Filters By:

T18 Ref No
Keyword
State
City
Agency
Tender ID
Due Date
Tender Source
Tender Type

Aligning pins Tenders List

Latest Aligning pins Tenders in India – Verified Leads & Real-Time Insights by Tender18

Finding the right Aligning pins tenders in India’s competitive e-procurement ecosystem requires more than just access—it demands accurate data, real-time monitoring, and expert analysis.

At Tender18 Infotech Private Limited, we bring deep industry experience in government procurement to help businesses identify, evaluate, and win Aligning pins tenders efficiently. With a centralized platform aggregating 1100+ live tenders, we provide a single, trusted source for opportunities from central, state, and PSU departments.


Real-Time Aligning pins Tender Intelligence & Monitoring

Our advanced dashboard delivers actionable insights and structured tender data, enabling you to make faster and smarter bidding decisions.

We categorize Aligning pins tenders into:

  • Supply Tenders – BOQs and specifications sourced from GeM and PSUs
  • Service Tenders – NITs and scope of work from CPPP and state portals
  • EPC Projects – Large-scale infrastructure tenders with financial and design data

✔ This structured approach ensures complete transparency and deeper bid analysis before submission.


Comprehensive Sources of Aligning pins Tenders

Tender18 acts as a centralized gateway by aggregating tenders from trusted and official sources:

  • Central Government Portals – CPPP, NIC, and Government e-Marketplace (GeM)
  • Railways & Transport – IREPS and Metro Rail projects
  • Power & Energy PSUs – NTPC, ONGC, NHPC, PowerGrid
  • Defense & Strategic Sectors – MES and DRDO tenders
  • State e-Procurement Portals – Gujarat, Maharashtra, Tamil Nadu, UP, and more

✔ Every listing is verified and regularly updated to maintain data accuracy and trust.


Step-by-Step Guide to Participate in Aligning pins Tenders

1. Eligibility & Prequalification

Before bidding, ensure compliance with:

  • Financial turnover requirements (30–50% of tender value)
  • Past experience (2–3 similar projects)
  • Valid solvency certificate

2. Mandatory Documentation Checklist

Prepare the following to avoid disqualification:

  • Digital Signature Certificate (Class 3 DSC)
  • GST, PAN, MSME/Udyam registration
  • EMD (Earnest Money Deposit) or exemption proof
  • Technical bid with execution methodology

3. BOQ Analysis & Financial Bidding

The BOQ (Bill of Quantities) is the most critical component:

  • Analyze item-wise pricing
  • Ensure competitive yet sustainable quotes
  • Avoid underbidding risks (L1 pressure)

✔ Expert analysis can significantly improve your bid success ratio.


Why Tender18 is a Trusted Platform for Aligning pins Tenders

✔ Proven Expertise in Government Procurement

We combine industry knowledge with practical bidding experience.

✔ Verified & Reliable Data

All Aligning pins tenders are sourced from official portals and cross-checked for accuracy.

✔ Advanced Filtering Tools

Filter tenders by value, EMD, location, and category for precise targeting.

✔ Corrigendum & Update Tracking

Get instant alerts on deadline changes and specification updates.

✔ Historical Data Insights

Analyze past tender results to understand pricing trends and competition.

✔ End-to-End Bidding Support

From discovery to submission, including GeM onboarding and strategy.


Growth of Aligning pins Sector in 2026

With the Government of India focusing on digital procurement and infrastructure expansion, the Aligning pins sector has seen significant growth in e-tendering opportunities.

The rise of GeM-based procurement models like:

  • L1 Purchase
  • Direct Procurement
  • MSME-friendly policies

…has made it easier for startups and SMEs to participate and win contracts


Frequently Asked Questions (SEO Optimized)

How can I get daily Aligning pins tender alerts?

You can register on Tender18 and select your preferred category. You will receive daily email alerts with all new Aligning pins tenders.

Is EMD mandatory for all Aligning pins tenders?

No, MSME and Udyam-registered businesses may get exemptions. Always check the NIT for specific conditions.

What is the difference between a Aligning pins work tender and supply tender?

A supply tender involves delivering goods, while a work tender includes execution, labor, and project completion.

Can I access private Aligning pins tenders on Tender18?

Yes, we also track major private sector and EPC tenders along with government opportunities.


Get Expert Support for Aligning pins Tenders

Tender18 is more than a listing platform—we are your strategic partner in winning tenders.

Our services include:

  • Tender discovery & analysis
  • Documentation support
  • Bid strategy & submission
  • GeM registration & OEM onboarding

📞 Call / WhatsApp: +91 7069661818
🌐 Website: www.tender18.com

T18 Ref No : 15443970
live Tender
Location : mainpuri , uttar pradesh
Source : GEM Tenders
live Tender

tender for carriage of distribution transformer 100 kva from esc mnp , carriage of distribution transformer 250 kva from esc mnp , carriage of acsr weasel conductor from esc mnp , carriage of m s earthing rod 20 x2540 mm from esc mnp , carriage of lt al. xlpe cable size 1x240 sq.mm. from esc mnp , carriage of lt xlpe cable 1x120 sq.mm. for dtr from esc mnp , carriage of lt xlpe cable 1x400 sq.mm. for dtr from esc mnp , carriage of lt xlpe cable size 3.5x70 or 35 sq.mm. from esc mnp , carriage of lt ab cable 3x120 1x95 1x16 sq.mm. from esc mnp , carriage of lt ab cable 3x50 1x35 1x16 sq.mm. from esc mnp , carriage of lt ab cable 3x95 1x70 1x16 sq.mm. from esc mnp , carriage of 33 kv xlpe cable 3x300 sq.mm. from esc mnp , carriage of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. from esc mnp , carriage of 33 kv straight through size 3x300 sq.mm. from esc mnp , carriage of g.i. wire 6 or 8 swg for guarding from esc mnp , carriage of three phase distribution box from esc mnp , erection of fixing of lt fuse set protection box with all respective accessories as per norms , execution of chemical earthing with g.i. patti clamp nut and bolts as per norms , erection of l.t. tail less unit with all respective material as grouted angel with fabrication work etc. , laying of acsr weasel conductor , laying of lt ab cable 3x120 1x95 1x16 sq.mm. , laying of lt ab cable 3x50 1x35 1x16 sq.mm. , laying of lt ab cable 3x95 1x70 1x16 sq.mm. , mounting of three phase distribution box , erection of double pole structure 8.5 mtr pcc pole , erection of single pole structure 8.5 mtrs pcc pole , erection of tri pole structure 33 kv 13 mtr st pole , grouting of pcc or stp pole , grouting of stay , earthing of pole , guarding of 11 kv line , fencing of 250 kva distribution transformers , plinth for 250 kva transformer , installation of 11by0.4 kv tf 25 kva , installation of 11by0.4 kv tf 63 kva , installation of 11by0.4 kv tf 100 kva , installation of 11by0.4 kv tf 250 kva , laying of 33 kv xlpe cable 3x300 sq.mm. , installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms. , dismentlling, received back and safe carriage of jarjar g.i. wire and weasel conducter including with rolling from pit site to esc, mainpuri , received back of distribution transformer after, boqbhogaon, clamp for 11 kv v type cross arm with bolts and nuts, three phase distribution box clamp with nut and bolts, connecting cable for distribution box 1x35 sq.mm., l.t. fuse set protection box with all accessories, tinned copper fuse wire different size, hdpe pipe 140 mm., stone pad 300x300x75, holding clamp for doulble pole unit with nut and bolts, ms angle 75x75x6x2028mm with clamp and bolt and nut t or f base, t off chhanel and t off clamp with nut and bolts, top chhanel 125x65x240, dropper channel 100x50x2028 mm., danger board with clamp and nut and bolt, chemical earthing with g.i. patti clamp nut and bolts as per norms, l.t. tail less unit with all respective material angel, patti and other material, copper l pieace 62x225x12mm., 11 kv f clamp with nut and bolts, suspension clamp, dead end clamp, eye i hook, eye bolts for guarding, j hook, lt clamp for pcc or stp with bolts and nuts, pearcing connector, alluminium lug 120 sq.mm., alluminium lug 240 sq.mm., alluminium lug 400 sq.mm., nut bolts and washers off size, guarding angel, guarding angel clamp, m.s. angel iron 65x65x6 mm. 2700 mm long bracing with 4 nos clamp with nut and bolts, 13 m stp pole sp55 galvanised, 8.5 m pcc pole, v type cross arm for 11 kv, 11 kv pin insulator with pin, disc insulator with fitting t and c 45 kn 114 nos and 70kn 27 nos, 11 kv fuse set, 11 kv tpmo with polymer insulator, complete stay 9gi stay rod 20x1800 mm stay wire 7 and 8 swg 10 kg stay clamp bolt nut and washer, distribution transformer 25 kva, distribution transformer 63 kva, distribution transformer 100 kva, distribution transformer 250 kva, acsr weasel conductor or insulated conductor as provided by department, m s earthing rod 20 x2540 mm, lt al. xlpe cable size 1x240 sq.mm., lt xlpe cable 1x120 sq.mm. for dtr, lt xlpe cable 1x400 sq.mm. for dtr, lt xlpe cable size 3.5x70 or 35 sq.mm., lt ab cable 3x120 1x95 1x16 sq.mm., lt ab cable 3x50 1x35 1x16 sq.mm., lt ab cable 3x95 1x70 1x16 sq.mm., 33 kv xlpe cable 3x300 sq.mm., 33 kv indoor or outdoor jointing kit size 3x300 sq.mm., 33 kv straight through size 3x300 sq.mm., g.i. wire 6 or 8 swg for guarding, three phase distribution box, fixing of l.t. fuse set protection box with all respective accessories as per norms, l.t. tail less unit with all respective material as grouted angel with fabrication work etc., laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr weasel conductor or insulated conductor as provided by department, laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x120 1x95 1x16 sq.mm., laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x50 1x35 1x16 sq.mm, laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x95 1x70 1x16 sq.mm., mounting of three phase distribution box with clamp nut & bolts and make proper connection with connecting cable., erection of double pole structure 8.5 mtr pcc pole by digging of pits fitting of all relevant accessories as per respo norms. 34 nos pole at different location under concern division., erection of single pole structure 8.5 mtrs pcc pole by digging of pits fitting of all relevant accessories as per respo norms. at different location under concern division., erection of tri pole structure 33 kv 13 mtr st pole by digging of pits fitting of all relevant accessories as per respo norms. 3 nos pole at different location under concern division., grouting of pcc or stp pole long as per respo norms with material cement, sand, blast stone with the ratio 0.268 cu.m. each will be provided by conractor, grouting of stay as per respo norms cement, sand, blast stone material will be provided by conractor, earthing of pole by m s earthing rod 20 x2540 mm with 6 swg earthing wire etc and make proper connection., guarding of 11 kv line with gaurding angel, clamp eye bolts and gaurding g.i. wire 6 or 8 swg 30 span, fencing of distribution transformers with enamel in proper alignment as per respo manual and as per direction of executive engineer including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work., plinth for 250 kva transformer proper size as per resspo norms, installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 25 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 63 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 100 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 250 kva with l.t. xlpe cable suitable size with all respective material as per norms., laying of following cable by hdd method with hdpe pipe (140 mm.) including digging and restoring along with brick and sand including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work. 33 kv xlpe cable 3x300 sq.mm., installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms., dismentlling of jarjar g.i. wire and weasel conducter including with rolling received back and safe carriage from pit site to esc, mainpuri, received back of distribution transformer after increasing capacity from pit site to esc, mainpuri ( 17 nos 100 kva)


Tender Value : 7000000
Due Date : Jun 10, 2026
T18 Ref No : 15443971
live Tender
Location : mainpuri , uttar pradesh
Source : GEM Tenders
live Tender

tender for , carriage of distribution transformer 250 kva from esc mnp , carriage of acsr rabbit conductor from esc mnp , carriage of acsr weasel conductor or insulated conductor as provided by department from esc mnp , carriage of m s earthing rod 20 x2540 mm from esc mnp , carriage of lt al. xlpe cable size 1x240 sq.mm. from esc mnp , carriage of lt xlpe cable 1x120 sq.mm. from esc mnp , carriage of 11 kv xlpe cable 3x185 sq.mm. from esc mnp , carriage of lt ab cable 3x120 1x95 1x16 sq.mm. from esc mnp , carriage of 33 kv xlpe cable 3x300 sq.mm. from esc mnp , carriage of 11 kv xlpe cable 3x300 sq.mm. from esc mnp , carriage of 11 kv indoor or outdoor jointing kit size 3x300 sq.mm. from esc mnp , carriage of 11 kv indoor or outdoor jointing kit size 3x185 sq.mm. from esc mnp , carriage of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. from esc mnp , carriage of 11 kv straight through size 3x185 sq.mm. from esc mnp , carriage of 11 kv vcb for og ctr 200by100by5a 350 mva 1250 amp. from esc mnp , carriage of 11 kv vcb ic ctr 600by300by5a 350 mva 1250 amp. from esc mnp , carriage of g.i. wire 6or8 swg for guarding from esc mnp , carriage of three phase distribution box from esc mnp , erection of fixing of l.t. fuse set protection box with all respective accessories as per norms , execution of chemical earthing with g.i. patti clamp nut and bolts as per norms , erection of l.t. tail less unit with all respective material as grouted angel with fabrication work etc. , laying of acsr rabbit conductor , laying of acsr weasel conductor or insulated conductor as provided by department , laying of lt ab cable 3x120 1x95 1x16 sq.mm. , mounting of three phase distribution box , erection of double pole structure , erection of single pole structure , grouting of pcc or stp pole , grouting of stay , earthing of pole , guarding of 11 kv line with gaurding angel etc , fencing of distribution transformers , make plinth for 250 kva transformer proper size as per resspo norms , installation of 11by0.4 kv tf 100 kva , installation of 11by0.4 kv tf 250 kva , laying of 11 kv xlpe cable 3x185 sq.mm. , laying of 11 kv xlpe cable 3x300 sq.mm. , laying of 33 kv xlpe cable 3x300 sq.mm. , installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms. , installation of 11 kv indoor or outdoor jointing kit size 3x185 sq.mm. as per norms. , installation of 11 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms. , installation of 11 kv straight through size 3x185 sq.mm. as per norms. , installation of 11 kv vcb og ctr 200by100by5a 350 mva 1250 amp. , installation of 11 kv vcb ic ctr 600by300by5a 350 mva 1250 amp. , dismentlling of old and damaged cable of different size , received back of distribution transformer after increasing, boqeudd, 11 kv v type cross arm clamp with bolts and nuts, three phase distribution box clamp with nut and bolts, connecting cable for distribution box 1x35 sq.mm., l.t. fuse set protection box with all accessories, tinned copper fuse wire different size, hdpe pipe 140 mm., stone pad 300x300x75, ms angle 75x75x6x2028mm with clamp and bolt and nut tf base, t off chhanel and t off clamp with nut and bolts, top chhanel 125x65x240, dropper channel 100x50x2028 mm., chemical earthing with g.i. patti clamp nut and bolts as per norms, l.t. tail less unit with all respective material angel, patti and other material, copper l pieace 62x225x12mm., 4 core lt mcb with box for 250 kva tf, 11 kv f clamp with nut and bolts, al. pg clamp weasel to weasel conductor, al. pg clamp rabbit to rabbit conductor, suspension clamp, dead end clamp, eye i hook, eye bolts for guarding, j hook, lt clamp for pcc or stp with bolts and nuts, pearcing connector, alluminium lug 120 sq.mm., alluminium lug 240 sq.mm., guarding angel, guarding angel clamp, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 8.5 m pcc pole, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 9 m stp pole sp 55 galvanised, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 m stp pole sp 55 galvanised, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 13 m stp pole sp 55 galvanised, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department v type cross arm for 11 kv, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv pin insulator with pin, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department disc insulator with fitting tandc 45 kn, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv fuse set, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv tpmo with polymer insulator, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department complete stay 9gi stay rod 20x1800 mm, stay wire 7 or 8 swg, 10 kg, stay clamp, bolt, nut and washer, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department distribution transformer 100 kva, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department distribution transformer 250 kva, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department acsr rabbit conductor, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department acsr weasel conductor or insulated conductor as provided by department, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department m s earthing rod 20 x2540 mm, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department lt al. xlpe cable size 1x240 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department lt xlpe cable 1x120 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv xlpe cable 3x185 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department lt ab cable 3x120 1x95 1x16 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 33 kv xlpe cable 3x300 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv xlpe cable 3x300 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv indoor or outdoor jointing kit size 3x300 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv indoor or outdoor jointing kit size 3x185 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 33 kv indoor or outdoor jointing kit size 3x300 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv straight through size 3x185 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv vcb for og ctr 200by100by5a 350 mva 1250 amp., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv vcb ic ctr 600by300by5a 350 mva 1250 amp., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department g.i. wire 6 or 8 swg for guarding, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department three phase distribution box, fixing of l.t. fuse set protection box with all respective accessories as per norms, l.t. tail less unit with all respective material as grouted angel with fabrication work etc., laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr rabbit conductor, laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr weasel conductor or insulated conductor as provided by department, laying, stringing, sagging, with all respective material clamp with nut and bolts suspension clamp eye j hook pearcing connector etc of following conductor cable on the erected supports, as per respo norms. lt ab cable 3x120 1x95 1x16 sq.mm., mounting of three phase distribution box with clamp nut & bolts and make proper connection with connecting cable., erection of double pole structure 11 mtr stp pole by digging of pits fitting of all relevant accessories as per respo norms. 22 nos pole at different location under concern division., erection of single pole structure 8.5 mtrs pcc pole, 9 mtr st, 11 mtr st pole, 13 mtr st by digging of pits fitting of all relevant accessories as per respo norms. at different location under concern division., grouting of pcc or stp pole long as per respo norms with material cement, sand, blast stone with the ratio 0.268 cu.m. each will be provided by conractor, grouting of stay as per respo norms cement, sand, blast stone material will be provided by conractor, earthing of pole by m s earthing rod 20 x2540 mm with 6 swg earthing wire etc and make proper connection., guarding of 11 kv line with gaurding angel, clamp eye bolts and gaurding g.i. wire 6 or 8 swg 60 span, fencing of distribution transformers with enamel in proper alignment as per respo manual and as per direction of executive engineer including the cost of arrangement of labour, t and p, carrier etc. required for proper completion of work., make plinth for 250 kva transformer proper size as per resspo norms, installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work. 11by0.4 kv tf 100 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work. 11by0.4 kv tf 250 kva with l.t. xlpe cable suitable size with all respective material as per norms., laying of following cable including digging and restoring along with brick and sand including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work. at different location under concern division.11 kv xlpe cable 3x185 sq.mm., laying of following cable including digging and restoring along with brick and sand including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work. at different location under concern division. 11 kv xlpe cable 3x300 sq.mm., laying of following cable by hdd method with hdpe pipe 140 mm. including digging and restoring along with brick and sand including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work. 33 kv xlpe cable 3x300 sq.mm., installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms., installation of 11 kv indoor or outdoor jointing kit size 3x185 sq.mm. as per norms., installation of 11 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms., installation of 11 kv straight through size 3x185 sq.mm. as per norms., installation of 11 kv vcb og ctr 200by100by5a 350 mva 1250 amp. and make proper connection as per norms., installation of 11 kv vcb ic ctr 600by300by5a 350 mva 1250 amp. and make proper connection as per norms., dismentlling of old and damaged cable of different size including with rolling received back and safe carriage from pit site to esc, mainpuri, received back of distribution transformer after increasing capacity from pit site to esc, mainpuri 30 nos 100 kva


Tender Value : 0
Due Date : Jun 10, 2026
T18 Ref No : 15443972
live Tender
Location : mainpuri , uttar pradesh
Source : GEM Tenders
live Tender

tender for supply of 11 kv v type cross arm clamp , supply of 3 phase dis. box clamp with nut and bolts , supply of connecting cable , supply of l.t. fuse set protection box , supply of tinned copper fuse wire different size , supply of hdpe pipe , supply of stone pad , supply of holding clamp , supply of ms angle , supply of t-off chhanel , supply of top chhanel 125x65x240 , supply of dropper channel 100x50x2028 mm. , supply of danger board with clamp and nut and bolt , supply of g.i. patti clamp nut and bolts , supply of l.t. tail less unit , supply of copper l-pieace , supply of 11 kv f clamp , supply of suspension clamp , supply of dead end clamp , supply of eye i hook , supply of eye bolts for guarding , supply of j hook , supply of lt clamp , supply of pearcing connector , supply of alluminium lug 120 sq.mm. , supply of alluminium lug 240 sq.mm. , supply of alluminium lug 70 sq.mm. , supply of nut bolts and washers off size , supply of guarding angel , supply of guarding angel clamp , supply of m.s. angel iron 65x65x6 mm. , carriage of 9 m stp pole-sp- 55 galvanised , carriage of 11 m stp pole-sp- 55 galvanised , carriage of 8.5 m pcc pole , carriage of v type cross arm for 11 kv , carriage of 11 kv pin insulator with pin , carriage of disc insulator with fitting t and c 45 kn , carriage of 11 kv fuse set , carriage of 11 kv tpmo with polymer insulator , carriage of complete stay , carriage of distribution transformer 25 kva , carriage of distribution transformer 63 kva , carriage of distribution transformer 100 kva , carriage of distribution transformer 250 kva , carriage of acsr dog conductor , carriage of acsr weasel conductor , carriage of m s earthing rod 20 x2540 mm , carriage of lt al. xlpe cable size 1x240 sq.mm. , carriage of lt pvc cable 1x120 sq.mm. for dtr , carriage of lt pvc armoured cable size 3.5x70 or 35 sq.mm. , carriage of 11, boqbpkarhalmnp, supply of clamp for 11 kv v type cross arm with bolts and nuts, supply of three phase distribution box clamp with nut and bolts, supply of connecting cable for distribution box 1x35 sq.mm., supply of l.t. fuse set protection box with all accessories, supply of tinned copper fuse wire different size, supply of hdpe pipe 140 mm., supply of stone pad300x300x75, supply of holding clamp for doulble pole unit with nut and bolts, supply of ms angle 75x75x6x2028mm with clamp and bolt and nutt or f base, supply of t-off chhanel+ t or f clamp with nut and bolts, supply of top chhanel 125x65x240, supply of dropper channel 100x50x2028 mm., supply of danger board with clamp and nut bolt, supply of chemical earthing with g.i. patti clamp nut and bolts as per norms, supply of pipe earthing with g.i. patti clamp nut and bolts as per norms, supply of l.t. tail less unit with all respective material angel, patti and other material, supply of copper l-pieace 62x225x12mm., supply of 11 kv f clamp with nut and bolts, supply of suspension clamp, supply of dead end clamp, supply of eye i hook, supply of eye bolts for guarding, supply of j hook, supply of lt clamp for pcc or stp with bolts and nuts, supply of pearcing connector, supply of alluminium lug 120 sq.mm., supply of alluminium lug 240 sq.mm., supply of alluminium lug 70 sq.mm., supply of nut bolts and washers off size, supply of guarding angel, supply of guarding angel clamp, supply of m.s. angel iron 65x65x6 mm., 2700 mm long bracing with 4 nos clamp with nut and bolts, carriage of 9 m stp pole-sp- 55 galvanised, carriage of 11 m stp pole-sp- 55 galvanised, carriage of 8.5 m pcc pole, carriage of v type cross arm for 11 kv, carriage of 11 kv pin insulator with pin, carriage of disc insulator with fitting tandc 45 kn, carriage of 11 kv fuse set, carriage of 11 kv tpmo with polymer insulator, carriage of complete stay 9gi stay rod 20x1800 mm, stay wire 7 or 8 swg, 10 kg, stay clamp, bolt, nut and washer, carriage of distribution transformer 25 kva, carriage of distribution transformer 63 kva, carriage of distribution transformer 100 kva, carriage of distribution transformer 250 kva, carriage of acsr dog conductor, carriage of acsr weasel conductor or or insulated conductor as provided by department, carriage of m s earthing rod 20 x2540 mm, carriage of lt al. xlpe cable size 1x240 sq.mm., carriage of lt pvc cable 1x120 sq.mm. for dtr, carriage of lt pvc armoured cable size 3.5x70 or 35 sq.mm., carriage of 11 kv xlpe cable 3x185 sq.mm., carriage of lt ab cable 3x120+1x95+1x16 sq.mm., carriage of lt ab cable 3x50+1x35+1x16 sq.mm., carriage of lt ab cable 3x95+1x70+1x16 sq.mm., carriage of lt pvc armoured cable size 4x25 sq.mm., carriage of 33 kv xlpe cable 3x300 sq.mm., carriage of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm., carriage of 11 kv indoor or outdoor jointing kit size 3x185 sq.mm., carriage of 33 kv straight through size 3x300 sq.mm., carriage of 11 kv straight through size 3x185 sq.mm., carriage of 11 kv vcb for o or g ctr 200 or 100 or 5a 350 mva1250 amp., carriage of g.i. wire 6 or 8 swg for guarding, carriage of three phase distribution box, fixing of l.t. fuse set protection box with all respective accessories as per norms, chemical earthing with g.i. patti clamp nut and bolts as per norms, pipe earthing with g.i. patti clamp nut and bolts as per norms, l.t. tail less unit with all respective material as grouted angel with fabrication work etc., laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr dog conductor., laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr weasel conductor, laying, stringing, sagging, with all respective materialclamp with nut and bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable3x120+1x95+1x16 sq.mm., laying, stringing, sagging, with all respective materialclamp with nut and bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable3x50+1x35+1x16 sq.mm., laying, stringing, sagging, with all respective materialclamp with nut and bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable3x95+1x70+1x16 sq.mm., mounting of three phase distribution box with clamp nut and bolts and make proper connection with connecting cable., erection of double pole structure 11 mtr stp pole by digging of pits fitting of all relevant accessories as per respo norms.26 nos pole at different location under concern division., erection of single pole structure 8.5 mtrs pcc pole, 9 mtr st and 11 mtr st pole by digging of pits fitting of all relevant accessories as per respo norms. at different location under concern division., grouting of pcc or stp pole long as per respo norms with materialcement, sand, blast stone with the ratio 0.268 cu.m. each will be provided by conractor, grouting of stay as per respo normscement, sand, blast stone material will be provided by conractor, earthing of pole by m s earthing rod 20 x2540 mm with 6 swg earthing wire etc and make proper connection., guarding of 11 kv line with gaurding angel, clamp eye bolts and gaurding g.i. wire 6 or 8 swg86 span, fencing of distribution transformers with enamel in proper alignment as per respo manual and as per direction of executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work., plinth for 250 kva transformer proper size as per resspo norms, installation of the following new transformers at various 11 or 0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper ht or lt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11 or 0.4 kv t or f 25 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11 or 0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper ht or lt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11 or 0.4 kv t or f 63 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11 or 0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper ht or lt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11 or 0.4 kv t or f 100 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11 or 0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper ht or lt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11 or 0.4 kv t or f 250 kva with l.t. xlpe cable suitable size with all respective material as per norms., laying of following cable including digging and restoring along with brick and sand including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work. at different location under concern division.11 kv xlpe cable 3x185 sq.mm., laying of following cable by hdd method with hdpe pipe140 mm. including digging and restoring along with brick and sand including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work. 33 kv xlpe cable 3x300 sq.mm., installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms., installation of 11 kv indoor or outdoor jointing kit size 3x185 sq.mm. as per norms., installation of 33 kv straight through size 3x300 sq.mm. as per norms., installation of 11 kv straight through size 3x185 sq.mm. as per norms., installation of 11 kv vcb and make proper connection as per norms., dismentlling of jarjar g.i. wire and weasel conducter including with rolling and safe carriage from pit site to esc, mainpuri, received back of distribution transformer after increasing capacity from pit site to esc, mainpuri 4 nos 10 or 16 kva


Tender Value : 6300000
Due Date : Jun 10, 2026
T18 Ref No : 14975278

tender for repair of mechanical equipment and capital repair in bar mill of lmmm aligning rollers:replacement of aligning rollers assembly, roughing stands(1 to 8):changing of universal shafts, vertical stands:changing of g/b.input universal shafts, moving rake:rectification of bend rakes, stands:revisioning of wobblers, rhhf:removal,revisioning&fixing of gearboxes, rhhf:roller water box seals changing, stands:replacement of wornout rest pads for std.shifting cylinder, intermediate & finishing stands:changing of horizontal universal shafts, stands:revisioning of pawl type catchers, stands:revisioning of spray pipes, stands:revisioning of int.& fin.screw down gearboxes, vert.stands:rectificaiton of lift table jamming, fixed rakes:rectification of bend rakes, cooling bed:replacement of brake slide levers, stands:replacement of spindle holder pipes, stands:changing of stand housing liners, stands:replacement of main water hoses, loopers:changing of looper wear plates, stands:revisioning of zapex coupling, stands:air flushing of spray pipes, stands:replacement of bottom spray pipes, cooling bed i & ii:inspection / changing of brake slide bearings (bs1,bs2 & sl), vertical strands:changing of floating shaft, rhhf:revisioning of blowers, rhhf:replacement of rollers, stands:replacement of cross assembly for u-shaft , stands:replacement of sliding plates, roughing stands revisioning of s/d gearboxes, roughing stands:replacement of s/d gearboxes, vertical stands:replacement of output shafts, rotary shear pinch roll:revisioning of gearbox, rotary shear pinch roll:replacement of gearbox, roller table:replacement and conditioning of rollers, run in trough:adjustment of turnbuckles, aligning device:assembly of aligning rollers, aligning device:replacement & revisioning of u-shafts, stand changing car:replacement of unlocking bolts of stand shifting cylinder, roll changing rig:replacement of rig nut, roll changing rig:replacement of screw, roll changing rig:revisioning of carriage, roll changing rig:revisioning of gearbox, vertical stands revisioning & replacement of wobblers, roller reclamation as per scope of work enclosed-dismantling of roller assembly., roller reclamation as per scope of work enclosed-build up of roller, roller reclamation as per scope of work enclosed-assembly of the roller, dismantling of roller hearth furnace rollers, assembling of roller hearth furnace rollers, replacement of run out roller table rollers in finishing area of barmill, dismantling & assembling of run out roller table rollers in finishing area of barmill, build up & grinding of aligning roller, replacement of drive shaft for roller barrel, rhhf:fabrication & erection of damaged deslagging doors, stands:chang.of bed plates-finishing group, vertical stands:revisioning of lift table gearboxes, rhhf:replacement of entry & exit doors, cooling bed:changing of separating ledges, rhhf:replacement of explosion flaps, rhhf:revisioning,assembling,replacement & aligning of rollers, pinch roll(rhhf):revisioning of top roll, pinch roll(rhhf):revisioning of bottom roll, roughing stands(h1-h4):revisioning and replacement of s/d gearboxes, vertical stands:replacement of main drive gearbox, run in trough:replacement of brakeslide straps, cooling bed:assembly and replacement of moving rakes, cooling bed:assembly and replacement of fixed rakes, combined hor.&vert.looper:replacement of base frame, stand changing car replacement of liners, dual rotary shear:replacement of scarp chute, rhhf:revisioning & replacement of gas pipe line assembly, run in troughs(cooling bed):revisioning of drive gearboxes of bs1,bs2&separating ledges assembly, stands:revisioning of trestle assembly, rhhf replacement of gas compensators, stand changing car replacement of covers, pendulum shear:revisioning of drive crank & assembly, rhhf:fabrication of shell assembly, rhhf:replacement of shell assembly, cooling bed:replacement of drive gear coupling, replacement of aligning roller table turnbuckles, replacement of bs1,bs2 & sl graphite bushes and bearings, replacement of bs1,bs2 & sl lever pins, replacement and revisioning of cuttler hammer brakes of moving rake and chain drive, replcement and revisioning of pneumatic disc brake assembly of bs2 drive, replacement of counter weight bracket and pins of chain 2, replacement of run in trough turnbuckles and pins, revisioning of moving rake long shaft plummer blocks and split bearings, replacement of moving rake long shaft broken coupling bolts, replacement/revisioning of drive lever and crank assembly of bs1,bs2 and sl


Tender Value : 2191138
Due Date : Apr 12, 2026
T18 Ref No : 15266936
Source : GEM Tenders

tender for item 1 , item 2 , item 3 , item 4 , item 5, augmentation of building, augmentation of building 1, augmentation of building 2, augmentation of building 3, augmentation of building 4, augmentation of building 5 supplying and placing in position main table,eru & pedestal of the following specifications. the main table shall be of size 3600 width mm x 1080 mm depth x 750 mm height. top surface of the table shall made up of mdf (medium density fibre ) board duly finished with veneer and final coating of pu. the main desk should contain in smart case - space slides effortlessly in style.the mobile pedestal shall be of size 480 width mm x 640 depth mm x 600 height mm. mobile pedestal shall be coated of mdf (medium density fiber) with veneer coating and pu coating.the eru top shall be of mdf (medium density fiber) board duly finished with veneer and final pu coating. size of eru top 1900 width mm x 480 depth mm x 550(not from ground with castors).the main desk is provided eith the wire management system also there is perfect storage side unit . 1 2 supplying and placing in position back unit of the following specifications. the size of the back unit shall be 1000 mm width x 480 mm depth x 2035 mm height. the back unit shall be made up of mdf board duly finished with veneer & final finish by pu coating. the mobile unit can be bought in multiples.pu coating hardness 1.5h. 2 3 providing, supplying and placing of 3 seater sofa. dimensions w x h x d (cm)222 x 103 x 89 .nomenclature & dimensions (mm): tolarence + / - 10 mm code description specification code description specification a total width 2220 b total depth 890 c total height 1030 d seating area width 1720 e seating area depth 520 f seating area height from ground 510 g arm height 645 h arm width 250 i back height from arm 420 j back width 2060 k arm depth 610 l leg height 70 m back height from seat 660 n lumbar height from seat 410 stitching: thread : polyester pitch :- 4 ( type of thread : nylon , polyester) ( pitch of thread i.e. stitch per inch) no. of ply in thread : 3 stitching tolarence : 10 mm minimum tex # (tkt #): 75 tkt leather/pvc/fabric: (pu/pvc/cotton/ polyester/ composite) pigmented leather + pvc thickness (mm) :leather=1.5mm / pvc=0.38mm weight (gsm) : pvc=750gsm tensile strength {wrap/weft} (kg/cm) : leather=300kg/cm2 + pvc=100kg/cm2 bursting strength (kg/cm2) : adhesion (pvc/pu backing) (kg/cm) : colour fastness to rubbing {dry /wet} (scale 1-5) : leather=5 / pvc=3 frame material (tropical wood / pine wood/ rubber wood): pine wood moisture content ( recommended 12 – 18 %) :15% anti – tremite treatment (recommended borex powder treatment) : kiln drying : conventional thickness of plywood used(mm) : 3mm/9mm/12mm/18mm standard of plywood used: commercial plywood seat foam: (density, type) * provide weight of recron filling used per seat* thickness (mm) : 127mm density (kg/m3): 27 kg/m3 + 30 kg/m3 type of foam (virgin/composite/moulded/ slabstock) : virgin * please provide layerwsie detail of foam used along with details of density & thickness* back foam: (density, type) * provide weight of recron filling used per seat* thickness (mm) : recron filling 1.0kg /seat density (kg/m3): n/a type of foam (virgin/composite/moulded/ slabstock) : n/a * please provide layerwsie 1 detail of foam used along with details of density & thickness* armrest foam: (density, type) * provide weight of recron filling used per seat* thickness (mm) : 38mm density (kg/m3): 27 kg/m3 + 30 kg/m3 type of foam (virgin/composite/moulded/ slabstock) : virgin * please provide layerwsie detail of foam used along with details of density & thickness* belt/ webbing material: width of belt (mm) : n/a. total length of belt used (mm): n/a. tensile strength (kg/cm) : n/a. recommended 3-4 vertical & 3 horizontal webbing mesh & 50 % stretch while fixing spring details ( s-spring / pocket spring): thickness of s-spring (mm) : 4.0mm & 34mm width number of springs used: -4 s-springs (zig-zag springs) + 1 tie rods/ seat length of s-spring used (mm) : n/a. number of pocket springs per seat: n/a. thickness of pocket spring (mm) : n/a. * provide details of number of pocket springs & pitch * leg material: * fixing of leg : (self tapping screw / insert with metric threading) :- n/a * material of leg : (plastic / insert moulding / wooden/ ms + chrome plating / ss) :- n/a * bush for leg bottom : (pvc bush / felt pad) :- n/a bonding solution: * type of glue used : (synthetic / rubber base/ water base/ solvent base) : rubber base glue * material handling data sheet (msds) for glue polyester fibre fill : * denier : 13 * fiber hollowness : 100% * siliconized fibre * conjugated fibre stapling pins: * size of pin : (zinc plated) yes * no. of pins : bottom non-woven cloth : * gsm : 100 gsm non woven cloth * colour : black colour metal under structure detail : * bedstead size : (in mm) * pipe / tube section : ( l x b x thickness) * mesh size : ( thickness & mesh square size) plating/ coating : type of plating : powder coating salt spray test : (in hours) recommended 96 hrs of salt spray for plating & 250 hrs for coating mechanism : manual / automatic : manual mechanism make : allstar warranty of mechanism : (recommended 3 years warranty on mechanism) actuator power rating : packing specs: carton ply gsm :- number of ply : bursting strength (kg/m2) : recommended 22 – 24 bs 5 ply gsm of paper : 200-180-180- 180-180 other remarks: as per specification or picture warranty : 2 years warranty for sofa upholstery 3 years warranty for recliner mechanism 4 providing, supplying and placing of 1 seater sofa. dimensions w x h x d (cm) 107 x 103 x 89. nomenclature & dimensions (mm): tolarence + / - 10 mm code description specification code description specification a total width 1070 b total depth 890 c total height 1030 d seating area width 580 e seating area depth 520 f seating area height from ground 510 g arm height 645 h arm width 250 i back height from arm 420 j back width 925 k arm depth 610 l leg height 70 m back height from seat 660 n lumbar height from seat 410 stitching: thread : polyester pitch :- 4 ( type of thread : nylon , polyester) ( pitch of thread i.e. stitch per inch) no. of ply in thread : 3 stitching tolarence : 10 mm minimum tex # (tkt #): 75 tkt leather/pvc/fabric: (pu/pvc/cotton/ polyester/ composite) pigmemted leather + pvc thickness (mm) :leather=1.5mm / pvc=0.38mm weight (gsm) : pvc=750gsm tensile strength {wrap/weft} (kg/cm) : leather=300kg/cm2 + pvc=100kg/cm2 bursting strength (kg/cm2) : adhesion (pvc/pu backing) (kg/cm) : colour fastness to rubbing {dry /wet} (scale 1-5) : leather=5 / pvc=3 frame material (tropical wood / pine wood/ rubber wood): pine wood moisture content ( recommended 12 – 18 %) :15% anti – tremite treatment (recommended borex powder treatment) : kiln drying : conventional thickness of plywood used(mm) : 3mm/9mm/12mm/18mm standard of plywood used: commercial plywood seat foam: (density, type) * provide weight of recron filling used per seat* thickness (mm) : 127mm density (kg/m3): 27 kg/m3 + 30 kg/m3 type of foam (virgin/composite/moulded/ slabstock) : virgin * please provide layerwsie detail of foam used along with details of density & thickness* back foam: (density, type) * provide weight of recron filling used per seat* thickness (mm) : recron filling 1.0kg /seat density (kg/m3): n/a type of foam (virgin/composite/moulded/ slabstock) : n/a * please provide layerwsie detail of foam used along with details of density & thickness* armrest foam: (density, type) * provide weight of recron filling used per seat* thickness (mm) : 38mm density (kg/m3): 27 kg/m3 + 30 kg/m3 type of foam (virgin/composite/moulded/ slabstock) : virgin * please provide layerwsie detail of foam used along with details of density & thickness* belt/ webbing material: width of belt (mm) : n/a. total length of belt used (mm): n/a. tensile strength (kg/cm) : n/a. recommended 3-4 vertical & 3 horizontal webbing mesh & 50 % stretch while fixing spring details ( s-spring / pocket spring): thickness of s-spring (mm) : 4.0mm & 34mm width number of springs used: 4 s-springs (zig-zag springs) + 1 tie rods per seat length of s-spring used (mm) : n/a. number of pocket springs per seat: n/a. thickness of pocket spring (mm) : n/a. * provide details of number of pocket springs & pitch * leg material: * fixing of leg : (self tapping screw / insert with metric threading) :- n/a * material of leg : (plastic / insert moulding / wooden/ ms + chrome plating / ss) :- n/a * bush for leg bottom : (pvc bush / felt pad) :- n/a bonding solution: * type of glue used : (synthetic / rubber base/ water base/ solvent base) : rubber base glue * material handling data sheet (msds) for glue polyester fibre fill : * denier : 13 * fiber hollowness : 100% * siliconized fibre * conjugated fibre stapling pins: * size of pin : (zinc plated) yes * 2 no. of pins : bottom non-woven cloth : * gsm : 100 gsm non woven cloth * colour : black colour metal under structure detail : * bedstead size : (in mm) * pipe / tube section : ( l x b x thickness) * mesh size : ( thickness & mesh square size) plating/ coating : type of plating : powder coating salt spray test : (in hours) recommended 96 hrs of salt spray for plating & 250 hrs for coating mechanism : manual / automatic : automatic mechanism make : allstar warranty of mechanism : (recommended 3 years warranty on mechanism) actuator power rating : 50w packing specs: carton ply gsm :- number of ply : bursting strength (kg/m2) : recommended 22 – 24 bs 5 ply gsm of paper : 200-180-180- 180-180 other remarks: as per specification or picture warranty : 2 years warranty for sofa upholstery 3 years warranty for recliner mechanism & actuator 5 providing, supplying and placing of coffee table overall size : width: 100cm depth : 65cm height : 43cm table materials: glass of 08 mm thk tempered, solid rubber woood legs and frame, ms sheet as bottom shelf .decoration materials & specifications: (density / type): pu coating to the rubber wood parts, clear glass rubber wood understructure with 12 mm tempered glass top. ms sheet at the base, with a laser-cut floral design, can be used as a display shelf.tapered legs with enhanced aesthetics 1 6 providing, supplying and placing of high back chair. seat assembly: the cushioned seat inner is made of injection moulded glass filled polyamide.upholstered seat sub-assembly consists of moulded high resilience (hr) polyurethane foam of density 45±2 kg/m³, and hardness load 16 ± 2 kgf as per is:7888 for 25% compression. *seat size: 45.5cm. (d) x 52.4cm. (w) back assembly: the cushioned back is made of pu foam with polypropylene injection molded plastic inner. *high back size: 50.5 cm. (w) x 76.7 cm. (d) armrests: the armrest having four range of adjustment · height adjustment sub assembly is inserted in the aluminum die cast arm body & all other adjustment are provided in adjustable arm top sub assembly. · up-down adjustment has 8 position (10.5±0.5cm range) · arm top swivel adjustment- 2 position, 12°±2° swivel inside · arm top width adjustment - any position (2.0±0.5cm range each arm top) · arm top to - fro adjustment- any position (4.0±0.5cm range) · armrest top is made up of high density pu molded over glass filled polyamide inner. posture perfect mechanism: the adjustable tilting mechanism is designed with the following features: · 360° revolving type. · forward tilt of sesat and back. · upright tilt lock. · tilt tension adjustment can be operated in seating position. · 3-position tilt limiter. seat depth adjustment: seat depth adjustment is housed below the seat and integrated with the mechanism with help of polypropene seat cover. seat depth can be adjusted in sitting position. seat depth adjustment range is of 5.0±0.5 cm. adjustable back support: back assembly is connected to buff polish die cast aluminum spine with an up-down mechanism assembly. back height can be adjusted in sitting position. it can be adjusted in the range of 7.5±0.5 cm. pneumatic height adjustment: the heavy duty class 4 pneumatic height adjustment has an adjustment stroke of 13.0±0.3 cm. pedestal: the pedestal is made of die-cast aluminium with buffing finish. it is fitted with 5nos. twin wheel castor. the pedestal is 67.0 ± 0.5cm pitchcenter dia. twin wheel castor: 5 nos. twin wheel soft castors are injection moulded in poly-amide with pu lining, having 6.5±0.1cm wheel diameter and assembled to pedestal. width (w): 74.0 cm. depth (d): 74.0 cm. height (h): 112.0 - 132.5 cm. seat height (sh): 44.5 - 58.0 cm. 2 7 providing, supplying and placing of visitor chair. chair upperstructure: it is a single shell 1.2 ±0.1cm. thick hot pressed plywood with moulded polyurethane foam on top & backing foam on rear side. it is upholstered with option of knitted & leatherette fabric.the seat has extra thick foam on front edge to give comfort to popliteal area.the foam backing done in back for extra fluffiness and comfort in chair. seat & back high resilience (hr) polyurethane foam :the hr polyurethane foam for seat and back is moulded with density 45 +/-2 kg/m³ and hardness load 16 ± 2 kgf as per is:7888 at 25% compression. m.s. visitor tubular frame : the powder coated (dft 40-60 micron) tubular frame is cantilever type & made of ø2.54±0.03 cm x 0.2±0.016 cm thk ms erw tube. armrests:the armrest top is moulded from polyurethane(pu) with metal insert and mounted on to a tubular frame. width (w): 60.5 cm. depth (d): 65.0 cm. height (h): 86.5 cm. seat height (sh): 46.0 cm 6 8 supplying and placing in position conference table of the following specifications. its size shall be 2400 width mm x 1200 depth mm x 750 height mm . top work surface shall be 12 mm thick tougher glass with back painted design on to under side and crystal edge polish finish . the construction shall be knock down construction . the understructure shall have all panels made from 36 mm thick pre-laminated board with 2 mm thick pvc edge beading . understructure also consists of storage for cpu , projector and paper storage . provision for glass adjustment for glass aligning . the wire management shall have legrand electricals used for wire management on tocentre support beam panel and cpu storage area for socket connections ,rj11,rj45 . 1 9 providing, supplying and placing of high back chair. seat/back assembly: the seat should be made up of 1.2 ±0.1cm. thick hot pressed plywood upholstered with fabric or synthetic leather and moulded polyurethane foam. the back should be made up 1.2 ±0.1cm. thick hot pressed plywood and upholstered with replaceable fabric or synthetic leather upholstery covers and moulded polyurethane foam. the back ply and foam should be designed with contoured lumber support for comfortable seating posture. back size: 48cm.(w) x 76.0cm.(h) seat size: 51.0cm.(w) x 48.0cm.(d) high resilience (hr) polyurethane foam: the hr polyurethane foam for seat and back should be moulded with density = 45 +/-2 kg/m³ and hardness load 16 ± 2 kgf for 25% compression. armrests :the armrest top should be made of moulded polyurethane (p.u) and mounted on to a drop lift height adjustable type m.s. tubular armrest support chrome plated. the armrest height should be adjustable up to 6.5±0.5cm. in 5 steps . knee tilt synchro mechanism with seat depth adjustment mechanism: the mechanism should be designed with the following features: • 360° revolving type single point control. • front pivot for tilt with feet resting on ground ensuring more comfort. • tilt tension adjustment. • 4-position locking with anti-shock feature. • seat back tilting ratio of 1:2 • seat depth adjustment of 6.0 ±0.5cm. can be locked in 6 positions adjustable backrest: the backrest consshould be ts of a sliding up down mechanism, which can be adjusted in the range of 7.5±0.5cm. and can be locked in 5 positions for correct position of lumber support. pneumatic height adjustment: the pneumatic height adjustment has an adjustment of 10.0±0.3cm. pedestal assembly: the pedestal should be fabricated from 0.2 ± 0.02 cm thick hr sheet . chrome plated and assembled with injection moulded black polypropylene hub cap and 5 nos. twin wheel castors. the pedestal should be 66.0±0.5cm. pitch-center dia. (76.0±1.0 cm with castors). twin wheel castors the twin wheel castors should be injection moulded in black nylon. overall dimensions of chair seat height - min 47.5 to max 57.5cm. height - min 103.5 to max 120.5cm. width & depth of chair as measured from pedestal - width-76.0 cm and depth-76.0 cm. 8 10 providing, placing and supplying of table: high-density high moisture resistance (hdhmr) worktop : worktop is made of 25mm thick pre-laminated hdhmr board. all edges of work surfaces shall provide with machinepessed 2mm thick pvc lipping glued with hot melt eva glue. the work tops are available in square (900x900). trio leg for 4 legged table: trio legs is fabricated from combination of 1.2 mm, 2 mm thk crca (as per is: 513), 3mm, 5mm thk hr (as per is: 2062) which has a triangular shape. argo shield welding is used for fabrication. this is a three dimensional leg which has inclination in 2 planes, it has a ball socket m8 leveler with bottom translucent cap, that allows adjustment up to 50 mm height. the whole structure is epoxy polyster powder coated (dft 40-60 microns). it is assembled using alloy steel hardware (ni / zn plated). cross member / connector : cross members in the upbeat system are made from 50 mm x 25 mm x 1.2mm thk (as per is: 7138 erw). cross members are assembled by friction fit pdc joinery and grub screws. the whole structure is epoxy polyster powder coated (dft 40-60 microns). it is assembled using alloy steel hardware (ni / zn plated). cross are available in 3 lengths, viz.: ( 350mm, 1100mm & 1700mm). 1 11 providing, placing and supplying of wood chair. wood understructure assembly: the under structure is made up of solid steamed beech wood of first grade and adjustable plinth screw. u/s assembly: 51.7cm (w) x 50cm (d) x 36.7cm (h) seat assembly: the seat is made up of 1.2 ± 0.1 cm thick hot - pressed plywood moulded by high resilience pu foam -density:65 ± 5kg/cu.m and upholstered with fabric. seat assembly: 49.5cm (w) x 47.6cm (d) x 8.3cm (h). back assembly: the back is made up of dia. 1cm ms rod -is:2062 and 0.6cm thk hr plate -is:2062 welded together and moulded by high resilience pu foam -density:65 ± 5kg/cu.m and upholstered with fabric. back assembly: 62.5cm (w) x 49.7cm (d) x 46.5cm (h). width: 62.5cm depth: 63.3cm height: 78.4cm seat height: 45cm


Tender Value : 40000000
Due Date : May 26, 2026