tender for erection and fabrication work a erection and fabrication work a 1 , erection and fabrication work a 2 , erection and fabrication work a 3 , erection and fabrication work a 4 , erection and fabrication work a 5 , erection and fabrication work a 6 , erection and fabrication work a 7 , erection and fabrication work a 8 , erection and fabrication work a 9 , erection and fabrication work a 10 , erection and fabrication work a 11 , erection and fabrication work a 12 , erection and fabrication work a 13 , erection and fabrication work a 14 , erection and fabrication work a 15 , erection and fabrication work a 16 , erection and fabrication work a 17 , erection and fabrication work a 18 , erection and fabrication work a 19 , erection and fabrication work a 20 , erection and fabrication work a 21 , erection and fabrication work a 22 , erection and fabrication work a 23 , erection and fabrication work a 24 , erection and fabrication work a 25 , erection and fabrication work a 26 , erection and fabrication work a 27 , erection and fabrication work a 28 , erection and fabrication work a 29 , erection and fabrication work a 30 , erection and fabrication work a 31 , erection and fabrication work a 32 , erection and fabrication work a 33 , erection and fabrication work a 34 , erection and fabrication work a 35 , erection and fabrication work a 36 , erection and fabrication work a 37 , erection and fabrication work a 38 , erection and fabrication work a 39 , erection and fabrication work a 40 , erection and fabrication work a 41 , erection and fabrication work a 42 , erection and fabrication work a 43 , erection and fabrication work a 44 , erection and fabrication work a 45 , erection and fabrication work a 46 , erection and fabrication work a 47 , erection and fabrication work a 48 , erection and fabrication work a 49 , erection and fabrication work a 50 , erection and fabrication work a 51 , erection and fabrication work a 52 , erection and fabrication work a 53 , erection and fabrication work a 54 , erection and fabrication work a 55 , erection and fabrication work a 56 , erection and fabrication work a 57 , erection and fabrication work a 58 , erection and fabrication work a 59 , erection and fabrication work a 60 , erection and fabrication work a 61 , erection and fabrication work a 62 , erection and fabrication work a 63 , erection and fabrication work a 64 , erection and fabrication work a 65 , erection and fabrication work a 66, erection and fabrication work a, cutting and removing the weak/broken parts of the discharge chute for the scraper in the mill, fabricating new parts from 12 mm plate, reinstalling them, fixing hole plates as per profile by welding to secure the scraper, and conducting a trial after completion of work., cutting and removing the worn/weak runner base of the cane carrier, fabricating a box structure using 100 mm channel to installation the runner base, fitting it properly, and straightening and reusing the old channel by turning it over., cutting and removing the old worn/cut 40/50 mm square bars of the cane unloader and installing new square bars in their place as before, followed by a satisfactory trial., cutting and removing the worn/cut runners of the cane carrier/rake carrier/bagasse elevator/r.b.c., reinstalling them by either turning over the old ones or fitting new runners as per original design., cutting and removing the worn/cut/weak side plates of chains used in cane carrier/rake carrier/r.b.c., and installing old or new plates in their place., cutting and removing the worn/weak side plates of the fibrizer hood, installing new plates, welding inside and outside, and conducting a satisfactory trial., complete overhauling, testing, and trial of the bagasse baling machine., performing necessary repairs on the old racks of s.r.c./i.r.c., fabricating new racks as per sample for the chains of bagasse elevator/r.b.c., replacing the weak/broken bottom/top covers of t.r.p.f. by fabricating and installing new covers as per original design, and conducting a satisfactory trial., cutting and removing the weak/broken tail end boots of s.r.c./i.r.c., fabricating new ones from 8.0/10.0 mm old/new plate as per sample, installing, leak-proof welding, and conducting a satisfactory trial., dismantling various parts of the cane unloader grabs, repairing all parts, hardfacing the fingers as per instructions, and reassembling the grabs., cutting and removing the weak/broken juice tray used for compound imbibition in mills, fabricating a new tray from plate as per sample, installing it in place, and making all connections., cutting and removing the worn/weak guides that prevent chains of cane carrier/s.r.c./i.r.c. and bagasse elevator from lifting, fabricating new guides as per instructions, installing them, and conducting a satisfactory trial., welding the worn/cut wheels of the cane unloader bridge/trolley drive as per instructions., cutting and removing the weak/broken donali chutes of t.r.p.f., fabricating new donali chutes as per the old ones, and erecting them in place., fabricating and installing m.s. rings on the idler wheel of the cane carrier as per instructions., fabricating and installing a support using 25.0 mm plate between the mill head stock and t.r.p.f. head stock as per instructions., repairing and balancing the old hammer shanks of the fibrizer by welding and hardfacing as per instructions., cutting and removing the worn/weak hoods of the cane chopper/leveller and fabricating a new folding type from new plate and installing it., replacing the broken plates in the pockets of the fibrizer's pocketed type anvil plate with new plates, straightening bent plates, welding, and hardfacing as per instructions., welding and leveling the worn hubs of the cane leveller/chopper rotor assembly on the working side and top sides, and hardfacing as per instructions., cutting and removing the weak beds of reduction gears and motors on cane unloaders, modifying and fabricating new beds, installing them, aligning the gear and motor, and conducting a trial., strengthening the weak/broken columns of the cane carrier structure by welding plates as per instructions., fabricating and fitting juice rings in the mill rollers as per sample., performing necessary repairs on the pressure chutes installed between t.r.p.f. and the mill., cutting and removing the weak/broken juice receiving tank of the mills, fabricating a new tank from 8.0/10.0 mm plate as per sample, fitting it in place, making all connections, and conducting a leak-proof trial., cutting and removing the weak/broken bottom cone of the mill's juice receiving tank, fabricating a new cone as per sample, fitting it in place, making all connections as before, and conducting a leak-proof trial., cutting and removing the weak/broken 10 inch/12 inch pipes between the mill juice tray and gutter, fabricating and fitting new s.s. pipes in their place, and conducting a leak-proof trial., lining the bottom trough of s.r.c./i.r.c. with 3.00 mm thick s.s. plate and doing leak-proof welding., removing the shifted bed of feed pump no. 1 on the boiler, fabricating and installing a new bed, making related connections, and conducting a trial., making the damper in the old i.d. fan ducting at the boiler station leak-proof using new/old plate before the chimney and doing complete welding so that when the new i.d. runs, there is no back air from the chimney., cutting and removing the nipple reducers of all three wet scrubber pumps and their leaking pipe lines, installing new pipe lines, and making all connections as before with leak-proof welding., opening all nozzles inside the wet scrubber venturi, removing damaged nozzles, installing new nozzles, and making all connections as before., fabricating new pipes from old boiler tubes for backwash from the service tank to the wet scrubber, and making all connections with new valves and clamps in the pipeline., cutting and removing the weak and leaking juice tray from under the t.r.p.f. that brings juice to the mill juice tray, and fabricating and installing a new one., cutting and removing the weak/broken ash chutes of the boilers, and fabricating and fitting new chutes from old/new plate as per the old ones., performing necessary repairs on the weak/broken dampers of air heaters, economizers, and f.d./i.d. fans' inlets/outlets or suction/delivery., replacing the frames and grids of the internal steam filter fitted in the boiler drums by fabricating new frames and fitting grids., cutting and removing the weak/broken flue gas ducting between the i.d. fans and the chimney, fabricating and installing new ducting from 5.0/6.0 mm thick plate, and conducting a leak-proof trial., for the weak bagassilo fan, fabricating a new impeller as per sample, repairing the casing as necessary, and conducting a successful trial., cutting and removing the weak/broken suction cones in the casings of i.d./f.d. fans, fabricating and installing new cones as per sample, and conducting a successful trial., replacing the damaged weak grids/perforated sheets of the baffle plates inside the boiler feed tank., cutting and removing the weak/broken bagasse feeding chutes of boiler no. 1, 2, and 3, and performing necessary repairs., replacing the weak/broken air headers installed outside for supplying additional f.d. air in the furnace of 20-ton capacity boiler no. 1 and 2 with new headers., cutting the weak/broken ducting between the air heater and i.d. fans and fabricating and installing new ducting from 5/6 mm thick plate., removing damaged perforated grids in the bagasse elevator used for bagasse to bagassilo filtration and fitting new grids., lowering the economizer coils/tubes of 20-ton capacity boiler no. 1 and 2, cleaning them internally and externally, conducting hydraulic testing at standard pressure, and after testing, lifting and refitting them, making the economizer bands leak-proof, and conducting a satisfactory hydraulic test., cutting and removing the weak/broken channel/plate of the s.r.c./i.r.c. trough and fabricating and installing new ones as per instructions., fabricating and installing angle iron rings for strengthening the boiler chimney., strengthening the weak and damaged truss-type bridge structure of the cane unloader by adding new channels, angles, and plates to provide satisfactory strength., welding the oval/worn enlarged holes on both ends of the block-type chain links of s.r.c./i.r.c. chains, drilling pin-size holes in the attachment, and grinding the faces to level., cutting and removing the worn/weak attachment used for fixing racks on the block-type chain links of s.r.c./i.r.c. chains, fabricating new attachment links from 12 mm thick plate as before, welding them onto the links, and drilling holes as per drawing., constructing a separate platform path using old angle channels for access to all three unloaders., replacing the weak/broken parts of i.d. fan casing, air heater cell/ducting, and economizer cell., cutting and removing the old m.s. plate of the bottom trough and boot of s.r.c./i.r.c., installing new plate to make the trough and boot leak-proof, and lining the boot and trough with 3 mm thick s.s. plate, followed by a satisfactory trial., fabricating new racks from 25 mm thick plate as per sample for s.r.c./i.r.c. chains, drilling holes, cutting and supporting chain rollers on both ends, and preparing them., removing the bent 250 mm channel of the trolley in the cane unloader, leveling it, strengthening the structure, fitting worn/weak runner square bars, checking diagonals, and leveling the wheel., removing all four wheels of the mill and power house crane, cleaning, checking bearings, greasing all plumber blocks, replacing damaged bearings with mill spares, welding worn wheels to a uniform size, and conducting a satisfactory trial., performing necessary repairs and hardfacing on the worn shells/teeth of t.r.p.f. top/bottom rollers, and adding rings on both sides as needed to compensate for reduced shell length., cutting and removing the weak/leaking juice tray of the mill and fabricating a new one from 5 mm s.s. plate as per sample, and conducting a leak-proof trial., performing necessary repairs on the damaged s.s. juice tray of the mill., in case of head stock cracking or misalignment, removing the head stock, regrouting, aligning, and completing all related work., removing the shaft of the damaged t.r.p.f. roller and dismantling the shell using gas cutting., cutting the 63.5 mm old boiler tubes with bends, making a 5.1 meter straight line, preparing them for the air heater, and cleaning them by grinding.

Latest Tender Detail from uttar pradesh cooperative sugar factories federation ltd UPCSFFL for the tender for erection and fabrication work a erection and fabrication work a 1 , erection and fabrication work a 2 , erection and fabrication work a 3 , erection and fabrication work a 4 , erection and fabrication work a 5 , erection and fabrication work a 6 , erection and fabrication work a 7 , erection and fabrication work a 8 , erection and fabrication work a 9 , erection and fabrication work a 10 , erection and fabrication work a 11 , erection and fabrication work a 12 , erection and fabrication work a 13 , erection and fabrication work a 14 , erection and fabrication work a 15 , erection and fabrication work a 16 , erection and fabrication work a 17 , erection and fabrication work a 18 , erection and fabrication work a 19 , erection and fabrication work a 20 , erection and fabrication work a 21 , erection and fabrication work a 22 , erection and fabrication work a 23 , erection and fabrication work a 24 , erection and fabrication work a 25 , erection and fabrication work a 26 , erection and fabrication work a 27 , erection and fabrication work a 28 , erection and fabrication work a 29 , erection and fabrication work a 30 , erection and fabrication work a 31 , erection and fabrication work a 32 , erection and fabrication work a 33 , erection and fabrication work a 34 , erection and fabrication work a 35 , erection and fabrication work a 36 , erection and fabrication work a 37 , erection and fabrication work a 38 , erection and fabrication work a 39 , erection and fabrication work a 40 , erection and fabrication work a 41 , erection and fabrication work a 42 , erection and fabrication work a 43 , erection and fabrication work a 44 , erection and fabrication work a 45 , erection and fabrication work a 46 , erection and fabrication work a 47 , erection and fabrication work a 48 , erection and fabrication work a 49 , erection and fabrication work a 50 , erection and fabrication work a 51 , erection and fabrication work a 52 , erection and fabrication work a 53 , erection and fabrication work a 54 , erection and fabrication work a 55 , erection and fabrication work a 56 , erection and fabrication work a 57 , erection and fabrication work a 58 , erection and fabrication work a 59 , erection and fabrication work a 60 , erection and fabrication work a 61 , erection and fabrication work a 62 , erection and fabrication work a 63 , erection and fabrication work a 64 , erection and fabrication work a 65 , erection and fabrication work a 66, erection and fabrication work a, cutting and removing the weak/broken parts of the discharge chute for the scraper in the mill, fabricating new parts from 12 mm plate, reinstalling them, fixing hole plates as per profile by welding to secure the scraper, and conducting a trial after completion of work., cutting and removing the worn/weak runner base of the cane carrier, fabricating a box structure using 100 mm channel to installation the runner base, fitting it properly, and straightening and reusing the old channel by turning it over., cutting and removing the old worn/cut 40/50 mm square bars of the cane unloader and installing new square bars in their place as before, followed by a satisfactory trial., cutting and removing the worn/cut runners of the cane carrier/rake carrier/bagasse elevator/r.b.c., reinstalling them by either turning over the old ones or fitting new runners as per original design., cutting and removing the worn/cut/weak side plates of chains used in cane carrier/rake carrier/r.b.c., and installing old or new plates in their place., cutting and removing the worn/weak side plates of the fibrizer hood, installing new plates, welding inside and outside, and conducting a satisfactory trial., complete overhauling, testing, and trial of the bagasse baling machine., performing necessary repairs on the old racks of s.r.c./i.r.c., fabricating new racks as per sample for the chains of bagasse elevator/r.b.c., replacing the weak/broken bottom/top covers of t.r.p.f. by fabricating and installing new covers as per original design, and conducting a satisfactory trial., cutting and removing the weak/broken tail end boots of s.r.c./i.r.c., fabricating new ones from 8.0/10.0 mm old/new plate as per sample, installing, leak-proof welding, and conducting a satisfactory trial., dismantling various parts of the cane unloader grabs, repairing all parts, hardfacing the fingers as per instructions, and reassembling the grabs., cutting and removing the weak/broken juice tray used for compound imbibition in mills, fabricating a new tray from plate as per sample, installing it in place, and making all connections., cutting and removing the worn/weak guides that prevent chains of cane carrier/s.r.c./i.r.c. and bagasse elevator from lifting, fabricating new guides as per instructions, installing them, and conducting a satisfactory trial., welding the worn/cut wheels of the cane unloader bridge/trolley drive as per instructions., cutting and removing the weak/broken donali chutes of t.r.p.f., fabricating new donali chutes as per the old ones, and erecting them in place., fabricating and installing m.s. rings on the idler wheel of the cane carrier as per instructions., fabricating and installing a support using 25.0 mm plate between the mill head stock and t.r.p.f. head stock as per instructions., repairing and balancing the old hammer shanks of the fibrizer by welding and hardfacing as per instructions., cutting and removing the worn/weak hoods of the cane chopper/leveller and fabricating a new folding type from new plate and installing it., replacing the broken plates in the pockets of the fibrizer's pocketed type anvil plate with new plates, straightening bent plates, welding, and hardfacing as per instructions., welding and leveling the worn hubs of the cane leveller/chopper rotor assembly on the working side and top sides, and hardfacing as per instructions., cutting and removing the weak beds of reduction gears and motors on cane unloaders, modifying and fabricating new beds, installing them, aligning the gear and motor, and conducting a trial., strengthening the weak/broken columns of the cane carrier structure by welding plates as per instructions., fabricating and fitting juice rings in the mill rollers as per sample., performing necessary repairs on the pressure chutes installed between t.r.p.f. and the mill., cutting and removing the weak/broken juice receiving tank of the mills, fabricating a new tank from 8.0/10.0 mm plate as per sample, fitting it in place, making all connections, and conducting a leak-proof trial., cutting and removing the weak/broken bottom cone of the mill's juice receiving tank, fabricating a new cone as per sample, fitting it in place, making all connections as before, and conducting a leak-proof trial., cutting and removing the weak/broken 10 inch/12 inch pipes between the mill juice tray and gutter, fabricating and fitting new s.s. pipes in their place, and conducting a leak-proof trial., lining the bottom trough of s.r.c./i.r.c. with 3.00 mm thick s.s. plate and doing leak-proof welding., removing the shifted bed of feed pump no. 1 on the boiler, fabricating and installing a new bed, making related connections, and conducting a trial., making the damper in the old i.d. fan ducting at the boiler station leak-proof using new/old plate before the chimney and doing complete welding so that when the new i.d. runs, there is no back air from the chimney., cutting and removing the nipple reducers of all three wet scrubber pumps and their leaking pipe lines, installing new pipe lines, and making all connections as before with leak-proof welding., opening all nozzles inside the wet scrubber venturi, removing damaged nozzles, installing new nozzles, and making all connections as before., fabricating new pipes from old boiler tubes for backwash from the service tank to the wet scrubber, and making all connections with new valves and clamps in the pipeline., cutting and removing the weak and leaking juice tray from under the t.r.p.f. that brings juice to the mill juice tray, and fabricating and installing a new one., cutting and removing the weak/broken ash chutes of the boilers, and fabricating and fitting new chutes from old/new plate as per the old ones., performing necessary repairs on the weak/broken dampers of air heaters, economizers, and f.d./i.d. fans' inlets/outlets or suction/delivery., replacing the frames and grids of the internal steam filter fitted in the boiler drums by fabricating new frames and fitting grids., cutting and removing the weak/broken flue gas ducting between the i.d. fans and the chimney, fabricating and installing new ducting from 5.0/6.0 mm thick plate, and conducting a leak-proof trial., for the weak bagassilo fan, fabricating a new impeller as per sample, repairing the casing as necessary, and conducting a successful trial., cutting and removing the weak/broken suction cones in the casings of i.d./f.d. fans, fabricating and installing new cones as per sample, and conducting a successful trial., replacing the damaged weak grids/perforated sheets of the baffle plates inside the boiler feed tank., cutting and removing the weak/broken bagasse feeding chutes of boiler no. 1, 2, and 3, and performing necessary repairs., replacing the weak/broken air headers installed outside for supplying additional f.d. air in the furnace of 20-ton capacity boiler no. 1 and 2 with new headers., cutting the weak/broken ducting between the air heater and i.d. fans and fabricating and installing new ducting from 5/6 mm thick plate., removing damaged perforated grids in the bagasse elevator used for bagasse to bagassilo filtration and fitting new grids., lowering the economizer coils/tubes of 20-ton capacity boiler no. 1 and 2, cleaning them internally and externally, conducting hydraulic testing at standard pressure, and after testing, lifting and refitting them, making the economizer bands leak-proof, and conducting a satisfactory hydraulic test., cutting and removing the weak/broken channel/plate of the s.r.c./i.r.c. trough and fabricating and installing new ones as per instructions., fabricating and installing angle iron rings for strengthening the boiler chimney., strengthening the weak and damaged truss-type bridge structure of the cane unloader by adding new channels, angles, and plates to provide satisfactory strength., welding the oval/worn enlarged holes on both ends of the block-type chain links of s.r.c./i.r.c. chains, drilling pin-size holes in the attachment, and grinding the faces to level., cutting and removing the worn/weak attachment used for fixing racks on the block-type chain links of s.r.c./i.r.c. chains, fabricating new attachment links from 12 mm thick plate as before, welding them onto the links, and drilling holes as per drawing., constructing a separate platform path using old angle channels for access to all three unloaders., replacing the weak/broken parts of i.d. fan casing, air heater cell/ducting, and economizer cell., cutting and removing the old m.s. plate of the bottom trough and boot of s.r.c./i.r.c., installing new plate to make the trough and boot leak-proof, and lining the boot and trough with 3 mm thick s.s. plate, followed by a satisfactory trial., fabricating new racks from 25 mm thick plate as per sample for s.r.c./i.r.c. chains, drilling holes, cutting and supporting chain rollers on both ends, and preparing them., removing the bent 250 mm channel of the trolley in the cane unloader, leveling it, strengthening the structure, fitting worn/weak runner square bars, checking diagonals, and leveling the wheel., removing all four wheels of the mill and power house crane, cleaning, checking bearings, greasing all plumber blocks, replacing damaged bearings with mill spares, welding worn wheels to a uniform size, and conducting a satisfactory trial., performing necessary repairs and hardfacing on the worn shells/teeth of t.r.p.f. top/bottom rollers, and adding rings on both sides as needed to compensate for reduced shell length., cutting and removing the weak/leaking juice tray of the mill and fabricating a new one from 5 mm s.s. plate as per sample, and conducting a leak-proof trial., performing necessary repairs on the damaged s.s. juice tray of the mill., in case of head stock cracking or misalignment, removing the head stock, regrouting, aligning, and completing all related work., removing the shaft of the damaged t.r.p.f. roller and dismantling the shell using gas cutting., cutting the 63.5 mm old boiler tubes with bends, making a 5.1 meter straight line, preparing them for the air heater, and cleaning them by grinding. in muzaffarnagar, uttar pradesh,. Reference number 15982890. Don't miss out on this chance to be part of a significant project. Register for free today to access the complete tender details and download the necessary documents. Seize the opportunity with Tender 18!

T18 Ref No:15982890
Tender ID:GEM/2026/B/7696370
Tender Agency:uttar pradesh cooperative sugar factories federation ltd UPCSFFL
City:muzaffarnagar
State:uttar pradesh
Tender Related Keywords :perforated sheets, fabrication work, baling machine, boiler chimney, wet scrubber, square bars, pipe lines, angle iron, feed pump, ms rings, ss pipes, ss plate, ms plate, bearings
Description :total quantity = 2064 ----- document required from seller = experience criteria,past performance,bidder turnover,additional doc 1 (requested in atc),additional doc 2 (requested in atc)
Tender Value:1657196
Tender EMD:Refer Document
Tender Fee:Refer Document
Published Date:Jun 24, 2026
Due Date:Jul 10, 2026
Tender Opening Date:Jul 10, 2026
T18 Ref No:15982890Tender Value:1657196
Tender ID:GEM/2026/B/7696370Tender EMD:Refer Document
Tender Agency:uttar pradesh cooperative sugar factories federation ltd UPCSFFLTender Fee:Refer Document
City:muzaffarnagarPublished Date:Jun 24, 2026
State:uttar pradeshDue Date:Jul 10, 2026
Tender Related Keywords :perforated sheets, fabrication work, baling machine, boiler chimney, wet scrubber, square bars, pipe lines, angle iron, feed pump, ms rings, ss pipes, ss plate, ms plate, bearingsTender Opening Date:Jul 10, 2026
Description :total quantity = 2064 ----- document required from seller = experience criteria,past performance,bidder turnover,additional doc 1 (requested in atc),additional doc 2 (requested in atc)
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.

This Government Tender has been Published  by Uttar pradesh cooperative sugar factories federation ltd UPCSFFL for work related to perforated sheets,fabrication work,baling machine,boiler chimney,wet scrubber,square bars,pipe lines,angle iron,feed pump,ms rings,ss pipes,ss plate,ms plate,bearings in Muzaffarnagar, Uttar pradesh. The Tender work is tender for erection and fabrication work a erection and fabrication work a 1 , erection and fabrication work a 2 , erection and fabrication work a 3 , erection and fabrication work a 4 , erection and fabrication work a 5 , erection and fabrication work a 6 , erection and fabrication work a 7 , erection and fabrication work a 8 , erection and fabrication work a 9 , erection and fabrication work a 10 , erection and fabrication work a 11 , erection and fabrication work a 12 , erection and fabrication work a 13 , erection and fabrication work a 14 , erection and fabrication work a 15 , erection and fabrication work a 16 , erection and fabrication work a 17 , erection and fabrication work a 18 , erection and fabrication work a 19 , erection and fabrication work a 20 , erection and fabrication work a 21 , erection and fabrication work a 22 , erection and fabrication work a 23 , erection and fabrication work a 24 , erection and fabrication work a 25 , erection and fabrication work a 26 , erection and fabrication work a 27 , erection and fabrication work a 28 , erection and fabrication work a 29 , erection and fabrication work a 30 , erection and fabrication work a 31 , erection and fabrication work a 32 , erection and fabrication work a 33 , erection and fabrication work a 34 , erection and fabrication work a 35 , erection and fabrication work a 36 , erection and fabrication work a 37 , erection and fabrication work a 38 , erection and fabrication work a 39 , erection and fabrication work a 40 , erection and fabrication work a 41 , erection and fabrication work a 42 , erection and fabrication work a 43 , erection and fabrication work a 44 , erection and fabrication work a 45 , erection and fabrication work a 46 , erection and fabrication work a 47 , erection and fabrication work a 48 , erection and fabrication work a 49 , erection and fabrication work a 50 , erection and fabrication work a 51 , erection and fabrication work a 52 , erection and fabrication work a 53 , erection and fabrication work a 54 , erection and fabrication work a 55 , erection and fabrication work a 56 , erection and fabrication work a 57 , erection and fabrication work a 58 , erection and fabrication work a 59 , erection and fabrication work a 60 , erection and fabrication work a 61 , erection and fabrication work a 62 , erection and fabrication work a 63 , erection and fabrication work a 64 , erection and fabrication work a 65 , erection and fabrication work a 66, erection and fabrication work a, cutting and removing the weak/broken parts of the discharge chute for the scraper in the mill, fabricating new parts from 12 mm plate, reinstalling them, fixing hole plates as per profile by welding to secure the scraper, and conducting a trial after completion of work., cutting and removing the worn/weak runner base of the cane carrier, fabricating a box structure using 100 mm channel to installation the runner base, fitting it properly, and straightening and reusing the old channel by turning it over., cutting and removing the old worn/cut 40/50 mm square bars of the cane unloader and installing new square bars in their place as before, followed by a satisfactory trial., cutting and removing the worn/cut runners of the cane carrier/rake carrier/bagasse elevator/r.b.c., reinstalling them by either turning over the old ones or fitting new runners as per original design., cutting and removing the worn/cut/weak side plates of chains used in cane carrier/rake carrier/r.b.c., and installing old or new plates in their place., cutting and removing the worn/weak side plates of the fibrizer hood, installing new plates, welding inside and outside, and conducting a satisfactory trial., complete overhauling, testing, and trial of the bagasse baling machine., performing necessary repairs on the old racks of s.r.c./i.r.c., fabricating new racks as per sample for the chains of bagasse elevator/r.b.c., replacing the weak/broken bottom/top covers of t.r.p.f. by fabricating and installing new covers as per original design, and conducting a satisfactory trial., cutting and removing the weak/broken tail end boots of s.r.c./i.r.c., fabricating new ones from 8.0/10.0 mm old/new plate as per sample, installing, leak-proof welding, and conducting a satisfactory trial., dismantling various parts of the cane unloader grabs, repairing all parts, hardfacing the fingers as per instructions, and reassembling the grabs., cutting and removing the weak/broken juice tray used for compound imbibition in mills, fabricating a new tray from plate as per sample, installing it in place, and making all connections., cutting and removing the worn/weak guides that prevent chains of cane carrier/s.r.c./i.r.c. and bagasse elevator from lifting, fabricating new guides as per instructions, installing them, and conducting a satisfactory trial., welding the worn/cut wheels of the cane unloader bridge/trolley drive as per instructions., cutting and removing the weak/broken donali chutes of t.r.p.f., fabricating new donali chutes as per the old ones, and erecting them in place., fabricating and installing m.s. rings on the idler wheel of the cane carrier as per instructions., fabricating and installing a support using 25.0 mm plate between the mill head stock and t.r.p.f. head stock as per instructions., repairing and balancing the old hammer shanks of the fibrizer by welding and hardfacing as per instructions., cutting and removing the worn/weak hoods of the cane chopper/leveller and fabricating a new folding type from new plate and installing it., replacing the broken plates in the pockets of the fibrizer's pocketed type anvil plate with new plates, straightening bent plates, welding, and hardfacing as per instructions., welding and leveling the worn hubs of the cane leveller/chopper rotor assembly on the working side and top sides, and hardfacing as per instructions., cutting and removing the weak beds of reduction gears and motors on cane unloaders, modifying and fabricating new beds, installing them, aligning the gear and motor, and conducting a trial., strengthening the weak/broken columns of the cane carrier structure by welding plates as per instructions., fabricating and fitting juice rings in the mill rollers as per sample., performing necessary repairs on the pressure chutes installed between t.r.p.f. and the mill., cutting and removing the weak/broken juice receiving tank of the mills, fabricating a new tank from 8.0/10.0 mm plate as per sample, fitting it in place, making all connections, and conducting a leak-proof trial., cutting and removing the weak/broken bottom cone of the mill's juice receiving tank, fabricating a new cone as per sample, fitting it in place, making all connections as before, and conducting a leak-proof trial., cutting and removing the weak/broken 10 inch/12 inch pipes between the mill juice tray and gutter, fabricating and fitting new s.s. pipes in their place, and conducting a leak-proof trial., lining the bottom trough of s.r.c./i.r.c. with 3.00 mm thick s.s. plate and doing leak-proof welding., removing the shifted bed of feed pump no. 1 on the boiler, fabricating and installing a new bed, making related connections, and conducting a trial., making the damper in the old i.d. fan ducting at the boiler station leak-proof using new/old plate before the chimney and doing complete welding so that when the new i.d. runs, there is no back air from the chimney., cutting and removing the nipple reducers of all three wet scrubber pumps and their leaking pipe lines, installing new pipe lines, and making all connections as before with leak-proof welding., opening all nozzles inside the wet scrubber venturi, removing damaged nozzles, installing new nozzles, and making all connections as before., fabricating new pipes from old boiler tubes for backwash from the service tank to the wet scrubber, and making all connections with new valves and clamps in the pipeline., cutting and removing the weak and leaking juice tray from under the t.r.p.f. that brings juice to the mill juice tray, and fabricating and installing a new one., cutting and removing the weak/broken ash chutes of the boilers, and fabricating and fitting new chutes from old/new plate as per the old ones., performing necessary repairs on the weak/broken dampers of air heaters, economizers, and f.d./i.d. fans' inlets/outlets or suction/delivery., replacing the frames and grids of the internal steam filter fitted in the boiler drums by fabricating new frames and fitting grids., cutting and removing the weak/broken flue gas ducting between the i.d. fans and the chimney, fabricating and installing new ducting from 5.0/6.0 mm thick plate, and conducting a leak-proof trial., for the weak bagassilo fan, fabricating a new impeller as per sample, repairing the casing as necessary, and conducting a successful trial., cutting and removing the weak/broken suction cones in the casings of i.d./f.d. fans, fabricating and installing new cones as per sample, and conducting a successful trial., replacing the damaged weak grids/perforated sheets of the baffle plates inside the boiler feed tank., cutting and removing the weak/broken bagasse feeding chutes of boiler no. 1, 2, and 3, and performing necessary repairs., replacing the weak/broken air headers installed outside for supplying additional f.d. air in the furnace of 20-ton capacity boiler no. 1 and 2 with new headers., cutting the weak/broken ducting between the air heater and i.d. fans and fabricating and installing new ducting from 5/6 mm thick plate., removing damaged perforated grids in the bagasse elevator used for bagasse to bagassilo filtration and fitting new grids., lowering the economizer coils/tubes of 20-ton capacity boiler no. 1 and 2, cleaning them internally and externally, conducting hydraulic testing at standard pressure, and after testing, lifting and refitting them, making the economizer bands leak-proof, and conducting a satisfactory hydraulic test., cutting and removing the weak/broken channel/plate of the s.r.c./i.r.c. trough and fabricating and installing new ones as per instructions., fabricating and installing angle iron rings for strengthening the boiler chimney., strengthening the weak and damaged truss-type bridge structure of the cane unloader by adding new channels, angles, and plates to provide satisfactory strength., welding the oval/worn enlarged holes on both ends of the block-type chain links of s.r.c./i.r.c. chains, drilling pin-size holes in the attachment, and grinding the faces to level., cutting and removing the worn/weak attachment used for fixing racks on the block-type chain links of s.r.c./i.r.c. chains, fabricating new attachment links from 12 mm thick plate as before, welding them onto the links, and drilling holes as per drawing., constructing a separate platform path using old angle channels for access to all three unloaders., replacing the weak/broken parts of i.d. fan casing, air heater cell/ducting, and economizer cell., cutting and removing the old m.s. plate of the bottom trough and boot of s.r.c./i.r.c., installing new plate to make the trough and boot leak-proof, and lining the boot and trough with 3 mm thick s.s. plate, followed by a satisfactory trial., fabricating new racks from 25 mm thick plate as per sample for s.r.c./i.r.c. chains, drilling holes, cutting and supporting chain rollers on both ends, and preparing them., removing the bent 250 mm channel of the trolley in the cane unloader, leveling it, strengthening the structure, fitting worn/weak runner square bars, checking diagonals, and leveling the wheel., removing all four wheels of the mill and power house crane, cleaning, checking bearings, greasing all plumber blocks, replacing damaged bearings with mill spares, welding worn wheels to a uniform size, and conducting a satisfactory trial., performing necessary repairs and hardfacing on the worn shells/teeth of t.r.p.f. top/bottom rollers, and adding rings on both sides as needed to compensate for reduced shell length., cutting and removing the weak/leaking juice tray of the mill and fabricating a new one from 5 mm s.s. plate as per sample, and conducting a leak-proof trial., performing necessary repairs on the damaged s.s. juice tray of the mill., in case of head stock cracking or misalignment, removing the head stock, regrouting, aligning, and completing all related work., removing the shaft of the damaged t.r.p.f. roller and dismantling the shell using gas cutting., cutting the 63.5 mm old boiler tubes with bends, making a 5.1 meter straight line, preparing them for the air heater, and cleaning them by grinding. . Tender18 Provide this type Government Tender Information on daily basis.


This tender invites eligible contractors, suppliers, manufacturers, consultants, Startups, Msmes, traders and service providers to submit bids for the specified project, supply, service, or work requirement.


Before applying, interested bidders should review the tender scope, eligibility criteria, estimated contract value, important dates, technical requirements, reqired docuent list for bidder and bid submission instructions as per provided in the official tender documents. 


This Verified Information Provide By Tender18 in this page so Bidder Can Easiy  Understanding tender  requirements and bidders can prepare a compliant and competitive tender proposal.

To participate in the tender for erection and fabrication work a erection and fabrication work a 1 , erection and fabrication work a 2 , erection and fabrication work a 3 , erection and fabrication work a 4 , erection and fabrication work a 5 , erection and fabrication work a 6 , erection and fabrication work a 7 , erection and fabrication work a 8 , erection and fabrication work a 9 , erection and fabrication work a 10 , erection and fabrication work a 11 , erection and fabrication work a 12 , erection and fabrication work a 13 , erection and fabrication work a 14 , erection and fabrication work a 15 , erection and fabrication work a 16 , erection and fabrication work a 17 , erection and fabrication work a 18 , erection and fabrication work a 19 , erection and fabrication work a 20 , erection and fabrication work a 21 , erection and fabrication work a 22 , erection and fabrication work a 23 , erection and fabrication work a 24 , erection and fabrication work a 25 , erection and fabrication work a 26 , erection and fabrication work a 27 , erection and fabrication work a 28 , erection and fabrication work a 29 , erection and fabrication work a 30 , erection and fabrication work a 31 , erection and fabrication work a 32 , erection and fabrication work a 33 , erection and fabrication work a 34 , erection and fabrication work a 35 , erection and fabrication work a 36 , erection and fabrication work a 37 , erection and fabrication work a 38 , erection and fabrication work a 39 , erection and fabrication work a 40 , erection and fabrication work a 41 , erection and fabrication work a 42 , erection and fabrication work a 43 , erection and fabrication work a 44 , erection and fabrication work a 45 , erection and fabrication work a 46 , erection and fabrication work a 47 , erection and fabrication work a 48 , erection and fabrication work a 49 , erection and fabrication work a 50 , erection and fabrication work a 51 , erection and fabrication work a 52 , erection and fabrication work a 53 , erection and fabrication work a 54 , erection and fabrication work a 55 , erection and fabrication work a 56 , erection and fabrication work a 57 , erection and fabrication work a 58 , erection and fabrication work a 59 , erection and fabrication work a 60 , erection and fabrication work a 61 , erection and fabrication work a 62 , erection and fabrication work a 63 , erection and fabrication work a 64 , erection and fabrication work a 65 , erection and fabrication work a 66, erection and fabrication work a, cutting and removing the weak/broken parts of the discharge chute for the scraper in the mill, fabricating new parts from 12 mm plate, reinstalling them, fixing hole plates as per profile by welding to secure the scraper, and conducting a trial after completion of work., cutting and removing the worn/weak runner base of the cane carrier, fabricating a box structure using 100 mm channel to installation the runner base, fitting it properly, and straightening and reusing the old channel by turning it over., cutting and removing the old worn/cut 40/50 mm square bars of the cane unloader and installing new square bars in their place as before, followed by a satisfactory trial., cutting and removing the worn/cut runners of the cane carrier/rake carrier/bagasse elevator/r.b.c., reinstalling them by either turning over the old ones or fitting new runners as per original design., cutting and removing the worn/cut/weak side plates of chains used in cane carrier/rake carrier/r.b.c., and installing old or new plates in their place., cutting and removing the worn/weak side plates of the fibrizer hood, installing new plates, welding inside and outside, and conducting a satisfactory trial., complete overhauling, testing, and trial of the bagasse baling machine., performing necessary repairs on the old racks of s.r.c./i.r.c., fabricating new racks as per sample for the chains of bagasse elevator/r.b.c., replacing the weak/broken bottom/top covers of t.r.p.f. by fabricating and installing new covers as per original design, and conducting a satisfactory trial., cutting and removing the weak/broken tail end boots of s.r.c./i.r.c., fabricating new ones from 8.0/10.0 mm old/new plate as per sample, installing, leak-proof welding, and conducting a satisfactory trial., dismantling various parts of the cane unloader grabs, repairing all parts, hardfacing the fingers as per instructions, and reassembling the grabs., cutting and removing the weak/broken juice tray used for compound imbibition in mills, fabricating a new tray from plate as per sample, installing it in place, and making all connections., cutting and removing the worn/weak guides that prevent chains of cane carrier/s.r.c./i.r.c. and bagasse elevator from lifting, fabricating new guides as per instructions, installing them, and conducting a satisfactory trial., welding the worn/cut wheels of the cane unloader bridge/trolley drive as per instructions., cutting and removing the weak/broken donali chutes of t.r.p.f., fabricating new donali chutes as per the old ones, and erecting them in place., fabricating and installing m.s. rings on the idler wheel of the cane carrier as per instructions., fabricating and installing a support using 25.0 mm plate between the mill head stock and t.r.p.f. head stock as per instructions., repairing and balancing the old hammer shanks of the fibrizer by welding and hardfacing as per instructions., cutting and removing the worn/weak hoods of the cane chopper/leveller and fabricating a new folding type from new plate and installing it., replacing the broken plates in the pockets of the fibrizer's pocketed type anvil plate with new plates, straightening bent plates, welding, and hardfacing as per instructions., welding and leveling the worn hubs of the cane leveller/chopper rotor assembly on the working side and top sides, and hardfacing as per instructions., cutting and removing the weak beds of reduction gears and motors on cane unloaders, modifying and fabricating new beds, installing them, aligning the gear and motor, and conducting a trial., strengthening the weak/broken columns of the cane carrier structure by welding plates as per instructions., fabricating and fitting juice rings in the mill rollers as per sample., performing necessary repairs on the pressure chutes installed between t.r.p.f. and the mill., cutting and removing the weak/broken juice receiving tank of the mills, fabricating a new tank from 8.0/10.0 mm plate as per sample, fitting it in place, making all connections, and conducting a leak-proof trial., cutting and removing the weak/broken bottom cone of the mill's juice receiving tank, fabricating a new cone as per sample, fitting it in place, making all connections as before, and conducting a leak-proof trial., cutting and removing the weak/broken 10 inch/12 inch pipes between the mill juice tray and gutter, fabricating and fitting new s.s. pipes in their place, and conducting a leak-proof trial., lining the bottom trough of s.r.c./i.r.c. with 3.00 mm thick s.s. plate and doing leak-proof welding., removing the shifted bed of feed pump no. 1 on the boiler, fabricating and installing a new bed, making related connections, and conducting a trial., making the damper in the old i.d. fan ducting at the boiler station leak-proof using new/old plate before the chimney and doing complete welding so that when the new i.d. runs, there is no back air from the chimney., cutting and removing the nipple reducers of all three wet scrubber pumps and their leaking pipe lines, installing new pipe lines, and making all connections as before with leak-proof welding., opening all nozzles inside the wet scrubber venturi, removing damaged nozzles, installing new nozzles, and making all connections as before., fabricating new pipes from old boiler tubes for backwash from the service tank to the wet scrubber, and making all connections with new valves and clamps in the pipeline., cutting and removing the weak and leaking juice tray from under the t.r.p.f. that brings juice to the mill juice tray, and fabricating and installing a new one., cutting and removing the weak/broken ash chutes of the boilers, and fabricating and fitting new chutes from old/new plate as per the old ones., performing necessary repairs on the weak/broken dampers of air heaters, economizers, and f.d./i.d. fans' inlets/outlets or suction/delivery., replacing the frames and grids of the internal steam filter fitted in the boiler drums by fabricating new frames and fitting grids., cutting and removing the weak/broken flue gas ducting between the i.d. fans and the chimney, fabricating and installing new ducting from 5.0/6.0 mm thick plate, and conducting a leak-proof trial., for the weak bagassilo fan, fabricating a new impeller as per sample, repairing the casing as necessary, and conducting a successful trial., cutting and removing the weak/broken suction cones in the casings of i.d./f.d. fans, fabricating and installing new cones as per sample, and conducting a successful trial., replacing the damaged weak grids/perforated sheets of the baffle plates inside the boiler feed tank., cutting and removing the weak/broken bagasse feeding chutes of boiler no. 1, 2, and 3, and performing necessary repairs., replacing the weak/broken air headers installed outside for supplying additional f.d. air in the furnace of 20-ton capacity boiler no. 1 and 2 with new headers., cutting the weak/broken ducting between the air heater and i.d. fans and fabricating and installing new ducting from 5/6 mm thick plate., removing damaged perforated grids in the bagasse elevator used for bagasse to bagassilo filtration and fitting new grids., lowering the economizer coils/tubes of 20-ton capacity boiler no. 1 and 2, cleaning them internally and externally, conducting hydraulic testing at standard pressure, and after testing, lifting and refitting them, making the economizer bands leak-proof, and conducting a satisfactory hydraulic test., cutting and removing the weak/broken channel/plate of the s.r.c./i.r.c. trough and fabricating and installing new ones as per instructions., fabricating and installing angle iron rings for strengthening the boiler chimney., strengthening the weak and damaged truss-type bridge structure of the cane unloader by adding new channels, angles, and plates to provide satisfactory strength., welding the oval/worn enlarged holes on both ends of the block-type chain links of s.r.c./i.r.c. chains, drilling pin-size holes in the attachment, and grinding the faces to level., cutting and removing the worn/weak attachment used for fixing racks on the block-type chain links of s.r.c./i.r.c. chains, fabricating new attachment links from 12 mm thick plate as before, welding them onto the links, and drilling holes as per drawing., constructing a separate platform path using old angle channels for access to all three unloaders., replacing the weak/broken parts of i.d. fan casing, air heater cell/ducting, and economizer cell., cutting and removing the old m.s. plate of the bottom trough and boot of s.r.c./i.r.c., installing new plate to make the trough and boot leak-proof, and lining the boot and trough with 3 mm thick s.s. plate, followed by a satisfactory trial., fabricating new racks from 25 mm thick plate as per sample for s.r.c./i.r.c. chains, drilling holes, cutting and supporting chain rollers on both ends, and preparing them., removing the bent 250 mm channel of the trolley in the cane unloader, leveling it, strengthening the structure, fitting worn/weak runner square bars, checking diagonals, and leveling the wheel., removing all four wheels of the mill and power house crane, cleaning, checking bearings, greasing all plumber blocks, replacing damaged bearings with mill spares, welding worn wheels to a uniform size, and conducting a satisfactory trial., performing necessary repairs and hardfacing on the worn shells/teeth of t.r.p.f. top/bottom rollers, and adding rings on both sides as needed to compensate for reduced shell length., cutting and removing the weak/leaking juice tray of the mill and fabricating a new one from 5 mm s.s. plate as per sample, and conducting a leak-proof trial., performing necessary repairs on the damaged s.s. juice tray of the mill., in case of head stock cracking or misalignment, removing the head stock, regrouting, aligning, and completing all related work., removing the shaft of the damaged t.r.p.f. roller and dismantling the shell using gas cutting., cutting the 63.5 mm old boiler tubes with bends, making a 5.1 meter straight line, preparing them for the air heater, and cleaning them by grinding. , bidders should first download and review all available tender documents. These documents generally include the Notice Inviting Tender (NIT), Bill of Quantities (BOQ), technical specifications, eligibility criteria, scope of work, and bid submission instructions.


Tender Governemnt Authorities like Uttar pradesh cooperative sugar factories federation ltd UPCSFFL usually publish these documents on their official eProcurement portals, departmental tender portals, the GeM Tender Portal, or other government procurement platforms or on newspapre. Finding and accessing the correct tender documents across multiple portals can sometimes be time-consuming for bidders. 


To make the process easier, Tender18 provides quick access to the available tender documents related to this Muzaffarnagar , Uttar pradesh tender on a single page. Businesses involved in perforated sheets,fabrication work,baling machine,boiler chimney,wet scrubber,square bars,pipe lines,angle iron,feed pump,ms rings,ss pipes,ss plate,ms plate,bearings related products, services, or works can conveniently download the relevant documents and review the tender requirements without spending time searching across different procurement portals.

The tender for erection and fabrication work a erection and fabrication work a 1 , erection and fabrication work a 2 , erection and fabrication work a 3 , erection and fabrication work a 4 , erection and fabrication work a 5 , erection and fabrication work a 6 , erection and fabrication work a 7 , erection and fabrication work a 8 , erection and fabrication work a 9 , erection and fabrication work a 10 , erection and fabrication work a 11 , erection and fabrication work a 12 , erection and fabrication work a 13 , erection and fabrication work a 14 , erection and fabrication work a 15 , erection and fabrication work a 16 , erection and fabrication work a 17 , erection and fabrication work a 18 , erection and fabrication work a 19 , erection and fabrication work a 20 , erection and fabrication work a 21 , erection and fabrication work a 22 , erection and fabrication work a 23 , erection and fabrication work a 24 , erection and fabrication work a 25 , erection and fabrication work a 26 , erection and fabrication work a 27 , erection and fabrication work a 28 , erection and fabrication work a 29 , erection and fabrication work a 30 , erection and fabrication work a 31 , erection and fabrication work a 32 , erection and fabrication work a 33 , erection and fabrication work a 34 , erection and fabrication work a 35 , erection and fabrication work a 36 , erection and fabrication work a 37 , erection and fabrication work a 38 , erection and fabrication work a 39 , erection and fabrication work a 40 , erection and fabrication work a 41 , erection and fabrication work a 42 , erection and fabrication work a 43 , erection and fabrication work a 44 , erection and fabrication work a 45 , erection and fabrication work a 46 , erection and fabrication work a 47 , erection and fabrication work a 48 , erection and fabrication work a 49 , erection and fabrication work a 50 , erection and fabrication work a 51 , erection and fabrication work a 52 , erection and fabrication work a 53 , erection and fabrication work a 54 , erection and fabrication work a 55 , erection and fabrication work a 56 , erection and fabrication work a 57 , erection and fabrication work a 58 , erection and fabrication work a 59 , erection and fabrication work a 60 , erection and fabrication work a 61 , erection and fabrication work a 62 , erection and fabrication work a 63 , erection and fabrication work a 64 , erection and fabrication work a 65 , erection and fabrication work a 66, erection and fabrication work a, cutting and removing the weak/broken parts of the discharge chute for the scraper in the mill, fabricating new parts from 12 mm plate, reinstalling them, fixing hole plates as per profile by welding to secure the scraper, and conducting a trial after completion of work., cutting and removing the worn/weak runner base of the cane carrier, fabricating a box structure using 100 mm channel to installation the runner base, fitting it properly, and straightening and reusing the old channel by turning it over., cutting and removing the old worn/cut 40/50 mm square bars of the cane unloader and installing new square bars in their place as before, followed by a satisfactory trial., cutting and removing the worn/cut runners of the cane carrier/rake carrier/bagasse elevator/r.b.c., reinstalling them by either turning over the old ones or fitting new runners as per original design., cutting and removing the worn/cut/weak side plates of chains used in cane carrier/rake carrier/r.b.c., and installing old or new plates in their place., cutting and removing the worn/weak side plates of the fibrizer hood, installing new plates, welding inside and outside, and conducting a satisfactory trial., complete overhauling, testing, and trial of the bagasse baling machine., performing necessary repairs on the old racks of s.r.c./i.r.c., fabricating new racks as per sample for the chains of bagasse elevator/r.b.c., replacing the weak/broken bottom/top covers of t.r.p.f. by fabricating and installing new covers as per original design, and conducting a satisfactory trial., cutting and removing the weak/broken tail end boots of s.r.c./i.r.c., fabricating new ones from 8.0/10.0 mm old/new plate as per sample, installing, leak-proof welding, and conducting a satisfactory trial., dismantling various parts of the cane unloader grabs, repairing all parts, hardfacing the fingers as per instructions, and reassembling the grabs., cutting and removing the weak/broken juice tray used for compound imbibition in mills, fabricating a new tray from plate as per sample, installing it in place, and making all connections., cutting and removing the worn/weak guides that prevent chains of cane carrier/s.r.c./i.r.c. and bagasse elevator from lifting, fabricating new guides as per instructions, installing them, and conducting a satisfactory trial., welding the worn/cut wheels of the cane unloader bridge/trolley drive as per instructions., cutting and removing the weak/broken donali chutes of t.r.p.f., fabricating new donali chutes as per the old ones, and erecting them in place., fabricating and installing m.s. rings on the idler wheel of the cane carrier as per instructions., fabricating and installing a support using 25.0 mm plate between the mill head stock and t.r.p.f. head stock as per instructions., repairing and balancing the old hammer shanks of the fibrizer by welding and hardfacing as per instructions., cutting and removing the worn/weak hoods of the cane chopper/leveller and fabricating a new folding type from new plate and installing it., replacing the broken plates in the pockets of the fibrizer's pocketed type anvil plate with new plates, straightening bent plates, welding, and hardfacing as per instructions., welding and leveling the worn hubs of the cane leveller/chopper rotor assembly on the working side and top sides, and hardfacing as per instructions., cutting and removing the weak beds of reduction gears and motors on cane unloaders, modifying and fabricating new beds, installing them, aligning the gear and motor, and conducting a trial., strengthening the weak/broken columns of the cane carrier structure by welding plates as per instructions., fabricating and fitting juice rings in the mill rollers as per sample., performing necessary repairs on the pressure chutes installed between t.r.p.f. and the mill., cutting and removing the weak/broken juice receiving tank of the mills, fabricating a new tank from 8.0/10.0 mm plate as per sample, fitting it in place, making all connections, and conducting a leak-proof trial., cutting and removing the weak/broken bottom cone of the mill's juice receiving tank, fabricating a new cone as per sample, fitting it in place, making all connections as before, and conducting a leak-proof trial., cutting and removing the weak/broken 10 inch/12 inch pipes between the mill juice tray and gutter, fabricating and fitting new s.s. pipes in their place, and conducting a leak-proof trial., lining the bottom trough of s.r.c./i.r.c. with 3.00 mm thick s.s. plate and doing leak-proof welding., removing the shifted bed of feed pump no. 1 on the boiler, fabricating and installing a new bed, making related connections, and conducting a trial., making the damper in the old i.d. fan ducting at the boiler station leak-proof using new/old plate before the chimney and doing complete welding so that when the new i.d. runs, there is no back air from the chimney., cutting and removing the nipple reducers of all three wet scrubber pumps and their leaking pipe lines, installing new pipe lines, and making all connections as before with leak-proof welding., opening all nozzles inside the wet scrubber venturi, removing damaged nozzles, installing new nozzles, and making all connections as before., fabricating new pipes from old boiler tubes for backwash from the service tank to the wet scrubber, and making all connections with new valves and clamps in the pipeline., cutting and removing the weak and leaking juice tray from under the t.r.p.f. that brings juice to the mill juice tray, and fabricating and installing a new one., cutting and removing the weak/broken ash chutes of the boilers, and fabricating and fitting new chutes from old/new plate as per the old ones., performing necessary repairs on the weak/broken dampers of air heaters, economizers, and f.d./i.d. fans' inlets/outlets or suction/delivery., replacing the frames and grids of the internal steam filter fitted in the boiler drums by fabricating new frames and fitting grids., cutting and removing the weak/broken flue gas ducting between the i.d. fans and the chimney, fabricating and installing new ducting from 5.0/6.0 mm thick plate, and conducting a leak-proof trial., for the weak bagassilo fan, fabricating a new impeller as per sample, repairing the casing as necessary, and conducting a successful trial., cutting and removing the weak/broken suction cones in the casings of i.d./f.d. fans, fabricating and installing new cones as per sample, and conducting a successful trial., replacing the damaged weak grids/perforated sheets of the baffle plates inside the boiler feed tank., cutting and removing the weak/broken bagasse feeding chutes of boiler no. 1, 2, and 3, and performing necessary repairs., replacing the weak/broken air headers installed outside for supplying additional f.d. air in the furnace of 20-ton capacity boiler no. 1 and 2 with new headers., cutting the weak/broken ducting between the air heater and i.d. fans and fabricating and installing new ducting from 5/6 mm thick plate., removing damaged perforated grids in the bagasse elevator used for bagasse to bagassilo filtration and fitting new grids., lowering the economizer coils/tubes of 20-ton capacity boiler no. 1 and 2, cleaning them internally and externally, conducting hydraulic testing at standard pressure, and after testing, lifting and refitting them, making the economizer bands leak-proof, and conducting a satisfactory hydraulic test., cutting and removing the weak/broken channel/plate of the s.r.c./i.r.c. trough and fabricating and installing new ones as per instructions., fabricating and installing angle iron rings for strengthening the boiler chimney., strengthening the weak and damaged truss-type bridge structure of the cane unloader by adding new channels, angles, and plates to provide satisfactory strength., welding the oval/worn enlarged holes on both ends of the block-type chain links of s.r.c./i.r.c. chains, drilling pin-size holes in the attachment, and grinding the faces to level., cutting and removing the worn/weak attachment used for fixing racks on the block-type chain links of s.r.c./i.r.c. chains, fabricating new attachment links from 12 mm thick plate as before, welding them onto the links, and drilling holes as per drawing., constructing a separate platform path using old angle channels for access to all three unloaders., replacing the weak/broken parts of i.d. fan casing, air heater cell/ducting, and economizer cell., cutting and removing the old m.s. plate of the bottom trough and boot of s.r.c./i.r.c., installing new plate to make the trough and boot leak-proof, and lining the boot and trough with 3 mm thick s.s. plate, followed by a satisfactory trial., fabricating new racks from 25 mm thick plate as per sample for s.r.c./i.r.c. chains, drilling holes, cutting and supporting chain rollers on both ends, and preparing them., removing the bent 250 mm channel of the trolley in the cane unloader, leveling it, strengthening the structure, fitting worn/weak runner square bars, checking diagonals, and leveling the wheel., removing all four wheels of the mill and power house crane, cleaning, checking bearings, greasing all plumber blocks, replacing damaged bearings with mill spares, welding worn wheels to a uniform size, and conducting a satisfactory trial., performing necessary repairs and hardfacing on the worn shells/teeth of t.r.p.f. top/bottom rollers, and adding rings on both sides as needed to compensate for reduced shell length., cutting and removing the weak/leaking juice tray of the mill and fabricating a new one from 5 mm s.s. plate as per sample, and conducting a leak-proof trial., performing necessary repairs on the damaged s.s. juice tray of the mill., in case of head stock cracking or misalignment, removing the head stock, regrouting, aligning, and completing all related work., removing the shaft of the damaged t.r.p.f. roller and dismantling the shell using gas cutting., cutting the 63.5 mm old boiler tubes with bends, making a 5.1 meter straight line, preparing them for the air heater, and cleaning them by grinding. from Muzaffarnagar, Uttar pradesh may be relevant for contractors, suppliers, vendors, manufacturers, consultants, service providers, startups, MSMEs, and other organizations involved in perforated sheets,fabrication work,baling machine,boiler chimney,wet scrubber,square bars,pipe lines,angle iron,feed pump,ms rings,ss pipes,ss plate,ms plate,bearings related products, services, or works. However, eligibility to participate depends on the qualification criteria specified by Uttar pradesh cooperative sugar factories federation ltd UPCSFFL in the official tender documents.

Before submitting a bid, interested applicants should carefully review the eligibility conditions, technical requirements, financial criteria, work experience requirements, annual turnover conditions, registrations, certifications, and any other supporting documents required by the tendering authority. The detailed qualification requirements and bidder eligibility criteria are available in the tender notice and related documents provided on this page. 

Ensuring compliance with all eligibility and qualification requirements before bid submission can help bidders avoid disqualification and improve their chances of successful participation in the tender process.

Tende18 provides comprehensive tender bidding services, including a complete tender summary along with a detailed analysis of the Tender Qualification and Eligibility Criteria.

Interested in participating in the tender for erection and fabrication work a erection and fabrication work a 1 , erection and fabrication work a 2 , erection and fabrication work a 3 , erection and fabrication work a 4 , erection and fabrication work a 5 , erection and fabrication work a 6 , erection and fabrication work a 7 , erection and fabrication work a 8 , erection and fabrication work a 9 , erection and fabrication work a 10 , erection and fabrication work a 11 , erection and fabrication work a 12 , erection and fabrication work a 13 , erection and fabrication work a 14 , erection and fabrication work a 15 , erection and fabrication work a 16 , erection and fabrication work a 17 , erection and fabrication work a 18 , erection and fabrication work a 19 , erection and fabrication work a 20 , erection and fabrication work a 21 , erection and fabrication work a 22 , erection and fabrication work a 23 , erection and fabrication work a 24 , erection and fabrication work a 25 , erection and fabrication work a 26 , erection and fabrication work a 27 , erection and fabrication work a 28 , erection and fabrication work a 29 , erection and fabrication work a 30 , erection and fabrication work a 31 , erection and fabrication work a 32 , erection and fabrication work a 33 , erection and fabrication work a 34 , erection and fabrication work a 35 , erection and fabrication work a 36 , erection and fabrication work a 37 , erection and fabrication work a 38 , erection and fabrication work a 39 , erection and fabrication work a 40 , erection and fabrication work a 41 , erection and fabrication work a 42 , erection and fabrication work a 43 , erection and fabrication work a 44 , erection and fabrication work a 45 , erection and fabrication work a 46 , erection and fabrication work a 47 , erection and fabrication work a 48 , erection and fabrication work a 49 , erection and fabrication work a 50 , erection and fabrication work a 51 , erection and fabrication work a 52 , erection and fabrication work a 53 , erection and fabrication work a 54 , erection and fabrication work a 55 , erection and fabrication work a 56 , erection and fabrication work a 57 , erection and fabrication work a 58 , erection and fabrication work a 59 , erection and fabrication work a 60 , erection and fabrication work a 61 , erection and fabrication work a 62 , erection and fabrication work a 63 , erection and fabrication work a 64 , erection and fabrication work a 65 , erection and fabrication work a 66, erection and fabrication work a, cutting and removing the weak/broken parts of the discharge chute for the scraper in the mill, fabricating new parts from 12 mm plate, reinstalling them, fixing hole plates as per profile by welding to secure the scraper, and conducting a trial after completion of work., cutting and removing the worn/weak runner base of the cane carrier, fabricating a box structure using 100 mm channel to installation the runner base, fitting it properly, and straightening and reusing the old channel by turning it over., cutting and removing the old worn/cut 40/50 mm square bars of the cane unloader and installing new square bars in their place as before, followed by a satisfactory trial., cutting and removing the worn/cut runners of the cane carrier/rake carrier/bagasse elevator/r.b.c., reinstalling them by either turning over the old ones or fitting new runners as per original design., cutting and removing the worn/cut/weak side plates of chains used in cane carrier/rake carrier/r.b.c., and installing old or new plates in their place., cutting and removing the worn/weak side plates of the fibrizer hood, installing new plates, welding inside and outside, and conducting a satisfactory trial., complete overhauling, testing, and trial of the bagasse baling machine., performing necessary repairs on the old racks of s.r.c./i.r.c., fabricating new racks as per sample for the chains of bagasse elevator/r.b.c., replacing the weak/broken bottom/top covers of t.r.p.f. by fabricating and installing new covers as per original design, and conducting a satisfactory trial., cutting and removing the weak/broken tail end boots of s.r.c./i.r.c., fabricating new ones from 8.0/10.0 mm old/new plate as per sample, installing, leak-proof welding, and conducting a satisfactory trial., dismantling various parts of the cane unloader grabs, repairing all parts, hardfacing the fingers as per instructions, and reassembling the grabs., cutting and removing the weak/broken juice tray used for compound imbibition in mills, fabricating a new tray from plate as per sample, installing it in place, and making all connections., cutting and removing the worn/weak guides that prevent chains of cane carrier/s.r.c./i.r.c. and bagasse elevator from lifting, fabricating new guides as per instructions, installing them, and conducting a satisfactory trial., welding the worn/cut wheels of the cane unloader bridge/trolley drive as per instructions., cutting and removing the weak/broken donali chutes of t.r.p.f., fabricating new donali chutes as per the old ones, and erecting them in place., fabricating and installing m.s. rings on the idler wheel of the cane carrier as per instructions., fabricating and installing a support using 25.0 mm plate between the mill head stock and t.r.p.f. head stock as per instructions., repairing and balancing the old hammer shanks of the fibrizer by welding and hardfacing as per instructions., cutting and removing the worn/weak hoods of the cane chopper/leveller and fabricating a new folding type from new plate and installing it., replacing the broken plates in the pockets of the fibrizer's pocketed type anvil plate with new plates, straightening bent plates, welding, and hardfacing as per instructions., welding and leveling the worn hubs of the cane leveller/chopper rotor assembly on the working side and top sides, and hardfacing as per instructions., cutting and removing the weak beds of reduction gears and motors on cane unloaders, modifying and fabricating new beds, installing them, aligning the gear and motor, and conducting a trial., strengthening the weak/broken columns of the cane carrier structure by welding plates as per instructions., fabricating and fitting juice rings in the mill rollers as per sample., performing necessary repairs on the pressure chutes installed between t.r.p.f. and the mill., cutting and removing the weak/broken juice receiving tank of the mills, fabricating a new tank from 8.0/10.0 mm plate as per sample, fitting it in place, making all connections, and conducting a leak-proof trial., cutting and removing the weak/broken bottom cone of the mill's juice receiving tank, fabricating a new cone as per sample, fitting it in place, making all connections as before, and conducting a leak-proof trial., cutting and removing the weak/broken 10 inch/12 inch pipes between the mill juice tray and gutter, fabricating and fitting new s.s. pipes in their place, and conducting a leak-proof trial., lining the bottom trough of s.r.c./i.r.c. with 3.00 mm thick s.s. plate and doing leak-proof welding., removing the shifted bed of feed pump no. 1 on the boiler, fabricating and installing a new bed, making related connections, and conducting a trial., making the damper in the old i.d. fan ducting at the boiler station leak-proof using new/old plate before the chimney and doing complete welding so that when the new i.d. runs, there is no back air from the chimney., cutting and removing the nipple reducers of all three wet scrubber pumps and their leaking pipe lines, installing new pipe lines, and making all connections as before with leak-proof welding., opening all nozzles inside the wet scrubber venturi, removing damaged nozzles, installing new nozzles, and making all connections as before., fabricating new pipes from old boiler tubes for backwash from the service tank to the wet scrubber, and making all connections with new valves and clamps in the pipeline., cutting and removing the weak and leaking juice tray from under the t.r.p.f. that brings juice to the mill juice tray, and fabricating and installing a new one., cutting and removing the weak/broken ash chutes of the boilers, and fabricating and fitting new chutes from old/new plate as per the old ones., performing necessary repairs on the weak/broken dampers of air heaters, economizers, and f.d./i.d. fans' inlets/outlets or suction/delivery., replacing the frames and grids of the internal steam filter fitted in the boiler drums by fabricating new frames and fitting grids., cutting and removing the weak/broken flue gas ducting between the i.d. fans and the chimney, fabricating and installing new ducting from 5.0/6.0 mm thick plate, and conducting a leak-proof trial., for the weak bagassilo fan, fabricating a new impeller as per sample, repairing the casing as necessary, and conducting a successful trial., cutting and removing the weak/broken suction cones in the casings of i.d./f.d. fans, fabricating and installing new cones as per sample, and conducting a successful trial., replacing the damaged weak grids/perforated sheets of the baffle plates inside the boiler feed tank., cutting and removing the weak/broken bagasse feeding chutes of boiler no. 1, 2, and 3, and performing necessary repairs., replacing the weak/broken air headers installed outside for supplying additional f.d. air in the furnace of 20-ton capacity boiler no. 1 and 2 with new headers., cutting the weak/broken ducting between the air heater and i.d. fans and fabricating and installing new ducting from 5/6 mm thick plate., removing damaged perforated grids in the bagasse elevator used for bagasse to bagassilo filtration and fitting new grids., lowering the economizer coils/tubes of 20-ton capacity boiler no. 1 and 2, cleaning them internally and externally, conducting hydraulic testing at standard pressure, and after testing, lifting and refitting them, making the economizer bands leak-proof, and conducting a satisfactory hydraulic test., cutting and removing the weak/broken channel/plate of the s.r.c./i.r.c. trough and fabricating and installing new ones as per instructions., fabricating and installing angle iron rings for strengthening the boiler chimney., strengthening the weak and damaged truss-type bridge structure of the cane unloader by adding new channels, angles, and plates to provide satisfactory strength., welding the oval/worn enlarged holes on both ends of the block-type chain links of s.r.c./i.r.c. chains, drilling pin-size holes in the attachment, and grinding the faces to level., cutting and removing the worn/weak attachment used for fixing racks on the block-type chain links of s.r.c./i.r.c. chains, fabricating new attachment links from 12 mm thick plate as before, welding them onto the links, and drilling holes as per drawing., constructing a separate platform path using old angle channels for access to all three unloaders., replacing the weak/broken parts of i.d. fan casing, air heater cell/ducting, and economizer cell., cutting and removing the old m.s. plate of the bottom trough and boot of s.r.c./i.r.c., installing new plate to make the trough and boot leak-proof, and lining the boot and trough with 3 mm thick s.s. plate, followed by a satisfactory trial., fabricating new racks from 25 mm thick plate as per sample for s.r.c./i.r.c. chains, drilling holes, cutting and supporting chain rollers on both ends, and preparing them., removing the bent 250 mm channel of the trolley in the cane unloader, leveling it, strengthening the structure, fitting worn/weak runner square bars, checking diagonals, and leveling the wheel., removing all four wheels of the mill and power house crane, cleaning, checking bearings, greasing all plumber blocks, replacing damaged bearings with mill spares, welding worn wheels to a uniform size, and conducting a satisfactory trial., performing necessary repairs and hardfacing on the worn shells/teeth of t.r.p.f. top/bottom rollers, and adding rings on both sides as needed to compensate for reduced shell length., cutting and removing the weak/leaking juice tray of the mill and fabricating a new one from 5 mm s.s. plate as per sample, and conducting a leak-proof trial., performing necessary repairs on the damaged s.s. juice tray of the mill., in case of head stock cracking or misalignment, removing the head stock, regrouting, aligning, and completing all related work., removing the shaft of the damaged t.r.p.f. roller and dismantling the shell using gas cutting., cutting the 63.5 mm old boiler tubes with bends, making a 5.1 meter straight line, preparing them for the air heater, and cleaning them by grinding. issued by Uttar pradesh cooperative sugar factories federation ltd UPCSFFL for perforated sheets,fabrication work,baling machine,boiler chimney,wet scrubber,square bars,pipe lines,angle iron,feed pump,ms rings,ss pipes,ss plate,ms plate,bearings related work in Muzaffarnagar, Uttar pradesh? TENDER18 provides complete assistance to help businesses understand tender requirements, access tender documents, review eligibility criteria, qualification requirements, important dates, and bid submission guidelines associated with this tender.

Our Tender18 Expert Technical team can assist with vendor and GeM registration on the relevant departmental, eProcurement, GeM, or government tender portal, preparation of technical and financial bid documents, compliance with qualification criteria, document verification, and complete online tender submission support. Whether you are a contractor, supplier, manufacturer, consultant, startup, or MSME working in the field of perforated sheets,fabrication work,baling machine,boiler chimney,wet scrubber,square bars,pipe lines,angle iron,feed pump,ms rings,ss pipes,ss plate,ms plate,bearings, Tender18 can help simplify the tender participation process and support you throughout every stage of bidding for this tender. so that tender18 is one the top leading tender consultant in Inda.

1.

Whom should I contact if I have further queries about the Tender scope?

You can fill out the integrated inquiry form below on this detail page to share your company profile. Our consultancy desk will review your query regarding perforated sheets,fabrication work,baling machine,boiler chimney,wet scrubber,square bars,pipe lines,angle iron,feed pump,ms rings,ss pipes,ss plate,ms plate,bearings parameters and guide you on how to coordinate efficiently with the procurement team of Uttar pradesh cooperative sugar factories federation ltd UPCSFFL

2.

How can Tender18 assist my business in winning this government contract?

Tender18 provides end-to-end professional bidding support and documentation advisory for tender for erection and fabrication work a erection and fabrication work a 1 , erection and fabrication work a 2 , erection and fabrication work a 3 , erection and fabrication work a 4 , erection and fabrication work a 5 , erection and fabrication work a 6 , erection and fabrication work a 7 , erection and fabrication work a 8 , erection and fabrication work a 9 , erection and fabrication work a 10 , erection and fabrication work a 11 , erection and fabrication work a 12 , erection and fabrication work a 13 , erection and fabrication work a 14 , erection and fabrication work a 15 , erection and fabrication work a 16 , erection and fabrication work a 17 , erection and fabrication work a 18 , erection and fabrication work a 19 , erection and fabrication work a 20 , erection and fabrication work a 21 , erection and fabrication work a 22 , erection and fabrication work a 23 , erection and fabrication work a 24 , erection and fabrication work a 25 , erection and fabrication work a 26 , erection and fabrication work a 27 , erection and fabrication work a 28 , erection and fabrication work a 29 , erection and fabrication work a 30 , erection and fabrication work a 31 , erection and fabrication work a 32 , erection and fabrication work a 33 , erection and fabrication work a 34 , erection and fabrication work a 35 , erection and fabrication work a 36 , erection and fabrication work a 37 , erection and fabrication work a 38 , erection and fabrication work a 39 , erection and fabrication work a 40 , erection and fabrication work a 41 , erection and fabrication work a 42 , erection and fabrication work a 43 , erection and fabrication work a 44 , erection and fabrication work a 45 , erection and fabrication work a 46 , erection and fabrication work a 47 , erection and fabrication work a 48 , erection and fabrication work a 49 , erection and fabrication work a 50 , erection and fabrication work a 51 , erection and fabrication work a 52 , erection and fabrication work a 53 , erection and fabrication work a 54 , erection and fabrication work a 55 , erection and fabrication work a 56 , erection and fabrication work a 57 , erection and fabrication work a 58 , erection and fabrication work a 59 , erection and fabrication work a 60 , erection and fabrication work a 61 , erection and fabrication work a 62 , erection and fabrication work a 63 , erection and fabrication work a 64 , erection and fabrication work a 65 , erection and fabrication work a 66, erection and fabrication work a, cutting and removing the weak/broken parts of the discharge chute for the scraper in the mill, fabricating new parts from 12 mm plate, reinstalling them, fixing hole plates as per profile by welding to secure the scraper, and conducting a trial after completion of work., cutting and removing the worn/weak runner base of the cane carrier, fabricating a box structure using 100 mm channel to installation the runner base, fitting it properly, and straightening and reusing the old channel by turning it over., cutting and removing the old worn/cut 40/50 mm square bars of the cane unloader and installing new square bars in their place as before, followed by a satisfactory trial., cutting and removing the worn/cut runners of the cane carrier/rake carrier/bagasse elevator/r.b.c., reinstalling them by either turning over the old ones or fitting new runners as per original design., cutting and removing the worn/cut/weak side plates of chains used in cane carrier/rake carrier/r.b.c., and installing old or new plates in their place., cutting and removing the worn/weak side plates of the fibrizer hood, installing new plates, welding inside and outside, and conducting a satisfactory trial., complete overhauling, testing, and trial of the bagasse baling machine., performing necessary repairs on the old racks of s.r.c./i.r.c., fabricating new racks as per sample for the chains of bagasse elevator/r.b.c., replacing the weak/broken bottom/top covers of t.r.p.f. by fabricating and installing new covers as per original design, and conducting a satisfactory trial., cutting and removing the weak/broken tail end boots of s.r.c./i.r.c., fabricating new ones from 8.0/10.0 mm old/new plate as per sample, installing, leak-proof welding, and conducting a satisfactory trial., dismantling various parts of the cane unloader grabs, repairing all parts, hardfacing the fingers as per instructions, and reassembling the grabs., cutting and removing the weak/broken juice tray used for compound imbibition in mills, fabricating a new tray from plate as per sample, installing it in place, and making all connections., cutting and removing the worn/weak guides that prevent chains of cane carrier/s.r.c./i.r.c. and bagasse elevator from lifting, fabricating new guides as per instructions, installing them, and conducting a satisfactory trial., welding the worn/cut wheels of the cane unloader bridge/trolley drive as per instructions., cutting and removing the weak/broken donali chutes of t.r.p.f., fabricating new donali chutes as per the old ones, and erecting them in place., fabricating and installing m.s. rings on the idler wheel of the cane carrier as per instructions., fabricating and installing a support using 25.0 mm plate between the mill head stock and t.r.p.f. head stock as per instructions., repairing and balancing the old hammer shanks of the fibrizer by welding and hardfacing as per instructions., cutting and removing the worn/weak hoods of the cane chopper/leveller and fabricating a new folding type from new plate and installing it., replacing the broken plates in the pockets of the fibrizer's pocketed type anvil plate with new plates, straightening bent plates, welding, and hardfacing as per instructions., welding and leveling the worn hubs of the cane leveller/chopper rotor assembly on the working side and top sides, and hardfacing as per instructions., cutting and removing the weak beds of reduction gears and motors on cane unloaders, modifying and fabricating new beds, installing them, aligning the gear and motor, and conducting a trial., strengthening the weak/broken columns of the cane carrier structure by welding plates as per instructions., fabricating and fitting juice rings in the mill rollers as per sample., performing necessary repairs on the pressure chutes installed between t.r.p.f. and the mill., cutting and removing the weak/broken juice receiving tank of the mills, fabricating a new tank from 8.0/10.0 mm plate as per sample, fitting it in place, making all connections, and conducting a leak-proof trial., cutting and removing the weak/broken bottom cone of the mill's juice receiving tank, fabricating a new cone as per sample, fitting it in place, making all connections as before, and conducting a leak-proof trial., cutting and removing the weak/broken 10 inch/12 inch pipes between the mill juice tray and gutter, fabricating and fitting new s.s. pipes in their place, and conducting a leak-proof trial., lining the bottom trough of s.r.c./i.r.c. with 3.00 mm thick s.s. plate and doing leak-proof welding., removing the shifted bed of feed pump no. 1 on the boiler, fabricating and installing a new bed, making related connections, and conducting a trial., making the damper in the old i.d. fan ducting at the boiler station leak-proof using new/old plate before the chimney and doing complete welding so that when the new i.d. runs, there is no back air from the chimney., cutting and removing the nipple reducers of all three wet scrubber pumps and their leaking pipe lines, installing new pipe lines, and making all connections as before with leak-proof welding., opening all nozzles inside the wet scrubber venturi, removing damaged nozzles, installing new nozzles, and making all connections as before., fabricating new pipes from old boiler tubes for backwash from the service tank to the wet scrubber, and making all connections with new valves and clamps in the pipeline., cutting and removing the weak and leaking juice tray from under the t.r.p.f. that brings juice to the mill juice tray, and fabricating and installing a new one., cutting and removing the weak/broken ash chutes of the boilers, and fabricating and fitting new chutes from old/new plate as per the old ones., performing necessary repairs on the weak/broken dampers of air heaters, economizers, and f.d./i.d. fans' inlets/outlets or suction/delivery., replacing the frames and grids of the internal steam filter fitted in the boiler drums by fabricating new frames and fitting grids., cutting and removing the weak/broken flue gas ducting between the i.d. fans and the chimney, fabricating and installing new ducting from 5.0/6.0 mm thick plate, and conducting a leak-proof trial., for the weak bagassilo fan, fabricating a new impeller as per sample, repairing the casing as necessary, and conducting a successful trial., cutting and removing the weak/broken suction cones in the casings of i.d./f.d. fans, fabricating and installing new cones as per sample, and conducting a successful trial., replacing the damaged weak grids/perforated sheets of the baffle plates inside the boiler feed tank., cutting and removing the weak/broken bagasse feeding chutes of boiler no. 1, 2, and 3, and performing necessary repairs., replacing the weak/broken air headers installed outside for supplying additional f.d. air in the furnace of 20-ton capacity boiler no. 1 and 2 with new headers., cutting the weak/broken ducting between the air heater and i.d. fans and fabricating and installing new ducting from 5/6 mm thick plate., removing damaged perforated grids in the bagasse elevator used for bagasse to bagassilo filtration and fitting new grids., lowering the economizer coils/tubes of 20-ton capacity boiler no. 1 and 2, cleaning them internally and externally, conducting hydraulic testing at standard pressure, and after testing, lifting and refitting them, making the economizer bands leak-proof, and conducting a satisfactory hydraulic test., cutting and removing the weak/broken channel/plate of the s.r.c./i.r.c. trough and fabricating and installing new ones as per instructions., fabricating and installing angle iron rings for strengthening the boiler chimney., strengthening the weak and damaged truss-type bridge structure of the cane unloader by adding new channels, angles, and plates to provide satisfactory strength., welding the oval/worn enlarged holes on both ends of the block-type chain links of s.r.c./i.r.c. chains, drilling pin-size holes in the attachment, and grinding the faces to level., cutting and removing the worn/weak attachment used for fixing racks on the block-type chain links of s.r.c./i.r.c. chains, fabricating new attachment links from 12 mm thick plate as before, welding them onto the links, and drilling holes as per drawing., constructing a separate platform path using old angle channels for access to all three unloaders., replacing the weak/broken parts of i.d. fan casing, air heater cell/ducting, and economizer cell., cutting and removing the old m.s. plate of the bottom trough and boot of s.r.c./i.r.c., installing new plate to make the trough and boot leak-proof, and lining the boot and trough with 3 mm thick s.s. plate, followed by a satisfactory trial., fabricating new racks from 25 mm thick plate as per sample for s.r.c./i.r.c. chains, drilling holes, cutting and supporting chain rollers on both ends, and preparing them., removing the bent 250 mm channel of the trolley in the cane unloader, leveling it, strengthening the structure, fitting worn/weak runner square bars, checking diagonals, and leveling the wheel., removing all four wheels of the mill and power house crane, cleaning, checking bearings, greasing all plumber blocks, replacing damaged bearings with mill spares, welding worn wheels to a uniform size, and conducting a satisfactory trial., performing necessary repairs and hardfacing on the worn shells/teeth of t.r.p.f. top/bottom rollers, and adding rings on both sides as needed to compensate for reduced shell length., cutting and removing the weak/leaking juice tray of the mill and fabricating a new one from 5 mm s.s. plate as per sample, and conducting a leak-proof trial., performing necessary repairs on the damaged s.s. juice tray of the mill., in case of head stock cracking or misalignment, removing the head stock, regrouting, aligning, and completing all related work., removing the shaft of the damaged t.r.p.f. roller and dismantling the shell using gas cutting., cutting the 63.5 mm old boiler tubes with bends, making a 5.1 meter straight line, preparing them for the air heater, and cleaning them by grinding. . Our senior analysts help you decode the complete project guidelines, manage accurate costing sheets, and complete error-free submissions on the official platform used by Uttar pradesh cooperative sugar factories federation ltd UPCSFFL.

3.

What are the main reasons for a technical tender rejection?

Most online bids face rejection during the initial evaluation round due to avoidable errors like uploading blurred document scans, submitting expired DSCs, or missing critical experience papers required for tender for erection and fabrication work a erection and fabrication work a 1 , erection and fabrication work a 2 , erection and fabrication work a 3 , erection and fabrication work a 4 , erection and fabrication work a 5 , erection and fabrication work a 6 , erection and fabrication work a 7 , erection and fabrication work a 8 , erection and fabrication work a 9 , erection and fabrication work a 10 , erection and fabrication work a 11 , erection and fabrication work a 12 , erection and fabrication work a 13 , erection and fabrication work a 14 , erection and fabrication work a 15 , erection and fabrication work a 16 , erection and fabrication work a 17 , erection and fabrication work a 18 , erection and fabrication work a 19 , erection and fabrication work a 20 , erection and fabrication work a 21 , erection and fabrication work a 22 , erection and fabrication work a 23 , erection and fabrication work a 24 , erection and fabrication work a 25 , erection and fabrication work a 26 , erection and fabrication work a 27 , erection and fabrication work a 28 , erection and fabrication work a 29 , erection and fabrication work a 30 , erection and fabrication work a 31 , erection and fabrication work a 32 , erection and fabrication work a 33 , erection and fabrication work a 34 , erection and fabrication work a 35 , erection and fabrication work a 36 , erection and fabrication work a 37 , erection and fabrication work a 38 , erection and fabrication work a 39 , erection and fabrication work a 40 , erection and fabrication work a 41 , erection and fabrication work a 42 , erection and fabrication work a 43 , erection and fabrication work a 44 , erection and fabrication work a 45 , erection and fabrication work a 46 , erection and fabrication work a 47 , erection and fabrication work a 48 , erection and fabrication work a 49 , erection and fabrication work a 50 , erection and fabrication work a 51 , erection and fabrication work a 52 , erection and fabrication work a 53 , erection and fabrication work a 54 , erection and fabrication work a 55 , erection and fabrication work a 56 , erection and fabrication work a 57 , erection and fabrication work a 58 , erection and fabrication work a 59 , erection and fabrication work a 60 , erection and fabrication work a 61 , erection and fabrication work a 62 , erection and fabrication work a 63 , erection and fabrication work a 64 , erection and fabrication work a 65 , erection and fabrication work a 66, erection and fabrication work a, cutting and removing the weak/broken parts of the discharge chute for the scraper in the mill, fabricating new parts from 12 mm plate, reinstalling them, fixing hole plates as per profile by welding to secure the scraper, and conducting a trial after completion of work., cutting and removing the worn/weak runner base of the cane carrier, fabricating a box structure using 100 mm channel to installation the runner base, fitting it properly, and straightening and reusing the old channel by turning it over., cutting and removing the old worn/cut 40/50 mm square bars of the cane unloader and installing new square bars in their place as before, followed by a satisfactory trial., cutting and removing the worn/cut runners of the cane carrier/rake carrier/bagasse elevator/r.b.c., reinstalling them by either turning over the old ones or fitting new runners as per original design., cutting and removing the worn/cut/weak side plates of chains used in cane carrier/rake carrier/r.b.c., and installing old or new plates in their place., cutting and removing the worn/weak side plates of the fibrizer hood, installing new plates, welding inside and outside, and conducting a satisfactory trial., complete overhauling, testing, and trial of the bagasse baling machine., performing necessary repairs on the old racks of s.r.c./i.r.c., fabricating new racks as per sample for the chains of bagasse elevator/r.b.c., replacing the weak/broken bottom/top covers of t.r.p.f. by fabricating and installing new covers as per original design, and conducting a satisfactory trial., cutting and removing the weak/broken tail end boots of s.r.c./i.r.c., fabricating new ones from 8.0/10.0 mm old/new plate as per sample, installing, leak-proof welding, and conducting a satisfactory trial., dismantling various parts of the cane unloader grabs, repairing all parts, hardfacing the fingers as per instructions, and reassembling the grabs., cutting and removing the weak/broken juice tray used for compound imbibition in mills, fabricating a new tray from plate as per sample, installing it in place, and making all connections., cutting and removing the worn/weak guides that prevent chains of cane carrier/s.r.c./i.r.c. and bagasse elevator from lifting, fabricating new guides as per instructions, installing them, and conducting a satisfactory trial., welding the worn/cut wheels of the cane unloader bridge/trolley drive as per instructions., cutting and removing the weak/broken donali chutes of t.r.p.f., fabricating new donali chutes as per the old ones, and erecting them in place., fabricating and installing m.s. rings on the idler wheel of the cane carrier as per instructions., fabricating and installing a support using 25.0 mm plate between the mill head stock and t.r.p.f. head stock as per instructions., repairing and balancing the old hammer shanks of the fibrizer by welding and hardfacing as per instructions., cutting and removing the worn/weak hoods of the cane chopper/leveller and fabricating a new folding type from new plate and installing it., replacing the broken plates in the pockets of the fibrizer's pocketed type anvil plate with new plates, straightening bent plates, welding, and hardfacing as per instructions., welding and leveling the worn hubs of the cane leveller/chopper rotor assembly on the working side and top sides, and hardfacing as per instructions., cutting and removing the weak beds of reduction gears and motors on cane unloaders, modifying and fabricating new beds, installing them, aligning the gear and motor, and conducting a trial., strengthening the weak/broken columns of the cane carrier structure by welding plates as per instructions., fabricating and fitting juice rings in the mill rollers as per sample., performing necessary repairs on the pressure chutes installed between t.r.p.f. and the mill., cutting and removing the weak/broken juice receiving tank of the mills, fabricating a new tank from 8.0/10.0 mm plate as per sample, fitting it in place, making all connections, and conducting a leak-proof trial., cutting and removing the weak/broken bottom cone of the mill's juice receiving tank, fabricating a new cone as per sample, fitting it in place, making all connections as before, and conducting a leak-proof trial., cutting and removing the weak/broken 10 inch/12 inch pipes between the mill juice tray and gutter, fabricating and fitting new s.s. pipes in their place, and conducting a leak-proof trial., lining the bottom trough of s.r.c./i.r.c. with 3.00 mm thick s.s. plate and doing leak-proof welding., removing the shifted bed of feed pump no. 1 on the boiler, fabricating and installing a new bed, making related connections, and conducting a trial., making the damper in the old i.d. fan ducting at the boiler station leak-proof using new/old plate before the chimney and doing complete welding so that when the new i.d. runs, there is no back air from the chimney., cutting and removing the nipple reducers of all three wet scrubber pumps and their leaking pipe lines, installing new pipe lines, and making all connections as before with leak-proof welding., opening all nozzles inside the wet scrubber venturi, removing damaged nozzles, installing new nozzles, and making all connections as before., fabricating new pipes from old boiler tubes for backwash from the service tank to the wet scrubber, and making all connections with new valves and clamps in the pipeline., cutting and removing the weak and leaking juice tray from under the t.r.p.f. that brings juice to the mill juice tray, and fabricating and installing a new one., cutting and removing the weak/broken ash chutes of the boilers, and fabricating and fitting new chutes from old/new plate as per the old ones., performing necessary repairs on the weak/broken dampers of air heaters, economizers, and f.d./i.d. fans' inlets/outlets or suction/delivery., replacing the frames and grids of the internal steam filter fitted in the boiler drums by fabricating new frames and fitting grids., cutting and removing the weak/broken flue gas ducting between the i.d. fans and the chimney, fabricating and installing new ducting from 5.0/6.0 mm thick plate, and conducting a leak-proof trial., for the weak bagassilo fan, fabricating a new impeller as per sample, repairing the casing as necessary, and conducting a successful trial., cutting and removing the weak/broken suction cones in the casings of i.d./f.d. fans, fabricating and installing new cones as per sample, and conducting a successful trial., replacing the damaged weak grids/perforated sheets of the baffle plates inside the boiler feed tank., cutting and removing the weak/broken bagasse feeding chutes of boiler no. 1, 2, and 3, and performing necessary repairs., replacing the weak/broken air headers installed outside for supplying additional f.d. air in the furnace of 20-ton capacity boiler no. 1 and 2 with new headers., cutting the weak/broken ducting between the air heater and i.d. fans and fabricating and installing new ducting from 5/6 mm thick plate., removing damaged perforated grids in the bagasse elevator used for bagasse to bagassilo filtration and fitting new grids., lowering the economizer coils/tubes of 20-ton capacity boiler no. 1 and 2, cleaning them internally and externally, conducting hydraulic testing at standard pressure, and after testing, lifting and refitting them, making the economizer bands leak-proof, and conducting a satisfactory hydraulic test., cutting and removing the weak/broken channel/plate of the s.r.c./i.r.c. trough and fabricating and installing new ones as per instructions., fabricating and installing angle iron rings for strengthening the boiler chimney., strengthening the weak and damaged truss-type bridge structure of the cane unloader by adding new channels, angles, and plates to provide satisfactory strength., welding the oval/worn enlarged holes on both ends of the block-type chain links of s.r.c./i.r.c. chains, drilling pin-size holes in the attachment, and grinding the faces to level., cutting and removing the worn/weak attachment used for fixing racks on the block-type chain links of s.r.c./i.r.c. chains, fabricating new attachment links from 12 mm thick plate as before, welding them onto the links, and drilling holes as per drawing., constructing a separate platform path using old angle channels for access to all three unloaders., replacing the weak/broken parts of i.d. fan casing, air heater cell/ducting, and economizer cell., cutting and removing the old m.s. plate of the bottom trough and boot of s.r.c./i.r.c., installing new plate to make the trough and boot leak-proof, and lining the boot and trough with 3 mm thick s.s. plate, followed by a satisfactory trial., fabricating new racks from 25 mm thick plate as per sample for s.r.c./i.r.c. chains, drilling holes, cutting and supporting chain rollers on both ends, and preparing them., removing the bent 250 mm channel of the trolley in the cane unloader, leveling it, strengthening the structure, fitting worn/weak runner square bars, checking diagonals, and leveling the wheel., removing all four wheels of the mill and power house crane, cleaning, checking bearings, greasing all plumber blocks, replacing damaged bearings with mill spares, welding worn wheels to a uniform size, and conducting a satisfactory trial., performing necessary repairs and hardfacing on the worn shells/teeth of t.r.p.f. top/bottom rollers, and adding rings on both sides as needed to compensate for reduced shell length., cutting and removing the weak/leaking juice tray of the mill and fabricating a new one from 5 mm s.s. plate as per sample, and conducting a leak-proof trial., performing necessary repairs on the damaged s.s. juice tray of the mill., in case of head stock cracking or misalignment, removing the head stock, regrouting, aligning, and completing all related work., removing the shaft of the damaged t.r.p.f. roller and dismantling the shell using gas cutting., cutting the 63.5 mm old boiler tubes with bends, making a 5.1 meter straight line, preparing them for the air heater, and cleaning them by grinding. in Uttar pradesh.

4.

Can contractors located outside the local region participate in this bid?

Eligibility for outstation bidders depends entirely on the terms set inside the document for tender for erection and fabrication work a erection and fabrication work a 1 , erection and fabrication work a 2 , erection and fabrication work a 3 , erection and fabrication work a 4 , erection and fabrication work a 5 , erection and fabrication work a 6 , erection and fabrication work a 7 , erection and fabrication work a 8 , erection and fabrication work a 9 , erection and fabrication work a 10 , erection and fabrication work a 11 , erection and fabrication work a 12 , erection and fabrication work a 13 , erection and fabrication work a 14 , erection and fabrication work a 15 , erection and fabrication work a 16 , erection and fabrication work a 17 , erection and fabrication work a 18 , erection and fabrication work a 19 , erection and fabrication work a 20 , erection and fabrication work a 21 , erection and fabrication work a 22 , erection and fabrication work a 23 , erection and fabrication work a 24 , erection and fabrication work a 25 , erection and fabrication work a 26 , erection and fabrication work a 27 , erection and fabrication work a 28 , erection and fabrication work a 29 , erection and fabrication work a 30 , erection and fabrication work a 31 , erection and fabrication work a 32 , erection and fabrication work a 33 , erection and fabrication work a 34 , erection and fabrication work a 35 , erection and fabrication work a 36 , erection and fabrication work a 37 , erection and fabrication work a 38 , erection and fabrication work a 39 , erection and fabrication work a 40 , erection and fabrication work a 41 , erection and fabrication work a 42 , erection and fabrication work a 43 , erection and fabrication work a 44 , erection and fabrication work a 45 , erection and fabrication work a 46 , erection and fabrication work a 47 , erection and fabrication work a 48 , erection and fabrication work a 49 , erection and fabrication work a 50 , erection and fabrication work a 51 , erection and fabrication work a 52 , erection and fabrication work a 53 , erection and fabrication work a 54 , erection and fabrication work a 55 , erection and fabrication work a 56 , erection and fabrication work a 57 , erection and fabrication work a 58 , erection and fabrication work a 59 , erection and fabrication work a 60 , erection and fabrication work a 61 , erection and fabrication work a 62 , erection and fabrication work a 63 , erection and fabrication work a 64 , erection and fabrication work a 65 , erection and fabrication work a 66, erection and fabrication work a, cutting and removing the weak/broken parts of the discharge chute for the scraper in the mill, fabricating new parts from 12 mm plate, reinstalling them, fixing hole plates as per profile by welding to secure the scraper, and conducting a trial after completion of work., cutting and removing the worn/weak runner base of the cane carrier, fabricating a box structure using 100 mm channel to installation the runner base, fitting it properly, and straightening and reusing the old channel by turning it over., cutting and removing the old worn/cut 40/50 mm square bars of the cane unloader and installing new square bars in their place as before, followed by a satisfactory trial., cutting and removing the worn/cut runners of the cane carrier/rake carrier/bagasse elevator/r.b.c., reinstalling them by either turning over the old ones or fitting new runners as per original design., cutting and removing the worn/cut/weak side plates of chains used in cane carrier/rake carrier/r.b.c., and installing old or new plates in their place., cutting and removing the worn/weak side plates of the fibrizer hood, installing new plates, welding inside and outside, and conducting a satisfactory trial., complete overhauling, testing, and trial of the bagasse baling machine., performing necessary repairs on the old racks of s.r.c./i.r.c., fabricating new racks as per sample for the chains of bagasse elevator/r.b.c., replacing the weak/broken bottom/top covers of t.r.p.f. by fabricating and installing new covers as per original design, and conducting a satisfactory trial., cutting and removing the weak/broken tail end boots of s.r.c./i.r.c., fabricating new ones from 8.0/10.0 mm old/new plate as per sample, installing, leak-proof welding, and conducting a satisfactory trial., dismantling various parts of the cane unloader grabs, repairing all parts, hardfacing the fingers as per instructions, and reassembling the grabs., cutting and removing the weak/broken juice tray used for compound imbibition in mills, fabricating a new tray from plate as per sample, installing it in place, and making all connections., cutting and removing the worn/weak guides that prevent chains of cane carrier/s.r.c./i.r.c. and bagasse elevator from lifting, fabricating new guides as per instructions, installing them, and conducting a satisfactory trial., welding the worn/cut wheels of the cane unloader bridge/trolley drive as per instructions., cutting and removing the weak/broken donali chutes of t.r.p.f., fabricating new donali chutes as per the old ones, and erecting them in place., fabricating and installing m.s. rings on the idler wheel of the cane carrier as per instructions., fabricating and installing a support using 25.0 mm plate between the mill head stock and t.r.p.f. head stock as per instructions., repairing and balancing the old hammer shanks of the fibrizer by welding and hardfacing as per instructions., cutting and removing the worn/weak hoods of the cane chopper/leveller and fabricating a new folding type from new plate and installing it., replacing the broken plates in the pockets of the fibrizer's pocketed type anvil plate with new plates, straightening bent plates, welding, and hardfacing as per instructions., welding and leveling the worn hubs of the cane leveller/chopper rotor assembly on the working side and top sides, and hardfacing as per instructions., cutting and removing the weak beds of reduction gears and motors on cane unloaders, modifying and fabricating new beds, installing them, aligning the gear and motor, and conducting a trial., strengthening the weak/broken columns of the cane carrier structure by welding plates as per instructions., fabricating and fitting juice rings in the mill rollers as per sample., performing necessary repairs on the pressure chutes installed between t.r.p.f. and the mill., cutting and removing the weak/broken juice receiving tank of the mills, fabricating a new tank from 8.0/10.0 mm plate as per sample, fitting it in place, making all connections, and conducting a leak-proof trial., cutting and removing the weak/broken bottom cone of the mill's juice receiving tank, fabricating a new cone as per sample, fitting it in place, making all connections as before, and conducting a leak-proof trial., cutting and removing the weak/broken 10 inch/12 inch pipes between the mill juice tray and gutter, fabricating and fitting new s.s. pipes in their place, and conducting a leak-proof trial., lining the bottom trough of s.r.c./i.r.c. with 3.00 mm thick s.s. plate and doing leak-proof welding., removing the shifted bed of feed pump no. 1 on the boiler, fabricating and installing a new bed, making related connections, and conducting a trial., making the damper in the old i.d. fan ducting at the boiler station leak-proof using new/old plate before the chimney and doing complete welding so that when the new i.d. runs, there is no back air from the chimney., cutting and removing the nipple reducers of all three wet scrubber pumps and their leaking pipe lines, installing new pipe lines, and making all connections as before with leak-proof welding., opening all nozzles inside the wet scrubber venturi, removing damaged nozzles, installing new nozzles, and making all connections as before., fabricating new pipes from old boiler tubes for backwash from the service tank to the wet scrubber, and making all connections with new valves and clamps in the pipeline., cutting and removing the weak and leaking juice tray from under the t.r.p.f. that brings juice to the mill juice tray, and fabricating and installing a new one., cutting and removing the weak/broken ash chutes of the boilers, and fabricating and fitting new chutes from old/new plate as per the old ones., performing necessary repairs on the weak/broken dampers of air heaters, economizers, and f.d./i.d. fans' inlets/outlets or suction/delivery., replacing the frames and grids of the internal steam filter fitted in the boiler drums by fabricating new frames and fitting grids., cutting and removing the weak/broken flue gas ducting between the i.d. fans and the chimney, fabricating and installing new ducting from 5.0/6.0 mm thick plate, and conducting a leak-proof trial., for the weak bagassilo fan, fabricating a new impeller as per sample, repairing the casing as necessary, and conducting a successful trial., cutting and removing the weak/broken suction cones in the casings of i.d./f.d. fans, fabricating and installing new cones as per sample, and conducting a successful trial., replacing the damaged weak grids/perforated sheets of the baffle plates inside the boiler feed tank., cutting and removing the weak/broken bagasse feeding chutes of boiler no. 1, 2, and 3, and performing necessary repairs., replacing the weak/broken air headers installed outside for supplying additional f.d. air in the furnace of 20-ton capacity boiler no. 1 and 2 with new headers., cutting the weak/broken ducting between the air heater and i.d. fans and fabricating and installing new ducting from 5/6 mm thick plate., removing damaged perforated grids in the bagasse elevator used for bagasse to bagassilo filtration and fitting new grids., lowering the economizer coils/tubes of 20-ton capacity boiler no. 1 and 2, cleaning them internally and externally, conducting hydraulic testing at standard pressure, and after testing, lifting and refitting them, making the economizer bands leak-proof, and conducting a satisfactory hydraulic test., cutting and removing the weak/broken channel/plate of the s.r.c./i.r.c. trough and fabricating and installing new ones as per instructions., fabricating and installing angle iron rings for strengthening the boiler chimney., strengthening the weak and damaged truss-type bridge structure of the cane unloader by adding new channels, angles, and plates to provide satisfactory strength., welding the oval/worn enlarged holes on both ends of the block-type chain links of s.r.c./i.r.c. chains, drilling pin-size holes in the attachment, and grinding the faces to level., cutting and removing the worn/weak attachment used for fixing racks on the block-type chain links of s.r.c./i.r.c. chains, fabricating new attachment links from 12 mm thick plate as before, welding them onto the links, and drilling holes as per drawing., constructing a separate platform path using old angle channels for access to all three unloaders., replacing the weak/broken parts of i.d. fan casing, air heater cell/ducting, and economizer cell., cutting and removing the old m.s. plate of the bottom trough and boot of s.r.c./i.r.c., installing new plate to make the trough and boot leak-proof, and lining the boot and trough with 3 mm thick s.s. plate, followed by a satisfactory trial., fabricating new racks from 25 mm thick plate as per sample for s.r.c./i.r.c. chains, drilling holes, cutting and supporting chain rollers on both ends, and preparing them., removing the bent 250 mm channel of the trolley in the cane unloader, leveling it, strengthening the structure, fitting worn/weak runner square bars, checking diagonals, and leveling the wheel., removing all four wheels of the mill and power house crane, cleaning, checking bearings, greasing all plumber blocks, replacing damaged bearings with mill spares, welding worn wheels to a uniform size, and conducting a satisfactory trial., performing necessary repairs and hardfacing on the worn shells/teeth of t.r.p.f. top/bottom rollers, and adding rings on both sides as needed to compensate for reduced shell length., cutting and removing the weak/leaking juice tray of the mill and fabricating a new one from 5 mm s.s. plate as per sample, and conducting a leak-proof trial., performing necessary repairs on the damaged s.s. juice tray of the mill., in case of head stock cracking or misalignment, removing the head stock, regrouting, aligning, and completing all related work., removing the shaft of the damaged t.r.p.f. roller and dismantling the shell using gas cutting., cutting the 63.5 mm old boiler tubes with bends, making a 5.1 meter straight line, preparing them for the air heater, and cleaning them by grinding. . While many public sector projects allow national competitive bidding, certain localized works require local offices or specific registration metrics in Muzaffarnagar.

5.

Do I need an active GeM Portal registration to apply for this work?

If this procurement is routed through the central marketplace, an active GeM Seller ID is mandatory to supply perforated sheets,fabrication work,baling machine,boiler chimney,wet scrubber,square bars,pipe lines,angle iron,feed pump,ms rings,ss pipes,ss plate,ms plate,bearings items. Tender18 offers complete assistance for brand cataloging, profile creation, and vendor assessment required officially by Uttar pradesh cooperative sugar factories federation ltd UPCSFFL

6.

What are the primary legal documents required to submit a valid bid?

To register an eligible bid for these perforated sheets,fabrication work,baling machine,boiler chimney,wet scrubber,square bars,pipe lines,angle iron,feed pump,ms rings,ss pipes,ss plate,ms plate,bearings contracts, companies must prepare their core compliance documents. Vendors operating across Uttar pradesh must ensure they possess a valid GST registration, permanent account number (PAN), and active Class-3 Digital Signature Certificates.

7.

What products or services are required for this active work?

This public procurement cycle is specifically looking for qualified vendors and suppliers who can provide high-quality perforated sheets,fabrication work,baling machine,boiler chimney,wet scrubber,square bars,pipe lines,angle iron,feed pump,ms rings,ss pipes,ss plate,ms plate,bearings solutions. The operational execution, delivery, and deployment of these materials must be managed locally within the Muzaffarnagar region.

8.

Where can I review the estimated cost or budget details for this Tender?

The estimated project cost and budget thresholds can be reviewed directly inside the tender document. Bidders can analyze these qualification files to check if their firm meets the financial capability criteria specified for tender for erection and fabrication work a erection and fabrication work a 1 , erection and fabrication work a 2 , erection and fabrication work a 3 , erection and fabrication work a 4 , erection and fabrication work a 5 , erection and fabrication work a 6 , erection and fabrication work a 7 , erection and fabrication work a 8 , erection and fabrication work a 9 , erection and fabrication work a 10 , erection and fabrication work a 11 , erection and fabrication work a 12 , erection and fabrication work a 13 , erection and fabrication work a 14 , erection and fabrication work a 15 , erection and fabrication work a 16 , erection and fabrication work a 17 , erection and fabrication work a 18 , erection and fabrication work a 19 , erection and fabrication work a 20 , erection and fabrication work a 21 , erection and fabrication work a 22 , erection and fabrication work a 23 , erection and fabrication work a 24 , erection and fabrication work a 25 , erection and fabrication work a 26 , erection and fabrication work a 27 , erection and fabrication work a 28 , erection and fabrication work a 29 , erection and fabrication work a 30 , erection and fabrication work a 31 , erection and fabrication work a 32 , erection and fabrication work a 33 , erection and fabrication work a 34 , erection and fabrication work a 35 , erection and fabrication work a 36 , erection and fabrication work a 37 , erection and fabrication work a 38 , erection and fabrication work a 39 , erection and fabrication work a 40 , erection and fabrication work a 41 , erection and fabrication work a 42 , erection and fabrication work a 43 , erection and fabrication work a 44 , erection and fabrication work a 45 , erection and fabrication work a 46 , erection and fabrication work a 47 , erection and fabrication work a 48 , erection and fabrication work a 49 , erection and fabrication work a 50 , erection and fabrication work a 51 , erection and fabrication work a 52 , erection and fabrication work a 53 , erection and fabrication work a 54 , erection and fabrication work a 55 , erection and fabrication work a 56 , erection and fabrication work a 57 , erection and fabrication work a 58 , erection and fabrication work a 59 , erection and fabrication work a 60 , erection and fabrication work a 61 , erection and fabrication work a 62 , erection and fabrication work a 63 , erection and fabrication work a 64 , erection and fabrication work a 65 , erection and fabrication work a 66, erection and fabrication work a, cutting and removing the weak/broken parts of the discharge chute for the scraper in the mill, fabricating new parts from 12 mm plate, reinstalling them, fixing hole plates as per profile by welding to secure the scraper, and conducting a trial after completion of work., cutting and removing the worn/weak runner base of the cane carrier, fabricating a box structure using 100 mm channel to installation the runner base, fitting it properly, and straightening and reusing the old channel by turning it over., cutting and removing the old worn/cut 40/50 mm square bars of the cane unloader and installing new square bars in their place as before, followed by a satisfactory trial., cutting and removing the worn/cut runners of the cane carrier/rake carrier/bagasse elevator/r.b.c., reinstalling them by either turning over the old ones or fitting new runners as per original design., cutting and removing the worn/cut/weak side plates of chains used in cane carrier/rake carrier/r.b.c., and installing old or new plates in their place., cutting and removing the worn/weak side plates of the fibrizer hood, installing new plates, welding inside and outside, and conducting a satisfactory trial., complete overhauling, testing, and trial of the bagasse baling machine., performing necessary repairs on the old racks of s.r.c./i.r.c., fabricating new racks as per sample for the chains of bagasse elevator/r.b.c., replacing the weak/broken bottom/top covers of t.r.p.f. by fabricating and installing new covers as per original design, and conducting a satisfactory trial., cutting and removing the weak/broken tail end boots of s.r.c./i.r.c., fabricating new ones from 8.0/10.0 mm old/new plate as per sample, installing, leak-proof welding, and conducting a satisfactory trial., dismantling various parts of the cane unloader grabs, repairing all parts, hardfacing the fingers as per instructions, and reassembling the grabs., cutting and removing the weak/broken juice tray used for compound imbibition in mills, fabricating a new tray from plate as per sample, installing it in place, and making all connections., cutting and removing the worn/weak guides that prevent chains of cane carrier/s.r.c./i.r.c. and bagasse elevator from lifting, fabricating new guides as per instructions, installing them, and conducting a satisfactory trial., welding the worn/cut wheels of the cane unloader bridge/trolley drive as per instructions., cutting and removing the weak/broken donali chutes of t.r.p.f., fabricating new donali chutes as per the old ones, and erecting them in place., fabricating and installing m.s. rings on the idler wheel of the cane carrier as per instructions., fabricating and installing a support using 25.0 mm plate between the mill head stock and t.r.p.f. head stock as per instructions., repairing and balancing the old hammer shanks of the fibrizer by welding and hardfacing as per instructions., cutting and removing the worn/weak hoods of the cane chopper/leveller and fabricating a new folding type from new plate and installing it., replacing the broken plates in the pockets of the fibrizer's pocketed type anvil plate with new plates, straightening bent plates, welding, and hardfacing as per instructions., welding and leveling the worn hubs of the cane leveller/chopper rotor assembly on the working side and top sides, and hardfacing as per instructions., cutting and removing the weak beds of reduction gears and motors on cane unloaders, modifying and fabricating new beds, installing them, aligning the gear and motor, and conducting a trial., strengthening the weak/broken columns of the cane carrier structure by welding plates as per instructions., fabricating and fitting juice rings in the mill rollers as per sample., performing necessary repairs on the pressure chutes installed between t.r.p.f. and the mill., cutting and removing the weak/broken juice receiving tank of the mills, fabricating a new tank from 8.0/10.0 mm plate as per sample, fitting it in place, making all connections, and conducting a leak-proof trial., cutting and removing the weak/broken bottom cone of the mill's juice receiving tank, fabricating a new cone as per sample, fitting it in place, making all connections as before, and conducting a leak-proof trial., cutting and removing the weak/broken 10 inch/12 inch pipes between the mill juice tray and gutter, fabricating and fitting new s.s. pipes in their place, and conducting a leak-proof trial., lining the bottom trough of s.r.c./i.r.c. with 3.00 mm thick s.s. plate and doing leak-proof welding., removing the shifted bed of feed pump no. 1 on the boiler, fabricating and installing a new bed, making related connections, and conducting a trial., making the damper in the old i.d. fan ducting at the boiler station leak-proof using new/old plate before the chimney and doing complete welding so that when the new i.d. runs, there is no back air from the chimney., cutting and removing the nipple reducers of all three wet scrubber pumps and their leaking pipe lines, installing new pipe lines, and making all connections as before with leak-proof welding., opening all nozzles inside the wet scrubber venturi, removing damaged nozzles, installing new nozzles, and making all connections as before., fabricating new pipes from old boiler tubes for backwash from the service tank to the wet scrubber, and making all connections with new valves and clamps in the pipeline., cutting and removing the weak and leaking juice tray from under the t.r.p.f. that brings juice to the mill juice tray, and fabricating and installing a new one., cutting and removing the weak/broken ash chutes of the boilers, and fabricating and fitting new chutes from old/new plate as per the old ones., performing necessary repairs on the weak/broken dampers of air heaters, economizers, and f.d./i.d. fans' inlets/outlets or suction/delivery., replacing the frames and grids of the internal steam filter fitted in the boiler drums by fabricating new frames and fitting grids., cutting and removing the weak/broken flue gas ducting between the i.d. fans and the chimney, fabricating and installing new ducting from 5.0/6.0 mm thick plate, and conducting a leak-proof trial., for the weak bagassilo fan, fabricating a new impeller as per sample, repairing the casing as necessary, and conducting a successful trial., cutting and removing the weak/broken suction cones in the casings of i.d./f.d. fans, fabricating and installing new cones as per sample, and conducting a successful trial., replacing the damaged weak grids/perforated sheets of the baffle plates inside the boiler feed tank., cutting and removing the weak/broken bagasse feeding chutes of boiler no. 1, 2, and 3, and performing necessary repairs., replacing the weak/broken air headers installed outside for supplying additional f.d. air in the furnace of 20-ton capacity boiler no. 1 and 2 with new headers., cutting the weak/broken ducting between the air heater and i.d. fans and fabricating and installing new ducting from 5/6 mm thick plate., removing damaged perforated grids in the bagasse elevator used for bagasse to bagassilo filtration and fitting new grids., lowering the economizer coils/tubes of 20-ton capacity boiler no. 1 and 2, cleaning them internally and externally, conducting hydraulic testing at standard pressure, and after testing, lifting and refitting them, making the economizer bands leak-proof, and conducting a satisfactory hydraulic test., cutting and removing the weak/broken channel/plate of the s.r.c./i.r.c. trough and fabricating and installing new ones as per instructions., fabricating and installing angle iron rings for strengthening the boiler chimney., strengthening the weak and damaged truss-type bridge structure of the cane unloader by adding new channels, angles, and plates to provide satisfactory strength., welding the oval/worn enlarged holes on both ends of the block-type chain links of s.r.c./i.r.c. chains, drilling pin-size holes in the attachment, and grinding the faces to level., cutting and removing the worn/weak attachment used for fixing racks on the block-type chain links of s.r.c./i.r.c. chains, fabricating new attachment links from 12 mm thick plate as before, welding them onto the links, and drilling holes as per drawing., constructing a separate platform path using old angle channels for access to all three unloaders., replacing the weak/broken parts of i.d. fan casing, air heater cell/ducting, and economizer cell., cutting and removing the old m.s. plate of the bottom trough and boot of s.r.c./i.r.c., installing new plate to make the trough and boot leak-proof, and lining the boot and trough with 3 mm thick s.s. plate, followed by a satisfactory trial., fabricating new racks from 25 mm thick plate as per sample for s.r.c./i.r.c. chains, drilling holes, cutting and supporting chain rollers on both ends, and preparing them., removing the bent 250 mm channel of the trolley in the cane unloader, leveling it, strengthening the structure, fitting worn/weak runner square bars, checking diagonals, and leveling the wheel., removing all four wheels of the mill and power house crane, cleaning, checking bearings, greasing all plumber blocks, replacing damaged bearings with mill spares, welding worn wheels to a uniform size, and conducting a satisfactory trial., performing necessary repairs and hardfacing on the worn shells/teeth of t.r.p.f. top/bottom rollers, and adding rings on both sides as needed to compensate for reduced shell length., cutting and removing the weak/leaking juice tray of the mill and fabricating a new one from 5 mm s.s. plate as per sample, and conducting a leak-proof trial., performing necessary repairs on the damaged s.s. juice tray of the mill., in case of head stock cracking or misalignment, removing the head stock, regrouting, aligning, and completing all related work., removing the shaft of the damaged t.r.p.f. roller and dismantling the shell using gas cutting., cutting the 63.5 mm old boiler tubes with bends, making a 5.1 meter straight line, preparing them for the air heater, and cleaning them by grinding. by Uttar pradesh cooperative sugar factories federation ltd UPCSFFL

9.

How can I download the official BOQ file for this opportunity?

You can download the commercial Bill of Quantities (BOQ) spreadsheet directly using the secure link provided on this page. The BOQ file contains the item descriptions and rate filling forms officially validated for tender for erection and fabrication work a erection and fabrication work a 1 , erection and fabrication work a 2 , erection and fabrication work a 3 , erection and fabrication work a 4 , erection and fabrication work a 5 , erection and fabrication work a 6 , erection and fabrication work a 7 , erection and fabrication work a 8 , erection and fabrication work a 9 , erection and fabrication work a 10 , erection and fabrication work a 11 , erection and fabrication work a 12 , erection and fabrication work a 13 , erection and fabrication work a 14 , erection and fabrication work a 15 , erection and fabrication work a 16 , erection and fabrication work a 17 , erection and fabrication work a 18 , erection and fabrication work a 19 , erection and fabrication work a 20 , erection and fabrication work a 21 , erection and fabrication work a 22 , erection and fabrication work a 23 , erection and fabrication work a 24 , erection and fabrication work a 25 , erection and fabrication work a 26 , erection and fabrication work a 27 , erection and fabrication work a 28 , erection and fabrication work a 29 , erection and fabrication work a 30 , erection and fabrication work a 31 , erection and fabrication work a 32 , erection and fabrication work a 33 , erection and fabrication work a 34 , erection and fabrication work a 35 , erection and fabrication work a 36 , erection and fabrication work a 37 , erection and fabrication work a 38 , erection and fabrication work a 39 , erection and fabrication work a 40 , erection and fabrication work a 41 , erection and fabrication work a 42 , erection and fabrication work a 43 , erection and fabrication work a 44 , erection and fabrication work a 45 , erection and fabrication work a 46 , erection and fabrication work a 47 , erection and fabrication work a 48 , erection and fabrication work a 49 , erection and fabrication work a 50 , erection and fabrication work a 51 , erection and fabrication work a 52 , erection and fabrication work a 53 , erection and fabrication work a 54 , erection and fabrication work a 55 , erection and fabrication work a 56 , erection and fabrication work a 57 , erection and fabrication work a 58 , erection and fabrication work a 59 , erection and fabrication work a 60 , erection and fabrication work a 61 , erection and fabrication work a 62 , erection and fabrication work a 63 , erection and fabrication work a 64 , erection and fabrication work a 65 , erection and fabrication work a 66, erection and fabrication work a, cutting and removing the weak/broken parts of the discharge chute for the scraper in the mill, fabricating new parts from 12 mm plate, reinstalling them, fixing hole plates as per profile by welding to secure the scraper, and conducting a trial after completion of work., cutting and removing the worn/weak runner base of the cane carrier, fabricating a box structure using 100 mm channel to installation the runner base, fitting it properly, and straightening and reusing the old channel by turning it over., cutting and removing the old worn/cut 40/50 mm square bars of the cane unloader and installing new square bars in their place as before, followed by a satisfactory trial., cutting and removing the worn/cut runners of the cane carrier/rake carrier/bagasse elevator/r.b.c., reinstalling them by either turning over the old ones or fitting new runners as per original design., cutting and removing the worn/cut/weak side plates of chains used in cane carrier/rake carrier/r.b.c., and installing old or new plates in their place., cutting and removing the worn/weak side plates of the fibrizer hood, installing new plates, welding inside and outside, and conducting a satisfactory trial., complete overhauling, testing, and trial of the bagasse baling machine., performing necessary repairs on the old racks of s.r.c./i.r.c., fabricating new racks as per sample for the chains of bagasse elevator/r.b.c., replacing the weak/broken bottom/top covers of t.r.p.f. by fabricating and installing new covers as per original design, and conducting a satisfactory trial., cutting and removing the weak/broken tail end boots of s.r.c./i.r.c., fabricating new ones from 8.0/10.0 mm old/new plate as per sample, installing, leak-proof welding, and conducting a satisfactory trial., dismantling various parts of the cane unloader grabs, repairing all parts, hardfacing the fingers as per instructions, and reassembling the grabs., cutting and removing the weak/broken juice tray used for compound imbibition in mills, fabricating a new tray from plate as per sample, installing it in place, and making all connections., cutting and removing the worn/weak guides that prevent chains of cane carrier/s.r.c./i.r.c. and bagasse elevator from lifting, fabricating new guides as per instructions, installing them, and conducting a satisfactory trial., welding the worn/cut wheels of the cane unloader bridge/trolley drive as per instructions., cutting and removing the weak/broken donali chutes of t.r.p.f., fabricating new donali chutes as per the old ones, and erecting them in place., fabricating and installing m.s. rings on the idler wheel of the cane carrier as per instructions., fabricating and installing a support using 25.0 mm plate between the mill head stock and t.r.p.f. head stock as per instructions., repairing and balancing the old hammer shanks of the fibrizer by welding and hardfacing as per instructions., cutting and removing the worn/weak hoods of the cane chopper/leveller and fabricating a new folding type from new plate and installing it., replacing the broken plates in the pockets of the fibrizer's pocketed type anvil plate with new plates, straightening bent plates, welding, and hardfacing as per instructions., welding and leveling the worn hubs of the cane leveller/chopper rotor assembly on the working side and top sides, and hardfacing as per instructions., cutting and removing the weak beds of reduction gears and motors on cane unloaders, modifying and fabricating new beds, installing them, aligning the gear and motor, and conducting a trial., strengthening the weak/broken columns of the cane carrier structure by welding plates as per instructions., fabricating and fitting juice rings in the mill rollers as per sample., performing necessary repairs on the pressure chutes installed between t.r.p.f. and the mill., cutting and removing the weak/broken juice receiving tank of the mills, fabricating a new tank from 8.0/10.0 mm plate as per sample, fitting it in place, making all connections, and conducting a leak-proof trial., cutting and removing the weak/broken bottom cone of the mill's juice receiving tank, fabricating a new cone as per sample, fitting it in place, making all connections as before, and conducting a leak-proof trial., cutting and removing the weak/broken 10 inch/12 inch pipes between the mill juice tray and gutter, fabricating and fitting new s.s. pipes in their place, and conducting a leak-proof trial., lining the bottom trough of s.r.c./i.r.c. with 3.00 mm thick s.s. plate and doing leak-proof welding., removing the shifted bed of feed pump no. 1 on the boiler, fabricating and installing a new bed, making related connections, and conducting a trial., making the damper in the old i.d. fan ducting at the boiler station leak-proof using new/old plate before the chimney and doing complete welding so that when the new i.d. runs, there is no back air from the chimney., cutting and removing the nipple reducers of all three wet scrubber pumps and their leaking pipe lines, installing new pipe lines, and making all connections as before with leak-proof welding., opening all nozzles inside the wet scrubber venturi, removing damaged nozzles, installing new nozzles, and making all connections as before., fabricating new pipes from old boiler tubes for backwash from the service tank to the wet scrubber, and making all connections with new valves and clamps in the pipeline., cutting and removing the weak and leaking juice tray from under the t.r.p.f. that brings juice to the mill juice tray, and fabricating and installing a new one., cutting and removing the weak/broken ash chutes of the boilers, and fabricating and fitting new chutes from old/new plate as per the old ones., performing necessary repairs on the weak/broken dampers of air heaters, economizers, and f.d./i.d. fans' inlets/outlets or suction/delivery., replacing the frames and grids of the internal steam filter fitted in the boiler drums by fabricating new frames and fitting grids., cutting and removing the weak/broken flue gas ducting between the i.d. fans and the chimney, fabricating and installing new ducting from 5.0/6.0 mm thick plate, and conducting a leak-proof trial., for the weak bagassilo fan, fabricating a new impeller as per sample, repairing the casing as necessary, and conducting a successful trial., cutting and removing the weak/broken suction cones in the casings of i.d./f.d. fans, fabricating and installing new cones as per sample, and conducting a successful trial., replacing the damaged weak grids/perforated sheets of the baffle plates inside the boiler feed tank., cutting and removing the weak/broken bagasse feeding chutes of boiler no. 1, 2, and 3, and performing necessary repairs., replacing the weak/broken air headers installed outside for supplying additional f.d. air in the furnace of 20-ton capacity boiler no. 1 and 2 with new headers., cutting the weak/broken ducting between the air heater and i.d. fans and fabricating and installing new ducting from 5/6 mm thick plate., removing damaged perforated grids in the bagasse elevator used for bagasse to bagassilo filtration and fitting new grids., lowering the economizer coils/tubes of 20-ton capacity boiler no. 1 and 2, cleaning them internally and externally, conducting hydraulic testing at standard pressure, and after testing, lifting and refitting them, making the economizer bands leak-proof, and conducting a satisfactory hydraulic test., cutting and removing the weak/broken channel/plate of the s.r.c./i.r.c. trough and fabricating and installing new ones as per instructions., fabricating and installing angle iron rings for strengthening the boiler chimney., strengthening the weak and damaged truss-type bridge structure of the cane unloader by adding new channels, angles, and plates to provide satisfactory strength., welding the oval/worn enlarged holes on both ends of the block-type chain links of s.r.c./i.r.c. chains, drilling pin-size holes in the attachment, and grinding the faces to level., cutting and removing the worn/weak attachment used for fixing racks on the block-type chain links of s.r.c./i.r.c. chains, fabricating new attachment links from 12 mm thick plate as before, welding them onto the links, and drilling holes as per drawing., constructing a separate platform path using old angle channels for access to all three unloaders., replacing the weak/broken parts of i.d. fan casing, air heater cell/ducting, and economizer cell., cutting and removing the old m.s. plate of the bottom trough and boot of s.r.c./i.r.c., installing new plate to make the trough and boot leak-proof, and lining the boot and trough with 3 mm thick s.s. plate, followed by a satisfactory trial., fabricating new racks from 25 mm thick plate as per sample for s.r.c./i.r.c. chains, drilling holes, cutting and supporting chain rollers on both ends, and preparing them., removing the bent 250 mm channel of the trolley in the cane unloader, leveling it, strengthening the structure, fitting worn/weak runner square bars, checking diagonals, and leveling the wheel., removing all four wheels of the mill and power house crane, cleaning, checking bearings, greasing all plumber blocks, replacing damaged bearings with mill spares, welding worn wheels to a uniform size, and conducting a satisfactory trial., performing necessary repairs and hardfacing on the worn shells/teeth of t.r.p.f. top/bottom rollers, and adding rings on both sides as needed to compensate for reduced shell length., cutting and removing the weak/leaking juice tray of the mill and fabricating a new one from 5 mm s.s. plate as per sample, and conducting a leak-proof trial., performing necessary repairs on the damaged s.s. juice tray of the mill., in case of head stock cracking or misalignment, removing the head stock, regrouting, aligning, and completing all related work., removing the shaft of the damaged t.r.p.f. roller and dismantling the shell using gas cutting., cutting the 63.5 mm old boiler tubes with bends, making a 5.1 meter straight line, preparing them for the air heater, and cleaning them by grinding. within the Uttar pradesh jurisdiction

10.

How can I find the submission closing date for this contract?

The official timeline and deadline details for tender for erection and fabrication work a erection and fabrication work a 1 , erection and fabrication work a 2 , erection and fabrication work a 3 , erection and fabrication work a 4 , erection and fabrication work a 5 , erection and fabrication work a 6 , erection and fabrication work a 7 , erection and fabrication work a 8 , erection and fabrication work a 9 , erection and fabrication work a 10 , erection and fabrication work a 11 , erection and fabrication work a 12 , erection and fabrication work a 13 , erection and fabrication work a 14 , erection and fabrication work a 15 , erection and fabrication work a 16 , erection and fabrication work a 17 , erection and fabrication work a 18 , erection and fabrication work a 19 , erection and fabrication work a 20 , erection and fabrication work a 21 , erection and fabrication work a 22 , erection and fabrication work a 23 , erection and fabrication work a 24 , erection and fabrication work a 25 , erection and fabrication work a 26 , erection and fabrication work a 27 , erection and fabrication work a 28 , erection and fabrication work a 29 , erection and fabrication work a 30 , erection and fabrication work a 31 , erection and fabrication work a 32 , erection and fabrication work a 33 , erection and fabrication work a 34 , erection and fabrication work a 35 , erection and fabrication work a 36 , erection and fabrication work a 37 , erection and fabrication work a 38 , erection and fabrication work a 39 , erection and fabrication work a 40 , erection and fabrication work a 41 , erection and fabrication work a 42 , erection and fabrication work a 43 , erection and fabrication work a 44 , erection and fabrication work a 45 , erection and fabrication work a 46 , erection and fabrication work a 47 , erection and fabrication work a 48 , erection and fabrication work a 49 , erection and fabrication work a 50 , erection and fabrication work a 51 , erection and fabrication work a 52 , erection and fabrication work a 53 , erection and fabrication work a 54 , erection and fabrication work a 55 , erection and fabrication work a 56 , erection and fabrication work a 57 , erection and fabrication work a 58 , erection and fabrication work a 59 , erection and fabrication work a 60 , erection and fabrication work a 61 , erection and fabrication work a 62 , erection and fabrication work a 63 , erection and fabrication work a 64 , erection and fabrication work a 65 , erection and fabrication work a 66, erection and fabrication work a, cutting and removing the weak/broken parts of the discharge chute for the scraper in the mill, fabricating new parts from 12 mm plate, reinstalling them, fixing hole plates as per profile by welding to secure the scraper, and conducting a trial after completion of work., cutting and removing the worn/weak runner base of the cane carrier, fabricating a box structure using 100 mm channel to installation the runner base, fitting it properly, and straightening and reusing the old channel by turning it over., cutting and removing the old worn/cut 40/50 mm square bars of the cane unloader and installing new square bars in their place as before, followed by a satisfactory trial., cutting and removing the worn/cut runners of the cane carrier/rake carrier/bagasse elevator/r.b.c., reinstalling them by either turning over the old ones or fitting new runners as per original design., cutting and removing the worn/cut/weak side plates of chains used in cane carrier/rake carrier/r.b.c., and installing old or new plates in their place., cutting and removing the worn/weak side plates of the fibrizer hood, installing new plates, welding inside and outside, and conducting a satisfactory trial., complete overhauling, testing, and trial of the bagasse baling machine., performing necessary repairs on the old racks of s.r.c./i.r.c., fabricating new racks as per sample for the chains of bagasse elevator/r.b.c., replacing the weak/broken bottom/top covers of t.r.p.f. by fabricating and installing new covers as per original design, and conducting a satisfactory trial., cutting and removing the weak/broken tail end boots of s.r.c./i.r.c., fabricating new ones from 8.0/10.0 mm old/new plate as per sample, installing, leak-proof welding, and conducting a satisfactory trial., dismantling various parts of the cane unloader grabs, repairing all parts, hardfacing the fingers as per instructions, and reassembling the grabs., cutting and removing the weak/broken juice tray used for compound imbibition in mills, fabricating a new tray from plate as per sample, installing it in place, and making all connections., cutting and removing the worn/weak guides that prevent chains of cane carrier/s.r.c./i.r.c. and bagasse elevator from lifting, fabricating new guides as per instructions, installing them, and conducting a satisfactory trial., welding the worn/cut wheels of the cane unloader bridge/trolley drive as per instructions., cutting and removing the weak/broken donali chutes of t.r.p.f., fabricating new donali chutes as per the old ones, and erecting them in place., fabricating and installing m.s. rings on the idler wheel of the cane carrier as per instructions., fabricating and installing a support using 25.0 mm plate between the mill head stock and t.r.p.f. head stock as per instructions., repairing and balancing the old hammer shanks of the fibrizer by welding and hardfacing as per instructions., cutting and removing the worn/weak hoods of the cane chopper/leveller and fabricating a new folding type from new plate and installing it., replacing the broken plates in the pockets of the fibrizer's pocketed type anvil plate with new plates, straightening bent plates, welding, and hardfacing as per instructions., welding and leveling the worn hubs of the cane leveller/chopper rotor assembly on the working side and top sides, and hardfacing as per instructions., cutting and removing the weak beds of reduction gears and motors on cane unloaders, modifying and fabricating new beds, installing them, aligning the gear and motor, and conducting a trial., strengthening the weak/broken columns of the cane carrier structure by welding plates as per instructions., fabricating and fitting juice rings in the mill rollers as per sample., performing necessary repairs on the pressure chutes installed between t.r.p.f. and the mill., cutting and removing the weak/broken juice receiving tank of the mills, fabricating a new tank from 8.0/10.0 mm plate as per sample, fitting it in place, making all connections, and conducting a leak-proof trial., cutting and removing the weak/broken bottom cone of the mill's juice receiving tank, fabricating a new cone as per sample, fitting it in place, making all connections as before, and conducting a leak-proof trial., cutting and removing the weak/broken 10 inch/12 inch pipes between the mill juice tray and gutter, fabricating and fitting new s.s. pipes in their place, and conducting a leak-proof trial., lining the bottom trough of s.r.c./i.r.c. with 3.00 mm thick s.s. plate and doing leak-proof welding., removing the shifted bed of feed pump no. 1 on the boiler, fabricating and installing a new bed, making related connections, and conducting a trial., making the damper in the old i.d. fan ducting at the boiler station leak-proof using new/old plate before the chimney and doing complete welding so that when the new i.d. runs, there is no back air from the chimney., cutting and removing the nipple reducers of all three wet scrubber pumps and their leaking pipe lines, installing new pipe lines, and making all connections as before with leak-proof welding., opening all nozzles inside the wet scrubber venturi, removing damaged nozzles, installing new nozzles, and making all connections as before., fabricating new pipes from old boiler tubes for backwash from the service tank to the wet scrubber, and making all connections with new valves and clamps in the pipeline., cutting and removing the weak and leaking juice tray from under the t.r.p.f. that brings juice to the mill juice tray, and fabricating and installing a new one., cutting and removing the weak/broken ash chutes of the boilers, and fabricating and fitting new chutes from old/new plate as per the old ones., performing necessary repairs on the weak/broken dampers of air heaters, economizers, and f.d./i.d. fans' inlets/outlets or suction/delivery., replacing the frames and grids of the internal steam filter fitted in the boiler drums by fabricating new frames and fitting grids., cutting and removing the weak/broken flue gas ducting between the i.d. fans and the chimney, fabricating and installing new ducting from 5.0/6.0 mm thick plate, and conducting a leak-proof trial., for the weak bagassilo fan, fabricating a new impeller as per sample, repairing the casing as necessary, and conducting a successful trial., cutting and removing the weak/broken suction cones in the casings of i.d./f.d. fans, fabricating and installing new cones as per sample, and conducting a successful trial., replacing the damaged weak grids/perforated sheets of the baffle plates inside the boiler feed tank., cutting and removing the weak/broken bagasse feeding chutes of boiler no. 1, 2, and 3, and performing necessary repairs., replacing the weak/broken air headers installed outside for supplying additional f.d. air in the furnace of 20-ton capacity boiler no. 1 and 2 with new headers., cutting the weak/broken ducting between the air heater and i.d. fans and fabricating and installing new ducting from 5/6 mm thick plate., removing damaged perforated grids in the bagasse elevator used for bagasse to bagassilo filtration and fitting new grids., lowering the economizer coils/tubes of 20-ton capacity boiler no. 1 and 2, cleaning them internally and externally, conducting hydraulic testing at standard pressure, and after testing, lifting and refitting them, making the economizer bands leak-proof, and conducting a satisfactory hydraulic test., cutting and removing the weak/broken channel/plate of the s.r.c./i.r.c. trough and fabricating and installing new ones as per instructions., fabricating and installing angle iron rings for strengthening the boiler chimney., strengthening the weak and damaged truss-type bridge structure of the cane unloader by adding new channels, angles, and plates to provide satisfactory strength., welding the oval/worn enlarged holes on both ends of the block-type chain links of s.r.c./i.r.c. chains, drilling pin-size holes in the attachment, and grinding the faces to level., cutting and removing the worn/weak attachment used for fixing racks on the block-type chain links of s.r.c./i.r.c. chains, fabricating new attachment links from 12 mm thick plate as before, welding them onto the links, and drilling holes as per drawing., constructing a separate platform path using old angle channels for access to all three unloaders., replacing the weak/broken parts of i.d. fan casing, air heater cell/ducting, and economizer cell., cutting and removing the old m.s. plate of the bottom trough and boot of s.r.c./i.r.c., installing new plate to make the trough and boot leak-proof, and lining the boot and trough with 3 mm thick s.s. plate, followed by a satisfactory trial., fabricating new racks from 25 mm thick plate as per sample for s.r.c./i.r.c. chains, drilling holes, cutting and supporting chain rollers on both ends, and preparing them., removing the bent 250 mm channel of the trolley in the cane unloader, leveling it, strengthening the structure, fitting worn/weak runner square bars, checking diagonals, and leveling the wheel., removing all four wheels of the mill and power house crane, cleaning, checking bearings, greasing all plumber blocks, replacing damaged bearings with mill spares, welding worn wheels to a uniform size, and conducting a satisfactory trial., performing necessary repairs and hardfacing on the worn shells/teeth of t.r.p.f. top/bottom rollers, and adding rings on both sides as needed to compensate for reduced shell length., cutting and removing the weak/leaking juice tray of the mill and fabricating a new one from 5 mm s.s. plate as per sample, and conducting a leak-proof trial., performing necessary repairs on the damaged s.s. juice tray of the mill., in case of head stock cracking or misalignment, removing the head stock, regrouting, aligning, and completing all related work., removing the shaft of the damaged t.r.p.f. roller and dismantling the shell using gas cutting., cutting the 63.5 mm old boiler tubes with bends, making a 5.1 meter straight line, preparing them for the air heater, and cleaning them by grinding. are available inside the detailed notification files. Bidders planning to target this contract in Muzaffarnagar should check the official portal schedule early to complete their online technical and financial submission well before the closing hours.

Tender Inquiry