Latest Tender Detail from uttar pradesh cooperative sugar factories federation ltd UPCSFFL for the tender for pan no 6 4 , installation valve in steam line at pan no 2 550 mm 1 , installation valve in steam line at pan no 2 550 mm 2 , installation valve in steam line at pan no 2 550 mm 3 , installation valve in steam line at pan no 2 550 mm 4 , replace nipple and band of a heavy tank 2 , replace nipple and band of a heavy tank 3 , replace nipple and band of a heavy tank 4 , remove clean and reinstall 4inch size syrup line on pan , cut and remove syrup header and fabricate and installation new header , replacing the 6inch size glycol washing line fitted on pan no 1 , replacing nipples of different lines of pan no 6 1 , replacing nipples of different lines of pan no 6 2 , replacing nipples of different lines of pan no 6 3 , replacing nipples of different lines of pan no 6 4 , replacing 10inch size nipples of cut off line of pan no 6 1 , replacing 10inch size nipples of cut off line of pan no 6 2 , replacing 10inch size nipples of cut off line of pan no 6 3 , replacing 10inch size nipples of cut off line of pan no 6 4 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 1 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 2 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 3 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 4 , fabricating m s bed for syrup pump and motor fitting and alignment followed by satisfactory trial , dismantling weak condensate bottle of old set , replacing weak pipeline flange valve and band of old set vertical juice heater 1 , replacing weak pipeline flange valve and band of old set vertical juice heater 2 , replacing weak pipeline flange valve and band of old set vertical juice heater 3 , replacing weak pipeline flange valve and band of old set vertical juice heater 4 , replacing weak pipeline flange valve and band of old set vertical juice heater 5 , replacing weak pipeline of old quad set no 4 1 , replacing weak pipeline of old quad set no 4 2 , replacing weak pipeline of old quad set no 4 3 , replacing weak pipeline of old quad set no 4 4 , replacing weak pipeline of old quad set no 4 5 , dismantling damaged mesh of section pipe located at injection no 2 and 3 and making a new one from given m s plate and fitting it , cutting and discarding old damaged reducer plate of section pipe located at injection no 2 and 3 and remaking the same , fitting water line from overhead to service tank 1 , fitting water line from overhead to service tank 2 , details of work of canti machine no 6 and 7 1 , details of work of canti machine no 6 and 7 2 , details of work of canti machine no 6 and 7 3 , details of work with new pipes from s sugarbin 1 , details of work with new pipes from s sugarbin 2 , details of work with new pipes from s sugarbin 3 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 1 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 2 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 3 , work on hot water line of brown sugar magma 1 , work on hot water line of brown sugar magma 2 , work on hot water line of brown sugar magma 3 , work on hot water line of brown sugar magma 4 , cutting and removing damaged monitor casing and ribs , cutting and removing damaged center shaft and arms inside kcp machines no 1 and 2 bending and fitting new parts with 8 to 10 mm plate , dismantling damaged upper cover part of canty machine no 6 and 7 scrapping fabricating and fitting new cover with 12 mm plate and making all related connections , dismantling damaged part of molasses weighing scale receiving tank and fabricating and fitting new part by bending 8 mm thick, fabrication, fabricate and installation 6inch size nipple, fabricate and installation 6inch size flange, dismantling 6inch size pipeline, installing 6inch size pipeline and giving satisfactory trial, fabricate and installation 6inch size band, replace damaged 100 pound 3inch size pipeline from pan no 1 to pan no 6 and give satisfactory trial, dismantle the weak vapor pipe from pan no 1 to 6, fabricate the weak vapor pipe from pan no 1 to 6, replace main hole dia 600 mm of pan no 3 sevual with 10 mm thick plate, replace damaged overflow pipeline of bh and cl molasses conditioner of 6inch size, replace corroded nipples pipes flanges of 6inch size header on pan no 5 and 6 installation related nipples valves etc and give satisfactory trial, replace 2inch size pipeline, fabricate and installation 2inch size flange, fabricate and installation 2inch size nipple, fabricate and installation 3inch size flange, fabricate and installation 3inch size valve, replace and installation 6inch size pipeline, replace 6inch size pipeline of the above, installation valve in steam line at pan no 2 550 mm, installation flange in steam line at pan no 2 550 mm, installation nipple in steam line at pan no 2 550 mm, fabricate and installation catcher element size 75 x 75 x 8 angle on pan no 4 and 5, replace nipples of the above tank, replace bands of the above tank, replace partition of syrup tank with 10/12 mm thick plate, remove clean and reinstall 4inch size syrup line on pan, cut and remove syrup header and fabricate and installation new header, replacing the 6inch size glycol washing line fitted on pan no 1, replacing nipples of 2inch size line mentioned above, replacing nipples of 4inch size line mentioned above, replacing nipples of 6inch size line mentioned above, replacing nipples of 8inch size line mentioned above, replacing 10inch size nipples of cut off line of pan no 6, replacing 10inch size pipe line, making and fitting 10inch size flange, making and fitting 10inch size band, making and fitting 8inch size band, replacing 4inch size pipe line, making and fitting 4inch size flange, making and fitting 4inch size valve, fabricating m s bed for syrup pump and motor fitting and alignment followed by satisfactory trial, dismantling weak condensate bottle of old set vertical line juice heater and quad body no 4 disposing to scrap yard fabricating all connections using 8/10 mm plates and giving satisfactory vacuum trial, replacing 2inch size pipeline, replacing 6inch size pipeline, making and fitting 2inch size flange, making and fitting 6inch size flange, making and fitting 6inch size band, making and fitting 6inch size valve, dismantling damaged mesh of section pipe located at injection no 2 and 3 and making a new one from given m s plate and fitting it, cutting and discarding old damaged reducer plate of section pipe located at injection no 2 and 3 and remaking the same, fitting mentioned line into service tank, making and fitting 8inch size nipple, dismantling and fitting 6inch size pipeline, dismantling resistance box installed on spray making and fitting new one from given m m plate carrying out proper stay fitting and welding and conducting leak proof trial, dismantling and installing 8inch size pipeline, fabricating and installing 8inch size bands, fabricating and installing 8inch size flanges, dismantling and installing 12inch size pipeline, fabricating and installing 12inch size bands, fabricating and installing 12inch size flanges, dismantling and installing 3inch size pipeline, manufacturing and installing 3inch size nipples, manufacturing and installing 3inch size bands, cutting and removing damaged monitor casing and ribs inside canty no 1 and 2 and kcp machine 1 and 2 patching with 10/12 mm ms plate and giving satisfactory trial 1, cutting and removing damaged center shaft and arms inside kcp machines no 1 and 2 bending and fitting new parts with 8 to 10 mm plate 1, dismantling damaged upper cover part of canty machine no 6 and 7 scrapping fabricating and fitting new cover with 12 mm plate and making all related connections, dismantling damaged part of molasses weighing scale receiving tank and fabricating and fitting new part by bending 8 mm thick plate and depositing scrap in scrap yard, dismantling damaged plate of sugar discharge chute from sugar elevator to sugar grader and fabricating and fitting new plate of 6 mm thickness depositing scrap in scrap yard, modifying sugar chute of grader in dryer house and giving satisfactory trial, dismantling and installing 4inch size pipeline, fabricating and installing 4inch size flanges, manufacturing and installing 4inch size bands, manufacturing and installing 4inch size nipples, removing transit heater installed on c centrifugal machine opening side plate for cleaning and hydraulic servicing reinstalling in place and making all connections, dismantling and installing 2inch size pipeline, fabricating and installing 2inch size flanges, manufacturing and installing 2inch size nipples, manufacturing and installing 2inch size valves, removing old taper of sugar hopper no 1 scrapping it fabricating new one from 3/5 mm ms plate installing and giving satisfactory trial, dismantling and installing 6inch size pipeline, manufacturing and installing 6inch size bands, manufacturing and installing 6inch size flanges, manufacturing and installing 5inch size flanges, manufacturing and installing 5inch size valves, removing damaged/weak top and bottom sugar discharge chute of canty machine no 4 including flange scrapping fabricating new parts with 6 mm ms plate as per suit sample preparing all connections like angle channel etc fitting on side and giving satisfactory trial, installing 2inch flow meter, dismantling the damaged 6inch dia pipeline from primary clarifier to anoxic tank and putting it in scrap yard and installing a new pipeline, installing 4inch size valve/nrv, fabricating 4inch size band, fabricating and installing 2inch size flange, dismantling the damaged 8inch dia pipeline from aeration tank to secondary tank and putting it in scrap yard, dismantling diffusers installed in aeration tank and putting them in scrap yard and replacing the throat part, in sulfate removal plant reaction chamber dismantling corroded 6 mm partition plate putting it in scrap yard and fabricating with new 8 mm plate, dismantling corroded 2inch size treated water outlet line of etp and putting in scrap yard and installing new 3inch size line at the same location, dismantling 800 mm dia exhaust pipe line below turbine with nipple band flange and putting in scrap yard, fabricating 800 mm dia exhaust pipeline below turbine from 12 mm plate by bending and installing at position and providing satisfactory trial, fabricating 800 mm dia exhaust pipeline below vapor cell 950 wag meter from 12 mm plate by bending and installing at position and providing satisfactory trial, fabricating 800 mm dia exhaust pipeline below vapor cell 950 wag meter from 12 mm plate by bending into t shape and installing at position and providing satisfactory trial, fabricating 800 mm dia exhaust pipeline dummy/flange from 12 mm plate by bending and installing at position and providing satisfactory trial, dismantling weak part of semichemiser 1000 wag meter warm saser putting scrap in scrap yard fabricating from 12 mm thick plate by bending and installing with related connections and giving satisfactory trial size dia 3 4 m, dismantling weak parts of old quad body no 2 and 3 20inch vapor pipe putting scrap in scrap yard fabricating from 8 mm thick plate by bending and installing and providing satisfactory trial, dismantling weak parts of vapor pipe 32inch size of vapor cell 1000 wag meter putting scrap in scrap yard fabricating from 8 mm thick plate by bending and installing and providing satisfactory trial, dismantling weak part of 6inch size header of all juice heaters condensate and installing new one, removing all partition plates of juice heater header by cutting straight and circular shapes cleaning tube plate completely and fabricating new circular and straight partition plates from 10/12 mm plate installing and preparing header with ms strips as before applying rubber strips and providing satisfactory trial, cutting out quailons and all related angles fixed in clarifier compartments and refitting after completion of work and providing satisfactory trial, patching inside clarifier with 6/8 mm ms plate, dismantling damaged 8inch size ms pipeline from clarifier clear juice overflow tank to sombox, installing 6inch size ms pipeline from clarifier compartments no 2 and 3 to mud tank and providing satisfactory trial, opening 6inch size valve and installing at designated location, fabricating 6inch size nipple and installing at designated location, fabricating 6inch size flange by cutting plate and dismantling to fit, dismantling 4inch size air pipeline above door including nipple band flange and putting scrap in scrap yard, installing 4inch size air pipeline above door and providing satisfactory trial, dismantling 6inch size ms pipeline of big vacuum filter mud tank overflow line and putting scrap in scrap yard, fitting and trial of 6inch size ms pipeline overflow line of big vacuum filter mud tank at position, fabricating 6inch size band, fabricating 8inch size band, dismantling 8inch size pipeline from big vacuum filter pump to condenser and putting scrap in scrap yard, fitting and trial of 8inch size pipeline from big vacuum filter pump to condenser at position, dismantling 4inch ms pipeline from filter juice header to vibro screen, fitting and trial of 4inch ms pipeline from filter juice header to vibro screen at position, making 4inch size nipple, opening 4inch size valve, installing 4inch size valve at the specified location, cutting 4inch size flange from plate making it and fitting after drilling, dismantling 3inch size pipeline, installing and fitting 3inch size line at position and giving satisfactory trial, making and installing 3inch size t, making and installing 3inch size nipple, cutting 3inch size flange from plate making it and installing, making and installing 3inch size band, dismantling 8inch size clear juice overflow pipeline, installing and fitting 8inch size clear juice overflow pipeline at position and giving satisfactory trial, installing and fitting 6inch size pipeline at position and giving satisfactory trial, making and installing 6inch size band/elbow at specified location, making and installing 6inch size t, dismantling 4inch size pipeline, installing and fitting 4inch size pipeline at position and giving satisfactory trial, making and installing 4inch size band, making and installing 4inch size t, dismantling 10inch size pipeline, installing fitting and trial of 10inch size pipeline at position, making and installing 10inch size t, making and installing 10inch size dummy/flange, dismantling 6inch pipeline, installing fitting and trial of 6inch size pipeline at position, opening and binding 6inch size valve, installing fitting and trial of 4inch size pipeline at position, making and installing 8inch and 6inch size cross, dismantling 4inch size ammonia pipeline of semichemiser quad, installing 4inch size ammonia pipeline of semichemiser quad at position, making 4inch size band, making 4inch size t, making 4inch size flange, dismantling 2inch size pipeline, fixing 2inch size pipeline in position, dismantling new quad no 2 vapor pipe 24inch size vapor pipeline fabricating it by bending with 10 mm thick plate and installing, fabricating and installing 24inch size bends, fabricating and installing 24inch size tees, fabricating and installing 24inch size flange/dummy, dismantling 24inch size pipeline, fitting 24inch size pipeline in position, fabricating and installing 24inch size flange, cutting damaged 6inch syrup pump header fabricating new header and installing along with fitting all related nipples valves etc and conducting satisfactory trial, dismantling bent incoming and outgoing wax and heater cell and partition plate between double beat valve of juice heater/ juice heater header fabricating new one using 12/10 mm plate as before installing and conducting satisfactory trial, dismantling 6inch condensate header of juice heaters and replacing the weak part, fitting 6inch size pipeline in position and conducting satisfactory trial, fabricating and installing 6inch size flange, fabricating and installing 6inch size nipple, fabricating and installing 6inch size tees, dismantling and fitting 6inch size pipeline in position and conducting satisfactory trial in najibabad, uttar pradesh,. Reference number 16022210. Don't miss out on this chance to be part of a significant project. Register for free today to access the complete tender details and download the necessary documents. Seize the opportunity with Tender 18!
| T18 Ref No: | 16022210 |
|---|---|
| Tender ID: | GEM/2026/B/7719504 |
| Tender Agency: | uttar pradesh cooperative sugar factories federation ltd UPCSFFL |
| City: | najibabad |
| State: | uttar pradesh |
| Tender Related Keywords : | centrifugal machine, valve dismantling, reaction chamber, pipeline fitting, water pipeline, weighing scale, resistance box, aeration tank, treated water, vacuum filter, juice heater, sugar grader, water outlet, exhaust pipe, air pipeline, ms pipeline, filter pump, water line, side plate, flow meter, m s plate, pipe line, ms plate |
| Description : | total quantity = 1802 |
| T18 Ref No: | 16022210 | Tender Value: | Refer Document |
|---|---|---|---|
| Tender ID: | GEM/2026/B/7719504 | Tender EMD: | Refer Document |
| Tender Agency: | uttar pradesh cooperative sugar factories federation ltd UPCSFFL | Tender Fee: | Refer Document |
| City: | najibabad | Published Date: | Jun 28, 2026 |
| State: | uttar pradesh | Due Date: | Jul 13, 2026 |
| Tender Related Keywords : | centrifugal machine, valve dismantling, reaction chamber, pipeline fitting, water pipeline, weighing scale, resistance box, aeration tank, treated water, vacuum filter, juice heater, sugar grader, water outlet, exhaust pipe, air pipeline, ms pipeline, filter pump, water line, side plate, flow meter, m s plate, pipe line, ms plate | Tender Opening Date: | Jul 13, 2026 |
| Description : | total quantity = 1802 | ||
Looking For Complete Tender Bidding Consultancy? Our Technical Experts Will Help You Prepare And Submit Your Tender Successfully.