tender for soil investigation for augmentation of water storage and distribution system , mobilization of boring equipment , setting of drilling rig , drilling of bore hole , laboratory investigation , determination of chemical properties , conducting plate load test , determination of physical and chemical properties , determination of rl on ground level , preparation and submission of investigation report, geo investigation for augmentation of water storage and distribution system at ina ezhimala, providing access to the site,clearing site and making good to erecting and conducting soil testing transfers within the site and for any other temporary arrangements to be erected within the area in connection with conducting soil testing (03 locations), mobilization of boring equipment for soil investigation and demobilization of equipment after completion of work, setting of drilling rig at each bore locations, drilling of borehole, trial pits 01 no for ph and bore hole for ug sump-03 nos and ph - 01 no. boreholes will be made using rotary drilling and representative soil samples shall be collected from the boreholes at every 1m interval or change of strata. the diameter of boreholes will be 150mm as per is-1892.the borehole shall be terminated at 15 m below existing ground level (egl) or upto hard rock strata which is occur earlier. the following shall be carried out (i) field investigation shall be carried out on top of the ground level of each borehole shown as a drawing. (ii) standard penetration test will be carried out as per is 2131-1981 at 1m interval or change in strata. the spt consists of driving split spoon sampler 63.5 kg hammer drop weight with free fall of 760 mm. the number of blows for every 150 mm shall be recorded for a penetration of 450 mm (a) trial pit 01 each and (b) bore hole 06 each., laboratory investigation - the soil samples be tested in the laboratory to evaluate the following. a)type of soil and its gradation b)consistency limit c)natural density d)natural water content e)shear tests, determination of chemical properties - the soil samples be tested in the laboratory to evaluate the following a) ph b) sulphur content c) chloride content, conducting plate load test and submission of soil bearing capacity report for proposed different site including mobilization of equipment, excavation, testing and submission of detailed geotechnical report. (a) excavation up to required testing depth. (b) providing all labour, hydraulic jack, reaction arrangement, loading platform, test plates, measuring gauges and accessories. (c) recording settlement observations at various loading stages (24 hrs). determination of (d) safe bearing capacity (sbc) (e) settlement characteristics (f) modulus of subgrade reaction (g) submission of detailed soil investigation and test report with recommendations for foundation design. the final report shall contain (a) site observations (b) test methodology (c) load vs settlement curves (d) safe bearing capacity calculations (e) foundation recommendations (f) settlement analysis (g) photographs of testing, determination of physical and chemical properties of ground water shall include tests for ph, total hardness, etc, determination of rl of ground level/founding level with reference to a bm using topographic survey (03 locations), preparation and submission of investigation report for suitable foundation which includes a) sbc should be worked out for following size of isolated footing / raft foundation. i)1.5x1.5 m ii) 1.5x2.5 m iii) 2.0x2.5 m iv)2.0x3.0 m b) photographic record of geo exploration as well as testing. c) recommendation as regards possibility of liquefaction of soil in case of saturated or partially saturated loose or uncompacted sandy soil. d) swelling index and swelling pressure in respect of black cotton soil and its depth or layer. e) depth of ground water table(gwt) in peak mansoon(lowest) peak summer (highest)after correlation of result with seasonal variation of water table in proposed site.lab testing, borelogs, recommendation of foundation type and bearing capacity including vetting by any govt engg colleges.

Latest Tender Detail from indian army for the tender for soil investigation for augmentation of water storage and distribution system , mobilization of boring equipment , setting of drilling rig , drilling of bore hole , laboratory investigation , determination of chemical properties , conducting plate load test , determination of physical and chemical properties , determination of rl on ground level , preparation and submission of investigation report, geo investigation for augmentation of water storage and distribution system at ina ezhimala, providing access to the site,clearing site and making good to erecting and conducting soil testing transfers within the site and for any other temporary arrangements to be erected within the area in connection with conducting soil testing (03 locations), mobilization of boring equipment for soil investigation and demobilization of equipment after completion of work, setting of drilling rig at each bore locations, drilling of borehole, trial pits 01 no for ph and bore hole for ug sump-03 nos and ph - 01 no. boreholes will be made using rotary drilling and representative soil samples shall be collected from the boreholes at every 1m interval or change of strata. the diameter of boreholes will be 150mm as per is-1892.the borehole shall be terminated at 15 m below existing ground level (egl) or upto hard rock strata which is occur earlier. the following shall be carried out (i) field investigation shall be carried out on top of the ground level of each borehole shown as a drawing. (ii) standard penetration test will be carried out as per is 2131-1981 at 1m interval or change in strata. the spt consists of driving split spoon sampler 63.5 kg hammer drop weight with free fall of 760 mm. the number of blows for every 150 mm shall be recorded for a penetration of 450 mm (a) trial pit 01 each and (b) bore hole 06 each., laboratory investigation - the soil samples be tested in the laboratory to evaluate the following. a)type of soil and its gradation b)consistency limit c)natural density d)natural water content e)shear tests, determination of chemical properties - the soil samples be tested in the laboratory to evaluate the following a) ph b) sulphur content c) chloride content, conducting plate load test and submission of soil bearing capacity report for proposed different site including mobilization of equipment, excavation, testing and submission of detailed geotechnical report. (a) excavation up to required testing depth. (b) providing all labour, hydraulic jack, reaction arrangement, loading platform, test plates, measuring gauges and accessories. (c) recording settlement observations at various loading stages (24 hrs). determination of (d) safe bearing capacity (sbc) (e) settlement characteristics (f) modulus of subgrade reaction (g) submission of detailed soil investigation and test report with recommendations for foundation design. the final report shall contain (a) site observations (b) test methodology (c) load vs settlement curves (d) safe bearing capacity calculations (e) foundation recommendations (f) settlement analysis (g) photographs of testing, determination of physical and chemical properties of ground water shall include tests for ph, total hardness, etc, determination of rl of ground level/founding level with reference to a bm using topographic survey (03 locations), preparation and submission of investigation report for suitable foundation which includes a) sbc should be worked out for following size of isolated footing / raft foundation. i)1.5x1.5 m ii) 1.5x2.5 m iii) 2.0x2.5 m iv)2.0x3.0 m b) photographic record of geo exploration as well as testing. c) recommendation as regards possibility of liquefaction of soil in case of saturated or partially saturated loose or uncompacted sandy soil. d) swelling index and swelling pressure in respect of black cotton soil and its depth or layer. e) depth of ground water table(gwt) in peak mansoon(lowest) peak summer (highest)after correlation of result with seasonal variation of water table in proposed site.lab testing, borelogs, recommendation of foundation type and bearing capacity including vetting by any govt engg colleges. in kannur, kerala,. Reference number 16344752. Don't miss out on this chance to be part of a significant project. Register for free today to access the complete tender details and download the necessary documents. Seize the opportunity with Tender 18!

T18 Ref No:16344752
Tender ID:GEM/2026/B/7756626
Tender Agency:indian army
City:kannur
State:kerala
Tender Related Keywords :
Description :
total quantity = 32 ----- document required from seller = experience criteria,past performance,bidder turnover ----- evaluation method = total value wise evaluation
T18 Ref No:16344752Tender Value:1180000
Tender ID:GEM/2026/B/7756626Tender EMD:Refer Document
Tender Agency:indian armyTender Fee:Refer Document
City:kannurPublished Date:Jul 21, 2026
State:keralaDue Date:Jul 31, 2026
Tender Related Keywords :laboratory investigation, temporary arrangements, geotechnical report, soil investigation, topographic survey, hydraulic jack, water storage, natural water, water content, soil testing, soil bearing, water table, bearingTender Opening Date:Jul 31, 2026
Description :total quantity = 32 ----- document required from seller = experience criteria,past performance,bidder turnover ----- evaluation method = total value wise evaluation

Get Complete Tender Documents to Participate

Tender NoticeBOQEligibilityEMD DetailsImportant Dates
We take all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.

Browse GeM Portal Tenders

This Government Tender has been Published  by Indian Army for work related to laboratory investigation,temporary arrangements,geotechnical report,soil investigation,topographic survey,hydraulic jack,water storage,natural water,water content,soil testing,soil bearing,water table,bearing in Kannur, Kerala. The Tender work is tender for soil investigation for augmentation of water storage and distribution system , mobilization of boring equipment , setting of drilling rig , drilling of bore hole , laboratory investigation , determination of chemical properties , conducting plate load test , determination of physical and chemical properties , determination of rl on ground level , preparation and submission of investigation report, geo investigation for augmentation of water storage and distribution system at ina ezhimala, providing access to the site,clearing site and making good to erecting and conducting soil testing transfers within the site and for any other temporary arrangements to be erected within the area in connection with conducting soil testing (03 locations), mobilization of boring equipment for soil investigation and demobilization of equipment after completion of work, setting of drilling rig at each bore locations, drilling of borehole, trial pits 01 no for ph and bore hole for ug sump-03 nos and ph - 01 no. boreholes will be made using rotary drilling and representative soil samples shall be collected from the boreholes at every 1m interval or change of strata. the diameter of boreholes will be 150mm as per is-1892.the borehole shall be terminated at 15 m below existing ground level (egl) or upto hard rock strata which is occur earlier. the following shall be carried out (i) field investigation shall be carried out on top of the ground level of each borehole shown as a drawing. (ii) standard penetration test will be carried out as per is 2131-1981 at 1m interval or change in strata. the spt consists of driving split spoon sampler 63.5 kg hammer drop weight with free fall of 760 mm. the number of blows for every 150 mm shall be recorded for a penetration of 450 mm (a) trial pit 01 each and (b) bore hole 06 each., laboratory investigation - the soil samples be tested in the laboratory to evaluate the following. a)type of soil and its gradation b)consistency limit c)natural density d)natural water content e)shear tests, determination of chemical properties - the soil samples be tested in the laboratory to evaluate the following a) ph b) sulphur content c) chloride content, conducting plate load test and submission of soil bearing capacity report for proposed different site including mobilization of equipment, excavation, testing and submission of detailed geotechnical report. (a) excavation up to required testing depth. (b) providing all labour, hydraulic jack, reaction arrangement, loading platform, test plates, measuring gauges and accessories. (c) recording settlement observations at various loading stages (24 hrs). determination of (d) safe bearing capacity (sbc) (e) settlement characteristics (f) modulus of subgrade reaction (g) submission of detailed soil investigation and test report with recommendations for foundation design. the final report shall contain (a) site observations (b) test methodology (c) load vs settlement curves (d) safe bearing capacity calculations (e) foundation recommendations (f) settlement analysis (g) photographs of testing, determination of physical and chemical properties of ground water shall include tests for ph, total hardness, etc, determination of rl of ground level/founding level with reference to a bm using topographic survey (03 locations), preparation and submission of investigation report for suitable foundation which includes a) sbc should be worked out for following size of isolated footing / raft foundation. i)1.5x1.5 m ii) 1.5x2.5 m iii) 2.0x2.5 m iv)2.0x3.0 m b) photographic record of geo exploration as well as testing. c) recommendation as regards possibility of liquefaction of soil in case of saturated or partially saturated loose or uncompacted sandy soil. d) swelling index and swelling pressure in respect of black cotton soil and its depth or layer. e) depth of ground water table(gwt) in peak mansoon(lowest) peak summer (highest)after correlation of result with seasonal variation of water table in proposed site.lab testing, borelogs, recommendation of foundation type and bearing capacity including vetting by any govt engg colleges.. Tender18 Provide this type Government Tender Information on daily basis.


This tender invites eligible contractors, suppliers, manufacturers, consultants, Startups, Msmes, traders and service providers to submit bids for the specified project, supply, service, or work requirement.


Before applying, interested bidders should review the tender scope, eligibility criteria, estimated contract value, important dates, technical requirements, reqired docuent list for bidder and bid submission instructions as per provided in the official tender documents. 


This Verified Information Provide By Tender18 in this page so Bidder Can Easiy  Understanding tender  requirements and bidders can prepare a compliant and competitive tender proposal.

To participate in the tender for soil investigation for augmentation of water storage and distribution system , mobilization of boring equipment , setting of drilling rig , drilling of bore hole , laboratory investigation , determination of chemical properties , conducting plate load test , determination of physical and chemical properties , determination of rl on ground level , preparation and submission of investigation report, geo investigation for augmentation of water storage and distribution system at ina ezhimala, providing access to the site,clearing site and making good to erecting and conducting soil testing transfers within the site and for any other temporary arrangements to be erected within the area in connection with conducting soil testing (03 locations), mobilization of boring equipment for soil investigation and demobilization of equipment after completion of work, setting of drilling rig at each bore locations, drilling of borehole, trial pits 01 no for ph and bore hole for ug sump-03 nos and ph - 01 no. boreholes will be made using rotary drilling and representative soil samples shall be collected from the boreholes at every 1m interval or change of strata. the diameter of boreholes will be 150mm as per is-1892.the borehole shall be terminated at 15 m below existing ground level (egl) or upto hard rock strata which is occur earlier. the following shall be carried out (i) field investigation shall be carried out on top of the ground level of each borehole shown as a drawing. (ii) standard penetration test will be carried out as per is 2131-1981 at 1m interval or change in strata. the spt consists of driving split spoon sampler 63.5 kg hammer drop weight with free fall of 760 mm. the number of blows for every 150 mm shall be recorded for a penetration of 450 mm (a) trial pit 01 each and (b) bore hole 06 each., laboratory investigation - the soil samples be tested in the laboratory to evaluate the following. a)type of soil and its gradation b)consistency limit c)natural density d)natural water content e)shear tests, determination of chemical properties - the soil samples be tested in the laboratory to evaluate the following a) ph b) sulphur content c) chloride content, conducting plate load test and submission of soil bearing capacity report for proposed different site including mobilization of equipment, excavation, testing and submission of detailed geotechnical report. (a) excavation up to required testing depth. (b) providing all labour, hydraulic jack, reaction arrangement, loading platform, test plates, measuring gauges and accessories. (c) recording settlement observations at various loading stages (24 hrs). determination of (d) safe bearing capacity (sbc) (e) settlement characteristics (f) modulus of subgrade reaction (g) submission of detailed soil investigation and test report with recommendations for foundation design. the final report shall contain (a) site observations (b) test methodology (c) load vs settlement curves (d) safe bearing capacity calculations (e) foundation recommendations (f) settlement analysis (g) photographs of testing, determination of physical and chemical properties of ground water shall include tests for ph, total hardness, etc, determination of rl of ground level/founding level with reference to a bm using topographic survey (03 locations), preparation and submission of investigation report for suitable foundation which includes a) sbc should be worked out for following size of isolated footing / raft foundation. i)1.5x1.5 m ii) 1.5x2.5 m iii) 2.0x2.5 m iv)2.0x3.0 m b) photographic record of geo exploration as well as testing. c) recommendation as regards possibility of liquefaction of soil in case of saturated or partially saturated loose or uncompacted sandy soil. d) swelling index and swelling pressure in respect of black cotton soil and its depth or layer. e) depth of ground water table(gwt) in peak mansoon(lowest) peak summer (highest)after correlation of result with seasonal variation of water table in proposed site.lab testing, borelogs, recommendation of foundation type and bearing capacity including vetting by any govt engg colleges., bidders should first download and review all available tender documents. These documents generally include the Notice Inviting Tender (NIT), Bill of Quantities (BOQ), technical specifications, eligibility criteria, scope of work, and bid submission instructions.


Tender Governemnt Authorities like Indian Army usually publish these documents on their official eProcurement portals, departmental tender portals, the GeM Tender Portal, or other government procurement platforms or on newspapre. Finding and accessing the correct tender documents across multiple portals can sometimes be time-consuming for bidders. 


To make the process easier, Tender18 provides quick access to the available tender documents related to this Kannur , Kerala tender on a single page. Businesses involved in laboratory investigation,temporary arrangements,geotechnical report,soil investigation,topographic survey,hydraulic jack,water storage,natural water,water content,soil testing,soil bearing,water table,bearing related products, services, or works can conveniently download the relevant documents and review the tender requirements without spending time searching across different procurement portals.

The tender for soil investigation for augmentation of water storage and distribution system , mobilization of boring equipment , setting of drilling rig , drilling of bore hole , laboratory investigation , determination of chemical properties , conducting plate load test , determination of physical and chemical properties , determination of rl on ground level , preparation and submission of investigation report, geo investigation for augmentation of water storage and distribution system at ina ezhimala, providing access to the site,clearing site and making good to erecting and conducting soil testing transfers within the site and for any other temporary arrangements to be erected within the area in connection with conducting soil testing (03 locations), mobilization of boring equipment for soil investigation and demobilization of equipment after completion of work, setting of drilling rig at each bore locations, drilling of borehole, trial pits 01 no for ph and bore hole for ug sump-03 nos and ph - 01 no. boreholes will be made using rotary drilling and representative soil samples shall be collected from the boreholes at every 1m interval or change of strata. the diameter of boreholes will be 150mm as per is-1892.the borehole shall be terminated at 15 m below existing ground level (egl) or upto hard rock strata which is occur earlier. the following shall be carried out (i) field investigation shall be carried out on top of the ground level of each borehole shown as a drawing. (ii) standard penetration test will be carried out as per is 2131-1981 at 1m interval or change in strata. the spt consists of driving split spoon sampler 63.5 kg hammer drop weight with free fall of 760 mm. the number of blows for every 150 mm shall be recorded for a penetration of 450 mm (a) trial pit 01 each and (b) bore hole 06 each., laboratory investigation - the soil samples be tested in the laboratory to evaluate the following. a)type of soil and its gradation b)consistency limit c)natural density d)natural water content e)shear tests, determination of chemical properties - the soil samples be tested in the laboratory to evaluate the following a) ph b) sulphur content c) chloride content, conducting plate load test and submission of soil bearing capacity report for proposed different site including mobilization of equipment, excavation, testing and submission of detailed geotechnical report. (a) excavation up to required testing depth. (b) providing all labour, hydraulic jack, reaction arrangement, loading platform, test plates, measuring gauges and accessories. (c) recording settlement observations at various loading stages (24 hrs). determination of (d) safe bearing capacity (sbc) (e) settlement characteristics (f) modulus of subgrade reaction (g) submission of detailed soil investigation and test report with recommendations for foundation design. the final report shall contain (a) site observations (b) test methodology (c) load vs settlement curves (d) safe bearing capacity calculations (e) foundation recommendations (f) settlement analysis (g) photographs of testing, determination of physical and chemical properties of ground water shall include tests for ph, total hardness, etc, determination of rl of ground level/founding level with reference to a bm using topographic survey (03 locations), preparation and submission of investigation report for suitable foundation which includes a) sbc should be worked out for following size of isolated footing / raft foundation. i)1.5x1.5 m ii) 1.5x2.5 m iii) 2.0x2.5 m iv)2.0x3.0 m b) photographic record of geo exploration as well as testing. c) recommendation as regards possibility of liquefaction of soil in case of saturated or partially saturated loose or uncompacted sandy soil. d) swelling index and swelling pressure in respect of black cotton soil and its depth or layer. e) depth of ground water table(gwt) in peak mansoon(lowest) peak summer (highest)after correlation of result with seasonal variation of water table in proposed site.lab testing, borelogs, recommendation of foundation type and bearing capacity including vetting by any govt engg colleges. from Kannur, Kerala may be relevant for contractors, suppliers, vendors, manufacturers, consultants, service providers, startups, MSMEs, and other organizations involved in laboratory investigation,temporary arrangements,geotechnical report,soil investigation,topographic survey,hydraulic jack,water storage,natural water,water content,soil testing,soil bearing,water table,bearing related products, services, or works. However, eligibility to participate depends on the qualification criteria specified by Indian Army in the official tender documents.

Before submitting a bid, interested applicants should carefully review the eligibility conditions, technical requirements, financial criteria, work experience requirements, annual turnover conditions, registrations, certifications, and any other supporting documents required by the tendering authority. The detailed qualification requirements and bidder eligibility criteria are available in the tender notice and related documents provided on this page. 

Ensuring compliance with all eligibility and qualification requirements before bid submission can help bidders avoid disqualification and improve their chances of successful participation in the tender process.

Tende18 provides comprehensive tender bidding services, including a complete tender summary along with a detailed analysis of the Tender Qualification and Eligibility Criteria.

Interested in participating in the tender for soil investigation for augmentation of water storage and distribution system , mobilization of boring equipment , setting of drilling rig , drilling of bore hole , laboratory investigation , determination of chemical properties , conducting plate load test , determination of physical and chemical properties , determination of rl on ground level , preparation and submission of investigation report, geo investigation for augmentation of water storage and distribution system at ina ezhimala, providing access to the site,clearing site and making good to erecting and conducting soil testing transfers within the site and for any other temporary arrangements to be erected within the area in connection with conducting soil testing (03 locations), mobilization of boring equipment for soil investigation and demobilization of equipment after completion of work, setting of drilling rig at each bore locations, drilling of borehole, trial pits 01 no for ph and bore hole for ug sump-03 nos and ph - 01 no. boreholes will be made using rotary drilling and representative soil samples shall be collected from the boreholes at every 1m interval or change of strata. the diameter of boreholes will be 150mm as per is-1892.the borehole shall be terminated at 15 m below existing ground level (egl) or upto hard rock strata which is occur earlier. the following shall be carried out (i) field investigation shall be carried out on top of the ground level of each borehole shown as a drawing. (ii) standard penetration test will be carried out as per is 2131-1981 at 1m interval or change in strata. the spt consists of driving split spoon sampler 63.5 kg hammer drop weight with free fall of 760 mm. the number of blows for every 150 mm shall be recorded for a penetration of 450 mm (a) trial pit 01 each and (b) bore hole 06 each., laboratory investigation - the soil samples be tested in the laboratory to evaluate the following. a)type of soil and its gradation b)consistency limit c)natural density d)natural water content e)shear tests, determination of chemical properties - the soil samples be tested in the laboratory to evaluate the following a) ph b) sulphur content c) chloride content, conducting plate load test and submission of soil bearing capacity report for proposed different site including mobilization of equipment, excavation, testing and submission of detailed geotechnical report. (a) excavation up to required testing depth. (b) providing all labour, hydraulic jack, reaction arrangement, loading platform, test plates, measuring gauges and accessories. (c) recording settlement observations at various loading stages (24 hrs). determination of (d) safe bearing capacity (sbc) (e) settlement characteristics (f) modulus of subgrade reaction (g) submission of detailed soil investigation and test report with recommendations for foundation design. the final report shall contain (a) site observations (b) test methodology (c) load vs settlement curves (d) safe bearing capacity calculations (e) foundation recommendations (f) settlement analysis (g) photographs of testing, determination of physical and chemical properties of ground water shall include tests for ph, total hardness, etc, determination of rl of ground level/founding level with reference to a bm using topographic survey (03 locations), preparation and submission of investigation report for suitable foundation which includes a) sbc should be worked out for following size of isolated footing / raft foundation. i)1.5x1.5 m ii) 1.5x2.5 m iii) 2.0x2.5 m iv)2.0x3.0 m b) photographic record of geo exploration as well as testing. c) recommendation as regards possibility of liquefaction of soil in case of saturated or partially saturated loose or uncompacted sandy soil. d) swelling index and swelling pressure in respect of black cotton soil and its depth or layer. e) depth of ground water table(gwt) in peak mansoon(lowest) peak summer (highest)after correlation of result with seasonal variation of water table in proposed site.lab testing, borelogs, recommendation of foundation type and bearing capacity including vetting by any govt engg colleges. issued by Indian Army for laboratory investigation,temporary arrangements,geotechnical report,soil investigation,topographic survey,hydraulic jack,water storage,natural water,water content,soil testing,soil bearing,water table,bearing related work in Kannur, Kerala? TENDER18 provides complete assistance to help businesses understand tender requirements, access tender documents, review eligibility criteria, qualification requirements, important dates, and bid submission guidelines associated with this tender.

Our Tender18 Expert Technical team can assist with vendor and GeM registration on the relevant departmental, eProcurement, GeM, or government tender portal, preparation of technical and financial bid documents, compliance with qualification criteria, document verification, and complete online tender submission support. Whether you are a contractor, supplier, manufacturer, consultant, startup, or MSME working in the field of laboratory investigation,temporary arrangements,geotechnical report,soil investigation,topographic survey,hydraulic jack,water storage,natural water,water content,soil testing,soil bearing,water table,bearing, Tender18 can help simplify the tender participation process and support you throughout every stage of bidding for this tender. so that tender18 is one the top leading tender consultant in Inda.

1.

Whom should I contact if I have further queries about the Tender scope?

You can fill out the integrated inquiry form below on this detail page to share your company profile. Our consultancy desk will review your query regarding laboratory investigation,temporary arrangements,geotechnical report,soil investigation,topographic survey,hydraulic jack,water storage,natural water,water content,soil testing,soil bearing,water table,bearing parameters and guide you on how to coordinate efficiently with the procurement team of Indian Army

2.

How can Tender18 assist my business in winning this government contract?

Tender18 provides end-to-end professional bidding support and documentation advisory for Tender For Soil Investigation For Augmentation Of Water Storage And Distribution System , Mobilization Of Boring Equipment , Setting Of Drilling Rig , Drilling Of Bore Hole , Laboratory Investigation , Determination Of Chemical Properties , Conducting Plate Load Test , Determination Of Physical And Chemical Properties , Determination Of Rl On Ground Level , Preparation And Submission Of Investigation Report, Geo Investigation For Augmentation Of Water Storage And Distribution System At Ina Ezhimala, Providing Access To The Site,clearing Site And Making Good To Erecting And Conducting Soil Testing Transfers Within The Site And For Any Other Temporary Arrangements To Be Erected Within The Area In Connection With Conducting Soil Testing (03 Locations), Mobilization Of Boring Equipment For Soil Investigation And Demobilization Of Equipment After Completion Of Work, Setting Of Drilling Rig At Each Bore Locations, Drilling Of Borehole, Trial Pits 01 No For Ph And Bore Hole For Ug Sump-03 Nos And Ph - 01 No. Boreholes Will Be Made Using Rotary Drilling And Representative Soil Samples Shall Be Collected From The Boreholes At Every 1m Interval Or Change Of Strata. The Diameter Of Boreholes Will Be 150mm As Per Is-1892.the Borehole Shall Be Terminated At 15 M Below Existing Ground Level (egl) Or Upto Hard Rock Strata Which Is Occur Earlier. The Following Shall Be Carried Out (i) Field Investigation Shall Be Carried Out On Top Of The Ground Level Of Each Borehole Shown As A Drawing. (ii) Standard Penetration Test Will Be Carried Out As Per Is 2131-1981 At 1m Interval Or Change In Strata. The Spt Consists Of Driving Split Spoon Sampler 63.5 Kg Hammer Drop Weight With Free Fall Of 760 Mm. The Number Of Blows For Every 150 Mm Shall Be Recorded For A Penetration Of 450 Mm (a) Trial Pit 01 Each And (b) Bore Hole 06 Each., Laboratory Investigation - The Soil Samples Be Tested In The Laboratory To Evaluate The Following. A)type Of Soil And Its Gradation B)consistency Limit C)natural Density D)natural Water Content E)shear Tests, Determination Of Chemical Properties - The Soil Samples Be Tested In The Laboratory To Evaluate The Following A) Ph B) Sulphur Content C) Chloride Content, Conducting Plate Load Test And Submission Of Soil Bearing Capacity Report For Proposed Different Site Including Mobilization Of Equipment, Excavation, Testing And Submission Of Detailed Geotechnical Report. (a) Excavation Up To Required Testing Depth. (b) Providing All Labour, Hydraulic Jack, Reaction Arrangement, Loading Platform, Test Plates, Measuring Gauges And Accessories. (c) Recording Settlement Observations At Various Loading Stages (24 Hrs). Determination Of (d) Safe Bearing Capacity (sbc) (e) Settlement Characteristics (f) Modulus Of Subgrade Reaction (g) Submission Of Detailed Soil Investigation And Test Report With Recommendations For Foundation Design. The Final Report Shall Contain (a) Site Observations (b) Test Methodology (c) Load Vs Settlement Curves (d) Safe Bearing Capacity Calculations (e) Foundation Recommendations (f) Settlement Analysis (g) Photographs Of Testing, Determination Of Physical And Chemical Properties Of Ground Water Shall Include Tests For Ph, Total Hardness, Etc, Determination Of Rl Of Ground Level/founding Level With Reference To A Bm Using Topographic Survey (03 Locations), Preparation And Submission Of Investigation Report For Suitable Foundation Which Includes A) Sbc Should Be Worked Out For Following Size Of Isolated Footing / Raft Foundation. I)1.5x1.5 M Ii) 1.5x2.5 M Iii) 2.0x2.5 M Iv)2.0x3.0 M B) Photographic Record Of Geo Exploration As Well As Testing. C) Recommendation As Regards Possibility Of Liquefaction Of Soil In Case Of Saturated Or Partially Saturated Loose Or Uncompacted Sandy Soil. D) Swelling Index And Swelling Pressure In Respect Of Black Cotton Soil And Its Depth Or Layer. E) Depth Of Ground Water Table(gwt) In Peak Mansoon(lowest) Peak Summer (highest)after Correlation Of Result With Seasonal Variation Of Water Table In Proposed Site.lab Testing, Borelogs, Recommendation Of Foundation Type And Bearing Capacity Including Vetting By Any Govt Engg Colleges. . Our senior analysts help you decode the complete project guidelines, manage accurate costing sheets, and complete error-free submissions on the official platform used by Indian Army.

3.

What are the main reasons for a technical tender rejection?

Most online bids face rejection during the initial evaluation round due to avoidable errors like uploading blurred document scans, submitting expired DSCs, or missing critical experience papers required for Tender For Soil Investigation For Augmentation Of Water Storage And Distribution System , Mobilization Of Boring Equipment , Setting Of Drilling Rig , Drilling Of Bore Hole , Laboratory Investigation , Determination Of Chemical Properties , Conducting Plate Load Test , Determination Of Physical And Chemical Properties , Determination Of Rl On Ground Level , Preparation And Submission Of Investigation Report, Geo Investigation For Augmentation Of Water Storage And Distribution System At Ina Ezhimala, Providing Access To The Site,clearing Site And Making Good To Erecting And Conducting Soil Testing Transfers Within The Site And For Any Other Temporary Arrangements To Be Erected Within The Area In Connection With Conducting Soil Testing (03 Locations), Mobilization Of Boring Equipment For Soil Investigation And Demobilization Of Equipment After Completion Of Work, Setting Of Drilling Rig At Each Bore Locations, Drilling Of Borehole, Trial Pits 01 No For Ph And Bore Hole For Ug Sump-03 Nos And Ph - 01 No. Boreholes Will Be Made Using Rotary Drilling And Representative Soil Samples Shall Be Collected From The Boreholes At Every 1m Interval Or Change Of Strata. The Diameter Of Boreholes Will Be 150mm As Per Is-1892.the Borehole Shall Be Terminated At 15 M Below Existing Ground Level (egl) Or Upto Hard Rock Strata Which Is Occur Earlier. The Following Shall Be Carried Out (i) Field Investigation Shall Be Carried Out On Top Of The Ground Level Of Each Borehole Shown As A Drawing. (ii) Standard Penetration Test Will Be Carried Out As Per Is 2131-1981 At 1m Interval Or Change In Strata. The Spt Consists Of Driving Split Spoon Sampler 63.5 Kg Hammer Drop Weight With Free Fall Of 760 Mm. The Number Of Blows For Every 150 Mm Shall Be Recorded For A Penetration Of 450 Mm (a) Trial Pit 01 Each And (b) Bore Hole 06 Each., Laboratory Investigation - The Soil Samples Be Tested In The Laboratory To Evaluate The Following. A)type Of Soil And Its Gradation B)consistency Limit C)natural Density D)natural Water Content E)shear Tests, Determination Of Chemical Properties - The Soil Samples Be Tested In The Laboratory To Evaluate The Following A) Ph B) Sulphur Content C) Chloride Content, Conducting Plate Load Test And Submission Of Soil Bearing Capacity Report For Proposed Different Site Including Mobilization Of Equipment, Excavation, Testing And Submission Of Detailed Geotechnical Report. (a) Excavation Up To Required Testing Depth. (b) Providing All Labour, Hydraulic Jack, Reaction Arrangement, Loading Platform, Test Plates, Measuring Gauges And Accessories. (c) Recording Settlement Observations At Various Loading Stages (24 Hrs). Determination Of (d) Safe Bearing Capacity (sbc) (e) Settlement Characteristics (f) Modulus Of Subgrade Reaction (g) Submission Of Detailed Soil Investigation And Test Report With Recommendations For Foundation Design. The Final Report Shall Contain (a) Site Observations (b) Test Methodology (c) Load Vs Settlement Curves (d) Safe Bearing Capacity Calculations (e) Foundation Recommendations (f) Settlement Analysis (g) Photographs Of Testing, Determination Of Physical And Chemical Properties Of Ground Water Shall Include Tests For Ph, Total Hardness, Etc, Determination Of Rl Of Ground Level/founding Level With Reference To A Bm Using Topographic Survey (03 Locations), Preparation And Submission Of Investigation Report For Suitable Foundation Which Includes A) Sbc Should Be Worked Out For Following Size Of Isolated Footing / Raft Foundation. I)1.5x1.5 M Ii) 1.5x2.5 M Iii) 2.0x2.5 M Iv)2.0x3.0 M B) Photographic Record Of Geo Exploration As Well As Testing. C) Recommendation As Regards Possibility Of Liquefaction Of Soil In Case Of Saturated Or Partially Saturated Loose Or Uncompacted Sandy Soil. D) Swelling Index And Swelling Pressure In Respect Of Black Cotton Soil And Its Depth Or Layer. E) Depth Of Ground Water Table(gwt) In Peak Mansoon(lowest) Peak Summer (highest)after Correlation Of Result With Seasonal Variation Of Water Table In Proposed Site.lab Testing, Borelogs, Recommendation Of Foundation Type And Bearing Capacity Including Vetting By Any Govt Engg Colleges. in Kerala.

4.

Can contractors located outside the local region participate in this bid?

Eligibility for outstation bidders depends entirely on the terms set inside the document for Tender For Soil Investigation For Augmentation Of Water Storage And Distribution System , Mobilization Of Boring Equipment , Setting Of Drilling Rig , Drilling Of Bore Hole , Laboratory Investigation , Determination Of Chemical Properties , Conducting Plate Load Test , Determination Of Physical And Chemical Properties , Determination Of Rl On Ground Level , Preparation And Submission Of Investigation Report, Geo Investigation For Augmentation Of Water Storage And Distribution System At Ina Ezhimala, Providing Access To The Site,clearing Site And Making Good To Erecting And Conducting Soil Testing Transfers Within The Site And For Any Other Temporary Arrangements To Be Erected Within The Area In Connection With Conducting Soil Testing (03 Locations), Mobilization Of Boring Equipment For Soil Investigation And Demobilization Of Equipment After Completion Of Work, Setting Of Drilling Rig At Each Bore Locations, Drilling Of Borehole, Trial Pits 01 No For Ph And Bore Hole For Ug Sump-03 Nos And Ph - 01 No. Boreholes Will Be Made Using Rotary Drilling And Representative Soil Samples Shall Be Collected From The Boreholes At Every 1m Interval Or Change Of Strata. The Diameter Of Boreholes Will Be 150mm As Per Is-1892.the Borehole Shall Be Terminated At 15 M Below Existing Ground Level (egl) Or Upto Hard Rock Strata Which Is Occur Earlier. The Following Shall Be Carried Out (i) Field Investigation Shall Be Carried Out On Top Of The Ground Level Of Each Borehole Shown As A Drawing. (ii) Standard Penetration Test Will Be Carried Out As Per Is 2131-1981 At 1m Interval Or Change In Strata. The Spt Consists Of Driving Split Spoon Sampler 63.5 Kg Hammer Drop Weight With Free Fall Of 760 Mm. The Number Of Blows For Every 150 Mm Shall Be Recorded For A Penetration Of 450 Mm (a) Trial Pit 01 Each And (b) Bore Hole 06 Each., Laboratory Investigation - The Soil Samples Be Tested In The Laboratory To Evaluate The Following. A)type Of Soil And Its Gradation B)consistency Limit C)natural Density D)natural Water Content E)shear Tests, Determination Of Chemical Properties - The Soil Samples Be Tested In The Laboratory To Evaluate The Following A) Ph B) Sulphur Content C) Chloride Content, Conducting Plate Load Test And Submission Of Soil Bearing Capacity Report For Proposed Different Site Including Mobilization Of Equipment, Excavation, Testing And Submission Of Detailed Geotechnical Report. (a) Excavation Up To Required Testing Depth. (b) Providing All Labour, Hydraulic Jack, Reaction Arrangement, Loading Platform, Test Plates, Measuring Gauges And Accessories. (c) Recording Settlement Observations At Various Loading Stages (24 Hrs). Determination Of (d) Safe Bearing Capacity (sbc) (e) Settlement Characteristics (f) Modulus Of Subgrade Reaction (g) Submission Of Detailed Soil Investigation And Test Report With Recommendations For Foundation Design. The Final Report Shall Contain (a) Site Observations (b) Test Methodology (c) Load Vs Settlement Curves (d) Safe Bearing Capacity Calculations (e) Foundation Recommendations (f) Settlement Analysis (g) Photographs Of Testing, Determination Of Physical And Chemical Properties Of Ground Water Shall Include Tests For Ph, Total Hardness, Etc, Determination Of Rl Of Ground Level/founding Level With Reference To A Bm Using Topographic Survey (03 Locations), Preparation And Submission Of Investigation Report For Suitable Foundation Which Includes A) Sbc Should Be Worked Out For Following Size Of Isolated Footing / Raft Foundation. I)1.5x1.5 M Ii) 1.5x2.5 M Iii) 2.0x2.5 M Iv)2.0x3.0 M B) Photographic Record Of Geo Exploration As Well As Testing. C) Recommendation As Regards Possibility Of Liquefaction Of Soil In Case Of Saturated Or Partially Saturated Loose Or Uncompacted Sandy Soil. D) Swelling Index And Swelling Pressure In Respect Of Black Cotton Soil And Its Depth Or Layer. E) Depth Of Ground Water Table(gwt) In Peak Mansoon(lowest) Peak Summer (highest)after Correlation Of Result With Seasonal Variation Of Water Table In Proposed Site.lab Testing, Borelogs, Recommendation Of Foundation Type And Bearing Capacity Including Vetting By Any Govt Engg Colleges.. While many public sector projects allow national competitive bidding, certain localized works require local offices or specific registration metrics in Kannur.

5.

Do I need an active GeM Portal registration to apply for this work?

If this procurement is routed through the central marketplace, an active GeM Seller ID is mandatory to supply laboratory investigation,temporary arrangements,geotechnical report,soil investigation,topographic survey,hydraulic jack,water storage,natural water,water content,soil testing,soil bearing,water table,bearing items. Tender18 offers complete assistance for brand cataloging, profile creation, and vendor assessment required officially by Indian Army

6.

What are the primary legal documents required to submit a valid bid?

To register an eligible bid for these laboratory investigation,temporary arrangements,geotechnical report,soil investigation,topographic survey,hydraulic jack,water storage,natural water,water content,soil testing,soil bearing,water table,bearing contracts, companies must prepare their core compliance documents. Vendors operating across Kerala must ensure they possess a valid GST registration, permanent account number (PAN), and active Class-3 Digital Signature Certificates.

7.

What products or services are required for this active work?

This public procurement cycle is specifically looking for qualified vendors and suppliers who can provide high-quality laboratory investigation,temporary arrangements,geotechnical report,soil investigation,topographic survey,hydraulic jack,water storage,natural water,water content,soil testing,soil bearing,water table,bearing solutions. The operational execution, delivery, and deployment of these materials must be managed locally within the Kannur region.

8.

Where can I review the estimated cost or budget details for this Tender?

The estimated project cost and budget thresholds can be reviewed directly inside the tender document. Bidders can analyze these qualification files to check if their firm meets the financial capability criteria specified for Tender For Soil Investigation For Augmentation Of Water Storage And Distribution System , Mobilization Of Boring Equipment , Setting Of Drilling Rig , Drilling Of Bore Hole , Laboratory Investigation , Determination Of Chemical Properties , Conducting Plate Load Test , Determination Of Physical And Chemical Properties , Determination Of Rl On Ground Level , Preparation And Submission Of Investigation Report, Geo Investigation For Augmentation Of Water Storage And Distribution System At Ina Ezhimala, Providing Access To The Site,clearing Site And Making Good To Erecting And Conducting Soil Testing Transfers Within The Site And For Any Other Temporary Arrangements To Be Erected Within The Area In Connection With Conducting Soil Testing (03 Locations), Mobilization Of Boring Equipment For Soil Investigation And Demobilization Of Equipment After Completion Of Work, Setting Of Drilling Rig At Each Bore Locations, Drilling Of Borehole, Trial Pits 01 No For Ph And Bore Hole For Ug Sump-03 Nos And Ph - 01 No. Boreholes Will Be Made Using Rotary Drilling And Representative Soil Samples Shall Be Collected From The Boreholes At Every 1m Interval Or Change Of Strata. The Diameter Of Boreholes Will Be 150mm As Per Is-1892.the Borehole Shall Be Terminated At 15 M Below Existing Ground Level (egl) Or Upto Hard Rock Strata Which Is Occur Earlier. The Following Shall Be Carried Out (i) Field Investigation Shall Be Carried Out On Top Of The Ground Level Of Each Borehole Shown As A Drawing. (ii) Standard Penetration Test Will Be Carried Out As Per Is 2131-1981 At 1m Interval Or Change In Strata. The Spt Consists Of Driving Split Spoon Sampler 63.5 Kg Hammer Drop Weight With Free Fall Of 760 Mm. The Number Of Blows For Every 150 Mm Shall Be Recorded For A Penetration Of 450 Mm (a) Trial Pit 01 Each And (b) Bore Hole 06 Each., Laboratory Investigation - The Soil Samples Be Tested In The Laboratory To Evaluate The Following. A)type Of Soil And Its Gradation B)consistency Limit C)natural Density D)natural Water Content E)shear Tests, Determination Of Chemical Properties - The Soil Samples Be Tested In The Laboratory To Evaluate The Following A) Ph B) Sulphur Content C) Chloride Content, Conducting Plate Load Test And Submission Of Soil Bearing Capacity Report For Proposed Different Site Including Mobilization Of Equipment, Excavation, Testing And Submission Of Detailed Geotechnical Report. (a) Excavation Up To Required Testing Depth. (b) Providing All Labour, Hydraulic Jack, Reaction Arrangement, Loading Platform, Test Plates, Measuring Gauges And Accessories. (c) Recording Settlement Observations At Various Loading Stages (24 Hrs). Determination Of (d) Safe Bearing Capacity (sbc) (e) Settlement Characteristics (f) Modulus Of Subgrade Reaction (g) Submission Of Detailed Soil Investigation And Test Report With Recommendations For Foundation Design. The Final Report Shall Contain (a) Site Observations (b) Test Methodology (c) Load Vs Settlement Curves (d) Safe Bearing Capacity Calculations (e) Foundation Recommendations (f) Settlement Analysis (g) Photographs Of Testing, Determination Of Physical And Chemical Properties Of Ground Water Shall Include Tests For Ph, Total Hardness, Etc, Determination Of Rl Of Ground Level/founding Level With Reference To A Bm Using Topographic Survey (03 Locations), Preparation And Submission Of Investigation Report For Suitable Foundation Which Includes A) Sbc Should Be Worked Out For Following Size Of Isolated Footing / Raft Foundation. I)1.5x1.5 M Ii) 1.5x2.5 M Iii) 2.0x2.5 M Iv)2.0x3.0 M B) Photographic Record Of Geo Exploration As Well As Testing. C) Recommendation As Regards Possibility Of Liquefaction Of Soil In Case Of Saturated Or Partially Saturated Loose Or Uncompacted Sandy Soil. D) Swelling Index And Swelling Pressure In Respect Of Black Cotton Soil And Its Depth Or Layer. E) Depth Of Ground Water Table(gwt) In Peak Mansoon(lowest) Peak Summer (highest)after Correlation Of Result With Seasonal Variation Of Water Table In Proposed Site.lab Testing, Borelogs, Recommendation Of Foundation Type And Bearing Capacity Including Vetting By Any Govt Engg Colleges. by Indian Army

9.

How can I download the official BOQ file for this opportunity?

You can download the commercial Bill of Quantities (BOQ) spreadsheet directly using the secure link provided on this page. The BOQ file contains the item descriptions and rate filling forms officially validated for Tender For Soil Investigation For Augmentation Of Water Storage And Distribution System , Mobilization Of Boring Equipment , Setting Of Drilling Rig , Drilling Of Bore Hole , Laboratory Investigation , Determination Of Chemical Properties , Conducting Plate Load Test , Determination Of Physical And Chemical Properties , Determination Of Rl On Ground Level , Preparation And Submission Of Investigation Report, Geo Investigation For Augmentation Of Water Storage And Distribution System At Ina Ezhimala, Providing Access To The Site,clearing Site And Making Good To Erecting And Conducting Soil Testing Transfers Within The Site And For Any Other Temporary Arrangements To Be Erected Within The Area In Connection With Conducting Soil Testing (03 Locations), Mobilization Of Boring Equipment For Soil Investigation And Demobilization Of Equipment After Completion Of Work, Setting Of Drilling Rig At Each Bore Locations, Drilling Of Borehole, Trial Pits 01 No For Ph And Bore Hole For Ug Sump-03 Nos And Ph - 01 No. Boreholes Will Be Made Using Rotary Drilling And Representative Soil Samples Shall Be Collected From The Boreholes At Every 1m Interval Or Change Of Strata. The Diameter Of Boreholes Will Be 150mm As Per Is-1892.the Borehole Shall Be Terminated At 15 M Below Existing Ground Level (egl) Or Upto Hard Rock Strata Which Is Occur Earlier. The Following Shall Be Carried Out (i) Field Investigation Shall Be Carried Out On Top Of The Ground Level Of Each Borehole Shown As A Drawing. (ii) Standard Penetration Test Will Be Carried Out As Per Is 2131-1981 At 1m Interval Or Change In Strata. The Spt Consists Of Driving Split Spoon Sampler 63.5 Kg Hammer Drop Weight With Free Fall Of 760 Mm. The Number Of Blows For Every 150 Mm Shall Be Recorded For A Penetration Of 450 Mm (a) Trial Pit 01 Each And (b) Bore Hole 06 Each., Laboratory Investigation - The Soil Samples Be Tested In The Laboratory To Evaluate The Following. A)type Of Soil And Its Gradation B)consistency Limit C)natural Density D)natural Water Content E)shear Tests, Determination Of Chemical Properties - The Soil Samples Be Tested In The Laboratory To Evaluate The Following A) Ph B) Sulphur Content C) Chloride Content, Conducting Plate Load Test And Submission Of Soil Bearing Capacity Report For Proposed Different Site Including Mobilization Of Equipment, Excavation, Testing And Submission Of Detailed Geotechnical Report. (a) Excavation Up To Required Testing Depth. (b) Providing All Labour, Hydraulic Jack, Reaction Arrangement, Loading Platform, Test Plates, Measuring Gauges And Accessories. (c) Recording Settlement Observations At Various Loading Stages (24 Hrs). Determination Of (d) Safe Bearing Capacity (sbc) (e) Settlement Characteristics (f) Modulus Of Subgrade Reaction (g) Submission Of Detailed Soil Investigation And Test Report With Recommendations For Foundation Design. The Final Report Shall Contain (a) Site Observations (b) Test Methodology (c) Load Vs Settlement Curves (d) Safe Bearing Capacity Calculations (e) Foundation Recommendations (f) Settlement Analysis (g) Photographs Of Testing, Determination Of Physical And Chemical Properties Of Ground Water Shall Include Tests For Ph, Total Hardness, Etc, Determination Of Rl Of Ground Level/founding Level With Reference To A Bm Using Topographic Survey (03 Locations), Preparation And Submission Of Investigation Report For Suitable Foundation Which Includes A) Sbc Should Be Worked Out For Following Size Of Isolated Footing / Raft Foundation. I)1.5x1.5 M Ii) 1.5x2.5 M Iii) 2.0x2.5 M Iv)2.0x3.0 M B) Photographic Record Of Geo Exploration As Well As Testing. C) Recommendation As Regards Possibility Of Liquefaction Of Soil In Case Of Saturated Or Partially Saturated Loose Or Uncompacted Sandy Soil. D) Swelling Index And Swelling Pressure In Respect Of Black Cotton Soil And Its Depth Or Layer. E) Depth Of Ground Water Table(gwt) In Peak Mansoon(lowest) Peak Summer (highest)after Correlation Of Result With Seasonal Variation Of Water Table In Proposed Site.lab Testing, Borelogs, Recommendation Of Foundation Type And Bearing Capacity Including Vetting By Any Govt Engg Colleges. within the Kerala jurisdiction

10.

How can I find the submission closing date for this contract?

The official timeline and deadline details for Tender For Soil Investigation For Augmentation Of Water Storage And Distribution System , Mobilization Of Boring Equipment , Setting Of Drilling Rig , Drilling Of Bore Hole , Laboratory Investigation , Determination Of Chemical Properties , Conducting Plate Load Test , Determination Of Physical And Chemical Properties , Determination Of Rl On Ground Level , Preparation And Submission Of Investigation Report, Geo Investigation For Augmentation Of Water Storage And Distribution System At Ina Ezhimala, Providing Access To The Site,clearing Site And Making Good To Erecting And Conducting Soil Testing Transfers Within The Site And For Any Other Temporary Arrangements To Be Erected Within The Area In Connection With Conducting Soil Testing (03 Locations), Mobilization Of Boring Equipment For Soil Investigation And Demobilization Of Equipment After Completion Of Work, Setting Of Drilling Rig At Each Bore Locations, Drilling Of Borehole, Trial Pits 01 No For Ph And Bore Hole For Ug Sump-03 Nos And Ph - 01 No. Boreholes Will Be Made Using Rotary Drilling And Representative Soil Samples Shall Be Collected From The Boreholes At Every 1m Interval Or Change Of Strata. The Diameter Of Boreholes Will Be 150mm As Per Is-1892.the Borehole Shall Be Terminated At 15 M Below Existing Ground Level (egl) Or Upto Hard Rock Strata Which Is Occur Earlier. The Following Shall Be Carried Out (i) Field Investigation Shall Be Carried Out On Top Of The Ground Level Of Each Borehole Shown As A Drawing. (ii) Standard Penetration Test Will Be Carried Out As Per Is 2131-1981 At 1m Interval Or Change In Strata. The Spt Consists Of Driving Split Spoon Sampler 63.5 Kg Hammer Drop Weight With Free Fall Of 760 Mm. The Number Of Blows For Every 150 Mm Shall Be Recorded For A Penetration Of 450 Mm (a) Trial Pit 01 Each And (b) Bore Hole 06 Each., Laboratory Investigation - The Soil Samples Be Tested In The Laboratory To Evaluate The Following. A)type Of Soil And Its Gradation B)consistency Limit C)natural Density D)natural Water Content E)shear Tests, Determination Of Chemical Properties - The Soil Samples Be Tested In The Laboratory To Evaluate The Following A) Ph B) Sulphur Content C) Chloride Content, Conducting Plate Load Test And Submission Of Soil Bearing Capacity Report For Proposed Different Site Including Mobilization Of Equipment, Excavation, Testing And Submission Of Detailed Geotechnical Report. (a) Excavation Up To Required Testing Depth. (b) Providing All Labour, Hydraulic Jack, Reaction Arrangement, Loading Platform, Test Plates, Measuring Gauges And Accessories. (c) Recording Settlement Observations At Various Loading Stages (24 Hrs). Determination Of (d) Safe Bearing Capacity (sbc) (e) Settlement Characteristics (f) Modulus Of Subgrade Reaction (g) Submission Of Detailed Soil Investigation And Test Report With Recommendations For Foundation Design. The Final Report Shall Contain (a) Site Observations (b) Test Methodology (c) Load Vs Settlement Curves (d) Safe Bearing Capacity Calculations (e) Foundation Recommendations (f) Settlement Analysis (g) Photographs Of Testing, Determination Of Physical And Chemical Properties Of Ground Water Shall Include Tests For Ph, Total Hardness, Etc, Determination Of Rl Of Ground Level/founding Level With Reference To A Bm Using Topographic Survey (03 Locations), Preparation And Submission Of Investigation Report For Suitable Foundation Which Includes A) Sbc Should Be Worked Out For Following Size Of Isolated Footing / Raft Foundation. I)1.5x1.5 M Ii) 1.5x2.5 M Iii) 2.0x2.5 M Iv)2.0x3.0 M B) Photographic Record Of Geo Exploration As Well As Testing. C) Recommendation As Regards Possibility Of Liquefaction Of Soil In Case Of Saturated Or Partially Saturated Loose Or Uncompacted Sandy Soil. D) Swelling Index And Swelling Pressure In Respect Of Black Cotton Soil And Its Depth Or Layer. E) Depth Of Ground Water Table(gwt) In Peak Mansoon(lowest) Peak Summer (highest)after Correlation Of Result With Seasonal Variation Of Water Table In Proposed Site.lab Testing, Borelogs, Recommendation Of Foundation Type And Bearing Capacity Including Vetting By Any Govt Engg Colleges. are available inside the detailed notification files. Bidders planning to target this contract in Kannur should check the official portal schedule early to complete their online technical and financial submission well before the closing hours.

Get Expert Tender Bidding Support

Looking For Complete Tender Bidding Consultancy? Our Technical Experts Will Help You Prepare And Submit Your Tender Successfully.

Call Our Expert: +91 7069661818
Your Information Is 100% Secure & Confidential