Search Tenders
Filters
Reset All
Tender Status
T18 Ref No
All States
All Cities
All Agencies
Tender ID
Due Date
Tender Value
Tender Source (GeM, Cppp & Others)
Tender Type

33Latest Sag rod Tenders List

Latest Sag rod Tenders in India – Verified Leads & Real-Time Insights by Tender18

Finding the right Sag rod tenders in India’s competitive e-procurement ecosystem requires more than just access—it demands accurate data, real-time monitoring, and expert analysis.

At Tender18 Infotech Private Limited, we bring deep industry experience in government procurement to help businesses identify, evaluate, and win Sag rod tenders efficiently. With a centralized platform aggregating 1100+ live tenders, we provide a single, trusted source for opportunities from central, state, and PSU departments.


Real-Time Sag rod Tender Intelligence & Monitoring

Our advanced dashboard delivers actionable insights and structured tender data, enabling you to make faster and smarter bidding decisions.

We categorize Sag rod tenders into:

  • Supply Tenders – BOQs and specifications sourced from GeM and PSUs
  • Service Tenders – NITs and scope of work from CPPP and state portals
  • EPC Projects – Large-scale infrastructure tenders with financial and design data

✔ This structured approach ensures complete transparency and deeper bid analysis before submission.


Comprehensive Sources of Sag rod Tenders

Tender18 acts as a centralized gateway by aggregating tenders from trusted and official sources:

  • Central Government Portals – CPPP, NIC, and Government e-Marketplace (GeM)
  • Railways & Transport – IREPS and Metro Rail projects
  • Power & Energy PSUs – NTPC, ONGC, NHPC, PowerGrid
  • Defense & Strategic Sectors – MES and DRDO tenders
  • State e-Procurement Portals – Gujarat, Maharashtra, Tamil Nadu, UP, and more

✔ Every listing is verified and regularly updated to maintain data accuracy and trust.


Step-by-Step Guide to Participate in Sag rod Tenders

1. Eligibility & Prequalification

Before bidding, ensure compliance with:

  • Financial turnover requirements (30–50% of tender value)
  • Past experience (2–3 similar projects)
  • Valid solvency certificate

2. Mandatory Documentation Checklist

Prepare the following to avoid disqualification:

  • Digital Signature Certificate (Class 3 DSC)
  • GST, PAN, MSME/Udyam registration
  • EMD (Earnest Money Deposit) or exemption proof
  • Technical bid with execution methodology

3. BOQ Analysis & Financial Bidding

The BOQ (Bill of Quantities) is the most critical component:

  • Analyze item-wise pricing
  • Ensure competitive yet sustainable quotes
  • Avoid underbidding risks (L1 pressure)

✔ Expert analysis can significantly improve your bid success ratio.


Why Tender18 is a Trusted Platform for Sag rod Tenders

✔ Proven Expertise in Government Procurement

We combine industry knowledge with practical bidding experience.

✔ Verified & Reliable Data

All Sag rod tenders are sourced from official portals and cross-checked for accuracy.

✔ Advanced Filtering Tools

Filter tenders by value, EMD, location, and category for precise targeting.

✔ Corrigendum & Update Tracking

Get instant alerts on deadline changes and specification updates.

✔ Historical Data Insights

Analyze past tender results to understand pricing trends and competition.

✔ End-to-End Bidding Support

From discovery to submission, including GeM onboarding and strategy.


Growth of Sag rod Sector in 2026

With the Government of India focusing on digital procurement and infrastructure expansion, the Sag rod sector has seen significant growth in e-tendering opportunities.

The rise of GeM-based procurement models like:

  • L1 Purchase
  • Direct Procurement
  • MSME-friendly policies

…has made it easier for startups and SMEs to participate and win contracts


Frequently Asked Questions (SEO Optimized)

How can I get daily Sag rod tender alerts?

You can register on Tender18 and select your preferred category. You will receive daily email alerts with all new Sag rod tenders.

Is EMD mandatory for all Sag rod tenders?

No, MSME and Udyam-registered businesses may get exemptions. Always check the NIT for specific conditions.

What is the difference between a Sag rod work tender and supply tender?

A supply tender involves delivering goods, while a work tender includes execution, labor, and project completion.

Can I access private Sag rod tenders on Tender18?

Yes, we also track major private sector and EPC tenders along with government opportunities.


Get Expert Support for Sag rod Tenders

Tender18 is more than a listing platform—we are your strategic partner in winning tenders.

Our services include:

  • Tender discovery & analysis
  • Documentation support
  • Bid strategy & submission
  • GeM registration & OEM onboarding

📞 Call / WhatsApp: +91 7069661818
🌐 Website: www.tender18.com

Due Date
T18 Ref No : 16957354
Location : aligarh , uttar pradesh
Source : GEM Tenders
LIVE TENDER
tender for carriage of pcc and stp poles 8.5, 11 and 13 mtr , carriage of line material , erection of pcc and stp poles 8.5, 11 and 13 mtr , erection of double poles 8.5, 11 and 13 mtr , installation and fixing of 11 kv tpmo. , erection and grouting of stay set , providing and fixing of insulator , laying of acsr weasal, rabbit and dog conductor. , erection of abc conductor , grouting of pcc and stp poles , making of plinth , fixing of earthing rod , chopping of tree branches , providing and fixing of clamps of lt , providing and fixing , carriage and installation of 25 kva transformer , carriage and installation of 63 kva transformer , carriage and installation of 100 kva transformer , carriage and installation of 400 kva transformer , dismantling of old pcc and stp poles , dismantling and removal of conductor , erection of section tee pole , carriage and installation of lt dist box , provding and fixing, filling cable joints , safe carriage of cables , laying of under ground cable , laying of overhead cable , guarding of 11 kv line by gi wire , safe carriage and installation of metering unit , safe carriage and installation of metering cubicle , provding and fixing wearing gi pipe, erection and commissioning of transformer and pole and line, carriage of pcc and stp poles from store centre or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends, also including the work of dragging etc and also including the cost of labour, t and p carrier etc required for proper completion of work dist 0 to 50 kms, carriage of line material viz lt cable, conductor, gi earth wire, barbed wire, cross arm, angle, channel, insulator, various clamps, xlpe cable, cable, stone pad and other line material from store centre or from any other place to the respective site of work through the kachha pacca road including the work of its loading and unloading at the respective end, also including the work of dragging etc and also including the cost of labour, t and p carrier etc required for proper completion of work dist 0 to 50 kms, erection of single support including complete h.t and l.t fittings with drilling and cutting as per resspo manual and as per direction of engineer incharge including the cost of labour, t and p and carrier etc required for proper completion of work, erection of double and section pole on following poles including including complete h.t and l.t fittings with drilling and cutting and the work of complete line as per resspo norms manual and as per direction of engineer incharge including the cost of labour, t and p and carrier etc required for proper completion of work, erection of double and section pole on following poles including including complete h.t and l.t fittings with drilling & cutting and the work of complete line as per resspo norms manual and as per direction of engineer incharge including the cost of labour, t and p and carrier etc required for proper completion of work, erection and grouting of stay set including the work of nozzling etc as per resspo manual and also including the cost of arrangement of all grouting material, labour, t and p etc required for proper completion of work, providing and fixing of stay insulator, laying, sagging, stringing, binding and jumpering etc of line conductor on the newly erected pole as per resspo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t and p carrier etc required for proper completion of work, abc conductor 3x50+1x35+1x16 sqmm and 3x95+1x70+1x16 sqmm and 3x120+1x95+1x16 sqmm and 1x16+1x25 sqmm, grouting of pcc and stp poles 8.5, 11 and 13 mtr long as per resspo norms, making the plinth of steel poles, fixing of earthing rod as per resspo manual and as per direction of supervising engineer including the cost of labour, t and p etc required for proper completion of work, chopping of tree branches which are touching to ht and lt lines, providing and fixing of clamps of lt, cross arm holding, f clamp, stay clamp, danger board clamp and all type clamps with nut and bolts as per actual site requirement, providing and fixing of lt shackle insulator, providing and fixing of missing nut bolts and washer, carriage and installation from site to store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and t and p etc required for proper completion earthing and jumphering of work, dismentling of old pcc and stp poles for shifting after dismentling of all accessories. it includes the work of cartage, cost of labour, t and p carrier etc required for proper completion of work, dismantling and removal of existing conductor, cable, gi wire from the various area preparing their coils and then stacking in the respective jeos store as per direction of supervising engineer it includes the work of cartage, cost of labour, t nad p carrier etc required for proper completion of work, erection of section tee pole including fixing of all fittings as per respo norms, carriage and installation of lt distribution box three phase distribution box from store centre sarsol to pit site including loading and unloading at both ends mounting and fixing on pole also by making connections as per resspo norms, provding and fixing and filling of 3x70,3x120,3x185 11 kv xlpe heat shrinkable cable jointing kits indoor and outdoor type including the cost of labour t and p carrier etc for proper completion of work, safe carriage of 3x70,3x120,3x185,3x300 sqmm 33 kv by 11 kv xlpe cable from store center to respective site of work including loading and unloading at both ends for proper completion of work, laying of 3x70,3x120,3x185,3x300 sqmm 33 kv and 11 kv under ground cable by straight through after digging trench of 600 mm wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable the cable shall be duly protected by ist class bricks, two on either side and third on top of the cable, laid in series one after the other. the work includes supplying of fine sand and bricks, filling and ramming of the left out soil, closing the trench and levelling spare cable shall be left and buried in the trench in the shape of rings at both ends all material except cable, labour, t and p carrier etc, required for proper completion of work will be arranged by the contractor at his own cost, laying of 3x70,3x120,3x185,3x300 sqmm 33 kv and 11 kv overhead cable work includes labour, t and p carrier etc, required for proper completion of work will be arranged by the contractor at his own cost, guarding of 11 kv line by laying two nos gi wire parallel and fixing of lacings tilli at a distance at 2 to 3 mtr as per respo manual and also including the cost of arragement of labour, t and p etc required for proper completion of work, safe carriage and installation of 33kv by 11 kv ct and pt pole mounted metering unit on double pole after fixing of channel with m s clamps and nuts bolts for holding the channel angle etc the unit body shall be earthed by connecting m s strip of size 1,8x1 finally connected to earthing rod of size 20mm x2540 mm 11 kv line shall be connected to unit as per instructions of sdo and ae m the m s strip and earth rod shall be included in the scope of work, safe carriage and installation of 33kv by 11 kv pilfer proof metering cubicle from store centre, sarsol to site of work, provding and fixing wearing gi pipe 6 inch dia on the feeder cable before mounting the cable on the double pole lifting, mounting and clamping of 11 kv feeder cable with boxes on the feeder double pole structure and making connections including supply
T18 Ref No : 16957361
Location : aligarh , uttar pradesh
Source : GEM Tenders
LIVE TENDER
tender for carriage of pcc and stp poles 8.5, 11 and 13 mtr , carriage of line material , erection of pcc and stp poles 8.5, 11 and 13 mtr , erection of double poles 8.5, 11 and 13 mtr , installation and fixing of 11 kv tpmo. , erection and grouting of stay set , providing and fixing of insulator , laying of acsr weasal, rabbit and dog conductor. , erection of abc conductor , grouting of pcc and stp poles , making of plinth , fixing of earthing rod , chopping of tree branches , providing and fixing of clamps of lt , providing and fixing , carriage and installation of 25 kva transformer , carriage and installation of 63 kva transformer , carriage and installation of 100 kva transformer , carriage and installation of 400 kva transformer , dismantling of old pcc and stp poles , dismantling and removal of conductor , erection of section tee pole , carriage and installation of lt dist box , provding and fixing, filling cable joints , safe carriage of cables , laying of under ground cable , laying of overhead cable , guarding of 11 kv line by gi wire , safe carriage and installation of metering unit , safe carriage and installation of metering cubicle , provding and fixing wearing gi pipe, erection and commissioning of transformer and pole and line, carriage of pcc and stp poles from store centre or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends, also including the work of dragging etc and also including the cost of labour, t and p carrier etc required for proper completion of work dist 0 to 50 kms, carriage of line material viz lt cable, conductor, gi earth wire, barbed wire, cross arm, angle, channel, insulator, various clamps, xlpe cable, cable, stone pad and other line material from store centre or from any other place to the respective site of work through the kachha pacca road including the work of its loading and unloading at the respective end, also including the work of dragging etc and also including the cost of labour, t and p carrier etc required for proper completion of work dist 0 to 50 kms, erection of single support including complete h.t and l.t fittings with drilling and cutting as per resspo manual and as per direction of engineer incharge including the cost of labour, t and p and carrier etc required for proper completion of work, erection of double and section pole on following poles including including complete h.t and l.t fittings with drilling and cutting and the work of complete line as per resspo norms manual and as per direction of engineer incharge including the cost of labour, t and p and carrier etc required for proper completion of work, erection of double and section pole on following poles including including complete h.t and l.t fittings with drilling & cutting and the work of complete line as per resspo norms manual and as per direction of engineer incharge including the cost of labour, t and p and carrier etc required for proper completion of work, erection and grouting of stay set including the work of nozzling etc as per resspo manual and also including the cost of arrangement of all grouting material, labour, t and p etc required for proper completion of work, providing and fixing of stay insulator, laying, sagging, stringing, binding and jumpering etc of line conductor on the newly erected pole as per resspo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t and p carrier etc required for proper completion of work, abc conductor 3x50+1x35+1x16 sqmm and 3x95+1x70+1x16 sqmm and 3x120+1x95+1x16 sqmm and 1x16+1x25 sqmm, grouting of pcc and stp poles 8.5, 11 and 13 mtr long as per resspo norms, making the plinth of steel poles, fixing of earthing rod as per resspo manual and as per direction of supervising engineer including the cost of labour, t and p etc required for proper completion of work, chopping of tree branches which are touching to ht and lt lines, providing and fixing of clamps of lt, cross arm holding, f clamp, stay clamp, danger board clamp and all type clamps with nut and bolts as per actual site requirement, providing and fixing of lt shackle insulator, providing and fixing of missing nut bolts and washer, carriage and installation from site to store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and t and p etc required for proper completion earthing and jumphering of work, dismentling of old pcc and stp poles for shifting after dismentling of all accessories. it includes the work of cartage, cost of labour, t and p carrier etc required for proper completion of work, dismantling and removal of existing conductor, cable, gi wire from the various area preparing their coils and then stacking in the respective jeos store as per direction of supervising engineer it includes the work of cartage, cost of labour, t nad p carrier etc required for proper completion of work, erection of section tee pole including fixing of all fittings as per respo norms, carriage and installation of lt distribution box three phase distribution box from store centre sarsol to pit site including loading and unloading at both ends mounting and fixing on pole also by making connections as per resspo norms, provding and fixing and filling of 3x70,3x120,3x185 11 kv xlpe heat shrinkable cable jointing kits indoor and outdoor type including the cost of labour t and p carrier etc for proper completion of work, safe carriage of 3x70,3x120,3x185,3x300 sqmm 33 kv by 11 kv xlpe cable from store center to respective site of work including loading and unloading at both ends for proper completion of work, laying of 3x70,3x120,3x185,3x300 sqmm 33 kv and 11 kv under ground cable by straight through after digging trench of 600 mm wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable the cable shall be duly protected by ist class bricks, two on either side and third on top of the cable, laid in series one after the other. the work includes supplying of fine sand and bricks, filling and ramming of the left out soil, closing the trench and levelling spare cable shall be left and buried in the trench in the shape of rings at both ends all material except cable, labour, t and p carrier etc, required for proper completion of work will be arranged by the contractor at his own cost, laying of 3x70,3x120,3x185,3x300 sqmm 33 kv and 11 kv overhead cable work includes labour, t and p carrier etc, required for proper completion of work will be arranged by the contractor at his own cost, guarding of 11 kv line by laying two nos gi wire parallel and fixing of lacings tilli at a distance at 2 to 3 mtr as per respo manual and also including the cost of arragement of labour, t and p etc required for proper completion of work, safe carriage and installation of 33kv by 11 kv ct and pt pole mounted metering unit on double pole after fixing of channel with m s clamps and nuts bolts for holding the channel angle etc the unit body shall be earthed by connecting m s strip of size 1,8x1 finally connected to earthing rod of size 20mm x2540 mm 11 kv line shall be connected to unit as per instructions of sdo and ae m the m s strip and earth rod shall be included in the scope of work, safe carriage and installation of 33kv by 11 kv pilfer proof metering cubicle from store centre, sarsol to site of work, provding and fixing wearing gi pipe 6 inch dia on the feeder cable before mounting the cable on the double pole lifting, mounting and clamping of 11 kv feeder cable with boxes on the feeder double pole structure and making connections including supply
T18 Ref No : 15632401
Location : kasganj , uttar pradesh
Source : GEM Tenders
corrigendum tender for supply of lt ab cable , supply of st pole lt clamp , supply of ms channel dropper , supply of stone pad , supply of holding clamp , supply of m.s. angle , supply of m.s. channel , supply of suspension clamp , supply of m.s. top channel , supply of dead end clamp , supply of danger board , supply of eye hook , supply of barbed wire g.i. , supply of aluminium paint , supply of red oxide paint , supply of number plate , supply of copper l-piece , supply of al leg long barrel , supply of henley type tailless unit , supply of lt t off clamp , supply of lt pvc cable , supply of gi wire 8 swg , supply of hdpe pipe , supply of dp clamp , supply of guarding angle , supply of guarding angle clamp , supply of pcc pole lt clamp , supply of gi pipe , supply of lt shackle insulator , supply of nut and bolts , safe carriage of 25 kva tf , safe carriage of 63 kva tf , safe carriage of 100 kva tf , safe carriage of 250 kva tf , safe carriage of pcc pole , safe carriage of st pole , safe carriage of acsr weasel conductor , safe carriage of acsr dog conductor , safe carriage of lt xlpe cable , safe carriage of disc insulator , safe carriage of disc fitting , safe carriage of pin insulator , safe carriage of pin with nut , safe carriage of tpmo , safe carriage of 11 kv fuse set , safe carriage of lt fuse set , safe carriage of stay set complete , safe carriage of earthing rod , safe carriage of 11 kv xlpe cable , safe carriage of 11 kv j kit od , safe carriage of 33 kv xlpe cable , safe carriage of 33 kv j kit i d , safe carriage of 33 kv j kit od , safe carriage of 11 kv cross arm clamp , safe carriage of 11 kv cross arm v-tpye , safe carriage of 33 kv cross arm clamp , safe carriage of 33 kv cross arm v-tpye , safe carriage of 11 kv f-clamp , safe carriage of 33 kv f-clamp , safe carriage of t-off channel , safe carriage of clamp of t-off channel , erection of 25 kva t f , erection of 63 kva t f , erection of 100 kva t f , erection of 250 kva tf , erection of pcc double pole , erection of pcc pole , erection of st double pole , erection of st pole , erection of pipe earthing , erection of plinth , erection of fencing , erection of hdpe pipe , erection of acsr weasel conductor , erection of acsr dog conductor , erection of lt ab cable , erection of lt pcv cable , erection of ms channel , erection of m.s. angle , erection of m.s. channel , erection of suspension clamp , erection of m.s. top channel , painting of st poles , erection of danger board , erection of barbed wire , erection of g.i. wire , erection of number plate , erection of copper l-piece , erection of al leg long barrel , erection of henley type tailless unit , erection of gi pipe , erection of lt shackle insulator , erection of stay set complete , erection of lt xlpe cable , erection of 11 kv tpmo , erection of fuse set , erection of 11 kv xlpe cable , erection of 11 kv j kit od , erection of 33 kv xlpe cable , erection of 33 kv j kit id , erection of 33 kv jkit od , erection of eye hook, installation of additional tfs and line strenghtning work, lt ab cable (3x120+1x95+1x16) sqmm, lt clamp with nut&bolt stp pole with netural, ms channel dropper 100x50x2028 mm, stone pad 300x300x75 mm, holding clamp for top channel tpmo & fuse set with nut & bolt, m.s. angle 75x75x6x2028mm with clamp nut & bolt t/f base, m.s. channel (125x65x1300 mm) t-off, suspension clamp, m.s. top channel 125x65x2240 mm, dead end clamp, danger board with clamp, eye hook, barbed wire (g.i.), aluminium paint, red oxide paint, number plate, copper l-piece 50x225x10 mm (ls), copper l-piece 62x225x12 mm (ls), al leg long barrel of size (ls), henley type tailless unit for 250 kva, lt t off clamp with nut & bolt, lt pvc cable 3.5x150/70 sqmm, gi wire 8 swg, 140 mm od pn-4pe-80 grade uv stabilized hdpe pipe in 6 mtr, dp clamp for pcc pole, guarding angle, guarding angle clamp, lt clamp for pcc pole, gi pipe 6 dia, lt shackle insulator, nut & bolts for lt shackle insulator, safe carriage of 11/0.4 kv tf 25 kva & following materials from electricity store center soron/etah / aligarh to the site of work, including loading & unloading at both ends, traspotation upto the work side. the rates shall be inclusive of all labour charges, t&p and all incidental expenses required for complete execution of the work., 11/0.4 kv tf 63 kva, 11/0.4 kv tf 100 kva, 11/0.4 kv tf 250 kva, pcc pole 8.5 mtr, stp pole 11 metre, acsr weasel conductor, acsr dog conductor, lt xlpe cable al 1x240 sqmm, 11 kv disc insulator t&c type 4500 kg., 11 kv disc fitting, 11 kv pin insulator, 11 kv pin with nut, 11 kv tpmo, 11 kv fuse set, lt fuse set, stay set complete, earthing of pole by ms earthing rod of 20x2500 mm and 6 swg earthing wire etc., 11 kv xlpe cable 3x120 sqmm (with spare cable), 11 kv xlpe cable 3x185 sqmm (with spare cable), 11 kv 3x185 sqmm outdoor j/k, 33 kv 3x300 sqmm xlpe cable, 11 kv 3x120 sqmm outdoor j/k, 33 kv 3x300 sqmm indooe j/k, 33 kv 3x300 outdoor j/k, 33 kv polymer pin insulator, 33 kv pin with nut, 11 kv cross arm clamp, 11 kv cross arm v-tpye, 33 kv cross arm clamp, 33 kv cross arm v-tpye, 11 kv f-clamp for pcc pole, 33 kv f-clamp for pcc pole, t-off channel, clamp of t-off channel, installation of new 25 kva, 11/0.4 kv transformer complete in all respects, installation of new 63 kva, 11/0.4 kv transformer complete in all respects, installation of new 100 kva, 11/0.4 kv transformer complete in all respects, installation of new 250 kva, 11/0.4 kv transformer complete in all respects, erection of double support with complete ht/lt fittings on 8.5 m pcc poles, including earthing, grouting, and muffing of poles, erection of single support with complete ht/lt fittings on 8.5 m pcc poles, including earthing, grouting, and muffing of poles, erection of double support with complete ht/lt fittings on 11 m st poles, including earthing, grouting, and muffing of poles, erection of single support with complete ht/lt fittings on 11 m st poles, including earthing, grouting, and muffing of poles, installation of pipe earthing (body and neutral) up to 60 feet depth or minimum water level, as per respo norms, construction and installation of plinth for 250 kva transformer, complete in all respects, construction and installation of 6-foot-high fencing for 250 kva transformer, including civil works for a 4mx4 m area, complete in all respects, laying & fixing hdpe pipeunder ground through hdd method, laying sagging stringing, binding and jumpering acsr weasel conductor, laying sagging stringing, binding and jumpering acsr dog conductor, laying & fixing of lt ab cable (3x120+1x95+1x16) sqmm, laying & fixing of lt pvc cable 3.5x150/70 sq mm, erection & installation of ms channel (dropper) 100x50x2028 mm, erection & installation of m.s. angle 75x75x6x2028mm with clamp nut & bolt t/f base, erection & installation of m.s. channel (125x65x1300 mm) t-off, erection & installation of suspension clamp, erection & installation of dead end clamp, erection & installation of m.s. top channel 125x65x2240 mm, painting of st pole with red oxide & ailunimum paint as per respo norms, fixing of danger board with clamp, laying & fixing of barbed wire (g.i.), laying & fixing of g.i. wire 8 swg, fixing of number plate, erection & installation of copper l-piece 50x225x10 mm (ls), erection & installation of copper l-piece 62x225x12 mm (ls), erection & installation of al leg long barrel of size (ls), erection & installation of henley type tailless unit for 250 kva, laying & fixing of gi pipe 6 dia, erection & installation of lt shackle insulator, erection & installation of stay set complete in all respect, laying & fixing of lt xlpe cable al 1x240 sqmm, erection & installation of 11 kv tpmo, erection & installation of 11 kv fuse set, erection & installation of lt fuse set, laying & fixing of 11 kv xlpe cable 3x120 sqmm (with spare cable), laying & fixing of 11 kv xlpe cable 3x185 sqmm (with spare cable), laying & fixing of 11 kv 3x185 sqmm outdoor j/k, laying & fixing of 33 kv 3x300 sqmm xlpe cable, laying & fixing of 11 kv 3x120 sqmm outdoor j/k, laying & fixing of 33 kv 3x300 sqmm indooe j/k, laying & fixing of 33 kv 3x300 outdoor j/k, laying & fixing of eye hook

Unlock Full Tender Access

Start Free Trial to download documents before deadline

T18 Ref No : 15733182
Location : kasganj , uttar pradesh
Source : GEM Tenders
corrigendum tender for safe carriage of pcc pole , safe carriage of st pole , cartage of line material , erection of pcc pole , erection of st pole , erection of doubel pcc pole , erection of stay set , erection of earthing rod , safe carriage of xlpe cable , erection of cable , erection of xlpe cable , erection of conductor , erection of ab cable , erection of tf , safe carriage of 11 kv pilfer proof metering cubicle , erection of 11 kv pilfer proof metering cubicle , guarding of 11 kv line , cutting and chopping of tree , providing and fixing of dp clamps , safe carriage of 11 kv ct pt , erection of 11 kv ct pt , safe carriage of lt distribution box , fencing of 250 kva tf , plinth of 250 kva tf , safe carriage and installation of 250 kva tf , providing and fixing of nut bolt , providing and fixing of holding clamps , safe carriage and installation of 11 kv pilfer proof cubical, running tender under full deposit scheme in edd soron kasganj, safe carriage of following pcc pole 8.5 mtr store centre or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, t&p carrier etc. required for proper completion of work., st pole 9/11 mtr, cartage of line material viz weasal conductor, gi earth wire, cross arm, angle, channel, insulator, clamps & other line material from store centre or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, t&p carrier etc. required for proper completion of work., erection of single support pcc pole 8.5 mtr including complete h.t/l.t fittings with grouting , earthing, muffling and digging etc. as per respo norms manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work., stp 9/11 mtr., erection of double pole on pcc poles 8.5 mtr. including the work of complete line with grouting , earthing, muffling and digging etc. as per respo norms manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work., erection of stay set complete including the work of nuzzling etc. as per respo manual and also including the cost of arrangement of all grouting material, labour, t&p fixing of stay insulator etc. required for proper completion of work., fixing of earthing rod as per respo manual and as per direction of supervising engineer including the t&p, cost of labour., safe carriage of xlpe cable of size 3x(35/70/120/185) sq. m.m. from store to respective site of work including loading unloading at both ends., laying of 3x(35/70/120/185) sq.mm. 11 kv under ground cable after digging trench of 600 mm. wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable. the cable shall be duly protected by ist class bricks, two on either side and third on top of the cable, laid in series one after the other. the work includes supplying of fine sand and bricks, filling and ramming of the left out soil, closing the trench and levelling. spare cable shall be left and buried in the trench in the shape of rings at both ends. all material (except cable), labour, t&p carrier etc, required for proper completion of work will be arranged by the contractor at his own cost., filling of 3x70/120 sq. m.m. 11 kv xlpe heat shrinkable cable jointing kits outdoor/indoor type including the cost of labour t&p carrier etc for proper completion of work., laying sagging stringing, binding and jumpering etc. of acsr weasel conductor/ rabbit / dog conductoron the newly erected pole as per respo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t&p carrier etc. required for proper completion of work., lt abc 3x50+1x35+1x16 bunch conductor, lt abc 1x16 bunch conductor, carriage and installation from store to site of 10/16/25/63/100 kva t/f including the work of its loading & unloading, dragging etc. and also including the cost of labour and t&p etc. required for proper completion of work., safe carriage of 11 kv pilfer proof metering cubicle from store centre, soron (kasganj) to site of work including loading and unloading at both ends. average distance approx. 0 km to 50 km., erection & grouting of 11 kv pilfer-proof metering cubicle making connections with bus bar, tapping with empire tape with existing earthing. the above work includes the cost of labour, t&p, carrier & material etc. required for proper completion of work except cost of 11 kv vcbs., guarding of 11 kv line by laying two nos. gi wire parallel and fixing of lacings (tilli) at a distance at 2-3 mtr. as per respo manual and also including the cost of arragement of labour, t & p carrier etc. required for proper completion of work., cutting and chopping of tree branches which comes on ht/lt lines., providing and fixing of dp clamp on vendors cost., safe carriage of 11 kv ct/pt pole mounting unit of any other place or from site of work to the work of its loading and unloading at the respective ends including the cost of labour t&p and carrier etc. required for proper completion of work., installation of 11 kv ct-pt combined metering unit on double pole after fixing of channel with m.s. clamps and nuts bolts for holding the channel angle etc. the unit body shall be earthed by connecting m.s. strip of size 1/8x1 finally connected to earthing rod of size 20mm x2540 mm. 11 kv line shall be connected to unit as per instructions of sdo/ae(m). the m.s. strip & earth rod shall be included in the scope of work., safe carriage of lt distribution box (three phase) from store centre soron (kasganj) to pit site including loading and unloading at both ends mounting and fixing on pole also by making connections as per respo norms., providing and fixing of welded wire mesh fencing around 250 kva transformer plinth with ms angle of size 40x40x6 mm length and 1.20 mtrs height. such panels shall be supported on ms angle from of size 40x40x6 mm having 04 nos corner supports of height 1.65 mtrs including extended legs for grouting which will be used as a door for entry of the personel or removal/shifting of transformer with welded hinges, sliding belt etc for locking arrangement as per drawing and specifications. the fencing will be painted in the green colour synthetic enamel paint after painting with one coat of red oxide primer. the rates should be inclusive of all materials required for completion of above work. (length of each fencing approx. 11 mtrs) with t&p labour etc. by the contractor., making of plinth for 250 kva tf in all respect as per respo norms at vendors cost., safe carriage and installation from store to site of 250 kva transformer including the work of its loading & unloading, dragging etc. and also including the cost of labour and t&p etc. required for proper completion of work., providing and fixing of nut bolt off size as per site requirment on vendors cost, providing and fixing of various type lt ht holding clamp for st/pcc pole as per site requirment on vendors cost., safe carriage and installation from store to site of 11 kv pilfer proof metering cubicle including the work of its loading & unloading, dragging etc. and also including the cost of labour and t&p etc. required for proper completion of work.
T18 Ref No : 15749249
Location : mainpuri , uttar pradesh
Source : GEM Tenders
corrigendum tender for carriage of distribution transformer 100 kva from esc mnp , carriage of distribution transformer 250 kva from esc mnp , carriage of acsr weasel conductor from esc mnp , carriage of m s earthing rod 20 x2540 mm from esc mnp , carriage of lt al. xlpe cable size 1x240 sq.mm. from esc mnp , carriage of lt xlpe cable 1x120 sq.mm. for dtr from esc mnp , carriage of lt xlpe cable 1x400 sq.mm. for dtr from esc mnp , carriage of lt xlpe cable size 3.5x70 or 35 sq.mm. from esc mnp , carriage of lt ab cable 3x120 1x95 1x16 sq.mm. from esc mnp , carriage of lt ab cable 3x50 1x35 1x16 sq.mm. from esc mnp , carriage of lt ab cable 3x95 1x70 1x16 sq.mm. from esc mnp , carriage of 33 kv xlpe cable 3x300 sq.mm. from esc mnp , carriage of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. from esc mnp , carriage of 33 kv straight through size 3x300 sq.mm. from esc mnp , carriage of g.i. wire 6 or 8 swg for guarding from esc mnp , carriage of three phase distribution box from esc mnp , erection of fixing of lt fuse set protection box with all respective accessories as per norms , execution of chemical earthing with g.i. patti clamp nut and bolts as per norms , erection of l.t. tail less unit with all respective material as grouted angel with fabrication work etc. , laying of acsr weasel conductor , laying of lt ab cable 3x120 1x95 1x16 sq.mm. , laying of lt ab cable 3x50 1x35 1x16 sq.mm. , laying of lt ab cable 3x95 1x70 1x16 sq.mm. , mounting of three phase distribution box , erection of double pole structure 8.5 mtr pcc pole , erection of single pole structure 8.5 mtrs pcc pole , erection of tri pole structure 33 kv 13 mtr st pole , grouting of pcc or stp pole , grouting of stay , earthing of pole , guarding of 11 kv line , fencing of 250 kva distribution transformers , plinth for 250 kva transformer , installation of 11by0.4 kv tf 25 kva , installation of 11by0.4 kv tf 63 kva , installation of 11by0.4 kv tf 100 kva , installation of 11by0.4 kv tf 250 kva , laying of 33 kv xlpe cable 3x300 sq.mm. , installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms. , dismentlling, received back and safe carriage of jarjar g.i. wire and weasel conducter including with rolling from pit site to esc, mainpuri , received back of distribution transformer after, boqbhogaon, clamp for 11 kv v type cross arm with bolts and nuts, three phase distribution box clamp with nut and bolts, connecting cable for distribution box 1x35 sq.mm., l.t. fuse set protection box with all accessories, tinned copper fuse wire different size, hdpe pipe 140 mm., stone pad 300x300x75, holding clamp for doulble pole unit with nut and bolts, ms angle 75x75x6x2028mm with clamp and bolt and nut t or f base, t off chhanel and t off clamp with nut and bolts, top chhanel 125x65x240, dropper channel 100x50x2028 mm., danger board with clamp and nut and bolt, chemical earthing with g.i. patti clamp nut and bolts as per norms, l.t. tail less unit with all respective material angel, patti and other material, copper l pieace 62x225x12mm., 11 kv f clamp with nut and bolts, suspension clamp, dead end clamp, eye i hook, eye bolts for guarding, j hook, lt clamp for pcc or stp with bolts and nuts, pearcing connector, alluminium lug 120 sq.mm., alluminium lug 240 sq.mm., alluminium lug 400 sq.mm., nut bolts and washers off size, guarding angel, guarding angel clamp, m.s. angel iron 65x65x6 mm. 2700 mm long bracing with 4 nos clamp with nut and bolts, 13 m stp pole sp55 galvanised, 8.5 m pcc pole, v type cross arm for 11 kv, 11 kv pin insulator with pin, disc insulator with fitting t and c 45 kn 114 nos and 70kn 27 nos, 11 kv fuse set, 11 kv tpmo with polymer insulator, complete stay 9gi stay rod 20x1800 mm stay wire 7 and 8 swg 10 kg stay clamp bolt nut and washer, distribution transformer 25 kva, distribution transformer 63 kva, distribution transformer 100 kva, distribution transformer 250 kva, acsr weasel conductor or insulated conductor as provided by department, m s earthing rod 20 x2540 mm, lt al. xlpe cable size 1x240 sq.mm., lt xlpe cable 1x120 sq.mm. for dtr, lt xlpe cable 1x400 sq.mm. for dtr, lt xlpe cable size 3.5x70 or 35 sq.mm., lt ab cable 3x120 1x95 1x16 sq.mm., lt ab cable 3x50 1x35 1x16 sq.mm., lt ab cable 3x95 1x70 1x16 sq.mm., 33 kv xlpe cable 3x300 sq.mm., 33 kv indoor or outdoor jointing kit size 3x300 sq.mm., 33 kv straight through size 3x300 sq.mm., g.i. wire 6 or 8 swg for guarding, three phase distribution box, fixing of l.t. fuse set protection box with all respective accessories as per norms, l.t. tail less unit with all respective material as grouted angel with fabrication work etc., laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr weasel conductor or insulated conductor as provided by department, laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x120 1x95 1x16 sq.mm., laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x50 1x35 1x16 sq.mm, laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x95 1x70 1x16 sq.mm., mounting of three phase distribution box with clamp nut & bolts and make proper connection with connecting cable., erection of double pole structure 8.5 mtr pcc pole by digging of pits fitting of all relevant accessories as per respo norms. 34 nos pole at different location under concern division., erection of single pole structure 8.5 mtrs pcc pole by digging of pits fitting of all relevant accessories as per respo norms. at different location under concern division., erection of tri pole structure 33 kv 13 mtr st pole by digging of pits fitting of all relevant accessories as per respo norms. 3 nos pole at different location under concern division., grouting of pcc or stp pole long as per respo norms with material cement, sand, blast stone with the ratio 0.268 cu.m. each will be provided by conractor, grouting of stay as per respo norms cement, sand, blast stone material will be provided by conractor, earthing of pole by m s earthing rod 20 x2540 mm with 6 swg earthing wire etc and make proper connection., guarding of 11 kv line with gaurding angel, clamp eye bolts and gaurding g.i. wire 6 or 8 swg 30 span, fencing of distribution transformers with enamel in proper alignment as per respo manual and as per direction of executive engineer including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work., plinth for 250 kva transformer proper size as per resspo norms, installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 25 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 63 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 100 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 250 kva with l.t. xlpe cable suitable size with all respective material as per norms., laying of following cable by hdd method with hdpe pipe (140 mm.) including digging and restoring along with brick and sand including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work. 33 kv xlpe cable 3x300 sq.mm., installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms., dismentlling of jarjar g.i. wire and weasel conducter including with rolling received back and safe carriage from pit site to esc, mainpuri, received back of distribution transformer after increasing capacity from pit site to esc, mainpuri ( 17 nos 100 kva)
T18 Ref No : 15763006
Location : mainpuri , uttar pradesh
Source : GEM Tenders
corrigendum tender for supply of 11 kv v type cross arm clamp , supply of 3 phase dis. box clamp with nut and bolts , supply of connecting cable , supply of l.t. fuse set protection box , supply of tinned copper fuse wire different size , supply of hdpe pipe , supply of stone pad , supply of holding clamp , supply of ms angle , supply of t-off chhanel , supply of top chhanel 125x65x240 , supply of dropper channel 100x50x2028 mm. , supply of danger board with clamp and nut and bolt , supply of g.i. patti clamp nut and bolts , supply of l.t. tail less unit , supply of copper l-pieace , supply of 11 kv f clamp , supply of suspension clamp , supply of dead end clamp , supply of eye i hook , supply of eye bolts for guarding , supply of j hook , supply of lt clamp , supply of pearcing connector , supply of alluminium lug 120 sq.mm. , supply of alluminium lug 240 sq.mm. , supply of alluminium lug 70 sq.mm. , supply of nut bolts and washers off size , supply of guarding angel , supply of guarding angel clamp , supply of m.s. angel iron 65x65x6 mm. , carriage of 9 m stp pole-sp- 55 galvanised , carriage of 11 m stp pole-sp- 55 galvanised , carriage of 8.5 m pcc pole , carriage of v type cross arm for 11 kv , carriage of 11 kv pin insulator with pin , carriage of disc insulator with fitting t and c 45 kn , carriage of 11 kv fuse set , carriage of 11 kv tpmo with polymer insulator , carriage of complete stay , carriage of distribution transformer 25 kva , carriage of distribution transformer 63 kva , carriage of distribution transformer 100 kva , carriage of distribution transformer 250 kva , carriage of acsr dog conductor , carriage of acsr weasel conductor , carriage of m s earthing rod 20 x2540 mm , carriage of lt al. xlpe cable size 1x240 sq.mm. , carriage of lt pvc cable 1x120 sq.mm. for dtr , carriage of lt pvc armoured cable size 3.5x70 or 35 sq.mm. , carriage of 11, boqbpkarhalmnp, supply of clamp for 11 kv v type cross arm with bolts and nuts, supply of three phase distribution box clamp with nut and bolts, supply of connecting cable for distribution box 1x35 sq.mm., supply of l.t. fuse set protection box with all accessories, supply of tinned copper fuse wire different size, supply of hdpe pipe 140 mm., supply of stone pad300x300x75, supply of holding clamp for doulble pole unit with nut and bolts, supply of ms angle 75x75x6x2028mm with clamp and bolt and nutt or f base, supply of t-off chhanel+ t or f clamp with nut and bolts, supply of top chhanel 125x65x240, supply of dropper channel 100x50x2028 mm., supply of danger board with clamp and nut bolt, supply of chemical earthing with g.i. patti clamp nut and bolts as per norms, supply of pipe earthing with g.i. patti clamp nut and bolts as per norms, supply of l.t. tail less unit with all respective material angel, patti and other material, supply of copper l-pieace 62x225x12mm., supply of 11 kv f clamp with nut and bolts, supply of suspension clamp, supply of dead end clamp, supply of eye i hook, supply of eye bolts for guarding, supply of j hook, supply of lt clamp for pcc or stp with bolts and nuts, supply of pearcing connector, supply of alluminium lug 120 sq.mm., supply of alluminium lug 240 sq.mm., supply of alluminium lug 70 sq.mm., supply of nut bolts and washers off size, supply of guarding angel, supply of guarding angel clamp, supply of m.s. angel iron 65x65x6 mm., 2700 mm long bracing with 4 nos clamp with nut and bolts, carriage of 9 m stp pole-sp- 55 galvanised, carriage of 11 m stp pole-sp- 55 galvanised, carriage of 8.5 m pcc pole, carriage of v type cross arm for 11 kv, carriage of 11 kv pin insulator with pin, carriage of disc insulator with fitting tandc 45 kn, carriage of 11 kv fuse set, carriage of 11 kv tpmo with polymer insulator, carriage of complete stay 9gi stay rod 20x1800 mm, stay wire 7 or 8 swg, 10 kg, stay clamp, bolt, nut and washer, carriage of distribution transformer 25 kva, carriage of distribution transformer 63 kva, carriage of distribution transformer 100 kva, carriage of distribution transformer 250 kva, carriage of acsr dog conductor, carriage of acsr weasel conductor or or insulated conductor as provided by department, carriage of m s earthing rod 20 x2540 mm, carriage of lt al. xlpe cable size 1x240 sq.mm., carriage of lt pvc cable 1x120 sq.mm. for dtr, carriage of lt pvc armoured cable size 3.5x70 or 35 sq.mm., carriage of 11 kv xlpe cable 3x185 sq.mm., carriage of lt ab cable 3x120+1x95+1x16 sq.mm., carriage of lt ab cable 3x50+1x35+1x16 sq.mm., carriage of lt ab cable 3x95+1x70+1x16 sq.mm., carriage of lt pvc armoured cable size 4x25 sq.mm., carriage of 33 kv xlpe cable 3x300 sq.mm., carriage of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm., carriage of 11 kv indoor or outdoor jointing kit size 3x185 sq.mm., carriage of 33 kv straight through size 3x300 sq.mm., carriage of 11 kv straight through size 3x185 sq.mm., carriage of 11 kv vcb for o or g ctr 200 or 100 or 5a 350 mva1250 amp., carriage of g.i. wire 6 or 8 swg for guarding, carriage of three phase distribution box, fixing of l.t. fuse set protection box with all respective accessories as per norms, chemical earthing with g.i. patti clamp nut and bolts as per norms, pipe earthing with g.i. patti clamp nut and bolts as per norms, l.t. tail less unit with all respective material as grouted angel with fabrication work etc., laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr dog conductor., laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr weasel conductor, laying, stringing, sagging, with all respective materialclamp with nut and bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable3x120+1x95+1x16 sq.mm., laying, stringing, sagging, with all respective materialclamp with nut and bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable3x50+1x35+1x16 sq.mm., laying, stringing, sagging, with all respective materialclamp with nut and bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable3x95+1x70+1x16 sq.mm., mounting of three phase distribution box with clamp nut and bolts and make proper connection with connecting cable., erection of double pole structure 11 mtr stp pole by digging of pits fitting of all relevant accessories as per respo norms.26 nos pole at different location under concern division., erection of single pole structure 8.5 mtrs pcc pole, 9 mtr st and 11 mtr st pole by digging of pits fitting of all relevant accessories as per respo norms. at different location under concern division., grouting of pcc or stp pole long as per respo norms with materialcement, sand, blast stone with the ratio 0.268 cu.m. each will be provided by conractor, grouting of stay as per respo normscement, sand, blast stone material will be provided by conractor, earthing of pole by m s earthing rod 20 x2540 mm with 6 swg earthing wire etc and make proper connection., guarding of 11 kv line with gaurding angel, clamp eye bolts and gaurding g.i. wire 6 or 8 swg86 span, fencing of distribution transformers with enamel in proper alignment as per respo manual and as per direction of executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work., plinth for 250 kva transformer proper size as per resspo norms, installation of the following new transformers at various 11 or 0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper ht or lt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11 or 0.4 kv t or f 25 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11 or 0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper ht or lt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11 or 0.4 kv t or f 63 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11 or 0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper ht or lt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11 or 0.4 kv t or f 100 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11 or 0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper ht or lt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11 or 0.4 kv t or f 250 kva with l.t. xlpe cable suitable size with all respective material as per norms., laying of following cable including digging and restoring along with brick and sand including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work. at different location under concern division.11 kv xlpe cable 3x185 sq.mm., laying of following cable by hdd method with hdpe pipe140 mm. including digging and restoring along with brick and sand including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work. 33 kv xlpe cable 3x300 sq.mm., installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms., installation of 11 kv indoor or outdoor jointing kit size 3x185 sq.mm. as per norms., installation of 33 kv straight through size 3x300 sq.mm. as per norms., installation of 11 kv straight through size 3x185 sq.mm. as per norms., installation of 11 kv vcb and make proper connection as per norms., dismentlling of jarjar g.i. wire and weasel conducter including with rolling and safe carriage from pit site to esc, mainpuri, received back of distribution transformer after increasing capacity from pit site to esc, mainpuri 4 nos 10 or 16 kva

Unlock Full Tender Access

Start Free Trial to download documents before deadline

T18 Ref No : 15763007
Location : mainpuri , uttar pradesh
Source : GEM Tenders
corrigendum tender for , carriage of distribution transformer 250 kva from esc mnp , carriage of acsr rabbit conductor from esc mnp , carriage of acsr weasel conductor or insulated conductor as provided by department from esc mnp , carriage of m s earthing rod 20 x2540 mm from esc mnp , carriage of lt al. xlpe cable size 1x240 sq.mm. from esc mnp , carriage of lt xlpe cable 1x120 sq.mm. from esc mnp , carriage of 11 kv xlpe cable 3x185 sq.mm. from esc mnp , carriage of lt ab cable 3x120 1x95 1x16 sq.mm. from esc mnp , carriage of 33 kv xlpe cable 3x300 sq.mm. from esc mnp , carriage of 11 kv xlpe cable 3x300 sq.mm. from esc mnp , carriage of 11 kv indoor or outdoor jointing kit size 3x300 sq.mm. from esc mnp , carriage of 11 kv indoor or outdoor jointing kit size 3x185 sq.mm. from esc mnp , carriage of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. from esc mnp , carriage of 11 kv straight through size 3x185 sq.mm. from esc mnp , carriage of 11 kv vcb for og ctr 200by100by5a 350 mva 1250 amp. from esc mnp , carriage of 11 kv vcb ic ctr 600by300by5a 350 mva 1250 amp. from esc mnp , carriage of g.i. wire 6or8 swg for guarding from esc mnp , carriage of three phase distribution box from esc mnp , erection of fixing of l.t. fuse set protection box with all respective accessories as per norms , execution of chemical earthing with g.i. patti clamp nut and bolts as per norms , erection of l.t. tail less unit with all respective material as grouted angel with fabrication work etc. , laying of acsr rabbit conductor , laying of acsr weasel conductor or insulated conductor as provided by department , laying of lt ab cable 3x120 1x95 1x16 sq.mm. , mounting of three phase distribution box , erection of double pole structure , erection of single pole structure , grouting of pcc or stp pole , grouting of stay , earthing of pole , guarding of 11 kv line with gaurding angel etc , fencing of distribution transformers , make plinth for 250 kva transformer proper size as per resspo norms , installation of 11by0.4 kv tf 100 kva , installation of 11by0.4 kv tf 250 kva , laying of 11 kv xlpe cable 3x185 sq.mm. , laying of 11 kv xlpe cable 3x300 sq.mm. , laying of 33 kv xlpe cable 3x300 sq.mm. , installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms. , installation of 11 kv indoor or outdoor jointing kit size 3x185 sq.mm. as per norms. , installation of 11 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms. , installation of 11 kv straight through size 3x185 sq.mm. as per norms. , installation of 11 kv vcb og ctr 200by100by5a 350 mva 1250 amp. , installation of 11 kv vcb ic ctr 600by300by5a 350 mva 1250 amp. , dismentlling of old and damaged cable of different size , received back of distribution transformer after increasing, boqeudd, 11 kv v type cross arm clamp with bolts and nuts, three phase distribution box clamp with nut and bolts, connecting cable for distribution box 1x35 sq.mm., l.t. fuse set protection box with all accessories, tinned copper fuse wire different size, hdpe pipe 140 mm., stone pad 300x300x75, ms angle 75x75x6x2028mm with clamp and bolt and nut tf base, t off chhanel and t off clamp with nut and bolts, top chhanel 125x65x240, dropper channel 100x50x2028 mm., chemical earthing with g.i. patti clamp nut and bolts as per norms, l.t. tail less unit with all respective material angel, patti and other material, copper l pieace 62x225x12mm., 4 core lt mcb with box for 250 kva tf, 11 kv f clamp with nut and bolts, al. pg clamp weasel to weasel conductor, al. pg clamp rabbit to rabbit conductor, suspension clamp, dead end clamp, eye i hook, eye bolts for guarding, j hook, lt clamp for pcc or stp with bolts and nuts, pearcing connector, alluminium lug 120 sq.mm., alluminium lug 240 sq.mm., guarding angel, guarding angel clamp, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 8.5 m pcc pole, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 9 m stp pole sp 55 galvanised, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 m stp pole sp 55 galvanised, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 13 m stp pole sp 55 galvanised, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department v type cross arm for 11 kv, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv pin insulator with pin, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department disc insulator with fitting tandc 45 kn, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv fuse set, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv tpmo with polymer insulator, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department complete stay 9gi stay rod 20x1800 mm, stay wire 7 or 8 swg, 10 kg, stay clamp, bolt, nut and washer, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department distribution transformer 100 kva, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department distribution transformer 250 kva, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department acsr rabbit conductor, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department acsr weasel conductor or insulated conductor as provided by department, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department m s earthing rod 20 x2540 mm, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department lt al. xlpe cable size 1x240 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department lt xlpe cable 1x120 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv xlpe cable 3x185 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department lt ab cable 3x120 1x95 1x16 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 33 kv xlpe cable 3x300 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv xlpe cable 3x300 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv indoor or outdoor jointing kit size 3x300 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv indoor or outdoor jointing kit size 3x185 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 33 kv indoor or outdoor jointing kit size 3x300 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv straight through size 3x185 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv vcb for og ctr 200by100by5a 350 mva 1250 amp., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv vcb ic ctr 600by300by5a 350 mva 1250 amp., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department g.i. wire 6 or 8 swg for guarding, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department three phase distribution box, fixing of l.t. fuse set protection box with all respective accessories as per norms, l.t. tail less unit with all respective material as grouted angel with fabrication work etc., laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr rabbit conductor, laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr weasel conductor or insulated conductor as provided by department, laying, stringing, sagging, with all respective material clamp with nut and bolts suspension clamp eye j hook pearcing connector etc of following conductor cable on the erected supports, as per respo norms. lt ab cable 3x120 1x95 1x16 sq.mm., mounting of three phase distribution box with clamp nut & bolts and make proper connection with connecting cable., erection of double pole structure 11 mtr stp pole by digging of pits fitting of all relevant accessories as per respo norms. 22 nos pole at different location under concern division., erection of single pole structure 8.5 mtrs pcc pole, 9 mtr st, 11 mtr st pole, 13 mtr st by digging of pits fitting of all relevant accessories as per respo norms. at different location under concern division., grouting of pcc or stp pole long as per respo norms with material cement, sand, blast stone with the ratio 0.268 cu.m. each will be provided by conractor, grouting of stay as per respo norms cement, sand, blast stone material will be provided by conractor, earthing of pole by m s earthing rod 20 x2540 mm with 6 swg earthing wire etc and make proper connection., guarding of 11 kv line with gaurding angel, clamp eye bolts and gaurding g.i. wire 6 or 8 swg 60 span, fencing of distribution transformers with enamel in proper alignment as per respo manual and as per direction of executive engineer including the cost of arrangement of labour, t and p, carrier etc. required for proper completion of work., make plinth for 250 kva transformer proper size as per resspo norms, installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work. 11by0.4 kv tf 100 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work. 11by0.4 kv tf 250 kva with l.t. xlpe cable suitable size with all respective material as per norms., laying of following cable including digging and restoring along with brick and sand including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work. at different location under concern division.11 kv xlpe cable 3x185 sq.mm., laying of following cable including digging and restoring along with brick and sand including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work. at different location under concern division. 11 kv xlpe cable 3x300 sq.mm., laying of following cable by hdd method with hdpe pipe 140 mm. including digging and restoring along with brick and sand including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work. 33 kv xlpe cable 3x300 sq.mm., installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms., installation of 11 kv indoor or outdoor jointing kit size 3x185 sq.mm. as per norms., installation of 11 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms., installation of 11 kv straight through size 3x185 sq.mm. as per norms., installation of 11 kv vcb og ctr 200by100by5a 350 mva 1250 amp. and make proper connection as per norms., installation of 11 kv vcb ic ctr 600by300by5a 350 mva 1250 amp. and make proper connection as per norms., dismentlling of old and damaged cable of different size including with rolling received back and safe carriage from pit site to esc, mainpuri, received back of distribution transformer after increasing capacity from pit site to esc, mainpuri 30 nos 100 kva
T18 Ref No : 15779644
Location : mainpuri , uttar pradesh
Source : GEM Tenders
corrigendum tender for supply of 11 kv v type cross arm clamp , supply of 3 phase dis. box clamp with nut and bolts , supply of connecting cable , supply of l.t. fuse set protection box , supply of tinned copper fuse wire different size , supply of hdpe pipe , supply of stone pad , supply of holding clamp , supply of ms angle , supply of t-off chhanel , supply of top chhanel 125x65x240 , supply of dropper channel 100x50x2028 mm. , supply of danger board with clamp and nut and bolt , supply of g.i. patti clamp nut and bolts , supply of l.t. tail less unit , supply of copper l-pieace , supply of 11 kv f clamp , supply of suspension clamp , supply of dead end clamp , supply of eye i hook , supply of eye bolts for guarding , supply of j hook , supply of lt clamp , supply of pearcing connector , supply of alluminium lug 120 sq.mm. , supply of alluminium lug 240 sq.mm. , supply of alluminium lug 70 sq.mm. , supply of nut bolts and washers off size , supply of guarding angel , supply of guarding angel clamp , supply of m.s. angel iron 65x65x6 mm. , carriage of 9 m stp pole-sp- 55 galvanised , carriage of 11 m stp pole-sp- 55 galvanised , carriage of 8.5 m pcc pole , carriage of v type cross arm for 11 kv , carriage of 11 kv pin insulator with pin , carriage of disc insulator with fitting t and c 45 kn , carriage of 11 kv fuse set , carriage of 11 kv tpmo with polymer insulator , carriage of complete stay , carriage of distribution transformer 25 kva , carriage of distribution transformer 63 kva , carriage of distribution transformer 100 kva , carriage of distribution transformer 250 kva , carriage of acsr dog conductor , carriage of acsr weasel conductor , carriage of m s earthing rod 20 x2540 mm , carriage of lt al. xlpe cable size 1x240 sq.mm. , carriage of lt pvc cable 1x120 sq.mm. for dtr , carriage of lt pvc armoured cable size 3.5x70 or 35 sq.mm. , carriage of 11, boqbpkarhalmnp, supply of clamp for 11 kv v type cross arm with bolts and nuts, supply of three phase distribution box clamp with nut and bolts, supply of connecting cable for distribution box 1x35 sq.mm., supply of l.t. fuse set protection box with all accessories, supply of tinned copper fuse wire different size, supply of hdpe pipe 140 mm., supply of stone pad300x300x75, supply of holding clamp for doulble pole unit with nut and bolts, supply of ms angle 75x75x6x2028mm with clamp and bolt and nutt or f base, supply of t-off chhanel+ t or f clamp with nut and bolts, supply of top chhanel 125x65x240, supply of dropper channel 100x50x2028 mm., supply of danger board with clamp and nut bolt, supply of chemical earthing with g.i. patti clamp nut and bolts as per norms, supply of pipe earthing with g.i. patti clamp nut and bolts as per norms, supply of l.t. tail less unit with all respective material angel, patti and other material, supply of copper l-pieace 62x225x12mm., supply of 11 kv f clamp with nut and bolts, supply of suspension clamp, supply of dead end clamp, supply of eye i hook, supply of eye bolts for guarding, supply of j hook, supply of lt clamp for pcc or stp with bolts and nuts, supply of pearcing connector, supply of alluminium lug 120 sq.mm., supply of alluminium lug 240 sq.mm., supply of alluminium lug 70 sq.mm., supply of nut bolts and washers off size, supply of guarding angel, supply of guarding angel clamp, supply of m.s. angel iron 65x65x6 mm., 2700 mm long bracing with 4 nos clamp with nut and bolts, carriage of 9 m stp pole-sp- 55 galvanised, carriage of 11 m stp pole-sp- 55 galvanised, carriage of 8.5 m pcc pole, carriage of v type cross arm for 11 kv, carriage of 11 kv pin insulator with pin, carriage of disc insulator with fitting tandc 45 kn, carriage of 11 kv fuse set, carriage of 11 kv tpmo with polymer insulator, carriage of complete stay 9gi stay rod 20x1800 mm, stay wire 7 or 8 swg, 10 kg, stay clamp, bolt, nut and washer, carriage of distribution transformer 25 kva, carriage of distribution transformer 63 kva, carriage of distribution transformer 100 kva, carriage of distribution transformer 250 kva, carriage of acsr dog conductor, carriage of acsr weasel conductor or or insulated conductor as provided by department, carriage of m s earthing rod 20 x2540 mm, carriage of lt al. xlpe cable size 1x240 sq.mm., carriage of lt pvc cable 1x120 sq.mm. for dtr, carriage of lt pvc armoured cable size 3.5x70 or 35 sq.mm., carriage of 11 kv xlpe cable 3x185 sq.mm., carriage of lt ab cable 3x120+1x95+1x16 sq.mm., carriage of lt ab cable 3x50+1x35+1x16 sq.mm., carriage of lt ab cable 3x95+1x70+1x16 sq.mm., carriage of lt pvc armoured cable size 4x25 sq.mm., carriage of 33 kv xlpe cable 3x300 sq.mm., carriage of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm., carriage of 11 kv indoor or outdoor jointing kit size 3x185 sq.mm., carriage of 33 kv straight through size 3x300 sq.mm., carriage of 11 kv straight through size 3x185 sq.mm., carriage of 11 kv vcb for o or g ctr 200 or 100 or 5a 350 mva1250 amp., carriage of g.i. wire 6 or 8 swg for guarding, carriage of three phase distribution box, fixing of l.t. fuse set protection box with all respective accessories as per norms, chemical earthing with g.i. patti clamp nut and bolts as per norms, pipe earthing with g.i. patti clamp nut and bolts as per norms, l.t. tail less unit with all respective material as grouted angel with fabrication work etc., laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr dog conductor., laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr weasel conductor, laying, stringing, sagging, with all respective materialclamp with nut and bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable3x120+1x95+1x16 sq.mm., laying, stringing, sagging, with all respective materialclamp with nut and bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable3x50+1x35+1x16 sq.mm., laying, stringing, sagging, with all respective materialclamp with nut and bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable3x95+1x70+1x16 sq.mm., mounting of three phase distribution box with clamp nut and bolts and make proper connection with connecting cable., erection of double pole structure 11 mtr stp pole by digging of pits fitting of all relevant accessories as per respo norms.26 nos pole at different location under concern division., erection of single pole structure 8.5 mtrs pcc pole, 9 mtr st and 11 mtr st pole by digging of pits fitting of all relevant accessories as per respo norms. at different location under concern division., grouting of pcc or stp pole long as per respo norms with materialcement, sand, blast stone with the ratio 0.268 cu.m. each will be provided by conractor, grouting of stay as per respo normscement, sand, blast stone material will be provided by conractor, earthing of pole by m s earthing rod 20 x2540 mm with 6 swg earthing wire etc and make proper connection., guarding of 11 kv line with gaurding angel, clamp eye bolts and gaurding g.i. wire 6 or 8 swg86 span, fencing of distribution transformers with enamel in proper alignment as per respo manual and as per direction of executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work., plinth for 250 kva transformer proper size as per resspo norms, installation of the following new transformers at various 11 or 0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper ht or lt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11 or 0.4 kv t or f 25 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11 or 0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper ht or lt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11 or 0.4 kv t or f 63 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11 or 0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper ht or lt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11 or 0.4 kv t or f 100 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11 or 0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper ht or lt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11 or 0.4 kv t or f 250 kva with l.t. xlpe cable suitable size with all respective material as per norms., laying of following cable including digging and restoring along with brick and sand including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work. at different location under concern division.11 kv xlpe cable 3x185 sq.mm., laying of following cable by hdd method with hdpe pipe140 mm. including digging and restoring along with brick and sand including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work. 33 kv xlpe cable 3x300 sq.mm., installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms., installation of 11 kv indoor or outdoor jointing kit size 3x185 sq.mm. as per norms., installation of 33 kv straight through size 3x300 sq.mm. as per norms., installation of 11 kv straight through size 3x185 sq.mm. as per norms., installation of 11 kv vcb and make proper connection as per norms., dismentlling of jarjar g.i. wire and weasel conducter including with rolling and safe carriage from pit site to esc, mainpuri, received back of distribution transformer after increasing capacity from pit site to esc, mainpuri 4 nos 10 or 16 kva
T18 Ref No : 15779645
Location : mainpuri , uttar pradesh
Source : GEM Tenders
corrigendum tender for carriage of distribution transformer 100 kva from esc mnp , carriage of distribution transformer 250 kva from esc mnp , carriage of acsr weasel conductor from esc mnp , carriage of m s earthing rod 20 x2540 mm from esc mnp , carriage of lt al. xlpe cable size 1x240 sq.mm. from esc mnp , carriage of lt xlpe cable 1x120 sq.mm. for dtr from esc mnp , carriage of lt xlpe cable 1x400 sq.mm. for dtr from esc mnp , carriage of lt xlpe cable size 3.5x70 or 35 sq.mm. from esc mnp , carriage of lt ab cable 3x120 1x95 1x16 sq.mm. from esc mnp , carriage of lt ab cable 3x50 1x35 1x16 sq.mm. from esc mnp , carriage of lt ab cable 3x95 1x70 1x16 sq.mm. from esc mnp , carriage of 33 kv xlpe cable 3x300 sq.mm. from esc mnp , carriage of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. from esc mnp , carriage of 33 kv straight through size 3x300 sq.mm. from esc mnp , carriage of g.i. wire 6 or 8 swg for guarding from esc mnp , carriage of three phase distribution box from esc mnp , erection of fixing of lt fuse set protection box with all respective accessories as per norms , execution of chemical earthing with g.i. patti clamp nut and bolts as per norms , erection of l.t. tail less unit with all respective material as grouted angel with fabrication work etc. , laying of acsr weasel conductor , laying of lt ab cable 3x120 1x95 1x16 sq.mm. , laying of lt ab cable 3x50 1x35 1x16 sq.mm. , laying of lt ab cable 3x95 1x70 1x16 sq.mm. , mounting of three phase distribution box , erection of double pole structure 8.5 mtr pcc pole , erection of single pole structure 8.5 mtrs pcc pole , erection of tri pole structure 33 kv 13 mtr st pole , grouting of pcc or stp pole , grouting of stay , earthing of pole , guarding of 11 kv line , fencing of 250 kva distribution transformers , plinth for 250 kva transformer , installation of 11by0.4 kv tf 25 kva , installation of 11by0.4 kv tf 63 kva , installation of 11by0.4 kv tf 100 kva , installation of 11by0.4 kv tf 250 kva , laying of 33 kv xlpe cable 3x300 sq.mm. , installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms. , dismentlling, received back and safe carriage of jarjar g.i. wire and weasel conducter including with rolling from pit site to esc, mainpuri , received back of distribution transformer after, boqbhogaon, clamp for 11 kv v type cross arm with bolts and nuts, three phase distribution box clamp with nut and bolts, connecting cable for distribution box 1x35 sq.mm., l.t. fuse set protection box with all accessories, tinned copper fuse wire different size, hdpe pipe 140 mm., stone pad 300x300x75, holding clamp for doulble pole unit with nut and bolts, ms angle 75x75x6x2028mm with clamp and bolt and nut t or f base, t off chhanel and t off clamp with nut and bolts, top chhanel 125x65x240, dropper channel 100x50x2028 mm., danger board with clamp and nut and bolt, chemical earthing with g.i. patti clamp nut and bolts as per norms, l.t. tail less unit with all respective material angel, patti and other material, copper l pieace 62x225x12mm., 11 kv f clamp with nut and bolts, suspension clamp, dead end clamp, eye i hook, eye bolts for guarding, j hook, lt clamp for pcc or stp with bolts and nuts, pearcing connector, alluminium lug 120 sq.mm., alluminium lug 240 sq.mm., alluminium lug 400 sq.mm., nut bolts and washers off size, guarding angel, guarding angel clamp, m.s. angel iron 65x65x6 mm. 2700 mm long bracing with 4 nos clamp with nut and bolts, 13 m stp pole sp55 galvanised, 8.5 m pcc pole, v type cross arm for 11 kv, 11 kv pin insulator with pin, disc insulator with fitting t and c 45 kn 114 nos and 70kn 27 nos, 11 kv fuse set, 11 kv tpmo with polymer insulator, complete stay 9gi stay rod 20x1800 mm stay wire 7 and 8 swg 10 kg stay clamp bolt nut and washer, distribution transformer 25 kva, distribution transformer 63 kva, distribution transformer 100 kva, distribution transformer 250 kva, acsr weasel conductor or insulated conductor as provided by department, m s earthing rod 20 x2540 mm, lt al. xlpe cable size 1x240 sq.mm., lt xlpe cable 1x120 sq.mm. for dtr, lt xlpe cable 1x400 sq.mm. for dtr, lt xlpe cable size 3.5x70 or 35 sq.mm., lt ab cable 3x120 1x95 1x16 sq.mm., lt ab cable 3x50 1x35 1x16 sq.mm., lt ab cable 3x95 1x70 1x16 sq.mm., 33 kv xlpe cable 3x300 sq.mm., 33 kv indoor or outdoor jointing kit size 3x300 sq.mm., 33 kv straight through size 3x300 sq.mm., g.i. wire 6 or 8 swg for guarding, three phase distribution box, fixing of l.t. fuse set protection box with all respective accessories as per norms, l.t. tail less unit with all respective material as grouted angel with fabrication work etc., laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr weasel conductor or insulated conductor as provided by department, laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x120 1x95 1x16 sq.mm., laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x50 1x35 1x16 sq.mm, laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x95 1x70 1x16 sq.mm., mounting of three phase distribution box with clamp nut & bolts and make proper connection with connecting cable., erection of double pole structure 8.5 mtr pcc pole by digging of pits fitting of all relevant accessories as per respo norms. 34 nos pole at different location under concern division., erection of single pole structure 8.5 mtrs pcc pole by digging of pits fitting of all relevant accessories as per respo norms. at different location under concern division., erection of tri pole structure 33 kv 13 mtr st pole by digging of pits fitting of all relevant accessories as per respo norms. 3 nos pole at different location under concern division., grouting of pcc or stp pole long as per respo norms with material cement, sand, blast stone with the ratio 0.268 cu.m. each will be provided by conractor, grouting of stay as per respo norms cement, sand, blast stone material will be provided by conractor, earthing of pole by m s earthing rod 20 x2540 mm with 6 swg earthing wire etc and make proper connection., guarding of 11 kv line with gaurding angel, clamp eye bolts and gaurding g.i. wire 6 or 8 swg 30 span, fencing of distribution transformers with enamel in proper alignment as per respo manual and as per direction of executive engineer including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work., plinth for 250 kva transformer proper size as per resspo norms, installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 25 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 63 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 100 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 250 kva with l.t. xlpe cable suitable size with all respective material as per norms., laying of following cable by hdd method with hdpe pipe (140 mm.) including digging and restoring along with brick and sand including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work. 33 kv xlpe cable 3x300 sq.mm., installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms., dismentlling of jarjar g.i. wire and weasel conducter including with rolling received back and safe carriage from pit site to esc, mainpuri, received back of distribution transformer after increasing capacity from pit site to esc, mainpuri ( 17 nos 100 kva)

Unlock Full Tender Access

Start Free Trial to download documents before deadline

T18 Ref No : 15779646
Location : mainpuri , uttar pradesh
Source : GEM Tenders
corrigendum tender for , carriage of distribution transformer 250 kva from esc mnp , carriage of acsr rabbit conductor from esc mnp , carriage of acsr weasel conductor or insulated conductor as provided by department from esc mnp , carriage of m s earthing rod 20 x2540 mm from esc mnp , carriage of lt al. xlpe cable size 1x240 sq.mm. from esc mnp , carriage of lt xlpe cable 1x120 sq.mm. from esc mnp , carriage of 11 kv xlpe cable 3x185 sq.mm. from esc mnp , carriage of lt ab cable 3x120 1x95 1x16 sq.mm. from esc mnp , carriage of 33 kv xlpe cable 3x300 sq.mm. from esc mnp , carriage of 11 kv xlpe cable 3x300 sq.mm. from esc mnp , carriage of 11 kv indoor or outdoor jointing kit size 3x300 sq.mm. from esc mnp , carriage of 11 kv indoor or outdoor jointing kit size 3x185 sq.mm. from esc mnp , carriage of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. from esc mnp , carriage of 11 kv straight through size 3x185 sq.mm. from esc mnp , carriage of 11 kv vcb for og ctr 200by100by5a 350 mva 1250 amp. from esc mnp , carriage of 11 kv vcb ic ctr 600by300by5a 350 mva 1250 amp. from esc mnp , carriage of g.i. wire 6or8 swg for guarding from esc mnp , carriage of three phase distribution box from esc mnp , erection of fixing of l.t. fuse set protection box with all respective accessories as per norms , execution of chemical earthing with g.i. patti clamp nut and bolts as per norms , erection of l.t. tail less unit with all respective material as grouted angel with fabrication work etc. , laying of acsr rabbit conductor , laying of acsr weasel conductor or insulated conductor as provided by department , laying of lt ab cable 3x120 1x95 1x16 sq.mm. , mounting of three phase distribution box , erection of double pole structure , erection of single pole structure , grouting of pcc or stp pole , grouting of stay , earthing of pole , guarding of 11 kv line with gaurding angel etc , fencing of distribution transformers , make plinth for 250 kva transformer proper size as per resspo norms , installation of 11by0.4 kv tf 100 kva , installation of 11by0.4 kv tf 250 kva , laying of 11 kv xlpe cable 3x185 sq.mm. , laying of 11 kv xlpe cable 3x300 sq.mm. , laying of 33 kv xlpe cable 3x300 sq.mm. , installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms. , installation of 11 kv indoor or outdoor jointing kit size 3x185 sq.mm. as per norms. , installation of 11 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms. , installation of 11 kv straight through size 3x185 sq.mm. as per norms. , installation of 11 kv vcb og ctr 200by100by5a 350 mva 1250 amp. , installation of 11 kv vcb ic ctr 600by300by5a 350 mva 1250 amp. , dismentlling of old and damaged cable of different size , received back of distribution transformer after increasing, boqeudd, 11 kv v type cross arm clamp with bolts and nuts, three phase distribution box clamp with nut and bolts, connecting cable for distribution box 1x35 sq.mm., l.t. fuse set protection box with all accessories, tinned copper fuse wire different size, hdpe pipe 140 mm., stone pad 300x300x75, ms angle 75x75x6x2028mm with clamp and bolt and nut tf base, t off chhanel and t off clamp with nut and bolts, top chhanel 125x65x240, dropper channel 100x50x2028 mm., chemical earthing with g.i. patti clamp nut and bolts as per norms, l.t. tail less unit with all respective material angel, patti and other material, copper l pieace 62x225x12mm., 4 core lt mcb with box for 250 kva tf, 11 kv f clamp with nut and bolts, al. pg clamp weasel to weasel conductor, al. pg clamp rabbit to rabbit conductor, suspension clamp, dead end clamp, eye i hook, eye bolts for guarding, j hook, lt clamp for pcc or stp with bolts and nuts, pearcing connector, alluminium lug 120 sq.mm., alluminium lug 240 sq.mm., guarding angel, guarding angel clamp, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 8.5 m pcc pole, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 9 m stp pole sp 55 galvanised, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 m stp pole sp 55 galvanised, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 13 m stp pole sp 55 galvanised, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department v type cross arm for 11 kv, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv pin insulator with pin, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department disc insulator with fitting tandc 45 kn, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv fuse set, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv tpmo with polymer insulator, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department complete stay 9gi stay rod 20x1800 mm, stay wire 7 or 8 swg, 10 kg, stay clamp, bolt, nut and washer, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department distribution transformer 100 kva, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department distribution transformer 250 kva, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department acsr rabbit conductor, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department acsr weasel conductor or insulated conductor as provided by department, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department m s earthing rod 20 x2540 mm, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department lt al. xlpe cable size 1x240 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department lt xlpe cable 1x120 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv xlpe cable 3x185 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department lt ab cable 3x120 1x95 1x16 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 33 kv xlpe cable 3x300 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv xlpe cable 3x300 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv indoor or outdoor jointing kit size 3x300 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv indoor or outdoor jointing kit size 3x185 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 33 kv indoor or outdoor jointing kit size 3x300 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv straight through size 3x185 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv vcb for og ctr 200by100by5a 350 mva 1250 amp., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv vcb ic ctr 600by300by5a 350 mva 1250 amp., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department g.i. wire 6 or 8 swg for guarding, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department three phase distribution box, fixing of l.t. fuse set protection box with all respective accessories as per norms, l.t. tail less unit with all respective material as grouted angel with fabrication work etc., laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr rabbit conductor, laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr weasel conductor or insulated conductor as provided by department, laying, stringing, sagging, with all respective material clamp with nut and bolts suspension clamp eye j hook pearcing connector etc of following conductor cable on the erected supports, as per respo norms. lt ab cable 3x120 1x95 1x16 sq.mm., mounting of three phase distribution box with clamp nut & bolts and make proper connection with connecting cable., erection of double pole structure 11 mtr stp pole by digging of pits fitting of all relevant accessories as per respo norms. 22 nos pole at different location under concern division., erection of single pole structure 8.5 mtrs pcc pole, 9 mtr st, 11 mtr st pole, 13 mtr st by digging of pits fitting of all relevant accessories as per respo norms. at different location under concern division., grouting of pcc or stp pole long as per respo norms with material cement, sand, blast stone with the ratio 0.268 cu.m. each will be provided by conractor, grouting of stay as per respo norms cement, sand, blast stone material will be provided by conractor, earthing of pole by m s earthing rod 20 x2540 mm with 6 swg earthing wire etc and make proper connection., guarding of 11 kv line with gaurding angel, clamp eye bolts and gaurding g.i. wire 6 or 8 swg 60 span, fencing of distribution transformers with enamel in proper alignment as per respo manual and as per direction of executive engineer including the cost of arrangement of labour, t and p, carrier etc. required for proper completion of work., make plinth for 250 kva transformer proper size as per resspo norms, installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work. 11by0.4 kv tf 100 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work. 11by0.4 kv tf 250 kva with l.t. xlpe cable suitable size with all respective material as per norms., laying of following cable including digging and restoring along with brick and sand including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work. at different location under concern division.11 kv xlpe cable 3x185 sq.mm., laying of following cable including digging and restoring along with brick and sand including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work. at different location under concern division. 11 kv xlpe cable 3x300 sq.mm., laying of following cable by hdd method with hdpe pipe 140 mm. including digging and restoring along with brick and sand including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work. 33 kv xlpe cable 3x300 sq.mm., installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms., installation of 11 kv indoor or outdoor jointing kit size 3x185 sq.mm. as per norms., installation of 11 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms., installation of 11 kv straight through size 3x185 sq.mm. as per norms., installation of 11 kv vcb og ctr 200by100by5a 350 mva 1250 amp. and make proper connection as per norms., installation of 11 kv vcb ic ctr 600by300by5a 350 mva 1250 amp. and make proper connection as per norms., dismentlling of old and damaged cable of different size including with rolling received back and safe carriage from pit site to esc, mainpuri, received back of distribution transformer after increasing capacity from pit site to esc, mainpuri 30 nos 100 kva

Every year, central and state government departments release thousands of high-value contracts specifically dedicated to Sag Rod. Whether it involves bulk material supply, executing specialized operational services, or end-to-end turnkey project execution, the demand for capable vendors in the Sag Rod sector is massive.

At Tender18, we help businesses cut through the noise and exclusively target the exact work categories they specialize in. Instead of browsing through generic procurement sites, our platform isolates high-potential opportunities that match your specific industry capabilities.

Work Dynamics in the Sag Rod Sector

Government requirements for this specific vertical generally fall into distinct procurement patterns:

  • Product & Material Supply: Tenders focused strictly on sourcing, testing, and delivering high-quality items that meet the exact technical specifications of the buyer.
  • Service Level Agreements (SLAs): Long-term hiring of expert agencies for routine maintenance, manpower deployment, or continuous operational management.
  • Execution & Turnkey Projects: Comprehensive contracts where the bidder is responsible for everything from raw material procurement to final site installation and testing.

By focusing purely on your core strength in Sag Rod, you can build a highly profitable and stable pipeline of government clients.

Stop wasting time filtering through irrelevant notices. Our Sag Rod Tender Information Service is engineered for precision. We track exact product codes, service names, and specialized work terms across all government portals nationwide. When a buyer publishes a requirement that matches your specific business profile, our system alerts you instantly.

Deep Technical Insights & Documentation For Sag Rod Tenders

Bidding for specific works requires studying strict technical parameters. We provide immediate access to the core documents you need to evaluate the project:

  • Detailed Specifications & Drawings: Download the exact engineering guidelines, material testing standards, and quality benchmarks demanded by the buyer for Sag Rod.
  • Financial BOQ Spreadsheets: Access the official blank pricing formats where you need to input your unit rates, tax configurations, and total bid value.
  • Real-Time Technical Amendments: If the buying department changes the product specifications, alters the service scope, or shifts the delivery timeline, we instantly update the parent file so you are never caught off-guard.

Winning a contract for Sag Rod depends entirely on how perfectly your technical capabilities match the buyer’s demands. Even if you have the best product or service, a poorly formatted document or a missing compliance certificate will lead to instant technical rejection. Tender18’s Tender Bidding Service eliminates this risk by taking complete ownership of your digital submission.

Flawless Compliance & Portal Execution For Sag Rod Tenders

Under this service, Tender18 assigns a Dedicated Experienced Technical Person to your profile. This expert handles the heavy lifting of the entire bidding cycle:

  • Capability Mapping: We thoroughly cross-check your past completion certificates, ISO standard proofs, and financial turnover against the strict eligibility criteria required for Sag Rod bids.
  • Secure System Integration: Our technical desk seamlessly links your Class III Digital Signature Certificate (DSC) with the required e-procurement servers to securely encrypt your technical and financial envelopes.
  • Error-Free Financial Uploads: We audit your quoted BOQ pricing sheets for any formula or formatting errors before the final upload, ensuring your bid is successfully locked before the portal's closing hours.

Government buyers are aggressively using the Government e-Marketplace (GeM) for the direct procurement of Sag Rod. If your business profile is not accurately mapped on this portal, you remain practically invisible to these purchasing officers. Recognized as a trusted and expert GeM consultant, Tender18 offers specialized support to build, optimize, and maintain a highly visible vendor account for your business.

With an industry-leading support success ratio of over 95%, we handle the complex marketplace compliance so you can focus entirely on executing your orders

Expert Profile Management & Catalogue

Our dedicated consultants ensure your GeM presence is structurally perfect:

  • Precise Catalogue Listing: We upload and categorize your specific offerings under the exact search terms and parameters used by government buyers looking for Sag Rod, ensuring maximum search visibility.
  • OEM Dashboard & Assessment: For original manufacturers and creators, we guide you through the mandatory Quality Council of India (QCI) vendor assessments to successfully unlock your official OEM panel.
  • Profile Compliance & Caution Money: We manage your statutory documentation, brand approvals, and caution money limits to keep your account immune from technical suspensions.

Strategic Live Bid Participation

Beyond setup, we actively drive your market participation. Our team expertly handles the digital paperwork and rate configurations for GeM Custom Bids and Reverse Auctions (RA) related to Sag Rod, maximizing your chances of securing L1 status.

1.

How do I find government contracts exclusively matching my work in Sag Rod?

The easiest way is through the Tender18 platform. Instead of searching department by department, our system uses advanced keyword matching to gather all live supply, service, and execution tenders related directly to your core business in one place.

2.

Do I need specific testing or quality certificates to apply for these contracts?

It heavily depends on the nature of the work. For supply contracts, buyers often ask for ISO certifications, BIS marks, or specific lab testing reports. For service contracts, they may ask for labor licenses or past performance certificates (work orders).

3.

What is a BOQ and why is it important for my bid?

The Bill of Quantities (BOQ) is the official financial Excel sheet where you enter your competitive prices. Any mistake in this file—like adding extra rows, changing formulas, or saving it in the wrong format—will cause the portal server to reject your entire bid.

4.

Are samples required to be submitted physically before the digital bid opens?

For many product-based Sag Rod tenders, buying departments do ask bidders to submit physical samples to their office before the digital technical evaluation date. This requirement is always clearly mentioned in the official NIT document.

5.

How does the Dedicated Tender Expert from Tender18 help me?

Our assigned expert manages your total portal compliance. They extract the hidden rules from long tender PDFs, create a precise document checklist for your team, map your digital signature, and securely upload your technical and financial files onto the government servers.

6.

What is the role of a Digital Signature Certificate (DSC)?

A Class III DSC is a secure USB device that contains your digital identity. You cannot upload a bid without it. It is used to securely encrypt and lock your sensitive price data and technical documents so no one can view them before the official opening date.

7.

As an MSME, can I get financial benefits when bidding for Sag Rod?

Yes, the government strongly supports MSMEs. By uploading a valid Udyam Registration Certificate in the technical envelope, small businesses are frequently exempted from paying the initial Tender Document Fee and the Earnest Money Deposit (EMD).

8.

Why should I list my services or products on GeM for this category?

GeM is now the primary digital marketplace for all government agencies. If you are properly cataloged for Sag Rod, officers can view your profile and generate direct purchase orders or invite you to participate in exclusive Custom Bids.

9.

What makes Tender18 a reliable GeM support partner?

As a highly trusted and expert GeM consultant, Tender18 holds a proven support success ratio of over 95%. From flawless profile creation and complex catalogue mapping to OEM panel approvals and live Reverse Auction (RA) support, we handle it all seamlessly.

10.

What does "L1" mean in these government contracts?

"L1" stands for "Lowest Bidder 1". In government procurement, after all technical envelopes are approved, the financial sheets (BOQs) are opened. The bidder who has quoted the lowest compliant price for Sag Rod is declared L1 and is generally awarded the contract