tender for xlpe cable for working voltage up to and including 1.1 kv marked to is 7098 (part 1) (q2) , supply, installing, testing and commissioning of pdb panel 800a, 415v. the panel shall be indoor wall mounted. it shall be completely made of crca sheet steel. , supply, installing, testing and commissioning of pf correction panel with rms 430kvar, 415v. panel indoor floor mounted, free standing with ip-31 degree of ip made of crca sheet steel. , material and labour for xlpe insulated, lt armoured electric sense cable with aluminiur star ded conductor 1100 volts grade, cross- sectional area 4 sqmm, 6 core , m and l for brick sub class b 250mm x 115mm x 0.75mm and laid in trenches as in protection of ug cabe complete all as specified and directed , supply and filling in and spreading unwashed river sand for cushioning and covering the uncer ground cables in trenches and punning to provide required cover , excavation in trenches not exceeding 1.5 mtr wide and not exc 1.5 mtr depth for laying cif cables, pipe lines, protection pipes , returning filling in soil including spreading leveling watering and well rammimg in layer n exc 25 cm complete all as specified and directed , remnoving excavated soil not exc 50 mtr ant depositing where directed at a level not exc 1.5 mtr above the starting point all as specified and directed , material and labour for earthing complete with copper plate electrode 600mmx 600mmx. 3.1.5 mm thick buriel directely in ground vertically , supply and fixing 25 sqmm interconnecting pvc pipe sets and pipe fittings along with suitable accessories complete all as specified and directed , civil work rcc panel base slab size - 2000mm l x 1300mm w x 150mm thickness , warranty service amc by cmc including breakdown service for 1 year to ensure the safe, reliable, and efficient operation of the electrical panel, provision of solar factor correction for 1 mw solar plant, the enclosure shall have sturdy support structure with angle suppors as necessary. enclosure shall be finished with powder coating, after finishing 10 tanks chemical treatment. paint shed shall be ral-7035. suitable provisions shall be made in the panel for proper heat dissipation. air aspiration louvers for proper air circulation shall be provided as necessary. the panel shall be suitably sized to accommodate all the compor ents, providing necessary air clearance between live and non-live parts, providing necessary working clearance. incomer shall pe al busbars. power outgoing shall be one 800a, 415v, 50ka, tp, mccb, tm. bus bar shall be of aluminium with 0.8a by sq. mm current dens ty. suitable indication lamps for - phase supply indication and circuit elreaker - trip indication should be provided. mccbs shall be with door inter ocking protection systems. bus bars shall have coloured pvc sleeves. 800a outgoing shall be used to feed the 430kvar, 415v step-less pf correction system complete all as specified anc directed, the enclosure shall have sturdy support structure with angle supports as necessary. enclosure shall be finished with powder coating, after finishing 10 tanks chemical treatment. paint shed shall be ral-7035. suitable provisions shall be made in the panel for proper heat dissipation. air aspiration louvers for proper air circulation shall be provided as necessary. the step-leiss pf correctior panel system shall be without any pf correction passive capacitor banks, but single or mutiple module combination of static var generator, which can measure the actual requirement of reactive currents and produce and inject the same reactive currents inductive or capacit ve as per the system needs to compensate the reactive power demand individual phase -wise. there shall be one hill cum svg controller digital signal processor to sense the load current and operate the svg modules connected with the svg panel. reaction time of that dsp shall be 10 msec, so that cycle to cycle compensation to be established. the hmi display unit shall have 15channel oscilloscope to display live-status of the 3phase voltage, load current, grid current and svg currents, along with all major electrical pq parameters. svg modules should have efficiency of less than 98 percent and internal losses 2 percent of its full capacity. the svg modules shall have internal fan for heat dissipation by force air cooling method. maximum 50 no.s modules can be connected in parallel per ct set. the svg modules should be operated within the voltage range 350v to 480v. ambient temperature should be 0-45 temp c. noise level shall be 5db. built-in semiconductor-fuse protection for the svg modules is a must. load ct shall have 5a secoridary and in general it will be connected in close loop. full rating of individual static var generator moclule shall be 125kvar, 480v, 1504, which will output 107.8kvar at 415v ac. so, considering the 4nos of modules it will output 431.2kvar at 415v., laid in trenches by pipes by ducts by wall by boarings with necessary cable lugs and glands, nuts, bolts and washers etc and test ng complete all as specified and directed, m and l for brick sub class b 250mm x 115mm x 0.75mm and laid in trenches as in protection of ug cabe complete all as specified and directed, supply and filling in and spreading unwashed river sand for cushioning and covering the uncer ground cables in trenches and punning to provide required cover complete all as specified in ssr part-l and as directed, foundations etc and getting out in soft loose soil complete all as specified and directed., returning filling in soil including spreading leveling watering and well rammimg in layer n exc 25 cm complete all as specified and directed, remnoving excavated soil not exc 50 mtr ant depositing where directed at a level not exc 1.5 mtr above the starting point all as specified and directed, earth pit not less than 2.25 metres deep below ground level with top edge of plate not less than 1.5 metres belcw ground level, connected to and including coper strip of size 20 x 3 mm from earth electrode to test point by equipment or up to 7.5 metres whichever is less by means of bolts, nuts, check nuts and washers all as per electrical plate no 3 of ssr pt-l and gl watering pipe of 20 mm dia medium grade, gi funnel with wire mesh, including charcoal, salt packed all around the earth electrode plate in layers, pcc earth pit chamber 1-3-6 lype c1, rcc cover 1-2-4 type b1, ncluding excavation by earth work in any strata and returning filling, removal of surplus soil anc testing for required value complete all as specified and directed., supply and fixing 25 sqmm interconnecting pvc pipe sets and pipe fittings along with suitable accessories complete all as specified and directed, concrete grade -m25 mix ratio 1-2-1 - cement- sand- aggregate bot om reinforcement 12mm dia. tmt bars placed at - 150mm centre-to-centre spacing in both directions both ways top reinforcement- 10mm dia. tmt bars placed at 200mm centre-to-centre spacing in both directions both ways edge stirrups 8mm dia tmt bars placed at 200mm centre-to-centre spacing in both directions both way formwork proper shuttering to be provided to achieve specified dimensions and line and level. total load 700kg or 6.9kn. cable trench 300mmx300mm and ms chequered plate cover for trench. base plate- ms charinel by flat ismc 100 or 10mm thick plate. curing - minimum 7 cays of water curing or as per is 4-56 recommendat ons plastering over base slab plaster mix cement mortar 1-6 - cement- sand finish- surface to be finished with neat cement punning after plastering as required preparation surface to be cleaned and wetted before application. proper bonding and uniformity to be ensured cutting and mending in brick wall scope- cutting holes in brick walls for service entries pipes, cables, etc. maximum diameter up to 150mm mending work- all damages to be made good using cement mortar cernent consumption approx. 4 kg per meter of hole length as per estimate restoration to match existing finish plaster or paint, its associated systems through periodic inspection, testing, servicing, and emergency support over a period of one year after one year dlp duration one 1 years from the date of completion of dlp. services included scheduled quarterly site visits, visual inspection for overheating, corrosion, physical damage, cleaning of preventive maintenance panels dust, debris, moisture control, tightening of connections and torque testing of terminals, megger testing of insulation resistance, functional test of breakers and rcds corrective maintenance fault finding and diagnosis for reported issues, replacement of defective components, repair of wiring or damaged insulation, troubleshooting tripping or overloads emergency support on-site visit within 48 hours of call define sla clearly documentation and reporting maintenance logs and service reports after each visit annual performance summary report

Latest Tender Detail from indian army for the tender for xlpe cable for working voltage up to and including 1.1 kv marked to is 7098 (part 1) (q2) , supply, installing, testing and commissioning of pdb panel 800a, 415v. the panel shall be indoor wall mounted. it shall be completely made of crca sheet steel. , supply, installing, testing and commissioning of pf correction panel with rms 430kvar, 415v. panel indoor floor mounted, free standing with ip-31 degree of ip made of crca sheet steel. , material and labour for xlpe insulated, lt armoured electric sense cable with aluminiur star ded conductor 1100 volts grade, cross- sectional area 4 sqmm, 6 core , m and l for brick sub class b 250mm x 115mm x 0.75mm and laid in trenches as in protection of ug cabe complete all as specified and directed , supply and filling in and spreading unwashed river sand for cushioning and covering the uncer ground cables in trenches and punning to provide required cover , excavation in trenches not exceeding 1.5 mtr wide and not exc 1.5 mtr depth for laying cif cables, pipe lines, protection pipes , returning filling in soil including spreading leveling watering and well rammimg in layer n exc 25 cm complete all as specified and directed , remnoving excavated soil not exc 50 mtr ant depositing where directed at a level not exc 1.5 mtr above the starting point all as specified and directed , material and labour for earthing complete with copper plate electrode 600mmx 600mmx. 3.1.5 mm thick buriel directely in ground vertically , supply and fixing 25 sqmm interconnecting pvc pipe sets and pipe fittings along with suitable accessories complete all as specified and directed , civil work rcc panel base slab size - 2000mm l x 1300mm w x 150mm thickness , warranty service amc by cmc including breakdown service for 1 year to ensure the safe, reliable, and efficient operation of the electrical panel, provision of solar factor correction for 1 mw solar plant, the enclosure shall have sturdy support structure with angle suppors as necessary. enclosure shall be finished with powder coating, after finishing 10 tanks chemical treatment. paint shed shall be ral-7035. suitable provisions shall be made in the panel for proper heat dissipation. air aspiration louvers for proper air circulation shall be provided as necessary. the panel shall be suitably sized to accommodate all the compor ents, providing necessary air clearance between live and non-live parts, providing necessary working clearance. incomer shall pe al busbars. power outgoing shall be one 800a, 415v, 50ka, tp, mccb, tm. bus bar shall be of aluminium with 0.8a by sq. mm current dens ty. suitable indication lamps for - phase supply indication and circuit elreaker - trip indication should be provided. mccbs shall be with door inter ocking protection systems. bus bars shall have coloured pvc sleeves. 800a outgoing shall be used to feed the 430kvar, 415v step-less pf correction system complete all as specified anc directed, the enclosure shall have sturdy support structure with angle supports as necessary. enclosure shall be finished with powder coating, after finishing 10 tanks chemical treatment. paint shed shall be ral-7035. suitable provisions shall be made in the panel for proper heat dissipation. air aspiration louvers for proper air circulation shall be provided as necessary. the step-leiss pf correctior panel system shall be without any pf correction passive capacitor banks, but single or mutiple module combination of static var generator, which can measure the actual requirement of reactive currents and produce and inject the same reactive currents inductive or capacit ve as per the system needs to compensate the reactive power demand individual phase -wise. there shall be one hill cum svg controller digital signal processor to sense the load current and operate the svg modules connected with the svg panel. reaction time of that dsp shall be 10 msec, so that cycle to cycle compensation to be established. the hmi display unit shall have 15channel oscilloscope to display live-status of the 3phase voltage, load current, grid current and svg currents, along with all major electrical pq parameters. svg modules should have efficiency of less than 98 percent and internal losses 2 percent of its full capacity. the svg modules shall have internal fan for heat dissipation by force air cooling method. maximum 50 no.s modules can be connected in parallel per ct set. the svg modules should be operated within the voltage range 350v to 480v. ambient temperature should be 0-45 temp c. noise level shall be 5db. built-in semiconductor-fuse protection for the svg modules is a must. load ct shall have 5a secoridary and in general it will be connected in close loop. full rating of individual static var generator moclule shall be 125kvar, 480v, 1504, which will output 107.8kvar at 415v ac. so, considering the 4nos of modules it will output 431.2kvar at 415v., laid in trenches by pipes by ducts by wall by boarings with necessary cable lugs and glands, nuts, bolts and washers etc and test ng complete all as specified and directed, m and l for brick sub class b 250mm x 115mm x 0.75mm and laid in trenches as in protection of ug cabe complete all as specified and directed, supply and filling in and spreading unwashed river sand for cushioning and covering the uncer ground cables in trenches and punning to provide required cover complete all as specified in ssr part-l and as directed, foundations etc and getting out in soft loose soil complete all as specified and directed., returning filling in soil including spreading leveling watering and well rammimg in layer n exc 25 cm complete all as specified and directed, remnoving excavated soil not exc 50 mtr ant depositing where directed at a level not exc 1.5 mtr above the starting point all as specified and directed, earth pit not less than 2.25 metres deep below ground level with top edge of plate not less than 1.5 metres belcw ground level, connected to and including coper strip of size 20 x 3 mm from earth electrode to test point by equipment or up to 7.5 metres whichever is less by means of bolts, nuts, check nuts and washers all as per electrical plate no 3 of ssr pt-l and gl watering pipe of 20 mm dia medium grade, gi funnel with wire mesh, including charcoal, salt packed all around the earth electrode plate in layers, pcc earth pit chamber 1-3-6 lype c1, rcc cover 1-2-4 type b1, ncluding excavation by earth work in any strata and returning filling, removal of surplus soil anc testing for required value complete all as specified and directed., supply and fixing 25 sqmm interconnecting pvc pipe sets and pipe fittings along with suitable accessories complete all as specified and directed, concrete grade -m25 mix ratio 1-2-1 - cement- sand- aggregate bot om reinforcement 12mm dia. tmt bars placed at - 150mm centre-to-centre spacing in both directions both ways top reinforcement- 10mm dia. tmt bars placed at 200mm centre-to-centre spacing in both directions both ways edge stirrups 8mm dia tmt bars placed at 200mm centre-to-centre spacing in both directions both way formwork proper shuttering to be provided to achieve specified dimensions and line and level. total load 700kg or 6.9kn. cable trench 300mmx300mm and ms chequered plate cover for trench. base plate- ms charinel by flat ismc 100 or 10mm thick plate. curing - minimum 7 cays of water curing or as per is 4-56 recommendat ons plastering over base slab plaster mix cement mortar 1-6 - cement- sand finish- surface to be finished with neat cement punning after plastering as required preparation surface to be cleaned and wetted before application. proper bonding and uniformity to be ensured cutting and mending in brick wall scope- cutting holes in brick walls for service entries pipes, cables, etc. maximum diameter up to 150mm mending work- all damages to be made good using cement mortar cernent consumption approx. 4 kg per meter of hole length as per estimate restoration to match existing finish plaster or paint, its associated systems through periodic inspection, testing, servicing, and emergency support over a period of one year after one year dlp duration one 1 years from the date of completion of dlp. services included scheduled quarterly site visits, visual inspection for overheating, corrosion, physical damage, cleaning of preventive maintenance panels dust, debris, moisture control, tightening of connections and torque testing of terminals, megger testing of insulation resistance, functional test of breakers and rcds corrective maintenance fault finding and diagnosis for reported issues, replacement of defective components, repair of wiring or damaged insulation, troubleshooting tripping or overloads emergency support on-site visit within 48 hours of call define sla clearly documentation and reporting maintenance logs and service reports after each visit annual performance summary report in north 24 paraganas, west bengal,. Reference number 15286275. Don't miss out on this chance to be part of a significant project. Register for free today to access the complete tender details and download the necessary documents. Seize the opportunity with Tender 18!

T18 Ref No:15286275
Tender ID:GEM/2026/B/7493216
Tender Agency:indian army
City:north 24 paraganas
State:west bengal
Description :total quantity = 1616
Tender Value:Refer Document
Tender EMD:Refer Document
Tender Fee:Refer Document
Published Date:May 08, 2026
Due Date:May 18, 2026
Tender Opening Date:May 18, 2026
T18 Ref No:15286275Tender Value:Refer Document
Tender ID:GEM/2026/B/7493216Tender EMD:Refer Document
Tender Agency:indian armyTender Fee:Refer Document
City:north 24 paraganasPublished Date:May 08, 2026
State:west bengalDue Date:May 18, 2026
Tender Related Keywords :-Tender Opening Date:May 18, 2026
Description :total quantity = 1616
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.

This Government Tender has been Published  by Indian army for work related to in North 24 paraganas, West bengal. The Tender work is tender for xlpe cable for working voltage up to and including 1.1 kv marked to is 7098 (part 1) (q2) , supply, installing, testing and commissioning of pdb panel 800a, 415v. the panel shall be indoor wall mounted. it shall be completely made of crca sheet steel. , supply, installing, testing and commissioning of pf correction panel with rms 430kvar, 415v. panel indoor floor mounted, free standing with ip-31 degree of ip made of crca sheet steel. , material and labour for xlpe insulated, lt armoured electric sense cable with aluminiur star ded conductor 1100 volts grade, cross- sectional area 4 sqmm, 6 core , m and l for brick sub class b 250mm x 115mm x 0.75mm and laid in trenches as in protection of ug cabe complete all as specified and directed , supply and filling in and spreading unwashed river sand for cushioning and covering the uncer ground cables in trenches and punning to provide required cover , excavation in trenches not exceeding 1.5 mtr wide and not exc 1.5 mtr depth for laying cif cables, pipe lines, protection pipes , returning filling in soil including spreading leveling watering and well rammimg in layer n exc 25 cm complete all as specified and directed , remnoving excavated soil not exc 50 mtr ant depositing where directed at a level not exc 1.5 mtr above the starting point all as specified and directed , material and labour for earthing complete with copper plate electrode 600mmx 600mmx. 3.1.5 mm thick buriel directely in ground vertically , supply and fixing 25 sqmm interconnecting pvc pipe sets and pipe fittings along with suitable accessories complete all as specified and directed , civil work rcc panel base slab size - 2000mm l x 1300mm w x 150mm thickness , warranty service amc by cmc including breakdown service for 1 year to ensure the safe, reliable, and efficient operation of the electrical panel, provision of solar factor correction for 1 mw solar plant, the enclosure shall have sturdy support structure with angle suppors as necessary. enclosure shall be finished with powder coating, after finishing 10 tanks chemical treatment. paint shed shall be ral-7035. suitable provisions shall be made in the panel for proper heat dissipation. air aspiration louvers for proper air circulation shall be provided as necessary. the panel shall be suitably sized to accommodate all the compor ents, providing necessary air clearance between live and non-live parts, providing necessary working clearance. incomer shall pe al busbars. power outgoing shall be one 800a, 415v, 50ka, tp, mccb, tm. bus bar shall be of aluminium with 0.8a by sq. mm current dens ty. suitable indication lamps for - phase supply indication and circuit elreaker - trip indication should be provided. mccbs shall be with door inter ocking protection systems. bus bars shall have coloured pvc sleeves. 800a outgoing shall be used to feed the 430kvar, 415v step-less pf correction system complete all as specified anc directed, the enclosure shall have sturdy support structure with angle supports as necessary. enclosure shall be finished with powder coating, after finishing 10 tanks chemical treatment. paint shed shall be ral-7035. suitable provisions shall be made in the panel for proper heat dissipation. air aspiration louvers for proper air circulation shall be provided as necessary. the step-leiss pf correctior panel system shall be without any pf correction passive capacitor banks, but single or mutiple module combination of static var generator, which can measure the actual requirement of reactive currents and produce and inject the same reactive currents inductive or capacit ve as per the system needs to compensate the reactive power demand individual phase -wise. there shall be one hill cum svg controller digital signal processor to sense the load current and operate the svg modules connected with the svg panel. reaction time of that dsp shall be 10 msec, so that cycle to cycle compensation to be established. the hmi display unit shall have 15channel oscilloscope to display live-status of the 3phase voltage, load current, grid current and svg currents, along with all major electrical pq parameters. svg modules should have efficiency of less than 98 percent and internal losses 2 percent of its full capacity. the svg modules shall have internal fan for heat dissipation by force air cooling method. maximum 50 no.s modules can be connected in parallel per ct set. the svg modules should be operated within the voltage range 350v to 480v. ambient temperature should be 0-45 temp c. noise level shall be 5db. built-in semiconductor-fuse protection for the svg modules is a must. load ct shall have 5a secoridary and in general it will be connected in close loop. full rating of individual static var generator moclule shall be 125kvar, 480v, 1504, which will output 107.8kvar at 415v ac. so, considering the 4nos of modules it will output 431.2kvar at 415v., laid in trenches by pipes by ducts by wall by boarings with necessary cable lugs and glands, nuts, bolts and washers etc and test ng complete all as specified and directed, m and l for brick sub class b 250mm x 115mm x 0.75mm and laid in trenches as in protection of ug cabe complete all as specified and directed, supply and filling in and spreading unwashed river sand for cushioning and covering the uncer ground cables in trenches and punning to provide required cover complete all as specified in ssr part-l and as directed, foundations etc and getting out in soft loose soil complete all as specified and directed., returning filling in soil including spreading leveling watering and well rammimg in layer n exc 25 cm complete all as specified and directed, remnoving excavated soil not exc 50 mtr ant depositing where directed at a level not exc 1.5 mtr above the starting point all as specified and directed, earth pit not less than 2.25 metres deep below ground level with top edge of plate not less than 1.5 metres belcw ground level, connected to and including coper strip of size 20 x 3 mm from earth electrode to test point by equipment or up to 7.5 metres whichever is less by means of bolts, nuts, check nuts and washers all as per electrical plate no 3 of ssr pt-l and gl watering pipe of 20 mm dia medium grade, gi funnel with wire mesh, including charcoal, salt packed all around the earth electrode plate in layers, pcc earth pit chamber 1-3-6 lype c1, rcc cover 1-2-4 type b1, ncluding excavation by earth work in any strata and returning filling, removal of surplus soil anc testing for required value complete all as specified and directed., supply and fixing 25 sqmm interconnecting pvc pipe sets and pipe fittings along with suitable accessories complete all as specified and directed, concrete grade -m25 mix ratio 1-2-1 - cement- sand- aggregate bot om reinforcement 12mm dia. tmt bars placed at - 150mm centre-to-centre spacing in both directions both ways top reinforcement- 10mm dia. tmt bars placed at 200mm centre-to-centre spacing in both directions both ways edge stirrups 8mm dia tmt bars placed at 200mm centre-to-centre spacing in both directions both way formwork proper shuttering to be provided to achieve specified dimensions and line and level. total load 700kg or 6.9kn. cable trench 300mmx300mm and ms chequered plate cover for trench. base plate- ms charinel by flat ismc 100 or 10mm thick plate. curing - minimum 7 cays of water curing or as per is 4-56 recommendat ons plastering over base slab plaster mix cement mortar 1-6 - cement- sand finish- surface to be finished with neat cement punning after plastering as required preparation surface to be cleaned and wetted before application. proper bonding and uniformity to be ensured cutting and mending in brick wall scope- cutting holes in brick walls for service entries pipes, cables, etc. maximum diameter up to 150mm mending work- all damages to be made good using cement mortar cernent consumption approx. 4 kg per meter of hole length as per estimate restoration to match existing finish plaster or paint, its associated systems through periodic inspection, testing, servicing, and emergency support over a period of one year after one year dlp duration one 1 years from the date of completion of dlp. services included scheduled quarterly site visits, visual inspection for overheating, corrosion, physical damage, cleaning of preventive maintenance panels dust, debris, moisture control, tightening of connections and torque testing of terminals, megger testing of insulation resistance, functional test of breakers and rcds corrective maintenance fault finding and diagnosis for reported issues, replacement of defective components, repair of wiring or damaged insulation, troubleshooting tripping or overloads emergency support on-site visit within 48 hours of call define sla clearly documentation and reporting maintenance logs and service reports after each visit annual performance summary report. Tender18 Provide this type Government Tender Information on daily basis.


This tender invites eligible contractors, suppliers, manufacturers, consultants, Startups, Msmes, traders and service providers to submit bids for the specified project, supply, service, or work requirement.


Before applying, interested bidders should review the tender scope, eligibility criteria, estimated contract value, important dates, technical requirements, reqired docuent list for bidder and bid submission instructions as per provided in the official tender documents. 


This Verified Information Provide By Tender18 in this page so Bidder Can Easiy  Understanding tender  requirements and bidders can prepare a compliant and competitive tender proposal.

To participate in the tender for xlpe cable for working voltage up to and including 1.1 kv marked to is 7098 (part 1) (q2) , supply, installing, testing and commissioning of pdb panel 800a, 415v. the panel shall be indoor wall mounted. it shall be completely made of crca sheet steel. , supply, installing, testing and commissioning of pf correction panel with rms 430kvar, 415v. panel indoor floor mounted, free standing with ip-31 degree of ip made of crca sheet steel. , material and labour for xlpe insulated, lt armoured electric sense cable with aluminiur star ded conductor 1100 volts grade, cross- sectional area 4 sqmm, 6 core , m and l for brick sub class b 250mm x 115mm x 0.75mm and laid in trenches as in protection of ug cabe complete all as specified and directed , supply and filling in and spreading unwashed river sand for cushioning and covering the uncer ground cables in trenches and punning to provide required cover , excavation in trenches not exceeding 1.5 mtr wide and not exc 1.5 mtr depth for laying cif cables, pipe lines, protection pipes , returning filling in soil including spreading leveling watering and well rammimg in layer n exc 25 cm complete all as specified and directed , remnoving excavated soil not exc 50 mtr ant depositing where directed at a level not exc 1.5 mtr above the starting point all as specified and directed , material and labour for earthing complete with copper plate electrode 600mmx 600mmx. 3.1.5 mm thick buriel directely in ground vertically , supply and fixing 25 sqmm interconnecting pvc pipe sets and pipe fittings along with suitable accessories complete all as specified and directed , civil work rcc panel base slab size - 2000mm l x 1300mm w x 150mm thickness , warranty service amc by cmc including breakdown service for 1 year to ensure the safe, reliable, and efficient operation of the electrical panel, provision of solar factor correction for 1 mw solar plant, the enclosure shall have sturdy support structure with angle suppors as necessary. enclosure shall be finished with powder coating, after finishing 10 tanks chemical treatment. paint shed shall be ral-7035. suitable provisions shall be made in the panel for proper heat dissipation. air aspiration louvers for proper air circulation shall be provided as necessary. the panel shall be suitably sized to accommodate all the compor ents, providing necessary air clearance between live and non-live parts, providing necessary working clearance. incomer shall pe al busbars. power outgoing shall be one 800a, 415v, 50ka, tp, mccb, tm. bus bar shall be of aluminium with 0.8a by sq. mm current dens ty. suitable indication lamps for - phase supply indication and circuit elreaker - trip indication should be provided. mccbs shall be with door inter ocking protection systems. bus bars shall have coloured pvc sleeves. 800a outgoing shall be used to feed the 430kvar, 415v step-less pf correction system complete all as specified anc directed, the enclosure shall have sturdy support structure with angle supports as necessary. enclosure shall be finished with powder coating, after finishing 10 tanks chemical treatment. paint shed shall be ral-7035. suitable provisions shall be made in the panel for proper heat dissipation. air aspiration louvers for proper air circulation shall be provided as necessary. the step-leiss pf correctior panel system shall be without any pf correction passive capacitor banks, but single or mutiple module combination of static var generator, which can measure the actual requirement of reactive currents and produce and inject the same reactive currents inductive or capacit ve as per the system needs to compensate the reactive power demand individual phase -wise. there shall be one hill cum svg controller digital signal processor to sense the load current and operate the svg modules connected with the svg panel. reaction time of that dsp shall be 10 msec, so that cycle to cycle compensation to be established. the hmi display unit shall have 15channel oscilloscope to display live-status of the 3phase voltage, load current, grid current and svg currents, along with all major electrical pq parameters. svg modules should have efficiency of less than 98 percent and internal losses 2 percent of its full capacity. the svg modules shall have internal fan for heat dissipation by force air cooling method. maximum 50 no.s modules can be connected in parallel per ct set. the svg modules should be operated within the voltage range 350v to 480v. ambient temperature should be 0-45 temp c. noise level shall be 5db. built-in semiconductor-fuse protection for the svg modules is a must. load ct shall have 5a secoridary and in general it will be connected in close loop. full rating of individual static var generator moclule shall be 125kvar, 480v, 1504, which will output 107.8kvar at 415v ac. so, considering the 4nos of modules it will output 431.2kvar at 415v., laid in trenches by pipes by ducts by wall by boarings with necessary cable lugs and glands, nuts, bolts and washers etc and test ng complete all as specified and directed, m and l for brick sub class b 250mm x 115mm x 0.75mm and laid in trenches as in protection of ug cabe complete all as specified and directed, supply and filling in and spreading unwashed river sand for cushioning and covering the uncer ground cables in trenches and punning to provide required cover complete all as specified in ssr part-l and as directed, foundations etc and getting out in soft loose soil complete all as specified and directed., returning filling in soil including spreading leveling watering and well rammimg in layer n exc 25 cm complete all as specified and directed, remnoving excavated soil not exc 50 mtr ant depositing where directed at a level not exc 1.5 mtr above the starting point all as specified and directed, earth pit not less than 2.25 metres deep below ground level with top edge of plate not less than 1.5 metres belcw ground level, connected to and including coper strip of size 20 x 3 mm from earth electrode to test point by equipment or up to 7.5 metres whichever is less by means of bolts, nuts, check nuts and washers all as per electrical plate no 3 of ssr pt-l and gl watering pipe of 20 mm dia medium grade, gi funnel with wire mesh, including charcoal, salt packed all around the earth electrode plate in layers, pcc earth pit chamber 1-3-6 lype c1, rcc cover 1-2-4 type b1, ncluding excavation by earth work in any strata and returning filling, removal of surplus soil anc testing for required value complete all as specified and directed., supply and fixing 25 sqmm interconnecting pvc pipe sets and pipe fittings along with suitable accessories complete all as specified and directed, concrete grade -m25 mix ratio 1-2-1 - cement- sand- aggregate bot om reinforcement 12mm dia. tmt bars placed at - 150mm centre-to-centre spacing in both directions both ways top reinforcement- 10mm dia. tmt bars placed at 200mm centre-to-centre spacing in both directions both ways edge stirrups 8mm dia tmt bars placed at 200mm centre-to-centre spacing in both directions both way formwork proper shuttering to be provided to achieve specified dimensions and line and level. total load 700kg or 6.9kn. cable trench 300mmx300mm and ms chequered plate cover for trench. base plate- ms charinel by flat ismc 100 or 10mm thick plate. curing - minimum 7 cays of water curing or as per is 4-56 recommendat ons plastering over base slab plaster mix cement mortar 1-6 - cement- sand finish- surface to be finished with neat cement punning after plastering as required preparation surface to be cleaned and wetted before application. proper bonding and uniformity to be ensured cutting and mending in brick wall scope- cutting holes in brick walls for service entries pipes, cables, etc. maximum diameter up to 150mm mending work- all damages to be made good using cement mortar cernent consumption approx. 4 kg per meter of hole length as per estimate restoration to match existing finish plaster or paint, its associated systems through periodic inspection, testing, servicing, and emergency support over a period of one year after one year dlp duration one 1 years from the date of completion of dlp. services included scheduled quarterly site visits, visual inspection for overheating, corrosion, physical damage, cleaning of preventive maintenance panels dust, debris, moisture control, tightening of connections and torque testing of terminals, megger testing of insulation resistance, functional test of breakers and rcds corrective maintenance fault finding and diagnosis for reported issues, replacement of defective components, repair of wiring or damaged insulation, troubleshooting tripping or overloads emergency support on-site visit within 48 hours of call define sla clearly documentation and reporting maintenance logs and service reports after each visit annual performance summary report, bidders should first download and review all available tender documents. These documents generally include the Notice Inviting Tender (NIT), Bill of Quantities (BOQ), technical specifications, eligibility criteria, scope of work, and bid submission instructions.


Tender Governemnt Authorities like Indian army usually publish these documents on their official eProcurement portals, departmental tender portals, the GeM Tender Portal, or other government procurement platforms or on newspapre. Finding and accessing the correct tender documents across multiple portals can sometimes be time-consuming for bidders. 


To make the process easier, Tender18 provides quick access to the available tender documents related to this North 24 paraganas , West bengal tender on a single page. Businesses involved in related products, services, or works can conveniently download the relevant documents and review the tender requirements without spending time searching across different procurement portals.

The tender for xlpe cable for working voltage up to and including 1.1 kv marked to is 7098 (part 1) (q2) , supply, installing, testing and commissioning of pdb panel 800a, 415v. the panel shall be indoor wall mounted. it shall be completely made of crca sheet steel. , supply, installing, testing and commissioning of pf correction panel with rms 430kvar, 415v. panel indoor floor mounted, free standing with ip-31 degree of ip made of crca sheet steel. , material and labour for xlpe insulated, lt armoured electric sense cable with aluminiur star ded conductor 1100 volts grade, cross- sectional area 4 sqmm, 6 core , m and l for brick sub class b 250mm x 115mm x 0.75mm and laid in trenches as in protection of ug cabe complete all as specified and directed , supply and filling in and spreading unwashed river sand for cushioning and covering the uncer ground cables in trenches and punning to provide required cover , excavation in trenches not exceeding 1.5 mtr wide and not exc 1.5 mtr depth for laying cif cables, pipe lines, protection pipes , returning filling in soil including spreading leveling watering and well rammimg in layer n exc 25 cm complete all as specified and directed , remnoving excavated soil not exc 50 mtr ant depositing where directed at a level not exc 1.5 mtr above the starting point all as specified and directed , material and labour for earthing complete with copper plate electrode 600mmx 600mmx. 3.1.5 mm thick buriel directely in ground vertically , supply and fixing 25 sqmm interconnecting pvc pipe sets and pipe fittings along with suitable accessories complete all as specified and directed , civil work rcc panel base slab size - 2000mm l x 1300mm w x 150mm thickness , warranty service amc by cmc including breakdown service for 1 year to ensure the safe, reliable, and efficient operation of the electrical panel, provision of solar factor correction for 1 mw solar plant, the enclosure shall have sturdy support structure with angle suppors as necessary. enclosure shall be finished with powder coating, after finishing 10 tanks chemical treatment. paint shed shall be ral-7035. suitable provisions shall be made in the panel for proper heat dissipation. air aspiration louvers for proper air circulation shall be provided as necessary. the panel shall be suitably sized to accommodate all the compor ents, providing necessary air clearance between live and non-live parts, providing necessary working clearance. incomer shall pe al busbars. power outgoing shall be one 800a, 415v, 50ka, tp, mccb, tm. bus bar shall be of aluminium with 0.8a by sq. mm current dens ty. suitable indication lamps for - phase supply indication and circuit elreaker - trip indication should be provided. mccbs shall be with door inter ocking protection systems. bus bars shall have coloured pvc sleeves. 800a outgoing shall be used to feed the 430kvar, 415v step-less pf correction system complete all as specified anc directed, the enclosure shall have sturdy support structure with angle supports as necessary. enclosure shall be finished with powder coating, after finishing 10 tanks chemical treatment. paint shed shall be ral-7035. suitable provisions shall be made in the panel for proper heat dissipation. air aspiration louvers for proper air circulation shall be provided as necessary. the step-leiss pf correctior panel system shall be without any pf correction passive capacitor banks, but single or mutiple module combination of static var generator, which can measure the actual requirement of reactive currents and produce and inject the same reactive currents inductive or capacit ve as per the system needs to compensate the reactive power demand individual phase -wise. there shall be one hill cum svg controller digital signal processor to sense the load current and operate the svg modules connected with the svg panel. reaction time of that dsp shall be 10 msec, so that cycle to cycle compensation to be established. the hmi display unit shall have 15channel oscilloscope to display live-status of the 3phase voltage, load current, grid current and svg currents, along with all major electrical pq parameters. svg modules should have efficiency of less than 98 percent and internal losses 2 percent of its full capacity. the svg modules shall have internal fan for heat dissipation by force air cooling method. maximum 50 no.s modules can be connected in parallel per ct set. the svg modules should be operated within the voltage range 350v to 480v. ambient temperature should be 0-45 temp c. noise level shall be 5db. built-in semiconductor-fuse protection for the svg modules is a must. load ct shall have 5a secoridary and in general it will be connected in close loop. full rating of individual static var generator moclule shall be 125kvar, 480v, 1504, which will output 107.8kvar at 415v ac. so, considering the 4nos of modules it will output 431.2kvar at 415v., laid in trenches by pipes by ducts by wall by boarings with necessary cable lugs and glands, nuts, bolts and washers etc and test ng complete all as specified and directed, m and l for brick sub class b 250mm x 115mm x 0.75mm and laid in trenches as in protection of ug cabe complete all as specified and directed, supply and filling in and spreading unwashed river sand for cushioning and covering the uncer ground cables in trenches and punning to provide required cover complete all as specified in ssr part-l and as directed, foundations etc and getting out in soft loose soil complete all as specified and directed., returning filling in soil including spreading leveling watering and well rammimg in layer n exc 25 cm complete all as specified and directed, remnoving excavated soil not exc 50 mtr ant depositing where directed at a level not exc 1.5 mtr above the starting point all as specified and directed, earth pit not less than 2.25 metres deep below ground level with top edge of plate not less than 1.5 metres belcw ground level, connected to and including coper strip of size 20 x 3 mm from earth electrode to test point by equipment or up to 7.5 metres whichever is less by means of bolts, nuts, check nuts and washers all as per electrical plate no 3 of ssr pt-l and gl watering pipe of 20 mm dia medium grade, gi funnel with wire mesh, including charcoal, salt packed all around the earth electrode plate in layers, pcc earth pit chamber 1-3-6 lype c1, rcc cover 1-2-4 type b1, ncluding excavation by earth work in any strata and returning filling, removal of surplus soil anc testing for required value complete all as specified and directed., supply and fixing 25 sqmm interconnecting pvc pipe sets and pipe fittings along with suitable accessories complete all as specified and directed, concrete grade -m25 mix ratio 1-2-1 - cement- sand- aggregate bot om reinforcement 12mm dia. tmt bars placed at - 150mm centre-to-centre spacing in both directions both ways top reinforcement- 10mm dia. tmt bars placed at 200mm centre-to-centre spacing in both directions both ways edge stirrups 8mm dia tmt bars placed at 200mm centre-to-centre spacing in both directions both way formwork proper shuttering to be provided to achieve specified dimensions and line and level. total load 700kg or 6.9kn. cable trench 300mmx300mm and ms chequered plate cover for trench. base plate- ms charinel by flat ismc 100 or 10mm thick plate. curing - minimum 7 cays of water curing or as per is 4-56 recommendat ons plastering over base slab plaster mix cement mortar 1-6 - cement- sand finish- surface to be finished with neat cement punning after plastering as required preparation surface to be cleaned and wetted before application. proper bonding and uniformity to be ensured cutting and mending in brick wall scope- cutting holes in brick walls for service entries pipes, cables, etc. maximum diameter up to 150mm mending work- all damages to be made good using cement mortar cernent consumption approx. 4 kg per meter of hole length as per estimate restoration to match existing finish plaster or paint, its associated systems through periodic inspection, testing, servicing, and emergency support over a period of one year after one year dlp duration one 1 years from the date of completion of dlp. services included scheduled quarterly site visits, visual inspection for overheating, corrosion, physical damage, cleaning of preventive maintenance panels dust, debris, moisture control, tightening of connections and torque testing of terminals, megger testing of insulation resistance, functional test of breakers and rcds corrective maintenance fault finding and diagnosis for reported issues, replacement of defective components, repair of wiring or damaged insulation, troubleshooting tripping or overloads emergency support on-site visit within 48 hours of call define sla clearly documentation and reporting maintenance logs and service reports after each visit annual performance summary report from North 24 paraganas, West bengal may be relevant for contractors, suppliers, vendors, manufacturers, consultants, service providers, startups, MSMEs, and other organizations involved in related products, services, or works. However, eligibility to participate depends on the qualification criteria specified by Indian army in the official tender documents.

Before submitting a bid, interested applicants should carefully review the eligibility conditions, technical requirements, financial criteria, work experience requirements, annual turnover conditions, registrations, certifications, and any other supporting documents required by the tendering authority. The detailed qualification requirements and bidder eligibility criteria are available in the tender notice and related documents provided on this page. 

Ensuring compliance with all eligibility and qualification requirements before bid submission can help bidders avoid disqualification and improve their chances of successful participation in the tender process.

Tende18 provides comprehensive tender bidding services, including a complete tender summary along with a detailed analysis of the Tender Qualification and Eligibility Criteria.

Interested in participating in the tender for xlpe cable for working voltage up to and including 1.1 kv marked to is 7098 (part 1) (q2) , supply, installing, testing and commissioning of pdb panel 800a, 415v. the panel shall be indoor wall mounted. it shall be completely made of crca sheet steel. , supply, installing, testing and commissioning of pf correction panel with rms 430kvar, 415v. panel indoor floor mounted, free standing with ip-31 degree of ip made of crca sheet steel. , material and labour for xlpe insulated, lt armoured electric sense cable with aluminiur star ded conductor 1100 volts grade, cross- sectional area 4 sqmm, 6 core , m and l for brick sub class b 250mm x 115mm x 0.75mm and laid in trenches as in protection of ug cabe complete all as specified and directed , supply and filling in and spreading unwashed river sand for cushioning and covering the uncer ground cables in trenches and punning to provide required cover , excavation in trenches not exceeding 1.5 mtr wide and not exc 1.5 mtr depth for laying cif cables, pipe lines, protection pipes , returning filling in soil including spreading leveling watering and well rammimg in layer n exc 25 cm complete all as specified and directed , remnoving excavated soil not exc 50 mtr ant depositing where directed at a level not exc 1.5 mtr above the starting point all as specified and directed , material and labour for earthing complete with copper plate electrode 600mmx 600mmx. 3.1.5 mm thick buriel directely in ground vertically , supply and fixing 25 sqmm interconnecting pvc pipe sets and pipe fittings along with suitable accessories complete all as specified and directed , civil work rcc panel base slab size - 2000mm l x 1300mm w x 150mm thickness , warranty service amc by cmc including breakdown service for 1 year to ensure the safe, reliable, and efficient operation of the electrical panel, provision of solar factor correction for 1 mw solar plant, the enclosure shall have sturdy support structure with angle suppors as necessary. enclosure shall be finished with powder coating, after finishing 10 tanks chemical treatment. paint shed shall be ral-7035. suitable provisions shall be made in the panel for proper heat dissipation. air aspiration louvers for proper air circulation shall be provided as necessary. the panel shall be suitably sized to accommodate all the compor ents, providing necessary air clearance between live and non-live parts, providing necessary working clearance. incomer shall pe al busbars. power outgoing shall be one 800a, 415v, 50ka, tp, mccb, tm. bus bar shall be of aluminium with 0.8a by sq. mm current dens ty. suitable indication lamps for - phase supply indication and circuit elreaker - trip indication should be provided. mccbs shall be with door inter ocking protection systems. bus bars shall have coloured pvc sleeves. 800a outgoing shall be used to feed the 430kvar, 415v step-less pf correction system complete all as specified anc directed, the enclosure shall have sturdy support structure with angle supports as necessary. enclosure shall be finished with powder coating, after finishing 10 tanks chemical treatment. paint shed shall be ral-7035. suitable provisions shall be made in the panel for proper heat dissipation. air aspiration louvers for proper air circulation shall be provided as necessary. the step-leiss pf correctior panel system shall be without any pf correction passive capacitor banks, but single or mutiple module combination of static var generator, which can measure the actual requirement of reactive currents and produce and inject the same reactive currents inductive or capacit ve as per the system needs to compensate the reactive power demand individual phase -wise. there shall be one hill cum svg controller digital signal processor to sense the load current and operate the svg modules connected with the svg panel. reaction time of that dsp shall be 10 msec, so that cycle to cycle compensation to be established. the hmi display unit shall have 15channel oscilloscope to display live-status of the 3phase voltage, load current, grid current and svg currents, along with all major electrical pq parameters. svg modules should have efficiency of less than 98 percent and internal losses 2 percent of its full capacity. the svg modules shall have internal fan for heat dissipation by force air cooling method. maximum 50 no.s modules can be connected in parallel per ct set. the svg modules should be operated within the voltage range 350v to 480v. ambient temperature should be 0-45 temp c. noise level shall be 5db. built-in semiconductor-fuse protection for the svg modules is a must. load ct shall have 5a secoridary and in general it will be connected in close loop. full rating of individual static var generator moclule shall be 125kvar, 480v, 1504, which will output 107.8kvar at 415v ac. so, considering the 4nos of modules it will output 431.2kvar at 415v., laid in trenches by pipes by ducts by wall by boarings with necessary cable lugs and glands, nuts, bolts and washers etc and test ng complete all as specified and directed, m and l for brick sub class b 250mm x 115mm x 0.75mm and laid in trenches as in protection of ug cabe complete all as specified and directed, supply and filling in and spreading unwashed river sand for cushioning and covering the uncer ground cables in trenches and punning to provide required cover complete all as specified in ssr part-l and as directed, foundations etc and getting out in soft loose soil complete all as specified and directed., returning filling in soil including spreading leveling watering and well rammimg in layer n exc 25 cm complete all as specified and directed, remnoving excavated soil not exc 50 mtr ant depositing where directed at a level not exc 1.5 mtr above the starting point all as specified and directed, earth pit not less than 2.25 metres deep below ground level with top edge of plate not less than 1.5 metres belcw ground level, connected to and including coper strip of size 20 x 3 mm from earth electrode to test point by equipment or up to 7.5 metres whichever is less by means of bolts, nuts, check nuts and washers all as per electrical plate no 3 of ssr pt-l and gl watering pipe of 20 mm dia medium grade, gi funnel with wire mesh, including charcoal, salt packed all around the earth electrode plate in layers, pcc earth pit chamber 1-3-6 lype c1, rcc cover 1-2-4 type b1, ncluding excavation by earth work in any strata and returning filling, removal of surplus soil anc testing for required value complete all as specified and directed., supply and fixing 25 sqmm interconnecting pvc pipe sets and pipe fittings along with suitable accessories complete all as specified and directed, concrete grade -m25 mix ratio 1-2-1 - cement- sand- aggregate bot om reinforcement 12mm dia. tmt bars placed at - 150mm centre-to-centre spacing in both directions both ways top reinforcement- 10mm dia. tmt bars placed at 200mm centre-to-centre spacing in both directions both ways edge stirrups 8mm dia tmt bars placed at 200mm centre-to-centre spacing in both directions both way formwork proper shuttering to be provided to achieve specified dimensions and line and level. total load 700kg or 6.9kn. cable trench 300mmx300mm and ms chequered plate cover for trench. base plate- ms charinel by flat ismc 100 or 10mm thick plate. curing - minimum 7 cays of water curing or as per is 4-56 recommendat ons plastering over base slab plaster mix cement mortar 1-6 - cement- sand finish- surface to be finished with neat cement punning after plastering as required preparation surface to be cleaned and wetted before application. proper bonding and uniformity to be ensured cutting and mending in brick wall scope- cutting holes in brick walls for service entries pipes, cables, etc. maximum diameter up to 150mm mending work- all damages to be made good using cement mortar cernent consumption approx. 4 kg per meter of hole length as per estimate restoration to match existing finish plaster or paint, its associated systems through periodic inspection, testing, servicing, and emergency support over a period of one year after one year dlp duration one 1 years from the date of completion of dlp. services included scheduled quarterly site visits, visual inspection for overheating, corrosion, physical damage, cleaning of preventive maintenance panels dust, debris, moisture control, tightening of connections and torque testing of terminals, megger testing of insulation resistance, functional test of breakers and rcds corrective maintenance fault finding and diagnosis for reported issues, replacement of defective components, repair of wiring or damaged insulation, troubleshooting tripping or overloads emergency support on-site visit within 48 hours of call define sla clearly documentation and reporting maintenance logs and service reports after each visit annual performance summary report issued by Indian army for related work in North 24 paraganas, West bengal? TENDER18 provides complete assistance to help businesses understand tender requirements, access tender documents, review eligibility criteria, qualification requirements, important dates, and bid submission guidelines associated with this tender.

Our Tender18 Expert Technical team can assist with vendor and GeM registration on the relevant departmental, eProcurement, GeM, or government tender portal, preparation of technical and financial bid documents, compliance with qualification criteria, document verification, and complete online tender submission support. Whether you are a contractor, supplier, manufacturer, consultant, startup, or MSME working in the field of , Tender18 can help simplify the tender participation process and support you throughout every stage of bidding for this tender. so that tender18 is one the top leading tender consultant in Inda.

1.

Whom should I contact if I have further queries about the Tender scope?

You can fill out the integrated inquiry form below on this detail page to share your company profile. Our consultancy desk will review your query regarding parameters and guide you on how to coordinate efficiently with the procurement team of Indian army

2.

How can Tender18 assist my business in winning this government contract?

Tender18 provides end-to-end professional bidding support and documentation advisory for tender for xlpe cable for working voltage up to and including 1.1 kv marked to is 7098 (part 1) (q2) , supply, installing, testing and commissioning of pdb panel 800a, 415v. the panel shall be indoor wall mounted. it shall be completely made of crca sheet steel. , supply, installing, testing and commissioning of pf correction panel with rms 430kvar, 415v. panel indoor floor mounted, free standing with ip-31 degree of ip made of crca sheet steel. , material and labour for xlpe insulated, lt armoured electric sense cable with aluminiur star ded conductor 1100 volts grade, cross- sectional area 4 sqmm, 6 core , m and l for brick sub class b 250mm x 115mm x 0.75mm and laid in trenches as in protection of ug cabe complete all as specified and directed , supply and filling in and spreading unwashed river sand for cushioning and covering the uncer ground cables in trenches and punning to provide required cover , excavation in trenches not exceeding 1.5 mtr wide and not exc 1.5 mtr depth for laying cif cables, pipe lines, protection pipes , returning filling in soil including spreading leveling watering and well rammimg in layer n exc 25 cm complete all as specified and directed , remnoving excavated soil not exc 50 mtr ant depositing where directed at a level not exc 1.5 mtr above the starting point all as specified and directed , material and labour for earthing complete with copper plate electrode 600mmx 600mmx. 3.1.5 mm thick buriel directely in ground vertically , supply and fixing 25 sqmm interconnecting pvc pipe sets and pipe fittings along with suitable accessories complete all as specified and directed , civil work rcc panel base slab size - 2000mm l x 1300mm w x 150mm thickness , warranty service amc by cmc including breakdown service for 1 year to ensure the safe, reliable, and efficient operation of the electrical panel, provision of solar factor correction for 1 mw solar plant, the enclosure shall have sturdy support structure with angle suppors as necessary. enclosure shall be finished with powder coating, after finishing 10 tanks chemical treatment. paint shed shall be ral-7035. suitable provisions shall be made in the panel for proper heat dissipation. air aspiration louvers for proper air circulation shall be provided as necessary. the panel shall be suitably sized to accommodate all the compor ents, providing necessary air clearance between live and non-live parts, providing necessary working clearance. incomer shall pe al busbars. power outgoing shall be one 800a, 415v, 50ka, tp, mccb, tm. bus bar shall be of aluminium with 0.8a by sq. mm current dens ty. suitable indication lamps for - phase supply indication and circuit elreaker - trip indication should be provided. mccbs shall be with door inter ocking protection systems. bus bars shall have coloured pvc sleeves. 800a outgoing shall be used to feed the 430kvar, 415v step-less pf correction system complete all as specified anc directed, the enclosure shall have sturdy support structure with angle supports as necessary. enclosure shall be finished with powder coating, after finishing 10 tanks chemical treatment. paint shed shall be ral-7035. suitable provisions shall be made in the panel for proper heat dissipation. air aspiration louvers for proper air circulation shall be provided as necessary. the step-leiss pf correctior panel system shall be without any pf correction passive capacitor banks, but single or mutiple module combination of static var generator, which can measure the actual requirement of reactive currents and produce and inject the same reactive currents inductive or capacit ve as per the system needs to compensate the reactive power demand individual phase -wise. there shall be one hill cum svg controller digital signal processor to sense the load current and operate the svg modules connected with the svg panel. reaction time of that dsp shall be 10 msec, so that cycle to cycle compensation to be established. the hmi display unit shall have 15channel oscilloscope to display live-status of the 3phase voltage, load current, grid current and svg currents, along with all major electrical pq parameters. svg modules should have efficiency of less than 98 percent and internal losses 2 percent of its full capacity. the svg modules shall have internal fan for heat dissipation by force air cooling method. maximum 50 no.s modules can be connected in parallel per ct set. the svg modules should be operated within the voltage range 350v to 480v. ambient temperature should be 0-45 temp c. noise level shall be 5db. built-in semiconductor-fuse protection for the svg modules is a must. load ct shall have 5a secoridary and in general it will be connected in close loop. full rating of individual static var generator moclule shall be 125kvar, 480v, 1504, which will output 107.8kvar at 415v ac. so, considering the 4nos of modules it will output 431.2kvar at 415v., laid in trenches by pipes by ducts by wall by boarings with necessary cable lugs and glands, nuts, bolts and washers etc and test ng complete all as specified and directed, m and l for brick sub class b 250mm x 115mm x 0.75mm and laid in trenches as in protection of ug cabe complete all as specified and directed, supply and filling in and spreading unwashed river sand for cushioning and covering the uncer ground cables in trenches and punning to provide required cover complete all as specified in ssr part-l and as directed, foundations etc and getting out in soft loose soil complete all as specified and directed., returning filling in soil including spreading leveling watering and well rammimg in layer n exc 25 cm complete all as specified and directed, remnoving excavated soil not exc 50 mtr ant depositing where directed at a level not exc 1.5 mtr above the starting point all as specified and directed, earth pit not less than 2.25 metres deep below ground level with top edge of plate not less than 1.5 metres belcw ground level, connected to and including coper strip of size 20 x 3 mm from earth electrode to test point by equipment or up to 7.5 metres whichever is less by means of bolts, nuts, check nuts and washers all as per electrical plate no 3 of ssr pt-l and gl watering pipe of 20 mm dia medium grade, gi funnel with wire mesh, including charcoal, salt packed all around the earth electrode plate in layers, pcc earth pit chamber 1-3-6 lype c1, rcc cover 1-2-4 type b1, ncluding excavation by earth work in any strata and returning filling, removal of surplus soil anc testing for required value complete all as specified and directed., supply and fixing 25 sqmm interconnecting pvc pipe sets and pipe fittings along with suitable accessories complete all as specified and directed, concrete grade -m25 mix ratio 1-2-1 - cement- sand- aggregate bot om reinforcement 12mm dia. tmt bars placed at - 150mm centre-to-centre spacing in both directions both ways top reinforcement- 10mm dia. tmt bars placed at 200mm centre-to-centre spacing in both directions both ways edge stirrups 8mm dia tmt bars placed at 200mm centre-to-centre spacing in both directions both way formwork proper shuttering to be provided to achieve specified dimensions and line and level. total load 700kg or 6.9kn. cable trench 300mmx300mm and ms chequered plate cover for trench. base plate- ms charinel by flat ismc 100 or 10mm thick plate. curing - minimum 7 cays of water curing or as per is 4-56 recommendat ons plastering over base slab plaster mix cement mortar 1-6 - cement- sand finish- surface to be finished with neat cement punning after plastering as required preparation surface to be cleaned and wetted before application. proper bonding and uniformity to be ensured cutting and mending in brick wall scope- cutting holes in brick walls for service entries pipes, cables, etc. maximum diameter up to 150mm mending work- all damages to be made good using cement mortar cernent consumption approx. 4 kg per meter of hole length as per estimate restoration to match existing finish plaster or paint, its associated systems through periodic inspection, testing, servicing, and emergency support over a period of one year after one year dlp duration one 1 years from the date of completion of dlp. services included scheduled quarterly site visits, visual inspection for overheating, corrosion, physical damage, cleaning of preventive maintenance panels dust, debris, moisture control, tightening of connections and torque testing of terminals, megger testing of insulation resistance, functional test of breakers and rcds corrective maintenance fault finding and diagnosis for reported issues, replacement of defective components, repair of wiring or damaged insulation, troubleshooting tripping or overloads emergency support on-site visit within 48 hours of call define sla clearly documentation and reporting maintenance logs and service reports after each visit annual performance summary report . Our senior analysts help you decode the complete project guidelines, manage accurate costing sheets, and complete error-free submissions on the official platform used by Indian army.

3.

What are the main reasons for a technical tender rejection?

Most online bids face rejection during the initial evaluation round due to avoidable errors like uploading blurred document scans, submitting expired DSCs, or missing critical experience papers required for tender for xlpe cable for working voltage up to and including 1.1 kv marked to is 7098 (part 1) (q2) , supply, installing, testing and commissioning of pdb panel 800a, 415v. the panel shall be indoor wall mounted. it shall be completely made of crca sheet steel. , supply, installing, testing and commissioning of pf correction panel with rms 430kvar, 415v. panel indoor floor mounted, free standing with ip-31 degree of ip made of crca sheet steel. , material and labour for xlpe insulated, lt armoured electric sense cable with aluminiur star ded conductor 1100 volts grade, cross- sectional area 4 sqmm, 6 core , m and l for brick sub class b 250mm x 115mm x 0.75mm and laid in trenches as in protection of ug cabe complete all as specified and directed , supply and filling in and spreading unwashed river sand for cushioning and covering the uncer ground cables in trenches and punning to provide required cover , excavation in trenches not exceeding 1.5 mtr wide and not exc 1.5 mtr depth for laying cif cables, pipe lines, protection pipes , returning filling in soil including spreading leveling watering and well rammimg in layer n exc 25 cm complete all as specified and directed , remnoving excavated soil not exc 50 mtr ant depositing where directed at a level not exc 1.5 mtr above the starting point all as specified and directed , material and labour for earthing complete with copper plate electrode 600mmx 600mmx. 3.1.5 mm thick buriel directely in ground vertically , supply and fixing 25 sqmm interconnecting pvc pipe sets and pipe fittings along with suitable accessories complete all as specified and directed , civil work rcc panel base slab size - 2000mm l x 1300mm w x 150mm thickness , warranty service amc by cmc including breakdown service for 1 year to ensure the safe, reliable, and efficient operation of the electrical panel, provision of solar factor correction for 1 mw solar plant, the enclosure shall have sturdy support structure with angle suppors as necessary. enclosure shall be finished with powder coating, after finishing 10 tanks chemical treatment. paint shed shall be ral-7035. suitable provisions shall be made in the panel for proper heat dissipation. air aspiration louvers for proper air circulation shall be provided as necessary. the panel shall be suitably sized to accommodate all the compor ents, providing necessary air clearance between live and non-live parts, providing necessary working clearance. incomer shall pe al busbars. power outgoing shall be one 800a, 415v, 50ka, tp, mccb, tm. bus bar shall be of aluminium with 0.8a by sq. mm current dens ty. suitable indication lamps for - phase supply indication and circuit elreaker - trip indication should be provided. mccbs shall be with door inter ocking protection systems. bus bars shall have coloured pvc sleeves. 800a outgoing shall be used to feed the 430kvar, 415v step-less pf correction system complete all as specified anc directed, the enclosure shall have sturdy support structure with angle supports as necessary. enclosure shall be finished with powder coating, after finishing 10 tanks chemical treatment. paint shed shall be ral-7035. suitable provisions shall be made in the panel for proper heat dissipation. air aspiration louvers for proper air circulation shall be provided as necessary. the step-leiss pf correctior panel system shall be without any pf correction passive capacitor banks, but single or mutiple module combination of static var generator, which can measure the actual requirement of reactive currents and produce and inject the same reactive currents inductive or capacit ve as per the system needs to compensate the reactive power demand individual phase -wise. there shall be one hill cum svg controller digital signal processor to sense the load current and operate the svg modules connected with the svg panel. reaction time of that dsp shall be 10 msec, so that cycle to cycle compensation to be established. the hmi display unit shall have 15channel oscilloscope to display live-status of the 3phase voltage, load current, grid current and svg currents, along with all major electrical pq parameters. svg modules should have efficiency of less than 98 percent and internal losses 2 percent of its full capacity. the svg modules shall have internal fan for heat dissipation by force air cooling method. maximum 50 no.s modules can be connected in parallel per ct set. the svg modules should be operated within the voltage range 350v to 480v. ambient temperature should be 0-45 temp c. noise level shall be 5db. built-in semiconductor-fuse protection for the svg modules is a must. load ct shall have 5a secoridary and in general it will be connected in close loop. full rating of individual static var generator moclule shall be 125kvar, 480v, 1504, which will output 107.8kvar at 415v ac. so, considering the 4nos of modules it will output 431.2kvar at 415v., laid in trenches by pipes by ducts by wall by boarings with necessary cable lugs and glands, nuts, bolts and washers etc and test ng complete all as specified and directed, m and l for brick sub class b 250mm x 115mm x 0.75mm and laid in trenches as in protection of ug cabe complete all as specified and directed, supply and filling in and spreading unwashed river sand for cushioning and covering the uncer ground cables in trenches and punning to provide required cover complete all as specified in ssr part-l and as directed, foundations etc and getting out in soft loose soil complete all as specified and directed., returning filling in soil including spreading leveling watering and well rammimg in layer n exc 25 cm complete all as specified and directed, remnoving excavated soil not exc 50 mtr ant depositing where directed at a level not exc 1.5 mtr above the starting point all as specified and directed, earth pit not less than 2.25 metres deep below ground level with top edge of plate not less than 1.5 metres belcw ground level, connected to and including coper strip of size 20 x 3 mm from earth electrode to test point by equipment or up to 7.5 metres whichever is less by means of bolts, nuts, check nuts and washers all as per electrical plate no 3 of ssr pt-l and gl watering pipe of 20 mm dia medium grade, gi funnel with wire mesh, including charcoal, salt packed all around the earth electrode plate in layers, pcc earth pit chamber 1-3-6 lype c1, rcc cover 1-2-4 type b1, ncluding excavation by earth work in any strata and returning filling, removal of surplus soil anc testing for required value complete all as specified and directed., supply and fixing 25 sqmm interconnecting pvc pipe sets and pipe fittings along with suitable accessories complete all as specified and directed, concrete grade -m25 mix ratio 1-2-1 - cement- sand- aggregate bot om reinforcement 12mm dia. tmt bars placed at - 150mm centre-to-centre spacing in both directions both ways top reinforcement- 10mm dia. tmt bars placed at 200mm centre-to-centre spacing in both directions both ways edge stirrups 8mm dia tmt bars placed at 200mm centre-to-centre spacing in both directions both way formwork proper shuttering to be provided to achieve specified dimensions and line and level. total load 700kg or 6.9kn. cable trench 300mmx300mm and ms chequered plate cover for trench. base plate- ms charinel by flat ismc 100 or 10mm thick plate. curing - minimum 7 cays of water curing or as per is 4-56 recommendat ons plastering over base slab plaster mix cement mortar 1-6 - cement- sand finish- surface to be finished with neat cement punning after plastering as required preparation surface to be cleaned and wetted before application. proper bonding and uniformity to be ensured cutting and mending in brick wall scope- cutting holes in brick walls for service entries pipes, cables, etc. maximum diameter up to 150mm mending work- all damages to be made good using cement mortar cernent consumption approx. 4 kg per meter of hole length as per estimate restoration to match existing finish plaster or paint, its associated systems through periodic inspection, testing, servicing, and emergency support over a period of one year after one year dlp duration one 1 years from the date of completion of dlp. services included scheduled quarterly site visits, visual inspection for overheating, corrosion, physical damage, cleaning of preventive maintenance panels dust, debris, moisture control, tightening of connections and torque testing of terminals, megger testing of insulation resistance, functional test of breakers and rcds corrective maintenance fault finding and diagnosis for reported issues, replacement of defective components, repair of wiring or damaged insulation, troubleshooting tripping or overloads emergency support on-site visit within 48 hours of call define sla clearly documentation and reporting maintenance logs and service reports after each visit annual performance summary report in West bengal.

4.

Can contractors located outside the local region participate in this bid?

Eligibility for outstation bidders depends entirely on the terms set inside the document for tender for xlpe cable for working voltage up to and including 1.1 kv marked to is 7098 (part 1) (q2) , supply, installing, testing and commissioning of pdb panel 800a, 415v. the panel shall be indoor wall mounted. it shall be completely made of crca sheet steel. , supply, installing, testing and commissioning of pf correction panel with rms 430kvar, 415v. panel indoor floor mounted, free standing with ip-31 degree of ip made of crca sheet steel. , material and labour for xlpe insulated, lt armoured electric sense cable with aluminiur star ded conductor 1100 volts grade, cross- sectional area 4 sqmm, 6 core , m and l for brick sub class b 250mm x 115mm x 0.75mm and laid in trenches as in protection of ug cabe complete all as specified and directed , supply and filling in and spreading unwashed river sand for cushioning and covering the uncer ground cables in trenches and punning to provide required cover , excavation in trenches not exceeding 1.5 mtr wide and not exc 1.5 mtr depth for laying cif cables, pipe lines, protection pipes , returning filling in soil including spreading leveling watering and well rammimg in layer n exc 25 cm complete all as specified and directed , remnoving excavated soil not exc 50 mtr ant depositing where directed at a level not exc 1.5 mtr above the starting point all as specified and directed , material and labour for earthing complete with copper plate electrode 600mmx 600mmx. 3.1.5 mm thick buriel directely in ground vertically , supply and fixing 25 sqmm interconnecting pvc pipe sets and pipe fittings along with suitable accessories complete all as specified and directed , civil work rcc panel base slab size - 2000mm l x 1300mm w x 150mm thickness , warranty service amc by cmc including breakdown service for 1 year to ensure the safe, reliable, and efficient operation of the electrical panel, provision of solar factor correction for 1 mw solar plant, the enclosure shall have sturdy support structure with angle suppors as necessary. enclosure shall be finished with powder coating, after finishing 10 tanks chemical treatment. paint shed shall be ral-7035. suitable provisions shall be made in the panel for proper heat dissipation. air aspiration louvers for proper air circulation shall be provided as necessary. the panel shall be suitably sized to accommodate all the compor ents, providing necessary air clearance between live and non-live parts, providing necessary working clearance. incomer shall pe al busbars. power outgoing shall be one 800a, 415v, 50ka, tp, mccb, tm. bus bar shall be of aluminium with 0.8a by sq. mm current dens ty. suitable indication lamps for - phase supply indication and circuit elreaker - trip indication should be provided. mccbs shall be with door inter ocking protection systems. bus bars shall have coloured pvc sleeves. 800a outgoing shall be used to feed the 430kvar, 415v step-less pf correction system complete all as specified anc directed, the enclosure shall have sturdy support structure with angle supports as necessary. enclosure shall be finished with powder coating, after finishing 10 tanks chemical treatment. paint shed shall be ral-7035. suitable provisions shall be made in the panel for proper heat dissipation. air aspiration louvers for proper air circulation shall be provided as necessary. the step-leiss pf correctior panel system shall be without any pf correction passive capacitor banks, but single or mutiple module combination of static var generator, which can measure the actual requirement of reactive currents and produce and inject the same reactive currents inductive or capacit ve as per the system needs to compensate the reactive power demand individual phase -wise. there shall be one hill cum svg controller digital signal processor to sense the load current and operate the svg modules connected with the svg panel. reaction time of that dsp shall be 10 msec, so that cycle to cycle compensation to be established. the hmi display unit shall have 15channel oscilloscope to display live-status of the 3phase voltage, load current, grid current and svg currents, along with all major electrical pq parameters. svg modules should have efficiency of less than 98 percent and internal losses 2 percent of its full capacity. the svg modules shall have internal fan for heat dissipation by force air cooling method. maximum 50 no.s modules can be connected in parallel per ct set. the svg modules should be operated within the voltage range 350v to 480v. ambient temperature should be 0-45 temp c. noise level shall be 5db. built-in semiconductor-fuse protection for the svg modules is a must. load ct shall have 5a secoridary and in general it will be connected in close loop. full rating of individual static var generator moclule shall be 125kvar, 480v, 1504, which will output 107.8kvar at 415v ac. so, considering the 4nos of modules it will output 431.2kvar at 415v., laid in trenches by pipes by ducts by wall by boarings with necessary cable lugs and glands, nuts, bolts and washers etc and test ng complete all as specified and directed, m and l for brick sub class b 250mm x 115mm x 0.75mm and laid in trenches as in protection of ug cabe complete all as specified and directed, supply and filling in and spreading unwashed river sand for cushioning and covering the uncer ground cables in trenches and punning to provide required cover complete all as specified in ssr part-l and as directed, foundations etc and getting out in soft loose soil complete all as specified and directed., returning filling in soil including spreading leveling watering and well rammimg in layer n exc 25 cm complete all as specified and directed, remnoving excavated soil not exc 50 mtr ant depositing where directed at a level not exc 1.5 mtr above the starting point all as specified and directed, earth pit not less than 2.25 metres deep below ground level with top edge of plate not less than 1.5 metres belcw ground level, connected to and including coper strip of size 20 x 3 mm from earth electrode to test point by equipment or up to 7.5 metres whichever is less by means of bolts, nuts, check nuts and washers all as per electrical plate no 3 of ssr pt-l and gl watering pipe of 20 mm dia medium grade, gi funnel with wire mesh, including charcoal, salt packed all around the earth electrode plate in layers, pcc earth pit chamber 1-3-6 lype c1, rcc cover 1-2-4 type b1, ncluding excavation by earth work in any strata and returning filling, removal of surplus soil anc testing for required value complete all as specified and directed., supply and fixing 25 sqmm interconnecting pvc pipe sets and pipe fittings along with suitable accessories complete all as specified and directed, concrete grade -m25 mix ratio 1-2-1 - cement- sand- aggregate bot om reinforcement 12mm dia. tmt bars placed at - 150mm centre-to-centre spacing in both directions both ways top reinforcement- 10mm dia. tmt bars placed at 200mm centre-to-centre spacing in both directions both ways edge stirrups 8mm dia tmt bars placed at 200mm centre-to-centre spacing in both directions both way formwork proper shuttering to be provided to achieve specified dimensions and line and level. total load 700kg or 6.9kn. cable trench 300mmx300mm and ms chequered plate cover for trench. base plate- ms charinel by flat ismc 100 or 10mm thick plate. curing - minimum 7 cays of water curing or as per is 4-56 recommendat ons plastering over base slab plaster mix cement mortar 1-6 - cement- sand finish- surface to be finished with neat cement punning after plastering as required preparation surface to be cleaned and wetted before application. proper bonding and uniformity to be ensured cutting and mending in brick wall scope- cutting holes in brick walls for service entries pipes, cables, etc. maximum diameter up to 150mm mending work- all damages to be made good using cement mortar cernent consumption approx. 4 kg per meter of hole length as per estimate restoration to match existing finish plaster or paint, its associated systems through periodic inspection, testing, servicing, and emergency support over a period of one year after one year dlp duration one 1 years from the date of completion of dlp. services included scheduled quarterly site visits, visual inspection for overheating, corrosion, physical damage, cleaning of preventive maintenance panels dust, debris, moisture control, tightening of connections and torque testing of terminals, megger testing of insulation resistance, functional test of breakers and rcds corrective maintenance fault finding and diagnosis for reported issues, replacement of defective components, repair of wiring or damaged insulation, troubleshooting tripping or overloads emergency support on-site visit within 48 hours of call define sla clearly documentation and reporting maintenance logs and service reports after each visit annual performance summary report. While many public sector projects allow national competitive bidding, certain localized works require local offices or specific registration metrics in North 24 paraganas.

5.

Do I need an active GeM Portal registration to apply for this work?

If this procurement is routed through the central marketplace, an active GeM Seller ID is mandatory to supply items. Tender18 offers complete assistance for brand cataloging, profile creation, and vendor assessment required officially by Indian army

6.

What are the primary legal documents required to submit a valid bid?

To register an eligible bid for these contracts, companies must prepare their core compliance documents. Vendors operating across West bengal must ensure they possess a valid GST registration, permanent account number (PAN), and active Class-3 Digital Signature Certificates.

7.

What products or services are required for this active work?

This public procurement cycle is specifically looking for qualified vendors and suppliers who can provide high-quality solutions. The operational execution, delivery, and deployment of these materials must be managed locally within the North 24 paraganas region.

8.

Where can I review the estimated cost or budget details for this Tender?

The estimated project cost and budget thresholds can be reviewed directly inside the tender document. Bidders can analyze these qualification files to check if their firm meets the financial capability criteria specified for tender for xlpe cable for working voltage up to and including 1.1 kv marked to is 7098 (part 1) (q2) , supply, installing, testing and commissioning of pdb panel 800a, 415v. the panel shall be indoor wall mounted. it shall be completely made of crca sheet steel. , supply, installing, testing and commissioning of pf correction panel with rms 430kvar, 415v. panel indoor floor mounted, free standing with ip-31 degree of ip made of crca sheet steel. , material and labour for xlpe insulated, lt armoured electric sense cable with aluminiur star ded conductor 1100 volts grade, cross- sectional area 4 sqmm, 6 core , m and l for brick sub class b 250mm x 115mm x 0.75mm and laid in trenches as in protection of ug cabe complete all as specified and directed , supply and filling in and spreading unwashed river sand for cushioning and covering the uncer ground cables in trenches and punning to provide required cover , excavation in trenches not exceeding 1.5 mtr wide and not exc 1.5 mtr depth for laying cif cables, pipe lines, protection pipes , returning filling in soil including spreading leveling watering and well rammimg in layer n exc 25 cm complete all as specified and directed , remnoving excavated soil not exc 50 mtr ant depositing where directed at a level not exc 1.5 mtr above the starting point all as specified and directed , material and labour for earthing complete with copper plate electrode 600mmx 600mmx. 3.1.5 mm thick buriel directely in ground vertically , supply and fixing 25 sqmm interconnecting pvc pipe sets and pipe fittings along with suitable accessories complete all as specified and directed , civil work rcc panel base slab size - 2000mm l x 1300mm w x 150mm thickness , warranty service amc by cmc including breakdown service for 1 year to ensure the safe, reliable, and efficient operation of the electrical panel, provision of solar factor correction for 1 mw solar plant, the enclosure shall have sturdy support structure with angle suppors as necessary. enclosure shall be finished with powder coating, after finishing 10 tanks chemical treatment. paint shed shall be ral-7035. suitable provisions shall be made in the panel for proper heat dissipation. air aspiration louvers for proper air circulation shall be provided as necessary. the panel shall be suitably sized to accommodate all the compor ents, providing necessary air clearance between live and non-live parts, providing necessary working clearance. incomer shall pe al busbars. power outgoing shall be one 800a, 415v, 50ka, tp, mccb, tm. bus bar shall be of aluminium with 0.8a by sq. mm current dens ty. suitable indication lamps for - phase supply indication and circuit elreaker - trip indication should be provided. mccbs shall be with door inter ocking protection systems. bus bars shall have coloured pvc sleeves. 800a outgoing shall be used to feed the 430kvar, 415v step-less pf correction system complete all as specified anc directed, the enclosure shall have sturdy support structure with angle supports as necessary. enclosure shall be finished with powder coating, after finishing 10 tanks chemical treatment. paint shed shall be ral-7035. suitable provisions shall be made in the panel for proper heat dissipation. air aspiration louvers for proper air circulation shall be provided as necessary. the step-leiss pf correctior panel system shall be without any pf correction passive capacitor banks, but single or mutiple module combination of static var generator, which can measure the actual requirement of reactive currents and produce and inject the same reactive currents inductive or capacit ve as per the system needs to compensate the reactive power demand individual phase -wise. there shall be one hill cum svg controller digital signal processor to sense the load current and operate the svg modules connected with the svg panel. reaction time of that dsp shall be 10 msec, so that cycle to cycle compensation to be established. the hmi display unit shall have 15channel oscilloscope to display live-status of the 3phase voltage, load current, grid current and svg currents, along with all major electrical pq parameters. svg modules should have efficiency of less than 98 percent and internal losses 2 percent of its full capacity. the svg modules shall have internal fan for heat dissipation by force air cooling method. maximum 50 no.s modules can be connected in parallel per ct set. the svg modules should be operated within the voltage range 350v to 480v. ambient temperature should be 0-45 temp c. noise level shall be 5db. built-in semiconductor-fuse protection for the svg modules is a must. load ct shall have 5a secoridary and in general it will be connected in close loop. full rating of individual static var generator moclule shall be 125kvar, 480v, 1504, which will output 107.8kvar at 415v ac. so, considering the 4nos of modules it will output 431.2kvar at 415v., laid in trenches by pipes by ducts by wall by boarings with necessary cable lugs and glands, nuts, bolts and washers etc and test ng complete all as specified and directed, m and l for brick sub class b 250mm x 115mm x 0.75mm and laid in trenches as in protection of ug cabe complete all as specified and directed, supply and filling in and spreading unwashed river sand for cushioning and covering the uncer ground cables in trenches and punning to provide required cover complete all as specified in ssr part-l and as directed, foundations etc and getting out in soft loose soil complete all as specified and directed., returning filling in soil including spreading leveling watering and well rammimg in layer n exc 25 cm complete all as specified and directed, remnoving excavated soil not exc 50 mtr ant depositing where directed at a level not exc 1.5 mtr above the starting point all as specified and directed, earth pit not less than 2.25 metres deep below ground level with top edge of plate not less than 1.5 metres belcw ground level, connected to and including coper strip of size 20 x 3 mm from earth electrode to test point by equipment or up to 7.5 metres whichever is less by means of bolts, nuts, check nuts and washers all as per electrical plate no 3 of ssr pt-l and gl watering pipe of 20 mm dia medium grade, gi funnel with wire mesh, including charcoal, salt packed all around the earth electrode plate in layers, pcc earth pit chamber 1-3-6 lype c1, rcc cover 1-2-4 type b1, ncluding excavation by earth work in any strata and returning filling, removal of surplus soil anc testing for required value complete all as specified and directed., supply and fixing 25 sqmm interconnecting pvc pipe sets and pipe fittings along with suitable accessories complete all as specified and directed, concrete grade -m25 mix ratio 1-2-1 - cement- sand- aggregate bot om reinforcement 12mm dia. tmt bars placed at - 150mm centre-to-centre spacing in both directions both ways top reinforcement- 10mm dia. tmt bars placed at 200mm centre-to-centre spacing in both directions both ways edge stirrups 8mm dia tmt bars placed at 200mm centre-to-centre spacing in both directions both way formwork proper shuttering to be provided to achieve specified dimensions and line and level. total load 700kg or 6.9kn. cable trench 300mmx300mm and ms chequered plate cover for trench. base plate- ms charinel by flat ismc 100 or 10mm thick plate. curing - minimum 7 cays of water curing or as per is 4-56 recommendat ons plastering over base slab plaster mix cement mortar 1-6 - cement- sand finish- surface to be finished with neat cement punning after plastering as required preparation surface to be cleaned and wetted before application. proper bonding and uniformity to be ensured cutting and mending in brick wall scope- cutting holes in brick walls for service entries pipes, cables, etc. maximum diameter up to 150mm mending work- all damages to be made good using cement mortar cernent consumption approx. 4 kg per meter of hole length as per estimate restoration to match existing finish plaster or paint, its associated systems through periodic inspection, testing, servicing, and emergency support over a period of one year after one year dlp duration one 1 years from the date of completion of dlp. services included scheduled quarterly site visits, visual inspection for overheating, corrosion, physical damage, cleaning of preventive maintenance panels dust, debris, moisture control, tightening of connections and torque testing of terminals, megger testing of insulation resistance, functional test of breakers and rcds corrective maintenance fault finding and diagnosis for reported issues, replacement of defective components, repair of wiring or damaged insulation, troubleshooting tripping or overloads emergency support on-site visit within 48 hours of call define sla clearly documentation and reporting maintenance logs and service reports after each visit annual performance summary report by Indian army

9.

How can I download the official BOQ file for this opportunity?

You can download the commercial Bill of Quantities (BOQ) spreadsheet directly using the secure link provided on this page. The BOQ file contains the item descriptions and rate filling forms officially validated for tender for xlpe cable for working voltage up to and including 1.1 kv marked to is 7098 (part 1) (q2) , supply, installing, testing and commissioning of pdb panel 800a, 415v. the panel shall be indoor wall mounted. it shall be completely made of crca sheet steel. , supply, installing, testing and commissioning of pf correction panel with rms 430kvar, 415v. panel indoor floor mounted, free standing with ip-31 degree of ip made of crca sheet steel. , material and labour for xlpe insulated, lt armoured electric sense cable with aluminiur star ded conductor 1100 volts grade, cross- sectional area 4 sqmm, 6 core , m and l for brick sub class b 250mm x 115mm x 0.75mm and laid in trenches as in protection of ug cabe complete all as specified and directed , supply and filling in and spreading unwashed river sand for cushioning and covering the uncer ground cables in trenches and punning to provide required cover , excavation in trenches not exceeding 1.5 mtr wide and not exc 1.5 mtr depth for laying cif cables, pipe lines, protection pipes , returning filling in soil including spreading leveling watering and well rammimg in layer n exc 25 cm complete all as specified and directed , remnoving excavated soil not exc 50 mtr ant depositing where directed at a level not exc 1.5 mtr above the starting point all as specified and directed , material and labour for earthing complete with copper plate electrode 600mmx 600mmx. 3.1.5 mm thick buriel directely in ground vertically , supply and fixing 25 sqmm interconnecting pvc pipe sets and pipe fittings along with suitable accessories complete all as specified and directed , civil work rcc panel base slab size - 2000mm l x 1300mm w x 150mm thickness , warranty service amc by cmc including breakdown service for 1 year to ensure the safe, reliable, and efficient operation of the electrical panel, provision of solar factor correction for 1 mw solar plant, the enclosure shall have sturdy support structure with angle suppors as necessary. enclosure shall be finished with powder coating, after finishing 10 tanks chemical treatment. paint shed shall be ral-7035. suitable provisions shall be made in the panel for proper heat dissipation. air aspiration louvers for proper air circulation shall be provided as necessary. the panel shall be suitably sized to accommodate all the compor ents, providing necessary air clearance between live and non-live parts, providing necessary working clearance. incomer shall pe al busbars. power outgoing shall be one 800a, 415v, 50ka, tp, mccb, tm. bus bar shall be of aluminium with 0.8a by sq. mm current dens ty. suitable indication lamps for - phase supply indication and circuit elreaker - trip indication should be provided. mccbs shall be with door inter ocking protection systems. bus bars shall have coloured pvc sleeves. 800a outgoing shall be used to feed the 430kvar, 415v step-less pf correction system complete all as specified anc directed, the enclosure shall have sturdy support structure with angle supports as necessary. enclosure shall be finished with powder coating, after finishing 10 tanks chemical treatment. paint shed shall be ral-7035. suitable provisions shall be made in the panel for proper heat dissipation. air aspiration louvers for proper air circulation shall be provided as necessary. the step-leiss pf correctior panel system shall be without any pf correction passive capacitor banks, but single or mutiple module combination of static var generator, which can measure the actual requirement of reactive currents and produce and inject the same reactive currents inductive or capacit ve as per the system needs to compensate the reactive power demand individual phase -wise. there shall be one hill cum svg controller digital signal processor to sense the load current and operate the svg modules connected with the svg panel. reaction time of that dsp shall be 10 msec, so that cycle to cycle compensation to be established. the hmi display unit shall have 15channel oscilloscope to display live-status of the 3phase voltage, load current, grid current and svg currents, along with all major electrical pq parameters. svg modules should have efficiency of less than 98 percent and internal losses 2 percent of its full capacity. the svg modules shall have internal fan for heat dissipation by force air cooling method. maximum 50 no.s modules can be connected in parallel per ct set. the svg modules should be operated within the voltage range 350v to 480v. ambient temperature should be 0-45 temp c. noise level shall be 5db. built-in semiconductor-fuse protection for the svg modules is a must. load ct shall have 5a secoridary and in general it will be connected in close loop. full rating of individual static var generator moclule shall be 125kvar, 480v, 1504, which will output 107.8kvar at 415v ac. so, considering the 4nos of modules it will output 431.2kvar at 415v., laid in trenches by pipes by ducts by wall by boarings with necessary cable lugs and glands, nuts, bolts and washers etc and test ng complete all as specified and directed, m and l for brick sub class b 250mm x 115mm x 0.75mm and laid in trenches as in protection of ug cabe complete all as specified and directed, supply and filling in and spreading unwashed river sand for cushioning and covering the uncer ground cables in trenches and punning to provide required cover complete all as specified in ssr part-l and as directed, foundations etc and getting out in soft loose soil complete all as specified and directed., returning filling in soil including spreading leveling watering and well rammimg in layer n exc 25 cm complete all as specified and directed, remnoving excavated soil not exc 50 mtr ant depositing where directed at a level not exc 1.5 mtr above the starting point all as specified and directed, earth pit not less than 2.25 metres deep below ground level with top edge of plate not less than 1.5 metres belcw ground level, connected to and including coper strip of size 20 x 3 mm from earth electrode to test point by equipment or up to 7.5 metres whichever is less by means of bolts, nuts, check nuts and washers all as per electrical plate no 3 of ssr pt-l and gl watering pipe of 20 mm dia medium grade, gi funnel with wire mesh, including charcoal, salt packed all around the earth electrode plate in layers, pcc earth pit chamber 1-3-6 lype c1, rcc cover 1-2-4 type b1, ncluding excavation by earth work in any strata and returning filling, removal of surplus soil anc testing for required value complete all as specified and directed., supply and fixing 25 sqmm interconnecting pvc pipe sets and pipe fittings along with suitable accessories complete all as specified and directed, concrete grade -m25 mix ratio 1-2-1 - cement- sand- aggregate bot om reinforcement 12mm dia. tmt bars placed at - 150mm centre-to-centre spacing in both directions both ways top reinforcement- 10mm dia. tmt bars placed at 200mm centre-to-centre spacing in both directions both ways edge stirrups 8mm dia tmt bars placed at 200mm centre-to-centre spacing in both directions both way formwork proper shuttering to be provided to achieve specified dimensions and line and level. total load 700kg or 6.9kn. cable trench 300mmx300mm and ms chequered plate cover for trench. base plate- ms charinel by flat ismc 100 or 10mm thick plate. curing - minimum 7 cays of water curing or as per is 4-56 recommendat ons plastering over base slab plaster mix cement mortar 1-6 - cement- sand finish- surface to be finished with neat cement punning after plastering as required preparation surface to be cleaned and wetted before application. proper bonding and uniformity to be ensured cutting and mending in brick wall scope- cutting holes in brick walls for service entries pipes, cables, etc. maximum diameter up to 150mm mending work- all damages to be made good using cement mortar cernent consumption approx. 4 kg per meter of hole length as per estimate restoration to match existing finish plaster or paint, its associated systems through periodic inspection, testing, servicing, and emergency support over a period of one year after one year dlp duration one 1 years from the date of completion of dlp. services included scheduled quarterly site visits, visual inspection for overheating, corrosion, physical damage, cleaning of preventive maintenance panels dust, debris, moisture control, tightening of connections and torque testing of terminals, megger testing of insulation resistance, functional test of breakers and rcds corrective maintenance fault finding and diagnosis for reported issues, replacement of defective components, repair of wiring or damaged insulation, troubleshooting tripping or overloads emergency support on-site visit within 48 hours of call define sla clearly documentation and reporting maintenance logs and service reports after each visit annual performance summary report within the West bengal jurisdiction

10.

How can I find the submission closing date for this contract?

The official timeline and deadline details for tender for xlpe cable for working voltage up to and including 1.1 kv marked to is 7098 (part 1) (q2) , supply, installing, testing and commissioning of pdb panel 800a, 415v. the panel shall be indoor wall mounted. it shall be completely made of crca sheet steel. , supply, installing, testing and commissioning of pf correction panel with rms 430kvar, 415v. panel indoor floor mounted, free standing with ip-31 degree of ip made of crca sheet steel. , material and labour for xlpe insulated, lt armoured electric sense cable with aluminiur star ded conductor 1100 volts grade, cross- sectional area 4 sqmm, 6 core , m and l for brick sub class b 250mm x 115mm x 0.75mm and laid in trenches as in protection of ug cabe complete all as specified and directed , supply and filling in and spreading unwashed river sand for cushioning and covering the uncer ground cables in trenches and punning to provide required cover , excavation in trenches not exceeding 1.5 mtr wide and not exc 1.5 mtr depth for laying cif cables, pipe lines, protection pipes , returning filling in soil including spreading leveling watering and well rammimg in layer n exc 25 cm complete all as specified and directed , remnoving excavated soil not exc 50 mtr ant depositing where directed at a level not exc 1.5 mtr above the starting point all as specified and directed , material and labour for earthing complete with copper plate electrode 600mmx 600mmx. 3.1.5 mm thick buriel directely in ground vertically , supply and fixing 25 sqmm interconnecting pvc pipe sets and pipe fittings along with suitable accessories complete all as specified and directed , civil work rcc panel base slab size - 2000mm l x 1300mm w x 150mm thickness , warranty service amc by cmc including breakdown service for 1 year to ensure the safe, reliable, and efficient operation of the electrical panel, provision of solar factor correction for 1 mw solar plant, the enclosure shall have sturdy support structure with angle suppors as necessary. enclosure shall be finished with powder coating, after finishing 10 tanks chemical treatment. paint shed shall be ral-7035. suitable provisions shall be made in the panel for proper heat dissipation. air aspiration louvers for proper air circulation shall be provided as necessary. the panel shall be suitably sized to accommodate all the compor ents, providing necessary air clearance between live and non-live parts, providing necessary working clearance. incomer shall pe al busbars. power outgoing shall be one 800a, 415v, 50ka, tp, mccb, tm. bus bar shall be of aluminium with 0.8a by sq. mm current dens ty. suitable indication lamps for - phase supply indication and circuit elreaker - trip indication should be provided. mccbs shall be with door inter ocking protection systems. bus bars shall have coloured pvc sleeves. 800a outgoing shall be used to feed the 430kvar, 415v step-less pf correction system complete all as specified anc directed, the enclosure shall have sturdy support structure with angle supports as necessary. enclosure shall be finished with powder coating, after finishing 10 tanks chemical treatment. paint shed shall be ral-7035. suitable provisions shall be made in the panel for proper heat dissipation. air aspiration louvers for proper air circulation shall be provided as necessary. the step-leiss pf correctior panel system shall be without any pf correction passive capacitor banks, but single or mutiple module combination of static var generator, which can measure the actual requirement of reactive currents and produce and inject the same reactive currents inductive or capacit ve as per the system needs to compensate the reactive power demand individual phase -wise. there shall be one hill cum svg controller digital signal processor to sense the load current and operate the svg modules connected with the svg panel. reaction time of that dsp shall be 10 msec, so that cycle to cycle compensation to be established. the hmi display unit shall have 15channel oscilloscope to display live-status of the 3phase voltage, load current, grid current and svg currents, along with all major electrical pq parameters. svg modules should have efficiency of less than 98 percent and internal losses 2 percent of its full capacity. the svg modules shall have internal fan for heat dissipation by force air cooling method. maximum 50 no.s modules can be connected in parallel per ct set. the svg modules should be operated within the voltage range 350v to 480v. ambient temperature should be 0-45 temp c. noise level shall be 5db. built-in semiconductor-fuse protection for the svg modules is a must. load ct shall have 5a secoridary and in general it will be connected in close loop. full rating of individual static var generator moclule shall be 125kvar, 480v, 1504, which will output 107.8kvar at 415v ac. so, considering the 4nos of modules it will output 431.2kvar at 415v., laid in trenches by pipes by ducts by wall by boarings with necessary cable lugs and glands, nuts, bolts and washers etc and test ng complete all as specified and directed, m and l for brick sub class b 250mm x 115mm x 0.75mm and laid in trenches as in protection of ug cabe complete all as specified and directed, supply and filling in and spreading unwashed river sand for cushioning and covering the uncer ground cables in trenches and punning to provide required cover complete all as specified in ssr part-l and as directed, foundations etc and getting out in soft loose soil complete all as specified and directed., returning filling in soil including spreading leveling watering and well rammimg in layer n exc 25 cm complete all as specified and directed, remnoving excavated soil not exc 50 mtr ant depositing where directed at a level not exc 1.5 mtr above the starting point all as specified and directed, earth pit not less than 2.25 metres deep below ground level with top edge of plate not less than 1.5 metres belcw ground level, connected to and including coper strip of size 20 x 3 mm from earth electrode to test point by equipment or up to 7.5 metres whichever is less by means of bolts, nuts, check nuts and washers all as per electrical plate no 3 of ssr pt-l and gl watering pipe of 20 mm dia medium grade, gi funnel with wire mesh, including charcoal, salt packed all around the earth electrode plate in layers, pcc earth pit chamber 1-3-6 lype c1, rcc cover 1-2-4 type b1, ncluding excavation by earth work in any strata and returning filling, removal of surplus soil anc testing for required value complete all as specified and directed., supply and fixing 25 sqmm interconnecting pvc pipe sets and pipe fittings along with suitable accessories complete all as specified and directed, concrete grade -m25 mix ratio 1-2-1 - cement- sand- aggregate bot om reinforcement 12mm dia. tmt bars placed at - 150mm centre-to-centre spacing in both directions both ways top reinforcement- 10mm dia. tmt bars placed at 200mm centre-to-centre spacing in both directions both ways edge stirrups 8mm dia tmt bars placed at 200mm centre-to-centre spacing in both directions both way formwork proper shuttering to be provided to achieve specified dimensions and line and level. total load 700kg or 6.9kn. cable trench 300mmx300mm and ms chequered plate cover for trench. base plate- ms charinel by flat ismc 100 or 10mm thick plate. curing - minimum 7 cays of water curing or as per is 4-56 recommendat ons plastering over base slab plaster mix cement mortar 1-6 - cement- sand finish- surface to be finished with neat cement punning after plastering as required preparation surface to be cleaned and wetted before application. proper bonding and uniformity to be ensured cutting and mending in brick wall scope- cutting holes in brick walls for service entries pipes, cables, etc. maximum diameter up to 150mm mending work- all damages to be made good using cement mortar cernent consumption approx. 4 kg per meter of hole length as per estimate restoration to match existing finish plaster or paint, its associated systems through periodic inspection, testing, servicing, and emergency support over a period of one year after one year dlp duration one 1 years from the date of completion of dlp. services included scheduled quarterly site visits, visual inspection for overheating, corrosion, physical damage, cleaning of preventive maintenance panels dust, debris, moisture control, tightening of connections and torque testing of terminals, megger testing of insulation resistance, functional test of breakers and rcds corrective maintenance fault finding and diagnosis for reported issues, replacement of defective components, repair of wiring or damaged insulation, troubleshooting tripping or overloads emergency support on-site visit within 48 hours of call define sla clearly documentation and reporting maintenance logs and service reports after each visit annual performance summary report are available inside the detailed notification files. Bidders planning to target this contract in North 24 paraganas should check the official portal schedule early to complete their online technical and financial submission well before the closing hours.

Tender Inquiry