Search Tenders
Filters
Reset All
Tender Status
T18 Ref No
All States
All Cities
All Agencies
Tender ID
Due Date
Tender Value
Tender Source (GeM, Cppp & Others)
Tender Type

17Latest Rock drilling equipment Tenders List

Latest Rock drilling equipment Tenders in India – Verified Leads & Real-Time Insights by Tender18

Finding the right Rock drilling equipment tenders in India’s competitive e-procurement ecosystem requires more than just access—it demands accurate data, real-time monitoring, and expert analysis.

At Tender18 Infotech Private Limited, we bring deep industry experience in government procurement to help businesses identify, evaluate, and win Rock drilling equipment tenders efficiently. With a centralized platform aggregating 1100+ live tenders, we provide a single, trusted source for opportunities from central, state, and PSU departments.


Real-Time Rock drilling equipment Tender Intelligence & Monitoring

Our advanced dashboard delivers actionable insights and structured tender data, enabling you to make faster and smarter bidding decisions.

We categorize Rock drilling equipment tenders into:

  • Supply Tenders – BOQs and specifications sourced from GeM and PSUs
  • Service Tenders – NITs and scope of work from CPPP and state portals
  • EPC Projects – Large-scale infrastructure tenders with financial and design data

✔ This structured approach ensures complete transparency and deeper bid analysis before submission.


Comprehensive Sources of Rock drilling equipment Tenders

Tender18 acts as a centralized gateway by aggregating tenders from trusted and official sources:

  • Central Government Portals – CPPP, NIC, and Government e-Marketplace (GeM)
  • Railways & Transport – IREPS and Metro Rail projects
  • Power & Energy PSUs – NTPC, ONGC, NHPC, PowerGrid
  • Defense & Strategic Sectors – MES and DRDO tenders
  • State e-Procurement Portals – Gujarat, Maharashtra, Tamil Nadu, UP, and more

✔ Every listing is verified and regularly updated to maintain data accuracy and trust.


Step-by-Step Guide to Participate in Rock drilling equipment Tenders

1. Eligibility & Prequalification

Before bidding, ensure compliance with:

  • Financial turnover requirements (30–50% of tender value)
  • Past experience (2–3 similar projects)
  • Valid solvency certificate

2. Mandatory Documentation Checklist

Prepare the following to avoid disqualification:

  • Digital Signature Certificate (Class 3 DSC)
  • GST, PAN, MSME/Udyam registration
  • EMD (Earnest Money Deposit) or exemption proof
  • Technical bid with execution methodology

3. BOQ Analysis & Financial Bidding

The BOQ (Bill of Quantities) is the most critical component:

  • Analyze item-wise pricing
  • Ensure competitive yet sustainable quotes
  • Avoid underbidding risks (L1 pressure)

✔ Expert analysis can significantly improve your bid success ratio.


Why Tender18 is a Trusted Platform for Rock drilling equipment Tenders

✔ Proven Expertise in Government Procurement

We combine industry knowledge with practical bidding experience.

✔ Verified & Reliable Data

All Rock drilling equipment tenders are sourced from official portals and cross-checked for accuracy.

✔ Advanced Filtering Tools

Filter tenders by value, EMD, location, and category for precise targeting.

✔ Corrigendum & Update Tracking

Get instant alerts on deadline changes and specification updates.

✔ Historical Data Insights

Analyze past tender results to understand pricing trends and competition.

✔ End-to-End Bidding Support

From discovery to submission, including GeM onboarding and strategy.


Growth of Rock drilling equipment Sector in 2026

With the Government of India focusing on digital procurement and infrastructure expansion, the Rock drilling equipment sector has seen significant growth in e-tendering opportunities.

The rise of GeM-based procurement models like:

  • L1 Purchase
  • Direct Procurement
  • MSME-friendly policies

…has made it easier for startups and SMEs to participate and win contracts


Frequently Asked Questions (SEO Optimized)

How can I get daily Rock drilling equipment tender alerts?

You can register on Tender18 and select your preferred category. You will receive daily email alerts with all new Rock drilling equipment tenders.

Is EMD mandatory for all Rock drilling equipment tenders?

No, MSME and Udyam-registered businesses may get exemptions. Always check the NIT for specific conditions.

What is the difference between a Rock drilling equipment work tender and supply tender?

A supply tender involves delivering goods, while a work tender includes execution, labor, and project completion.

Can I access private Rock drilling equipment tenders on Tender18?

Yes, we also track major private sector and EPC tenders along with government opportunities.


Get Expert Support for Rock drilling equipment Tenders

Tender18 is more than a listing platform—we are your strategic partner in winning tenders.

Our services include:

  • Tender discovery & analysis
  • Documentation support
  • Bid strategy & submission
  • GeM registration & OEM onboarding

📞 Call / WhatsApp: +91 7069661818
🌐 Website: www.tender18.com

Due Date

Unlock Full Tender Access

Start Free Trial to download documents before deadline

T18 Ref No : 16639060
Location : vemula , andhra pradesh
Source : GEM Tenders
tender for bitumenlayingwork2 , kerbstonelayingwork1 , tailingexcavationwork1 , borrowearthsoilwork3 , removinghdpeliningwork1 , dismantlingstonepitching1 , backfillingoftailing1 , laboratorytestwork15 , humepipework1 , humepipework2 , humepipework3 , humepipework4 , humepipework5 , humepipework6 , earthworkfillingforbund1 , stonepitchingwork5 , brickwork1 , brickwork2 , plasteringwork1 , plasteringwork2 , plasteringwork3 , paitingwork1 , paitingwork2 , paitingwork3 , handrailingwork3 , ccforflooringwork1 , plasteringwork4 , glasssstripswork1 , cementpunning1 , aluminumwork1 , shutterworks1 , glasspaneswork1 , siliconsealantwork1 , doorworks1 , mechanicalinstallationpumps1 , mechanicalinstallationpipes1 , mechanicalinstallationpipes2 , mechanicalinstallationpipes3 , electricallinstallation5 , mechanicalerections1 , disposalareappep1 , slimedisposalareappep1 , slimedisposalareappep2 , constructionofelectricalfacilityworklumpsum1 , panelneartaillingpond , automaticpowerfactorcorrectionpanel1 , batterychargerdcboard , lcsmushroomheadstay1 , lcsmushroomheadstay2 , lcsmushroomheadstay3 , distributiontransformer1 , dieselgeneratorset1 , dieselgeneratorfounation1 , ltbusduct1 , htswitchgearincomingpanel1 , htswitchgearincomingpanel2 , mainlightingdistributionboard1 , sublightingdistributionboard , highmastlighting1 , highmastlighting2 , lighteningfixture1 , ltpowercables1 , htpowercables1 , htpowercables2 , ltcontrolcables , junctionboxes1 , earthinglightningitems1 , aircondition1 ,, construction of 4th stage tailing pond, stripping and clearing the site of jungles, bushes, shrubs, wood etc., uprooting of rank vegetation, trees and saplings of girth upto 30 cm measured at a height of 1m above ground level, removal of undesirable materials etc. including removal and disposal of debris at suitable locations with all leads and lifts, as decided by the engineer-in-charge., felling trees of girth (measured at a height of 1m above ground level) including cutting of trunks and branches, removing the roots and stacking of servicable material and disposal of unserviceable material at suitable ocations as decided by the engineer-in-charge. beyond 30 cm girth upto and including 60 cm girth, felling trees of girth (measured at a height of 1m above ground level) including cutting of trunks and branches, removing the roots and stacking of servicable material and disposal of unserviceable material at suitable ocations as decided by the engineer-in-charge. beyond 60 cm girth upto and including 120 cm girth, felling trees of girth (measured at a height of 1m above ground level) including cutting of trunks and branches, removing the roots and stacking of servicable material and disposal of unserviceable material at suitable ocations as decided by the engineer-in-charge. beyond 120 cm girth upto and including 240 cm girth, earth work in excavation in development of embankment profile in the following types of soils for all lifts, including taking adequate protection during excavation, drilling and transporting the excavated spoil / material after stripping of top soil as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead within acquired area of tailing dam & pond. all kinds of soils including hard and dense soils, earth work in excavation in development of embankment profile in the following types of soils for all lifts, including taking adequate protection during excavation, drilling and transporting the excavated spoil / material after stripping of top soil as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead within acquired area of tailing dam & pond. ordinary rock, earth work in excavation in development of embankment profile in the following types of soils for all lifts, including taking adequate protection during excavation, drilling and transporting the excavated spoil / material after stripping of top soil as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead within acquired area of tailing dam & pond.hard rock (blasting prohibited), earth work in excavation of hillocks within existing pond area in the following types of soils for all lifts, transporting the excavated spoil / material as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead and lift within acquired area of tailing dam & pond. all kinds of soils including hard and dense soils, earth work in excavation of hillocks within existing pond area in the following types of soils for all lifts, transporting the excavated spoil / material as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead and lift within acquired area of tailing dam & pond. ordinary rock, earth work in excavation of hillocks within existing pond area in the following types of soils for all lifts, transporting the excavated spoil / material as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead and lift within acquired area of tailing dam & pond. hard rock (blasting prohibited), earth work in excavation in bed layer -1 in the following types of soils for all lifts, including bailing / pumping out any water accumulating inside the excavation, taking adequate protection during excavation, transporting the excavated soil as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of the engineer-in-charge for any lead within acquired area of tailing dam & pond. all kinds of soils including hard and dense soils, earth work in excavation in bed layer -1 in the following types of soils for all lifts, including bailing / pumping out any water accumulating inside the excavation, taking adequate protection during excavation, transporting the excavated soil as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of the engineer-in-charge for any lead within acquired area of tailing dam & pond. ordinary rock, earth work in excavation in pipe-support foundations, peripheral drains, culverts, diversion drain, watch towers, miscellaneous equipment foundations etc. in the following types of soils for all lifts, including bailing / pumping out any water accumulating inside the excavation, taking adequate protection during excavation, drilling and transporting the excavated spoil / material as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead within acquired area of tailing dam & pond. all kinds of soils including hard and dense soils, earth work in excavation in pipe-support foundations, peripheral drains, culverts, diversion drain, watch towers, miscellaneous equipment foundations etc. in the following types of soils for all lifts, including bailing / pumping out any water accumulating inside the excavation, taking adequate protection during excavation, drilling and transporting the excavated spoil / material as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead within acquired area of tailing dam & pond. ordinary rock, earth work in excavation in pipe-support foundations, peripheral drains, culverts, diversion drain, watch towers, miscellaneous equipment foundations etc. in the following types of soils for all lifts, including bailing / pumping out any water accumulating inside the excavation, taking adequate protection during excavation, drilling and transporting the excavated spoil / material as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead within acquired area of tailing dam & pond. hard rock (blasting prohibited), supplying and transporting earth of specified quality (as per specification and drawing) from borrow-pit i.e. the source not owned by ucil but arranged by the contractor at his own cost including all taxes, royalty etc and filling the same in bed later - 1 in layers not exceeding 250 mm above existing ground level, watering of each layer in the stipulated manner as per specification and / or direction of the engineer-in-charge and compaction by mechanical means to achieve required degree of compaction as per specification, all complete as per drawing, specification and direction of the engineer-in-charge., supplying and transporting earth of specified quality (as per specification and drawing) from borrow-pit i.e. the source not owned by ucil but arranged by the contractor at his own cost including all taxes, royalty etc and filling the same in embankment in random fill zone in layers not exceeding 250 mm in proper profile to various heights above existing ground level, watering of each layer in the stipulated manner as per specification and / or direction of the engineer-in-charge and compaction by mechanical means to acheive required degree of compaction as per specification, disposal of excess of unusable material all complete as per drawing, specification and direction of the engineer-in-charge for any lead and lift (sectional measurement for compacted filling will only be paid)., supplying and transporting clay of specified quality and property (as per specification and drawing) from borrow-pit i.e. the source not owned by ucil but arranged by the contractor at his own cost including all taxes, royalty etc and laying the same over random fill on upstream side of embankment in layers not exceeding 150 mm measured loose in proper profile, watering of each layer in stipulated manner to various heights and compacting each layer by mechanical means to achieve required degree of compaction as per specification and / or direction of the engineer-in-charge, all complete as per drawing, specification and direction of the engineer-in-charge for any lead and lift (sectional measurement for compacted thickness will only be paid)., supplying, transporting and laying stone pitching with approved stone (average 300 mm thick) over clay lining on upstream side of dam with voids filler with stone dust with all lead and lift including cutwork, curing, scaffolding with all bye-work, all complete as per drawing, specification and direction of the engineer-in-charge. note - payment shall be made for the actual area of coverage of stone pitching. wastage shall not be payable., supplying, transporting and laying stone pitching with approved stone (average 300 mm thick) over random fill on downstream side of dam with voids filler with stone dust with all lead and lift including cutwork, curing, scaffolding with all bye-work, all complete as per drawing, specification and direction of the engineer-in-charge. note payment shall be made for the actual area of coverage of stone pitching. wastage shall not be payable., supplying, transporting, spreading and compacting sand (average 100 mm thick) over stone pitching on upstream side of dam with all lead and lift including all bye-work, all complete as per drawing, specification and direction of the engineer-in-charge., supplying, transporting and laying 1500 micron thick high density polyethelene (hdpe) sheet (textured on both sides) as lining over sand cushion layer on upstream side of dam, laid in position by qualified and skilled installer certified by the manufacturer and approved by the engineer-in-charge, with all lead and lift including sealing of joints (hot wedge single and dual track seaming and / or extrusion fillet seaming method or any other specialized method e.g. robotic two stitch welding etc.) of new sheets and sealing of new lining sheet with existing lining sheet with an overlap of approximately 1.0m, anchoring the new lining sheet on top of new embankment, maintaining quality control, conducting tests as per requirement of the specification, all complete as per drawing, provisions of specification and direction of the engineer-in-charge. note payment shall be made for the actual area of coverage of hdpe lining sheet. overlapping area, wastage etc. shall not be payable., supplying, transporting, laying and compacting uniformly graded stone aggregate filters within new embankment at all levels,incl shuttering, tools tackles all complete as per drawing, specification and direction of the engineer-in-charge., supplying, transporting, laying and compacting uniformly graded coarse sand filters within new embankment at all levels incl shuttering, tools tackles all complete as per drawing, specification and direction of the engineer-in-charge. (sand shall conform to is383). laying and compacting rock-fill toe dam on downstream side of embankment with following materials at all levels, all complete as per drawing, specification and direction of the engineer-in-charge., with rocks arranged by the contractor at his own cost (rate to include supply and transport also), earth work in back-filling including watering, ramming and compaction at all elevation around pipe support foundations, drain trenches etc. as per specifications and drawings and as directed by the engineer-in-charge with selected soils obtained from stacks under item no. 6 above for any lead within acquired area of tailing pond and dam. (filling shall be done in layers not exceeding 250 mm in loose thickness and watered as necessary. each layer of filling to be compacted to acheive a dry density of not less than 95% of the proctor density)., supplying, transporting and laying stone pitching with approved stone (average 300 mm thick) in diversion drain and at outfall locations with interstices between adjacent stones filled-in with stones of proper size well-driven in order to ensure tight packing and complete filling of all interstices so that no chip can be removed by hand, with all lead and lift including cutwork, curing, scaffolding with all bye-work, all complete as per drawing, specification and direction of the engineer-in-charge. note payment shall be made for the actual area of coverage of stone pitching. wastage shall not be payable., earthwork in filling using earth obtained from item nos. 3, 4, 5 and 6 above in construction of embankment of access roads (total four nos. access roads) connecting top of new tailing pond embankment in layers not exceeding 250 mm in proper profile to various heights above existing ground level, watering of each layer in the stipulated manner as per specification and / or direction of the engineer-in-charge and compaction by mechanical means to acheive required degree of compaction as per specification, all complete as per drawing, specification and direction of the engineer-in-charge for any lead and lift (sectional measurement for compacted filling will only be paid)., supplying, transporting and laying stone pitching with approved stone (average 300 mm thick) on sides of embankments of access roads with voids filler with stone dust with all lead and lift including cutwork, curing, scaffolding with all bye-work, all complete as per drawing, specification and direction of the engineer-in-charge., supplying site machine batched plain cement concrete of 136 nominal mix (1 cement 3 coarse sand 6 graded stone aggregate with 20 mm and down aggregates) below foundations, walls, drains, pits etc. including mixing, transporting, placing in position, compacting to proper thickness and level, curirg, maintaining proper quality control including cost of admixtures in recommended proportions as per is 9103 to accelerate/retard setting of concrete, improve workability without impairing strength and durability but excluding cost of shuttering work, all complete as per specifications, drawings and direction of the engineer-in-charge and including cost of form work., extra over item 30 bove for using ready mixed concrete (rmc) manufactured in fully automated batching plant and transported to site of work in transit mixer for all leads, having continuous agitator mixer including pumping of concrete from transit mixer to site of laying. note (i) cost of shuttering and reinforcement shall be paid in respective items. (note the bidder has to quote only extra cost above the item 30 in the line item of 31, for example- if the cost of item 30 i.e normal mix is rs. 3000 and cost of rmc mix is rs.3500 then the bidder has to quote only the extra cost amount i.e rs.500 (3500-3000) in the line item 31 of the price part), providing, mixing, laying in position in substructure upto plinth level, site machine batched design mix cement concrete for all types of reinforced cement concrete work, using coarse aggregate and fine aggregate derived from natural sources, cement, admixtures in recommended proportionsas per is 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength, including speading, laying, compacting to proper size/thickness and level, curing, maintaing proper quality control, carriage for all leads, trial mix and laboratory testing but excluding the cost of centering, shuttering, finishing and reinforcement as per drawings, specification and direction of the enginner-in-charge, for the following grades of concrete concrete of m25 grade with minimum cement content of 330 kg/cum, providing, mixing, laying in position in substructure upto plinth level, site machine batched design mix cement concrete for all types of reinforced cement concrete work, using coarse aggregate and fine aggregate derived from natural sources, cement, admixtures in recommended proportionsas per is 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength, including speading, laying, compacting to proper size/thickness and level, curing, maintaing proper quality control, carriage for all leads, trial mix and laboratory testing but excluding the cost of centering, shuttering, finishing and reinforcement as per drawings, specification and direction of the enginner-in-charge, for the following grades of concrete concrete of m30 grade with minimum cement content of 350 kg/cum, extra over item 32 above for using ready mixed concrete (rmc) manufactured in fully automated batching plant and transported to site of work in transit mixer for all leads, having continuous agitator mixer including pumping of concrete from transit mixer to site of laying. concrete of m25 grade with minimum cement content of 330 kg/cum (note the bidder has to quote only extra cost above the item 32 in the line item of 34, for example- if the cost of item 32 i.e normal mix is rs. 3000 and cost of rmc mix is rs.3500 then the bidder has to quote only the extra cost amount i.e rs.500 (3500-3000) in the line item 34 of the price part), extra over item 33 above for using ready mixed concrete (rmc) manufactured in fully automated batching plant and transported to site of work in transit mixer for all leads, having continuous agitator mixer including pumping of concrete from transit mixer to site of laying.concrete of m30 grade with minimum cement content of 350 kg/cum. (note the bidder has to quote only extra cost above the item 33 in the line item of 35, for example- if the cost of item 33 i.e normal mix is rs. 3000 and cost of rmc mix is rs.3500 then the bidder has to quote only the extra cost amount i.e rs.500 (3500-3000) in the line item 35 of the price part), providing, mixing, laying in position in superstructure above plinth level, site machine batched design mix cement concrete for all types of reinforced cement concrete work, using coarse aggregate and fine aggregate derived from natural sources, cement, admixtures in recommended proportionsas per is 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength, including speading, laying, compacting to proper size/thickness and level, curing, maintaing proper quality control, carriage for all leads, trial mix and laboratory testing but excluding the cost of centering, shuttering, finishing and reinforcement as per drawings, specification and direction of the enginner-in-charge, for the following grades of concrete concrete of m25 grade with minimum cement content of 330 kg/cum, providing, mixing, laying in position in superstructure above plinth level, site machine batched design mix cement concrete for all types of reinforced cement concrete work, using coarse aggregate and fine aggregate derived from natural sources, cement, admixtures in recommended proportionsas per is 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength, including speading, laying, compacting to proper size/thickness and level, curing, maintaing proper quality control, carriage for all leads, trial mix and laboratory testing but excluding the cost of centering, shuttering, finishing and reinforcement as per drawings, specification and direction of the enginner-in-charge, for the following grades of concrete concrete of m30 grade with minimum cement content of 350 kg/cum, extra over item 36 above for using ready mixed concrete (rmc) manufactured in fully automated batching plant and transported to site of work in transit mixer for all leads, having continuous agitator mixer including pumping of concrete from transit mixer to site of laying. concrete of m25 grade with minimum cement content of 330 kg/cum (note the bidder has to quote only extra cost above the item 36 in the line item of 38, for example- if the cost of item 36 i.e normal mix is rs. 3000 and cost of rmc mix is rs.3500 then the bidder has to quote only the extra cost amount i.e rs.500 (3500-3000) in the line item 38 of the price part), extra over item 37 above for using ready mixed concrete (rmc) manufactured in fully automated batching plant and transported to site of work in transit mixer for all leads, having continuous agitator mixer including pumping of concrete from transit mixer to site of laying. concrete of m30 grade with minimum cement content of 350 kg/cum (note the bidder has to quote only extra cost above the item 37 in the line item of 39, for example- if the cost of item 37 i.e normal mix is rs. 3000 and cost of rmc mix is rs.3500 then the bidder has to quote only the extra cost amount i.e rs.500 (3500-3000) in the line item 39 of the price part) (another note-2 for item nos. 23, 24, 25 and 26 (i) excess cement, if required in design mix, with respect to the minimum cement content mentioned above, shall be paid under respective item. (ii) cost of shuttering and reinforcement shall be paid through respective items.(iii) rendering of treatment at construction joint shall be carried out under supervision of manufacturer, cost of which shall be included in rate of these items. (iv) design of pipe support foundations, high mast foundations, miscellaneous pump foundations, transformer and other equipment foundations shall be under scope of the contractor. (v) contractor shall prepare design drawings and bar bending schedules for all rcc structures and submit the same to ucil for approval., supplying and laying precast reinforced cement concrete elements at any level using 20 mm and down graded crushed stones as coarse aggregate as per approved design mix including supply of materials / labour / tools and tackles etc. as required, formwork, mixing, laying, compacting to proper size and thickness, curing, storing, handling, transporting, erection without damage etc. but excluding cost of shuttering and reinforcement, all complete as per drawings, specifications and direction of the engineer-in-charge. concrete of m25 grade with minimum cement content of 330 kg/cum note (i) excess cement, if required in design mix, with respect to the minimum cement content mentioned above, shall be paid under respective item. (ii) cost of shuttering and reinforcement shall be paid in respective items., add for consumption of extra / excess cement, if required, in design mix concrete (item no. 23 to 26 above) over the specified minimum cement content in respective items mentioned above. note i) requirement of extra cement with respect to the minimum cement content mentioned against respective items of approved design mix of concrete to achieve the characteristic strength for each design mix must be approved by engineer-in-charge during mix design stage based on laboratory test results which must also be approved by the engineer-in-charge..(ii) payment shall be on the basis of actual quantity of cement used in mix concrete executed., supplying, installing, dismantling and removing shuttering for foundations and substructures upto plinth level in all kinds of rcc work for all leads and lifts including necessary rendering of concrete surfaces after exposure, maintaining proper quality control, supervision etc., all complete as per drawings, specification and direction of engineer-in-charge. notes for the above item nos. i) the design of formwork/staging shall be submitted by the contractor to ucil for approval before commencement of work., supplying, installing, dismantling and removing shuttering for superstructures above plinth level in all kinds of rcc work for all leads and lifts including necessary rendering of concrete surfaces after exposure, maintaining proper quality control, supervision etc., all completer as per drawings, specification and direction of engineer-in-charge. notes for the above item nos. i) the design of formwork/staging shall be submitted by the contractor to ucil for approval before commencement of work., supplying, straightening, cutting, bending, binding with 2 nos. 20 gauge annealed soft iron wire and placing in position following types of reinforcement, of all diameters to all types of rcc members in substructure upto plinth level including all lifts and leads, maintaining proper quality control, supervision, provision of necessary chairs/spacers, tying and bending of dowel bars, cover blocks of same grade of concrete, preparation of bar bending schedule and getting the same approved from ucil before construction, all complete as per drawings, specification and direction of the engineer-in-charge. thermo-mechanically treated (tmt) bars of grade fe-500d conforming to is1786. note for above items. i) the supply of fe 500d tmt bars conforming to is 1786 (latest) shall be fromm/s sail, iisco, rinl, tata steel and jindal from their own plants rolled from virgin material only.ii) reinforcement steel bars from rerollers of the above manufacturers will not be accepted iii) no extra payment shall be made on account of rolling margin and wastage iv) contractor shall supply copies of the documentary evidence of purchase of steel, test certificates from these manufacturers (steel either directly purchased or through their dealers)and also tests from third party, if required, to be arranged at no extra cost.v) welding weights, weight of binding wires etc. shall not be measured for payment but the cost of the same shall be deemed to have been included in the quoted rate.vi) chairs and spacers provided will not be paid extra.vii) preparation of bar bending schedule for reinforcement in all types of rcc structures will be prepared by the contractor and submitted to ucil for approval., supplying, straightening, cutting, bending, binding with 2 nos. 20 gauge annealed soft iron wire and placing in position following types of reinforcement, of all diameters to all types of rcc members in superstructure above plinth level including all lifts and leads, maintaining proper quality control, supervision, provision of necessary chairs/spacers, tying and bending of dowel bars, cover blocks of same grade of concrete, preparation of bar bending schedule and getting the same approved from ucil before construction, all complete as per drawings, specification and direction of the engineer-in-charge. thermo-mechanically treated (tmt) bars of grade fe-500d conforming to is1786. note for above items. i) the supply of fe 500d tmt bars conforming to is 1786 (latest) shall be fromm/s sail, iisco, rinl, tata steel and jindal from their own plants rolled from virgin material only.ii) reinforcement steel bars from rerollers of the above manufacturers will not be accepted iii) no extra payment shall be made on account of rolling margin and wastage iv) contractor shall supply copies of the documentary evidence of purchase of steel, test certificates from these manufacturers (steel either directly purchased or through their dealers)and also tests from third party, if required, to be arranged at no extra cost.v) welding weights, weight of binding wires etc. shall not be measured for payment but the cost of the same shall be deemed to have been included in the quoted rate.vi) chairs and spacers provided will not be paid extra.vii) preparation of bar bending schedule for reinforcement in all types of rcc structures will be prepared by the contractor and submitted to ucil for approval., supplying, fabricating and installing mild steel anchor bolts / holding down bolts, pipes, sleeves, inserts, hangers, conduits and any other mild steel, cast iron, g.i.cast steel and other fixures including lugs in cement concrete, including necessary templates for keeping them in position and with welding, bending to the required shape, if necessary and prime coat and final painting whereever necessary/applicable, cost of scaffolding, as required, at all leads and lifts, storing, handling, transporting, erection without damage, placing in position, maintaining proper quality control etc. all complete as per drawings, specification and direction of engineer-in-charge. note i) all materials shall be from m/s sail, iisco, rinl and tata steel from their own plants rolled from virgin material only. ii) welding weights, connections, bolts and nuts etc. shall not be measured for payment but the cost of which shall be deemed to have been included in the quoted rate. iii) contractor shall supply copies of the documentary evidence of purchase of steel, test certificates from these manufacturers and also tests from third party, if required, to be arranged at no extra cost. iv) all holes will be made by drilling only. gas cutting of holes will not be permitted. v) electrodes manufactured by m/s advani oerlikon, esab india, indian oxygen and dandh secheron only shall be used., taking delivery from ucil, handling, transporting and installing in cement concrete at all elevations anchor bolts, anchors, pipes, sleeves, inserts, hangers, conduits and any other mild steel, cast iron, g.i.cast steel and other fixures, cost of scaffolding, as required, placing in position, maintaining proper quality control etc. all complete as per drawings, specification and direction of engineer-in-charge.. note i) the fabricated embedded items including lugs etc. shall be supplied by ucil., supplying, fabricating and installing structural steel work conforming to is 2062 (grade e250, quality b0) in all kinds of work for pipe and cable supports at top of dam/embankment at all elevations including straightening of raw steel (if required), cutting, making edge preparation, making connections at fabrication yard by welding / bolting, hoisting, fixing in position by welding / bolting, cleaning and preparation of all steel, storing, loading, transportation, unloading, delivery at erection site, maintening proper quality control, surface preparation for painting, erection, alignment and connections of all structures true to line, level, plumb and dimension including rectification, if any, splicing, applying a primer coat of approved make before erection and two coats of final paint of approved make after erection and final alignment, preparation of design drawings, fab

Unlock Full Tender Access

Start Free Trial to download documents before deadline

T18 Ref No : 16953018
Location : vemula , andhra pradesh
Source : GEM Tenders
corrigendum tender for bitumenlayingwork2 , kerbstonelayingwork1 , tailingexcavationwork1 , borrowearthsoilwork3 , removinghdpeliningwork1 , dismantlingstonepitching1 , backfillingoftailing1 , laboratorytestwork15 , humepipework1 , humepipework2 , humepipework3 , humepipework4 , humepipework5 , humepipework6 , earthworkfillingforbund1 , stonepitchingwork5 , brickwork1 , brickwork2 , plasteringwork1 , plasteringwork2 , plasteringwork3 , paitingwork1 , paitingwork2 , paitingwork3 , handrailingwork3 , ccforflooringwork1 , plasteringwork4 , glasssstripswork1 , cementpunning1 , aluminumwork1 , shutterworks1 , glasspaneswork1 , siliconsealantwork1 , doorworks1 , mechanicalinstallationpumps1 , mechanicalinstallationpipes1 , mechanicalinstallationpipes2 , mechanicalinstallationpipes3 , electricallinstallation5 , mechanicalerections1 , disposalareappep1 , slimedisposalareappep1 , slimedisposalareappep2 , constructionofelectricalfacilityworklumpsum1 , panelneartaillingpond , automaticpowerfactorcorrectionpanel1 , batterychargerdcboard , lcsmushroomheadstay1 , lcsmushroomheadstay2 , lcsmushroomheadstay3 , distributiontransformer1 , dieselgeneratorset1 , dieselgeneratorfounation1 , ltbusduct1 , htswitchgearincomingpanel1 , htswitchgearincomingpanel2 , mainlightingdistributionboard1 , sublightingdistributionboard , highmastlighting1 , highmastlighting2 , lighteningfixture1 , ltpowercables1 , htpowercables1 , htpowercables2 , ltcontrolcables , junctionboxes1 , earthinglightningitems1 , aircondition1 ,, construction of 4th stage tailing pond, stripping and clearing the site of jungles, bushes, shrubs, wood etc., uprooting of rank vegetation, trees and saplings of girth upto 30 cm measured at a height of 1m above ground level, removal of undesirable materials etc. including removal and disposal of debris at suitable locations with all leads and lifts, as decided by the engineer-in-charge., felling trees of girth (measured at a height of 1m above ground level) including cutting of trunks and branches, removing the roots and stacking of servicable material and disposal of unserviceable material at suitable ocations as decided by the engineer-in-charge. beyond 30 cm girth upto and including 60 cm girth, felling trees of girth (measured at a height of 1m above ground level) including cutting of trunks and branches, removing the roots and stacking of servicable material and disposal of unserviceable material at suitable ocations as decided by the engineer-in-charge. beyond 60 cm girth upto and including 120 cm girth, felling trees of girth (measured at a height of 1m above ground level) including cutting of trunks and branches, removing the roots and stacking of servicable material and disposal of unserviceable material at suitable ocations as decided by the engineer-in-charge. beyond 120 cm girth upto and including 240 cm girth, earth work in excavation in development of embankment profile in the following types of soils for all lifts, including taking adequate protection during excavation, drilling and transporting the excavated spoil / material after stripping of top soil as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead within acquired area of tailing dam & pond. all kinds of soils including hard and dense soils, earth work in excavation in development of embankment profile in the following types of soils for all lifts, including taking adequate protection during excavation, drilling and transporting the excavated spoil / material after stripping of top soil as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead within acquired area of tailing dam & pond. ordinary rock, earth work in excavation in development of embankment profile in the following types of soils for all lifts, including taking adequate protection during excavation, drilling and transporting the excavated spoil / material after stripping of top soil as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead within acquired area of tailing dam & pond.hard rock (blasting prohibited), earth work in excavation of hillocks within existing pond area in the following types of soils for all lifts, transporting the excavated spoil / material as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead and lift within acquired area of tailing dam & pond. all kinds of soils including hard and dense soils, earth work in excavation of hillocks within existing pond area in the following types of soils for all lifts, transporting the excavated spoil / material as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead and lift within acquired area of tailing dam & pond. ordinary rock, earth work in excavation of hillocks within existing pond area in the following types of soils for all lifts, transporting the excavated spoil / material as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead and lift within acquired area of tailing dam & pond. hard rock (blasting prohibited), earth work in excavation in bed layer -1 in the following types of soils for all lifts, including bailing / pumping out any water accumulating inside the excavation, taking adequate protection during excavation, transporting the excavated soil as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of the engineer-in-charge for any lead within acquired area of tailing dam & pond. all kinds of soils including hard and dense soils, earth work in excavation in bed layer -1 in the following types of soils for all lifts, including bailing / pumping out any water accumulating inside the excavation, taking adequate protection during excavation, transporting the excavated soil as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of the engineer-in-charge for any lead within acquired area of tailing dam & pond. ordinary rock, earth work in excavation in pipe-support foundations, peripheral drains, culverts, diversion drain, watch towers, miscellaneous equipment foundations etc. in the following types of soils for all lifts, including bailing / pumping out any water accumulating inside the excavation, taking adequate protection during excavation, drilling and transporting the excavated spoil / material as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead within acquired area of tailing dam & pond. all kinds of soils including hard and dense soils, earth work in excavation in pipe-support foundations, peripheral drains, culverts, diversion drain, watch towers, miscellaneous equipment foundations etc. in the following types of soils for all lifts, including bailing / pumping out any water accumulating inside the excavation, taking adequate protection during excavation, drilling and transporting the excavated spoil / material as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead within acquired area of tailing dam & pond. ordinary rock, earth work in excavation in pipe-support foundations, peripheral drains, culverts, diversion drain, watch towers, miscellaneous equipment foundations etc. in the following types of soils for all lifts, including bailing / pumping out any water accumulating inside the excavation, taking adequate protection during excavation, drilling and transporting the excavated spoil / material as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of engineer for any lead within acquired area of tailing dam & pond. hard rock (blasting prohibited), supplying and transporting earth of specified quality (as per specification and drawing) from borrow-pit i.e. the source not owned by ucil but arranged by the contractor at his own cost including all taxes, royalty etc and filling the same in bed later - 1 in layers not exceeding 250 mm above existing ground level, watering of each layer in the stipulated manner as per specification and / or direction of the engineer-in-charge and compaction by mechanical means to achieve required degree of compaction as per specification, all complete as per drawing, specification and direction of the engineer-in-charge., supplying and transporting earth of specified quality (as per specification and drawing) from borrow-pit i.e. the source not owned by ucil but arranged by the contractor at his own cost including all taxes, royalty etc and filling the same in embankment in random fill zone in layers not exceeding 250 mm in proper profile to various heights above existing ground level, watering of each layer in the stipulated manner as per specification and / or direction of the engineer-in-charge and compaction by mechanical means to acheive required degree of compaction as per specification, disposal of excess of unusable material all complete as per drawing, specification and direction of the engineer-in-charge for any lead and lift (sectional measurement for compacted filling will only be paid)., supplying and transporting clay of specified quality and property (as per specification and drawing) from borrow-pit i.e. the source not owned by ucil but arranged by the contractor at his own cost including all taxes, royalty etc and laying the same over random fill on upstream side of embankment in layers not exceeding 150 mm measured loose in proper profile, watering of each layer in stipulated manner to various heights and compacting each layer by mechanical means to achieve required degree of compaction as per specification and / or direction of the engineer-in-charge, all complete as per drawing, specification and direction of the engineer-in-charge for any lead and lift (sectional measurement for compacted thickness will only be paid)., supplying, transporting and laying stone pitching with approved stone (average 300 mm thick) over clay lining on upstream side of dam with voids filler with stone dust with all lead and lift including cutwork, curing, scaffolding with all bye-work, all complete as per drawing, specification and direction of the engineer-in-charge. note - payment shall be made for the actual area of coverage of stone pitching. wastage shall not be payable., supplying, transporting and laying stone pitching with approved stone (average 300 mm thick) over random fill on downstream side of dam with voids filler with stone dust with all lead and lift including cutwork, curing, scaffolding with all bye-work, all complete as per drawing, specification and direction of the engineer-in-charge. note payment shall be made for the actual area of coverage of stone pitching. wastage shall not be payable., supplying, transporting, spreading and compacting sand (average 100 mm thick) over stone pitching on upstream side of dam with all lead and lift including all bye-work, all complete as per drawing, specification and direction of the engineer-in-charge., supplying, transporting and laying 1500 micron thick high density polyethelene (hdpe) sheet (textured on both sides) as lining over sand cushion layer on upstream side of dam, laid in position by qualified and skilled installer certified by the manufacturer and approved by the engineer-in-charge, with all lead and lift including sealing of joints (hot wedge single and dual track seaming and / or extrusion fillet seaming method or any other specialized method e.g. robotic two stitch welding etc.) of new sheets and sealing of new lining sheet with existing lining sheet with an overlap of approximately 1.0m, anchoring the new lining sheet on top of new embankment, maintaining quality control, conducting tests as per requirement of the specification, all complete as per drawing, provisions of specification and direction of the engineer-in-charge. note payment shall be made for the actual area of coverage of hdpe lining sheet. overlapping area, wastage etc. shall not be payable., supplying, transporting, laying and compacting uniformly graded stone aggregate filters within new embankment at all levels,incl shuttering, tools tackles all complete as per drawing, specification and direction of the engineer-in-charge., supplying, transporting, laying and compacting uniformly graded coarse sand filters within new embankment at all levels incl shuttering, tools tackles all complete as per drawing, specification and direction of the engineer-in-charge. (sand shall conform to is383). laying and compacting rock-fill toe dam on downstream side of embankment with following materials at all levels, all complete as per drawing, specification and direction of the engineer-in-charge., with rocks arranged by the contractor at his own cost (rate to include supply and transport also), earth work in back-filling including watering, ramming and compaction at all elevation around pipe support foundations, drain trenches etc. as per specifications and drawings and as directed by the engineer-in-charge with selected soils obtained from stacks under item no. 6 above for any lead within acquired area of tailing pond and dam. (filling shall be done in layers not exceeding 250 mm in loose thickness and watered as necessary. each layer of filling to be compacted to acheive a dry density of not less than 95% of the proctor density)., supplying, transporting and laying stone pitching with approved stone (average 300 mm thick) in diversion drain and at outfall locations with interstices between adjacent stones filled-in with stones of proper size well-driven in order to ensure tight packing and complete filling of all interstices so that no chip can be removed by hand, with all lead and lift including cutwork, curing, scaffolding with all bye-work, all complete as per drawing, specification and direction of the engineer-in-charge. note payment shall be made for the actual area of coverage of stone pitching. wastage shall not be payable., earthwork in filling using earth obtained from item nos. 3, 4, 5 and 6 above in construction of embankment of access roads (total four nos. access roads) connecting top of new tailing pond embankment in layers not exceeding 250 mm in proper profile to various heights above existing ground level, watering of each layer in the stipulated manner as per specification and / or direction of the engineer-in-charge and compaction by mechanical means to acheive required degree of compaction as per specification, all complete as per drawing, specification and direction of the engineer-in-charge for any lead and lift (sectional measurement for compacted filling will only be paid)., supplying, transporting and laying stone pitching with approved stone (average 300 mm thick) on sides of embankments of access roads with voids filler with stone dust with all lead and lift including cutwork, curing, scaffolding with all bye-work, all complete as per drawing, specification and direction of the engineer-in-charge., supplying site machine batched plain cement concrete of 136 nominal mix (1 cement 3 coarse sand 6 graded stone aggregate with 20 mm and down aggregates) below foundations, walls, drains, pits etc. including mixing, transporting, placing in position, compacting to proper thickness and level, curirg, maintaining proper quality control including cost of admixtures in recommended proportions as per is 9103 to accelerate/retard setting of concrete, improve workability without impairing strength and durability but excluding cost of shuttering work, all complete as per specifications, drawings and direction of the engineer-in-charge and including cost of form work., extra over item 30 bove for using ready mixed concrete (rmc) manufactured in fully automated batching plant and transported to site of work in transit mixer for all leads, having continuous agitator mixer including pumping of concrete from transit mixer to site of laying. note (i) cost of shuttering and reinforcement shall be paid in respective items. (note the bidder has to quote only extra cost above the item 30 in the line item of 31, for example- if the cost of item 30 i.e normal mix is rs. 3000 and cost of rmc mix is rs.3500 then the bidder has to quote only the extra cost amount i.e rs.500 (3500-3000) in the line item 31 of the price part), providing, mixing, laying in position in substructure upto plinth level, site machine batched design mix cement concrete for all types of reinforced cement concrete work, using coarse aggregate and fine aggregate derived from natural sources, cement, admixtures in recommended proportionsas per is 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength, including speading, laying, compacting to proper size/thickness and level, curing, maintaing proper quality control, carriage for all leads, trial mix and laboratory testing but excluding the cost of centering, shuttering, finishing and reinforcement as per drawings, specification and direction of the enginner-in-charge, for the following grades of concrete concrete of m25 grade with minimum cement content of 330 kg/cum, providing, mixing, laying in position in substructure upto plinth level, site machine batched design mix cement concrete for all types of reinforced cement concrete work, using coarse aggregate and fine aggregate derived from natural sources, cement, admixtures in recommended proportionsas per is 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength, including speading, laying, compacting to proper size/thickness and level, curing, maintaing proper quality control, carriage for all leads, trial mix and laboratory testing but excluding the cost of centering, shuttering, finishing and reinforcement as per drawings, specification and direction of the enginner-in-charge, for the following grades of concrete concrete of m30 grade with minimum cement content of 350 kg/cum, extra over item 32 above for using ready mixed concrete (rmc) manufactured in fully automated batching plant and transported to site of work in transit mixer for all leads, having continuous agitator mixer including pumping of concrete from transit mixer to site of laying. concrete of m25 grade with minimum cement content of 330 kg/cum (note the bidder has to quote only extra cost above the item 32 in the line item of 34, for example- if the cost of item 32 i.e normal mix is rs. 3000 and cost of rmc mix is rs.3500 then the bidder has to quote only the extra cost amount i.e rs.500 (3500-3000) in the line item 34 of the price part), extra over item 33 above for using ready mixed concrete (rmc) manufactured in fully automated batching plant and transported to site of work in transit mixer for all leads, having continuous agitator mixer including pumping of concrete from transit mixer to site of laying.concrete of m30 grade with minimum cement content of 350 kg/cum. (note the bidder has to quote only extra cost above the item 33 in the line item of 35, for example- if the cost of item 33 i.e normal mix is rs. 3000 and cost of rmc mix is rs.3500 then the bidder has to quote only the extra cost amount i.e rs.500 (3500-3000) in the line item 35 of the price part), providing, mixing, laying in position in superstructure above plinth level, site machine batched design mix cement concrete for all types of reinforced cement concrete work, using coarse aggregate and fine aggregate derived from natural sources, cement, admixtures in recommended proportionsas per is 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength, including speading, laying, compacting to proper size/thickness and level, curing, maintaing proper quality control, carriage for all leads, trial mix and laboratory testing but excluding the cost of centering, shuttering, finishing and reinforcement as per drawings, specification and direction of the enginner-in-charge, for the following grades of concrete concrete of m25 grade with minimum cement content of 330 kg/cum, providing, mixing, laying in position in superstructure above plinth level, site machine batched design mix cement concrete for all types of reinforced cement concrete work, using coarse aggregate and fine aggregate derived from natural sources, cement, admixtures in recommended proportionsas per is 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength, including speading, laying, compacting to proper size/thickness and level, curing, maintaing proper quality control, carriage for all leads, trial mix and laboratory testing but excluding the cost of centering, shuttering, finishing and reinforcement as per drawings, specification and direction of the enginner-in-charge, for the following grades of concrete concrete of m30 grade with minimum cement content of 350 kg/cum, extra over item 36 above for using ready mixed concrete (rmc) manufactured in fully automated batching plant and transported to site of work in transit mixer for all leads, having continuous agitator mixer including pumping of concrete from transit mixer to site of laying. concrete of m25 grade with minimum cement content of 330 kg/cum (note the bidder has to quote only extra cost above the item 36 in the line item of 38, for example- if the cost of item 36 i.e normal mix is rs. 3000 and cost of rmc mix is rs.3500 then the bidder has to quote only the extra cost amount i.e rs.500 (3500-3000) in the line item 38 of the price part), extra over item 37 above for using ready mixed concrete (rmc) manufactured in fully automated batching plant and transported to site of work in transit mixer for all leads, having continuous agitator mixer including pumping of concrete from transit mixer to site of laying. concrete of m30 grade with minimum cement content of 350 kg/cum (note the bidder has to quote only extra cost above the item 37 in the line item of 39, for example- if the cost of item 37 i.e normal mix is rs. 3000 and cost of rmc mix is rs.3500 then the bidder has to quote only the extra cost amount i.e rs.500 (3500-3000) in the line item 39 of the price part) (another note-2 for item nos. 23, 24, 25 and 26 (i) excess cement, if required in design mix, with respect to the minimum cement content mentioned above, shall be paid under respective item. (ii) cost of shuttering and reinforcement shall be paid through respective items.(iii) rendering of treatment at construction joint shall be carried out under supervision of manufacturer, cost of which shall be included in rate of these items. (iv) design of pipe support foundations, high mast foundations, miscellaneous pump foundations, transformer and other equipment foundations shall be under scope of the contractor. (v) contractor shall prepare design drawings and bar bending schedules for all rcc structures and submit the same to ucil for approval., supplying and laying precast reinforced cement concrete elements at any level using 20 mm and down graded crushed stones as coarse aggregate as per approved design mix including supply of materials / labour / tools and tackles etc. as required, formwork, mixing, laying, compacting to proper size and thickness, curing, storing, handling, transporting, erection without damage etc. but excluding cost of shuttering and reinforcement, all complete as per drawings, specifications and direction of the engineer-in-charge. concrete of m25 grade with minimum cement content of 330 kg/cum note (i) excess cement, if required in design mix, with respect to the minimum cement content mentioned above, shall be paid under respective item. (ii) cost of shuttering and reinforcement shall be paid in respective items., add for consumption of extra / excess cement, if required, in design mix concrete (item no. 23 to 26 above) over the specified minimum cement content in respective items mentioned above. note i) requirement of extra cement with respect to the minimum cement content mentioned against respective items of approved design mix of concrete to achieve the characteristic strength for each design mix must be approved by engineer-in-charge during mix design stage based on laboratory test results which must also be approved by the engineer-in-charge..(ii) payment shall be on the basis of actual quantity of cement used in mix concrete executed., supplying, installing, dismantling and removing shuttering for foundations and substructures upto plinth level in all kinds of rcc work for all leads and lifts including necessary rendering of concrete surfaces after exposure, maintaining proper quality control, supervision etc., all complete as per drawings, specification and direction of engineer-in-charge. notes for the above item nos. i) the design of formwork/staging shall be submitted by the contractor to ucil for approval before commencement of work., supplying, installing, dismantling and removing shuttering for superstructures above plinth level in all kinds of rcc work for all leads and lifts including necessary rendering of concrete surfaces after exposure, maintaining proper quality control, supervision etc., all completer as per drawings, specification and direction of engineer-in-charge. notes for the above item nos. i) the design of formwork/staging shall be submitted by the contractor to ucil for approval before commencement of work., supplying, straightening, cutting, bending, binding with 2 nos. 20 gauge annealed soft iron wire and placing in position following types of reinforcement, of all diameters to all types of rcc members in substructure upto plinth level including all lifts and leads, maintaining proper quality control, supervision, provision of necessary chairs/spacers, tying and bending of dowel bars, cover blocks of same grade of concrete, preparation of bar bending schedule and getting the same approved from ucil before construction, all complete as per drawings, specification and direction of the engineer-in-charge. thermo-mechanically treated (tmt) bars of grade fe-500d conforming to is1786. note for above items. i) the supply of fe 500d tmt bars conforming to is 1786 (latest) shall be fromm/s sail, iisco, rinl, tata steel and jindal from their own plants rolled from virgin material only.ii) reinforcement steel bars from rerollers of the above manufacturers will not be accepted iii) no extra payment shall be made on account of rolling margin and wastage iv) contractor shall supply copies of the documentary evidence of purchase of steel, test certificates from these manufacturers (steel either directly purchased or through their dealers)and also tests from third party, if required, to be arranged at no extra cost.v) welding weights, weight of binding wires etc. shall not be measured for payment but the cost of the same shall be deemed to have been included in the quoted rate.vi) chairs and spacers provided will not be paid extra.vii) preparation of bar bending schedule for reinforcement in all types of rcc structures will be prepared by the contractor and submitted to ucil for approval., supplying, straightening, cutting, bending, binding with 2 nos. 20 gauge annealed soft iron wire and placing in position following types of reinforcement, of all diameters to all types of rcc members in superstructure above plinth level including all lifts and leads, maintaining proper quality control, supervision, provision of necessary chairs/spacers, tying and bending of dowel bars, cover blocks of same grade of concrete, preparation of bar bending schedule and getting the same approved from ucil before construction, all complete as per drawings, specification and direction of the engineer-in-charge. thermo-mechanically treated (tmt) bars of grade fe-500d conforming to is1786. note for above items. i) the supply of fe 500d tmt bars conforming to is 1786 (latest) shall be fromm/s sail, iisco, rinl, tata steel and jindal from their own plants rolled from virgin material only.ii) reinforcement steel bars from rerollers of the above manufacturers will not be accepted iii) no extra payment shall be made on account of rolling margin and wastage iv) contractor shall supply copies of the documentary evidence of purchase of steel, test certificates from these manufacturers (steel either directly purchased or through their dealers)and also tests from third party, if required, to be arranged at no extra cost.v) welding weights, weight of binding wires etc. shall not be measured for payment but the cost of the same shall be deemed to have been included in the quoted rate.vi) chairs and spacers provided will not be paid extra.vii) preparation of bar bending schedule for reinforcement in all types of rcc structures will be prepared by the contractor and submitted to ucil for approval., supplying, fabricating and installing mild steel anchor bolts / holding down bolts, pipes, sleeves, inserts, hangers, conduits and any other mild steel, cast iron, g.i.cast steel and other fixures including lugs in cement concrete, including necessary templates for keeping them in position and with welding, bending to the required shape, if necessary and prime coat and final painting whereever necessary/applicable, cost of scaffolding, as required, at all leads and lifts, storing, handling, transporting, erection without damage, placing in position, maintaining proper quality control etc. all complete as per drawings, specification and direction of engineer-in-charge. note i) all materials shall be from m/s sail, iisco, rinl and tata steel from their own plants rolled from virgin material only. ii) welding weights, connections, bolts and nuts etc. shall not be measured for payment but the cost of which shall be deemed to have been included in the quoted rate. iii) contractor shall supply copies of the documentary evidence of purchase of steel, test certificates from these manufacturers and also tests from third party, if required, to be arranged at no extra cost. iv) all holes will be made by drilling only. gas cutting of holes will not be permitted. v) electrodes manufactured by m/s advani oerlikon, esab india, indian oxygen and dandh secheron only shall be used., taking delivery from ucil, handling, transporting and installing in cement concrete at all elevations anchor bolts, anchors, pipes, sleeves, inserts, hangers, conduits and any other mild steel, cast iron, g.i.cast steel and other fixures, cost of scaffolding, as required, placing in position, maintaining proper quality control etc. all complete as per drawings, specification and direction of engineer-in-charge.. note i) the fabricated embedded items including lugs etc. shall be supplied by ucil., supplying, fabricating and installing structural steel work conforming to is 2062 (grade e250, quality b0) in all kinds of work for pipe and cable supports at top of dam/embankment at all elevations including straightening of raw steel (if required), cutting, making edge preparation, making connections at fabrication yard by welding / bolting, hoisting, fixing in position by welding / bolting, cleaning and preparation of all steel, storing, loading, transportation, unloading, delivery at erection site, maintening proper quality control, surface preparation for painting, erection, alignment and connections of all structures true to line, level, plumb and dimension including rectification, if any, splicing, applying a primer coat of approved make before erection and two coats of final paint of approved make after erection and final alignment, preparation of design d
T18 Ref No : 16666242
Location : betul , madhya pradesh
Source : GEM Tenders
tender for drilling of 02 nos boreholes of 150 mm dia , geotechnical investigation reports 02 reports , internal shifting of machine and all equipments , cost of core box at site 04 qty inclusive gst complete , transportation and mobilisation of all equipments at site to carry out tests, consultancy of soil investigation, alfa drilling of 02 nos boreholes of 150 mm dia in soil oblique rock formation up to a depth of 6 metres each by calyx drilling machine comma as per is 1892 colon 1972 including collection of disturbed and undisturbed soil samples stop brova excavating trial pits at indicated locations of size 1 point 20 m by 1 point 20 m up to 3 m depth comma 5 m away from bore hole below existing filled level in all types of soils and collection of samples from various depth to conduct laboratory tests and reporting with photographs stop charlie rl of the ground level oblique foundation level with reference to a bm should invariably be mentioned in the soil investigation report stop delta photographic record of geo exploration as well as testing shall also form part of the report stop echo recommendation as regards possibility of liquefaction of soil in case of saturated or partially loose oblique uncompacted sandy soils stop foxtrot swelling index and swelling pressure in respect of black cotton soil and its depth oblique layer stop golf depth of ground water table in peak monsoon lowest and peak summer highest after correlation of results with seasonal variations of water table in the station stop hotel recommended for filling under floors and recommendation for type of footing and depth of footing stop inclusive gst complete, geotechnical investigation reports 02 reports shall include tests on sieve analysis comma atterbergs limit comma particle size analysis comma natural moisture content comma wet and dry density comma specific gravity comma tri axial compression comma consolidation comma cbr value and soil bearing capacity inclusive gst complete, internal shifting of machine and all equipments one qty inclusive gst complete, cost of core box at site 04 qty inclusive gst complete, transportation and mobilisation of all equipments at site to carry out tests under special repair no1 and 2 of 01 qty inclusive gst complete

Unlock Full Tender Access

Start Free Trial to download documents before deadline

T18 Ref No : 17151300
Location : noida , uttar pradesh
Source : GEM Tenders
tender for turnkey instrumentation supply for mr item no. 1.0001 including gst , supply for mr item no. 1.0002 including gst , supply for mr item no. 1.0003 including gst , supply for mr item no. 1.0004 including gst , supply for mr item no. 1.0005 including gst , supply for mr item no. 1.0006 including gst , supply for mr item no. 1.0007 including gst , supply for mr item no. 1.0008 including gst , supply for mr item no. 1.0009 including gst , supply for mr item no. 1.0010 including gst , supply for mr item no. 1.0011 including gst , supply for mr item no. 1.0012 including gst , supply for mr item no. 1.0013 including gst , supply for mr item no. 1.0014 including gst , supply for mr item no. 1.0015 including gst , supply for mr item no. 1.0016 including gst , supply for mr item no. 1.0017 including gst , supply for mr item no. 1.0018 including gst , supply for mr item no. 1.0019 including gst , supply for mr item no. 1.0020 including gst , supply for mr item no. 1.0021 including gst , supply for mr item no. 1.0022 including gst , supply for mr item no. 1.0023 including gst , supply for mr item no. 1.0024 including gst , supply for mr item no. 1.0025 including gst , supply for mr item no. 1.0026 including gst , supply for mr item no. 1.0027 including gst , supply for mr item no. 1.0028 including gst , supply for mr item no. 1.0029 including gst , supply for mr item no. 1.0030 including gst , supply for mr item no. 1.0031 including gst , supply for mr item no. 1.0032 including gst , supply for mr item no. 1.0033 for mr item no. 3.0012 transportation of mandatory spare price including gst , transportation for mr item no. 3.0013 transportation of mandatory spare price including gst , transportation for mr item no. 3.0014 transportation of mandatory spare price including gst , transportation for mr item no. 3.0015 transportation of mandatory spare price including gst , transportation for mr item no. 3.0016 transportation of mandatory spare price including gst , transportation for mr item no. 3.0017 transportation of mandatory spare price including gst , transportation for mr item no. 3.0018 transportation of mandatory spare price including gst , transportation for mr item no. 3.0019 transportation of mandatory spare price including gst , transportation for mr item no. 3.0020 transportation of mandatory spare price including gst , transportation for mr item no. 3.0021 transportation of mandatory spare price including gst , transportation for mr item no. 3.0022 transportation of mandatory spare price including gst , transportation for mr item no. 3.0023 transportation of mandatory spare price including gst , transportation for mr item no. 3.0024 transportation of mandatory spare price including gst , transportation for mr item no. 3.0025 transportation of mandatory spare price including gst , transportation for mr item no. 3.0026 transportation of mandatory spare price including gst , transportation for mr item no. 3.0027 transportation of mandatory spare price including gst , transportation for mr item no. 3.0028 transportation of mandatory spare price including gst , transportation for mr item no. 3.0029 transportation of mandatory spare price including gst , transportation for mr item no. 3.0030 transportation of mandatory spare price including gst , transportation for mr item no. 3.0031 transportation of mandatory spare price including gst , transportation for mr item no. 3.0032 transportation of mandatory spare price including gst , transportation for mr item no. 3.0033 transportation of mandatory spare price including gst , transportation for mr item no. 3.0034 transportation of mandatory spare price including gst , transportation for mr item no. 3.0035 transportation of mandatory spare price including gst , transportation for mr item no. 3.0036 transportation of mandatory spare price including gst , transportation for mr item no. 3.0037 transportation of mandatory spare price including gst , transportation for mr item no. 3.0038 transportation of mandatory spare price including gst , transportation for mr item no. 3.0039 transportation of mandatory spare price including gst , transportation for mr item no. 3.0040 transportation of mandatory spare price including gst , transportation for mr item no. 3.0041 transportation of mandatory spare price including gst , transportation for mr item no. 3.0042 transportation of mandatory spare price including gst , transportation for mr item no. 3.0043 transportation of mandatory spare price including gst , transportation for mr item no. 3.0044 transportation of mandatory spare price including gst , transportation for mr item no. 3.0045 transportation of mandatory spare price including gst , transportation for mr item no. 3.0046 transportation of mandatory spare price including gst , transportation for mr item no. 3.0047 transportation, turnkey instrumentation, supply for mr item no. 1.0001 including gst, supply for mr item no. 1.0002 including gst, supply for mr item no. 1.0003including gst, supply for mr item no. 1.0004 including gst, supply for mr item no. 1.0005 including gst, supply for mr item no. 1.0006 including gst, supply for mr item no. 1.0007 including gst, supply for mr item no. 1.0008 including gst, supply for mr item no. 1.0009 including gst, supply for mr item no. 1.0010 including gst, supply for mr item no. 1.0011 including gst, supply for mr item no. 1.0012 including gst, supply for mr item no. 1.0013 including gst, supply for mr item no. 1.0014 including gst, supply for mr item no. 1.0015 including gst, supply for mr item no. 1.0016 including gst, supply for mr item no. 1.0017 including gst, supply for mr item no. 1.0018 including gst, supply for mr item no. 1.0019 including gst, supply for mr item no. 1.0020 including gst, supply for mr item no. 1.0021 including gst, supply for mr item no. 1.0022 including gst, supply for mr item no. 1.0023 including gst, supply for mr item no. 1.0024 including gst, supply for mr item no. 1.0025 including gst, supply for mr item no. 1.0026 including gst, supply for mr item no. 1.0027 including gst, supply for mr item no. 1.0028 including gst, supply for mr item no. 1.0029 including gst, supply for mr item no. 1.0030 including gst, supply for mr item no. 1.0031 including gst, supply for mr item no. 1.0032 including gst, supply for mr item no. 1.0033 including gst, supply for mr item no. 1.0034 including gst, supply for mr item no. 1.0035 including gst, supply for mr item no. 1.0036 including gst, supply for mr item no. 1.0037 including gst, supply for mr item no. 1.0038 including gst, supply for mr item no. 1.0039 including gst, supply for mr item no. 1.0040 including gst, supply for mr item no. 1.0041 including gst, supply for mr item no. 1.0042 including gst, supply for mr item no. 1.0043 including gst, supply for mr item no. 1.0044 including gst, supply for mr item no. 1.0045 including gst, supply for mr item no. 1.0046 including gst, supply for mr item no. 1.0047 including gst, supply for mr item no. 1.0048 including gst, supply for mr item no. 1.0049 including gst, supply for mr item no. 1.0050 including gst, supply for mr item no. 1.0051 including gst, supply for mr item no. 1.0052 including gst, supply for mr item no. 1.0053 including gst, supply for mr item no. 1.0054 including gst, supply for mr item no. 1.0055 including gst, supply for mr item no. 1.0056 including gst, supply for mr item no. 1.0057 including gst, supply for mr item no. 1.0058 including gst, supply for mr item no. 1.0059 including gst, supply for mr item no. 1.0060 including gst, supply for mr item no. 1.0061 including gst, supply for mr item no. 1.0062 including gst, supply for mr item no. 1.0063 including gst, supply for mr item no. 1.0064 including gst, supply for mr item no. 1.0065 including gst, supply for mr item no. 1.0066 including gst, supply for mr item no. 1.0067 including gst, supply for mr item no. 1.0068 including gst, supply for mr item no. 1.0069 including gst, supply for mr item no. 1.0070 including gst, supply for mr item no. 1.0071 including gst, supply for mr item no. 1.0072 including gst, supply for mr item no. 1.0073 including gst, supply for mr item no. 1.0074 including gst, supply for mr item no. 1.0075 including gst, site work for mr item no. 2.0008 including gst, site work for mr item no. 2.0023 including gst, transportation for mr item no. 3.0001 transportation of mandatory spare price including gst, transportation for mr item no. 3.0002 transportation of mandatory spare price including gst, transportation for mr item no. 3.0003 transportation of mandatory spare price including gst, transportation for mr item no. 3.0004 transportation of mandatory spare price including gst, transportation for mr item no. 3.0005 transportation of mandatory spare price including gst, transportation for mr item no. 3.0006 transportation of mandatory spare price including gst, transportation for mr item no. 3.0007 transportation of mandatory spare price including gst, transportation for mr item no. 3.0008 transportation of mandatory spare price including gst, transportation for mr item no. 3.0009 transportation of mandatory spare price including gst, transportation for mr item no. 3.0010 transportation of mandatory spare price including gst, transportation for mr item no. 3.0011 transportation of mandatory spare price including gst, transportation for mr item no. 3.0012 transportation of mandatory spare price including gst, transportation for mr item no. 3.0013 transportation of mandatory spare price including gst, transportation for mr item no. 3.0014 transportation of mandatory spare price including gst, transportation for mr item no. 3.0015 transportation of mandatory spare price including gst, transportation for mr item no. 3.0016 transportation of mandatory spare price including gst, transportation for mr item no. 3.0017 transportation of mandatory spare price including gst, transportation for mr item no. 3.0018 transportation of mandatory spare price including gst, transportation for mr item no. 3.0019 transportation of mandatory spare price including gst, transportation for mr item no. 3.0020 transportation of mandatory spare price including gst, transportation for mr item no. 3.0021 transportation of mandatory spare price including gst, transportation for mr item no. 3.0022 transportation of mandatory spare price including gst, transportation for mr item no. 3.0023 transportation of mandatory spare price including gst, transportation for mr item no. 3.0024 transportation of mandatory spare price including gst, transportation for mr item no. 3.0025 transportation of mandatory spare price including gst, transportation for mr item no. 3.0026 transportation of mandatory spare price including gst, transportation for mr item no. 3.0027 transportation of mandatory spare price including gst, transportation for mr item no. 3.0028 transportation of mandatory spare price including gst, transportation for mr item no. 3.0029 transportation of mandatory spare price including gst, transportation for mr item no. 3.0030 transportation of mandatory spare price including gst, transportation for mr item no. 3.0031 transportation of mandatory spare price including gst, transportation for mr item no. 3.0032 transportation of mandatory spare price including gst, transportation for mr item no. 3.0033 transportation of mandatory spare price including gst, transportation for mr item no. 3.0034 transportation of mandatory spare price including gst, transportation for mr item no. 3.0035 transportation of mandatory spare price including gst, transportation for mr item no. 3.0036 transportation of mandatory spare price including gst, transportation for mr item no. 3.0037 transportation of mandatory spare price including gst, transportation for mr item no. 3.0038 transportation of mandatory spare price including gst, transportation for mr item no. 3.0039 transportation of mandatory spare price including gst, transportation for mr item no. 3.0040 transportation of mandatory spare price including gst, transportation for mr item no. 3.0041 transportation of mandatory spare price including gst, transportation for mr item no. 3.0042 transportation of mandatory spare price including gst, transportation for mr item no. 3.0043 transportation of mandatory spare price including gst, transportation for mr item no. 3.0044 transportation of mandatory spare price including gst, transportation for mr item no. 3.0045 transportation of mandatory spare price including gst, transportation for mr item no. 3.0046 transportation of mandatory spare price including gst, transportation for mr item no. 3.0047 transportation of mandatory spare price including gst, transportation for mr item no. 3.0048 transportation of mandatory spare price including gst, transportation for mr item no. 3.0049 transportation of mandatory spare price including gst, transportation for mr item no. 3.0050 transportation of mandatory spare price including gst, transportation for mr item no. 3.0051 transportation of mandatory spare price including gst, transportation for mr item no. 3.0052 transportation of mandatory spare price including gst, transportation for mr item no. 3.0053 transportation of mandatory spare price including gst, transportation for mr item no. 3.0054 transportation of mandatory spare price including gst, transportation for mr item no. 3.0055 transportation of mandatory spare price including gst, transportation for mr item no. 3.0056 transportation of mandatory spare price including gst, transportation for mr item no. 3.0057 transportation of mandatory spare price including gst, transportation for mr item no. 3.0058 transportation of mandatory spare price including gst, transportation for mr item no. 3.0059 transportation of mandatory spare price including gst, transportation for mr item no. 3.0060 transportation of mandatory spare price including gst, transportation for mr item no. 3.0061 transportation of mandatory spare price including gst, transportation for mr item no. 3.0062 transportation of mandatory spare price including gst, transportation for mr item no. 3.0063 transportation of mandatory spare price including gst, transportation for mr item no. 3.0064 transportation of mandatory spare price including gst, transportation for mr item no. 3.0065 transportation of mandatory spare price including gst, transportation for mr item no. 3.0066 transportation of mandatory spare price including gst, transportation for mr item no. 3.0067 transportation of mandatory spare price including gst, transportation for mr item no. 3.0068 transportation of mandatory spare price including gst, transportation for mr item no. 3.0069 transportation of mandatory spare price including gst, transportation for mr item no. 3.0070 transportation of mandatory spare price including gst, transportation for mr item no. 3.0071 transportation of mandatory spare price including gst, transportation for mr item no. 3.0072 transportation of mandatory spare price including gst, transportation for mr item no. 3.0073 transportation of mandatory spare price including gst, transportation for mr item no. 3.0074 transportation of mandatory spare price including gst, transportation for mr item no. 3.0075 transportation of mandatory spare price including gst, total mandatory spare price including gst as per mr sl. no. 4.0001, total supervision charges for item sl. no. 8.0001 considering 01 manday including gst, total supervision charges for item sl. no. 8.0002 considering 03 manday including gst, total supervision charges for item sl. no. 8.0003 considering 03 manday including gst, total supervision charges for item sl. no. 8.0004 considering 01 manday including gst, total supervision charges for item sl. no. 8.0005 considering 01 manday including gst, total supervision charges for item sl. no. 8.0006 considering 01 manday including gst, total supervision charges for item sl. no. 8.0008 considering 01 manday including gst, total supervision charges for item sl. no. 8.0009 considering 01 manday including gst, total supervision charges for item sl. no. 8.0012 considering 01 manday including gst, total supervision charges for item sl. no. 8.0015 considering 01 manday including gst, total supervision charges for item sl. no. 8.0018 considering 01 manday including gst, total supervision charges for item sl. no. 8.0019 considering 01 manday including gst, total supervision charges for item sl. no. 8.0020 considering 01 manday including gst, total supervision charges for item sl. no. 8.0021 considering 01 manday including gst, total supervision charges for item sl. no. 8.0023 considering 01 manday including gst, total supervision charges for item sl. no. 8.0024 considering 01 manday including gst, total supervision charges for item sl. no. 8.0025 considering 01 manday including gst, total supervision charges for item sl. no. 8.0026 considering 01 manday including gst, total supervision charges for item sl. no. 8.0027 considering 01 manday including gst, total supervision charges for item sl. no. 8.0028 considering 01 manday including gst, total supervision charges for item sl. no. 8.0029 considering 01 manday including gst, total supervision charges for item sl. no. 8.0030 considering 01 manday including gst, total supervision charges for item sl. no. 8.0031 considering 01 manday including gst, total supervision charges for item sl. no. 8.0032 considering 01 manday including gst, total supervision charges for item sl. no. 8.0033 considering 01 manday including gst, total supervision charges for item sl. no. 8.0034 considering 01 manday including gst, total supervision charges for item sl. no. 8.0035 considering 01 manday including gst, total supervision charges for item sl. no. 8.0036 considering 01 manday including gst, total supervision charges for item sl. no. 8.0037 considering 01 manday including gst, total supervision charges for item sl. no. 8.0038 considering 01 manday including gst, total supervision charges for item sl. no. 8.0039 considering 01 manday including gst, total supervision charges for item sl. no. 8.0040 considering 01 manday including gst, total supervision charges for item sl. no. 8.0041 considering 01 manday including gst, total supervision charges for item sl. no. 8.0042 considering 01 manday including gst, total supervision charges for item sl. no. 8.0043 considering 01 manday including gst, total supervision charges for item sl. no. 8.0044 considering 01 manday including gst, total supervision charges for item sl. no. 8.0045 considering 01 manday including gst, total supervision charges for item sl. no. 8.0046 considering 01 manday including gst, total supervision charges for item sl. no. 8.0047 considering 01 manday including gst, total supervision charges for item sl. no. 8.0048 considering 01 manday including gst, total supervision charges for item sl. no. 8.0049 considering 01 manday including gst, total training charges at site for item sl. no.11.0002 considering 10 manday including gst, total training charges at site for item sl. no.11.0003 considering 10 manday including gst turnkey instrumentation for vijaipur pata c2/c3 pipeline project of gail (india) limited instrumentation items like dcs/ esd/ plc, emission monitoring system, machine monitoring system, condition monitoring system, fire detection & alarm system, gas & liquid metering systems, mass flow meter, process analysers, ultrasonic flowmeter, anti surge & governor control system, master control station for movs, actuators, transmitters, radar gauges, multi-spot temperature sensors, batch controller unit, additive blocks, hydrocarbon detectors, field instruments like radar gauges, nucleonic gauges, servo level gauging, hydrastep, smart positioner in control valves, multi point reactor thermocouple, flame scanner, viscosity cum density meter, high pressure/temperature special type valves, is test equipment, flare flow meter, tank farm management system, loading automation system, gas detection system, corrosion monitoring system, wireless instrumentation, surge relief valve skid, meter provers, pipeline leak detection system (negative pressure wave type) etc, equipment involved in drilling, completion, testing and production of oil and gas wells, electronic carousel, safety relief valves, compressors, turbines and blowers, heat ejectors, exchangers, condensers where supply installation testing and commissioning and / expert supervisory services are involved, equipment for which life cycle cost evaluation is done considering amc/camc etc, electrical equipment like flameproof plant communication system, gis (gas insulated switchgear), numerical relays, flameproof and/or explosion proof cctv, synchronous machines, tetra system etc, laboratory and r&d equipment like gas chromatographs, spectrometers, analytical equipment, automatic liquid sampler, dry colorimetric (tape) detectors, mercury free pvt equipment, ht-hp corrosion cell, wheel test machine, atmospheric and ht-hp- consistometer, ultra sonic cement analyzer / ht-ultra sonic cement analyzer, compressive strength tester, stirred fluid loss apparatus, total sulfur analyzer, colony counter, laminar flow systems, microscope with digital camera, anaerobic chamber, rockeval, toc analyser, sindist analyser, cold finger test apparatus, microcoulometer, atomic absorption spectrometer, high performance ion clromatograph, permeameter, helium porosimeter, laser scattering particle size distribution analyser, microscope high magnification, flame photometer, u.v.- visible spectrophotometers, ep lube tester, differential sticking tester, electrical stability meter, stemi-2000 microscope/ equivalent, core gamma logger, energy dispersive spectrometer, thin section machine, x-ray diffractometer, wettability tester, ambient resistivity system, flouroscope, spin drop tensiometer, fluid eval, mercury inclusion porosity meter, tri-axial test machine, smoke point detector, vitrinite reflectance vro microscope, curing chamber/ht curing chamber, source rock pyrolyser with sulphur/ without sulphur, nga gas analyzer flash point apparatus/ automatic, compressive strength analyser, ht-hp curing chamber, crush resistance test equipment, manual dry bath pore point apparatus, bench type dissolved oxygen meter, bench type grain moisture meter, rotational viscometer, capillary pressure instrument, core plugging machine, core trimming machine, hp-ht filter press, bench top density meter, hp-ht roller oven with aging cells, crude oil analyser, static gel strength analyser, oilwell cement mechanical properties analyser, poroperm, acoustic velocity system, auto saturation, porosimeter cum permeameter, rock testing system, auto core saturation, auto inbibioimeter for reverse permeability, proppant conductivity tester etc, pipeline intrusion and detection system (pids), scada & apps system, rim seal protection system, chemical treatment program which involves supply of process chemicals, dosing & monitoring the parameters etc, geophysical services, seismic data acquisition system, vsp data acquisition system, field processing unit, geophysical equipment (non-seismic including gravity magnetic, mt, em etc.), seismic data processing software, seismic data interpretation software, hydrocarbon reservoir software, seismic data archival software, petro-physical software, geophysical equipment, field processing unit, global navigation satellite system, specialised geological lab equipment, seismic data acquisition system, seismic data processing/imaging software, tape drive unit, vsp data acquisition system, vsp processing software, high-end servers for g&g applications, hpcc solution, virtualization and container software, logging services, logging unit, equipment and tools rated for hostile hpht environment (temperature > 300°f & pressure > 10,000 psi)

Every year, central and state government departments release thousands of high-value contracts specifically dedicated to Rock Drilling Equipment. Whether it involves bulk material supply, executing specialized operational services, or end-to-end turnkey project execution, the demand for capable vendors in the Rock Drilling Equipment sector is massive.

At Tender18, we help businesses cut through the noise and exclusively target the exact work categories they specialize in. Instead of browsing through generic procurement sites, our platform isolates high-potential opportunities that match your specific industry capabilities.

Work Dynamics in the Rock Drilling Equipment Sector

Government requirements for this specific vertical generally fall into distinct procurement patterns:

  • Product & Material Supply: Tenders focused strictly on sourcing, testing, and delivering high-quality items that meet the exact technical specifications of the buyer.
  • Service Level Agreements (SLAs): Long-term hiring of expert agencies for routine maintenance, manpower deployment, or continuous operational management.
  • Execution & Turnkey Projects: Comprehensive contracts where the bidder is responsible for everything from raw material procurement to final site installation and testing.

By focusing purely on your core strength in Rock Drilling Equipment, you can build a highly profitable and stable pipeline of government clients.

Stop wasting time filtering through irrelevant notices. Our Rock Drilling Equipment Tender Information Service is engineered for precision. We track exact product codes, service names, and specialized work terms across all government portals nationwide. When a buyer publishes a requirement that matches your specific business profile, our system alerts you instantly.

Deep Technical Insights & Documentation For Rock Drilling Equipment Tenders

Bidding for specific works requires studying strict technical parameters. We provide immediate access to the core documents you need to evaluate the project:

  • Detailed Specifications & Drawings: Download the exact engineering guidelines, material testing standards, and quality benchmarks demanded by the buyer for Rock Drilling Equipment.
  • Financial BOQ Spreadsheets: Access the official blank pricing formats where you need to input your unit rates, tax configurations, and total bid value.
  • Real-Time Technical Amendments: If the buying department changes the product specifications, alters the service scope, or shifts the delivery timeline, we instantly update the parent file so you are never caught off-guard.

Winning a contract for Rock Drilling Equipment depends entirely on how perfectly your technical capabilities match the buyer’s demands. Even if you have the best product or service, a poorly formatted document or a missing compliance certificate will lead to instant technical rejection. Tender18’s Tender Bidding Service eliminates this risk by taking complete ownership of your digital submission.

Flawless Compliance & Portal Execution For Rock Drilling Equipment Tenders

Under this service, Tender18 assigns a Dedicated Experienced Technical Person to your profile. This expert handles the heavy lifting of the entire bidding cycle:

  • Capability Mapping: We thoroughly cross-check your past completion certificates, ISO standard proofs, and financial turnover against the strict eligibility criteria required for Rock Drilling Equipment bids.
  • Secure System Integration: Our technical desk seamlessly links your Class III Digital Signature Certificate (DSC) with the required e-procurement servers to securely encrypt your technical and financial envelopes.
  • Error-Free Financial Uploads: We audit your quoted BOQ pricing sheets for any formula or formatting errors before the final upload, ensuring your bid is successfully locked before the portal's closing hours.

Government buyers are aggressively using the Government e-Marketplace (GeM) for the direct procurement of Rock Drilling Equipment. If your business profile is not accurately mapped on this portal, you remain practically invisible to these purchasing officers. Recognized as a trusted and expert GeM consultant, Tender18 offers specialized support to build, optimize, and maintain a highly visible vendor account for your business.

With an industry-leading support success ratio of over 95%, we handle the complex marketplace compliance so you can focus entirely on executing your orders

Expert Profile Management & Catalogue

Our dedicated consultants ensure your GeM presence is structurally perfect:

  • Precise Catalogue Listing: We upload and categorize your specific offerings under the exact search terms and parameters used by government buyers looking for Rock Drilling Equipment, ensuring maximum search visibility.
  • OEM Dashboard & Assessment: For original manufacturers and creators, we guide you through the mandatory Quality Council of India (QCI) vendor assessments to successfully unlock your official OEM panel.
  • Profile Compliance & Caution Money: We manage your statutory documentation, brand approvals, and caution money limits to keep your account immune from technical suspensions.

Strategic Live Bid Participation

Beyond setup, we actively drive your market participation. Our team expertly handles the digital paperwork and rate configurations for GeM Custom Bids and Reverse Auctions (RA) related to Rock Drilling Equipment, maximizing your chances of securing L1 status.

1.

How do I find government contracts exclusively matching my work in Rock Drilling Equipment?

The easiest way is through the Tender18 platform. Instead of searching department by department, our system uses advanced keyword matching to gather all live supply, service, and execution tenders related directly to your core business in one place.

2.

Do I need specific testing or quality certificates to apply for these contracts?

It heavily depends on the nature of the work. For supply contracts, buyers often ask for ISO certifications, BIS marks, or specific lab testing reports. For service contracts, they may ask for labor licenses or past performance certificates (work orders).

3.

What is a BOQ and why is it important for my bid?

The Bill of Quantities (BOQ) is the official financial Excel sheet where you enter your competitive prices. Any mistake in this file—like adding extra rows, changing formulas, or saving it in the wrong format—will cause the portal server to reject your entire bid.

4.

Are samples required to be submitted physically before the digital bid opens?

For many product-based Rock Drilling Equipment tenders, buying departments do ask bidders to submit physical samples to their office before the digital technical evaluation date. This requirement is always clearly mentioned in the official NIT document.

5.

How does the Dedicated Tender Expert from Tender18 help me?

Our assigned expert manages your total portal compliance. They extract the hidden rules from long tender PDFs, create a precise document checklist for your team, map your digital signature, and securely upload your technical and financial files onto the government servers.

6.

What is the role of a Digital Signature Certificate (DSC)?

A Class III DSC is a secure USB device that contains your digital identity. You cannot upload a bid without it. It is used to securely encrypt and lock your sensitive price data and technical documents so no one can view them before the official opening date.

7.

As an MSME, can I get financial benefits when bidding for Rock Drilling Equipment?

Yes, the government strongly supports MSMEs. By uploading a valid Udyam Registration Certificate in the technical envelope, small businesses are frequently exempted from paying the initial Tender Document Fee and the Earnest Money Deposit (EMD).

8.

Why should I list my services or products on GeM for this category?

GeM is now the primary digital marketplace for all government agencies. If you are properly cataloged for Rock Drilling Equipment, officers can view your profile and generate direct purchase orders or invite you to participate in exclusive Custom Bids.

9.

What makes Tender18 a reliable GeM support partner?

As a highly trusted and expert GeM consultant, Tender18 holds a proven support success ratio of over 95%. From flawless profile creation and complex catalogue mapping to OEM panel approvals and live Reverse Auction (RA) support, we handle it all seamlessly.

10.

What does "L1" mean in these government contracts?

"L1" stands for "Lowest Bidder 1". In government procurement, after all technical envelopes are approved, the financial sheets (BOQs) are opened. The bidder who has quoted the lowest compliant price for Rock Drilling Equipment is declared L1 and is generally awarded the contract