lift including all bye-work, all complete as per drawing, specification and direction of the engineer-in-charge., supplying, transporting and laying 1500 micron thick high density polyethelene (hdpe) sheet (textured on both sides) as lining over sand cushion layer on upstream side of dam, laid in position by qualified and skilled installer certified by the manufacturer and approved by the engineer-in-charge, with all lead and lift including sealing of joints (hot wedge single and dual track seaming and / or extrusion fillet seaming method or any other specialized method e.g. robotic two stitch welding etc.) of new sheets and sealing of new lining sheet with existing lining sheet with an overlap of approximately 1.0m, anchoring the new lining sheet on top of new embankment, maintaining quality control, conducting tests as per requirement of the specification, all complete as per drawing, provisions of specification and direction of the engineer-in-charge. note payment shall be made for the actual area of coverage of hdpe lining sheet. overlapping area, wastage etc. shall not be payable., supplying, transporting, laying and compacting uniformly graded stone aggregate filters within new embankment at all levels,incl shuttering, tools tackles all complete as per drawing, specification and direction of the engineer-in-charge., supplying, transporting, laying and compacting uniformly graded coarse sand filters within new embankment at all levels incl shuttering, tools tackles all complete as per drawing, specification and direction of the engineer-in-charge. (sand shall conform to is383). laying and compacting rock-fill toe dam on downstream side of embankment with following materials at all levels, all complete as per drawing, specification and direction of the engineer-in-charge., with rocks arranged by the contractor at his own cost (rate to include supply and transport also), earth work in back-filling including watering, ramming and compaction at all elevation around pipe support foundations, drain trenches etc. as per specifications and drawings and as directed by the engineer-in-charge with selected soils obtained from stacks under item no. 6 above for any lead within acquired area of tailing pond and dam. (filling shall be done in layers not exceeding 250 mm in loose thickness and watered as necessary. each layer of filling to be compacted to acheive a dry density of not less than 95% of the proctor density)., supplying, transporting and laying stone pitching with approved stone (average 300 mm thick) in diversion drain and at outfall locations with interstices between adjacent stones filled-in with stones of proper size well-driven in order to ensure tight packing and complete filling of all interstices so that no chip can be removed by hand, with all lead and lift including cutwork, curing, scaffolding with all bye-work, all complete as per drawing, specification and direction of the engineer-in-charge. note payment shall be made for the actual area of coverage of stone pitching. wastage shall not be payable., earthwork in filling using earth obtained from item nos. 3, 4, 5 and 6 above in construction of embankment of access roads (total four nos. access roads) connecting top of new tailing pond embankment in layers not exceeding 250 mm in proper profile to various heights above existing ground level, watering of each layer in the stipulated manner as per specification and / or direction of the engineer-in-charge and compaction by mechanical means to acheive required degree of compaction as per specification, all complete as per drawing, specification and direction of the engineer-in-charge for any lead and lift (sectional measurement for compacted filling will only be paid)., supplying, transporting and laying stone pitching with approved stone (average 300 mm thick) on sides of embankments of access roads with voids filler with stone dust with all lead and lift including cutwork, curing, scaffolding with all bye-work, all complete as per drawing, specification and direction of the engineer-in-charge., supplying site machine batched plain cement concrete of 136 nominal mix (1 cement 3 coarse sand 6 graded stone aggregate with 20 mm and down aggregates) below foundations, walls, drains, pits etc. including mixing, transporting, placing in position, compacting to proper thickness and level, curirg, maintaining proper quality control including cost of admixtures in recommended proportions as per is 9103 to accelerate/retard setting of concrete, improve workability without impairing strength and durability but excluding cost of shuttering work, all complete as per specifications, drawings and direction of the engineer-in-charge and including cost of form work., extra over item 30 bove for using ready mixed concrete (rmc) manufactured in fully automated batching plant and transported to site of work in transit mixer for all leads, having continuous agitator mixer including pumping of concrete from transit mixer to site of laying. note (i) cost of shuttering and reinforcement shall be paid in respective items. (note the bidder has to quote only extra cost above the item 30 in the line item of 31, for example- if the cost of item 30 i.e normal mix is rs. 3000 and cost of rmc mix is rs.3500 then the bidder has to quote only the extra cost amount i.e rs.500 (3500-3000) in the line item 31 of the price part), providing, mixing, laying in position in substructure upto plinth level, site machine batched design mix cement concrete for all types of reinforced cement concrete work, using coarse aggregate and fine aggregate derived from natural sources, cement, admixtures in recommended proportionsas per is 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength, including speading, laying, compacting to proper size/thickness and level, curing, maintaing proper quality control, carriage for all leads, trial mix and laboratory testing but excluding the cost of centering, shuttering, finishing and reinforcement as per drawings, specification and direction of the enginner-in-charge, for the following grades of concrete concrete of m25 grade with minimum cement content of 330 kg/cum, providing, mixing, laying in position in substructure upto plinth level, site machine batched design mix cement concrete for all types of reinforced cement concrete work, using coarse aggregate and fine aggregate derived from natural sources, cement, admixtures in recommended proportionsas per is 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength, including speading, laying, compacting to proper size/thickness and level, curing, maintaing proper quality control, carriage for all leads, trial mix and laboratory testing but excluding the cost of centering, shuttering, finishing and reinforcement as per drawings, specification and direction of the enginner-in-charge, for the following grades of concrete concrete of m30 grade with minimum cement content of 350 kg/cum, extra over item 32 above for using ready mixed concrete (rmc) manufactured in fully automated batching plant and transported to site of work in transit mixer for all leads, having continuous agitator mixer including pumping of concrete from transit mixer to site of laying. concrete of m25 grade with minimum cement content of 330 kg/cum (note the bidder has to quote only extra cost above the item 32 in the line item of 34, for example- if the cost of item 32 i.e normal mix is rs. 3000 and cost of rmc mix is rs.3500 then the bidder has to quote only the extra cost amount i.e rs.500 (3500-3000) in the line item 34 of the price part), extra over item 33 above for using ready mixed concrete (rmc) manufactured in fully automated batching plant and transported to site of work in transit mixer for all leads, having continuous agitator mixer including pumping of concrete from transit mixer to site of laying.concrete of m30 grade with minimum cement content of 350 kg/cum. (note the bidder has to quote only extra cost above the item 33 in the line item of 35, for example- if the cost of item 33 i.e normal mix is rs. 3000 and cost of rmc mix is rs.3500 then the bidder has to quote only the extra cost amount i.e rs.500 (3500-3000) in the line item 35 of the price part), providing, mixing, laying in position in superstructure above plinth level, site machine batched design mix cement concrete for all types of reinforced cement concrete work, using coarse aggregate and fine aggregate derived from natural sources, cement, admixtures in recommended proportionsas per is 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength, including speading, laying, compacting to proper size/thickness and level, curing, maintaing proper quality control, carriage for all leads, trial mix and laboratory testing but excluding the cost of centering, shuttering, finishing and reinforcement as per drawings, specification and direction of the enginner-in-charge, for the following grades of concrete concrete of m25 grade with minimum cement content of 330 kg/cum, providing, mixing, laying in position in superstructure above plinth level, site machine batched design mix cement concrete for all types of reinforced cement concrete work, using coarse aggregate and fine aggregate derived from natural sources, cement, admixtures in recommended proportionsas per is 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength, including speading, laying, compacting to proper size/thickness and level, curing, maintaing proper quality control, carriage for all leads, trial mix and laboratory testing but excluding the cost of centering, shuttering, finishing and reinforcement as per drawings, specification and direction of the enginner-in-charge, for the following grades of concrete concrete of m30 grade with minimum cement content of 350 kg/cum, extra over item 36 above for using ready mixed concrete (rmc) manufactured in fully automated batching plant and transported to site of work in transit mixer for all leads, having continuous agitator mixer including pumping of concrete from transit mixer to site of laying. concrete of m25 grade with minimum cement content of 330 kg/cum (note the bidder has to quote only extra cost above the item 36 in the line item of 38, for example- if the cost of item 36 i.e normal mix is rs. 3000 and cost of rmc mix is rs.3500 then the bidder has to quote only the extra cost amount i.e rs.500 (3500-3000) in the line item 38 of the price part), extra over item 37 above for using ready mixed concrete (rmc) manufactured in fully automated batching plant and transported to site of work in transit mixer for all leads, having continuous agitator mixer including pumping of concrete from transit mixer to site of laying. concrete of m30 grade with minimum cement content of 350 kg/cum (note the bidder has to quote only extra cost above the item 37 in the line item of 39, for example- if the cost of item 37 i.e normal mix is rs. 3000 and cost of rmc mix is rs.3500 then the bidder has to quote only the extra cost amount i.e rs.500 (3500-3000) in the line item 39 of the price part) (another note-2 for item nos. 23, 24, 25 and 26 (i) excess cement, if required in design mix, with respect to the minimum cement content mentioned above, shall be paid under respective item. (ii) cost of shuttering and reinforcement shall be paid through respective items.(iii) rendering of treatment at construction joint shall be carried out under supervision of manufacturer, cost of which shall be included in rate of these items. (iv) design of pipe support foundations, high mast foundations, miscellaneous pump foundations, transformer and other equipment foundations shall be under scope of the contractor. (v) contractor shall prepare design drawings and bar bending schedules for all rcc structures and submit the same to ucil for approval., supplying and laying precast reinforced cement concrete elements at any level using 20 mm and down graded crushed stones as coarse aggregate as per approved design mix including supply of materials / labour / tools and tackles etc. as required, formwork, mixing, laying, compacting to proper size and thickness, curing, storing, handling, transporting, erection without damage etc. but excluding cost of shuttering and reinforcement, all complete as per drawings, specifications and direction of the engineer-in-charge. concrete of m25 grade with minimum cement content of 330 kg/cum note (i) excess cement, if required in design mix, with respect to the minimum cement content mentioned above, shall be paid under respective item. (ii) cost of shuttering and reinforcement shall be paid in respective items., add for consumption of extra / excess cement, if required, in design mix concrete (item no. 23 to 26 above) over the specified minimum cement content in respective items mentioned above. note i) requirement of extra cement with respect to the minimum cement content mentioned against respective items of approved design mix of concrete to achieve the characteristic strength for each design mix must be approved by engineer-in-charge during mix design stage based on laboratory test results which must also be approved by the engineer-in-charge..(ii) payment shall be on the basis of actual quantity of cement used in mix concrete executed., supplying, installing, dismantling and removing shuttering for foundations and substructures upto plinth level in all kinds of rcc work for all leads and lifts including necessary rendering of concrete surfaces after exposure, maintaining proper quality control, supervision etc., all complete as per drawings, specification and direction of engineer-in-charge. notes for the above item nos. i) the design of formwork/staging shall be submitted by the contractor to ucil for approval before commencement of work., supplying, installing, dismantling and removing shuttering for superstructures above plinth level in all kinds of rcc work for all leads and lifts including necessary rendering of concrete surfaces after exposure, maintaining proper quality control, supervision etc., all completer as per drawings, specification and direction of engineer-in-charge. notes for the above item nos. i) the design of formwork/staging shall be submitted by the contractor to ucil for approval before commencement of work., supplying, straightening, cutting, bending, binding with 2 nos. 20 gauge annealed soft iron wire and placing in position following types of reinforcement, of all diameters to all types of rcc members in substructure upto plinth level including all lifts and leads, maintaining proper quality control, supervision, provision of necessary chairs/spacers, tying and bending of dowel bars, cover blocks of same grade of concrete, preparation of bar bending schedule and getting the same approved from ucil before construction, all complete as per drawings, specification and direction of the engineer-in-charge. thermo-mechanically treated (tmt) bars of grade fe-500d conforming to is1786. note for above items. i) the supply of fe 500d tmt bars conforming to is 1786 (latest) shall be fromm/s sail, iisco, rinl, tata steel and jindal from their own plants rolled from virgin material only.ii) reinforcement steel bars from rerollers of the above manufacturers will not be accepted iii) no extra payment shall be made on account of rolling margin and wastage iv) contractor shall supply copies of the documentary evidence of purchase of steel, test certificates from these manufacturers (steel either directly purchased or through their dealers)and also tests from third party, if required, to be arranged at no extra cost.v) welding weights, weight of binding wires etc. shall not be measured for payment but the cost of the same shall be deemed to have been included in the quoted rate.vi) chairs and spacers provided will not be paid extra.vii) preparation of bar bending schedule for reinforcement in all types of rcc structures will be prepared by the contractor and submitted to ucil for approval., supplying, straightening, cutting, bending, binding with 2 nos. 20 gauge annealed soft iron wire and placing in position following types of reinforcement, of all diameters to all types of rcc members in superstructure above plinth level including all lifts and leads, maintaining proper quality control, supervision, provision of necessary chairs/spacers, tying and bending of dowel bars, cover blocks of same grade of concrete, preparation of bar bending schedule and getting the same approved from ucil before construction, all complete as per drawings, specification and direction of the engineer-in-charge. thermo-mechanically treated (tmt) bars of grade fe-500d conforming to is1786. note for above items. i) the supply of fe 500d tmt bars conforming to is 1786 (latest) shall be fromm/s sail, iisco, rinl, tata steel and jindal from their own plants rolled from virgin material only.ii) reinforcement steel bars from rerollers of the above manufacturers will not be accepted iii) no extra payment shall be made on account of rolling margin and wastage iv) contractor shall supply copies of the documentary evidence of purchase of steel, test certificates from these manufacturers (steel either directly purchased or through their dealers)and also tests from third party, if required, to be arranged at no extra cost.v) welding weights, weight of binding wires etc. shall not be measured for payment but the cost of the same shall be deemed to have been included in the quoted rate.vi) chairs and spacers provided will not be paid extra.vii) preparation of bar bending schedule for reinforcement in all types of rcc structures will be prepared by the contractor and submitted to ucil for approval., supplying, fabricating and installing mild steel anchor bolts / holding down bolts, pipes, sleeves, inserts, hangers, conduits and any other mild steel, cast iron, g.i.cast steel and other fixures including lugs in cement concrete, including necessary templates for keeping them in position and with welding, bending to the required shape, if necessary and prime coat and final painting whereever necessary/applicable, cost of scaffolding, as required, at all leads and lifts, storing, handling, transporting, erection without damage, placing in position, maintaining proper quality control etc. all complete as per drawings, specification and direction of engineer-in-charge. note i) all materials shall be from m/s sail, iisco, rinl and tata steel from their own plants rolled from virgin material only. ii) welding weights, connections, bolts and nuts etc. shall not be measured for payment but the cost of which shall be deemed to have been included in the quoted rate. iii) contractor shall supply copies of the documentary evidence of purchase of steel, test certificates from these manufacturers and also tests from third party, if required, to be arranged at no extra cost. iv) all holes will be made by drilling only. gas cutting of holes will not be permitted. v) electrodes manufactured by m/s advani oerlikon, esab india, indian oxygen and dandh secheron only shall be used., taking delivery from ucil, handling, transporting and installing in cement concrete at all elevations anchor bolts, anchors, pipes, sleeves, inserts, hangers, conduits and any other mild steel, cast iron, g.i.cast steel and other fixures, cost of scaffolding, as required, placing in position, maintaining proper quality control etc. all complete as per drawings, specification and direction of engineer-in-charge.. note i) the fabricated embedded items including lugs etc. shall be supplied by ucil., supplying, fabricating and installing structural steel work conforming to is 2062 (grade e250, quality b0) in all kinds of work for pipe and cable supports at top of dam/embankment at all elevations including straightening of raw steel (if required), cutting, making edge preparation, making connections at fabrication yard by welding / bolting, hoisting, fixing in position by welding / bolting, cleaning and preparation of all steel, storing, loading, transportation, unloading, delivery at erection site, maintening proper quality control, surface preparation for painting, erection, alignment and connections of all structures true to line, level, plumb and dimension including rectification, if any, splicing, applying a primer coat of approved make before erection and two coats of final paint of approved make after erection and final alignment, preparation of design d

Unlock Full Tender Access

Start Free Trial to download documents before deadline

T18 Ref No : 15719668
Location : ghatshila , jharkhand
Source : GEM Tenders
tender for title1 , title2 , title3 , title4 , title5 , title6 , title7 , title8 , title9 , title10 , title11 , title12 , title13 , title14 , title15 , title16 , title17 , title18 , title19 , title20 , title21 , title22 , title23 , title24 , title25, renovation and painting of shopping complex at ucil narwapahar, providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing (1 cement , 2 coarse sand (zone iii), 4 graded stone aggregate 20 mm nominal size), centering and shuttering including strutting, propping etc. and removal of form for suspended floors, roofs, landing, balconies and access platform, centering and shuttering including strutting, propping etc. and removal of form for columns, pillars, piers, abutments, posts and struts, steel reinforcement for r.c.c. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level. thermo mechanically treated bars of grade fe 500d or more., brick work with common burnt clay f.p.s. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor v level in all shapes and sizes in a) cement mortar (1 cement, 6 coarse sand), 12 mm cement plaster of mix (1 cement, 4 fine sand), neat cement punning., providing and fixing 1st quality ceramic glazed floor tiles conforming to is 15622 (thickness to be specified by the manufacturer) of approved make in all colours, shades except burgundy, bottle green, black of any size as approved by eic in skirting, risers of steps and dados over 12 mm thick bed or cement mortar (1 cement, 3 coarse sand) and jointing with grey cement slurry, 3.3 kg per sqm including pointing in white cement mixed with pigment of matching shade complete., white washing with lime to give an even shade. a) satna lime wash on walls with one coat., removing white or colour wash by scrapping and sand preparing the surface smooth including necessary papering and repairs to scratches etc. complete, wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade. one or more coats on old work, finishing walls with water proofing cement paint of required shade. new work (two or more coats applied, 3.84 kg per 10 sqm), distempering with 1st quality acrylic distemper (ready made) having voc content less than 50 gm per ltr. of approved manufacturer and of required shade and colour complete as per manufacturers specification. one or more coats on old work, painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade, one or more coats on old work, providing and fixing soil, waste and vent pipes 100 mm dia, sand cast iron s and s pipe as per is 1729, demolishing r.c.c. work manually by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of eic, providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete., providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia m.s. tube 1.5 m centre to centre, horizontal and vertical tubes joining with cup and lock system with m.s. tubes, m.s. tube challies, m.s. clamps and m.s. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it thereafter. the scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of eic. the elevational area of the scaffolding shall be measured for payment purpose. the payment will be made once irrespective of duration of scaffolding., cement concrete flooring (1 cement, 2 coarse sand, 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. 40 mm thick with 20 mm nominal size stone aggregate, 1.5 mm thick decorative laminated sheet, labour for fitting and fixing g.c.l. or c.a. sheet roofing in proper slope including the cost of j or l hooks, limpet iand bitumen washers, carriage of sheets to work site, and taxes all complete as per building specification and direction of eic., servicing of rolling shutters, rolling shutter made of 80mm x 1.25 mm machine rolled laths, servicing of rolling shutters, top cover for rolling shutters 1.25 mm thick metre, servicing of rolling shutters, 27.5 cm long wire spring grade no. 2 for rolling shutters, servicing of rolling shutters, ball bearing for rolling shutters
T18 Ref No : 16211132
Source : GEM Tenders
corrigendum tender for erection and fabrication work a 1 , erection and fabrication work a 2 , erection and fabrication work a 3 , erection and fabrication work a 4 , erection and fabrication work a 5 , erection and fabrication work a 6 , erection and fabrication work a 7 , erection and fabrication work a 8 , erection and fabrication work a 9 , erection and fabrication work a 10 , erection and fabrication work a 11 , erection and fabrication work a 12 , erection and fabrication work a 13 , erection and fabrication work a 14 , erection and fabrication work a 15 , erection and fabrication work a 16 , erection and fabrication work a 17 , erection and fabrication work a 18 , erection and fabrication work a 19 , erection and fabrication work a 20 , erection and fabrication work a 21 , erection and fabrication work a 22 , erection and fabrication work a 23 , erection and fabrication work a 24 , erection and fabrication work a 25 , erection and fabrication work a 26 , erection and fabrication work a 27 , erection and fabrication work a 28 , erection and fabrication work a 29 , erection and fabrication work a 30 , erection and fabrication work a 31 , erection and fabrication work a 32 , erection and fabrication work a 33 , erection and fabrication work a 34 , erection and fabrication work a 35 , erection and fabrication work a 36 , erection and fabrication work a 37 , erection and fabrication work a 38 , erection and fabrication work a 39 , erection and fabrication work a 40 , erection and fabrication work a 41 , erection and fabrication work a 42 , erection and fabrication work a 43 , erection and fabrication work a 44 , erection and fabrication work a 45 , erection and fabrication work a 46 , erection and fabrication work a 47 , erection and fabrication work a 48 , erection and fabrication work a 49 , erection and fabrication work a 50 , erection and fabrication work a 51 , erection and fabrication work a 52 , erection and fabrication work a 53 , erection and fabrication work a 54 , erection and fabrication work a 55 , erection and fabrication work a 56 , erection and fabrication work a 57 , erection and fabrication work a 58 , erection and fabrication work a 59 , erection and fabrication work a 60 , erection and fabrication work a 61 , erection and fabrication work a 62 , erection and fabrication work a 63 , erection and fabrication work a 64 , erection and fabrication work a 65 , erection and fabrication work a 66, erection and fabrication work a, cut out and remove the weakened and worn-out portions of the discharge chute of the mill scraper. fabricate new sections using 12 mm thick plates, reinstall them, and provide perforated plates as per the scraper profile. weld and fix them securely, then conduct a satisfactory trial. remove the worn-out runner base of the cane carrier. fabricate a new runner base using a 100 mm channel box, installation it, and straighten, reverse, and reinstall the old channel. remove the worn 40/50 mm square bars of the cane unloader and replace them with new square bars of the same size. conduct a satisfactory trial. remove the worn runners of the cane carrier, rake carrier, bagasse elevator, and r.b.c. replace them by reversing the old runners or installing new runners as required. remove the worn or damaged side plates of the chains of the cane carrier, rake carrier, and r.b.c. replace them with repaired old plates or new plates. remove the worn side plates of the fibrizer hood. installation new plates, weld them from both inside and outside, and conduct a satisfactory trial. carry out complete overhauling, testing, and trial of the bagasse baling machine. perform the required repairs on the old racks of the s.r.c. and i.r.c. fabricate new racks for the bagasse elevator/r.b.c. chains as per the sample. fabricate and installation new top and bottom covers of the t.r.p.f. as per the existing design and conduct a satisfactory trial. remove the worn tail-end boots of the s.r.c./i.r.c. fabricate new boots from 8 mm/10 mm thick plates as per the sample, installation them, carry out leak-proof welding, and conduct a satisfactory trial. dismantle the grabs of the cane unloaders, repair all parts, perform hardfacing on the fingers as instructed, reassemble the grabs, and conduct a satisfactory trial. remove the damaged juice tray used for compound imbibition in the mills. fabricate and installation a new tray as per the sample and reconnect all fittings. remove the worn guides provided to prevent the chains of the cane carrier, s.r.c., i.r.c., and bagasse elevator from lifting. fabricate and installation new guides as instructed and conduct a satisfactory trial. repair the worn wheels of the bridge/trolley drive of the cane unloaders by welding as instructed. remove the damaged twin chutes of the t.r.p.f. fabricate new twin chutes matching the existing design and erect them in position. fabricate and fit m.s. rings on the idler wheels of the cane carrier. provide a 25 mm thick plate support between the mill headstock and the t.r.p.f. headstock as instructed. repair the old hammer shanks of the fibrizer by welding, hardfacing, and balancing. remove the damaged hoods of the cane chopper/leveller. fabricate and installation new folding-type hoods. replace the broken pocket plates of the pocket-type anvil plate of the fibrizer with new plates. straighten bent plates, weld them, and perform hardfacing as instructed. build up the worn hub surfaces of the cane leveller/chopper rotor assembly by welding, machine them flat, and perform hardfacing. remove the weakened motor and gearbox beds of the cane unloaders. fabricate modified new beds, installation them, align the motor and gearbox, and conduct a trial. strengthen the weakened columns of the cane carrier structure by welding reinforcing plates. fabricate and fit juice rings in the mill rollers as per the sample. carry out the required repairs to the pressure chutes between the t.r.p.f. and the mill. remove the damaged mill juice receiving tank. fabricate a new tank using 8 mm/10 mm thick plates, installation it, reconnect all connections, and conduct a leak-proof trial. remove the damaged bottom cone of the mill juice receiving tank. fabricate and installation a new cone as per the sample, reconnect all fittings, and conduct a leak-proof trial. remove the damaged 10"/12" pipes between the mill juice tray and the gutter. fabricate and installation new stainless steel pipes and conduct a leak-proof trial. provide 3 mm thick stainless steel lining in the bottom trough of the s.r.c./i.r.c. with leak-proof welding. remove the loose bed of boiler feed pump no. 1, fabricate and installation a new bed, reconnect all fittings, and conduct a trial. fabricate a leak-proof damper in the old i.d. fan ducting before the chimney so that there is no backflow of air when the new i.d. fan operates. remove the nipple reducers and damaged pipelines of all three wet scrubber pumps. installation new pipelines and carry out leak-proof welding. remove all nozzles inside the wet scrubber venturi, replace damaged nozzles with new ones, and reconnect all fittings. fabricate a new backwash pipeline from old boiler tubes between the service tank and wet scrubber. installation new valves, clamps, and complete all connections. remove the damaged juice tray below the t.r.p.f. leading to the mill juice tray. fabricate and installation a new tray. remove damaged ash chutes of the boilers. fabricate new chutes from old/new plates matching the original design and installation them. repair the damaged dampers of air heaters, economizers, and f.d./i.d. fan inlet, outlet, suction, and delivery ducts. fabricate new frames and fit new mesh/screens for the internal steam filters of the boiler drums. remove the damaged flue gas ducting between the i.d. fans and chimney. fabricate and installation new ducting from 5–6 mm thick plates and conduct a leak-proof trial. fabricate new impellers for the bagassilo fan as per the sample, repair the casing, and conduct a successful trial. remove the damaged suction cones of the i.d./f.d. fan casings. fabricate and installation new cones as per the sample and conduct a satisfactory trial. replace the damaged perforated baffle plates inside the boiler feed tank. remove and repair the damaged bagasse feeding chutes of boilers 1, 2, and 3. replace the damaged air headers supplying additional f.d. air to the furnaces of 20-ton boilers 1 and 2. replace the damaged ducting between the air heater and i.d. fan with new ducting made from 5–6 mm thick plates. replace damaged perforated screens used for bagasse filtration in the bagasse elevator. remove the economizer coils/tubes of 20-ton boilers 1 and 2, clean them internally and externally, conduct hydraulic testing, reinstall them, make them leak-proof, and carry out final hydraulic testing. remove damaged trough channels/plates of the s.r.c./i.r.c., fabricate replacements as instructed, and installation them. fabricate and installation angle iron strengthening rings on the boiler chimney. strengthen the damaged truss-type bridge structure of the cane unloader using new channels, angles, and plates. weld and restore the enlarged holes of the block-type chain links of the s.r.c./i.r.c., redrill pin holes, and grind the surfaces smooth. replace the worn rack attachment links of the s.r.c./i.r.c. chains with new 12 mm thick plate attachments, weld them, and drill holes as per the drawing. construct separate access platforms for all three cane unloaders using old angle channels. replace the damaged portions of the i.d. fan casing, air heater cell/ducting, and economizer cell. replace the old m.s. plates of the s.r.c./i.r.c. trough and boot, make them leak-proof, and provide 3 mm stainless steel lining. fabricate new racks for the s.r.c./i.r.c. chains from 25 mm thick plates, drill holes, and provide roller supports at both ends. remove the bent 250 mm channel of the cane unloader trolley, restore line and level, strengthen the structure, fit a new runner square bar, check diagonals, and align the wheels. dismantle all four wheels of the mill and powerhouse cranes, clean them, inspect bearings, grease all plumber blocks, replace damaged bearings from mill spares, repair worn wheels by welding, and conduct a satisfactory trial. repair the worn shells and teeth of the t.r.p.f. top and bottom rollers by hardfacing. fit rings on both sides to compensate for reduced shell length. remove the damaged mill juice tray and fabricate a new tray using 5 mm stainless steel plate as per the sample. conduct a leak-proof trial. repair the stainless steel juice tray of the mill. remove the mill headstock if cracked or misaligned, re-grout it, realign it, and complete all associated works. remove the shaft of the damaged t.r.p.f. roller and dismantle the shell using gas cutting. cut old 63.5 mm boiler tubes with bends, prepare 5.1-meter straight tubes for the air heater, and clean them by grinding.
T18 Ref No : 15982890
Source : GEM Tenders
tender for erection and fabrication work a erection and fabrication work a 1 , erection and fabrication work a 2 , erection and fabrication work a 3 , erection and fabrication work a 4 , erection and fabrication work a 5 , erection and fabrication work a 6 , erection and fabrication work a 7 , erection and fabrication work a 8 , erection and fabrication work a 9 , erection and fabrication work a 10 , erection and fabrication work a 11 , erection and fabrication work a 12 , erection and fabrication work a 13 , erection and fabrication work a 14 , erection and fabrication work a 15 , erection and fabrication work a 16 , erection and fabrication work a 17 , erection and fabrication work a 18 , erection and fabrication work a 19 , erection and fabrication work a 20 , erection and fabrication work a 21 , erection and fabrication work a 22 , erection and fabrication work a 23 , erection and fabrication work a 24 , erection and fabrication work a 25 , erection and fabrication work a 26 , erection and fabrication work a 27 , erection and fabrication work a 28 , erection and fabrication work a 29 , erection and fabrication work a 30 , erection and fabrication work a 31 , erection and fabrication work a 32 , erection and fabrication work a 33 , erection and fabrication work a 34 , erection and fabrication work a 35 , erection and fabrication work a 36 , erection and fabrication work a 37 , erection and fabrication work a 38 , erection and fabrication work a 39 , erection and fabrication work a 40 , erection and fabrication work a 41 , erection and fabrication work a 42 , erection and fabrication work a 43 , erection and fabrication work a 44 , erection and fabrication work a 45 , erection and fabrication work a 46 , erection and fabrication work a 47 , erection and fabrication work a 48 , erection and fabrication work a 49 , erection and fabrication work a 50 , erection and fabrication work a 51 , erection and fabrication work a 52 , erection and fabrication work a 53 , erection and fabrication work a 54 , erection and fabrication work a 55 , erection and fabrication work a 56 , erection and fabrication work a 57 , erection and fabrication work a 58 , erection and fabrication work a 59 , erection and fabrication work a 60 , erection and fabrication work a 61 , erection and fabrication work a 62 , erection and fabrication work a 63 , erection and fabrication work a 64 , erection and fabrication work a 65 , erection and fabrication work a 66, erection and fabrication work a, cutting and removing the weak/broken parts of the discharge chute for the scraper in the mill, fabricating new parts from 12 mm plate, reinstalling them, fixing hole plates as per profile by welding to secure the scraper, and conducting a trial after completion of work., cutting and removing the worn/weak runner base of the cane carrier, fabricating a box structure using 100 mm channel to installation the runner base, fitting it properly, and straightening and reusing the old channel by turning it over., cutting and removing the old worn/cut 40/50 mm square bars of the cane unloader and installing new square bars in their place as before, followed by a satisfactory trial., cutting and removing the worn/cut runners of the cane carrier/rake carrier/bagasse elevator/r.b.c., reinstalling them by either turning over the old ones or fitting new runners as per original design., cutting and removing the worn/cut/weak side plates of chains used in cane carrier/rake carrier/r.b.c., and installing old or new plates in their place., cutting and removing the worn/weak side plates of the fibrizer hood, installing new plates, welding inside and outside, and conducting a satisfactory trial., complete overhauling, testing, and trial of the bagasse baling machine., performing necessary repairs on the old racks of s.r.c./i.r.c., fabricating new racks as per sample for the chains of bagasse elevator/r.b.c., replacing the weak/broken bottom/top covers of t.r.p.f. by fabricating and installing new covers as per original design, and conducting a satisfactory trial., cutting and removing the weak/broken tail end boots of s.r.c./i.r.c., fabricating new ones from 8.0/10.0 mm old/new plate as per sample, installing, leak-proof welding, and conducting a satisfactory trial., dismantling various parts of the cane unloader grabs, repairing all parts, hardfacing the fingers as per instructions, and reassembling the grabs., cutting and removing the weak/broken juice tray used for compound imbibition in mills, fabricating a new tray from plate as per sample, installing it in place, and making all connections., cutting and removing the worn/weak guides that prevent chains of cane carrier/s.r.c./i.r.c. and bagasse elevator from lifting, fabricating new guides as per instructions, installing them, and conducting a satisfactory trial., welding the worn/cut wheels of the cane unloader bridge/trolley drive as per instructions., cutting and removing the weak/broken donali chutes of t.r.p.f., fabricating new donali chutes as per the old ones, and erecting them in place., fabricating and installing m.s. rings on the idler wheel of the cane carrier as per instructions., fabricating and installing a support using 25.0 mm plate between the mill head stock and t.r.p.f. head stock as per instructions., repairing and balancing the old hammer shanks of the fibrizer by welding and hardfacing as per instructions., cutting and removing the worn/weak hoods of the cane chopper/leveller and fabricating a new folding type from new plate and installing it., replacing the broken plates in the pockets of the fibrizer's pocketed type anvil plate with new plates, straightening bent plates, welding, and hardfacing as per instructions., welding and leveling the worn hubs of the cane leveller/chopper rotor assembly on the working side and top sides, and hardfacing as per instructions., cutting and removing the weak beds of reduction gears and motors on cane unloaders, modifying and fabricating new beds, installing them, aligning the gear and motor, and conducting a trial., strengthening the weak/broken columns of the cane carrier structure by welding plates as per instructions., fabricating and fitting juice rings in the mill rollers as per sample., performing necessary repairs on the pressure chutes installed between t.r.p.f. and the mill., cutting and removing the weak/broken juice receiving tank of the mills, fabricating a new tank from 8.0/10.0 mm plate as per sample, fitting it in place, making all connections, and conducting a leak-proof trial., cutting and removing the weak/broken bottom cone of the mill's juice receiving tank, fabricating a new cone as per sample, fitting it in place, making all connections as before, and conducting a leak-proof trial., cutting and removing the weak/broken 10 inch/12 inch pipes between the mill juice tray and gutter, fabricating and fitting new s.s. pipes in their place, and conducting a leak-proof trial., lining the bottom trough of s.r.c./i.r.c. with 3.00 mm thick s.s. plate and doing leak-proof welding., removing the shifted bed of feed pump no. 1 on the boiler, fabricating and installing a new bed, making related connections, and conducting a trial., making the damper in the old i.d. fan ducting at the boiler station leak-proof using new/old plate before the chimney and doing complete welding so that when the new i.d. runs, there is no back air from the chimney., cutting and removing the nipple reducers of all three wet scrubber pumps and their leaking pipe lines, installing new pipe lines, and making all connections as before with leak-proof welding., opening all nozzles inside the wet scrubber venturi, removing damaged nozzles, installing new nozzles, and making all connections as before., fabricating new pipes from old boiler tubes for backwash from the service tank to the wet scrubber, and making all connections with new valves and clamps in the pipeline., cutting and removing the weak and leaking juice tray from under the t.r.p.f. that brings juice to the mill juice tray, and fabricating and installing a new one., cutting and removing the weak/broken ash chutes of the boilers, and fabricating and fitting new chutes from old/new plate as per the old ones., performing necessary repairs on the weak/broken dampers of air heaters, economizers, and f.d./i.d. fans' inlets/outlets or suction/delivery., replacing the frames and grids of the internal steam filter fitted in the boiler drums by fabricating new frames and fitting grids., cutting and removing the weak/broken flue gas ducting between the i.d. fans and the chimney, fabricating and installing new ducting from 5.0/6.0 mm thick plate, and conducting a leak-proof trial., for the weak bagassilo fan, fabricating a new impeller as per sample, repairing the casing as necessary, and conducting a successful trial., cutting and removing the weak/broken suction cones in the casings of i.d./f.d. fans, fabricating and installing new cones as per sample, and conducting a successful trial., replacing the damaged weak grids/perforated sheets of the baffle plates inside the boiler feed tank., cutting and removing the weak/broken bagasse feeding chutes of boiler no. 1, 2, and 3, and performing necessary repairs., replacing the weak/broken air headers installed outside for supplying additional f.d. air in the furnace of 20-ton capacity boiler no. 1 and 2 with new headers., cutting the weak/broken ducting between the air heater and i.d. fans and fabricating and installing new ducting from 5/6 mm thick plate., removing damaged perforated grids in the bagasse elevator used for bagasse to bagassilo filtration and fitting new grids., lowering the economizer coils/tubes of 20-ton capacity boiler no. 1 and 2, cleaning them internally and externally, conducting hydraulic testing at standard pressure, and after testing, lifting and refitting them, making the economizer bands leak-proof, and conducting a satisfactory hydraulic test., cutting and removing the weak/broken channel/plate of the s.r.c./i.r.c. trough and fabricating and installing new ones as per instructions., fabricating and installing angle iron rings for strengthening the boiler chimney., strengthening the weak and damaged truss-type bridge structure of the cane unloader by adding new channels, angles, and plates to provide satisfactory strength., welding the oval/worn enlarged holes on both ends of the block-type chain links of s.r.c./i.r.c. chains, drilling pin-size holes in the attachment, and grinding the faces to level., cutting and removing the worn/weak attachment used for fixing racks on the block-type chain links of s.r.c./i.r.c. chains, fabricating new attachment links from 12 mm thick plate as before, welding them onto the links, and drilling holes as per drawing., constructing a separate platform path using old angle channels for access to all three unloaders., replacing the weak/broken parts of i.d. fan casing, air heater cell/ducting, and economizer cell., cutting and removing the old m.s. plate of the bottom trough and boot of s.r.c./i.r.c., installing new plate to make the trough and boot leak-proof, and lining the boot and trough with 3 mm thick s.s. plate, followed by a satisfactory trial., fabricating new racks from 25 mm thick plate as per sample for s.r.c./i.r.c. chains, drilling holes, cutting and supporting chain rollers on both ends, and preparing them., removing the bent 250 mm channel of the trolley in the cane unloader, leveling it, strengthening the structure, fitting worn/weak runner square bars, checking diagonals, and leveling the wheel., removing all four wheels of the mill and power house crane, cleaning, checking bearings, greasing all plumber blocks, replacing damaged bearings with mill spares, welding worn wheels to a uniform size, and conducting a satisfactory trial., performing necessary repairs and hardfacing on the worn shells/teeth of t.r.p.f. top/bottom rollers, and adding rings on both sides as needed to compensate for reduced shell length., cutting and removing the weak/leaking juice tray of the mill and fabricating a new one from 5 mm s.s. plate as per sample, and conducting a leak-proof trial., performing necessary repairs on the damaged s.s. juice tray of the mill., in case of head stock cracking or misalignment, removing the head stock, regrouting, aligning, and completing all related work., removing the shaft of the damaged t.r.p.f. roller and dismantling the shell using gas cutting., cutting the 63.5 mm old boiler tubes with bends, making a 5.1 meter straight line, preparing them for the air heater, and cleaning them by grinding.

Unlock Full Tender Access

Start Free Trial to download documents before deadline

T18 Ref No : 16139917
Location : ghatshila , jharkhand
Source : GEM Tenders
tender for title1 , title2 , title3 , title4 , title5 , title6 , title7 , title8 , title9 , title10 , title11 , title12 , title13 , title14 , title15 , title16 , title17 , title18 , title19 , title20 , title21 , title22 , title23, construction of boundary wall at aecs secondary at narwapahar mines, earth work in excavation by mechanical means hydraulic excavator manual means over areas exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by engineer in charge. all kind of soil, filling available excavated earth excluding rock in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering lead upto 50m and lift upto 1.50m., clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50m outside the periphery of the area cleared., providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work up to plinth levelshelves,chajja,lintel,band,plain window sills,stsiarcase and spiral stair case above plinth level upto floor five level execluding the cost of centering,shuttering,finishing and reinforced with 1 ratio 1.5 ratio 3 1 cement 1.5 coarse sand 3 graded stone aggregate. 1 5 10 1 cement 5 coarse sand zone iii derived from natural sources 10 graded stone aggregate 40 mm nominal size derived from natural sources, providing and laying cement concrete in retaining walls, return walls, walls any thickness including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing 1 2 4 1 cement 2 coarse sand zone iii derived from natural sources 4 graded stone aggregate 20 mm nominal size derived from natural sources, centering and shuttering including strutting, propping etc and removal of form work for foundations, footings, bases for columns foundations, footings, bases for columns, centering and shuttering including strutting, propping etc. and removal of form for foundations, footings, bases of columns, etc. for mass concrete, centering and shuttering including strutting, propping etc. and removal of form for lintels, beams, plinth beams, girders, bressumers and cantilevers, centering and shuttering including strutting, propping etc. and removal of form for columns, pillars, piers, abutments, posts and struts, steel reinforcement for r.c.c. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. thermo mechanically treated bars of grade fe 500d or more., steel reinforcement for r.c.c. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. thermo mechanically treated bars of grade fe 500d or more., providing and laying in position machine batched and machine mixed design mix m 25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per is 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of engineer in charge. note cement content considered in this item is at the rate 330 kg per cum. excess or less cement used as per design mix is payable or recoverable separately all works upto plinth level, providing and laying in position machine batched and machine mixed design mix m 25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per is 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of engineer-in-charge. (note cement content considered in this item is at the rate 330 kg per cum. excess or less cement used as per design mix is payable or recoverable separately. all works above plinth level upto floor v level., add for using extra cement in the items of design mix over and above the specified cement content therein., brick work with common burnt clay f.p.s. non modular bricks of class designation 7.5 in foundation and plinth in cement mortar 1 6 1 cement 6 coarse sand, brick work with common burnt clay f.p.s. non modular bricks of class designation 7.5 in superstructure above plinth level up to floor v level in all shapes and sizes in cement mortar 1 6 1 cement 6 coarse sand, 12 mm cement plaster of mix 1 6 1 cement 6 coarse sand, 15 mm cement plaster on rough side of single or half brick wall of mix 1 6 1 cement 6 coarse sand, finishing walls with premium acrylic smooth exterior paint with silicone additives of required shade new work two or more coats applied at the rate 1.43 ltr per 10 sqm over and including priming coat of exterior primer applied at the rate 2.20 kg per10 sqm, applying priming coat with ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron steel works, painting with synthetic enamel paint of approved brand and manufacture to give an even shade two or more coats on new work, providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre openable length total length 90 m, having 50 nos rounds per 6 metre length, upto 3 m height of wall with existing angle iron y shaped placed 2.4m or 3.00 m apart and with 9 horizontal r.b.t. reinforced barbed wire, stud tied with g.i. staples and g.i. clips to retain horizontal, including necessary bolts or g.i. barbed wire tied to angle iron, all complete as per direction of engineer in charge, with reinforced barbed tape r.b.t. spring core 2.5mm thick wire of high tensile strength of 165 kg per sq.mm with tape 0.52 mm thick and weight 43.478 gm per metre cost of m.s. angle, c.c. blocks shall be paid separately, supplying at site angle iron post and strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete.
T18 Ref No : 16639060
Location : vemula , andhra pradesh
Source : GEM Tenders
tender for bitumenlayingwork2 , kerbstonelayingwork1 , tailingexcavationwork1 , borrowearthsoilwork3 , removinghdpeliningwork1 , dismantlingstonepitching1 , backfillingoftailing1 , laboratorytestwork15 , humepipework1 , humepipework2 , humepipework3 , humepipework4 , humepipework5 , humepipework6 , earthworkfillingforbund1 , stonepitchingwork5 , brickwork1 , brickwork2 , plasteringwork1 , plasteringwork2 , plasteringwork3 , paitingwork1 , paitingwork2 , paitingwork3 , handrailingwork3 , ccforflooringwork1 , plasteringwork4 , glasssstripswork1 , cementpunning1 , aluminumwork1 , shutterworks1 , glasspaneswork1 , siliconsealantwork1 , doorworks1 , mechanicalinstallationpumps1 , mechanicalinstallationpipes1 , mechanicalinstallationpipes2 , mechanicalinstallationpipes3 , electricallinstallation5 , mechanicalerections1 , disposalareappep1 , slimedisposalareappep1 , slimedisposalareappep2 , constructionofelectricalfacilityworklumpsum1 , panelneartaillingpond , automaticpowerfactorcorrectionpanel1 , batterychargerdcboard , lcsmushroomheadstay1 , lcsmushroomheadstay2 , lcsmushroomheadstay3 , distributiontransformer1 , dieselgeneratorset1 , dieselgeneratorfounation1 , ltbusduct1 , htswitchgearincomingpanel1 , htswitchgearincomingpanel2 , mainlightingdistributionboard1 , sublightingdistributionboard , highmastlighting1 , highmastlighting2 , lighteningfixture1 , ltpowercables1 , htpowercables1 , htpowercables2 , ltcontrolcables , junctionboxes1 , earthinglightningitems1 , aircondition1 ,, construction of 4th stage tailing pond, stripping and clearing the site of jungles, bushes, shrubs, wood etc., uprooting of rank vegetation, trees and saplings of girth upto 30 cm measured at a height of 1m above ground level, removal of undesirable materials etc. including removal and disposal of debris at suitable locations with all leads and lifts, as decided by the engineer-in-charge., felling trees of girth (measured at a height of 1m above ground level) including cutting of trunks and branches, removing the roots and stacking of servicable material and disposal of unserviceable material at suitable ocations as decided by the engineer-in-charge. beyond 30 cm girth upto and including 60 cm girth, felling trees of girth (measured at a height of 1m above ground level) including cutting of trunks and branches, removing the roots and stacking of servicable material and disposal of unserviceable material at suitable ocations as decided by the engineer-in-charge. beyond 60 cm girth upto and including 120 cm girth, felling trees of girth (measured at a height of 1m above ground level) including cutting of trunks and branches, removing the roots and stacking of servicable material and disposal of unserviceable material at suitable ocations as decided by the engineer-in-charge. beyond 120 cm girth upto and including 240 cm girth, earth work in excavation in development of embankment profile in the following types of soils for all lifts, including taking adequate protection during excavation, drilling and transporting the excavated spoil / material after stripping of top soil as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead within acquired area of tailing dam & pond. all kinds of soils including hard and dense soils, earth work in excavation in development of embankment profile in the following types of soils for all lifts, including taking adequate protection during excavation, drilling and transporting the excavated spoil / material after stripping of top soil as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead within acquired area of tailing dam & pond. ordinary rock, earth work in excavation in development of embankment profile in the following types of soils for all lifts, including taking adequate protection during excavation, drilling and transporting the excavated spoil / material after stripping of top soil as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead within acquired area of tailing dam & pond.hard rock (blasting prohibited), earth work in excavation of hillocks within existing pond area in the following types of soils for all lifts, transporting the excavated spoil / material as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead and lift within acquired area of tailing dam & pond. all kinds of soils including hard and dense soils, earth work in excavation of hillocks within existing pond area in the following types of soils for all lifts, transporting the excavated spoil / material as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead and lift within acquired area of tailing dam & pond. ordinary rock, earth work in excavation of hillocks within existing pond area in the following types of soils for all lifts, transporting the excavated spoil / material as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead and lift within acquired area of tailing dam & pond. hard rock (blasting prohibited), earth work in excavation in bed layer -1 in the following types of soils for all lifts, including bailing / pumping out any water accumulating inside the excavation, taking adequate protection during excavation, transporting the excavated soil as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of the engineer-in-charge for any lead within acquired area of tailing dam & pond. all kinds of soils including hard and dense soils, earth work in excavation in bed layer -1 in the following types of soils for all lifts, including bailing / pumping out any water accumulating inside the excavation, taking adequate protection during excavation, transporting the excavated soil as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of the engineer-in-charge for any lead within acquired area of tailing dam & pond. ordinary rock, earth work in excavation in pipe-support foundations, peripheral drains, culverts, diversion drain, watch towers, miscellaneous equipment foundations etc. in the following types of soils for all lifts, including bailing / pumping out any water accumulating inside the excavation, taking adequate protection during excavation, drilling and transporting the excavated spoil / material as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead within acquired area of tailing dam & pond. all kinds of soils including hard and dense soils, earth work in excavation in pipe-support foundations, peripheral drains, culverts, diversion drain, watch towers, miscellaneous equipment foundations etc. in the following types of soils for all lifts, including bailing / pumping out any water accumulating inside the excavation, taking adequate protection during excavation, drilling and transporting the excavated spoil / material as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead within acquired area of tailing dam & pond. ordinary rock, earth work in excavation in pipe-support foundations, peripheral drains, culverts, diversion drain, watch towers, miscellaneous equipment foundations etc. in the following types of soils for all lifts, including bailing / pumping out any water accumulating inside the excavation, taking adequate protection during excavation, drilling and transporting the excavated spoil / material as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead within acquired area of tailing dam & pond. hard rock (blasting prohibited), supplying and transporting earth of specified quality (as per specification and drawing) from borrow-pit i.e. the source not owned by ucil but arranged by the contractor at his own cost including all taxes, royalty etc and filling the same in bed later - 1 in layers not exceeding 250 mm above existing ground level, watering of each layer in the stipulated manner as per specification and / or direction of the engineer-in-charge and compaction by mechanical means to achieve required degree of compaction as per specification, all complete as per drawing, specification and direction of the engineer-in-charge., supplying and transporting earth of specified quality (as per specification and drawing) from borrow-pit i.e. the source not owned by ucil but arranged by the contractor at his own cost including all taxes, royalty etc and filling the same in embankment in random fill zone in layers not exceeding 250 mm in proper profile to various heights above existing ground level, watering of each layer in the stipulated manner as per specification and / or direction of the engineer-in-charge and compaction by mechanical means to acheive required degree of compaction as per specification, disposal of excess of unusable material all complete as per drawing, specification and direction of the engineer-in-charge for any lead and lift (sectional measurement for compacted filling will only be paid)., supplying and transporting clay of specified quality and property (as per specification and drawing) from borrow-pit i.e. the source not owned by ucil but arranged by the contractor at his own cost including all taxes, royalty etc and laying the same over random fill on upstream side of embankment in layers not exceeding 150 mm measured loose in proper profile, watering of each layer in stipulated manner to various heights and compacting each layer by mechanical means to achieve required degree of compaction as per specification and / or direction of the engineer-in-charge, all complete as per drawing, specification and direction of the engineer-in-charge for any lead and lift (sectional measurement for compacted thickness will only be paid)., supplying, transporting and laying stone pitching with approved stone (average 300 mm thick) over clay lining on upstream side of dam with voids filler with stone dust with all lead and lift including cutwork, curing, scaffolding with all bye-work, all complete as per drawing, specification and direction of the engineer-in-charge. note - payment shall be made for the actual area of coverage of stone pitching. wastage shall not be payable., supplying, transporting and laying stone pitching with approved stone (average 300 mm thick) over random fill on downstream side of dam with voids filler with stone dust with all lead and lift including cutwork, curing, scaffolding with all bye-work, all complete as per drawing, specification and direction of the engineer-in-charge. note payment shall be made for the actual area of coverage of stone pitching. wastage shall not be payable., supplying, transporting, spreading and compacting sand (average 100 mm thick) over stone pitching on upstream side of dam with all lead and lift including all bye-work, all complete as per drawing, specification and direction of the engineer-in-charge., supplying, transporting and laying 1500 micron thick high density polyethelene (hdpe) sheet (textured on both sides) as lining over sand cushion layer on upstream side of dam, laid in position by qualified and skilled installer certified by the manufacturer and approved by the engineer-in-charge, with all lead and lift including sealing of joints (hot wedge single and dual track seaming and / or extrusion fillet seaming method or any other specialized method e.g. robotic two stitch welding etc.) of new sheets and sealing of new lining sheet with existing lining sheet with an overlap of approximately 1.0m, anchoring the new lining sheet on top of new embankment, maintaining quality control, conducting tests as per requirement of the specification, all complete as per drawing, provisions of specification and direction of the engineer-in-charge. note payment shall be made for the actual area of coverage of hdpe lining sheet. overlapping area, wastage etc. shall not be payable., supplying, transporting, laying and compacting uniformly graded stone aggregate filters within new embankment at all levels,incl shuttering, tools tackles all complete as per drawing, specification and direction of the engineer-in-charge., supplying, transporting, laying and compacting uniformly graded coarse sand filters within new embankment at all levels incl shuttering, tools tackles all complete as per drawing, specification and direction of the engineer-in-charge. (sand shall conform to is383). laying and compacting rock-fill toe dam on downstream side of embankment with following materials at all levels, all complete as per drawing, specification and direction of the engineer-in-charge., with rocks arranged by the contractor at his own cost (rate to include supply and transport also), earth work in back-filling including watering, ramming and compaction at all elevation around pipe support foundations, drain trenches etc. as per specifications and drawings and as directed by the engineer-in-charge with selected soils obtained from stacks under item no. 6 above for any lead within acquired area of tailing pond and dam. (filling shall be done in layers not exceeding 250 mm in loose thickness and watered as necessary. each layer of filling to be compacted to acheive a dry density of not less than 95% of the proctor density)., supplying, transporting and laying stone pitching with approved stone (average 300 mm thick) in diversion drain and at outfall locations with interstices between adjacent stones filled-in with stones of proper size well-driven in order to ensure tight packing and complete filling of all interstices so that no chip can be removed by hand, with all lead and lift including cutwork, curing, scaffolding with all bye-work, all complete as per drawing, specification and direction of the engineer-in-charge. note payment shall be made for the actual area of coverage of stone pitching. wastage shall not be payable., earthwork in filling using earth obtained from item nos. 3, 4, 5 and 6 above in construction of embankment of access roads (total four nos. access roads) connecting top of new tailing pond embankment in layers not exceeding 250 mm in proper profile to various heights above existing ground level, watering of each layer in the stipulated manner as per specification and / or direction of the engineer-in-charge and compaction by mechanical means to acheive required degree of compaction as per specification, all complete as per drawing, specification and direction of the engineer-in-charge for any lead and lift (sectional measurement for compacted filling will only be paid)., supplying, transporting and laying stone pitching with approved stone (average 300 mm thick) on sides of embankments of access roads with voids filler with stone dust with all lead and lift including cutwork, curing, scaffolding with all bye-work, all complete as per drawing, specification and direction of the engineer-in-charge., supplying site machine batched plain cement concrete of 136 nominal mix (1 cement 3 coarse sand 6 graded stone aggregate with 20 mm and down aggregates) below foundations, walls, drains, pits etc. including mixing, transporting, placing in position, compacting to proper thickness and level, curirg, maintaining proper quality control including cost of admixtures in recommended proportions as per is 9103 to accelerate/retard setting of concrete, improve workability without impairing strength and durability but excluding cost of shuttering work, all complete as per specifications, drawings and direction of the engineer-in-charge and including cost of form work., extra over item 30 bove for using ready mixed concrete (rmc) manufactured in fully automated batching plant and transported to site of work in transit mixer for all leads, having continuous agitator mixer including pumping of concrete from transit mixer to site of laying. note (i) cost of shuttering and reinforcement shall be paid in respective items. (note the bidder has to quote only extra cost above the item 30 in the line item of 31, for example- if the cost of item 30 i.e normal mix is rs. 3000 and cost of rmc mix is rs.3500 then the bidder has to quote only the extra cost amount i.e rs.500 (3500-3000) in the line item 31 of the price part), providing, mixing, laying in position in substructure upto plinth level, site machine batched design mix cement concrete for all types of reinforced cement concrete work, using coarse aggregate and fine aggregate derived from natural sources, cement, admixtures in recommended proportionsas per is 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength, including speading, laying, compacting to proper size/thickness and level, curing, maintaing proper quality control, carriage for all leads, trial mix and laboratory testing but excluding the cost of centering, shuttering, finishing and reinforcement as per drawings, specification and direction of the enginner-in-charge, for the following grades of concrete concrete of m25 grade with minimum cement content of 330 kg/cum, providing, mixing, laying in position in substructure upto plinth level, site machine batched design mix cement concrete for all types of reinforced cement concrete work, using coarse aggregate and fine aggregate derived from natural sources, cement, admixtures in recommended proportionsas per is 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength, including speading, laying, compacting to proper size/thickness and level, curing, maintaing proper quality control, carriage for all leads, trial mix and laboratory testing but excluding the cost of centering, shuttering, finishing and reinforcement as per drawings, specification and direction of the enginner-in-charge, for the following grades of concrete concrete of m30 grade with minimum cement content of 350 kg/cum, extra over item 32 above for using ready mixed concrete (rmc) manufactured in fully automated batching plant and transported to site of work in transit mixer for all leads, having continuous agitator mixer including pumping of concrete from transit mixer to site of laying. concrete of m25 grade with minimum cement content of 330 kg/cum (note the bidder has to quote only extra cost above the item 32 in the line item of 34, for example- if the cost of item 32 i.e normal mix is rs. 3000 and cost of rmc mix is rs.3500 then the bidder has to quote only the extra cost amount i.e rs.500 (3500-3000) in the line item 34 of the price part), extra over item 33 above for using ready mixed concrete (rmc) manufactured in fully automated batching plant and transported to site of work in transit mixer for all leads, having continuous agitator mixer including pumping of concrete from transit mixer to site of laying.concrete of m30 grade with minimum cement content of 350 kg/cum. (note the bidder has to quote only extra cost above the item 33 in the line item of 35, for example- if the cost of item 33 i.e normal mix is rs. 3000 and cost of rmc mix is rs.3500 then the bidder has to quote only the extra cost amount i.e rs.500 (3500-3000) in the line item 35 of the price part), providing, mixing, laying in position in superstructure above plinth level, site machine batched design mix cement concrete for all types of reinforced cement concrete work, using coarse aggregate and fine aggregate derived from natural sources, cement, admixtures in recommended proportionsas per is 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength, including speading, laying, compacting to proper size/thickness and level, curing, maintaing proper quality control, carriage for all leads, trial mix and laboratory testing but excluding the cost of centering, shuttering, finishing and reinforcement as per drawings, specification and direction of the enginner-in-charge, for the following grades of concrete concrete of m25 grade with minimum cement content of 330 kg/cum, providing, mixing, laying in position in superstructure above plinth level, site machine batched design mix cement concrete for all types of reinforced cement concrete work, using coarse aggregate and fine aggregate derived from natural sources, cement, admixtures in recommended proportionsas per is 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength, including speading, laying, compacting to proper size/thickness and level, curing, maintaing proper quality control, carriage for all leads, trial mix and laboratory testing but excluding the cost of centering, shuttering, finishing and reinforcement as per drawings, specification and direction of the enginner-in-charge, for the following grades of concrete concrete of m30 grade with minimum cement content of 350 kg/cum, extra over item 36 above for using ready mixed concrete (rmc) manufactured in fully automated batching plant and transported to site of work in transit mixer for all leads, having continuous agitator mixer including pumping of concrete from transit mixer to site of laying. concrete of m25 grade with minimum cement content of 330 kg/cum (note the bidder has to quote only extra cost above the item 36 in the line item of 38, for example- if the cost of item 36 i.e normal mix is rs. 3000 and cost of rmc mix is rs.3500 then the bidder has to quote only the extra cost amount i.e rs.500 (3500-3000) in the line item 38 of the price part), extra over item 37 above for using ready mixed concrete (rmc) manufactured in fully automated batching plant and transported to site of work in transit mixer for all leads, having continuous agitator mixer including pumping of concrete from transit mixer to site of laying. concrete of m30 grade with minimum cement content of 350 kg/cum (note the bidder has to quote only extra cost above the item 37 in the line item of 39, for example- if the cost of item 37 i.e normal mix is rs. 3000 and cost of rmc mix is rs.3500 then the bidder has to quote only the extra cost amount i.e rs.500 (3500-3000) in the line item 39 of the price part) (another note-2 for item nos. 23, 24, 25 and 26 (i) excess cement, if required in design mix, with respect to the minimum cement content mentioned above, shall be paid under respective item. (ii) cost of shuttering and reinforcement shall be paid through respective items.(iii) rendering of treatment at construction joint shall be carried out under supervision of manufacturer, cost of which shall be included in rate of these items. (iv) design of pipe support foundations, high mast foundations, miscellaneous pump foundations, transformer and other equipment foundations shall be under scope of the contractor. (v) contractor shall prepare design drawings and bar bending schedules for all rcc structures and submit the same to ucil for approval., supplying and laying precast reinforced cement concrete elements at any level using 20 mm and down graded crushed stones as coarse aggregate as per approved design mix including supply of materials / labour / tools and tackles etc. as required, formwork, mixing, laying, compacting to proper size and thickness, curing, storing, handling, transporting, erection without damage etc. but excluding cost of shuttering and reinforcement, all complete as per drawings, specifications and direction of the engineer-in-charge. concrete of m25 grade with minimum cement content of 330 kg/cum note (i) excess cement, if required in design mix, with respect to the minimum cement content mentioned above, shall be paid under respective item. (ii) cost of shuttering and reinforcement shall be paid in respective items., add for consumption of extra / excess cement, if required, in design mix concrete (item no. 23 to 26 above) over the specified minimum cement content in respective items mentioned above. note i) requirement of extra cement with respect to the minimum cement content mentioned against respective items of approved design mix of concrete to achieve the characteristic strength for each design mix must be approved by engineer-in-charge during mix design stage based on laboratory test results which must also be approved by the engineer-in-charge..(ii) payment shall be on the basis of actual quantity of cement used in mix concrete executed., supplying, installing, dismantling and removing shuttering for foundations and substructures upto plinth level in all kinds of rcc work for all leads and lifts including necessary rendering of concrete surfaces after exposure, maintaining proper quality control, supervision etc., all complete as per drawings, specification and direction of engineer-in-charge. notes for the above item nos. i) the design of formwork/staging shall be submitted by the contractor to ucil for approval before commencement of work., supplying, installing, dismantling and removing shuttering for superstructures above plinth level in all kinds of rcc work for all leads and lifts including necessary rendering of concrete surfaces after exposure, maintaining proper quality control, supervision etc., all completer as per drawings, specification and direction of engineer-in-charge. notes for the above item nos. i) the design of formwork/staging shall be submitted by the contractor to ucil for approval before commencement of work., supplying, straightening, cutting, bending, binding with 2 nos. 20 gauge annealed soft iron wire and placing in position following types of reinforcement, of all diameters to all types of rcc members in substructure upto plinth level including all lifts and leads, maintaining proper quality control, supervision, provision of necessary chairs/spacers, tying and bending of dowel bars, cover blocks of same grade of concrete, preparation of bar bending schedule and getting the same approved from ucil before construction, all complete as per drawings, specification and direction of the engineer-in-charge. thermo-mechanically treated (tmt) bars of grade fe-500d conforming to is1786. note for above items. i) the supply of fe 500d tmt bars conforming to is 1786 (latest) shall be fromm/s sail, iisco, rinl, tata steel and jindal from their own plants rolled from virgin material only.ii) reinforcement steel bars from rerollers of the above manufacturers will not be accepted iii) no extra payment shall be made on account of rolling margin and wastage iv) contractor shall supply copies of the documentary evidence of purchase of steel, test certificates from these manufacturers (steel either directly purchased or through their dealers)and also tests from third party, if required, to be arranged at no extra cost.v) welding weights, weight of binding wires etc. shall not be measured for payment but the cost of the same shall be deemed to have been included in the quoted rate.vi) chairs and spacers provided will not be paid extra.vii) preparation of bar bending schedule for reinforcement in all types of rcc structures will be prepared by the contractor and submitted to ucil for approval., supplying, straightening, cutting, bending, binding with 2 nos. 20 gauge annealed soft iron wire and placing in position following types of reinforcement, of all diameters to all types of rcc members in superstructure above plinth level including all lifts and leads, maintaining proper quality control, supervision, provision of necessary chairs/spacers, tying and bending of dowel bars, cover blocks of same grade of concrete, preparation of bar bending schedule and getting the same approved from ucil before construction, all complete as per drawings, specification and direction of the engineer-in-charge. thermo-mechanically treated (tmt) bars of grade fe-500d conforming to is1786. note for above items. i) the supply of fe 500d tmt bars conforming to is 1786 (latest) shall be fromm/s sail, iisco, rinl, tata steel and jindal from their own plants rolled from virgin material only.ii) reinforcement steel bars from rerollers of the above manufacturers will not be accepted iii) no extra payment shall be made on account of rolling margin and wastage iv) contractor shall supply copies of the documentary evidence of purchase of steel, test certificates from these manufacturers (steel either directly purchased or through their dealers)and also tests from third party, if required, to be arranged at no extra cost.v) welding weights, weight of binding wires etc. shall not be measured for payment but the cost of the same shall be deemed to have been included in the quoted rate.vi) chairs and spacers provided will not be paid extra.vii) preparation of bar bending schedule for reinforcement in all types of rcc structures will be prepared by the contractor and submitted to ucil for approval., supplying, fabricating and installing mild steel anchor bolts / holding down bolts, pipes, sleeves, inserts, hangers, conduits and any other mild steel, cast iron, g.i.cast steel and other fixures including lugs in cement concrete, including necessary templates for keeping them in position and with welding, bending to the required shape, if necessary and prime coat and final painting whereever necessary/applicable, cost of scaffolding, as required, at all leads and lifts, storing, handling, transporting, erection without damage, placing in position, maintaining proper quality control etc. all complete as per drawings, specification and direction of engineer-in-charge. note i) all materials shall be from m/s sail, iisco, rinl and tata steel from their own plants rolled from virgin material only. ii) welding weights, connections, bolts and nuts etc. shall not be measured for payment but the cost of which shall be deemed to have been included in the quoted rate. iii) contractor shall supply copies of the documentary evidence of purchase of steel, test certificates from these manufacturers and also tests from third party, if required, to be arranged at no extra cost. iv) all holes will be made by drilling only. gas cutting of holes will not be permitted. v) electrodes manufactured by m/s advani oerlikon, esab india, indian oxygen and dandh secheron only shall be used., taking delivery from ucil, handling, transporting and installing in cement concrete at all elevations anchor bolts, anchors, pipes, sleeves, inserts, hangers, conduits and any other mild steel, cast iron, g.i.cast steel and other fixures, cost of scaffolding, as required, placing in position, maintaining proper quality control etc. all complete as per drawings, specification and direction of engineer-in-charge.. note i) the fabricated embedded items including lugs etc. shall be supplied by ucil., supplying, fabricating and installing structural steel work conforming to is 2062 (grade e250, quality b0) in all kinds of work for pipe and cable supports at top of dam/embankment at all elevations including straightening of raw steel (if required), cutting, making edge preparation, making connections at fabrication yard by welding / bolting, hoisting, fixing in position by welding / bolting, cleaning and preparation of all steel, storing, loading, transportation, unloading, delivery at erection site, maintening proper quality control, surface preparation for painting, erection, alignment and connections of all structures true to line, level, plumb and dimension including rectification, if any, splicing, applying a primer coat of approved make before erection and two coats of final paint of approved make after erection and final alignment, preparation of design drawings, fab

Every year, central and state government departments release thousands of high-value contracts specifically dedicated to Bar Straightening Machine. Whether it involves bulk material supply, executing specialized operational services, or end-to-end turnkey project execution, the demand for capable vendors in the Bar Straightening Machine sector is massive.

At Tender18, we help businesses cut through the noise and exclusively target the exact work categories they specialize in. Instead of browsing through generic procurement sites, our platform isolates high-potential opportunities that match your specific industry capabilities.

Work Dynamics in the Bar Straightening Machine Sector

Government requirements for this specific vertical generally fall into distinct procurement patterns:

  • Product & Material Supply: Tenders focused strictly on sourcing, testing, and delivering high-quality items that meet the exact technical specifications of the buyer.
  • Service Level Agreements (SLAs): Long-term hiring of expert agencies for routine maintenance, manpower deployment, or continuous operational management.
  • Execution & Turnkey Projects: Comprehensive contracts where the bidder is responsible for everything from raw material procurement to final site installation and testing.

By focusing purely on your core strength in Bar Straightening Machine, you can build a highly profitable and stable pipeline of government clients.

Stop wasting time filtering through irrelevant notices. Our Bar Straightening Machine Tender Information Service is engineered for precision. We track exact product codes, service names, and specialized work terms across all government portals nationwide. When a buyer publishes a requirement that matches your specific business profile, our system alerts you instantly.

Deep Technical Insights & Documentation For Bar Straightening Machine Tenders

Bidding for specific works requires studying strict technical parameters. We provide immediate access to the core documents you need to evaluate the project:

  • Detailed Specifications & Drawings: Download the exact engineering guidelines, material testing standards, and quality benchmarks demanded by the buyer for Bar Straightening Machine.
  • Financial BOQ Spreadsheets: Access the official blank pricing formats where you need to input your unit rates, tax configurations, and total bid value.
  • Real-Time Technical Amendments: If the buying department changes the product specifications, alters the service scope, or shifts the delivery timeline, we instantly update the parent file so you are never caught off-guard.

Winning a contract for Bar Straightening Machine depends entirely on how perfectly your technical capabilities match the buyer’s demands. Even if you have the best product or service, a poorly formatted document or a missing compliance certificate will lead to instant technical rejection. Tender18’s Tender Bidding Service eliminates this risk by taking complete ownership of your digital submission.

Flawless Compliance & Portal Execution For Bar Straightening Machine Tenders

Under this service, Tender18 assigns a Dedicated Experienced Technical Person to your profile. This expert handles the heavy lifting of the entire bidding cycle:

  • Capability Mapping: We thoroughly cross-check your past completion certificates, ISO standard proofs, and financial turnover against the strict eligibility criteria required for Bar Straightening Machine bids.
  • Secure System Integration: Our technical desk seamlessly links your Class III Digital Signature Certificate (DSC) with the required e-procurement servers to securely encrypt your technical and financial envelopes.
  • Error-Free Financial Uploads: We audit your quoted BOQ pricing sheets for any formula or formatting errors before the final upload, ensuring your bid is successfully locked before the portal's closing hours.

Government buyers are aggressively using the Government e-Marketplace (GeM) for the direct procurement of Bar Straightening Machine. If your business profile is not accurately mapped on this portal, you remain practically invisible to these purchasing officers. Recognized as a trusted and expert GeM consultant, Tender18 offers specialized support to build, optimize, and maintain a highly visible vendor account for your business.

With an industry-leading support success ratio of over 95%, we handle the complex marketplace compliance so you can focus entirely on executing your orders

Expert Profile Management & Catalogue

Our dedicated consultants ensure your GeM presence is structurally perfect:

  • Precise Catalogue Listing: We upload and categorize your specific offerings under the exact search terms and parameters used by government buyers looking for Bar Straightening Machine, ensuring maximum search visibility.
  • OEM Dashboard & Assessment: For original manufacturers and creators, we guide you through the mandatory Quality Council of India (QCI) vendor assessments to successfully unlock your official OEM panel.
  • Profile Compliance & Caution Money: We manage your statutory documentation, brand approvals, and caution money limits to keep your account immune from technical suspensions.

Strategic Live Bid Participation

Beyond setup, we actively drive your market participation. Our team expertly handles the digital paperwork and rate configurations for GeM Custom Bids and Reverse Auctions (RA) related to Bar Straightening Machine, maximizing your chances of securing L1 status.

1.

How do I find government contracts exclusively matching my work in Bar Straightening Machine?

The easiest way is through the Tender18 platform. Instead of searching department by department, our system uses advanced keyword matching to gather all live supply, service, and execution tenders related directly to your core business in one place.

2.

Do I need specific testing or quality certificates to apply for these contracts?

It heavily depends on the nature of the work. For supply contracts, buyers often ask for ISO certifications, BIS marks, or specific lab testing reports. For service contracts, they may ask for labor licenses or past performance certificates (work orders).

3.

What is a BOQ and why is it important for my bid?

The Bill of Quantities (BOQ) is the official financial Excel sheet where you enter your competitive prices. Any mistake in this file—like adding extra rows, changing formulas, or saving it in the wrong format—will cause the portal server to reject your entire bid.

4.

Are samples required to be submitted physically before the digital bid opens?

For many product-based Bar Straightening Machine tenders, buying departments do ask bidders to submit physical samples to their office before the digital technical evaluation date. This requirement is always clearly mentioned in the official NIT document.

5.

How does the Dedicated Tender Expert from Tender18 help me?

Our assigned expert manages your total portal compliance. They extract the hidden rules from long tender PDFs, create a precise document checklist for your team, map your digital signature, and securely upload your technical and financial files onto the government servers.

6.

What is the role of a Digital Signature Certificate (DSC)?

A Class III DSC is a secure USB device that contains your digital identity. You cannot upload a bid without it. It is used to securely encrypt and lock your sensitive price data and technical documents so no one can view them before the official opening date.

7.

As an MSME, can I get financial benefits when bidding for Bar Straightening Machine?

Yes, the government strongly supports MSMEs. By uploading a valid Udyam Registration Certificate in the technical envelope, small businesses are frequently exempted from paying the initial Tender Document Fee and the Earnest Money Deposit (EMD).

8.

Why should I list my services or products on GeM for this category?

GeM is now the primary digital marketplace for all government agencies. If you are properly cataloged for Bar Straightening Machine, officers can view your profile and generate direct purchase orders or invite you to participate in exclusive Custom Bids.

9.

What makes Tender18 a reliable GeM support partner?

As a highly trusted and expert GeM consultant, Tender18 holds a proven support success ratio of over 95%. From flawless profile creation and complex catalogue mapping to OEM panel approvals and live Reverse Auction (RA) support, we handle it all seamlessly.

10.

What does "L1" mean in these government contracts?

"L1" stands for "Lowest Bidder 1". In government procurement, after all technical envelopes are approved, the financial sheets (BOQs) are opened. The bidder who has quoted the lowest compliant price for Bar Straightening Machine is declared L1 and is generally awarded the contract