corrigendum tender for erection and fabrication work b 1 , erection and fabrication work b 2 , erection and fabrication work b 3 , erection and fabrication work b 4 , erection and fabrication work b 5 , erection and fabrication work b 6 , erection and fabrication work b 7 , erection and fabrication work b 8 , erection and fabrication work b 9 , erection and fabrication work b 10 , erection and fabrication work b 11 , erection and fabrication work b 12 , erection and fabrication work b 13 , erection and fabrication work b 14 , erection and fabrication work b 15 , erection and fabrication work b 16 , erection and fabrication work b 17 , erection and fabrication work b 18 , erection and fabrication work b 19 , erection and fabrication work b 20 , erection and fabrication work b 21 , erection and fabrication work b 22 , erection and fabrication work b 23 , erection and fabrication work b 24 , erection and fabrication work b 25 , erection and fabrication work b 26 , erection and fabrication work b 27 , erection and fabrication work b 28 , erection and fabrication work b 29 , erection and fabrication work b 30 , erection and fabrication work b 31 , erection and fabrication work b 32 , erection and fabrication work b 33 , erection and fabrication work b 34 , erection and fabrication work b 35 , erection and fabrication work b 36 , erection and fabrication work b 37 , erection and fabrication work b 38 , erection and fabrication work b 39 , erection and fabrication work b 40 , erection and fabrication work b 41 , erection and fabrication work b 42 , erection and fabrication work b 43 , erection and fabrication work b 44 , erection and fabrication work b 45 , erection and fabrication work b 46 , erection and fabrication work b 47 , erection and fabrication work b 48 , erection and fabrication work b 49 , erection and fabrication work b 50 , erection and fabrication work b 51 , erection and fabrication work b 52 , erection and fabrication work b 53 , erection and fabrication work b 54, erection and fabrication work b, cut out and remove the damaged plate; fabricate and installation a new 10 mm plate in its place, and provide support by installing angle channels beneath the bottom. dismantle and lower the clarifier coil; clean it, replace corroded flanges/pipes, refit the coil, and drill holes according to specifications. cut out and remove the corroded mud scraper plate from the clarifier; fabricate and installation a new plate, fit the scraper, and conduct a trial run. dismantle the weak mud scraper pipes in the clarifier, installation new pipes, and mount the mud scraper assembly. installation an 800/900 mm diameter rubber-seated angle valve in the steam/vapour lines of the quad, semi-kestner, and vapour cell units as directed, and conduct a leak-proof trial. to completely re-tube the quad body, cut and lower the calandria's bottom saucer; after fitting the tubes and conducting a hydraulic test on the calandria, weld the bottom saucer (internally and externally) to ensure it is leak-proof, and perform water and vacuum trials. dismantle corroded or weak vapour/exhaust steam lines associated with the semi-kestner, vapour cell, quad bodies, and pans; fabricate new lines using 8.0/10.0 mm thick m.s. plate based on original specifications, erect the new lines, perform leak-proof welding, and conduct successful water and steam trials. cut out and remove corroded/weak juice distributors or down-take pipes in the quad bodies and installation newly fabricated replacements. cut out and remove corroded/weak manholes from pans, doors, sulphur furnaces, quad bodies, cells, and bottom saucers, and installation newly fabricated manholes based on original specifications. dismantle and remove corroded/weak umbrellas from the semi-kestner, vapour cell, quad bodies, and pans; fabricate new umbrellas according to original specifications and erect them with necessary supports. for the vapour pipes of pans and quads, provide external reinforcement using m.s. -material of 900 to 1100 mm diameter... fabricate and installation t-rings made of plate or angle iron; cut out and remove corroded or weak ammonia gas headers from the quad bodies; fabricate and erect new headers; installation nipples, valves, flanges, etc., and conduct a leak-proof trial; remove weak shells from the semi-kestner, vapour cell, and quad bodies; fabricate new ones to specifications, erect them in place, and conduct a leak-proof trial; dismantle the weak vapour pipe located between the evaporator quad bodies; fabricate and installation a new vapour pipe (600, 700, or 800 mm diameter) using new or existing plate; perform leak-proof welding and conduct a water trial; cut out and remove leaky or weak external catchers from the evaporator and pan vapour pipes; fabricate new catchers (including internals) based on samples, fit them in place, perform leak-proof welding, and conduct successful water-filling/vacuum trials; remove the top plate of the external catcher on the evaporator and pan vapour pipes to carry out necessary repairs on weak internals, cones, or shells; reinstall the top plate, perform leak-proof welding, and conduct successful water-filling/vacuum trials; cut out and remove the corroded or weak agitator of the 10" x 20" vacuum filter; fabricate a new one based on the old design, fit it in place, and conduct a successful trial; cut out and remove the corroded or weak agitator of the 8" x 16" vacuum filter; fabricate a new one based on the old design, fit it in place, and conduct a successful trial; cut out and remove the corroded or weak mud tray of the vacuum filter; fabricate a new mud tray using new or existing plate and fit it in place; replace the corroded or weak side plate of the vacuum filter and conduct a satisfactory water trial; cut out and remove the corroded or weak agitator section of the 10" x 20" vacuum filter and carry out necessary repairs based on the old design; cut out and remove the weak tapered cone of the 40-ton capacity pan. fabricate and installation a replacement using a new 12/16 mm plate, following the sample; restore all connections to their original state, ensure leak-proof welding, and conduct successful water-filling and vacuum trials. cut out and remove corroded or weak agitator sections of the 8-inch x 16-inch vacuum filter and carry out necessary repairs as per the original specifications. dismantle the bagasse silo cyclone at the vacuum filter station, replace corroded sections, perform necessary repairs, reinstall it in its original position, and restore all connections. cut out and remove the corroded or weak shell of the mud mixer; fabricate a new shell (using new or existing plate material), installation it in place, and conduct a successful trial. cut out and remove corroded or weak mud discharge chutes located at the discharge end of the mud conveyor belts; fabricate and installation replacements using existing plate material and conduct a trial. dismantle and remove corroded or weak condenser bottles from the vacuum filters; fabricate and installation new ones based on the sample and conduct a successful vacuum trial. in the boiling house, remove the foundation bolts/beds of corroded or weak pumps and construct new channel-based beds; installation new foundation bolts into the pits prepared by the civil team to create these new channel beds; mount the pump and motor, complete the necessary connections and alignment, and conduct a satisfactory trial. installation supports made from old m.s. pipes for the so2 gas lines.

Latest Tender Detail from uttar pradesh cooperative sugar factories federation ltd UPCSFFL for the corrigendum tender for erection and fabrication work b 1 , erection and fabrication work b 2 , erection and fabrication work b 3 , erection and fabrication work b 4 , erection and fabrication work b 5 , erection and fabrication work b 6 , erection and fabrication work b 7 , erection and fabrication work b 8 , erection and fabrication work b 9 , erection and fabrication work b 10 , erection and fabrication work b 11 , erection and fabrication work b 12 , erection and fabrication work b 13 , erection and fabrication work b 14 , erection and fabrication work b 15 , erection and fabrication work b 16 , erection and fabrication work b 17 , erection and fabrication work b 18 , erection and fabrication work b 19 , erection and fabrication work b 20 , erection and fabrication work b 21 , erection and fabrication work b 22 , erection and fabrication work b 23 , erection and fabrication work b 24 , erection and fabrication work b 25 , erection and fabrication work b 26 , erection and fabrication work b 27 , erection and fabrication work b 28 , erection and fabrication work b 29 , erection and fabrication work b 30 , erection and fabrication work b 31 , erection and fabrication work b 32 , erection and fabrication work b 33 , erection and fabrication work b 34 , erection and fabrication work b 35 , erection and fabrication work b 36 , erection and fabrication work b 37 , erection and fabrication work b 38 , erection and fabrication work b 39 , erection and fabrication work b 40 , erection and fabrication work b 41 , erection and fabrication work b 42 , erection and fabrication work b 43 , erection and fabrication work b 44 , erection and fabrication work b 45 , erection and fabrication work b 46 , erection and fabrication work b 47 , erection and fabrication work b 48 , erection and fabrication work b 49 , erection and fabrication work b 50 , erection and fabrication work b 51 , erection and fabrication work b 52 , erection and fabrication work b 53 , erection and fabrication work b 54, erection and fabrication work b, cut out and remove the damaged plate; fabricate and installation a new 10 mm plate in its place, and provide support by installing angle channels beneath the bottom. dismantle and lower the clarifier coil; clean it, replace corroded flanges/pipes, refit the coil, and drill holes according to specifications. cut out and remove the corroded mud scraper plate from the clarifier; fabricate and installation a new plate, fit the scraper, and conduct a trial run. dismantle the weak mud scraper pipes in the clarifier, installation new pipes, and mount the mud scraper assembly. installation an 800/900 mm diameter rubber-seated angle valve in the steam/vapour lines of the quad, semi-kestner, and vapour cell units as directed, and conduct a leak-proof trial. to completely re-tube the quad body, cut and lower the calandria's bottom saucer; after fitting the tubes and conducting a hydraulic test on the calandria, weld the bottom saucer (internally and externally) to ensure it is leak-proof, and perform water and vacuum trials. dismantle corroded or weak vapour/exhaust steam lines associated with the semi-kestner, vapour cell, quad bodies, and pans; fabricate new lines using 8.0/10.0 mm thick m.s. plate based on original specifications, erect the new lines, perform leak-proof welding, and conduct successful water and steam trials. cut out and remove corroded/weak juice distributors or down-take pipes in the quad bodies and installation newly fabricated replacements. cut out and remove corroded/weak manholes from pans, doors, sulphur furnaces, quad bodies, cells, and bottom saucers, and installation newly fabricated manholes based on original specifications. dismantle and remove corroded/weak umbrellas from the semi-kestner, vapour cell, quad bodies, and pans; fabricate new umbrellas according to original specifications and erect them with necessary supports. for the vapour pipes of pans and quads, provide external reinforcement using m.s. -material of 900 to 1100 mm diameter... fabricate and installation t-rings made of plate or angle iron; cut out and remove corroded or weak ammonia gas headers from the quad bodies; fabricate and erect new headers; installation nipples, valves, flanges, etc., and conduct a leak-proof trial; remove weak shells from the semi-kestner, vapour cell, and quad bodies; fabricate new ones to specifications, erect them in place, and conduct a leak-proof trial; dismantle the weak vapour pipe located between the evaporator quad bodies; fabricate and installation a new vapour pipe (600, 700, or 800 mm diameter) using new or existing plate; perform leak-proof welding and conduct a water trial; cut out and remove leaky or weak external catchers from the evaporator and pan vapour pipes; fabricate new catchers (including internals) based on samples, fit them in place, perform leak-proof welding, and conduct successful water-filling/vacuum trials; remove the top plate of the external catcher on the evaporator and pan vapour pipes to carry out necessary repairs on weak internals, cones, or shells; reinstall the top plate, perform leak-proof welding, and conduct successful water-filling/vacuum trials; cut out and remove the corroded or weak agitator of the 10" x 20" vacuum filter; fabricate a new one based on the old design, fit it in place, and conduct a successful trial; cut out and remove the corroded or weak agitator of the 8" x 16" vacuum filter; fabricate a new one based on the old design, fit it in place, and conduct a successful trial; cut out and remove the corroded or weak mud tray of the vacuum filter; fabricate a new mud tray using new or existing plate and fit it in place; replace the corroded or weak side plate of the vacuum filter and conduct a satisfactory water trial; cut out and remove the corroded or weak agitator section of the 10" x 20" vacuum filter and carry out necessary repairs based on the old design; cut out and remove the weak tapered cone of the 40-ton capacity pan. fabricate and installation a replacement using a new 12/16 mm plate, following the sample; restore all connections to their original state, ensure leak-proof welding, and conduct successful water-filling and vacuum trials. cut out and remove corroded or weak agitator sections of the 8-inch x 16-inch vacuum filter and carry out necessary repairs as per the original specifications. dismantle the bagasse silo cyclone at the vacuum filter station, replace corroded sections, perform necessary repairs, reinstall it in its original position, and restore all connections. cut out and remove the corroded or weak shell of the mud mixer; fabricate a new shell (using new or existing plate material), installation it in place, and conduct a successful trial. cut out and remove corroded or weak mud discharge chutes located at the discharge end of the mud conveyor belts; fabricate and installation replacements using existing plate material and conduct a trial. dismantle and remove corroded or weak condenser bottles from the vacuum filters; fabricate and installation new ones based on the sample and conduct a successful vacuum trial. in the boiling house, remove the foundation bolts/beds of corroded or weak pumps and construct new channel-based beds; installation new foundation bolts into the pits prepared by the civil team to create these new channel beds; mount the pump and motor, complete the necessary connections and alignment, and conduct a satisfactory trial. installation supports made from old m.s. pipes for the so2 gas lines. in muzaffarnagar, uttar pradesh,. Reference number 16257263. Don't miss out on this chance to be part of a significant project. Register for free today to access the complete tender details and download the necessary documents. Seize the opportunity with Tender 18!

T18 Ref No:16257263
Tender ID:GEM/2026/B/7705587
Tender Agency:uttar pradesh cooperative sugar factories federation ltd UPCSFFL
City:muzaffarnagar
State:uttar pradesh
Tender Related Keywords :
Description :
total quantity = 323 ----- document required from seller = experience criteria,past performance,bidder turnover,additional doc 1 (requested in atc),additional doc 2 (requested in atc) ----- evaluation method = item wise evaluation
T18 Ref No:16257263Tender Value:1738793
Tender ID:GEM/2026/B/7705587Tender EMD:Refer Document
Tender Agency:uttar pradesh cooperative sugar factories federation ltd UPCSFFLTender Fee:Refer Document
City:muzaffarnagarPublished Date:Jul 14, 2026
State:uttar pradeshDue Date:Jul 17, 2026
Tender Related Keywords :fabrication work, discharge chutes, conveyor belts, vacuum filter, angle valve, ammonia gas, angle iron, side plate, ms plate, ms pipes, so2 gas, boltsTender Opening Date:Jul 17, 2026
Description :total quantity = 323 ----- document required from seller = experience criteria,past performance,bidder turnover,additional doc 1 (requested in atc),additional doc 2 (requested in atc) ----- evaluation method = item wise evaluation

Get Complete Tender Documents to Participate

Tender NoticeBOQEligibilityEMD DetailsImportant Dates
We take all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.

Browse GeM Portal Tenders

This Government Tender has been Published  by Uttar Pradesh Cooperative Sugar Factories Federation Ltd UPCSFFL for work related to fabrication work,discharge chutes,conveyor belts,vacuum filter,angle valve,ammonia gas,angle iron,side plate,ms plate,ms pipes,so2 gas,bolts in Muzaffarnagar, Uttar Pradesh. The Tender work is corrigendum tender for erection and fabrication work b 1 , erection and fabrication work b 2 , erection and fabrication work b 3 , erection and fabrication work b 4 , erection and fabrication work b 5 , erection and fabrication work b 6 , erection and fabrication work b 7 , erection and fabrication work b 8 , erection and fabrication work b 9 , erection and fabrication work b 10 , erection and fabrication work b 11 , erection and fabrication work b 12 , erection and fabrication work b 13 , erection and fabrication work b 14 , erection and fabrication work b 15 , erection and fabrication work b 16 , erection and fabrication work b 17 , erection and fabrication work b 18 , erection and fabrication work b 19 , erection and fabrication work b 20 , erection and fabrication work b 21 , erection and fabrication work b 22 , erection and fabrication work b 23 , erection and fabrication work b 24 , erection and fabrication work b 25 , erection and fabrication work b 26 , erection and fabrication work b 27 , erection and fabrication work b 28 , erection and fabrication work b 29 , erection and fabrication work b 30 , erection and fabrication work b 31 , erection and fabrication work b 32 , erection and fabrication work b 33 , erection and fabrication work b 34 , erection and fabrication work b 35 , erection and fabrication work b 36 , erection and fabrication work b 37 , erection and fabrication work b 38 , erection and fabrication work b 39 , erection and fabrication work b 40 , erection and fabrication work b 41 , erection and fabrication work b 42 , erection and fabrication work b 43 , erection and fabrication work b 44 , erection and fabrication work b 45 , erection and fabrication work b 46 , erection and fabrication work b 47 , erection and fabrication work b 48 , erection and fabrication work b 49 , erection and fabrication work b 50 , erection and fabrication work b 51 , erection and fabrication work b 52 , erection and fabrication work b 53 , erection and fabrication work b 54, erection and fabrication work b, cut out and remove the damaged plate; fabricate and installation a new 10 mm plate in its place, and provide support by installing angle channels beneath the bottom. dismantle and lower the clarifier coil; clean it, replace corroded flanges/pipes, refit the coil, and drill holes according to specifications. cut out and remove the corroded mud scraper plate from the clarifier; fabricate and installation a new plate, fit the scraper, and conduct a trial run. dismantle the weak mud scraper pipes in the clarifier, installation new pipes, and mount the mud scraper assembly. installation an 800/900 mm diameter rubber-seated angle valve in the steam/vapour lines of the quad, semi-kestner, and vapour cell units as directed, and conduct a leak-proof trial. to completely re-tube the quad body, cut and lower the calandria's bottom saucer; after fitting the tubes and conducting a hydraulic test on the calandria, weld the bottom saucer (internally and externally) to ensure it is leak-proof, and perform water and vacuum trials. dismantle corroded or weak vapour/exhaust steam lines associated with the semi-kestner, vapour cell, quad bodies, and pans; fabricate new lines using 8.0/10.0 mm thick m.s. plate based on original specifications, erect the new lines, perform leak-proof welding, and conduct successful water and steam trials. cut out and remove corroded/weak juice distributors or down-take pipes in the quad bodies and installation newly fabricated replacements. cut out and remove corroded/weak manholes from pans, doors, sulphur furnaces, quad bodies, cells, and bottom saucers, and installation newly fabricated manholes based on original specifications. dismantle and remove corroded/weak umbrellas from the semi-kestner, vapour cell, quad bodies, and pans; fabricate new umbrellas according to original specifications and erect them with necessary supports. for the vapour pipes of pans and quads, provide external reinforcement using m.s. -material of 900 to 1100 mm diameter... fabricate and installation t-rings made of plate or angle iron; cut out and remove corroded or weak ammonia gas headers from the quad bodies; fabricate and erect new headers; installation nipples, valves, flanges, etc., and conduct a leak-proof trial; remove weak shells from the semi-kestner, vapour cell, and quad bodies; fabricate new ones to specifications, erect them in place, and conduct a leak-proof trial; dismantle the weak vapour pipe located between the evaporator quad bodies; fabricate and installation a new vapour pipe (600, 700, or 800 mm diameter) using new or existing plate; perform leak-proof welding and conduct a water trial; cut out and remove leaky or weak external catchers from the evaporator and pan vapour pipes; fabricate new catchers (including internals) based on samples, fit them in place, perform leak-proof welding, and conduct successful water-filling/vacuum trials; remove the top plate of the external catcher on the evaporator and pan vapour pipes to carry out necessary repairs on weak internals, cones, or shells; reinstall the top plate, perform leak-proof welding, and conduct successful water-filling/vacuum trials; cut out and remove the corroded or weak agitator of the 10" x 20" vacuum filter; fabricate a new one based on the old design, fit it in place, and conduct a successful trial; cut out and remove the corroded or weak agitator of the 8" x 16" vacuum filter; fabricate a new one based on the old design, fit it in place, and conduct a successful trial; cut out and remove the corroded or weak mud tray of the vacuum filter; fabricate a new mud tray using new or existing plate and fit it in place; replace the corroded or weak side plate of the vacuum filter and conduct a satisfactory water trial; cut out and remove the corroded or weak agitator section of the 10" x 20" vacuum filter and carry out necessary repairs based on the old design; cut out and remove the weak tapered cone of the 40-ton capacity pan. fabricate and installation a replacement using a new 12/16 mm plate, following the sample; restore all connections to their original state, ensure leak-proof welding, and conduct successful water-filling and vacuum trials. cut out and remove corroded or weak agitator sections of the 8-inch x 16-inch vacuum filter and carry out necessary repairs as per the original specifications. dismantle the bagasse silo cyclone at the vacuum filter station, replace corroded sections, perform necessary repairs, reinstall it in its original position, and restore all connections. cut out and remove the corroded or weak shell of the mud mixer; fabricate a new shell (using new or existing plate material), installation it in place, and conduct a successful trial. cut out and remove corroded or weak mud discharge chutes located at the discharge end of the mud conveyor belts; fabricate and installation replacements using existing plate material and conduct a trial. dismantle and remove corroded or weak condenser bottles from the vacuum filters; fabricate and installation new ones based on the sample and conduct a successful vacuum trial. in the boiling house, remove the foundation bolts/beds of corroded or weak pumps and construct new channel-based beds; installation new foundation bolts into the pits prepared by the civil team to create these new channel beds; mount the pump and motor, complete the necessary connections and alignment, and conduct a satisfactory trial. installation supports made from old m.s. pipes for the so2 gas lines.. Tender18 Provide this type Government Tender Information on daily basis.


This tender invites eligible contractors, suppliers, manufacturers, consultants, Startups, Msmes, traders and service providers to submit bids for the specified project, supply, service, or work requirement.


Before applying, interested bidders should review the tender scope, eligibility criteria, estimated contract value, important dates, technical requirements, reqired docuent list for bidder and bid submission instructions as per provided in the official tender documents. 


This Verified Information Provide By Tender18 in this page so Bidder Can Easiy  Understanding tender  requirements and bidders can prepare a compliant and competitive tender proposal.

To participate in the corrigendum tender for erection and fabrication work b 1 , erection and fabrication work b 2 , erection and fabrication work b 3 , erection and fabrication work b 4 , erection and fabrication work b 5 , erection and fabrication work b 6 , erection and fabrication work b 7 , erection and fabrication work b 8 , erection and fabrication work b 9 , erection and fabrication work b 10 , erection and fabrication work b 11 , erection and fabrication work b 12 , erection and fabrication work b 13 , erection and fabrication work b 14 , erection and fabrication work b 15 , erection and fabrication work b 16 , erection and fabrication work b 17 , erection and fabrication work b 18 , erection and fabrication work b 19 , erection and fabrication work b 20 , erection and fabrication work b 21 , erection and fabrication work b 22 , erection and fabrication work b 23 , erection and fabrication work b 24 , erection and fabrication work b 25 , erection and fabrication work b 26 , erection and fabrication work b 27 , erection and fabrication work b 28 , erection and fabrication work b 29 , erection and fabrication work b 30 , erection and fabrication work b 31 , erection and fabrication work b 32 , erection and fabrication work b 33 , erection and fabrication work b 34 , erection and fabrication work b 35 , erection and fabrication work b 36 , erection and fabrication work b 37 , erection and fabrication work b 38 , erection and fabrication work b 39 , erection and fabrication work b 40 , erection and fabrication work b 41 , erection and fabrication work b 42 , erection and fabrication work b 43 , erection and fabrication work b 44 , erection and fabrication work b 45 , erection and fabrication work b 46 , erection and fabrication work b 47 , erection and fabrication work b 48 , erection and fabrication work b 49 , erection and fabrication work b 50 , erection and fabrication work b 51 , erection and fabrication work b 52 , erection and fabrication work b 53 , erection and fabrication work b 54, erection and fabrication work b, cut out and remove the damaged plate; fabricate and installation a new 10 mm plate in its place, and provide support by installing angle channels beneath the bottom. dismantle and lower the clarifier coil; clean it, replace corroded flanges/pipes, refit the coil, and drill holes according to specifications. cut out and remove the corroded mud scraper plate from the clarifier; fabricate and installation a new plate, fit the scraper, and conduct a trial run. dismantle the weak mud scraper pipes in the clarifier, installation new pipes, and mount the mud scraper assembly. installation an 800/900 mm diameter rubber-seated angle valve in the steam/vapour lines of the quad, semi-kestner, and vapour cell units as directed, and conduct a leak-proof trial. to completely re-tube the quad body, cut and lower the calandria's bottom saucer; after fitting the tubes and conducting a hydraulic test on the calandria, weld the bottom saucer (internally and externally) to ensure it is leak-proof, and perform water and vacuum trials. dismantle corroded or weak vapour/exhaust steam lines associated with the semi-kestner, vapour cell, quad bodies, and pans; fabricate new lines using 8.0/10.0 mm thick m.s. plate based on original specifications, erect the new lines, perform leak-proof welding, and conduct successful water and steam trials. cut out and remove corroded/weak juice distributors or down-take pipes in the quad bodies and installation newly fabricated replacements. cut out and remove corroded/weak manholes from pans, doors, sulphur furnaces, quad bodies, cells, and bottom saucers, and installation newly fabricated manholes based on original specifications. dismantle and remove corroded/weak umbrellas from the semi-kestner, vapour cell, quad bodies, and pans; fabricate new umbrellas according to original specifications and erect them with necessary supports. for the vapour pipes of pans and quads, provide external reinforcement using m.s. -material of 900 to 1100 mm diameter... fabricate and installation t-rings made of plate or angle iron; cut out and remove corroded or weak ammonia gas headers from the quad bodies; fabricate and erect new headers; installation nipples, valves, flanges, etc., and conduct a leak-proof trial; remove weak shells from the semi-kestner, vapour cell, and quad bodies; fabricate new ones to specifications, erect them in place, and conduct a leak-proof trial; dismantle the weak vapour pipe located between the evaporator quad bodies; fabricate and installation a new vapour pipe (600, 700, or 800 mm diameter) using new or existing plate; perform leak-proof welding and conduct a water trial; cut out and remove leaky or weak external catchers from the evaporator and pan vapour pipes; fabricate new catchers (including internals) based on samples, fit them in place, perform leak-proof welding, and conduct successful water-filling/vacuum trials; remove the top plate of the external catcher on the evaporator and pan vapour pipes to carry out necessary repairs on weak internals, cones, or shells; reinstall the top plate, perform leak-proof welding, and conduct successful water-filling/vacuum trials; cut out and remove the corroded or weak agitator of the 10" x 20" vacuum filter; fabricate a new one based on the old design, fit it in place, and conduct a successful trial; cut out and remove the corroded or weak agitator of the 8" x 16" vacuum filter; fabricate a new one based on the old design, fit it in place, and conduct a successful trial; cut out and remove the corroded or weak mud tray of the vacuum filter; fabricate a new mud tray using new or existing plate and fit it in place; replace the corroded or weak side plate of the vacuum filter and conduct a satisfactory water trial; cut out and remove the corroded or weak agitator section of the 10" x 20" vacuum filter and carry out necessary repairs based on the old design; cut out and remove the weak tapered cone of the 40-ton capacity pan. fabricate and installation a replacement using a new 12/16 mm plate, following the sample; restore all connections to their original state, ensure leak-proof welding, and conduct successful water-filling and vacuum trials. cut out and remove corroded or weak agitator sections of the 8-inch x 16-inch vacuum filter and carry out necessary repairs as per the original specifications. dismantle the bagasse silo cyclone at the vacuum filter station, replace corroded sections, perform necessary repairs, reinstall it in its original position, and restore all connections. cut out and remove the corroded or weak shell of the mud mixer; fabricate a new shell (using new or existing plate material), installation it in place, and conduct a successful trial. cut out and remove corroded or weak mud discharge chutes located at the discharge end of the mud conveyor belts; fabricate and installation replacements using existing plate material and conduct a trial. dismantle and remove corroded or weak condenser bottles from the vacuum filters; fabricate and installation new ones based on the sample and conduct a successful vacuum trial. in the boiling house, remove the foundation bolts/beds of corroded or weak pumps and construct new channel-based beds; installation new foundation bolts into the pits prepared by the civil team to create these new channel beds; mount the pump and motor, complete the necessary connections and alignment, and conduct a satisfactory trial. installation supports made from old m.s. pipes for the so2 gas lines., bidders should first download and review all available tender documents. These documents generally include the Notice Inviting Tender (NIT), Bill of Quantities (BOQ), technical specifications, eligibility criteria, scope of work, and bid submission instructions.


Tender Governemnt Authorities like Uttar Pradesh Cooperative Sugar Factories Federation Ltd UPCSFFL usually publish these documents on their official eProcurement portals, departmental tender portals, the GeM Tender Portal, or other government procurement platforms or on newspapre. Finding and accessing the correct tender documents across multiple portals can sometimes be time-consuming for bidders. 


To make the process easier, Tender18 provides quick access to the available tender documents related to this Muzaffarnagar , Uttar Pradesh tender on a single page. Businesses involved in fabrication work,discharge chutes,conveyor belts,vacuum filter,angle valve,ammonia gas,angle iron,side plate,ms plate,ms pipes,so2 gas,bolts related products, services, or works can conveniently download the relevant documents and review the tender requirements without spending time searching across different procurement portals.

The corrigendum tender for erection and fabrication work b 1 , erection and fabrication work b 2 , erection and fabrication work b 3 , erection and fabrication work b 4 , erection and fabrication work b 5 , erection and fabrication work b 6 , erection and fabrication work b 7 , erection and fabrication work b 8 , erection and fabrication work b 9 , erection and fabrication work b 10 , erection and fabrication work b 11 , erection and fabrication work b 12 , erection and fabrication work b 13 , erection and fabrication work b 14 , erection and fabrication work b 15 , erection and fabrication work b 16 , erection and fabrication work b 17 , erection and fabrication work b 18 , erection and fabrication work b 19 , erection and fabrication work b 20 , erection and fabrication work b 21 , erection and fabrication work b 22 , erection and fabrication work b 23 , erection and fabrication work b 24 , erection and fabrication work b 25 , erection and fabrication work b 26 , erection and fabrication work b 27 , erection and fabrication work b 28 , erection and fabrication work b 29 , erection and fabrication work b 30 , erection and fabrication work b 31 , erection and fabrication work b 32 , erection and fabrication work b 33 , erection and fabrication work b 34 , erection and fabrication work b 35 , erection and fabrication work b 36 , erection and fabrication work b 37 , erection and fabrication work b 38 , erection and fabrication work b 39 , erection and fabrication work b 40 , erection and fabrication work b 41 , erection and fabrication work b 42 , erection and fabrication work b 43 , erection and fabrication work b 44 , erection and fabrication work b 45 , erection and fabrication work b 46 , erection and fabrication work b 47 , erection and fabrication work b 48 , erection and fabrication work b 49 , erection and fabrication work b 50 , erection and fabrication work b 51 , erection and fabrication work b 52 , erection and fabrication work b 53 , erection and fabrication work b 54, erection and fabrication work b, cut out and remove the damaged plate; fabricate and installation a new 10 mm plate in its place, and provide support by installing angle channels beneath the bottom. dismantle and lower the clarifier coil; clean it, replace corroded flanges/pipes, refit the coil, and drill holes according to specifications. cut out and remove the corroded mud scraper plate from the clarifier; fabricate and installation a new plate, fit the scraper, and conduct a trial run. dismantle the weak mud scraper pipes in the clarifier, installation new pipes, and mount the mud scraper assembly. installation an 800/900 mm diameter rubber-seated angle valve in the steam/vapour lines of the quad, semi-kestner, and vapour cell units as directed, and conduct a leak-proof trial. to completely re-tube the quad body, cut and lower the calandria's bottom saucer; after fitting the tubes and conducting a hydraulic test on the calandria, weld the bottom saucer (internally and externally) to ensure it is leak-proof, and perform water and vacuum trials. dismantle corroded or weak vapour/exhaust steam lines associated with the semi-kestner, vapour cell, quad bodies, and pans; fabricate new lines using 8.0/10.0 mm thick m.s. plate based on original specifications, erect the new lines, perform leak-proof welding, and conduct successful water and steam trials. cut out and remove corroded/weak juice distributors or down-take pipes in the quad bodies and installation newly fabricated replacements. cut out and remove corroded/weak manholes from pans, doors, sulphur furnaces, quad bodies, cells, and bottom saucers, and installation newly fabricated manholes based on original specifications. dismantle and remove corroded/weak umbrellas from the semi-kestner, vapour cell, quad bodies, and pans; fabricate new umbrellas according to original specifications and erect them with necessary supports. for the vapour pipes of pans and quads, provide external reinforcement using m.s. -material of 900 to 1100 mm diameter... fabricate and installation t-rings made of plate or angle iron; cut out and remove corroded or weak ammonia gas headers from the quad bodies; fabricate and erect new headers; installation nipples, valves, flanges, etc., and conduct a leak-proof trial; remove weak shells from the semi-kestner, vapour cell, and quad bodies; fabricate new ones to specifications, erect them in place, and conduct a leak-proof trial; dismantle the weak vapour pipe located between the evaporator quad bodies; fabricate and installation a new vapour pipe (600, 700, or 800 mm diameter) using new or existing plate; perform leak-proof welding and conduct a water trial; cut out and remove leaky or weak external catchers from the evaporator and pan vapour pipes; fabricate new catchers (including internals) based on samples, fit them in place, perform leak-proof welding, and conduct successful water-filling/vacuum trials; remove the top plate of the external catcher on the evaporator and pan vapour pipes to carry out necessary repairs on weak internals, cones, or shells; reinstall the top plate, perform leak-proof welding, and conduct successful water-filling/vacuum trials; cut out and remove the corroded or weak agitator of the 10" x 20" vacuum filter; fabricate a new one based on the old design, fit it in place, and conduct a successful trial; cut out and remove the corroded or weak agitator of the 8" x 16" vacuum filter; fabricate a new one based on the old design, fit it in place, and conduct a successful trial; cut out and remove the corroded or weak mud tray of the vacuum filter; fabricate a new mud tray using new or existing plate and fit it in place; replace the corroded or weak side plate of the vacuum filter and conduct a satisfactory water trial; cut out and remove the corroded or weak agitator section of the 10" x 20" vacuum filter and carry out necessary repairs based on the old design; cut out and remove the weak tapered cone of the 40-ton capacity pan. fabricate and installation a replacement using a new 12/16 mm plate, following the sample; restore all connections to their original state, ensure leak-proof welding, and conduct successful water-filling and vacuum trials. cut out and remove corroded or weak agitator sections of the 8-inch x 16-inch vacuum filter and carry out necessary repairs as per the original specifications. dismantle the bagasse silo cyclone at the vacuum filter station, replace corroded sections, perform necessary repairs, reinstall it in its original position, and restore all connections. cut out and remove the corroded or weak shell of the mud mixer; fabricate a new shell (using new or existing plate material), installation it in place, and conduct a successful trial. cut out and remove corroded or weak mud discharge chutes located at the discharge end of the mud conveyor belts; fabricate and installation replacements using existing plate material and conduct a trial. dismantle and remove corroded or weak condenser bottles from the vacuum filters; fabricate and installation new ones based on the sample and conduct a successful vacuum trial. in the boiling house, remove the foundation bolts/beds of corroded or weak pumps and construct new channel-based beds; installation new foundation bolts into the pits prepared by the civil team to create these new channel beds; mount the pump and motor, complete the necessary connections and alignment, and conduct a satisfactory trial. installation supports made from old m.s. pipes for the so2 gas lines. from Muzaffarnagar, Uttar Pradesh may be relevant for contractors, suppliers, vendors, manufacturers, consultants, service providers, startups, MSMEs, and other organizations involved in fabrication work,discharge chutes,conveyor belts,vacuum filter,angle valve,ammonia gas,angle iron,side plate,ms plate,ms pipes,so2 gas,bolts related products, services, or works. However, eligibility to participate depends on the qualification criteria specified by Uttar Pradesh Cooperative Sugar Factories Federation Ltd UPCSFFL in the official tender documents.

Before submitting a bid, interested applicants should carefully review the eligibility conditions, technical requirements, financial criteria, work experience requirements, annual turnover conditions, registrations, certifications, and any other supporting documents required by the tendering authority. The detailed qualification requirements and bidder eligibility criteria are available in the tender notice and related documents provided on this page. 

Ensuring compliance with all eligibility and qualification requirements before bid submission can help bidders avoid disqualification and improve their chances of successful participation in the tender process.

Tende18 provides comprehensive tender bidding services, including a complete tender summary along with a detailed analysis of the Tender Qualification and Eligibility Criteria.

Interested in participating in the corrigendum tender for erection and fabrication work b 1 , erection and fabrication work b 2 , erection and fabrication work b 3 , erection and fabrication work b 4 , erection and fabrication work b 5 , erection and fabrication work b 6 , erection and fabrication work b 7 , erection and fabrication work b 8 , erection and fabrication work b 9 , erection and fabrication work b 10 , erection and fabrication work b 11 , erection and fabrication work b 12 , erection and fabrication work b 13 , erection and fabrication work b 14 , erection and fabrication work b 15 , erection and fabrication work b 16 , erection and fabrication work b 17 , erection and fabrication work b 18 , erection and fabrication work b 19 , erection and fabrication work b 20 , erection and fabrication work b 21 , erection and fabrication work b 22 , erection and fabrication work b 23 , erection and fabrication work b 24 , erection and fabrication work b 25 , erection and fabrication work b 26 , erection and fabrication work b 27 , erection and fabrication work b 28 , erection and fabrication work b 29 , erection and fabrication work b 30 , erection and fabrication work b 31 , erection and fabrication work b 32 , erection and fabrication work b 33 , erection and fabrication work b 34 , erection and fabrication work b 35 , erection and fabrication work b 36 , erection and fabrication work b 37 , erection and fabrication work b 38 , erection and fabrication work b 39 , erection and fabrication work b 40 , erection and fabrication work b 41 , erection and fabrication work b 42 , erection and fabrication work b 43 , erection and fabrication work b 44 , erection and fabrication work b 45 , erection and fabrication work b 46 , erection and fabrication work b 47 , erection and fabrication work b 48 , erection and fabrication work b 49 , erection and fabrication work b 50 , erection and fabrication work b 51 , erection and fabrication work b 52 , erection and fabrication work b 53 , erection and fabrication work b 54, erection and fabrication work b, cut out and remove the damaged plate; fabricate and installation a new 10 mm plate in its place, and provide support by installing angle channels beneath the bottom. dismantle and lower the clarifier coil; clean it, replace corroded flanges/pipes, refit the coil, and drill holes according to specifications. cut out and remove the corroded mud scraper plate from the clarifier; fabricate and installation a new plate, fit the scraper, and conduct a trial run. dismantle the weak mud scraper pipes in the clarifier, installation new pipes, and mount the mud scraper assembly. installation an 800/900 mm diameter rubber-seated angle valve in the steam/vapour lines of the quad, semi-kestner, and vapour cell units as directed, and conduct a leak-proof trial. to completely re-tube the quad body, cut and lower the calandria's bottom saucer; after fitting the tubes and conducting a hydraulic test on the calandria, weld the bottom saucer (internally and externally) to ensure it is leak-proof, and perform water and vacuum trials. dismantle corroded or weak vapour/exhaust steam lines associated with the semi-kestner, vapour cell, quad bodies, and pans; fabricate new lines using 8.0/10.0 mm thick m.s. plate based on original specifications, erect the new lines, perform leak-proof welding, and conduct successful water and steam trials. cut out and remove corroded/weak juice distributors or down-take pipes in the quad bodies and installation newly fabricated replacements. cut out and remove corroded/weak manholes from pans, doors, sulphur furnaces, quad bodies, cells, and bottom saucers, and installation newly fabricated manholes based on original specifications. dismantle and remove corroded/weak umbrellas from the semi-kestner, vapour cell, quad bodies, and pans; fabricate new umbrellas according to original specifications and erect them with necessary supports. for the vapour pipes of pans and quads, provide external reinforcement using m.s. -material of 900 to 1100 mm diameter... fabricate and installation t-rings made of plate or angle iron; cut out and remove corroded or weak ammonia gas headers from the quad bodies; fabricate and erect new headers; installation nipples, valves, flanges, etc., and conduct a leak-proof trial; remove weak shells from the semi-kestner, vapour cell, and quad bodies; fabricate new ones to specifications, erect them in place, and conduct a leak-proof trial; dismantle the weak vapour pipe located between the evaporator quad bodies; fabricate and installation a new vapour pipe (600, 700, or 800 mm diameter) using new or existing plate; perform leak-proof welding and conduct a water trial; cut out and remove leaky or weak external catchers from the evaporator and pan vapour pipes; fabricate new catchers (including internals) based on samples, fit them in place, perform leak-proof welding, and conduct successful water-filling/vacuum trials; remove the top plate of the external catcher on the evaporator and pan vapour pipes to carry out necessary repairs on weak internals, cones, or shells; reinstall the top plate, perform leak-proof welding, and conduct successful water-filling/vacuum trials; cut out and remove the corroded or weak agitator of the 10" x 20" vacuum filter; fabricate a new one based on the old design, fit it in place, and conduct a successful trial; cut out and remove the corroded or weak agitator of the 8" x 16" vacuum filter; fabricate a new one based on the old design, fit it in place, and conduct a successful trial; cut out and remove the corroded or weak mud tray of the vacuum filter; fabricate a new mud tray using new or existing plate and fit it in place; replace the corroded or weak side plate of the vacuum filter and conduct a satisfactory water trial; cut out and remove the corroded or weak agitator section of the 10" x 20" vacuum filter and carry out necessary repairs based on the old design; cut out and remove the weak tapered cone of the 40-ton capacity pan. fabricate and installation a replacement using a new 12/16 mm plate, following the sample; restore all connections to their original state, ensure leak-proof welding, and conduct successful water-filling and vacuum trials. cut out and remove corroded or weak agitator sections of the 8-inch x 16-inch vacuum filter and carry out necessary repairs as per the original specifications. dismantle the bagasse silo cyclone at the vacuum filter station, replace corroded sections, perform necessary repairs, reinstall it in its original position, and restore all connections. cut out and remove the corroded or weak shell of the mud mixer; fabricate a new shell (using new or existing plate material), installation it in place, and conduct a successful trial. cut out and remove corroded or weak mud discharge chutes located at the discharge end of the mud conveyor belts; fabricate and installation replacements using existing plate material and conduct a trial. dismantle and remove corroded or weak condenser bottles from the vacuum filters; fabricate and installation new ones based on the sample and conduct a successful vacuum trial. in the boiling house, remove the foundation bolts/beds of corroded or weak pumps and construct new channel-based beds; installation new foundation bolts into the pits prepared by the civil team to create these new channel beds; mount the pump and motor, complete the necessary connections and alignment, and conduct a satisfactory trial. installation supports made from old m.s. pipes for the so2 gas lines. issued by Uttar Pradesh Cooperative Sugar Factories Federation Ltd UPCSFFL for fabrication work,discharge chutes,conveyor belts,vacuum filter,angle valve,ammonia gas,angle iron,side plate,ms plate,ms pipes,so2 gas,bolts related work in Muzaffarnagar, Uttar Pradesh? TENDER18 provides complete assistance to help businesses understand tender requirements, access tender documents, review eligibility criteria, qualification requirements, important dates, and bid submission guidelines associated with this tender.

Our Tender18 Expert Technical team can assist with vendor and GeM registration on the relevant departmental, eProcurement, GeM, or government tender portal, preparation of technical and financial bid documents, compliance with qualification criteria, document verification, and complete online tender submission support. Whether you are a contractor, supplier, manufacturer, consultant, startup, or MSME working in the field of fabrication work,discharge chutes,conveyor belts,vacuum filter,angle valve,ammonia gas,angle iron,side plate,ms plate,ms pipes,so2 gas,bolts, Tender18 can help simplify the tender participation process and support you throughout every stage of bidding for this tender. so that tender18 is one the top leading tender consultant in Inda.

1.

Whom should I contact if I have further queries about the Tender scope?

You can fill out the integrated inquiry form below on this detail page to share your company profile. Our consultancy desk will review your query regarding fabrication work,discharge chutes,conveyor belts,vacuum filter,angle valve,ammonia gas,angle iron,side plate,ms plate,ms pipes,so2 gas,bolts parameters and guide you on how to coordinate efficiently with the procurement team of Uttar Pradesh Cooperative Sugar Factories Federation Ltd UPCSFFL

2.

How can Tender18 assist my business in winning this government contract?

Tender18 provides end-to-end professional bidding support and documentation advisory for Corrigendum Tender For Erection And Fabrication Work B 1 , Erection And Fabrication Work B 2 , Erection And Fabrication Work B 3 , Erection And Fabrication Work B 4 , Erection And Fabrication Work B 5 , Erection And Fabrication Work B 6 , Erection And Fabrication Work B 7 , Erection And Fabrication Work B 8 , Erection And Fabrication Work B 9 , Erection And Fabrication Work B 10 , Erection And Fabrication Work B 11 , Erection And Fabrication Work B 12 , Erection And Fabrication Work B 13 , Erection And Fabrication Work B 14 , Erection And Fabrication Work B 15 , Erection And Fabrication Work B 16 , Erection And Fabrication Work B 17 , Erection And Fabrication Work B 18 , Erection And Fabrication Work B 19 , Erection And Fabrication Work B 20 , Erection And Fabrication Work B 21 , Erection And Fabrication Work B 22 , Erection And Fabrication Work B 23 , Erection And Fabrication Work B 24 , Erection And Fabrication Work B 25 , Erection And Fabrication Work B 26 , Erection And Fabrication Work B 27 , Erection And Fabrication Work B 28 , Erection And Fabrication Work B 29 , Erection And Fabrication Work B 30 , Erection And Fabrication Work B 31 , Erection And Fabrication Work B 32 , Erection And Fabrication Work B 33 , Erection And Fabrication Work B 34 , Erection And Fabrication Work B 35 , Erection And Fabrication Work B 36 , Erection And Fabrication Work B 37 , Erection And Fabrication Work B 38 , Erection And Fabrication Work B 39 , Erection And Fabrication Work B 40 , Erection And Fabrication Work B 41 , Erection And Fabrication Work B 42 , Erection And Fabrication Work B 43 , Erection And Fabrication Work B 44 , Erection And Fabrication Work B 45 , Erection And Fabrication Work B 46 , Erection And Fabrication Work B 47 , Erection And Fabrication Work B 48 , Erection And Fabrication Work B 49 , Erection And Fabrication Work B 50 , Erection And Fabrication Work B 51 , Erection And Fabrication Work B 52 , Erection And Fabrication Work B 53 , Erection And Fabrication Work B 54, Erection And Fabrication Work B, Cut Out And Remove The Damaged Plate; Fabricate And Installation A New 10 Mm Plate In Its Place, And Provide Support By Installing Angle Channels Beneath The Bottom. Dismantle And Lower The Clarifier Coil; Clean It, Replace Corroded Flanges/pipes, Refit The Coil, And Drill Holes According To Specifications. Cut Out And Remove The Corroded Mud Scraper Plate From The Clarifier; Fabricate And Installation A New Plate, Fit The Scraper, And Conduct A Trial Run. Dismantle The Weak Mud Scraper Pipes In The Clarifier, Installation New Pipes, And Mount The Mud Scraper Assembly. Installation An 800/900 Mm Diameter Rubber-seated Angle Valve In The Steam/vapour Lines Of The Quad, Semi-kestner, And Vapour Cell Units As Directed, And Conduct A Leak-proof Trial. To Completely Re-tube The Quad Body, Cut And Lower The Calandria's Bottom Saucer; After Fitting The Tubes And Conducting A Hydraulic Test On The Calandria, Weld The Bottom Saucer (internally And Externally) To Ensure It Is Leak-proof, And Perform Water And Vacuum Trials. Dismantle Corroded Or Weak Vapour/exhaust Steam Lines Associated With The Semi-kestner, Vapour Cell, Quad Bodies, And Pans; Fabricate New Lines Using 8.0/10.0 Mm Thick M.s. Plate Based On Original Specifications, Erect The New Lines, Perform Leak-proof Welding, And Conduct Successful Water And Steam Trials. Cut Out And Remove Corroded/weak Juice Distributors Or Down-take Pipes In The Quad Bodies And Installation Newly Fabricated Replacements. Cut Out And Remove Corroded/weak Manholes From Pans, Doors, Sulphur Furnaces, Quad Bodies, Cells, And Bottom Saucers, And Installation Newly Fabricated Manholes Based On Original Specifications. Dismantle And Remove Corroded/weak Umbrellas From The Semi-kestner, Vapour Cell, Quad Bodies, And Pans; Fabricate New Umbrellas According To Original Specifications And Erect Them With Necessary Supports. For The Vapour Pipes Of Pans And Quads, Provide External Reinforcement Using M.s. -material Of 900 To 1100 Mm Diameter... Fabricate And Installation T-rings Made Of Plate Or Angle Iron; Cut Out And Remove Corroded Or Weak Ammonia Gas Headers From The Quad Bodies; Fabricate And Erect New Headers; Installation Nipples, Valves, Flanges, Etc., And Conduct A Leak-proof Trial; Remove Weak Shells From The Semi-kestner, Vapour Cell, And Quad Bodies; Fabricate New Ones To Specifications, Erect Them In Place, And Conduct A Leak-proof Trial; Dismantle The Weak Vapour Pipe Located Between The Evaporator Quad Bodies; Fabricate And Installation A New Vapour Pipe (600, 700, Or 800 Mm Diameter) Using New Or Existing Plate; Perform Leak-proof Welding And Conduct A Water Trial; Cut Out And Remove Leaky Or Weak External Catchers From The Evaporator And Pan Vapour Pipes; Fabricate New Catchers (including Internals) Based On Samples, Fit Them In Place, Perform Leak-proof Welding, And Conduct Successful Water-filling/vacuum Trials; Remove The Top Plate Of The External Catcher On The Evaporator And Pan Vapour Pipes To Carry Out Necessary Repairs On Weak Internals, Cones, Or Shells; Reinstall The Top Plate, Perform Leak-proof Welding, And Conduct Successful Water-filling/vacuum Trials; Cut Out And Remove The Corroded Or Weak Agitator Of The 10" X 20" Vacuum Filter; Fabricate A New One Based On The Old Design, Fit It In Place, And Conduct A Successful Trial; Cut Out And Remove The Corroded Or Weak Agitator Of The 8" X 16" Vacuum Filter; Fabricate A New One Based On The Old Design, Fit It In Place, And Conduct A Successful Trial; Cut Out And Remove The Corroded Or Weak Mud Tray Of The Vacuum Filter; Fabricate A New Mud Tray Using New Or Existing Plate And Fit It In Place; Replace The Corroded Or Weak Side Plate Of The Vacuum Filter And Conduct A Satisfactory Water Trial; Cut Out And Remove The Corroded Or Weak Agitator Section Of The 10" X 20" Vacuum Filter And Carry Out Necessary Repairs Based On The Old Design; Cut Out And Remove The Weak Tapered Cone Of The 40-ton Capacity Pan. Fabricate And Installation A Replacement Using A New 12/16 Mm Plate, Following The Sample; Restore All Connections To Their Original State, Ensure Leak-proof Welding, And Conduct Successful Water-filling And Vacuum Trials. Cut Out And Remove Corroded Or Weak Agitator Sections Of The 8-inch X 16-inch Vacuum Filter And Carry Out Necessary Repairs As Per The Original Specifications. Dismantle The Bagasse Silo Cyclone At The Vacuum Filter Station, Replace Corroded Sections, Perform Necessary Repairs, Reinstall It In Its Original Position, And Restore All Connections. Cut Out And Remove The Corroded Or Weak Shell Of The Mud Mixer; Fabricate A New Shell (using New Or Existing Plate Material), Installation It In Place, And Conduct A Successful Trial. Cut Out And Remove Corroded Or Weak Mud Discharge Chutes Located At The Discharge End Of The Mud Conveyor Belts; Fabricate And Installation Replacements Using Existing Plate Material And Conduct A Trial. Dismantle And Remove Corroded Or Weak Condenser Bottles From The Vacuum Filters; Fabricate And Installation New Ones Based On The Sample And Conduct A Successful Vacuum Trial. In The Boiling House, Remove The Foundation Bolts/beds Of Corroded Or Weak Pumps And Construct New Channel-based Beds; Installation New Foundation Bolts Into The Pits Prepared By The Civil Team To Create These New Channel Beds; Mount The Pump And Motor, Complete The Necessary Connections And Alignment, And Conduct A Satisfactory Trial. Installation Supports Made From Old M.s. Pipes For The So2 Gas Lines. . Our senior analysts help you decode the complete project guidelines, manage accurate costing sheets, and complete error-free submissions on the official platform used by Uttar Pradesh Cooperative Sugar Factories Federation Ltd UPCSFFL.

3.

What are the main reasons for a technical tender rejection?

Most online bids face rejection during the initial evaluation round due to avoidable errors like uploading blurred document scans, submitting expired DSCs, or missing critical experience papers required for Corrigendum Tender For Erection And Fabrication Work B 1 , Erection And Fabrication Work B 2 , Erection And Fabrication Work B 3 , Erection And Fabrication Work B 4 , Erection And Fabrication Work B 5 , Erection And Fabrication Work B 6 , Erection And Fabrication Work B 7 , Erection And Fabrication Work B 8 , Erection And Fabrication Work B 9 , Erection And Fabrication Work B 10 , Erection And Fabrication Work B 11 , Erection And Fabrication Work B 12 , Erection And Fabrication Work B 13 , Erection And Fabrication Work B 14 , Erection And Fabrication Work B 15 , Erection And Fabrication Work B 16 , Erection And Fabrication Work B 17 , Erection And Fabrication Work B 18 , Erection And Fabrication Work B 19 , Erection And Fabrication Work B 20 , Erection And Fabrication Work B 21 , Erection And Fabrication Work B 22 , Erection And Fabrication Work B 23 , Erection And Fabrication Work B 24 , Erection And Fabrication Work B 25 , Erection And Fabrication Work B 26 , Erection And Fabrication Work B 27 , Erection And Fabrication Work B 28 , Erection And Fabrication Work B 29 , Erection And Fabrication Work B 30 , Erection And Fabrication Work B 31 , Erection And Fabrication Work B 32 , Erection And Fabrication Work B 33 , Erection And Fabrication Work B 34 , Erection And Fabrication Work B 35 , Erection And Fabrication Work B 36 , Erection And Fabrication Work B 37 , Erection And Fabrication Work B 38 , Erection And Fabrication Work B 39 , Erection And Fabrication Work B 40 , Erection And Fabrication Work B 41 , Erection And Fabrication Work B 42 , Erection And Fabrication Work B 43 , Erection And Fabrication Work B 44 , Erection And Fabrication Work B 45 , Erection And Fabrication Work B 46 , Erection And Fabrication Work B 47 , Erection And Fabrication Work B 48 , Erection And Fabrication Work B 49 , Erection And Fabrication Work B 50 , Erection And Fabrication Work B 51 , Erection And Fabrication Work B 52 , Erection And Fabrication Work B 53 , Erection And Fabrication Work B 54, Erection And Fabrication Work B, Cut Out And Remove The Damaged Plate; Fabricate And Installation A New 10 Mm Plate In Its Place, And Provide Support By Installing Angle Channels Beneath The Bottom. Dismantle And Lower The Clarifier Coil; Clean It, Replace Corroded Flanges/pipes, Refit The Coil, And Drill Holes According To Specifications. Cut Out And Remove The Corroded Mud Scraper Plate From The Clarifier; Fabricate And Installation A New Plate, Fit The Scraper, And Conduct A Trial Run. Dismantle The Weak Mud Scraper Pipes In The Clarifier, Installation New Pipes, And Mount The Mud Scraper Assembly. Installation An 800/900 Mm Diameter Rubber-seated Angle Valve In The Steam/vapour Lines Of The Quad, Semi-kestner, And Vapour Cell Units As Directed, And Conduct A Leak-proof Trial. To Completely Re-tube The Quad Body, Cut And Lower The Calandria's Bottom Saucer; After Fitting The Tubes And Conducting A Hydraulic Test On The Calandria, Weld The Bottom Saucer (internally And Externally) To Ensure It Is Leak-proof, And Perform Water And Vacuum Trials. Dismantle Corroded Or Weak Vapour/exhaust Steam Lines Associated With The Semi-kestner, Vapour Cell, Quad Bodies, And Pans; Fabricate New Lines Using 8.0/10.0 Mm Thick M.s. Plate Based On Original Specifications, Erect The New Lines, Perform Leak-proof Welding, And Conduct Successful Water And Steam Trials. Cut Out And Remove Corroded/weak Juice Distributors Or Down-take Pipes In The Quad Bodies And Installation Newly Fabricated Replacements. Cut Out And Remove Corroded/weak Manholes From Pans, Doors, Sulphur Furnaces, Quad Bodies, Cells, And Bottom Saucers, And Installation Newly Fabricated Manholes Based On Original Specifications. Dismantle And Remove Corroded/weak Umbrellas From The Semi-kestner, Vapour Cell, Quad Bodies, And Pans; Fabricate New Umbrellas According To Original Specifications And Erect Them With Necessary Supports. For The Vapour Pipes Of Pans And Quads, Provide External Reinforcement Using M.s. -material Of 900 To 1100 Mm Diameter... Fabricate And Installation T-rings Made Of Plate Or Angle Iron; Cut Out And Remove Corroded Or Weak Ammonia Gas Headers From The Quad Bodies; Fabricate And Erect New Headers; Installation Nipples, Valves, Flanges, Etc., And Conduct A Leak-proof Trial; Remove Weak Shells From The Semi-kestner, Vapour Cell, And Quad Bodies; Fabricate New Ones To Specifications, Erect Them In Place, And Conduct A Leak-proof Trial; Dismantle The Weak Vapour Pipe Located Between The Evaporator Quad Bodies; Fabricate And Installation A New Vapour Pipe (600, 700, Or 800 Mm Diameter) Using New Or Existing Plate; Perform Leak-proof Welding And Conduct A Water Trial; Cut Out And Remove Leaky Or Weak External Catchers From The Evaporator And Pan Vapour Pipes; Fabricate New Catchers (including Internals) Based On Samples, Fit Them In Place, Perform Leak-proof Welding, And Conduct Successful Water-filling/vacuum Trials; Remove The Top Plate Of The External Catcher On The Evaporator And Pan Vapour Pipes To Carry Out Necessary Repairs On Weak Internals, Cones, Or Shells; Reinstall The Top Plate, Perform Leak-proof Welding, And Conduct Successful Water-filling/vacuum Trials; Cut Out And Remove The Corroded Or Weak Agitator Of The 10" X 20" Vacuum Filter; Fabricate A New One Based On The Old Design, Fit It In Place, And Conduct A Successful Trial; Cut Out And Remove The Corroded Or Weak Agitator Of The 8" X 16" Vacuum Filter; Fabricate A New One Based On The Old Design, Fit It In Place, And Conduct A Successful Trial; Cut Out And Remove The Corroded Or Weak Mud Tray Of The Vacuum Filter; Fabricate A New Mud Tray Using New Or Existing Plate And Fit It In Place; Replace The Corroded Or Weak Side Plate Of The Vacuum Filter And Conduct A Satisfactory Water Trial; Cut Out And Remove The Corroded Or Weak Agitator Section Of The 10" X 20" Vacuum Filter And Carry Out Necessary Repairs Based On The Old Design; Cut Out And Remove The Weak Tapered Cone Of The 40-ton Capacity Pan. Fabricate And Installation A Replacement Using A New 12/16 Mm Plate, Following The Sample; Restore All Connections To Their Original State, Ensure Leak-proof Welding, And Conduct Successful Water-filling And Vacuum Trials. Cut Out And Remove Corroded Or Weak Agitator Sections Of The 8-inch X 16-inch Vacuum Filter And Carry Out Necessary Repairs As Per The Original Specifications. Dismantle The Bagasse Silo Cyclone At The Vacuum Filter Station, Replace Corroded Sections, Perform Necessary Repairs, Reinstall It In Its Original Position, And Restore All Connections. Cut Out And Remove The Corroded Or Weak Shell Of The Mud Mixer; Fabricate A New Shell (using New Or Existing Plate Material), Installation It In Place, And Conduct A Successful Trial. Cut Out And Remove Corroded Or Weak Mud Discharge Chutes Located At The Discharge End Of The Mud Conveyor Belts; Fabricate And Installation Replacements Using Existing Plate Material And Conduct A Trial. Dismantle And Remove Corroded Or Weak Condenser Bottles From The Vacuum Filters; Fabricate And Installation New Ones Based On The Sample And Conduct A Successful Vacuum Trial. In The Boiling House, Remove The Foundation Bolts/beds Of Corroded Or Weak Pumps And Construct New Channel-based Beds; Installation New Foundation Bolts Into The Pits Prepared By The Civil Team To Create These New Channel Beds; Mount The Pump And Motor, Complete The Necessary Connections And Alignment, And Conduct A Satisfactory Trial. Installation Supports Made From Old M.s. Pipes For The So2 Gas Lines. in Uttar Pradesh.

4.

Can contractors located outside the local region participate in this bid?

Eligibility for outstation bidders depends entirely on the terms set inside the document for Corrigendum Tender For Erection And Fabrication Work B 1 , Erection And Fabrication Work B 2 , Erection And Fabrication Work B 3 , Erection And Fabrication Work B 4 , Erection And Fabrication Work B 5 , Erection And Fabrication Work B 6 , Erection And Fabrication Work B 7 , Erection And Fabrication Work B 8 , Erection And Fabrication Work B 9 , Erection And Fabrication Work B 10 , Erection And Fabrication Work B 11 , Erection And Fabrication Work B 12 , Erection And Fabrication Work B 13 , Erection And Fabrication Work B 14 , Erection And Fabrication Work B 15 , Erection And Fabrication Work B 16 , Erection And Fabrication Work B 17 , Erection And Fabrication Work B 18 , Erection And Fabrication Work B 19 , Erection And Fabrication Work B 20 , Erection And Fabrication Work B 21 , Erection And Fabrication Work B 22 , Erection And Fabrication Work B 23 , Erection And Fabrication Work B 24 , Erection And Fabrication Work B 25 , Erection And Fabrication Work B 26 , Erection And Fabrication Work B 27 , Erection And Fabrication Work B 28 , Erection And Fabrication Work B 29 , Erection And Fabrication Work B 30 , Erection And Fabrication Work B 31 , Erection And Fabrication Work B 32 , Erection And Fabrication Work B 33 , Erection And Fabrication Work B 34 , Erection And Fabrication Work B 35 , Erection And Fabrication Work B 36 , Erection And Fabrication Work B 37 , Erection And Fabrication Work B 38 , Erection And Fabrication Work B 39 , Erection And Fabrication Work B 40 , Erection And Fabrication Work B 41 , Erection And Fabrication Work B 42 , Erection And Fabrication Work B 43 , Erection And Fabrication Work B 44 , Erection And Fabrication Work B 45 , Erection And Fabrication Work B 46 , Erection And Fabrication Work B 47 , Erection And Fabrication Work B 48 , Erection And Fabrication Work B 49 , Erection And Fabrication Work B 50 , Erection And Fabrication Work B 51 , Erection And Fabrication Work B 52 , Erection And Fabrication Work B 53 , Erection And Fabrication Work B 54, Erection And Fabrication Work B, Cut Out And Remove The Damaged Plate; Fabricate And Installation A New 10 Mm Plate In Its Place, And Provide Support By Installing Angle Channels Beneath The Bottom. Dismantle And Lower The Clarifier Coil; Clean It, Replace Corroded Flanges/pipes, Refit The Coil, And Drill Holes According To Specifications. Cut Out And Remove The Corroded Mud Scraper Plate From The Clarifier; Fabricate And Installation A New Plate, Fit The Scraper, And Conduct A Trial Run. Dismantle The Weak Mud Scraper Pipes In The Clarifier, Installation New Pipes, And Mount The Mud Scraper Assembly. Installation An 800/900 Mm Diameter Rubber-seated Angle Valve In The Steam/vapour Lines Of The Quad, Semi-kestner, And Vapour Cell Units As Directed, And Conduct A Leak-proof Trial. To Completely Re-tube The Quad Body, Cut And Lower The Calandria's Bottom Saucer; After Fitting The Tubes And Conducting A Hydraulic Test On The Calandria, Weld The Bottom Saucer (internally And Externally) To Ensure It Is Leak-proof, And Perform Water And Vacuum Trials. Dismantle Corroded Or Weak Vapour/exhaust Steam Lines Associated With The Semi-kestner, Vapour Cell, Quad Bodies, And Pans; Fabricate New Lines Using 8.0/10.0 Mm Thick M.s. Plate Based On Original Specifications, Erect The New Lines, Perform Leak-proof Welding, And Conduct Successful Water And Steam Trials. Cut Out And Remove Corroded/weak Juice Distributors Or Down-take Pipes In The Quad Bodies And Installation Newly Fabricated Replacements. Cut Out And Remove Corroded/weak Manholes From Pans, Doors, Sulphur Furnaces, Quad Bodies, Cells, And Bottom Saucers, And Installation Newly Fabricated Manholes Based On Original Specifications. Dismantle And Remove Corroded/weak Umbrellas From The Semi-kestner, Vapour Cell, Quad Bodies, And Pans; Fabricate New Umbrellas According To Original Specifications And Erect Them With Necessary Supports. For The Vapour Pipes Of Pans And Quads, Provide External Reinforcement Using M.s. -material Of 900 To 1100 Mm Diameter... Fabricate And Installation T-rings Made Of Plate Or Angle Iron; Cut Out And Remove Corroded Or Weak Ammonia Gas Headers From The Quad Bodies; Fabricate And Erect New Headers; Installation Nipples, Valves, Flanges, Etc., And Conduct A Leak-proof Trial; Remove Weak Shells From The Semi-kestner, Vapour Cell, And Quad Bodies; Fabricate New Ones To Specifications, Erect Them In Place, And Conduct A Leak-proof Trial; Dismantle The Weak Vapour Pipe Located Between The Evaporator Quad Bodies; Fabricate And Installation A New Vapour Pipe (600, 700, Or 800 Mm Diameter) Using New Or Existing Plate; Perform Leak-proof Welding And Conduct A Water Trial; Cut Out And Remove Leaky Or Weak External Catchers From The Evaporator And Pan Vapour Pipes; Fabricate New Catchers (including Internals) Based On Samples, Fit Them In Place, Perform Leak-proof Welding, And Conduct Successful Water-filling/vacuum Trials; Remove The Top Plate Of The External Catcher On The Evaporator And Pan Vapour Pipes To Carry Out Necessary Repairs On Weak Internals, Cones, Or Shells; Reinstall The Top Plate, Perform Leak-proof Welding, And Conduct Successful Water-filling/vacuum Trials; Cut Out And Remove The Corroded Or Weak Agitator Of The 10" X 20" Vacuum Filter; Fabricate A New One Based On The Old Design, Fit It In Place, And Conduct A Successful Trial; Cut Out And Remove The Corroded Or Weak Agitator Of The 8" X 16" Vacuum Filter; Fabricate A New One Based On The Old Design, Fit It In Place, And Conduct A Successful Trial; Cut Out And Remove The Corroded Or Weak Mud Tray Of The Vacuum Filter; Fabricate A New Mud Tray Using New Or Existing Plate And Fit It In Place; Replace The Corroded Or Weak Side Plate Of The Vacuum Filter And Conduct A Satisfactory Water Trial; Cut Out And Remove The Corroded Or Weak Agitator Section Of The 10" X 20" Vacuum Filter And Carry Out Necessary Repairs Based On The Old Design; Cut Out And Remove The Weak Tapered Cone Of The 40-ton Capacity Pan. Fabricate And Installation A Replacement Using A New 12/16 Mm Plate, Following The Sample; Restore All Connections To Their Original State, Ensure Leak-proof Welding, And Conduct Successful Water-filling And Vacuum Trials. Cut Out And Remove Corroded Or Weak Agitator Sections Of The 8-inch X 16-inch Vacuum Filter And Carry Out Necessary Repairs As Per The Original Specifications. Dismantle The Bagasse Silo Cyclone At The Vacuum Filter Station, Replace Corroded Sections, Perform Necessary Repairs, Reinstall It In Its Original Position, And Restore All Connections. Cut Out And Remove The Corroded Or Weak Shell Of The Mud Mixer; Fabricate A New Shell (using New Or Existing Plate Material), Installation It In Place, And Conduct A Successful Trial. Cut Out And Remove Corroded Or Weak Mud Discharge Chutes Located At The Discharge End Of The Mud Conveyor Belts; Fabricate And Installation Replacements Using Existing Plate Material And Conduct A Trial. Dismantle And Remove Corroded Or Weak Condenser Bottles From The Vacuum Filters; Fabricate And Installation New Ones Based On The Sample And Conduct A Successful Vacuum Trial. In The Boiling House, Remove The Foundation Bolts/beds Of Corroded Or Weak Pumps And Construct New Channel-based Beds; Installation New Foundation Bolts Into The Pits Prepared By The Civil Team To Create These New Channel Beds; Mount The Pump And Motor, Complete The Necessary Connections And Alignment, And Conduct A Satisfactory Trial. Installation Supports Made From Old M.s. Pipes For The So2 Gas Lines.. While many public sector projects allow national competitive bidding, certain localized works require local offices or specific registration metrics in Muzaffarnagar.

5.

Do I need an active GeM Portal registration to apply for this work?

If this procurement is routed through the central marketplace, an active GeM Seller ID is mandatory to supply fabrication work,discharge chutes,conveyor belts,vacuum filter,angle valve,ammonia gas,angle iron,side plate,ms plate,ms pipes,so2 gas,bolts items. Tender18 offers complete assistance for brand cataloging, profile creation, and vendor assessment required officially by Uttar Pradesh Cooperative Sugar Factories Federation Ltd UPCSFFL

6.

What are the primary legal documents required to submit a valid bid?

To register an eligible bid for these fabrication work,discharge chutes,conveyor belts,vacuum filter,angle valve,ammonia gas,angle iron,side plate,ms plate,ms pipes,so2 gas,bolts contracts, companies must prepare their core compliance documents. Vendors operating across Uttar Pradesh must ensure they possess a valid GST registration, permanent account number (PAN), and active Class-3 Digital Signature Certificates.

7.

What products or services are required for this active work?

This public procurement cycle is specifically looking for qualified vendors and suppliers who can provide high-quality fabrication work,discharge chutes,conveyor belts,vacuum filter,angle valve,ammonia gas,angle iron,side plate,ms plate,ms pipes,so2 gas,bolts solutions. The operational execution, delivery, and deployment of these materials must be managed locally within the Muzaffarnagar region.

8.

Where can I review the estimated cost or budget details for this Tender?

The estimated project cost and budget thresholds can be reviewed directly inside the tender document. Bidders can analyze these qualification files to check if their firm meets the financial capability criteria specified for Corrigendum Tender For Erection And Fabrication Work B 1 , Erection And Fabrication Work B 2 , Erection And Fabrication Work B 3 , Erection And Fabrication Work B 4 , Erection And Fabrication Work B 5 , Erection And Fabrication Work B 6 , Erection And Fabrication Work B 7 , Erection And Fabrication Work B 8 , Erection And Fabrication Work B 9 , Erection And Fabrication Work B 10 , Erection And Fabrication Work B 11 , Erection And Fabrication Work B 12 , Erection And Fabrication Work B 13 , Erection And Fabrication Work B 14 , Erection And Fabrication Work B 15 , Erection And Fabrication Work B 16 , Erection And Fabrication Work B 17 , Erection And Fabrication Work B 18 , Erection And Fabrication Work B 19 , Erection And Fabrication Work B 20 , Erection And Fabrication Work B 21 , Erection And Fabrication Work B 22 , Erection And Fabrication Work B 23 , Erection And Fabrication Work B 24 , Erection And Fabrication Work B 25 , Erection And Fabrication Work B 26 , Erection And Fabrication Work B 27 , Erection And Fabrication Work B 28 , Erection And Fabrication Work B 29 , Erection And Fabrication Work B 30 , Erection And Fabrication Work B 31 , Erection And Fabrication Work B 32 , Erection And Fabrication Work B 33 , Erection And Fabrication Work B 34 , Erection And Fabrication Work B 35 , Erection And Fabrication Work B 36 , Erection And Fabrication Work B 37 , Erection And Fabrication Work B 38 , Erection And Fabrication Work B 39 , Erection And Fabrication Work B 40 , Erection And Fabrication Work B 41 , Erection And Fabrication Work B 42 , Erection And Fabrication Work B 43 , Erection And Fabrication Work B 44 , Erection And Fabrication Work B 45 , Erection And Fabrication Work B 46 , Erection And Fabrication Work B 47 , Erection And Fabrication Work B 48 , Erection And Fabrication Work B 49 , Erection And Fabrication Work B 50 , Erection And Fabrication Work B 51 , Erection And Fabrication Work B 52 , Erection And Fabrication Work B 53 , Erection And Fabrication Work B 54, Erection And Fabrication Work B, Cut Out And Remove The Damaged Plate; Fabricate And Installation A New 10 Mm Plate In Its Place, And Provide Support By Installing Angle Channels Beneath The Bottom. Dismantle And Lower The Clarifier Coil; Clean It, Replace Corroded Flanges/pipes, Refit The Coil, And Drill Holes According To Specifications. Cut Out And Remove The Corroded Mud Scraper Plate From The Clarifier; Fabricate And Installation A New Plate, Fit The Scraper, And Conduct A Trial Run. Dismantle The Weak Mud Scraper Pipes In The Clarifier, Installation New Pipes, And Mount The Mud Scraper Assembly. Installation An 800/900 Mm Diameter Rubber-seated Angle Valve In The Steam/vapour Lines Of The Quad, Semi-kestner, And Vapour Cell Units As Directed, And Conduct A Leak-proof Trial. To Completely Re-tube The Quad Body, Cut And Lower The Calandria's Bottom Saucer; After Fitting The Tubes And Conducting A Hydraulic Test On The Calandria, Weld The Bottom Saucer (internally And Externally) To Ensure It Is Leak-proof, And Perform Water And Vacuum Trials. Dismantle Corroded Or Weak Vapour/exhaust Steam Lines Associated With The Semi-kestner, Vapour Cell, Quad Bodies, And Pans; Fabricate New Lines Using 8.0/10.0 Mm Thick M.s. Plate Based On Original Specifications, Erect The New Lines, Perform Leak-proof Welding, And Conduct Successful Water And Steam Trials. Cut Out And Remove Corroded/weak Juice Distributors Or Down-take Pipes In The Quad Bodies And Installation Newly Fabricated Replacements. Cut Out And Remove Corroded/weak Manholes From Pans, Doors, Sulphur Furnaces, Quad Bodies, Cells, And Bottom Saucers, And Installation Newly Fabricated Manholes Based On Original Specifications. Dismantle And Remove Corroded/weak Umbrellas From The Semi-kestner, Vapour Cell, Quad Bodies, And Pans; Fabricate New Umbrellas According To Original Specifications And Erect Them With Necessary Supports. For The Vapour Pipes Of Pans And Quads, Provide External Reinforcement Using M.s. -material Of 900 To 1100 Mm Diameter... Fabricate And Installation T-rings Made Of Plate Or Angle Iron; Cut Out And Remove Corroded Or Weak Ammonia Gas Headers From The Quad Bodies; Fabricate And Erect New Headers; Installation Nipples, Valves, Flanges, Etc., And Conduct A Leak-proof Trial; Remove Weak Shells From The Semi-kestner, Vapour Cell, And Quad Bodies; Fabricate New Ones To Specifications, Erect Them In Place, And Conduct A Leak-proof Trial; Dismantle The Weak Vapour Pipe Located Between The Evaporator Quad Bodies; Fabricate And Installation A New Vapour Pipe (600, 700, Or 800 Mm Diameter) Using New Or Existing Plate; Perform Leak-proof Welding And Conduct A Water Trial; Cut Out And Remove Leaky Or Weak External Catchers From The Evaporator And Pan Vapour Pipes; Fabricate New Catchers (including Internals) Based On Samples, Fit Them In Place, Perform Leak-proof Welding, And Conduct Successful Water-filling/vacuum Trials; Remove The Top Plate Of The External Catcher On The Evaporator And Pan Vapour Pipes To Carry Out Necessary Repairs On Weak Internals, Cones, Or Shells; Reinstall The Top Plate, Perform Leak-proof Welding, And Conduct Successful Water-filling/vacuum Trials; Cut Out And Remove The Corroded Or Weak Agitator Of The 10" X 20" Vacuum Filter; Fabricate A New One Based On The Old Design, Fit It In Place, And Conduct A Successful Trial; Cut Out And Remove The Corroded Or Weak Agitator Of The 8" X 16" Vacuum Filter; Fabricate A New One Based On The Old Design, Fit It In Place, And Conduct A Successful Trial; Cut Out And Remove The Corroded Or Weak Mud Tray Of The Vacuum Filter; Fabricate A New Mud Tray Using New Or Existing Plate And Fit It In Place; Replace The Corroded Or Weak Side Plate Of The Vacuum Filter And Conduct A Satisfactory Water Trial; Cut Out And Remove The Corroded Or Weak Agitator Section Of The 10" X 20" Vacuum Filter And Carry Out Necessary Repairs Based On The Old Design; Cut Out And Remove The Weak Tapered Cone Of The 40-ton Capacity Pan. Fabricate And Installation A Replacement Using A New 12/16 Mm Plate, Following The Sample; Restore All Connections To Their Original State, Ensure Leak-proof Welding, And Conduct Successful Water-filling And Vacuum Trials. Cut Out And Remove Corroded Or Weak Agitator Sections Of The 8-inch X 16-inch Vacuum Filter And Carry Out Necessary Repairs As Per The Original Specifications. Dismantle The Bagasse Silo Cyclone At The Vacuum Filter Station, Replace Corroded Sections, Perform Necessary Repairs, Reinstall It In Its Original Position, And Restore All Connections. Cut Out And Remove The Corroded Or Weak Shell Of The Mud Mixer; Fabricate A New Shell (using New Or Existing Plate Material), Installation It In Place, And Conduct A Successful Trial. Cut Out And Remove Corroded Or Weak Mud Discharge Chutes Located At The Discharge End Of The Mud Conveyor Belts; Fabricate And Installation Replacements Using Existing Plate Material And Conduct A Trial. Dismantle And Remove Corroded Or Weak Condenser Bottles From The Vacuum Filters; Fabricate And Installation New Ones Based On The Sample And Conduct A Successful Vacuum Trial. In The Boiling House, Remove The Foundation Bolts/beds Of Corroded Or Weak Pumps And Construct New Channel-based Beds; Installation New Foundation Bolts Into The Pits Prepared By The Civil Team To Create These New Channel Beds; Mount The Pump And Motor, Complete The Necessary Connections And Alignment, And Conduct A Satisfactory Trial. Installation Supports Made From Old M.s. Pipes For The So2 Gas Lines. by Uttar Pradesh Cooperative Sugar Factories Federation Ltd UPCSFFL

9.

How can I download the official BOQ file for this opportunity?

You can download the commercial Bill of Quantities (BOQ) spreadsheet directly using the secure link provided on this page. The BOQ file contains the item descriptions and rate filling forms officially validated for Corrigendum Tender For Erection And Fabrication Work B 1 , Erection And Fabrication Work B 2 , Erection And Fabrication Work B 3 , Erection And Fabrication Work B 4 , Erection And Fabrication Work B 5 , Erection And Fabrication Work B 6 , Erection And Fabrication Work B 7 , Erection And Fabrication Work B 8 , Erection And Fabrication Work B 9 , Erection And Fabrication Work B 10 , Erection And Fabrication Work B 11 , Erection And Fabrication Work B 12 , Erection And Fabrication Work B 13 , Erection And Fabrication Work B 14 , Erection And Fabrication Work B 15 , Erection And Fabrication Work B 16 , Erection And Fabrication Work B 17 , Erection And Fabrication Work B 18 , Erection And Fabrication Work B 19 , Erection And Fabrication Work B 20 , Erection And Fabrication Work B 21 , Erection And Fabrication Work B 22 , Erection And Fabrication Work B 23 , Erection And Fabrication Work B 24 , Erection And Fabrication Work B 25 , Erection And Fabrication Work B 26 , Erection And Fabrication Work B 27 , Erection And Fabrication Work B 28 , Erection And Fabrication Work B 29 , Erection And Fabrication Work B 30 , Erection And Fabrication Work B 31 , Erection And Fabrication Work B 32 , Erection And Fabrication Work B 33 , Erection And Fabrication Work B 34 , Erection And Fabrication Work B 35 , Erection And Fabrication Work B 36 , Erection And Fabrication Work B 37 , Erection And Fabrication Work B 38 , Erection And Fabrication Work B 39 , Erection And Fabrication Work B 40 , Erection And Fabrication Work B 41 , Erection And Fabrication Work B 42 , Erection And Fabrication Work B 43 , Erection And Fabrication Work B 44 , Erection And Fabrication Work B 45 , Erection And Fabrication Work B 46 , Erection And Fabrication Work B 47 , Erection And Fabrication Work B 48 , Erection And Fabrication Work B 49 , Erection And Fabrication Work B 50 , Erection And Fabrication Work B 51 , Erection And Fabrication Work B 52 , Erection And Fabrication Work B 53 , Erection And Fabrication Work B 54, Erection And Fabrication Work B, Cut Out And Remove The Damaged Plate; Fabricate And Installation A New 10 Mm Plate In Its Place, And Provide Support By Installing Angle Channels Beneath The Bottom. Dismantle And Lower The Clarifier Coil; Clean It, Replace Corroded Flanges/pipes, Refit The Coil, And Drill Holes According To Specifications. Cut Out And Remove The Corroded Mud Scraper Plate From The Clarifier; Fabricate And Installation A New Plate, Fit The Scraper, And Conduct A Trial Run. Dismantle The Weak Mud Scraper Pipes In The Clarifier, Installation New Pipes, And Mount The Mud Scraper Assembly. Installation An 800/900 Mm Diameter Rubber-seated Angle Valve In The Steam/vapour Lines Of The Quad, Semi-kestner, And Vapour Cell Units As Directed, And Conduct A Leak-proof Trial. To Completely Re-tube The Quad Body, Cut And Lower The Calandria's Bottom Saucer; After Fitting The Tubes And Conducting A Hydraulic Test On The Calandria, Weld The Bottom Saucer (internally And Externally) To Ensure It Is Leak-proof, And Perform Water And Vacuum Trials. Dismantle Corroded Or Weak Vapour/exhaust Steam Lines Associated With The Semi-kestner, Vapour Cell, Quad Bodies, And Pans; Fabricate New Lines Using 8.0/10.0 Mm Thick M.s. Plate Based On Original Specifications, Erect The New Lines, Perform Leak-proof Welding, And Conduct Successful Water And Steam Trials. Cut Out And Remove Corroded/weak Juice Distributors Or Down-take Pipes In The Quad Bodies And Installation Newly Fabricated Replacements. Cut Out And Remove Corroded/weak Manholes From Pans, Doors, Sulphur Furnaces, Quad Bodies, Cells, And Bottom Saucers, And Installation Newly Fabricated Manholes Based On Original Specifications. Dismantle And Remove Corroded/weak Umbrellas From The Semi-kestner, Vapour Cell, Quad Bodies, And Pans; Fabricate New Umbrellas According To Original Specifications And Erect Them With Necessary Supports. For The Vapour Pipes Of Pans And Quads, Provide External Reinforcement Using M.s. -material Of 900 To 1100 Mm Diameter... Fabricate And Installation T-rings Made Of Plate Or Angle Iron; Cut Out And Remove Corroded Or Weak Ammonia Gas Headers From The Quad Bodies; Fabricate And Erect New Headers; Installation Nipples, Valves, Flanges, Etc., And Conduct A Leak-proof Trial; Remove Weak Shells From The Semi-kestner, Vapour Cell, And Quad Bodies; Fabricate New Ones To Specifications, Erect Them In Place, And Conduct A Leak-proof Trial; Dismantle The Weak Vapour Pipe Located Between The Evaporator Quad Bodies; Fabricate And Installation A New Vapour Pipe (600, 700, Or 800 Mm Diameter) Using New Or Existing Plate; Perform Leak-proof Welding And Conduct A Water Trial; Cut Out And Remove Leaky Or Weak External Catchers From The Evaporator And Pan Vapour Pipes; Fabricate New Catchers (including Internals) Based On Samples, Fit Them In Place, Perform Leak-proof Welding, And Conduct Successful Water-filling/vacuum Trials; Remove The Top Plate Of The External Catcher On The Evaporator And Pan Vapour Pipes To Carry Out Necessary Repairs On Weak Internals, Cones, Or Shells; Reinstall The Top Plate, Perform Leak-proof Welding, And Conduct Successful Water-filling/vacuum Trials; Cut Out And Remove The Corroded Or Weak Agitator Of The 10" X 20" Vacuum Filter; Fabricate A New One Based On The Old Design, Fit It In Place, And Conduct A Successful Trial; Cut Out And Remove The Corroded Or Weak Agitator Of The 8" X 16" Vacuum Filter; Fabricate A New One Based On The Old Design, Fit It In Place, And Conduct A Successful Trial; Cut Out And Remove The Corroded Or Weak Mud Tray Of The Vacuum Filter; Fabricate A New Mud Tray Using New Or Existing Plate And Fit It In Place; Replace The Corroded Or Weak Side Plate Of The Vacuum Filter And Conduct A Satisfactory Water Trial; Cut Out And Remove The Corroded Or Weak Agitator Section Of The 10" X 20" Vacuum Filter And Carry Out Necessary Repairs Based On The Old Design; Cut Out And Remove The Weak Tapered Cone Of The 40-ton Capacity Pan. Fabricate And Installation A Replacement Using A New 12/16 Mm Plate, Following The Sample; Restore All Connections To Their Original State, Ensure Leak-proof Welding, And Conduct Successful Water-filling And Vacuum Trials. Cut Out And Remove Corroded Or Weak Agitator Sections Of The 8-inch X 16-inch Vacuum Filter And Carry Out Necessary Repairs As Per The Original Specifications. Dismantle The Bagasse Silo Cyclone At The Vacuum Filter Station, Replace Corroded Sections, Perform Necessary Repairs, Reinstall It In Its Original Position, And Restore All Connections. Cut Out And Remove The Corroded Or Weak Shell Of The Mud Mixer; Fabricate A New Shell (using New Or Existing Plate Material), Installation It In Place, And Conduct A Successful Trial. Cut Out And Remove Corroded Or Weak Mud Discharge Chutes Located At The Discharge End Of The Mud Conveyor Belts; Fabricate And Installation Replacements Using Existing Plate Material And Conduct A Trial. Dismantle And Remove Corroded Or Weak Condenser Bottles From The Vacuum Filters; Fabricate And Installation New Ones Based On The Sample And Conduct A Successful Vacuum Trial. In The Boiling House, Remove The Foundation Bolts/beds Of Corroded Or Weak Pumps And Construct New Channel-based Beds; Installation New Foundation Bolts Into The Pits Prepared By The Civil Team To Create These New Channel Beds; Mount The Pump And Motor, Complete The Necessary Connections And Alignment, And Conduct A Satisfactory Trial. Installation Supports Made From Old M.s. Pipes For The So2 Gas Lines. within the Uttar Pradesh jurisdiction

10.

How can I find the submission closing date for this contract?

The official timeline and deadline details for Corrigendum Tender For Erection And Fabrication Work B 1 , Erection And Fabrication Work B 2 , Erection And Fabrication Work B 3 , Erection And Fabrication Work B 4 , Erection And Fabrication Work B 5 , Erection And Fabrication Work B 6 , Erection And Fabrication Work B 7 , Erection And Fabrication Work B 8 , Erection And Fabrication Work B 9 , Erection And Fabrication Work B 10 , Erection And Fabrication Work B 11 , Erection And Fabrication Work B 12 , Erection And Fabrication Work B 13 , Erection And Fabrication Work B 14 , Erection And Fabrication Work B 15 , Erection And Fabrication Work B 16 , Erection And Fabrication Work B 17 , Erection And Fabrication Work B 18 , Erection And Fabrication Work B 19 , Erection And Fabrication Work B 20 , Erection And Fabrication Work B 21 , Erection And Fabrication Work B 22 , Erection And Fabrication Work B 23 , Erection And Fabrication Work B 24 , Erection And Fabrication Work B 25 , Erection And Fabrication Work B 26 , Erection And Fabrication Work B 27 , Erection And Fabrication Work B 28 , Erection And Fabrication Work B 29 , Erection And Fabrication Work B 30 , Erection And Fabrication Work B 31 , Erection And Fabrication Work B 32 , Erection And Fabrication Work B 33 , Erection And Fabrication Work B 34 , Erection And Fabrication Work B 35 , Erection And Fabrication Work B 36 , Erection And Fabrication Work B 37 , Erection And Fabrication Work B 38 , Erection And Fabrication Work B 39 , Erection And Fabrication Work B 40 , Erection And Fabrication Work B 41 , Erection And Fabrication Work B 42 , Erection And Fabrication Work B 43 , Erection And Fabrication Work B 44 , Erection And Fabrication Work B 45 , Erection And Fabrication Work B 46 , Erection And Fabrication Work B 47 , Erection And Fabrication Work B 48 , Erection And Fabrication Work B 49 , Erection And Fabrication Work B 50 , Erection And Fabrication Work B 51 , Erection And Fabrication Work B 52 , Erection And Fabrication Work B 53 , Erection And Fabrication Work B 54, Erection And Fabrication Work B, Cut Out And Remove The Damaged Plate; Fabricate And Installation A New 10 Mm Plate In Its Place, And Provide Support By Installing Angle Channels Beneath The Bottom. Dismantle And Lower The Clarifier Coil; Clean It, Replace Corroded Flanges/pipes, Refit The Coil, And Drill Holes According To Specifications. Cut Out And Remove The Corroded Mud Scraper Plate From The Clarifier; Fabricate And Installation A New Plate, Fit The Scraper, And Conduct A Trial Run. Dismantle The Weak Mud Scraper Pipes In The Clarifier, Installation New Pipes, And Mount The Mud Scraper Assembly. Installation An 800/900 Mm Diameter Rubber-seated Angle Valve In The Steam/vapour Lines Of The Quad, Semi-kestner, And Vapour Cell Units As Directed, And Conduct A Leak-proof Trial. To Completely Re-tube The Quad Body, Cut And Lower The Calandria's Bottom Saucer; After Fitting The Tubes And Conducting A Hydraulic Test On The Calandria, Weld The Bottom Saucer (internally And Externally) To Ensure It Is Leak-proof, And Perform Water And Vacuum Trials. Dismantle Corroded Or Weak Vapour/exhaust Steam Lines Associated With The Semi-kestner, Vapour Cell, Quad Bodies, And Pans; Fabricate New Lines Using 8.0/10.0 Mm Thick M.s. Plate Based On Original Specifications, Erect The New Lines, Perform Leak-proof Welding, And Conduct Successful Water And Steam Trials. Cut Out And Remove Corroded/weak Juice Distributors Or Down-take Pipes In The Quad Bodies And Installation Newly Fabricated Replacements. Cut Out And Remove Corroded/weak Manholes From Pans, Doors, Sulphur Furnaces, Quad Bodies, Cells, And Bottom Saucers, And Installation Newly Fabricated Manholes Based On Original Specifications. Dismantle And Remove Corroded/weak Umbrellas From The Semi-kestner, Vapour Cell, Quad Bodies, And Pans; Fabricate New Umbrellas According To Original Specifications And Erect Them With Necessary Supports. For The Vapour Pipes Of Pans And Quads, Provide External Reinforcement Using M.s. -material Of 900 To 1100 Mm Diameter... Fabricate And Installation T-rings Made Of Plate Or Angle Iron; Cut Out And Remove Corroded Or Weak Ammonia Gas Headers From The Quad Bodies; Fabricate And Erect New Headers; Installation Nipples, Valves, Flanges, Etc., And Conduct A Leak-proof Trial; Remove Weak Shells From The Semi-kestner, Vapour Cell, And Quad Bodies; Fabricate New Ones To Specifications, Erect Them In Place, And Conduct A Leak-proof Trial; Dismantle The Weak Vapour Pipe Located Between The Evaporator Quad Bodies; Fabricate And Installation A New Vapour Pipe (600, 700, Or 800 Mm Diameter) Using New Or Existing Plate; Perform Leak-proof Welding And Conduct A Water Trial; Cut Out And Remove Leaky Or Weak External Catchers From The Evaporator And Pan Vapour Pipes; Fabricate New Catchers (including Internals) Based On Samples, Fit Them In Place, Perform Leak-proof Welding, And Conduct Successful Water-filling/vacuum Trials; Remove The Top Plate Of The External Catcher On The Evaporator And Pan Vapour Pipes To Carry Out Necessary Repairs On Weak Internals, Cones, Or Shells; Reinstall The Top Plate, Perform Leak-proof Welding, And Conduct Successful Water-filling/vacuum Trials; Cut Out And Remove The Corroded Or Weak Agitator Of The 10" X 20" Vacuum Filter; Fabricate A New One Based On The Old Design, Fit It In Place, And Conduct A Successful Trial; Cut Out And Remove The Corroded Or Weak Agitator Of The 8" X 16" Vacuum Filter; Fabricate A New One Based On The Old Design, Fit It In Place, And Conduct A Successful Trial; Cut Out And Remove The Corroded Or Weak Mud Tray Of The Vacuum Filter; Fabricate A New Mud Tray Using New Or Existing Plate And Fit It In Place; Replace The Corroded Or Weak Side Plate Of The Vacuum Filter And Conduct A Satisfactory Water Trial; Cut Out And Remove The Corroded Or Weak Agitator Section Of The 10" X 20" Vacuum Filter And Carry Out Necessary Repairs Based On The Old Design; Cut Out And Remove The Weak Tapered Cone Of The 40-ton Capacity Pan. Fabricate And Installation A Replacement Using A New 12/16 Mm Plate, Following The Sample; Restore All Connections To Their Original State, Ensure Leak-proof Welding, And Conduct Successful Water-filling And Vacuum Trials. Cut Out And Remove Corroded Or Weak Agitator Sections Of The 8-inch X 16-inch Vacuum Filter And Carry Out Necessary Repairs As Per The Original Specifications. Dismantle The Bagasse Silo Cyclone At The Vacuum Filter Station, Replace Corroded Sections, Perform Necessary Repairs, Reinstall It In Its Original Position, And Restore All Connections. Cut Out And Remove The Corroded Or Weak Shell Of The Mud Mixer; Fabricate A New Shell (using New Or Existing Plate Material), Installation It In Place, And Conduct A Successful Trial. Cut Out And Remove Corroded Or Weak Mud Discharge Chutes Located At The Discharge End Of The Mud Conveyor Belts; Fabricate And Installation Replacements Using Existing Plate Material And Conduct A Trial. Dismantle And Remove Corroded Or Weak Condenser Bottles From The Vacuum Filters; Fabricate And Installation New Ones Based On The Sample And Conduct A Successful Vacuum Trial. In The Boiling House, Remove The Foundation Bolts/beds Of Corroded Or Weak Pumps And Construct New Channel-based Beds; Installation New Foundation Bolts Into The Pits Prepared By The Civil Team To Create These New Channel Beds; Mount The Pump And Motor, Complete The Necessary Connections And Alignment, And Conduct A Satisfactory Trial. Installation Supports Made From Old M.s. Pipes For The So2 Gas Lines. are available inside the detailed notification files. Bidders planning to target this contract in Muzaffarnagar should check the official portal schedule early to complete their online technical and financial submission well before the closing hours.

Get Expert Tender Bidding Support

Looking For Complete Tender Bidding Consultancy? Our Technical Experts Will Help You Prepare And Submit Your Tender Successfully.

Call Our Expert: +91 7069661818
Your Information Is 100% Secure & Confidential