Filters By:

T18 Ref No
Keyword
State
City
Agency
Tender ID
Due Date
Tender Source
Tender Type

Road grouting work Tenders List

Latest Road grouting work Tenders in India – Verified Leads & Real-Time Insights by Tender18

Finding the right Road grouting work tenders in India’s competitive e-procurement ecosystem requires more than just access—it demands accurate data, real-time monitoring, and expert analysis.

At Tender18 Infotech Private Limited, we bring deep industry experience in government procurement to help businesses identify, evaluate, and win Road grouting work tenders efficiently. With a centralized platform aggregating 1100+ live tenders, we provide a single, trusted source for opportunities from central, state, and PSU departments.


Real-Time Road grouting work Tender Intelligence & Monitoring

Our advanced dashboard delivers actionable insights and structured tender data, enabling you to make faster and smarter bidding decisions.

We categorize Road grouting work tenders into:

  • Supply Tenders – BOQs and specifications sourced from GeM and PSUs
  • Service Tenders – NITs and scope of work from CPPP and state portals
  • EPC Projects – Large-scale infrastructure tenders with financial and design data

✔ This structured approach ensures complete transparency and deeper bid analysis before submission.


Comprehensive Sources of Road grouting work Tenders

Tender18 acts as a centralized gateway by aggregating tenders from trusted and official sources:

  • Central Government Portals – CPPP, NIC, and Government e-Marketplace (GeM)
  • Railways & Transport – IREPS and Metro Rail projects
  • Power & Energy PSUs – NTPC, ONGC, NHPC, PowerGrid
  • Defense & Strategic Sectors – MES and DRDO tenders
  • State e-Procurement Portals – Gujarat, Maharashtra, Tamil Nadu, UP, and more

✔ Every listing is verified and regularly updated to maintain data accuracy and trust.


Step-by-Step Guide to Participate in Road grouting work Tenders

1. Eligibility & Prequalification

Before bidding, ensure compliance with:

  • Financial turnover requirements (30–50% of tender value)
  • Past experience (2–3 similar projects)
  • Valid solvency certificate

2. Mandatory Documentation Checklist

Prepare the following to avoid disqualification:

  • Digital Signature Certificate (Class 3 DSC)
  • GST, PAN, MSME/Udyam registration
  • EMD (Earnest Money Deposit) or exemption proof
  • Technical bid with execution methodology

3. BOQ Analysis & Financial Bidding

The BOQ (Bill of Quantities) is the most critical component:

  • Analyze item-wise pricing
  • Ensure competitive yet sustainable quotes
  • Avoid underbidding risks (L1 pressure)

✔ Expert analysis can significantly improve your bid success ratio.


Why Tender18 is a Trusted Platform for Road grouting work Tenders

✔ Proven Expertise in Government Procurement

We combine industry knowledge with practical bidding experience.

✔ Verified & Reliable Data

All Road grouting work tenders are sourced from official portals and cross-checked for accuracy.

✔ Advanced Filtering Tools

Filter tenders by value, EMD, location, and category for precise targeting.

✔ Corrigendum & Update Tracking

Get instant alerts on deadline changes and specification updates.

✔ Historical Data Insights

Analyze past tender results to understand pricing trends and competition.

✔ End-to-End Bidding Support

From discovery to submission, including GeM onboarding and strategy.


Growth of Road grouting work Sector in 2026

With the Government of India focusing on digital procurement and infrastructure expansion, the Road grouting work sector has seen significant growth in e-tendering opportunities.

The rise of GeM-based procurement models like:

  • L1 Purchase
  • Direct Procurement
  • MSME-friendly policies

…has made it easier for startups and SMEs to participate and win contracts


Frequently Asked Questions (SEO Optimized)

How can I get daily Road grouting work tender alerts?

You can register on Tender18 and select your preferred category. You will receive daily email alerts with all new Road grouting work tenders.

Is EMD mandatory for all Road grouting work tenders?

No, MSME and Udyam-registered businesses may get exemptions. Always check the NIT for specific conditions.

What is the difference between a Road grouting work work tender and supply tender?

A supply tender involves delivering goods, while a work tender includes execution, labor, and project completion.

Can I access private Road grouting work tenders on Tender18?

Yes, we also track major private sector and EPC tenders along with government opportunities.


Get Expert Support for Road grouting work Tenders

Tender18 is more than a listing platform—we are your strategic partner in winning tenders.

Our services include:

  • Tender discovery & analysis
  • Documentation support
  • Bid strategy & submission
  • GeM registration & OEM onboarding

📞 Call / WhatsApp: +91 7069661818
🌐 Website: www.tender18.com

T18 Ref No : 15144638
live Tender
Location : aligarh , uttar pradesh
Source : GEM Tenders
live Tender

tender for carriage of pcc and stp poles 8.5, 11 and 13 mtr , carriage of line material , erection of pcc and stp poles 8.5, 11 and 13 mtr , erection of double poles 8.5, 11 and 13 mtr , installation and fixing of 11 kv tpmo. , erection and grouting of stay set , providing and fixing of insulator , laying of acsr weasal, rabbit and dog conductor. , erection of abc conductor , grouting of pcc and stp poles , making of plinth , fixing of earthing rod , chopping of tree branches , providing and fixing of clamps of lt , providing and fixing , carriage and installation of 25 kva transformer , carriage and installation of 63 kva transformer , carriage and installation of 100 kva transformer , carriage and installation of 400 kva transformer , dismantling of old pcc and stp poles , dismantling and removal of conductor , erection of section tee pole , carriage and installation of lt dist box , provding and fixing, filling cable joints , safe carriage of cables , laying of under ground cable , laying of overhead cable , guarding of 11 kv line by gi wire , safe carriage and installation of metering unit , safe carriage and installation of metering cubicle , provding and fixing wearing gi pipe, erection and commissioning of transformer and pole and line, carriage of pcc and stp poles from store centre or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends, also including the work of dragging etc and also including the cost of labour, t and p carrier etc required for proper completion of work dist 0 to 50 kms, carriage of line material viz lt cable, conductor, gi earth wire, barbed wire, cross arm, angle, channel, insulator, various clamps, xlpe cable, cable, stone pad and other line material from store centre or from any other place to the respective site of work through the kachha pacca road including the work of its loading and unloading at the respective end, also including the work of dragging etc and also including the cost of labour, t and p carrier etc required for proper completion of work dist 0 to 50 kms, erection of single support including complete h.t and l.t fittings with drilling and cutting as per resspo manual and as per direction of engineer incharge including the cost of labour, t and p and carrier etc required for proper completion of work, erection of double and section pole on following poles including including complete h.t and l.t fittings with drilling and cutting and the work of complete line as per resspo norms manual and as per direction of engineer incharge including the cost of labour, t and p and carrier etc required for proper completion of work, erection of double and section pole on following poles including including complete h.t and l.t fittings with drilling & cutting and the work of complete line as per resspo norms manual and as per direction of engineer incharge including the cost of labour, t and p and carrier etc required for proper completion of work, erection and grouting of stay set including the work of nozzling etc as per resspo manual and also including the cost of arrangement of all grouting material, labour, t and p etc required for proper completion of work, providing and fixing of stay insulator, laying, sagging, stringing, binding and jumpering etc of line conductor on the newly erected pole as per resspo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t and p carrier etc required for proper completion of work, abc conductor 3x50+1x35+1x16 sqmm and 3x95+1x70+1x16 sqmm and 3x120+1x95+1x16 sqmm and 1x16+1x25 sqmm, grouting of pcc and stp poles 8.5, 11 and 13 mtr long as per resspo norms, making the plinth of steel poles, fixing of earthing rod as per resspo manual and as per direction of supervising engineer including the cost of labour, t and p etc required for proper completion of work, chopping of tree branches which are touching to ht and lt lines, providing and fixing of clamps of lt, cross arm holding, f clamp, stay clamp, danger board clamp and all type clamps with nut and bolts as per actual site requirement, providing and fixing of lt shackle insulator, providing and fixing of missing nut bolts and washer, carriage and installation from site to store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and t and p etc required for proper completion earthing and jumphering of work, dismentling of old pcc and stp poles for shifting after dismentling of all accessories. it includes the work of cartage, cost of labour, t and p carrier etc required for proper completion of work, dismantling and removal of existing conductor, cable, gi wire from the various area preparing their coils and then stacking in the respective jeos store as per direction of supervising engineer it includes the work of cartage, cost of labour, t nad p carrier etc required for proper completion of work, erection of section tee pole including fixing of all fittings as per respo norms, carriage and installation of lt distribution box three phase distribution box from store centre sarsol to pit site including loading and unloading at both ends mounting and fixing on pole also by making connections as per resspo norms, provding and fixing and filling of 3x70,3x120,3x185 11 kv xlpe heat shrinkable cable jointing kits indoor and outdoor type including the cost of labour t and p carrier etc for proper completion of work, safe carriage of 3x70,3x120,3x185,3x300 sqmm 33 kv by 11 kv xlpe cable from store center to respective site of work including loading and unloading at both ends for proper completion of work, laying of 3x70,3x120,3x185,3x300 sqmm 33 kv and 11 kv under ground cable by straight through after digging trench of 600 mm wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable the cable shall be duly protected by ist class bricks, two on either side and third on top of the cable, laid in series one after the other. the work includes supplying of fine sand and bricks, filling and ramming of the left out soil, closing the trench and levelling spare cable shall be left and buried in the trench in the shape of rings at both ends all material except cable, labour, t and p carrier etc, required for proper completion of work will be arranged by the contractor at his own cost, laying of 3x70,3x120,3x185,3x300 sqmm 33 kv and 11 kv overhead cable work includes labour, t and p carrier etc, required for proper completion of work will be arranged by the contractor at his own cost, guarding of 11 kv line by laying two nos gi wire parallel and fixing of lacings tilli at a distance at 2 to 3 mtr as per respo manual and also including the cost of arragement of labour, t and p etc required for proper completion of work, safe carriage and installation of 33kv by 11 kv ct and pt pole mounted metering unit on double pole after fixing of channel with m s clamps and nuts bolts for holding the channel angle etc the unit body shall be earthed by connecting m s strip of size 1,8x1 finally connected to earthing rod of size 20mm x2540 mm 11 kv line shall be connected to unit as per instructions of sdo and ae m the m s strip and earth rod shall be included in the scope of work, safe carriage and installation of 33kv by 11 kv pilfer proof metering cubicle from store centre, sarsol to site of work, provding and fixing wearing gi pipe 6 inch dia on the feeder cable before mounting the cable on the double pole lifting, mounting and clamping of 11 kv feeder cable with boxes on the feeder double pole structure and making connections including supply


Tender Value : 2000000
Due Date : May 22, 2026
T18 Ref No : 15505091
live Tender
Location : aligarh , uttar pradesh
Source : GEM Tenders
live Tender

corrigendum tender for carriage of pcc and stp poles 8.5, 11 and 13 mtr , carriage of line material , erection of pcc and stp poles 8.5, 11 and 13 mtr , erection of double poles 8.5, 11 and 13 mtr , installation and fixing of 11 kv tpmo. , erection and grouting of stay set , providing and fixing of insulator , laying of acsr weasal, rabbit and dog conductor. , erection of abc conductor , grouting of pcc and stp poles , making of plinth , fixing of earthing rod , chopping of tree branches , providing and fixing of clamps of lt , providing and fixing , carriage and installation of 25 kva transformer , carriage and installation of 63 kva transformer , carriage and installation of 100 kva transformer , carriage and installation of 400 kva transformer , dismantling of old pcc and stp poles , dismantling and removal of conductor , erection of section tee pole , carriage and installation of lt dist box , provding and fixing, filling cable joints , safe carriage of cables , laying of under ground cable , laying of overhead cable , guarding of 11 kv line by gi wire , safe carriage and installation of metering unit , safe carriage and installation of metering cubicle , provding and fixing wearing gi pipe, erection and commissioning of transformer and pole and line, carriage of pcc and stp poles from store centre or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends, also including the work of dragging etc and also including the cost of labour, t and p carrier etc required for proper completion of work dist 0 to 50 kms, carriage of line material viz lt cable, conductor, gi earth wire, barbed wire, cross arm, angle, channel, insulator, various clamps, xlpe cable, cable, stone pad and other line material from store centre or from any other place to the respective site of work through the kachha pacca road including the work of its loading and unloading at the respective end, also including the work of dragging etc and also including the cost of labour, t and p carrier etc required for proper completion of work dist 0 to 50 kms, erection of single support including complete h.t and l.t fittings with drilling and cutting as per resspo manual and as per direction of engineer incharge including the cost of labour, t and p and carrier etc required for proper completion of work, erection of double and section pole on following poles including including complete h.t and l.t fittings with drilling and cutting and the work of complete line as per resspo norms manual and as per direction of engineer incharge including the cost of labour, t and p and carrier etc required for proper completion of work, erection of double and section pole on following poles including including complete h.t and l.t fittings with drilling & cutting and the work of complete line as per resspo norms manual and as per direction of engineer incharge including the cost of labour, t and p and carrier etc required for proper completion of work, erection and grouting of stay set including the work of nozzling etc as per resspo manual and also including the cost of arrangement of all grouting material, labour, t and p etc required for proper completion of work, providing and fixing of stay insulator, laying, sagging, stringing, binding and jumpering etc of line conductor on the newly erected pole as per resspo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t and p carrier etc required for proper completion of work, abc conductor 3x50+1x35+1x16 sqmm and 3x95+1x70+1x16 sqmm and 3x120+1x95+1x16 sqmm and 1x16+1x25 sqmm, grouting of pcc and stp poles 8.5, 11 and 13 mtr long as per resspo norms, making the plinth of steel poles, fixing of earthing rod as per resspo manual and as per direction of supervising engineer including the cost of labour, t and p etc required for proper completion of work, chopping of tree branches which are touching to ht and lt lines, providing and fixing of clamps of lt, cross arm holding, f clamp, stay clamp, danger board clamp and all type clamps with nut and bolts as per actual site requirement, providing and fixing of lt shackle insulator, providing and fixing of missing nut bolts and washer, carriage and installation from site to store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and t and p etc required for proper completion earthing and jumphering of work, dismentling of old pcc and stp poles for shifting after dismentling of all accessories. it includes the work of cartage, cost of labour, t and p carrier etc required for proper completion of work, dismantling and removal of existing conductor, cable, gi wire from the various area preparing their coils and then stacking in the respective jeos store as per direction of supervising engineer it includes the work of cartage, cost of labour, t nad p carrier etc required for proper completion of work, erection of section tee pole including fixing of all fittings as per respo norms, carriage and installation of lt distribution box three phase distribution box from store centre sarsol to pit site including loading and unloading at both ends mounting and fixing on pole also by making connections as per resspo norms, provding and fixing and filling of 3x70,3x120,3x185 11 kv xlpe heat shrinkable cable jointing kits indoor and outdoor type including the cost of labour t and p carrier etc for proper completion of work, safe carriage of 3x70,3x120,3x185,3x300 sqmm 33 kv by 11 kv xlpe cable from store center to respective site of work including loading and unloading at both ends for proper completion of work, laying of 3x70,3x120,3x185,3x300 sqmm 33 kv and 11 kv under ground cable by straight through after digging trench of 600 mm wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable the cable shall be duly protected by ist class bricks, two on either side and third on top of the cable, laid in series one after the other. the work includes supplying of fine sand and bricks, filling and ramming of the left out soil, closing the trench and levelling spare cable shall be left and buried in the trench in the shape of rings at both ends all material except cable, labour, t and p carrier etc, required for proper completion of work will be arranged by the contractor at his own cost, laying of 3x70,3x120,3x185,3x300 sqmm 33 kv and 11 kv overhead cable work includes labour, t and p carrier etc, required for proper completion of work will be arranged by the contractor at his own cost, guarding of 11 kv line by laying two nos gi wire parallel and fixing of lacings tilli at a distance at 2 to 3 mtr as per respo manual and also including the cost of arragement of labour, t and p etc required for proper completion of work, safe carriage and installation of 33kv by 11 kv ct and pt pole mounted metering unit on double pole after fixing of channel with m s clamps and nuts bolts for holding the channel angle etc the unit body shall be earthed by connecting m s strip of size 1,8x1 finally connected to earthing rod of size 20mm x2540 mm 11 kv line shall be connected to unit as per instructions of sdo and ae m the m s strip and earth rod shall be included in the scope of work, safe carriage and installation of 33kv by 11 kv pilfer proof metering cubicle from store centre, sarsol to site of work, provding and fixing wearing gi pipe 6 inch dia on the feeder cable before mounting the cable on the double pole lifting, mounting and clamping of 11 kv feeder cable with boxes on the feeder double pole structure and making connections including supply


Tender Value : 2000000
Due Date : May 28, 2026
T18 Ref No : 15427077
live Tender
Location : kasganj , uttar pradesh
Source : GEM Tenders
live Tender

tender for safe carriage of pcc pole , safe carraige of st pole , cartage of line material , replacment of damaged pcc pole , replacment of damaged st pole , grouting nuzzling and muffling of pcc pole , grouting nuzzling and muffling of st pole , erection of double pcc pole , erection grouting and nuzzling of stay set , fixing and connecting of earthing rods , re sagging of acsr dog and weasel conductor , re sagging of lt ab cable , laying spreading lifting of cable , laying spreading lifting of cable , cutting and chopping of tree branches , supply and fixing of nut bolt off size , supply and fixing of holding clamp , erection of cross arm etc , weldig of stp rust pole , replacment of lt cable , recieved back material, maintinance and repair work in edd kasganj, safe carriage of pcc pole 8.5 / 9 mtr long store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, t&p carrier etc. required for proper completion of work., st poles 11/13 mtr, cartage of line material viz weasal conductor, dog concudtor, stay set, earthing rod, lt ab cable (different size) gi earth wire, cross arm, angle, channel, insulator, clamps & other line material from store centre or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, t&p carrier etc. required for proper completion of work. (up to 100 km)., replacement of damaged pcc pole 8.5/ 9 mtr. long by opening of all existing accessories and conductor from damaged pole properly and removal of damaged pole and erect the new pole at same place including fixing of all existing accessories and conductor on the new pole etc. as per direction of supervising engineer. its including the cost of all labour, t&p etc. (including carriage of damaged pole to store) required for proper completion of work., grouting, nuzzling and muffling of pcc pole 8.5/9 mtr. long as per resspo manual including of the cost of labour, t&p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast in ratio including the cost of arrangement of cement, sand, brick ballast etc., erection of st poles 11/13 mtr, erection of double supprot pcc pole 8.5/9 mtr long, erection, grouting and nuzzling of stay set including the work of nozzling etc. as per respo manual and also including the cost of arrangement of all grouting material, labour, t&p etc. required for proper completion of work as per resspo manual., fixing and connecting of earthing rods as per resspo manual including the cost of labour t&p etc required for proper completion of work., re-sagging of loose 33kv/11 kv / l.t. lines as per direction of supervising engineer. its includes the cost of labour, t&p etc. required for proper completion of work., lt a. b. cable (different size), laying, spreading, lifting & final sagging of aerial bunched 3x50+1x35+1x16 sq.mm.cable of following size including fixing of all accessories as per resspo manual & as per direction by supervising engineer., 3x95+1x70+1x16 sq.mm., 3x120+1x90+1x16 sq.mm., cutting & chopping of tree branches for proper clearance of ht/lt line, providing & fixing of nut bolt off size on vendors cost., providing & fixing of holding clamp for st/pcc pole one vendors cost., fixing of cross arm, insulator etc., welding of stp rust pole with fixing & removal of all accessiores., replacement of lt cable provided by department in distrubution transformers., rust/damage iron material carriage from site to store center, cartage of dismantlled line material / scrap viz st pole weasal conductor, gi earth wire, cross arm, angle, channel, insulator, clamps & other line material from site to store centre as per direction of supervising engineer through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, t&p carrier etc. required for proper completion of work. (dist. 0 to 100 kms.).


Tender Value : 500000
Due Date : Jun 09, 2026
T18 Ref No : 15427775
live Tender
Location : aligarh , uttar pradesh
Source : GEM Tenders
live Tender

tender for carriage of pcc and stp poles 8.5, 11 and 13 mtr , carriage of line material , erection of pcc and stp poles 8.5, 11 and 13 mtr , erection of double poles 8.5, 11 and 13 mtr , installation and fixing of 11 kv tpmo. , erection and grouting of stay set , providing and fixing of insulator , laying of acsr weasal, rabbit and dog conductor. , erection of abc conductor , grouting of pcc and stp poles , making of plinth , fixing of earthing rod , chopping of tree branches , providing and fixing of clamps of lt , providing and fixing , carriage and installation of 25 kva transformer , carriage and installation of 63 kva transformer , carriage and installation of 100 kva transformer , carriage and installation of 400 kva transformer , dismantling of old pcc and stp poles , dismantling and removal of conductor , erection of section tee pole , carriage and installation of lt dist box , provding and fixing, filling cable joints , safe carriage of cables , laying of under ground cable , laying of overhead cable , guarding of 11 kv line by gi wire , safe carriage and installation of metering unit , safe carriage and installation of metering cubicle , provding and fixing wearing gi pipe, installation of distribution transformer and lines and poles, carriage of following poles from store centre or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends, also including the work of dragging etc and also including the cost of labour, t and p carrier etc required for proper completion of work dist 0 to 50 kms, carriage of line material viz lt cable, conductor, gi earth wire, barbed wire, cross arm, angle, channel, insulator, various clamps, xlpe cable, cable, stone pad and other line material from store centre or from any other place to the respective site of work through the kachha pacca road including the work of its loading and unloading at the respective end, also including the work of dragging etc and also including the cost of labour, t and p carrier etc required for proper completion of work dist 0 to 50 kms, erection of single support including complete h.t and l.t fittings with drilling and cutting as per resspo manual and as per direction of engineer incharge including the cost of labour, t and p and carrier etc required for proper completion of work, erection of double and section pole on following poles including including complete h.t and l.t fittings with drilling and cutting and the work of complete line as per resspo norms manual and as per direction of engineer incharge including the cost of labour, t and p and carrier etc required for proper completion of work, erection of double and section pole on following poles including including complete h.t and l.t fittings with drilling & cutting and the work of complete line as per resspo norms manual and as per direction of engineer incharge including the cost of labour, t and p and carrier etc required for proper completion of work, erection and grouting of stay set including the work of nozzling etc as per resspo manual and also including the cost of arrangement of all grouting material, labour, t and p etc required for proper completion of work, providing and fixing of stay insulator, laying, sagging, stringing, binding and jumpering etc of line conductor on the newly erected pole as per resspo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t and p carrier etc required for proper completion of work, abc conductor 3x50+1x35+1x16 sqmm and 3x95+1x70+1x16 sqmm and 3x120+1x95+1x16 sqmm and 1x16+1x25 sqmm, grouting of pcc and stp poles 8.5, 11 and 13 mtr long as per resspo norms, making the plinth of steel poles, fixing of earthing rod as per resspo manual and as per direction of supervising engineer including the cost of labour, t and p etc required for proper completion of work, chopping of tree branches which are touching to ht and lt lines, providing and fixing of clamps of lt, cross arm holding, f clamp, stay clamp, danger board clamp and all type clamps with nut and bolts as per actual site requirement, providing and fixing of lt shackle insulator, providing and fixing of missing nut bolts and washer, carriage and installation from site to store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and t and p etc required for proper completion earthing and jumphering of work, dismentling of old pcc and stp poles for shifting after dismentling of all accessories. it includes the work of cartage, cost of labour, t and p carrier etc required for proper completion of work, dismantling and removal of existing conductor, cable, gi wire from the various area preparing their coils and then stacking in the respective jeos store as per direction of supervising engineer it includes the work of cartage, cost of labour, t nad p carrier etc required for proper completion of work, erection of section tee pole including fixing of all fittings as per respo norms, carriage and installation of lt distribution box three phase distribution box from store centre sarsol to pit site including loading and unloading at both ends mounting and fixing on pole also by making connections as per resspo norms, provding and fixing and filling of 3x70,3x120,3x185 11 kv xlpe heat shrinkable cable jointing kits indoor and outdoor type including the cost of labour t and p carrier etc for proper completion of work, safe carriage of 3x70,3x120,3x185,3x300 sqmm 33 kv by 11 kv xlpe cable from store center to respective site of work including loading and unloading at both ends for proper completion of work, laying of 3x70,3x120,3x185,3x300 sqmm 33 kv and 11 kv under ground cable by straight through after digging trench of 600 mm wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable the cable shall be duly protected by ist class bricks, two on either side and third on top of the cable, laid in series one after the other. the work includes supplying of fine sand and bricks, filling and ramming of the left out soil, closing the trench and levelling spare cable shall be left and buried in the trench in the shape of rings at both ends all material except cable, labour, t and p carrier etc, required for proper completion of work will be arranged by the contractor at his own cost, laying of 3x70,3x120,3x185,3x300 sqmm 33 kv and 11 kv overhead cable work includes labour, t and p carrier etc, required for proper completion of work will be arranged by the contractor at his own cost, guarding of 11 kv line by laying two nos gi wire parallel and fixing of lacings tilli at a distance at 2 to 3 mtr as per respo manual and also including the cost of arragement of labour, t and p etc required for proper completion of work, safe carriage and installation of 33kv by 11 kv ct and pt pole mounted metering unit on double pole after fixing of channel with m s clamps and nuts bolts for holding the channel angle etc the unit body shall be earthed by connecting m s strip of size 1,8x1 finally connected to earthing rod of size 20mm x2540 mm 11 kv line shall be connected to unit as per instructions of sdo and ae m the m s strip and earth rod shall be included in the scope of work, safe carriage and installation of 33kv by 11 kv pilfer proof metering cubicle from store centre, sarsol to site of work, provding and fixing wearing gi pipe 6 o dia on the feeder cable before mounting the cable on the double pole lifting, mounting and clamping of 11 kv feeder cable with boxes on the feeder double pole structure and making connections including supply


Tender Value : 2000000
Due Date : Jun 15, 2026
T18 Ref No : 15443971
live Tender
Location : mainpuri , uttar pradesh
Source : GEM Tenders
live Tender

tender for , carriage of distribution transformer 250 kva from esc mnp , carriage of acsr rabbit conductor from esc mnp , carriage of acsr weasel conductor or insulated conductor as provided by department from esc mnp , carriage of m s earthing rod 20 x2540 mm from esc mnp , carriage of lt al. xlpe cable size 1x240 sq.mm. from esc mnp , carriage of lt xlpe cable 1x120 sq.mm. from esc mnp , carriage of 11 kv xlpe cable 3x185 sq.mm. from esc mnp , carriage of lt ab cable 3x120 1x95 1x16 sq.mm. from esc mnp , carriage of 33 kv xlpe cable 3x300 sq.mm. from esc mnp , carriage of 11 kv xlpe cable 3x300 sq.mm. from esc mnp , carriage of 11 kv indoor or outdoor jointing kit size 3x300 sq.mm. from esc mnp , carriage of 11 kv indoor or outdoor jointing kit size 3x185 sq.mm. from esc mnp , carriage of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. from esc mnp , carriage of 11 kv straight through size 3x185 sq.mm. from esc mnp , carriage of 11 kv vcb for og ctr 200by100by5a 350 mva 1250 amp. from esc mnp , carriage of 11 kv vcb ic ctr 600by300by5a 350 mva 1250 amp. from esc mnp , carriage of g.i. wire 6or8 swg for guarding from esc mnp , carriage of three phase distribution box from esc mnp , erection of fixing of l.t. fuse set protection box with all respective accessories as per norms , execution of chemical earthing with g.i. patti clamp nut and bolts as per norms , erection of l.t. tail less unit with all respective material as grouted angel with fabrication work etc. , laying of acsr rabbit conductor , laying of acsr weasel conductor or insulated conductor as provided by department , laying of lt ab cable 3x120 1x95 1x16 sq.mm. , mounting of three phase distribution box , erection of double pole structure , erection of single pole structure , grouting of pcc or stp pole , grouting of stay , earthing of pole , guarding of 11 kv line with gaurding angel etc , fencing of distribution transformers , make plinth for 250 kva transformer proper size as per resspo norms , installation of 11by0.4 kv tf 100 kva , installation of 11by0.4 kv tf 250 kva , laying of 11 kv xlpe cable 3x185 sq.mm. , laying of 11 kv xlpe cable 3x300 sq.mm. , laying of 33 kv xlpe cable 3x300 sq.mm. , installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms. , installation of 11 kv indoor or outdoor jointing kit size 3x185 sq.mm. as per norms. , installation of 11 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms. , installation of 11 kv straight through size 3x185 sq.mm. as per norms. , installation of 11 kv vcb og ctr 200by100by5a 350 mva 1250 amp. , installation of 11 kv vcb ic ctr 600by300by5a 350 mva 1250 amp. , dismentlling of old and damaged cable of different size , received back of distribution transformer after increasing, boqeudd, 11 kv v type cross arm clamp with bolts and nuts, three phase distribution box clamp with nut and bolts, connecting cable for distribution box 1x35 sq.mm., l.t. fuse set protection box with all accessories, tinned copper fuse wire different size, hdpe pipe 140 mm., stone pad 300x300x75, ms angle 75x75x6x2028mm with clamp and bolt and nut tf base, t off chhanel and t off clamp with nut and bolts, top chhanel 125x65x240, dropper channel 100x50x2028 mm., chemical earthing with g.i. patti clamp nut and bolts as per norms, l.t. tail less unit with all respective material angel, patti and other material, copper l pieace 62x225x12mm., 4 core lt mcb with box for 250 kva tf, 11 kv f clamp with nut and bolts, al. pg clamp weasel to weasel conductor, al. pg clamp rabbit to rabbit conductor, suspension clamp, dead end clamp, eye i hook, eye bolts for guarding, j hook, lt clamp for pcc or stp with bolts and nuts, pearcing connector, alluminium lug 120 sq.mm., alluminium lug 240 sq.mm., guarding angel, guarding angel clamp, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 8.5 m pcc pole, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 9 m stp pole sp 55 galvanised, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 m stp pole sp 55 galvanised, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 13 m stp pole sp 55 galvanised, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department v type cross arm for 11 kv, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv pin insulator with pin, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department disc insulator with fitting tandc 45 kn, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv fuse set, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv tpmo with polymer insulator, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department complete stay 9gi stay rod 20x1800 mm, stay wire 7 or 8 swg, 10 kg, stay clamp, bolt, nut and washer, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department distribution transformer 100 kva, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department distribution transformer 250 kva, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department acsr rabbit conductor, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department acsr weasel conductor or insulated conductor as provided by department, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department m s earthing rod 20 x2540 mm, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department lt al. xlpe cable size 1x240 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department lt xlpe cable 1x120 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv xlpe cable 3x185 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department lt ab cable 3x120 1x95 1x16 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 33 kv xlpe cable 3x300 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv xlpe cable 3x300 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv indoor or outdoor jointing kit size 3x300 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv indoor or outdoor jointing kit size 3x185 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 33 kv indoor or outdoor jointing kit size 3x300 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv straight through size 3x185 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv vcb for og ctr 200by100by5a 350 mva 1250 amp., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv vcb ic ctr 600by300by5a 350 mva 1250 amp., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department g.i. wire 6 or 8 swg for guarding, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department three phase distribution box, fixing of l.t. fuse set protection box with all respective accessories as per norms, l.t. tail less unit with all respective material as grouted angel with fabrication work etc., laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr rabbit conductor, laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr weasel conductor or insulated conductor as provided by department, laying, stringing, sagging, with all respective material clamp with nut and bolts suspension clamp eye j hook pearcing connector etc of following conductor cable on the erected supports, as per respo norms. lt ab cable 3x120 1x95 1x16 sq.mm., mounting of three phase distribution box with clamp nut & bolts and make proper connection with connecting cable., erection of double pole structure 11 mtr stp pole by digging of pits fitting of all relevant accessories as per respo norms. 22 nos pole at different location under concern division., erection of single pole structure 8.5 mtrs pcc pole, 9 mtr st, 11 mtr st pole, 13 mtr st by digging of pits fitting of all relevant accessories as per respo norms. at different location under concern division., grouting of pcc or stp pole long as per respo norms with material cement, sand, blast stone with the ratio 0.268 cu.m. each will be provided by conractor, grouting of stay as per respo norms cement, sand, blast stone material will be provided by conractor, earthing of pole by m s earthing rod 20 x2540 mm with 6 swg earthing wire etc and make proper connection., guarding of 11 kv line with gaurding angel, clamp eye bolts and gaurding g.i. wire 6 or 8 swg 60 span, fencing of distribution transformers with enamel in proper alignment as per respo manual and as per direction of executive engineer including the cost of arrangement of labour, t and p, carrier etc. required for proper completion of work., make plinth for 250 kva transformer proper size as per resspo norms, installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work. 11by0.4 kv tf 100 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work. 11by0.4 kv tf 250 kva with l.t. xlpe cable suitable size with all respective material as per norms., laying of following cable including digging and restoring along with brick and sand including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work. at different location under concern division.11 kv xlpe cable 3x185 sq.mm., laying of following cable including digging and restoring along with brick and sand including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work. at different location under concern division. 11 kv xlpe cable 3x300 sq.mm., laying of following cable by hdd method with hdpe pipe 140 mm. including digging and restoring along with brick and sand including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work. 33 kv xlpe cable 3x300 sq.mm., installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms., installation of 11 kv indoor or outdoor jointing kit size 3x185 sq.mm. as per norms., installation of 11 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms., installation of 11 kv straight through size 3x185 sq.mm. as per norms., installation of 11 kv vcb og ctr 200by100by5a 350 mva 1250 amp. and make proper connection as per norms., installation of 11 kv vcb ic ctr 600by300by5a 350 mva 1250 amp. and make proper connection as per norms., dismentlling of old and damaged cable of different size including with rolling received back and safe carriage from pit site to esc, mainpuri, received back of distribution transformer after increasing capacity from pit site to esc, mainpuri 30 nos 100 kva


Tender Value : 0
Due Date : Jun 10, 2026
T18 Ref No : 15543874
live Tender
Location : aligarh , uttar pradesh
Source : GEM Tenders
live Tender

corrigendum tender for carriage of pcc and stp poles 8.5, 11 and 13 mtr , carriage of line material , erection of pcc and stp poles 8.5, 11 and 13 mtr , erection of double poles 8.5, 11 and 13 mtr , installation and fixing of 11 kv tpmo. , erection and grouting of stay set , providing and fixing of insulator , laying of acsr weasal, rabbit and dog conductor. , erection of abc conductor , grouting of pcc and stp poles , making of plinth , fixing of earthing rod , chopping of tree branches , providing and fixing of clamps of lt , providing and fixing , carriage and installation of 25 kva transformer , carriage and installation of 63 kva transformer , carriage and installation of 100 kva transformer , carriage and installation of 400 kva transformer , dismantling of old pcc and stp poles , dismantling and removal of conductor , erection of section tee pole , carriage and installation of lt dist box , provding and fixing, filling cable joints , safe carriage of cables , laying of under ground cable , laying of overhead cable , guarding of 11 kv line by gi wire , safe carriage and installation of metering unit , safe carriage and installation of metering cubicle , provding and fixing wearing gi pipe, erection and commissioning of transformer and pole and line, carriage of pcc and stp poles from store centre or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends, also including the work of dragging etc and also including the cost of labour, t and p carrier etc required for proper completion of work dist 0 to 50 kms, carriage of line material viz lt cable, conductor, gi earth wire, barbed wire, cross arm, angle, channel, insulator, various clamps, xlpe cable, cable, stone pad and other line material from store centre or from any other place to the respective site of work through the kachha pacca road including the work of its loading and unloading at the respective end, also including the work of dragging etc and also including the cost of labour, t and p carrier etc required for proper completion of work dist 0 to 50 kms, erection of single support including complete h.t and l.t fittings with drilling and cutting as per resspo manual and as per direction of engineer incharge including the cost of labour, t and p and carrier etc required for proper completion of work, erection of double and section pole on following poles including including complete h.t and l.t fittings with drilling and cutting and the work of complete line as per resspo norms manual and as per direction of engineer incharge including the cost of labour, t and p and carrier etc required for proper completion of work, erection of double and section pole on following poles including including complete h.t and l.t fittings with drilling & cutting and the work of complete line as per resspo norms manual and as per direction of engineer incharge including the cost of labour, t and p and carrier etc required for proper completion of work, erection and grouting of stay set including the work of nozzling etc as per resspo manual and also including the cost of arrangement of all grouting material, labour, t and p etc required for proper completion of work, providing and fixing of stay insulator, laying, sagging, stringing, binding and jumpering etc of line conductor on the newly erected pole as per resspo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t and p carrier etc required for proper completion of work, abc conductor 3x50+1x35+1x16 sqmm and 3x95+1x70+1x16 sqmm and 3x120+1x95+1x16 sqmm and 1x16+1x25 sqmm, grouting of pcc and stp poles 8.5, 11 and 13 mtr long as per resspo norms, making the plinth of steel poles, fixing of earthing rod as per resspo manual and as per direction of supervising engineer including the cost of labour, t and p etc required for proper completion of work, chopping of tree branches which are touching to ht and lt lines, providing and fixing of clamps of lt, cross arm holding, f clamp, stay clamp, danger board clamp and all type clamps with nut and bolts as per actual site requirement, providing and fixing of lt shackle insulator, providing and fixing of missing nut bolts and washer, carriage and installation from site to store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and t and p etc required for proper completion earthing and jumphering of work, dismentling of old pcc and stp poles for shifting after dismentling of all accessories. it includes the work of cartage, cost of labour, t and p carrier etc required for proper completion of work, dismantling and removal of existing conductor, cable, gi wire from the various area preparing their coils and then stacking in the respective jeos store as per direction of supervising engineer it includes the work of cartage, cost of labour, t nad p carrier etc required for proper completion of work, erection of section tee pole including fixing of all fittings as per respo norms, carriage and installation of lt distribution box three phase distribution box from store centre sarsol to pit site including loading and unloading at both ends mounting and fixing on pole also by making connections as per resspo norms, provding and fixing and filling of 3x70,3x120,3x185 11 kv xlpe heat shrinkable cable jointing kits indoor and outdoor type including the cost of labour t and p carrier etc for proper completion of work, safe carriage of 3x70,3x120,3x185,3x300 sqmm 33 kv by 11 kv xlpe cable from store center to respective site of work including loading and unloading at both ends for proper completion of work, laying of 3x70,3x120,3x185,3x300 sqmm 33 kv and 11 kv under ground cable by straight through after digging trench of 600 mm wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable the cable shall be duly protected by ist class bricks, two on either side and third on top of the cable, laid in series one after the other. the work includes supplying of fine sand and bricks, filling and ramming of the left out soil, closing the trench and levelling spare cable shall be left and buried in the trench in the shape of rings at both ends all material except cable, labour, t and p carrier etc, required for proper completion of work will be arranged by the contractor at his own cost, laying of 3x70,3x120,3x185,3x300 sqmm 33 kv and 11 kv overhead cable work includes labour, t and p carrier etc, required for proper completion of work will be arranged by the contractor at his own cost, guarding of 11 kv line by laying two nos gi wire parallel and fixing of lacings tilli at a distance at 2 to 3 mtr as per respo manual and also including the cost of arragement of labour, t and p etc required for proper completion of work, safe carriage and installation of 33kv by 11 kv ct and pt pole mounted metering unit on double pole after fixing of channel with m s clamps and nuts bolts for holding the channel angle etc the unit body shall be earthed by connecting m s strip of size 1,8x1 finally connected to earthing rod of size 20mm x2540 mm 11 kv line shall be connected to unit as per instructions of sdo and ae m the m s strip and earth rod shall be included in the scope of work, safe carriage and installation of 33kv by 11 kv pilfer proof metering cubicle from store centre, sarsol to site of work, provding and fixing wearing gi pipe 6 inch dia on the feeder cable before mounting the cable on the double pole lifting, mounting and clamping of 11 kv feeder cable with boxes on the feeder double pole structure and making connections including supply


Tender Value : 2000000
Due Date : Jun 01, 2026
T18 Ref No : 15475651
live Tender
Location : kasganj , uttar pradesh
Source : GEM Tenders
live Tender

tender for safe carriage of pcc pole , safe carriage of st pole , cartage of line material , erection of pcc pole , erection of st pole , erection of doubel pcc pole , erection of stay set , erection of earthing rod , safe carriage of xlpe cable , erection of cable , erection of xlpe cable , erection of conductor , erection of ab cable , erection of tf , safe carriage of 11 kv pilfer proof metering cubicle , erection of 11 kv pilfer proof metering cubicle , guarding of 11 kv line , cutting and chopping of tree , providing and fixing of dp clamps , safe carriage of 11 kv ct pt , erection of 11 kv ct pt , safe carriage of lt distribution box , fencing of 250 kva tf , plinth of 250 kva tf , safe carriage and installation of 250 kva tf , providing and fixing of nut bolt , providing and fixing of holding clamps , safe carriage and installation of 11 kv pilfer proof cubical, running tender under full deposit scheme in edd soron kasganj, safe carriage of following pcc pole 8.5 mtr store centre or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, t&p carrier etc. required for proper completion of work., st pole 9/11 mtr, cartage of line material viz weasal conductor, gi earth wire, cross arm, angle, channel, insulator, clamps & other line material from store centre or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, t&p carrier etc. required for proper completion of work., erection of single support pcc pole 8.5 mtr including complete h.t/l.t fittings with grouting , earthing, muffling and digging etc. as per respo norms manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work., stp 9/11 mtr., erection of double pole on pcc poles 8.5 mtr. including the work of complete line with grouting , earthing, muffling and digging etc. as per respo norms manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work., erection of stay set complete including the work of nuzzling etc. as per respo manual and also including the cost of arrangement of all grouting material, labour, t&p fixing of stay insulator etc. required for proper completion of work., fixing of earthing rod as per respo manual and as per direction of supervising engineer including the t&p, cost of labour., safe carriage of xlpe cable of size 3x(35/70/120/185) sq. m.m. from store to respective site of work including loading unloading at both ends., laying of 3x(35/70/120/185) sq.mm. 11 kv under ground cable after digging trench of 600 mm. wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable. the cable shall be duly protected by ist class bricks, two on either side and third on top of the cable, laid in series one after the other. the work includes supplying of fine sand and bricks, filling and ramming of the left out soil, closing the trench and levelling. spare cable shall be left and buried in the trench in the shape of rings at both ends. all material (except cable), labour, t&p carrier etc, required for proper completion of work will be arranged by the contractor at his own cost., filling of 3x70/120 sq. m.m. 11 kv xlpe heat shrinkable cable jointing kits outdoor/indoor type including the cost of labour t&p carrier etc for proper completion of work., laying sagging stringing, binding and jumpering etc. of acsr weasel conductor/ rabbit / dog conductoron the newly erected pole as per respo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t&p carrier etc. required for proper completion of work., lt abc 3x50+1x35+1x16 bunch conductor, lt abc 1x16 bunch conductor, carriage and installation from store to site of 10/16/25/63/100 kva t/f including the work of its loading & unloading, dragging etc. and also including the cost of labour and t&p etc. required for proper completion of work., safe carriage of 11 kv pilfer proof metering cubicle from store centre, soron (kasganj) to site of work including loading and unloading at both ends. average distance approx. 0 km to 50 km., erection & grouting of 11 kv pilfer-proof metering cubicle making connections with bus bar, tapping with empire tape with existing earthing. the above work includes the cost of labour, t&p, carrier & material etc. required for proper completion of work except cost of 11 kv vcbs., guarding of 11 kv line by laying two nos. gi wire parallel and fixing of lacings (tilli) at a distance at 2-3 mtr. as per respo manual and also including the cost of arragement of labour, t & p carrier etc. required for proper completion of work., cutting and chopping of tree branches which comes on ht/lt lines., providing and fixing of dp clamp on vendors cost., safe carriage of 11 kv ct/pt pole mounting unit of any other place or from site of work to the work of its loading and unloading at the respective ends including the cost of labour t&p and carrier etc. required for proper completion of work., installation of 11 kv ct-pt combined metering unit on double pole after fixing of channel with m.s. clamps and nuts bolts for holding the channel angle etc. the unit body shall be earthed by connecting m.s. strip of size 1/8x1 finally connected to earthing rod of size 20mm x2540 mm. 11 kv line shall be connected to unit as per instructions of sdo/ae(m). the m.s. strip & earth rod shall be included in the scope of work., safe carriage of lt distribution box (three phase) from store centre soron (kasganj) to pit site including loading and unloading at both ends mounting and fixing on pole also by making connections as per respo norms., providing and fixing of welded wire mesh fencing around 250 kva transformer plinth with ms angle of size 40x40x6 mm length and 1.20 mtrs height. such panels shall be supported on ms angle from of size 40x40x6 mm having 04 nos corner supports of height 1.65 mtrs including extended legs for grouting which will be used as a door for entry of the personel or removal/shifting of transformer with welded hinges, sliding belt etc for locking arrangement as per drawing and specifications. the fencing will be painted in the green colour synthetic enamel paint after painting with one coat of red oxide primer. the rates should be inclusive of all materials required for completion of above work. (length of each fencing approx. 11 mtrs) with t&p labour etc. by the contractor., making of plinth for 250 kva tf in all respect as per respo norms at vendors cost., safe carriage and installation from store to site of 250 kva transformer including the work of its loading & unloading, dragging etc. and also including the cost of labour and t&p etc. required for proper completion of work., providing and fixing of nut bolt off size as per site requirment on vendors cost, providing and fixing of various type lt ht holding clamp for st/pcc pole as per site requirment on vendors cost., safe carriage and installation from store to site of 11 kv pilfer proof metering cubicle including the work of its loading & unloading, dragging etc. and also including the cost of labour and t&p etc. required for proper completion of work.


Tender Value : 1000000
Due Date : Jun 09, 2026
T18 Ref No : 15472075
live Tender
Location : aligarh , uttar pradesh
Source : GEM Tenders
live Tender

corrigendum tender for carriage of pcc and stp poles 8.5, 11 and 13 mtr , carriage of line material , erection of pcc and stp poles 8.5, 11 and 13 mtr , erection of double poles 8.5, 11 and 13 mtr , installation and fixing of 11 kv tpmo. , erection and grouting of stay set , providing and fixing of insulator , laying of acsr weasal, rabbit and dog conductor. , erection of abc conductor , grouting of pcc and stp poles , making of plinth , fixing of earthing rod , chopping of tree branches , providing and fixing of clamps of lt , providing and fixing , carriage and installation of 25 kva transformer , carriage and installation of 63 kva transformer , carriage and installation of 100 kva transformer , carriage and installation of 400 kva transformer , dismantling of old pcc and stp poles , dismantling and removal of conductor , erection of section tee pole , carriage and installation of lt dist box , provding and fixing, filling cable joints , safe carriage of cables , laying of under ground cable , laying of overhead cable , guarding of 11 kv line by gi wire , safe carriage and installation of metering unit , safe carriage and installation of metering cubicle , provding and fixing wearing gi pipe, erection and commissioning of transformer and pole and line, carriage of pcc and stp poles from store centre or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends, also including the work of dragging etc and also including the cost of labour, t and p carrier etc required for proper completion of work dist 0 to 50 kms, carriage of line material viz lt cable, conductor, gi earth wire, barbed wire, cross arm, angle, channel, insulator, various clamps, xlpe cable, cable, stone pad and other line material from store centre or from any other place to the respective site of work through the kachha pacca road including the work of its loading and unloading at the respective end, also including the work of dragging etc and also including the cost of labour, t and p carrier etc required for proper completion of work dist 0 to 50 kms, erection of single support including complete h.t and l.t fittings with drilling and cutting as per resspo manual and as per direction of engineer incharge including the cost of labour, t and p and carrier etc required for proper completion of work, erection of double and section pole on following poles including including complete h.t and l.t fittings with drilling and cutting and the work of complete line as per resspo norms manual and as per direction of engineer incharge including the cost of labour, t and p and carrier etc required for proper completion of work, erection of double and section pole on following poles including including complete h.t and l.t fittings with drilling & cutting and the work of complete line as per resspo norms manual and as per direction of engineer incharge including the cost of labour, t and p and carrier etc required for proper completion of work, erection and grouting of stay set including the work of nozzling etc as per resspo manual and also including the cost of arrangement of all grouting material, labour, t and p etc required for proper completion of work, providing and fixing of stay insulator, laying, sagging, stringing, binding and jumpering etc of line conductor on the newly erected pole as per resspo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t and p carrier etc required for proper completion of work, abc conductor 3x50+1x35+1x16 sqmm and 3x95+1x70+1x16 sqmm and 3x120+1x95+1x16 sqmm and 1x16+1x25 sqmm, grouting of pcc and stp poles 8.5, 11 and 13 mtr long as per resspo norms, making the plinth of steel poles, fixing of earthing rod as per resspo manual and as per direction of supervising engineer including the cost of labour, t and p etc required for proper completion of work, chopping of tree branches which are touching to ht and lt lines, providing and fixing of clamps of lt, cross arm holding, f clamp, stay clamp, danger board clamp and all type clamps with nut and bolts as per actual site requirement, providing and fixing of lt shackle insulator, providing and fixing of missing nut bolts and washer, carriage and installation from site to store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and t and p etc required for proper completion earthing and jumphering of work, dismentling of old pcc and stp poles for shifting after dismentling of all accessories. it includes the work of cartage, cost of labour, t and p carrier etc required for proper completion of work, dismantling and removal of existing conductor, cable, gi wire from the various area preparing their coils and then stacking in the respective jeos store as per direction of supervising engineer it includes the work of cartage, cost of labour, t nad p carrier etc required for proper completion of work, erection of section tee pole including fixing of all fittings as per respo norms, carriage and installation of lt distribution box three phase distribution box from store centre sarsol to pit site including loading and unloading at both ends mounting and fixing on pole also by making connections as per resspo norms, provding and fixing and filling of 3x70,3x120,3x185 11 kv xlpe heat shrinkable cable jointing kits indoor and outdoor type including the cost of labour t and p carrier etc for proper completion of work, safe carriage of 3x70,3x120,3x185,3x300 sqmm 33 kv by 11 kv xlpe cable from store center to respective site of work including loading and unloading at both ends for proper completion of work, laying of 3x70,3x120,3x185,3x300 sqmm 33 kv and 11 kv under ground cable by straight through after digging trench of 600 mm wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable the cable shall be duly protected by ist class bricks, two on either side and third on top of the cable, laid in series one after the other. the work includes supplying of fine sand and bricks, filling and ramming of the left out soil, closing the trench and levelling spare cable shall be left and buried in the trench in the shape of rings at both ends all material except cable, labour, t and p carrier etc, required for proper completion of work will be arranged by the contractor at his own cost, laying of 3x70,3x120,3x185,3x300 sqmm 33 kv and 11 kv overhead cable work includes labour, t and p carrier etc, required for proper completion of work will be arranged by the contractor at his own cost, guarding of 11 kv line by laying two nos gi wire parallel and fixing of lacings tilli at a distance at 2 to 3 mtr as per respo manual and also including the cost of arragement of labour, t and p etc required for proper completion of work, safe carriage and installation of 33kv by 11 kv ct and pt pole mounted metering unit on double pole after fixing of channel with m s clamps and nuts bolts for holding the channel angle etc the unit body shall be earthed by connecting m s strip of size 1,8x1 finally connected to earthing rod of size 20mm x2540 mm 11 kv line shall be connected to unit as per instructions of sdo and ae m the m s strip and earth rod shall be included in the scope of work, safe carriage and installation of 33kv by 11 kv pilfer proof metering cubicle from store centre, sarsol to site of work, provding and fixing wearing gi pipe 6 inch dia on the feeder cable before mounting the cable on the double pole lifting, mounting and clamping of 11 kv feeder cable with boxes on the feeder double pole structure and making connections including supply


Tender Value : 2000000
Due Date : May 25, 2026