tender for invitation for bids (ifb) for epc package for development of 550mw (1x550mw) grid connected solar pv projects near shimbhoo ka burj, rajasthan , design, engineering, manufacturing, supply, packing and forwarding, transportation, unloading storage, installation, testing and commissioning of solar photovoltaic plant including supply of solar pv modules., site - grading & clearing of vegetation, topographical survey, geotechnical investigation, design and construction of foundation & erection of tracker based module mounting structure (mms) for spv panels, including fixing of pv modules on mms (tracker based) and pv modules interconnection. , arranging power supply and water supply for construction purposes, construction of pre-engineered type inverter room (if applicable) with power conditioning unit associated lt and ht switchgear. in case of string inverter, construction of pre-engineered type ht switchgear room, all associated electrical and civil works required for interfacing with grid (i.e., transformers, panels, protection system, cables, metering at 33kv level, facilitation for grid compliance study as per regulation etc.). power evacuation in scope of the package shall be up to 33kv main pooling switchgear at owner’s pooling substation, laying and termination of ht cables (including supply) from block boundary to 33kv owner’s main pooling switchgear as per specification, module cleaning system including supply and installation of all accessories, construction of internal roads, pathways, construction of drainage system as per general layout and topography, any internal / temporary fencing, security cabin etc, scada system for remote monitoring and control of inverters with all hardware & software and complete set of weather monitoring station including cloud cover, dynamic reactive power compensation equipment to comply with the requirements of dynamic reactive power capability at poi as per the “report of the working group in respect of data submission procedure and verification of compliance to cea regulations on technical standards for connectivity to the grid by re generators july 2022” and its clarification(s)/amendment(s) thereof if any, cctvs along with remote monitoring system with coverage of 100% periphery, entry/exit gates of the solar blocks, wms inverter stations etc, comprehensive operation & maintenance of spv plant along with electrical equipment, consumables and spare parts for a period of three years from the date of commissioning of full project capacity., supply of mandatory spares

Latest Tender Detail from ntpc renewable energy limited for the tender for invitation for bids (ifb) for epc package for development of 550mw (1x550mw) grid connected solar pv projects near shimbhoo ka burj, rajasthan , design, engineering, manufacturing, supply, packing and forwarding, transportation, unloading storage, installation, testing and commissioning of solar photovoltaic plant including supply of solar pv modules., site - grading & clearing of vegetation, topographical survey, geotechnical investigation, design and construction of foundation & erection of tracker based module mounting structure (mms) for spv panels, including fixing of pv modules on mms (tracker based) and pv modules interconnection. , arranging power supply and water supply for construction purposes, construction of pre-engineered type inverter room (if applicable) with power conditioning unit associated lt and ht switchgear. in case of string inverter, construction of pre-engineered type ht switchgear room, all associated electrical and civil works required for interfacing with grid (i.e., transformers, panels, protection system, cables, metering at 33kv level, facilitation for grid compliance study as per regulation etc.). power evacuation in scope of the package shall be up to 33kv main pooling switchgear at owner’s pooling substation, laying and termination of ht cables (including supply) from block boundary to 33kv owner’s main pooling switchgear as per specification, module cleaning system including supply and installation of all accessories, construction of internal roads, pathways, construction of drainage system as per general layout and topography, any internal / temporary fencing, security cabin etc, scada system for remote monitoring and control of inverters with all hardware & software and complete set of weather monitoring station including cloud cover, dynamic reactive power compensation equipment to comply with the requirements of dynamic reactive power capability at poi as per the “report of the working group in respect of data submission procedure and verification of compliance to cea regulations on technical standards for connectivity to the grid by re generators july 2022” and its clarification(s)/amendment(s) thereof if any, cctvs along with remote monitoring system with coverage of 100% periphery, entry/exit gates of the solar blocks, wms inverter stations etc, comprehensive operation & maintenance of spv plant along with electrical equipment, consumables and spare parts for a period of three years from the date of commissioning of full project capacity., supply of mandatory spares in bikaner, rajasthan,. Reference number 15768069. Don't miss out on this chance to be part of a significant project. Register for free today to access the complete tender details and download the necessary documents. Seize the opportunity with Tender 18!

Tender Value:Refer Document
Tender EMD:Refer Document
Tender Fee:Refer Document
Published Date:Jun 03, 2026
Due Date:Jun 26, 2026
Tender Opening Date:Jun 26, 2026
Tender DocumentsDownload Document
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tender Inquiry

This Government Tender has been Published  by Ntpc renewable energy limited for work related to topographical survey,monitoring system,interconnection,transportation,investigation,construction,power supply,transformers,civil works,switchgear,generators,unloading,clearing,inverter,cleaning,pathways,survey,cables,gates in Bikaner, Rajasthan. The Tender work is tender for invitation for bids (ifb) for epc package for development of 550mw (1x550mw) grid connected solar pv projects near shimbhoo ka burj, rajasthan , design, engineering, manufacturing, supply, packing and forwarding, transportation, unloading storage, installation, testing and commissioning of solar photovoltaic plant including supply of solar pv modules., site - grading & clearing of vegetation, topographical survey, geotechnical investigation, design and construction of foundation & erection of tracker based module mounting structure (mms) for spv panels, including fixing of pv modules on mms (tracker based) and pv modules interconnection. , arranging power supply and water supply for construction purposes, construction of pre-engineered type inverter room (if applicable) with power conditioning unit associated lt and ht switchgear. in case of string inverter, construction of pre-engineered type ht switchgear room, all associated electrical and civil works required for interfacing with grid (i.e., transformers, panels, protection system, cables, metering at 33kv level, facilitation for grid compliance study as per regulation etc.). power evacuation in scope of the package shall be up to 33kv main pooling switchgear at owner’s pooling substation, laying and termination of ht cables (including supply) from block boundary to 33kv owner’s main pooling switchgear as per specification, module cleaning system including supply and installation of all accessories, construction of internal roads, pathways, construction of drainage system as per general layout and topography, any internal / temporary fencing, security cabin etc, scada system for remote monitoring and control of inverters with all hardware & software and complete set of weather monitoring station including cloud cover, dynamic reactive power compensation equipment to comply with the requirements of dynamic reactive power capability at poi as per the “report of the working group in respect of data submission procedure and verification of compliance to cea regulations on technical standards for connectivity to the grid by re generators july 2022” and its clarification(s)/amendment(s) thereof if any, cctvs along with remote monitoring system with coverage of 100% periphery, entry/exit gates of the solar blocks, wms inverter stations etc, comprehensive operation & maintenance of spv plant along with electrical equipment, consumables and spare parts for a period of three years from the date of commissioning of full project capacity., supply of mandatory spares. Tender18 Provide this type Government Tender Information on daily basis.


This tender invites eligible contractors, suppliers, manufacturers, consultants, Startups, Msmes, traders and service providers to submit bids for the specified project, supply, service, or work requirement.


Before applying, interested bidders should review the tender scope, eligibility criteria, estimated contract value, important dates, technical requirements, reqired docuent list for bidder and bid submission instructions as per provided in the official tender documents. 


This Verified Information Provide By Tender18 in this page so Bidder Can Easiy  Understanding tender  requirements and bidders can prepare a compliant and competitive tender proposal.

To participate in the tender for invitation for bids (ifb) for epc package for development of 550mw (1x550mw) grid connected solar pv projects near shimbhoo ka burj, rajasthan , design, engineering, manufacturing, supply, packing and forwarding, transportation, unloading storage, installation, testing and commissioning of solar photovoltaic plant including supply of solar pv modules., site - grading & clearing of vegetation, topographical survey, geotechnical investigation, design and construction of foundation & erection of tracker based module mounting structure (mms) for spv panels, including fixing of pv modules on mms (tracker based) and pv modules interconnection. , arranging power supply and water supply for construction purposes, construction of pre-engineered type inverter room (if applicable) with power conditioning unit associated lt and ht switchgear. in case of string inverter, construction of pre-engineered type ht switchgear room, all associated electrical and civil works required for interfacing with grid (i.e., transformers, panels, protection system, cables, metering at 33kv level, facilitation for grid compliance study as per regulation etc.). power evacuation in scope of the package shall be up to 33kv main pooling switchgear at owner’s pooling substation, laying and termination of ht cables (including supply) from block boundary to 33kv owner’s main pooling switchgear as per specification, module cleaning system including supply and installation of all accessories, construction of internal roads, pathways, construction of drainage system as per general layout and topography, any internal / temporary fencing, security cabin etc, scada system for remote monitoring and control of inverters with all hardware & software and complete set of weather monitoring station including cloud cover, dynamic reactive power compensation equipment to comply with the requirements of dynamic reactive power capability at poi as per the “report of the working group in respect of data submission procedure and verification of compliance to cea regulations on technical standards for connectivity to the grid by re generators july 2022” and its clarification(s)/amendment(s) thereof if any, cctvs along with remote monitoring system with coverage of 100% periphery, entry/exit gates of the solar blocks, wms inverter stations etc, comprehensive operation & maintenance of spv plant along with electrical equipment, consumables and spare parts for a period of three years from the date of commissioning of full project capacity., supply of mandatory spares, bidders should first download and review all available tender documents. These documents generally include the Notice Inviting Tender (NIT), Bill of Quantities (BOQ), technical specifications, eligibility criteria, scope of work, and bid submission instructions.


Tender Governemnt Authorities like Ntpc renewable energy limited usually publish these documents on their official eProcurement portals, departmental tender portals, the GeM Tender Portal, or other government procurement platforms or on newspapre. Finding and accessing the correct tender documents across multiple portals can sometimes be time-consuming for bidders. 


To make the process easier, Tender18 provides quick access to the available tender documents related to this Bikaner , Rajasthan tender on a single page. Businesses involved in topographical survey,monitoring system,interconnection,transportation,investigation,construction,power supply,transformers,civil works,switchgear,generators,unloading,clearing,inverter,cleaning,pathways,survey,cables,gates related products, services, or works can conveniently download the relevant documents and review the tender requirements without spending time searching across different procurement portals.

The tender for invitation for bids (ifb) for epc package for development of 550mw (1x550mw) grid connected solar pv projects near shimbhoo ka burj, rajasthan , design, engineering, manufacturing, supply, packing and forwarding, transportation, unloading storage, installation, testing and commissioning of solar photovoltaic plant including supply of solar pv modules., site - grading & clearing of vegetation, topographical survey, geotechnical investigation, design and construction of foundation & erection of tracker based module mounting structure (mms) for spv panels, including fixing of pv modules on mms (tracker based) and pv modules interconnection. , arranging power supply and water supply for construction purposes, construction of pre-engineered type inverter room (if applicable) with power conditioning unit associated lt and ht switchgear. in case of string inverter, construction of pre-engineered type ht switchgear room, all associated electrical and civil works required for interfacing with grid (i.e., transformers, panels, protection system, cables, metering at 33kv level, facilitation for grid compliance study as per regulation etc.). power evacuation in scope of the package shall be up to 33kv main pooling switchgear at owner’s pooling substation, laying and termination of ht cables (including supply) from block boundary to 33kv owner’s main pooling switchgear as per specification, module cleaning system including supply and installation of all accessories, construction of internal roads, pathways, construction of drainage system as per general layout and topography, any internal / temporary fencing, security cabin etc, scada system for remote monitoring and control of inverters with all hardware & software and complete set of weather monitoring station including cloud cover, dynamic reactive power compensation equipment to comply with the requirements of dynamic reactive power capability at poi as per the “report of the working group in respect of data submission procedure and verification of compliance to cea regulations on technical standards for connectivity to the grid by re generators july 2022” and its clarification(s)/amendment(s) thereof if any, cctvs along with remote monitoring system with coverage of 100% periphery, entry/exit gates of the solar blocks, wms inverter stations etc, comprehensive operation & maintenance of spv plant along with electrical equipment, consumables and spare parts for a period of three years from the date of commissioning of full project capacity., supply of mandatory spares from Bikaner, Rajasthan may be relevant for contractors, suppliers, vendors, manufacturers, consultants, service providers, startups, MSMEs, and other organizations involved in topographical survey,monitoring system,interconnection,transportation,investigation,construction,power supply,transformers,civil works,switchgear,generators,unloading,clearing,inverter,cleaning,pathways,survey,cables,gates related products, services, or works. However, eligibility to participate depends on the qualification criteria specified by Ntpc renewable energy limited in the official tender documents.

Before submitting a bid, interested applicants should carefully review the eligibility conditions, technical requirements, financial criteria, work experience requirements, annual turnover conditions, registrations, certifications, and any other supporting documents required by the tendering authority. The detailed qualification requirements and bidder eligibility criteria are available in the tender notice and related documents provided on this page. 

Ensuring compliance with all eligibility and qualification requirements before bid submission can help bidders avoid disqualification and improve their chances of successful participation in the tender process.

Tende18 provides comprehensive tender bidding services, including a complete tender summary along with a detailed analysis of the Tender Qualification and Eligibility Criteria.

Interested in participating in the tender for invitation for bids (ifb) for epc package for development of 550mw (1x550mw) grid connected solar pv projects near shimbhoo ka burj, rajasthan , design, engineering, manufacturing, supply, packing and forwarding, transportation, unloading storage, installation, testing and commissioning of solar photovoltaic plant including supply of solar pv modules., site - grading & clearing of vegetation, topographical survey, geotechnical investigation, design and construction of foundation & erection of tracker based module mounting structure (mms) for spv panels, including fixing of pv modules on mms (tracker based) and pv modules interconnection. , arranging power supply and water supply for construction purposes, construction of pre-engineered type inverter room (if applicable) with power conditioning unit associated lt and ht switchgear. in case of string inverter, construction of pre-engineered type ht switchgear room, all associated electrical and civil works required for interfacing with grid (i.e., transformers, panels, protection system, cables, metering at 33kv level, facilitation for grid compliance study as per regulation etc.). power evacuation in scope of the package shall be up to 33kv main pooling switchgear at owner’s pooling substation, laying and termination of ht cables (including supply) from block boundary to 33kv owner’s main pooling switchgear as per specification, module cleaning system including supply and installation of all accessories, construction of internal roads, pathways, construction of drainage system as per general layout and topography, any internal / temporary fencing, security cabin etc, scada system for remote monitoring and control of inverters with all hardware & software and complete set of weather monitoring station including cloud cover, dynamic reactive power compensation equipment to comply with the requirements of dynamic reactive power capability at poi as per the “report of the working group in respect of data submission procedure and verification of compliance to cea regulations on technical standards for connectivity to the grid by re generators july 2022” and its clarification(s)/amendment(s) thereof if any, cctvs along with remote monitoring system with coverage of 100% periphery, entry/exit gates of the solar blocks, wms inverter stations etc, comprehensive operation & maintenance of spv plant along with electrical equipment, consumables and spare parts for a period of three years from the date of commissioning of full project capacity., supply of mandatory spares issued by Ntpc renewable energy limited for topographical survey,monitoring system,interconnection,transportation,investigation,construction,power supply,transformers,civil works,switchgear,generators,unloading,clearing,inverter,cleaning,pathways,survey,cables,gates related work in Bikaner, Rajasthan? TENDER18 provides complete assistance to help businesses understand tender requirements, access tender documents, review eligibility criteria, qualification requirements, important dates, and bid submission guidelines associated with this tender.

Our Tender18 Expert Technical team can assist with vendor and GeM registration on the relevant departmental, eProcurement, GeM, or government tender portal, preparation of technical and financial bid documents, compliance with qualification criteria, document verification, and complete online tender submission support. Whether you are a contractor, supplier, manufacturer, consultant, startup, or MSME working in the field of topographical survey,monitoring system,interconnection,transportation,investigation,construction,power supply,transformers,civil works,switchgear,generators,unloading,clearing,inverter,cleaning,pathways,survey,cables,gates, Tender18 can help simplify the tender participation process and support you throughout every stage of bidding for this tender. so that tender18 is one the top leading tender consultant in Inda.

1.
Whom should I contact if I have further queries about the Tender scope?

You can fill out the integrated inquiry form below on this detail page to share your company profile. Our consultancy desk will review your query regarding topographical survey,monitoring system,interconnection,transportation,investigation,construction,power supply,transformers,civil works,switchgear,generators,unloading,clearing,inverter,cleaning,pathways,survey,cables,gates parameters and guide you on how to coordinate efficiently with the procurement team of Ntpc renewable energy limited

2.
How can Tender18 assist my business in winning this government contract?

Tender18 provides end-to-end professional bidding support and documentation advisory for tender for invitation for bids (ifb) for epc package for development of 550mw (1x550mw) grid connected solar pv projects near shimbhoo ka burj, rajasthan , design, engineering, manufacturing, supply, packing and forwarding, transportation, unloading storage, installation, testing and commissioning of solar photovoltaic plant including supply of solar pv modules., site - grading & clearing of vegetation, topographical survey, geotechnical investigation, design and construction of foundation & erection of tracker based module mounting structure (mms) for spv panels, including fixing of pv modules on mms (tracker based) and pv modules interconnection. , arranging power supply and water supply for construction purposes, construction of pre-engineered type inverter room (if applicable) with power conditioning unit associated lt and ht switchgear. in case of string inverter, construction of pre-engineered type ht switchgear room, all associated electrical and civil works required for interfacing with grid (i.e., transformers, panels, protection system, cables, metering at 33kv level, facilitation for grid compliance study as per regulation etc.). power evacuation in scope of the package shall be up to 33kv main pooling switchgear at owner’s pooling substation, laying and termination of ht cables (including supply) from block boundary to 33kv owner’s main pooling switchgear as per specification, module cleaning system including supply and installation of all accessories, construction of internal roads, pathways, construction of drainage system as per general layout and topography, any internal / temporary fencing, security cabin etc, scada system for remote monitoring and control of inverters with all hardware & software and complete set of weather monitoring station including cloud cover, dynamic reactive power compensation equipment to comply with the requirements of dynamic reactive power capability at poi as per the “report of the working group in respect of data submission procedure and verification of compliance to cea regulations on technical standards for connectivity to the grid by re generators july 2022” and its clarification(s)/amendment(s) thereof if any, cctvs along with remote monitoring system with coverage of 100% periphery, entry/exit gates of the solar blocks, wms inverter stations etc, comprehensive operation & maintenance of spv plant along with electrical equipment, consumables and spare parts for a period of three years from the date of commissioning of full project capacity., supply of mandatory spares . Our senior analysts help you decode the complete project guidelines, manage accurate costing sheets, and complete error-free submissions on the official platform used by Ntpc renewable energy limited.

3.
What are the main reasons for a technical tender rejection?

Most online bids face rejection during the initial evaluation round due to avoidable errors like uploading blurred document scans, submitting expired DSCs, or missing critical experience papers required for tender for invitation for bids (ifb) for epc package for development of 550mw (1x550mw) grid connected solar pv projects near shimbhoo ka burj, rajasthan , design, engineering, manufacturing, supply, packing and forwarding, transportation, unloading storage, installation, testing and commissioning of solar photovoltaic plant including supply of solar pv modules., site - grading & clearing of vegetation, topographical survey, geotechnical investigation, design and construction of foundation & erection of tracker based module mounting structure (mms) for spv panels, including fixing of pv modules on mms (tracker based) and pv modules interconnection. , arranging power supply and water supply for construction purposes, construction of pre-engineered type inverter room (if applicable) with power conditioning unit associated lt and ht switchgear. in case of string inverter, construction of pre-engineered type ht switchgear room, all associated electrical and civil works required for interfacing with grid (i.e., transformers, panels, protection system, cables, metering at 33kv level, facilitation for grid compliance study as per regulation etc.). power evacuation in scope of the package shall be up to 33kv main pooling switchgear at owner’s pooling substation, laying and termination of ht cables (including supply) from block boundary to 33kv owner’s main pooling switchgear as per specification, module cleaning system including supply and installation of all accessories, construction of internal roads, pathways, construction of drainage system as per general layout and topography, any internal / temporary fencing, security cabin etc, scada system for remote monitoring and control of inverters with all hardware & software and complete set of weather monitoring station including cloud cover, dynamic reactive power compensation equipment to comply with the requirements of dynamic reactive power capability at poi as per the “report of the working group in respect of data submission procedure and verification of compliance to cea regulations on technical standards for connectivity to the grid by re generators july 2022” and its clarification(s)/amendment(s) thereof if any, cctvs along with remote monitoring system with coverage of 100% periphery, entry/exit gates of the solar blocks, wms inverter stations etc, comprehensive operation & maintenance of spv plant along with electrical equipment, consumables and spare parts for a period of three years from the date of commissioning of full project capacity., supply of mandatory spares in Rajasthan.

4.
Can contractors located outside the local region participate in this bid?

Eligibility for outstation bidders depends entirely on the terms set inside the document for tender for invitation for bids (ifb) for epc package for development of 550mw (1x550mw) grid connected solar pv projects near shimbhoo ka burj, rajasthan , design, engineering, manufacturing, supply, packing and forwarding, transportation, unloading storage, installation, testing and commissioning of solar photovoltaic plant including supply of solar pv modules., site - grading & clearing of vegetation, topographical survey, geotechnical investigation, design and construction of foundation & erection of tracker based module mounting structure (mms) for spv panels, including fixing of pv modules on mms (tracker based) and pv modules interconnection. , arranging power supply and water supply for construction purposes, construction of pre-engineered type inverter room (if applicable) with power conditioning unit associated lt and ht switchgear. in case of string inverter, construction of pre-engineered type ht switchgear room, all associated electrical and civil works required for interfacing with grid (i.e., transformers, panels, protection system, cables, metering at 33kv level, facilitation for grid compliance study as per regulation etc.). power evacuation in scope of the package shall be up to 33kv main pooling switchgear at owner’s pooling substation, laying and termination of ht cables (including supply) from block boundary to 33kv owner’s main pooling switchgear as per specification, module cleaning system including supply and installation of all accessories, construction of internal roads, pathways, construction of drainage system as per general layout and topography, any internal / temporary fencing, security cabin etc, scada system for remote monitoring and control of inverters with all hardware & software and complete set of weather monitoring station including cloud cover, dynamic reactive power compensation equipment to comply with the requirements of dynamic reactive power capability at poi as per the “report of the working group in respect of data submission procedure and verification of compliance to cea regulations on technical standards for connectivity to the grid by re generators july 2022” and its clarification(s)/amendment(s) thereof if any, cctvs along with remote monitoring system with coverage of 100% periphery, entry/exit gates of the solar blocks, wms inverter stations etc, comprehensive operation & maintenance of spv plant along with electrical equipment, consumables and spare parts for a period of three years from the date of commissioning of full project capacity., supply of mandatory spares. While many public sector projects allow national competitive bidding, certain localized works require local offices or specific registration metrics in Bikaner.

5.
Do I need an active GeM Portal registration to apply for this work?

If this procurement is routed through the central marketplace, an active GeM Seller ID is mandatory to supply topographical survey,monitoring system,interconnection,transportation,investigation,construction,power supply,transformers,civil works,switchgear,generators,unloading,clearing,inverter,cleaning,pathways,survey,cables,gates items. Tender18 offers complete assistance for brand cataloging, profile creation, and vendor assessment required officially by Ntpc renewable energy limited

6.
What are the primary legal documents required to submit a valid bid?

To register an eligible bid for these topographical survey,monitoring system,interconnection,transportation,investigation,construction,power supply,transformers,civil works,switchgear,generators,unloading,clearing,inverter,cleaning,pathways,survey,cables,gates contracts, companies must prepare their core compliance documents. Vendors operating across Rajasthan must ensure they possess a valid GST registration, permanent account number (PAN), and active Class-3 Digital Signature Certificates.

7.
What products or services are required for this active work?

This public procurement cycle is specifically looking for qualified vendors and suppliers who can provide high-quality topographical survey,monitoring system,interconnection,transportation,investigation,construction,power supply,transformers,civil works,switchgear,generators,unloading,clearing,inverter,cleaning,pathways,survey,cables,gates solutions. The operational execution, delivery, and deployment of these materials must be managed locally within the Bikaner region.

8.
Where can I review the estimated cost or budget details for this Tender?

The estimated project cost and budget thresholds can be reviewed directly inside the tender document. Bidders can analyze these qualification files to check if their firm meets the financial capability criteria specified for tender for invitation for bids (ifb) for epc package for development of 550mw (1x550mw) grid connected solar pv projects near shimbhoo ka burj, rajasthan , design, engineering, manufacturing, supply, packing and forwarding, transportation, unloading storage, installation, testing and commissioning of solar photovoltaic plant including supply of solar pv modules., site - grading & clearing of vegetation, topographical survey, geotechnical investigation, design and construction of foundation & erection of tracker based module mounting structure (mms) for spv panels, including fixing of pv modules on mms (tracker based) and pv modules interconnection. , arranging power supply and water supply for construction purposes, construction of pre-engineered type inverter room (if applicable) with power conditioning unit associated lt and ht switchgear. in case of string inverter, construction of pre-engineered type ht switchgear room, all associated electrical and civil works required for interfacing with grid (i.e., transformers, panels, protection system, cables, metering at 33kv level, facilitation for grid compliance study as per regulation etc.). power evacuation in scope of the package shall be up to 33kv main pooling switchgear at owner’s pooling substation, laying and termination of ht cables (including supply) from block boundary to 33kv owner’s main pooling switchgear as per specification, module cleaning system including supply and installation of all accessories, construction of internal roads, pathways, construction of drainage system as per general layout and topography, any internal / temporary fencing, security cabin etc, scada system for remote monitoring and control of inverters with all hardware & software and complete set of weather monitoring station including cloud cover, dynamic reactive power compensation equipment to comply with the requirements of dynamic reactive power capability at poi as per the “report of the working group in respect of data submission procedure and verification of compliance to cea regulations on technical standards for connectivity to the grid by re generators july 2022” and its clarification(s)/amendment(s) thereof if any, cctvs along with remote monitoring system with coverage of 100% periphery, entry/exit gates of the solar blocks, wms inverter stations etc, comprehensive operation & maintenance of spv plant along with electrical equipment, consumables and spare parts for a period of three years from the date of commissioning of full project capacity., supply of mandatory spares by Ntpc renewable energy limited

9.
How can I download the official BOQ file for this opportunity?

You can download the commercial Bill of Quantities (BOQ) spreadsheet directly using the secure link provided on this page. The BOQ file contains the item descriptions and rate filling forms officially validated for tender for invitation for bids (ifb) for epc package for development of 550mw (1x550mw) grid connected solar pv projects near shimbhoo ka burj, rajasthan , design, engineering, manufacturing, supply, packing and forwarding, transportation, unloading storage, installation, testing and commissioning of solar photovoltaic plant including supply of solar pv modules., site - grading & clearing of vegetation, topographical survey, geotechnical investigation, design and construction of foundation & erection of tracker based module mounting structure (mms) for spv panels, including fixing of pv modules on mms (tracker based) and pv modules interconnection. , arranging power supply and water supply for construction purposes, construction of pre-engineered type inverter room (if applicable) with power conditioning unit associated lt and ht switchgear. in case of string inverter, construction of pre-engineered type ht switchgear room, all associated electrical and civil works required for interfacing with grid (i.e., transformers, panels, protection system, cables, metering at 33kv level, facilitation for grid compliance study as per regulation etc.). power evacuation in scope of the package shall be up to 33kv main pooling switchgear at owner’s pooling substation, laying and termination of ht cables (including supply) from block boundary to 33kv owner’s main pooling switchgear as per specification, module cleaning system including supply and installation of all accessories, construction of internal roads, pathways, construction of drainage system as per general layout and topography, any internal / temporary fencing, security cabin etc, scada system for remote monitoring and control of inverters with all hardware & software and complete set of weather monitoring station including cloud cover, dynamic reactive power compensation equipment to comply with the requirements of dynamic reactive power capability at poi as per the “report of the working group in respect of data submission procedure and verification of compliance to cea regulations on technical standards for connectivity to the grid by re generators july 2022” and its clarification(s)/amendment(s) thereof if any, cctvs along with remote monitoring system with coverage of 100% periphery, entry/exit gates of the solar blocks, wms inverter stations etc, comprehensive operation & maintenance of spv plant along with electrical equipment, consumables and spare parts for a period of three years from the date of commissioning of full project capacity., supply of mandatory spares within the Rajasthan jurisdiction

10.
How can I find the submission closing date for this contract?

The official timeline and deadline details for tender for invitation for bids (ifb) for epc package for development of 550mw (1x550mw) grid connected solar pv projects near shimbhoo ka burj, rajasthan , design, engineering, manufacturing, supply, packing and forwarding, transportation, unloading storage, installation, testing and commissioning of solar photovoltaic plant including supply of solar pv modules., site - grading & clearing of vegetation, topographical survey, geotechnical investigation, design and construction of foundation & erection of tracker based module mounting structure (mms) for spv panels, including fixing of pv modules on mms (tracker based) and pv modules interconnection. , arranging power supply and water supply for construction purposes, construction of pre-engineered type inverter room (if applicable) with power conditioning unit associated lt and ht switchgear. in case of string inverter, construction of pre-engineered type ht switchgear room, all associated electrical and civil works required for interfacing with grid (i.e., transformers, panels, protection system, cables, metering at 33kv level, facilitation for grid compliance study as per regulation etc.). power evacuation in scope of the package shall be up to 33kv main pooling switchgear at owner’s pooling substation, laying and termination of ht cables (including supply) from block boundary to 33kv owner’s main pooling switchgear as per specification, module cleaning system including supply and installation of all accessories, construction of internal roads, pathways, construction of drainage system as per general layout and topography, any internal / temporary fencing, security cabin etc, scada system for remote monitoring and control of inverters with all hardware & software and complete set of weather monitoring station including cloud cover, dynamic reactive power compensation equipment to comply with the requirements of dynamic reactive power capability at poi as per the “report of the working group in respect of data submission procedure and verification of compliance to cea regulations on technical standards for connectivity to the grid by re generators july 2022” and its clarification(s)/amendment(s) thereof if any, cctvs along with remote monitoring system with coverage of 100% periphery, entry/exit gates of the solar blocks, wms inverter stations etc, comprehensive operation & maintenance of spv plant along with electrical equipment, consumables and spare parts for a period of three years from the date of commissioning of full project capacity., supply of mandatory spares are available inside the detailed notification files. Bidders planning to target this contract in Bikaner should check the official portal schedule early to complete their online technical and financial submission well before the closing hours.