Search Tenders
Filters
Reset All
Tender Status
T18 Ref No
All States
All Cities
All Agencies
Tender ID
Due Date
Tender Value
Tender Source (GeM, Cppp & Others)
Tender Type

19Latest Vacuum pump motor repair Tenders List

Latest Vacuum pump motor repair Tenders in India – Verified Leads & Real-Time Insights by Tender18

Finding the right Vacuum pump motor repair tenders in India’s competitive e-procurement ecosystem requires more than just access—it demands accurate data, real-time monitoring, and expert analysis.

At Tender18 Infotech Private Limited, we bring deep industry experience in government procurement to help businesses identify, evaluate, and win Vacuum pump motor repair tenders efficiently. With a centralized platform aggregating 1100+ live tenders, we provide a single, trusted source for opportunities from central, state, and PSU departments.


Real-Time Vacuum pump motor repair Tender Intelligence & Monitoring

Our advanced dashboard delivers actionable insights and structured tender data, enabling you to make faster and smarter bidding decisions.

We categorize Vacuum pump motor repair tenders into:

  • Supply Tenders – BOQs and specifications sourced from GeM and PSUs
  • Service Tenders – NITs and scope of work from CPPP and state portals
  • EPC Projects – Large-scale infrastructure tenders with financial and design data

✔ This structured approach ensures complete transparency and deeper bid analysis before submission.


Comprehensive Sources of Vacuum pump motor repair Tenders

Tender18 acts as a centralized gateway by aggregating tenders from trusted and official sources:

  • Central Government Portals – CPPP, NIC, and Government e-Marketplace (GeM)
  • Railways & Transport – IREPS and Metro Rail projects
  • Power & Energy PSUs – NTPC, ONGC, NHPC, PowerGrid
  • Defense & Strategic Sectors – MES and DRDO tenders
  • State e-Procurement Portals – Gujarat, Maharashtra, Tamil Nadu, UP, and more

✔ Every listing is verified and regularly updated to maintain data accuracy and trust.


Step-by-Step Guide to Participate in Vacuum pump motor repair Tenders

1. Eligibility & Prequalification

Before bidding, ensure compliance with:

  • Financial turnover requirements (30–50% of tender value)
  • Past experience (2–3 similar projects)
  • Valid solvency certificate

2. Mandatory Documentation Checklist

Prepare the following to avoid disqualification:

  • Digital Signature Certificate (Class 3 DSC)
  • GST, PAN, MSME/Udyam registration
  • EMD (Earnest Money Deposit) or exemption proof
  • Technical bid with execution methodology

3. BOQ Analysis & Financial Bidding

The BOQ (Bill of Quantities) is the most critical component:

  • Analyze item-wise pricing
  • Ensure competitive yet sustainable quotes
  • Avoid underbidding risks (L1 pressure)

✔ Expert analysis can significantly improve your bid success ratio.


Why Tender18 is a Trusted Platform for Vacuum pump motor repair Tenders

✔ Proven Expertise in Government Procurement

We combine industry knowledge with practical bidding experience.

✔ Verified & Reliable Data

All Vacuum pump motor repair tenders are sourced from official portals and cross-checked for accuracy.

✔ Advanced Filtering Tools

Filter tenders by value, EMD, location, and category for precise targeting.

✔ Corrigendum & Update Tracking

Get instant alerts on deadline changes and specification updates.

✔ Historical Data Insights

Analyze past tender results to understand pricing trends and competition.

✔ End-to-End Bidding Support

From discovery to submission, including GeM onboarding and strategy.


Growth of Vacuum pump motor repair Sector in 2026

With the Government of India focusing on digital procurement and infrastructure expansion, the Vacuum pump motor repair sector has seen significant growth in e-tendering opportunities.

The rise of GeM-based procurement models like:

  • L1 Purchase
  • Direct Procurement
  • MSME-friendly policies

…has made it easier for startups and SMEs to participate and win contracts


Frequently Asked Questions (SEO Optimized)

How can I get daily Vacuum pump motor repair tender alerts?

You can register on Tender18 and select your preferred category. You will receive daily email alerts with all new Vacuum pump motor repair tenders.

Is EMD mandatory for all Vacuum pump motor repair tenders?

No, MSME and Udyam-registered businesses may get exemptions. Always check the NIT for specific conditions.

What is the difference between a Vacuum pump motor repair work tender and supply tender?

A supply tender involves delivering goods, while a work tender includes execution, labor, and project completion.

Can I access private Vacuum pump motor repair tenders on Tender18?

Yes, we also track major private sector and EPC tenders along with government opportunities.


Get Expert Support for Vacuum pump motor repair Tenders

Tender18 is more than a listing platform—we are your strategic partner in winning tenders.

Our services include:

  • Tender discovery & analysis
  • Documentation support
  • Bid strategy & submission
  • GeM registration & OEM onboarding

📞 Call / WhatsApp: +91 7069661818
🌐 Website: www.tender18.com

Due Date
T18 Ref No : 16724649
Location : songadh , gujarat
Source : GEM Tenders
LIVE TENDER
tender for special repair no. 1 supply of vane wheel impeller 1st stage part no 2t i 120 582 1 as spare of water ring type vacuum pump with make model serial as per specification attach , special repair no. 2 supply of control disc exhaust side part no 2t f 120 431 e as spare of water ring type vacuum pump with make model serial no. as per specification attach , special repair no. 3 supply of bearing case part no 2t i 120 247 r as spare of water ring type vacuum pump with make model serial no. ms airovac pump and engg. pvt. ltd as per specification attach , special repair no. 4 supply of shaft part no 2t f 120 763 as spare of water ring type vacuum pump with make model serial no. m s airovac pump and engg. pvt. ltd as per specification attach , special repair no. 5 supply of mechanical seal whole assembly part no 2t f 120 423 as spare of water ring type vacuum pump with make model serial no.as per specification attach , special repair no. 6 supply of vane wheel impeller 2nd stage part no 2t ii 120 582 2 as spare of water ring type vacuum pump with make model serial no. as per specification attach , special repair no. 7 supply of intermediate disc s and e set part no 2t f 120 433 as spare of water ring type vacuum pump with make model serial no. as per specification attach , special repair no. 8 supply of sleeve 2 nd stage part no 2t ii 120 761 2 as spare of water ring type vacuum pump with make model serial no. as per specification attach , special repair no. 9 supply of distance piece part no 2t f 120 253 3 as spare of water ring type vacuum pump with make model serial no. as per specification attach , special repair no. 10 supply of control disc suction side part no 2t f 120 432 s as spare of water ring type vacuum pump with make model serial no. as per specification attach , special repair no. 11 supply of complete water ring type vacuum pump assembly model 2t 50 d spl bare pump without motor as per specification attach , special repair no. 12 supply of sleeve 1st stage part no. 2t i 120 761 1 as spare of water ring type vacuum pump with make model serial no. as per specification attach, spare part of water ring, special repair no. 1 supply of vane wheel impeller 1st stage part no 2t i 120 582 1 as spare of water ring type vacuum pump with make model serial as per specification attach, special repair no. 2 supply of control disc exhaust side part no 2t f 120 431 e as spare of water ring type vacuum pump with make model serial no. as per specification attach, special repair no. 3 supply of bearing case part no 2t i 120 247 r as spare of water ring type vacuum pump with make model serial no. ms airovac pump and engg. pvt. ltd as per specification attach, special repair no. 4 supply of shaft part no 2t f 120 763 as spare of water ring type vacuum pump with make model serial no. m s airovac pump and engg. pvt. ltd as per specification attach, special repair no. 5 supply of mechanical seal whole assembly part no 2t f 120 423 as spare of water ring type vacuum pump with make model serial no. ms airovac pump and engg. pvt. ltd as per specification attach, special repair no. 6 supply of vane wheel impeller 2nd stage part no 2t ii 120 582 2 as spare of water ring type vacuum pump with make model serial no. as per specification attach, special repair no. 7 supply of intermediate disc s and e set part no 2t f 120 433 as spare of water ring type vacuum pump with make model serial no. as per specification attach, special repair no. 8 supply of sleeve 2 nd stage part no 2t ii 120 761 2 as spare of water ring type vacuum pump with make model serial no. ms airovac pump and engg. pvt. ltd 2t as per specification attach, special repair no. 9 supply of distance piece part no 2t f 120 253 3 as spare of water ring type vacuum pump with make model serial no. as per specification attach, special repair no. 10 supply of control disc suction side part no 2t f 120 432 s as spare of water ring type vacuum pump with make model serial no. ms airovac pump and engg. pvt. ltd as per specification attach, special repair no. 11 supply of complete water ring type vacuum pump assembly model 2t 50 d spl bare pump without motor as per specification attach, special repair no. 12 supply of sleeve 1st stage part no. 2t i 120 761 1 as spare of water ring type vacuum pump with make model serial no. ms airovac pump and engg. pvt. ltd 2 as per specification attach
T18 Ref No : 16764151
Source : GEM Tenders
LIVE TENDER
tender for st020011889 diaphragm 20nb with part no. p33dv1052n for vam with model no. tac s2 e3 make thermax ltd , st020011890 diaphragm 25nb with part no. p33dv1043n for vam with model no. tac s2 e3 make thermax ltd , co160140002 lithium bromide moly with part no. p620910023 for vam with model no. tac s2 e3 make thermax ltd , co160320004 lithium hydroxide with part no. p620960031 for vam with model no. tac s2 e3 make thermax ltd , st020211968 service valve cap assembly consisting of spindle end cap dead plug,spindle lock etc. with part no. c007130740 for vam with model no. tac s2 e3 make thermax ltd , st020011895 sight glass with part no. rm01c01006 for vam with model no. tac s2 e3 make thermax ltd , st020011888 vacuum pump ivp.t 180m with motor with part no. p01v01002i for vam with model no. tac s2 e3 make thermax ltd , st020211969 vacuum pump kit with vanes for ivp.t 180 with part no. p01vspvn18 for vam with model no. tac s2 e3 make thermax ltd , cs010190165 absorbent pump with part no. p01a01006t for vam with model no. tac s2 e3 make thermax ltd , st020211963 refrigerant pump with part no. p01r01004t for vam with model no. tac s2 e3 make thermax ltd , st020211964 absorbent pump repair kit with part no. p01asp017t for vam with model no. tac s2 e3 make thermax ltd , st020211967 refrigerant pump repair kit with part no. p01asp020t for vam with model no. tac s2 e3 make thermax ltd , st020211965 electric tube cleaning machine along with repair kit suitable for 6.4mm up to 25.4mm tube id and 2 mtr up to 25mtr long tube length part no. p99m02764m for vam with model no. tac s2 e3 , st020211966 complete assembly of magnetic filter 2inch along with all requisite fittings housing piping etc with part no. cpsrv00009 for vam with model no. tac s2 e3 make thermax ltd, vam spares, as per technical data sheet

Unlock Full Tender Access

Start Free Trial to download documents before deadline

T18 Ref No : 16257263
Source : GEM Tenders
corrigendum tender for erection and fabrication work b 1 , erection and fabrication work b 2 , erection and fabrication work b 3 , erection and fabrication work b 4 , erection and fabrication work b 5 , erection and fabrication work b 6 , erection and fabrication work b 7 , erection and fabrication work b 8 , erection and fabrication work b 9 , erection and fabrication work b 10 , erection and fabrication work b 11 , erection and fabrication work b 12 , erection and fabrication work b 13 , erection and fabrication work b 14 , erection and fabrication work b 15 , erection and fabrication work b 16 , erection and fabrication work b 17 , erection and fabrication work b 18 , erection and fabrication work b 19 , erection and fabrication work b 20 , erection and fabrication work b 21 , erection and fabrication work b 22 , erection and fabrication work b 23 , erection and fabrication work b 24 , erection and fabrication work b 25 , erection and fabrication work b 26 , erection and fabrication work b 27 , erection and fabrication work b 28 , erection and fabrication work b 29 , erection and fabrication work b 30 , erection and fabrication work b 31 , erection and fabrication work b 32 , erection and fabrication work b 33 , erection and fabrication work b 34 , erection and fabrication work b 35 , erection and fabrication work b 36 , erection and fabrication work b 37 , erection and fabrication work b 38 , erection and fabrication work b 39 , erection and fabrication work b 40 , erection and fabrication work b 41 , erection and fabrication work b 42 , erection and fabrication work b 43 , erection and fabrication work b 44 , erection and fabrication work b 45 , erection and fabrication work b 46 , erection and fabrication work b 47 , erection and fabrication work b 48 , erection and fabrication work b 49 , erection and fabrication work b 50 , erection and fabrication work b 51 , erection and fabrication work b 52 , erection and fabrication work b 53 , erection and fabrication work b 54, erection and fabrication work b, cut out and remove the damaged plate; fabricate and installation a new 10 mm plate in its place, and provide support by installing angle channels beneath the bottom. dismantle and lower the clarifier coil; clean it, replace corroded flanges/pipes, refit the coil, and drill holes according to specifications. cut out and remove the corroded mud scraper plate from the clarifier; fabricate and installation a new plate, fit the scraper, and conduct a trial run. dismantle the weak mud scraper pipes in the clarifier, installation new pipes, and mount the mud scraper assembly. installation an 800/900 mm diameter rubber-seated angle valve in the steam/vapour lines of the quad, semi-kestner, and vapour cell units as directed, and conduct a leak-proof trial. to completely re-tube the quad body, cut and lower the calandria's bottom saucer; after fitting the tubes and conducting a hydraulic test on the calandria, weld the bottom saucer (internally and externally) to ensure it is leak-proof, and perform water and vacuum trials. dismantle corroded or weak vapour/exhaust steam lines associated with the semi-kestner, vapour cell, quad bodies, and pans; fabricate new lines using 8.0/10.0 mm thick m.s. plate based on original specifications, erect the new lines, perform leak-proof welding, and conduct successful water and steam trials. cut out and remove corroded/weak juice distributors or down-take pipes in the quad bodies and installation newly fabricated replacements. cut out and remove corroded/weak manholes from pans, doors, sulphur furnaces, quad bodies, cells, and bottom saucers, and installation newly fabricated manholes based on original specifications. dismantle and remove corroded/weak umbrellas from the semi-kestner, vapour cell, quad bodies, and pans; fabricate new umbrellas according to original specifications and erect them with necessary supports. for the vapour pipes of pans and quads, provide external reinforcement using m.s. -material of 900 to 1100 mm diameter... fabricate and installation t-rings made of plate or angle iron; cut out and remove corroded or weak ammonia gas headers from the quad bodies; fabricate and erect new headers; installation nipples, valves, flanges, etc., and conduct a leak-proof trial; remove weak shells from the semi-kestner, vapour cell, and quad bodies; fabricate new ones to specifications, erect them in place, and conduct a leak-proof trial; dismantle the weak vapour pipe located between the evaporator quad bodies; fabricate and installation a new vapour pipe (600, 700, or 800 mm diameter) using new or existing plate; perform leak-proof welding and conduct a water trial; cut out and remove leaky or weak external catchers from the evaporator and pan vapour pipes; fabricate new catchers (including internals) based on samples, fit them in place, perform leak-proof welding, and conduct successful water-filling/vacuum trials; remove the top plate of the external catcher on the evaporator and pan vapour pipes to carry out necessary repairs on weak internals, cones, or shells; reinstall the top plate, perform leak-proof welding, and conduct successful water-filling/vacuum trials; cut out and remove the corroded or weak agitator of the 10" x 20" vacuum filter; fabricate a new one based on the old design, fit it in place, and conduct a successful trial; cut out and remove the corroded or weak agitator of the 8" x 16" vacuum filter; fabricate a new one based on the old design, fit it in place, and conduct a successful trial; cut out and remove the corroded or weak mud tray of the vacuum filter; fabricate a new mud tray using new or existing plate and fit it in place; replace the corroded or weak side plate of the vacuum filter and conduct a satisfactory water trial; cut out and remove the corroded or weak agitator section of the 10" x 20" vacuum filter and carry out necessary repairs based on the old design; cut out and remove the weak tapered cone of the 40-ton capacity pan. fabricate and installation a replacement using a new 12/16 mm plate, following the sample; restore all connections to their original state, ensure leak-proof welding, and conduct successful water-filling and vacuum trials. cut out and remove corroded or weak agitator sections of the 8-inch x 16-inch vacuum filter and carry out necessary repairs as per the original specifications. dismantle the bagasse silo cyclone at the vacuum filter station, replace corroded sections, perform necessary repairs, reinstall it in its original position, and restore all connections. cut out and remove the corroded or weak shell of the mud mixer; fabricate a new shell (using new or existing plate material), installation it in place, and conduct a successful trial. cut out and remove corroded or weak mud discharge chutes located at the discharge end of the mud conveyor belts; fabricate and installation replacements using existing plate material and conduct a trial. dismantle and remove corroded or weak condenser bottles from the vacuum filters; fabricate and installation new ones based on the sample and conduct a successful vacuum trial. in the boiling house, remove the foundation bolts/beds of corroded or weak pumps and construct new channel-based beds; installation new foundation bolts into the pits prepared by the civil team to create these new channel beds; mount the pump and motor, complete the necessary connections and alignment, and conduct a satisfactory trial. installation supports made from old m.s. pipes for the so2 gas lines.

Unlock Full Tender Access

Start Free Trial to download documents before deadline

T18 Ref No : 16239051
Source : GEM Tenders
corrigendum tender for fabrication repairing the condensate tank pump delivery line of the pan 1 , repairing the condensate tank pump delivery line of the pan 2 , repairing the condensate tank pump delivery line of the pan 3 , replacing damaged bypass line band flange of melter 1 , replacing damaged bypass line band flange of melter 2 , replacing damaged bypass line band flange of melter 3 , replace damaged 100 pound 3inch size pipeline from pan no 1 to pan no 6 and give satisfactory trial , replace the weak vapor pipe from pan no 1 to 6 size dia 1 150 m length 30 m 1 , replace the weak vapor pipe from pan no 1 to 6 size dia 1 150 m length 30 m 2 , replace main hole dia 600 mm of pan no 3 sevual with 10 mm thick plate , replace damaged overflow pipeline of bh and cl molasses conditioner of 6inch size 1 , replace damaged overflow pipeline of bh and cl molasses conditioner of 6inch size 2 , replace corroded nipples pipes flanges of 6inch size header on pan no 5 and 6 installation related nipples valves etc and give satisfactory trial , replace damaged ammonia pipeline flange nipple in pan no 4 and 6 1 , replace damaged ammonia pipeline flange nipple in pan no 4 and 6 2 , replace damaged ammonia pipeline flange nipple in pan no 4 and 6 3 , replace damaged ammonia pipeline flange nipple in pan no 4 and 6 4 , replace damaged ammonia pipeline flange nipple in pan no 4 and 6 5 , cut and remove damaged wash-out line installed on the pan and rebuild with supplied pipe and installation it 1 , cut and remove damaged wash-out line installed on the pan and rebuild with supplied pipe and installation it 2 , replace damaged washing pipeline nipple flange band on pan no 6 1 , replace damaged washing pipeline nipple flange band on pan no 6 2 , replace damaged washing pipeline nipple flange band on pan no 6 3 , replace damaged washing pipeline nipple flange band on pan no 6 4 , installation valve in steam line at pan no 2 550 mm 1 , installation valve in steam line at pan no 2 550 mm 2 , installation valve in steam line at pan no 2 550 mm 3 , installation valve in steam line at pan no 2 550 mm 4 , replace nipple and band of a heavy tank 2 , replace nipple and band of a heavy tank 3 , replace nipple and band of a heavy tank 4 , remove clean and reinstall 4inch size syrup line on pan , cut and remove syrup header and fabricate and installation new header , replacing the 6inch size glycol washing line fitted on pan no 1 , replacing nipples of different lines of pan no 6 1 , replacing nipples of different lines of pan no 6 2 , replacing nipples of different lines of pan no 6 3 , replacing nipples of different lines of pan no 6 4 , replacing 10inch size nipples of cut off line of pan no 6 1 , replacing 10inch size nipples of cut off line of pan no 6 2 , replacing 10inch size nipples of cut off line of pan no 6 3 , replacing 10inch size nipples of cut off line of pan no 6 4 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 1 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 2 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 3 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 4 , fabricating m s bed for syrup pump and motor fitting and alignment followed by satisfactory trial , dismantling weak condensate bottle of old set , replacing weak pipeline flange valve and band of old set vertical juice heater 1 , replacing weak pipeline flange valve and band of old set vertical juice heater 2 , replacing weak pipeline flange valve and band of old set vertical juice heater 3 , replacing weak pipeline flange valve and band of old set vertical juice heater 4 , replacing weak pipeline flange valve and band of old set vertical juice heater 5 , replacing weak pipeline of old quad set no 4 1 , replacing weak pipeline of old quad set no 4 2 , replacing weak pipeline of old quad set no 4 3 , replacing weak pipeline of old quad set no 4 4 , replacing weak pipeline of old quad set no 4 5 , dismantling damaged mesh of section pipe located at injection no 2 and 3 and making a new one from given m s plate and fitting it , cutting and discarding old damaged reducer plate of section pipe located at injection no 2 and 3 and remaking the same , fitting water line from overhead to service tank 1 , fitting water line from overhead to service tank 2 , details of work of canti machine no 6 and 7 1 , details of work of canti machine no 6 and 7 2 , details of work of canti machine no 6 and 7 3 , details of work with new pipes from s sugarbin 1 , details of work with new pipes from s sugarbin 2 , details of work with new pipes from s sugarbin 3 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 1 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 2 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 3 , work on hot water line of brown sugar magma 1 , work on hot water line of brown sugar magma 2 , work on hot water line of brown sugar magma 3 , work on hot water line of brown sugar magma 4 , cutting and removing damaged monitor casing and ribs , cutting and removing damaged center shaft and arms inside kcp machines no 1 and 2 bending and fitting new parts with 8 to 10 mm plate , dismantling damaged upper cover part of canty machine no 6 and 7 scrapping fabricating and fitting new cover with 12 mm plate and making all related connections , dismantling damaged part of molasses weighing scale receiving tank and fabricating and fitting new part by bending 8 mm thick, fabrication, fabricate and installation 6inch size nipple, fabricate and installation 6inch size flange, dismantling 6inch size pipeline, installing 6inch size pipeline and giving satisfactory trial, fabricate and installation 6inch size band, replace damaged 100 pound 3inch size pipeline from pan no 1 to pan no 6 and give satisfactory trial, dismantle the weak vapor pipe from pan no 1 to 6, fabricate the weak vapor pipe from pan no 1 to 6, replace main hole dia 600 mm of pan no 3 sevual with 10 mm thick plate, replace damaged overflow pipeline of bh and cl molasses conditioner of 6inch size, replace corroded nipples pipes flanges of 6inch size header on pan no 5 and 6 installation related nipples valves etc and give satisfactory trial, replace 2inch size pipeline, fabricate and installation 2inch size flange, fabricate and installation 2inch size nipple, fabricate and installation 3inch size flange, fabricate and installation 3inch size valve, replace and installation 6inch size pipeline, replace 6inch size pipeline of the above, installation valve in steam line at pan no 2 550 mm, installation flange in steam line at pan no 2 550 mm, installation nipple in steam line at pan no 2 550 mm, fabricate and installation catcher element size 75 x 75 x 8 angle on pan no 4 and 5, replace nipples of the above tank, replace bands of the above tank, replace partition of syrup tank with 10/12 mm thick plate, remove clean and reinstall 4inch size syrup line on pan, cut and remove syrup header and fabricate and installation new header, replacing the 6inch size glycol washing line fitted on pan no 1, replacing nipples of 2inch size line mentioned above, replacing nipples of 4inch size line mentioned above, replacing nipples of 6inch size line mentioned above, replacing nipples of 8inch size line mentioned above, replacing 10inch size nipples of cut off line of pan no 6, replacing 10inch size pipe line, making and fitting 10inch size flange, making and fitting 10inch size band, making and fitting 8inch size band, replacing 4inch size pipe line, making and fitting 4inch size flange, making and fitting 4inch size valve, fabricating m s bed for syrup pump and motor fitting and alignment followed by satisfactory trial, dismantling weak condensate bottle of old set vertical line juice heater and quad body no 4 disposing to scrap yard fabricating all connections using 8/10 mm plates and giving satisfactory vacuum trial, replacing 2inch size pipeline, replacing 6inch size pipeline, making and fitting 2inch size flange, making and fitting 6inch size flange, making and fitting 6inch size band, making and fitting 6inch size valve, dismantling damaged mesh of section pipe located at injection no 2 and 3 and making a new one from given m s plate and fitting it, cutting and discarding old damaged reducer plate of section pipe located at injection no 2 and 3 and remaking the same, fitting mentioned line into service tank, making and fitting 8inch size nipple, dismantling and fitting 6inch size pipeline, dismantling resistance box installed on spray making and fitting new one from given m m plate carrying out proper stay fitting and welding and conducting leak proof trial, dismantling and installing 8inch size pipeline, fabricating and installing 8inch size bands, fabricating and installing 8inch size flanges, dismantling and installing 12inch size pipeline, fabricating and installing 12inch size bands, fabricating and installing 12inch size flanges, dismantling and installing 3inch size pipeline, manufacturing and installing 3inch size nipples, manufacturing and installing 3inch size bands, cutting and removing damaged monitor casing and ribs inside canty no 1 and 2 and kcp machine 1 and 2 patching with 10/12 mm ms plate and giving satisfactory trial 1, cutting and removing damaged center shaft and arms inside kcp machines no 1 and 2 bending and fitting new parts with 8 to 10 mm plate 1, dismantling damaged upper cover part of canty machine no 6 and 7 scrapping fabricating and fitting new cover with 12 mm plate and making all related connections, dismantling damaged part of molasses weighing scale receiving tank and fabricating and fitting new part by bending 8 mm thick plate and depositing scrap in scrap yard, dismantling damaged plate of sugar discharge chute from sugar elevator to sugar grader and fabricating and fitting new plate of 6 mm thickness depositing scrap in scrap yard, modifying sugar chute of grader in dryer house and giving satisfactory trial, dismantling and installing 4inch size pipeline, fabricating and installing 4inch size flanges, manufacturing and installing 4inch size bands, manufacturing and installing 4inch size nipples, removing transit heater installed on c centrifugal machine opening side plate for cleaning and hydraulic servicing reinstalling in place and making all connections, dismantling and installing 2inch size pipeline, fabricating and installing 2inch size flanges, manufacturing and installing 2inch size nipples, manufacturing and installing 2inch size valves, removing old taper of sugar hopper no 1 scrapping it fabricating new one from 3/5 mm ms plate installing and giving satisfactory trial, dismantling and installing 6inch size pipeline, manufacturing and installing 6inch size bands, manufacturing and installing 6inch size flanges, manufacturing and installing 5inch size flanges, manufacturing and installing 5inch size valves, removing damaged/weak top and bottom sugar discharge chute of canty machine no 4 including flange scrapping fabricating new parts with 6 mm ms plate as per suit sample preparing all connections like angle channel etc fitting on side and giving satisfactory trial, installing 2inch flow meter, dismantling the damaged 6inch dia pipeline from primary clarifier to anoxic tank and putting it in scrap yard and installing a new pipeline, installing 4inch size valve/nrv, fabricating 4inch size band, fabricating and installing 2inch size flange, dismantling the damaged 8inch dia pipeline from aeration tank to secondary tank and putting it in scrap yard, dismantling diffusers installed in aeration tank and putting them in scrap yard and replacing the throat part, in sulfate removal plant reaction chamber dismantling corroded 6 mm partition plate putting it in scrap yard and fabricating with new 8 mm plate, dismantling corroded 2inch size treated water outlet line of etp and putting in scrap yard and installing new 3inch size line at the same location, dismantling 800 mm dia exhaust pipe line below turbine with nipple band flange and putting in scrap yard, fabricating 800 mm dia exhaust pipeline below turbine from 12 mm plate by bending and installing at position and providing satisfactory trial, fabricating 800 mm dia exhaust pipeline below vapor cell 950 wag meter from 12 mm plate by bending and installing at position and providing satisfactory trial, fabricating 800 mm dia exhaust pipeline below vapor cell 950 wag meter from 12 mm plate by bending into t shape and installing at position and providing satisfactory trial, fabricating 800 mm dia exhaust pipeline dummy/flange from 12 mm plate by bending and installing at position and providing satisfactory trial, dismantling weak part of semichemiser 1000 wag meter warm saser putting scrap in scrap yard fabricating from 12 mm thick plate by bending and installing with related connections and giving satisfactory trial size dia 3 4 m, dismantling weak parts of old quad body no 2 and 3 20inch vapor pipe putting scrap in scrap yard fabricating from 8 mm thick plate by bending and installing and providing satisfactory trial, dismantling weak parts of vapor pipe 32inch size of vapor cell 1000 wag meter putting scrap in scrap yard fabricating from 8 mm thick plate by bending and installing and providing satisfactory trial, dismantling weak part of 6inch size header of all juice heaters condensate and installing new one, removing all partition plates of juice heater header by cutting straight and circular shapes cleaning tube plate completely and fabricating new circular and straight partition plates from 10/12 mm plate installing and preparing header with ms strips as before applying rubber strips and providing satisfactory trial, cutting out quailons and all related angles fixed in clarifier compartments and refitting after completion of work and providing satisfactory trial, patching inside clarifier with 6/8 mm ms plate, dismantling damaged 8inch size ms pipeline from clarifier clear juice overflow tank to sombox, installing 6inch size ms pipeline from clarifier compartments no 2 and 3 to mud tank and providing satisfactory trial, opening 6inch size valve and installing at designated location, fabricating 6inch size nipple and installing at designated location, fabricating 6inch size flange by cutting plate and dismantling to fit, dismantling 4inch size air pipeline above door including nipple band flange and putting scrap in scrap yard, installing 4inch size air pipeline above door and providing satisfactory trial, dismantling 6inch size ms pipeline of big vacuum filter mud tank overflow line and putting scrap in scrap yard, fitting and trial of 6inch size ms pipeline overflow line of big vacuum filter mud tank at position, fabricating 6inch size band, fabricating 8inch size band, dismantling 8inch size pipeline from big vacuum filter pump to condenser and putting scrap in scrap yard, fitting and trial of 8inch size pipeline from big vacuum filter pump to condenser at position, dismantling 4inch ms pipeline from filter juice header to vibro screen, fitting and trial of 4inch ms pipeline from filter juice header to vibro screen at position, making 4inch size nipple, opening 4inch size valve, installing 4inch size valve at the specified location, cutting 4inch size flange from plate making it and fitting after drilling, dismantling 3inch size pipeline, installing and fitting 3inch size line at position and giving satisfactory trial, making and installing 3inch size t, making and installing 3inch size nipple, cutting 3inch size flange from plate making it and installing, making and installing 3inch size band, dismantling 8inch size clear juice overflow pipeline, installing and fitting 8inch size clear juice overflow pipeline at position and giving satisfactory trial, installing and fitting 6inch size pipeline at position and giving satisfactory trial, making and installing 6inch size band/elbow at specified location, making and installing 6inch size t, dismantling 4inch size pipeline, installing and fitting 4inch size pipeline at position and giving satisfactory trial, making and installing 4inch size band, making and installing 4inch size t, dismantling 10inch size pipeline, installing fitting and trial of 10inch size pipeline at position, making and installing 10inch size t, making and installing 10inch size dummy/flange, dismantling 6inch pipeline, installing fitting and trial of 6inch size pipeline at position, opening and binding 6inch size valve, installing fitting and trial of 4inch size pipeline at position, making and installing 8inch and 6inch size cross, dismantling 4inch size ammonia pipeline of semichemiser quad, installing 4inch size ammonia pipeline of semichemiser quad at position, making 4inch size band, making 4inch size t, making 4inch size flange, dismantling 2inch size pipeline, fixing 2inch size pipeline in position, dismantling new quad no 2 vapor pipe 24inch size vapor pipeline fabricating it by bending with 10 mm thick plate and installing, fabricating and installing 24inch size bends, fabricating and installing 24inch size tees, fabricating and installing 24inch size flange/dummy, dismantling 24inch size pipeline, fitting 24inch size pipeline in position, fabricating and installing 24inch size flange, cutting damaged 6inch syrup pump header fabricating new header and installing along with fitting all related nipples valves etc and conducting satisfactory trial, dismantling bent incoming and outgoing wax and heater cell and partition plate between double beat valve of juice heater/ juice heater header fabricating new one using 12/10 mm plate as before installing and conducting satisfactory trial, dismantling 6inch condensate header of juice heaters and replacing the weak part, fitting 6inch size pipeline in position and conducting satisfactory trial, fabricating and installing 6inch size flange, fabricating and installing 6inch size nipple, fabricating and installing 6inch size tees, dismantling and fitting 6inch size pipeline in position and conducting satisfactory trial
T18 Ref No : 16042253
Location : nanauta , uttar pradesh
Source : GEM Tenders
tender for mill house item no 1 , mill house item no 2 , mill house item no 3 , mill house item no 4 , mill house item no 5 , mill house item no 6 , mill house item no 7 , mill house item no 8 , mill house item no 9 , mill house item no 10 , mill house item no 11 , mill house item no 12 , mill house item no 13 , mill house item no 14 , mill house item no 15 , mill house item no 16 , mill house item no 17 , mill house item no 18 , mill house item no 19 , mill house item no 20 , mill house item no 21 , mill house item no 22 , mill house item no 23 , mill house item no 24 , mill house item no 25 , mill house item no 26 , mill house item no 27 , mill house item no 28 , mill house item no 29 , mill house item no 30 , mill house item no 31 , mill house item no 32 , mill house item no 33 , mill house item no 34 , mill house item no 35 , mill house item no 36 , mill house item no 37 , mill house item no 38 , mill house item no 39 , mill house item no 40 , mill house item no 41 , mill house item no 42 , mill house item no 43 , boiler house item no 1 , boiler house item no 2 , boiler house item no 3 , boiler house item no 4 , boiler house item no 5 , boiler house item no 6 , boiler house item no 7 , boiler house item no 8 , boiler house item no 9 , boiler house item no 10 , boiler house item no 11 , boiler house item no 12 , boiler house item no 13 , boiler house item no 14 , boiler house item no 15 , boiler house item no 16 , boiler house item no 17 , boiler house item no 18 , boiler house item no 19 , boiler house item no 20 , boiler house item no 21 , boiler house item no 22 , boiler house item no 23 , boiler house item no 24 , boiler house item no 25 , boiler house item no 26 , boiler house item no 27 , boiler house item no 28 , boiler house item no 29 , boiler house item no 30 , boiler house item no 31 , boiler house item no 32 , boiler house item no 33 , boiler house item no 34 , boiler house item no 35 , boiler house item no 36 , pan calandria work , spray item no 1 , vaccuum crystalizer , schedule work 1 , schedule work 2 , schedule work 3 , schedule work 4 , schedule work 5 , schedule work 6 , schedule work 7 , schedule work 8 , schedule work 9 , schedule work 10 , schedule work 11 , schedule work 12 , schedule work 13 , schedule work 14 , schedule work 15 , schedule work 16 , schedule work 17 , schedule work 18 , schedule work 19 , schedule work 20 , schedule work 21 , schedule work 22 , schedule work 23 , schedule work 24 , schedule work 25 , schedule work 26 , schedule work 27 , schedule work 28 , schedule work 29 , schedule work 30 , schedule work 31 , schedule work 32 , schedule work 33 , schedule work 34 , schedule work 35 , schedule work 36 , schedule work 37 , schedule work 38 , schedule work 39 , schedule work 40 , schedule work 41 , schedule work 42 , schedule work 43 , schedule work 44 , schedule work 45, boiler febrication, cutting of cheveran pineapple grooves on mill rollers, replacement of weak or worn out runners of cane carrier src and irc and cane unloader power supply angle, welding of oval hole or enlarged holes of attachments of block type chain links and redrilling as per template or profile, replacement of weak or worn out attachment of block type chain links along with drilling as per template orprofile and welding, replacement of worn-out tail end boot of src and irc, fabrication and fitting of new juice rings for mill roller as per sample, dismantling of worn out portion of square bar of long travel and cross travel there after grinding of base plate and fitting leveling and alignment of new square bar of cane unloader, welding on wear out mill and grpf crown pinion teeth there after grinding of teeth to make it as per profile, dismantling fabrication and erection of weak or worn out mill juice or water imbibitions box of compound imbibitions system, fabrication and erection of mill roller feed and discharge bearing cover from 10 mm or 8mm plate, fabrication and erection of runner supporting box below runner at irc src cane carrier and auxiliary cane carrier, replacement of worn out deflector plate and top plate of cane chopper or cane leveller or fibrizer by m s plate or ss lining plates along with strengthening, dismantling fabrication and erection of worn out or weak cane carrier chain side angle, dismantling fabrication and erection of return cane carrier chain supporting runner chain guide, dismantling fabrication and erection of worn out ms plate of truck tripler src irc and cane carrier side plate, sprocket teeth repairing and strengthening with extra support of irc src elevator new and old mbc rbc, repair and hard facing of auxiliary cane carrier kicker or pusher, welding and hard facing on wear out under feed roller teeth shell of roller and enlarging the length of roller as per standerd, replacement of worn-out perforated juice plate of screw conveyor at mill, repair and hard facing on cane leveller or chopper hubs, lever bracket of underfeed roller scrapper to be changed and to be fitted as directed, replacement and hard facing of worn out partition plate of anvil plate with 25 mm plate, hot forging of enlarged or eggshape holes of cane carrier links to make them as per existing, fabrication of 10 inch size non return valve from m s plate with fitting and leak proof trial, fabrication and erection of rotary screen ms conical juice tank, repair of cane carrier slates such as worn-out side wear plates holes and other to be done, fabrication and hard facing of under feed roller scrapper as per instructions to be done, welding on wear out teeth of cane carrier s r c and i r c sprockets to be done and teeth to be made as per profile after grinding process, ms ring to be fitted on worn-out both side of bagasse pusher at fibrizer and hard facing to be done on square bars fitted, welding of grpf scrapper teeth to make them as per profile after hard facing and grinding, repair and hard facing of cane unloader grab finger, underfeed roller pinion teeth builtup & hard facing, repairing of ms guard cover mill rollers crown pinion, dismantling and fitting of bagacillo screen as per instruction, dismantling of sprockets of src irc elevator etc on drive or trial end shaft and fitting the sameon new shaft &successful trail, rotary screen worn out support box replacement and accordingly strengthening its platform with successful trail, ss plates lining on the truff of irc or src and mills head stock grpf pressure chute nose plates and grinding of surface, fabrication and fitting of new fish plates of the grpf pressure chute and also fitting of profile building of the bottom and top new or old scrappers of the same along with ss linner of 5mm thick plate as per old sample, build up of oval enlarged pin holes of links of block type chain and drilling of holes as per pitch suitable to our pin, patching or repairing of weak worn out portion of cane unloader no 3 cabin by new old ms plate size 6mm along with proper strengthening, fabrication and erection of new src or irc racks as existing design sample, repairing of old src irc racks, repairing and hard facing of fibrizer hammer shank, dismantling of wornout burnt c i feeding chute of 20 ton boiler and fitting of new ci mouth-piece chute of bagasse feeder, dismantling fabrication and fitting of complete new casing of id fan with cone of 20 tph boiler, dismantling fabrication and fitting of complete new casing of id fan with cone of 30 tph boiler, fabrication and erection of weak portion of runner supporting box below the chain runner at old mbc new mbc cross carrier1,2,3 or bagasse elevator, dismantling of wornout burnt c i feeding chute of 40 ton boiler and fitting of new ci mouth-piece chute of bagasse feeder, replacement of worn out orweak portion of bottom trough and side plate of old new main bagasse carrier bagasse elevator cross carriers rbc by old new ms plates, replacement of worn-out ducting dampers of i d or fd fan economizer airheater inlet and outlet dampers with levers and bushes, replacement of worn-out weak portion of ducting of flue gas at different places with new old ms plate, fabrication and fitting of bagasse ash chute for new and old boilers with new old ms plate, repairing of wet scrubber shell demister of the 20 30 and 40 tons boiler by new or old ms plate or flat, fabrication and fitting of bagasse sliding gate for different bagasse carriers with successful trail, fabrication and erection of the bagasse cillo impeller with satisfactory trial as per old sample as directed, dismantling of boiler side wall front wall sealing plate economizer casing for replacement of boiler tubes dismantled old plates to be fitted with minor repair or patching after replacement of boiler tubes, replacement reversing of weak worn out runners of new mbc old mbc bagasse elevator cross carriers and rbc etc, repairing of wear out drive non drive end sprocket teeth by welding and grinding to make profile as per template of all bagasse carrier chains etc, repair of worn out weak boiler fd id fan casing along with successful trial by old new ms plate, replacement of worn out bagasse blower casing at bagasse elevator as per sample or as directed, complete hard facing of id fan impeller of 20 30 40 ton boilers, dismantling fabrication and erection of new old boiler i d fan expansion joint, dis cleaning repair and fitting of 20 30 and 40 ton boilers internal fitting, replacement of worn out hanging roof and arch structure of beam or channel size- 4 inch 5 inch of boiler no 1 and 2 of furnace and detrick arch, fabrication of bagasse feeding jantra of tractor, fabrication and fitting of worn out weak bagasse chute at belt conveyor, repairing of grate bars of 30 or 40 ton boilers, replacement of worn out teeth of bagasse feeder rotating drum of boiler no-3, 4 and 5 with satisfactory trial, dismantling fabrication and erection of id fan blade with base plate ribs and suction cone (a) 30 ton boiler, dismantling fabrication and erection of id fan blade with base plate ribs and suction cone (a) 40 ton boiler, fabrication and fitting of worn out chain supporting guide of new mbc old mbc bagasse elevator cross carrier and rbc etc, dismantling fabrication and fitting of worn out portion of old feed tank of boiler no 1 2 and 3, replacement of worn out ms beam and channel arrangement size- 4 inch or 5 inch of boiler no 1 and 2 arch, dismantling fabrication and fitting of safety valve worn out discharge assembly with proper support, replacement of worn out ms beam and channel arrangement size- 8inch 9inch for supporting side wall and roof tubes of boiler no 4 and 5, fabrication and erection of new racks for new mbc, fabrication and erection of new racks for old mbc, fabrication and erection of new racks for 3rd cross carrier chain, repairing of weak portion of racks of all bagasse carrier chains, dismantling of pan no 6 (196 sqm h s area 40ton) calandria providing the support for stay the shell above calandria unloading of new calandria from vehicle by their resources shifting of new calandria at the site fitting and erection of calandria at the place of old calandria with shell fitting of bottom cone of calandria inlet vapour or exhaust steam connection water line connection and making all other connection to run the body complete in all respect, dismantling of our old exhisting 600mm valve of 400 hp spray pump along with both side reducer providing support to to delivery line fitting and erection of new in all respect along with successful trial, dismantling of the existing vacuum crystallizer from ramala sugar mill,including safe removal of all connected pipelines,supports and accessories loading the dismantled vacuum crystallizer on their vehicle to nanauta sugar mill,unloading at site ,shifting to the designated location in the boiling house erection and complete installation with all necessary piping,structural modifications,and accesories required for successful commissioning the job shall be completed in all respects and made ready for smooth operation, dismantling ,fabrication and erection of m s pipe line including bend or flange etc 2 inch diameter, dismantling ,fabrication and erection of m s pipe line including bend or flange etc 3 inch diameter, dismantling ,fabrication and erection of m s pipe line including bend or flange etc 4 inch diameter, dismantling,fabrication and erection of m s pipe line including bend or flange etc 6 inch diameter, dismantling ,fabrication and erection of m s pipe line including bend or flange etc 8 inch diameter, dismantling ,fabrication and erection of m s pipe line including bend or flange etc 10 inch diameter, dismantling fabrication and erection of bend size- 3 inch diameter ms, dismantling fabrication and erection of bend size- 4 inch diameter ms, dismantling fabrication and erection of bend size- 6 inch diameter ms, dismantling fabrication and erection of bend size- 8 inch diameter ms, dismantling fabrication and erection of nipple size- 1inch diameter ms, dismantling fabrication and erection of nipple size- 2 inch diameter ms, dismantling fabrication and erection of nipple size- 3 inch diameter ms, dismantling fabrication and erection of nipple size- 6 inch diameter ms, dismantling fabrication and erection of nipple size- 8 inch diameter ms, dismantling fabrication and erection of tee size- 8 inch diameter ms, dismantling fabrication and erection of tee size- 10 inch diameter ms, dismantling fabrication and erection of flange size- 4 inch diameter ms, dismantling fabrication and erection of flange size- 6 inch diameter ms, dismantling fabrication and erection of flange size- 8 inch diameter ms, dismantling fabrication and erection of flange size- 10 inch diameter ms, dismantling fabrication and erection of reducer size-6 inch diameter ms, dismantling fabrication and erection of reducer size-8 inch diameter ms, dismantling fabrication and erection of reducer size-10 inch diameter ms, dismantling ,fitting of valve size- 3 inch diameter, dismantling,fitting of valve size- 6 inch diameter, dismantling,fitting of valve size- 8 inch diameter, dismantling,fitting of valve size- 10 inch diameter, dismantling fabrication and fitting of man hole, dismantling , fabrication and erection of platform by using old new plate, fabrication and erection of cat or monkey ladder, fabrication and erection stair case, fabrication and erection of railing from old material, dismantling of ms heavy structure or tank, dismantling of ms light structure, fabrication and erection light structure, fabrication and erection heavy structure, ss plate lining in different size for various equipments, fabrication & erection of complete square rectangular round tank with conical bottom, fabrication and patchwork of equipments using old new ms plate by 6 8 mm thick plate over round vessels any vessels, fabrication of pump bed with pump reduction gear and motor alignment up to 7 5 h p, fabrication of pump bed with pump reduction gear and motor alignment up to 10 h p, fabrication of pump bed with pump reduction gear and motor alignment up to 15 h p, fabrication of pump bed with pump reduction gear and motor alignment up to 30 h p, fabrication of pump bed with pump reduction gear box and motor alignment above 100 hp
T18 Ref No : 16042254
Location : nanauta , uttar pradesh
Source : GEM Tenders
tender for clarification house item no 39 , evaporator and clarification house item no 40 , pan house item no 1 , pan house item no 2 , pan house item no 3 , pan house item no 4 , pan house item no 5 , pan house item no 6 , pan house item no 7 , pan house item no 8 , pan house item no 9 , pan house item no 10 , pan house item no 11 , pan house item no 12 , pan house item no 13 , pan house item no 14 , pan house item no 15 , pan house item no 16 , pan house item no 17 , pan house item no 18 , pan house item no 19 , pan house item no 20 , pan house item no 21 , pan house item no 22 , pan house item no 23 , pan house item no 24 , pan house item no 25 , pan house item no 26 , pan house item no 27 , pan house item no 28 , pan house item no 29 , injection item no 1 , injection item no 2 , injection item no 3 , schedule work item no 1 , schedule work item no 2 , schedule work item no 3 , schedule work item no 4 , schedule work item no 5 , schedule work item no 6 , schedule work item no 7 , schedule work item no 8 , schedule work item no 9 , schedule work item no 10 , schedule work item no 11 , schedule work item no 12 , schedule work item no 13 , schedule work item no 14 , schedule work item no 15 , schedule work item no 16 , schedule work item no 17 , schedule work item no 18 , schedule work item no 19 , schedule work item no 20 , schedule work item no 21 , schedule work item no 22 , schedule work item no 23 , schedule work item no 24 , schedule work item no 25 , schedule work item no 26 , schedule work item no 27 , schedule work item no 28 , schedule work item no 29 , schedule work item no 30 , schedule work item no 31 , schedule work item no 32 , schedule work item no 33 , schedule work item no 34 , schedule work item no 35 , schedule work item no 36 , schedule work item no 37 , schedule work item no 38 , schedule work item no 39 , schedule work item no 40 , schedule work item no 41 , schedule work item no 42 , schedule work item no 43 , schedule work item no 44 , schedule work item no 45 , schedule work item no 46 , schedule work item no 47 , schedule work item no 48 , schedule work item no 49 , schedule work item no 50 , schedule work item no 51 , schedule work item no 52 , schedule work item no 53 , schedule work item no 54 , schedule work item no 55 , schedule work item no 56 , schedule work item no 57 , schedule work item no 58 , schedule work item no 59 , schedule work item no 60 , schedule work item no 61 , schedule work item no 62 , schedule work item no 63 , schedule work item no 64 , schedule work item no 65 , schedule work item no 66 , schedule work item no 67 , schedule work item no 68 , schedule work item no 69 , schedule work item no 70 , schedule work item no 71 , schedule work item no 72 , schedule work item no 73 , schedule work item no 74 , schedule work item no 75 , schedule work item no 76 , schedule work item no 77, boiling house febrication, dismantling cleaning repairing and refitting work of catcher internal elements of new semikestner (2300 m2) with leak proof trial, dismantling fabrication and erection work of evaporator body or semikestner or vapour shell complete with save all of uttam quad set, major repair of save all of the evaporator body or semikestner or vapour shell along with leak proof water and vacuum trail, dismantling fabrication and erection of weak or worn out partition plate of top and bottom header of juice heater and repairing of rubber strip holding grooves along with fitting of both cover leak proof water and vacuum trial, dismantling fabrication and erection work of the sulphur furnace melter along with hydraulic tested steam coil with all connections and satisfactory trial, dismantling fabrication and erection work of the sulphur furnace melt receiver along with hydraulic tested steam coil with all connections and satisfactory trial, dismantling fabrication and erection of sulphur furnace secondary cooler with its cooling coil and complete connection of water and associated pipe lines with satisfactory trial, repairing of sulphur furnace secondry cooler by replacing bunch of cooling pipe by providing all its existing connection, dismantling fabrication and erection of juice receiving bottle fitted at vacuum filter station by providing all its existing connection, dismantling fabrication and erection of weak or leak condenser at vacuum filter, dismantling fabrication and erection of muddy juice receiving tank complete with all connection and associated pipe lines along with leak proof trial, dismantling fabrication and erection of mud tray of vacuum filter 10feet x 20feet vacuum filter along with satisfactory trial, dismantling fabrication and erection weak mud agitator of 10feet x 20feet vacuum filter along with satisfactory trial, dismantling fabrication and erection of mud tray of vacuum filter 14feet x 28feet vacuum filter along with satisfactory trial, dismantling fabrication and erection weak mud agitator of 14feet x 28feet vacuum filter along with satisfactory trial, dismantling fabrication and erection of weak juice box of juice heater along with fitting of double beat valve and leak proof trial, dismantling fabrication and erection of weak or worn out portion of clear juice liquidation box along with leak proof trial, dismantling fabrication and erection of weak or worn out clarifier mud boot along with leak proof trial, dismantling fabrication and erection weak shell of compartment no 1 and 2 of juice clarifier (big) work of new dorr diameter 28feet capacity 3750 hl body shell including completion of all connections and leak proof trial, dismantling fabrication and erection weak shell of compartment no 1 of juice clarifier (small) work of new dorr diameter 24feet capacity 2550 hl body shell including completion of all connections and leak proof trial, dismantling fabrication and erection of weak shell of juice sulphiter 320 hl including completion of all connection and leak proof trial, dismantling fabrication and erection of juice catcher for raw or vacuum orsugar melter orsulphited juice pumps with suction or delivery connection, repairing of juice heater condensate bottle or evaporator or syrup receiving bottle with leak proof testing partition plate with all connection, repairing of so2 furnace sublimation pipe with its leaking tower etc with testing, dismantling fabrication and erection of vacuum filter mud mixer body and fitting of screw conveyor with proper alignment and satisfactory trial, fabrication and erection of screw conveyor as per old sample for mud mixture from 6mm thick plate with satisfactory trial, dismantling fabrication and fitting of new down take of quad or old or new semikestner etc, dismantling fabrication and erection of weak or leaky recovery tower of juice sulphiter or syrup sulphiter, repairing of umbrella and providing essential supports of quad, dismantling fabrication and erection of worn out umbrella of quad with old or new plates, dismantling fabrication and erection of saveall of quad old bodies, replacement of worn-out top conical portion of quad and vapour shell with save all proper strengthening with associated machinery, dismantling of worn out arms and shell (outside and inside) of juice sulphiter drum fabrication and erection with satisfactory trial, to replace worn out clear juice box or mud discharge box with valve of new dorr followed by satisfactory trial, replacement of worn out mud scrapper plate and fitting of mud scrapper at vacuum filter, major repair of lime slaker with proper alignment and trial, to replace worn out sulphur furnace header of size 8 inch or 10 inch between after burner and cooler, replacement of worn-out stirrer arms of clarifier completed with all support and squeezers etc, replacement of partition plate of old dorr compartment or intermediameterte tray with 5 or 6mm ms plate, dismantling of existing 700 sqm h s area of quad body first (uttam set calandria ) providing the support for stay the shell above calandria unloading of new calandria from vehicle by their resources shifting of new calandria at the site fitting and erection of calandria at the place of old calandria with shell fitting of bottom cone of calandria inlet vapour or exhaust steam connection water line connection and making all other connection to run the body complete in all respect, repairing of down-take of pan for 40 or 50 ton pan, repairing of down-take of pan for 60 or 80 ton pan, dismantling of gutter of molasses magma and massecuite, fabrication and fitting of gutter of molasses magma and massecuite, repairing of hinge type cover of gutter, replacement of worn-out condensate box of pans quad and juice heaters, dismantling fabrication and fitting of new umbrella in pans with supports and j pipes 40 or 50 ton pan, dismantling fabrication and fitting of new umbrella in pans with supports and j pipes 60 or 80 ton pan, repairing of umbrella of pans with supports and j pipes 40 or 50 ton pan, repairing of umbrella of pans with supports and j pipes 60 or 80 ton pan, replacement of worn out distributor by new for 40 or 50 ton pan, replacement of worn out distributor by new for 60 or 80 ton pan, replacement of weak sight glass flanges of pan and evaporater body along with leak proof water and vaccuum trial, replacement of complete worn-out or weak top cone of 40 or 50 ton pan by new with supports and strengthening of associated machinery parts proper along with leak proof water and vacuum trial, replacement of complete worn-out or weak top cone of 60 or 80 ton pan by new with supports and strengthening of associated machinery parts proper along with leak proof water and vacuum trial, strengthening of 40 or 60 ton pan body and taper portion with channel etc, dismantling fabrication and erection of box type feed header for each pan with all related connections including valves nipples flanges etc, dismantling fabrication and erection of weak portion of pan shell with 12mm ms plate along with leak proof water and vacuum trial welding must be double coated from outside and inside, replacement of weak orworn out side and bottom plate of cold or hot water over head tank syrup tank and molasses storage tanks at pan station by providing proper strengthening, fabrication and erection of complete new down take of 40 or 50 ton pan along with leak proof water and vacuum trial, fabrication and erection of complete new down take of 60 or 80 ton pan along with leak proof water and vacuum trial, repairing of weak orworn out save-all of 40 or 50 ton pan along with leak proof water and vacuum trial, dismantling fabrication and erection of pan save all with proper trial 40 or 50 ton along with leak proof water and vacuum trial, dismantling fabrication and erection of 60 or 80 ton pan save all along with leak proof water and vacuum trial, repairing of weak save-all of 60 or 80 ton pan along with leak proof water and vacuum trial, dismantling fabrication and erection of worn out portion of the chute for pan discharge valve with satisfactory trial, repairing or patching of weak body shell of molasses conditioner along with alignment of reduction gear box and motor, dismantling fabrication and fitting work of 80ton pan save all internals, disamantling,reapiring and re-fitting with leak proof trial of collapsed ss venturi of pan no 10 condensor, replacement of weak/leaky suction and delivery pipe of mf- 50x50/ 40x40 injection and spray pump as per old sample making and fitting of stone catcher fitting of pipe with pump, dismantling ,fabrication and erection of weak/wornout delivery pipe of injection pump having one end reducer, disamantling,fabrication and fitting work of injection header suction pipe mesh type stainer, dismantling ,fabrication and erection of m s pipe line including bend or flange etc 1 inch diameter, dismantling ,fabrication and erection of m s pipe line including bend or flange etc 2 inch diameter, dismantling ,fabrication and erection of m s pipe line including bend or flange etc 3 inch diameter, dismantling ,fabrication and erection of m s pipe line including bend or flange etc 4 inch diameter, dismantling ,fabrication and erection of m s pipe line including bend or flange etc 5 inch diameter, dismantling ,fabrication and erection of m s pipe line including bend or flange etc 6 inch diameter, dismantling fabrication and erection of bend size-2 inch diameter (ms), dismantling fabrication and erection of bend size- 3 inch diameter (ms), dismantling fabrication and erection of bend size- 4 inch diameter (ms), dismantling fabrication and erection of bend size- 5 inch diameter (ms), dismantling fabrication and erection of bend size- 6 inch diameter (ms), dismantling fabrication and erection of bend size- 8 inch diameter (ms), dismantling fabrication and erection of bend size-10 inch diameter (ms), dismantling fabrication and erection of bend size-12 inch diameter (ms), dismantling fabrication and erection of nipple size- 1inch diameter (ms), dismantling fabrication and erection of nipple size- 2 inch diameter (ms), dismantling fabrication and erection of nipple size- 3 inch diameter (ms), dismantling fabrication and erection of nipple size- 4 inch diameter (ms), dismantling fabrication and erection of nipple size- 5 inch diameter (ms), dismantling fabrication and erection of nipple size- 6 inch diameter (ms), dismantling fabrication and erection of nipple size- 8 inch diameter (ms), dismantling fabrication and erection of nipple size- 10 inch diameter (ms), dismantling fabrication and erection of nipple size- 12 inch diameter (ms), dismantling fabrication and erection of cross size- 6 inch diameter (ms), dismantling fabrication and erection of cross size- 8 inch diameter (ms), dismantling fabrication and erection of cross size- 10 inch diameter (ms), dismantling fabrication and erection of tee size- 4 inch diameter (ms), dismantling fabrication and erection of tee size- 5 inch diameter (ms), dismantling fabrication and erection of tee size- 6 inch diameter (ms), dismantling fabrication and erection of tee size- 8 inch diameter (ms), dismantling fabrication and erection of tee size- 10 inch diameter (ms), dismantling fabrication and erection of tee size- 12 inch diameter (ms), dismantling fabrication and erection of flange size- 4 inch diameter (ms), dismantling fabrication and erection of flange size- 5 inch diameter (ms), dismantling fabrication and erection of flange size- 6 inch diameter (ms), dismantling fabrication and erection of flange size- 8 inch diameter (ms), dismantling fabrication and erection of flange size- 10 inch diameter (ms), dismantling fabrication and erection of flange size- 12 inch diameter (ms), dismantling fabrication and erection of reducer size-4 inch diameter (ms), dismantling fabrication and erection of reducer size-5 inch diameter (ms), dismantling fabrication and erection of reducer size-6 inch diameter (ms), dismantling fabrication and erection of reducer size-8 inch diameter (ms), dismantling fabrication and erection of reducer size-10 inch diameter (ms), dismantling fabrication and erection of reducer size-12 inch diameter (ms), dismantling and fitting of valve size- 3 inch diameter, dismantling and fitting of valve size- 4 inch diameter, dismantling and fitting of valve size- 5 inch diameter, dismantling and fitting of valve size- 6 inch diameter, dismantling and fitting of valve size- 8 inch diameter, dismantling and fitting of valve size- 10 inch diameter, dismantling and fitting of valve size- 12 inch diameter, dismantling fabrication and fitting of man hole, dismantling fabrication and erection of platform by using old/new plate, fabrication and erection of railing from old material, fabrication and erection of t ring for strengthening of evaporator /pan vapour pipe, dismantling of ms heavy structure / tank, dismantling of ms light structure, fabrication and erection light structure, fabrication and erection heavy structure, fabrication of pump bed with pump, reduction gear and motor alignment up to 7 5 h p, fabrication of pump bed with pump, reduction gear and motor alignment up to 10 h p, fabrication of pump bed with pump, reduction gear and motor alignment up to 25 h p, fabrication of pump bed with pump, reduction gear and motor alignment up to 30 h p, dismantling and cleaning of ms pipe line with bend, flange , nipple etc, fitting of ms pipe line with bend, flange ,nipple etc after cleaning, fabrication and erection of complete square / rectangular /round tank with conical bottom, fabrication and fitting of ms coil (coils are to be duly bend and not offset pipe welding offset welds shall not be treated as coils but as pipes ) size-25mm, fabrication and fitting of ms coil (coils are to be duly bend and not offset pipe welding offset welds shall not be treated as coils but as pipes ) size-50mm, fabrication and fitting of ms coil (coils are to be duly bend and not offset pipe welding offset welds shall not be treated as coils but as pipes ) size-75mm, fabrication and fitting of ms coil (coils are to be duly bend and not offset pipe welding offset welds shall not be treated as coils but as pipes ) size-100mm, fabrication and fitting of ms coil (coils are to be duly bend and not offset pipe welding offset welds shall not be treated as coils but as pipes ) size-125mm, fabrication and fitting of ms coil (coils are to be duly bend and not offset pipe welding offset welds shall not be treated as coils but as pipes ) size-150mm, dismantling, fabrication and fitting of new cone and umbrella any where in the factory cone above 01 mtr dia upto 25mtr dia, dismantling , fabrication and fitting of new cone and umbrella any where in the factory, cone above 25 mtr dia, fabrication and patchwork of equipments using old/ new ms plate by 6/8 mm thick plate over round vessels/any vessels, disamntling fabrication and erection of weak vapor/exhaust steam pipe line and bend dia from 500mm to 900mm complete in all respect with leak proof trial, disamntling fabrication and erection of intermediate vapor pipe/vapor pipe and bends of quad bodies and vapor pipe and bends of pan dia from 900 mm to 1300 mm complete in all respect with leak proof trial

Unlock Full Tender Access

Start Free Trial to download documents before deadline

T18 Ref No : 16042325
Source : GEM Tenders
tender for erection and fabrication work c erection and fabrication work c 50 , erection and fabrication work c 51 , erection and fabrication work c 52 , erection and fabrication work c 53 , erection and fabrication work c 54 , erection and fabrication work c 55 , erection and fabrication work c 56 , erection and fabrication work c 57 , erection and fabrication work c 58 , erection and fabrication work c 59 , erection and fabrication work c 60 , erection and fabrication work c 61 , erection and fabrication work c 62 , erection and fabrication work c 63 , erection and fabrication work c 64 , erection and fabrication work c 65 , erection and fabrication work c 66 , erection and fabrication work c 67 , erection and fabrication work c 68 , erection and fabrication work c 69 , erection and fabrication work c 70 , erection and fabrication work c 71 , erection and fabrication work c 72 , erection and fabrication work c 73 , erection and fabrication work c 74 , erection and fabrication work c 75 , erection and fabrication work c 76 , erection and fabrication work c 77 , erection and fabrication work c 78 , erection and fabrication work c 79 , erection and fabrication work c 80 , erection and fabrication work c 81 , erection and fabrication work c 82 , erection and fabrication work c 83 , erection and fabrication work c 84 , erection and fabrication work c 85 , erection and fabrication work c 86 , erection and fabrication work c 87 , erection and fabrication work c 88 , erection and fabrication work c 89 , erection and fabrication work c 90 , erection and fabrication work c 91 , erection and fabrication work c 92 , erection and fabrication work c 93 , erection and fabrication work c 94 , erection and fabrication work c 95 , erection and fabrication work c 96 , erection and fabrication work c 97 , erection and fabrication work c 98 , erection and fabrication work c 99 , erection and fabrication work c 100 , erection and fabrication work c 101 , erection and fabrication work c 102 , erection and fabrication work c 103 , erection and fabrication work c 104 , erection and fabrication work c 105, erection and fabrication work c, cutting and removing the weak shells of pan/quad bodies, fabricating new ones from 10/12 mm thick plate and installing them in place, doing double coat welding from inside and outside, and conducting a leak-proof water/vacuum trial., dismantling the 600/1000 mm diameter right/angle type vapour valves installed on the vapour/steam lines of quad and pan, repairing the valves to make them leak-proof, and after testing, refitting them in place., replacing the weak/broken vapour pipe bends of pan/quad vapour pipes by fabricating new ones, ranging from 600 mm to 1100 mm diameter., providing support to the vapour pipes, vapour/exhaust steam lines of quad and pan by fabricating t/rings from angle iron or plate to strengthen them., removing the old leaking steam jackets of vapour cells, semi/kestner, pan, and quad bodies, fabricating new ones from 10/12 mm plate, installing them, and conducting a leak-proof trial., fitting fin-type cyclones on pan, quad, and vapour shells, fabricating new ones from 8/10 mm plate, installing them, welding, and conducting a satisfactory trial., cutting/removing the weak/broken/leaky valves installed on various steam lines of quad/pans, repairing the valves as necessary, and refitting them as per instructions., for replacing the worn/damaged worm wheel gland housing bushes of the drive of air cooled/dry seed/vacuum/twin vertical crystallizers, dismantling and separating the worm wheel and worm shaft housings, fitting new gun metal bushes in the gland housings, and after housing fitting, aligning and fitting the worm wheel and worm housings as before., cutting and removing the weak/broken parts of the vacuum crystallizer shell, repairing/modifying the shell from new/old plate, fitting it in place, doing leak-proof welding from inside and outside, and providing necessary strengthening from outside., dismantling and removing the damaged-tooth worm and worm wheel of the air/water cooled/vacuum/twin vertical crystallizer, fitting new worm and worm wheel in their place, installing the reduction gear and motor, aligning them, and conducting a trial., cutting and removing the weak gutters from various gutters installed on pans/crystallizers, and fabricating and installing new ones from old plate., dismantling the old/weak/broken shaft of air/water cooled crystallizers, fabricating a new shaft, installing it in place, fitting all arms, and conducting a satisfactory trial., cutting and removing the weak/broken parts of the shaft of air/water cooled crystallizers, fabricating a shaft from m.s. plate, fitting the new pipe shaft in place, installing all arms as before, and conducting a satisfactory trial., removing the loose/worn gun metal bush bearings on both sides of the crystallizer drive shaft, fitting new bushes, and conducting a trial., cutting and removing the weak arms on the shaft of the air/water cooled crystallizer, fabricating new arms from m.s. plate/pipe, installing them on the shaft, and conducting a successful trial., repairing the leaky/weak gate valve of the air/water cooled crystallizer and fitting it to be leak-proof., dismantling and removing the weak/broken section pipes from the elliptical suction pipes of mf 35x35 spray pumps installed for spraying, fabricating new ones with strainer from 8/10 mm thick m.s. plate as per sample, fitting them in place, and conducting a leak-proof trial., performing necessary repairs on the multi/jet spray boxes installed in the condenser of quad/pans., cutting the weak/broken parts of the main header, branch header, and branch lines of the spray pond, fabricating new ones from new/old plate as per instructions, fitting them in place, and conducting a leak-proof trial., cutting and removing the weak parts of the common injection header, fabricating a new one, erecting it in place, and conducting a leak-proof trial., fabricating the weak/broken resistance box of the drive motor of the injection/spray pump, fitting all internals, making connections, and conducting a satisfactory trial., dismantling the weak/broken base frame of the vertical spray pump, fabricating a new bed as per the old one, leveling it, installing it in place, fitting the pump, and aligning it., cutting and removing the weak/broken feed distribution headers of the pans, fabricating new headers from m.s. plate/pipe as per instructions, fitting them in place, making all connections as before, and conducting a successful water trial., cutting and removing the weak bottom/side plates of tanks built for storing syrup/melt and various molasses at the pan station, installing new/old plates as per

Every year, central and state government departments release thousands of high-value contracts specifically dedicated to Vacuum Pump Motor Repair. Whether it involves bulk material supply, executing specialized operational services, or end-to-end turnkey project execution, the demand for capable vendors in the Vacuum Pump Motor Repair sector is massive.

At Tender18, we help businesses cut through the noise and exclusively target the exact work categories they specialize in. Instead of browsing through generic procurement sites, our platform isolates high-potential opportunities that match your specific industry capabilities.

Work Dynamics in the Vacuum Pump Motor Repair Sector

Government requirements for this specific vertical generally fall into distinct procurement patterns:

  • Product & Material Supply: Tenders focused strictly on sourcing, testing, and delivering high-quality items that meet the exact technical specifications of the buyer.
  • Service Level Agreements (SLAs): Long-term hiring of expert agencies for routine maintenance, manpower deployment, or continuous operational management.
  • Execution & Turnkey Projects: Comprehensive contracts where the bidder is responsible for everything from raw material procurement to final site installation and testing.

By focusing purely on your core strength in Vacuum Pump Motor Repair, you can build a highly profitable and stable pipeline of government clients.

Stop wasting time filtering through irrelevant notices. Our Vacuum Pump Motor Repair Tender Information Service is engineered for precision. We track exact product codes, service names, and specialized work terms across all government portals nationwide. When a buyer publishes a requirement that matches your specific business profile, our system alerts you instantly.

Deep Technical Insights & Documentation For Vacuum Pump Motor Repair Tenders

Bidding for specific works requires studying strict technical parameters. We provide immediate access to the core documents you need to evaluate the project:

  • Detailed Specifications & Drawings: Download the exact engineering guidelines, material testing standards, and quality benchmarks demanded by the buyer for Vacuum Pump Motor Repair.
  • Financial BOQ Spreadsheets: Access the official blank pricing formats where you need to input your unit rates, tax configurations, and total bid value.
  • Real-Time Technical Amendments: If the buying department changes the product specifications, alters the service scope, or shifts the delivery timeline, we instantly update the parent file so you are never caught off-guard.

Winning a contract for Vacuum Pump Motor Repair depends entirely on how perfectly your technical capabilities match the buyer’s demands. Even if you have the best product or service, a poorly formatted document or a missing compliance certificate will lead to instant technical rejection. Tender18’s Tender Bidding Service eliminates this risk by taking complete ownership of your digital submission.

Flawless Compliance & Portal Execution For Vacuum Pump Motor Repair Tenders

Under this service, Tender18 assigns a Dedicated Experienced Technical Person to your profile. This expert handles the heavy lifting of the entire bidding cycle:

  • Capability Mapping: We thoroughly cross-check your past completion certificates, ISO standard proofs, and financial turnover against the strict eligibility criteria required for Vacuum Pump Motor Repair bids.
  • Secure System Integration: Our technical desk seamlessly links your Class III Digital Signature Certificate (DSC) with the required e-procurement servers to securely encrypt your technical and financial envelopes.
  • Error-Free Financial Uploads: We audit your quoted BOQ pricing sheets for any formula or formatting errors before the final upload, ensuring your bid is successfully locked before the portal's closing hours.

Government buyers are aggressively using the Government e-Marketplace (GeM) for the direct procurement of Vacuum Pump Motor Repair. If your business profile is not accurately mapped on this portal, you remain practically invisible to these purchasing officers. Recognized as a trusted and expert GeM consultant, Tender18 offers specialized support to build, optimize, and maintain a highly visible vendor account for your business.

With an industry-leading support success ratio of over 95%, we handle the complex marketplace compliance so you can focus entirely on executing your orders

Expert Profile Management & Catalogue

Our dedicated consultants ensure your GeM presence is structurally perfect:

  • Precise Catalogue Listing: We upload and categorize your specific offerings under the exact search terms and parameters used by government buyers looking for Vacuum Pump Motor Repair, ensuring maximum search visibility.
  • OEM Dashboard & Assessment: For original manufacturers and creators, we guide you through the mandatory Quality Council of India (QCI) vendor assessments to successfully unlock your official OEM panel.
  • Profile Compliance & Caution Money: We manage your statutory documentation, brand approvals, and caution money limits to keep your account immune from technical suspensions.

Strategic Live Bid Participation

Beyond setup, we actively drive your market participation. Our team expertly handles the digital paperwork and rate configurations for GeM Custom Bids and Reverse Auctions (RA) related to Vacuum Pump Motor Repair, maximizing your chances of securing L1 status.

1.

How do I find government contracts exclusively matching my work in Vacuum Pump Motor Repair?

The easiest way is through the Tender18 platform. Instead of searching department by department, our system uses advanced keyword matching to gather all live supply, service, and execution tenders related directly to your core business in one place.

2.

Do I need specific testing or quality certificates to apply for these contracts?

It heavily depends on the nature of the work. For supply contracts, buyers often ask for ISO certifications, BIS marks, or specific lab testing reports. For service contracts, they may ask for labor licenses or past performance certificates (work orders).

3.

What is a BOQ and why is it important for my bid?

The Bill of Quantities (BOQ) is the official financial Excel sheet where you enter your competitive prices. Any mistake in this file—like adding extra rows, changing formulas, or saving it in the wrong format—will cause the portal server to reject your entire bid.

4.

Are samples required to be submitted physically before the digital bid opens?

For many product-based Vacuum Pump Motor Repair tenders, buying departments do ask bidders to submit physical samples to their office before the digital technical evaluation date. This requirement is always clearly mentioned in the official NIT document.

5.

How does the Dedicated Tender Expert from Tender18 help me?

Our assigned expert manages your total portal compliance. They extract the hidden rules from long tender PDFs, create a precise document checklist for your team, map your digital signature, and securely upload your technical and financial files onto the government servers.

6.

What is the role of a Digital Signature Certificate (DSC)?

A Class III DSC is a secure USB device that contains your digital identity. You cannot upload a bid without it. It is used to securely encrypt and lock your sensitive price data and technical documents so no one can view them before the official opening date.

7.

As an MSME, can I get financial benefits when bidding for Vacuum Pump Motor Repair?

Yes, the government strongly supports MSMEs. By uploading a valid Udyam Registration Certificate in the technical envelope, small businesses are frequently exempted from paying the initial Tender Document Fee and the Earnest Money Deposit (EMD).

8.

Why should I list my services or products on GeM for this category?

GeM is now the primary digital marketplace for all government agencies. If you are properly cataloged for Vacuum Pump Motor Repair, officers can view your profile and generate direct purchase orders or invite you to participate in exclusive Custom Bids.

9.

What makes Tender18 a reliable GeM support partner?

As a highly trusted and expert GeM consultant, Tender18 holds a proven support success ratio of over 95%. From flawless profile creation and complex catalogue mapping to OEM panel approvals and live Reverse Auction (RA) support, we handle it all seamlessly.

10.

What does "L1" mean in these government contracts?

"L1" stands for "Lowest Bidder 1". In government procurement, after all technical envelopes are approved, the financial sheets (BOQs) are opened. The bidder who has quoted the lowest compliant price for Vacuum Pump Motor Repair is declared L1 and is generally awarded the contract