Filters By:

T18 Ref No
Keyword
State
City
Agency
Tender ID
Due Date
Tender Source
Tender Type

43Results forLatest Juice tank Tenders List

Latest Juice tank Tenders in India – Verified Leads & Real-Time Insights by Tender18

Finding the right Juice tank tenders in India’s competitive e-procurement ecosystem requires more than just access—it demands accurate data, real-time monitoring, and expert analysis.

At Tender18 Infotech Private Limited, we bring deep industry experience in government procurement to help businesses identify, evaluate, and win Juice tank tenders efficiently. With a centralized platform aggregating 1100+ live tenders, we provide a single, trusted source for opportunities from central, state, and PSU departments.


Real-Time Juice tank Tender Intelligence & Monitoring

Our advanced dashboard delivers actionable insights and structured tender data, enabling you to make faster and smarter bidding decisions.

We categorize Juice tank tenders into:

  • Supply Tenders – BOQs and specifications sourced from GeM and PSUs
  • Service Tenders – NITs and scope of work from CPPP and state portals
  • EPC Projects – Large-scale infrastructure tenders with financial and design data

✔ This structured approach ensures complete transparency and deeper bid analysis before submission.


Comprehensive Sources of Juice tank Tenders

Tender18 acts as a centralized gateway by aggregating tenders from trusted and official sources:

  • Central Government Portals – CPPP, NIC, and Government e-Marketplace (GeM)
  • Railways & Transport – IREPS and Metro Rail projects
  • Power & Energy PSUs – NTPC, ONGC, NHPC, PowerGrid
  • Defense & Strategic Sectors – MES and DRDO tenders
  • State e-Procurement Portals – Gujarat, Maharashtra, Tamil Nadu, UP, and more

✔ Every listing is verified and regularly updated to maintain data accuracy and trust.


Step-by-Step Guide to Participate in Juice tank Tenders

1. Eligibility & Prequalification

Before bidding, ensure compliance with:

  • Financial turnover requirements (30–50% of tender value)
  • Past experience (2–3 similar projects)
  • Valid solvency certificate

2. Mandatory Documentation Checklist

Prepare the following to avoid disqualification:

  • Digital Signature Certificate (Class 3 DSC)
  • GST, PAN, MSME/Udyam registration
  • EMD (Earnest Money Deposit) or exemption proof
  • Technical bid with execution methodology

3. BOQ Analysis & Financial Bidding

The BOQ (Bill of Quantities) is the most critical component:

  • Analyze item-wise pricing
  • Ensure competitive yet sustainable quotes
  • Avoid underbidding risks (L1 pressure)

✔ Expert analysis can significantly improve your bid success ratio.


Why Tender18 is a Trusted Platform for Juice tank Tenders

✔ Proven Expertise in Government Procurement

We combine industry knowledge with practical bidding experience.

✔ Verified & Reliable Data

All Juice tank tenders are sourced from official portals and cross-checked for accuracy.

✔ Advanced Filtering Tools

Filter tenders by value, EMD, location, and category for precise targeting.

✔ Corrigendum & Update Tracking

Get instant alerts on deadline changes and specification updates.

✔ Historical Data Insights

Analyze past tender results to understand pricing trends and competition.

✔ End-to-End Bidding Support

From discovery to submission, including GeM onboarding and strategy.


Growth of Juice tank Sector in 2026

With the Government of India focusing on digital procurement and infrastructure expansion, the Juice tank sector has seen significant growth in e-tendering opportunities.

The rise of GeM-based procurement models like:

  • L1 Purchase
  • Direct Procurement
  • MSME-friendly policies

…has made it easier for startups and SMEs to participate and win contracts


Frequently Asked Questions (SEO Optimized)

How can I get daily Juice tank tender alerts?

You can register on Tender18 and select your preferred category. You will receive daily email alerts with all new Juice tank tenders.

Is EMD mandatory for all Juice tank tenders?

No, MSME and Udyam-registered businesses may get exemptions. Always check the NIT for specific conditions.

What is the difference between a Juice tank work tender and supply tender?

A supply tender involves delivering goods, while a work tender includes execution, labor, and project completion.

Can I access private Juice tank tenders on Tender18?

Yes, we also track major private sector and EPC tenders along with government opportunities.


Get Expert Support for Juice tank Tenders

Tender18 is more than a listing platform—we are your strategic partner in winning tenders.

Our services include:

  • Tender discovery & analysis
  • Documentation support
  • Bid strategy & submission
  • GeM registration & OEM onboarding

📞 Call / WhatsApp: +91 7069661818
🌐 Website: www.tender18.com

T18 Ref No : 16257264
new Tender
Source : GEM Tenders
new Tender

corrigendum tender for erection and fabrication work c 50 , erection and fabrication work c 51 , erection and fabrication work c 52 , erection and fabrication work c 53 , erection and fabrication work c 54 , erection and fabrication work c 55 , erection and fabrication work c 56 , erection and fabrication work c 57 , erection and fabrication work c 58 , erection and fabrication work c 59 , erection and fabrication work c 60 , erection and fabrication work c 61 , erection and fabrication work c 62 , erection and fabrication work c 63 , erection and fabrication work c 64 , erection and fabrication work c 65 , erection and fabrication work c 66 , erection and fabrication work c 67 , erection and fabrication work c 68 , erection and fabrication work c 69 , erection and fabrication work c 70 , erection and fabrication work c 71 , erection and fabrication work c 72 , erection and fabrication work c 73 , erection and fabrication work c 74 , erection and fabrication work c 75 , erection and fabrication work c 76 , erection and fabrication work c 77 , erection and fabrication work c 78 , erection and fabrication work c 79 , erection and fabrication work c 80 , erection and fabrication work c 81 , erection and fabrication work c 82 , erection and fabrication work c 83 , erection and fabrication work c 84 , erection and fabrication work c 85 , erection and fabrication work c 86 , erection and fabrication work c 87 , erection and fabrication work c 88 , erection and fabrication work c 89 , erection and fabrication work c 90 , erection and fabrication work c 91 , erection and fabrication work c 92 , erection and fabrication work c 93 , erection and fabrication work c 94 , erection and fabrication work c 95 , erection and fabrication work c 96 , erection and fabrication work c 97 , erection and fabrication work c 98 , erection and fabrication work c 99 , erection and fabrication work c 100 , erection and fabrication work c 101 , erection and fabrication work c 102 , erection and fabrication work c 103 , erection and fabrication work c 104 , erection and fabrication work c 105, erection and fabrication work c, dismantling of flanges on m.s. pipes with a diameter exceeding 12 inches; fabrication and erection of flanges on m.s. pipes with a diameter exceeding 12 inches; dismantling of old platforms; fabrication and erection of old platforms; dismantling of heavy structures; fabrication and erection of heavy structures; fabrication, erection, and alignment of beds for motor pumps/reduction gear motors (3 hp to 30 hp); fabrication, erection, and alignment of beds for motor pumps/reduction gear motors (above 30 hp); dismantling (cutting and removing) the corroded roof/side of the juice clarifier, fabricating a new roof using new/existing plates as per instructions, and conducting a leak-proof water-filling trial; fabrication (cutting and removing) the corroded roof/side of the juice clarifier, fabricating a new roof using new/existing plates as per instructions, and conducting a leak-proof water-filling trial; erection (cutting and removing) the corroded roof/side of the juice clarifier, fabricating a new roof using new/existing plates as per instructions, and conducting a leak-proof water-filling trial; cutting and removing the corroded/weak scroll/conveyor of the mud mixer, fabricating a new one based on the sample, erecting it, and conducting a trial; cutting and removing the corroded/weak down-take of the pans, fabricating and installing a new one using 8/10 mm plates, and performing leak-proof welding; cutting and removing the corroded/weak juice distributor of the pans, fabricating and installing a new one using 6/8 mm plates based on the sample, and performing satisfactory welding; cutting and removing existing internal supports of the pan to replace the weak shell, and re-installing and welding new/existing supports after installing the new shell; replacing corroded foundation channels of n.k. 1100/1300 c/f machines with 250 mm channels and leveling the vapor line; cutting and removing corroded/weak oil guards of crystallizers. fabricate and installation using a new or existing plate. for c-type centrifugal machines, cut away and remove the corroded or weak side cover; fabricate a replacement according to specifications, fit it in the original position, and perform complete welding. fabricate and installation a replacement n.r.v. sheet (using new plate material) for the vertical injection pump, adjust the rod setting, and conduct a leak-proof trial. modify hopper no. 04 to fabricate and installation a chute. remove the corroded or weak ms angle grids from the injection channel; fabricate a new grid using new ms channels and rods, fit it into the channel, and weld it in place. cut away and remove the weak tapered section of the quad body; fabricate a replacement using 12/16 mm thick ms plate, weld it completely, and conduct a satisfactory leak-proof trial. remove the corroded or weak ms grid at the steam inlet of the quad/vapor cell/pan calandria; fabricate and installation a new grid using 6/8 mm thick plate and weld it completely. cut away and remove the corroded or weak down-take pipe of the quad body/vapor cell; fabricate and installation a new pipe using 8/10 mm thick plate, restore all connections (including the cone and distributor), weld them, and conduct a leak-proof trial. fabricate and installation a ring made from 12 mm plate for the pan's weak safety valve and reinforce the top section by welding on a plate. three molasses tanks, each with a capacity of 45,000 quintals, are installed at this mill society; dismantle the 2½-inch cooling coils from all three tanks, lower them for cleaning, cut away any corroded piping, and fabricate and installation new coils. upon completion, fit the coils onto the tank, construct a mounting base for the pump and motor (for cooling purposes), installation the assembly into the tubewell pipeline, and conduct a satisfactory trial run. cut and remove the damaged rail sections installed on the cane unloader; using one's own resources, installation the replacement rails provided by the mill committee, weld them in place, and successfully conduct a trial run. certain shell sections of the 30-tonne and 20-tonne chimneys installed at the mill committee site have corroded; cut and remove these damaged sections using one's own resources, fabricate new shell sections using 10–12 mm thick plates, erect them using one's own resources, and successfully conduct a trial run.


Due Date : Jul 17, 2026
T18 Ref No : 15996483
live Tender
Location : sarsawa , uttar pradesh
Source : GEM Tenders
live Tender

tender for custom bid for services - opening the covers of juice heaters no 1 2 3 and 4 to clean the tubes and reassembling them , custom bid for services - opening the covers of the quad vapor line juice heaters cleaning the tubes and reassembling them , custom bid for services - cleaning the tubes of quad dynamic juice heaters 300 mm by opening the covers and reassembling them , custom bid for services - 800 mm opening the condenser cover cleaning the tubes and reassembling , custom bid for services - cleaning of tubes by opening the manholes of the 1200 mm condenser , custom bid for services - cleaning the tubes by opening the manhole of the 960 mm vapour shell , custom bid for services - cleaning the tubes by opening the manhole of the 1200 mm vapour shell , custom bid for services - opening the manholes of the multiple effect evaporator bodies and adding chemicals , custom bid for services - cleaning the tubes by opening the manholes of the three bodies of the triple effect evaporator , custom bid for services - opening the manholes of the 650 mm and 540 mm bodies pouring in chemicals and resealing them , custom bid for services - cleaning of tubes by opening manholes of 650 mm and 540 mm bodies , custom bid for services - cleaning the tubes by opening the manholes of panels 1 through 8 , custom bid for services - opening the main hatch of the juice sulphitor cleaning it and reassembling it , custom bid for services - cleaning work of the gutter located beneath the panels , custom bid for services - opening cleaning and tying the syrup sulphiter , custom bid for services - cleaning and reconnecting the gas line per meter , custom bid for services - cleaning of syrup desmolysis tanks during the season , custom bid for services - cleaning the jam crystallizer by opening its manhole during the season , custom bid for services - opening cleaning and reconnecting the syrup line from the quad to the syrup sulphiter during the season per meter , custom bid for services - cleaning sand and soil from the raw juice tank during the season , custom bid for services - bagasse silo line cleaning work


Due Date : Jul 21, 2026
T18 Ref No : 16211058
live Tender
Source : GEM Tenders
live Tender

tender for works related to semikestner 1000 msq pipeline , wash out pipeline header to new quad body no 1 , raw juice pump pipeline , syrup pipeline cleaning work , syrup sulphiter pipeline , new quad no 4 extension catcher vapour body , bagassilo fan repair , big filter mud tray repair , vacuum air line work , pipe fabrication , clear juice tank repair , pump and motor alignment , juice heater repair , condensate bottle fabrication , clarifier repair , cane carrier repair , secondary rack carrier repair , rack carrier repair , cane carrier runner replacement , secondary rack carrier runner replacement , rack carrier runner replacement , cane carrier structural repair , rack carrier structural repair , cane carrier chain beam repair , inter rack carrier trough repair , mill trough repair , trpf lower plate repair , mill roller repair , leveler repair , fiberizer repair , secondary rack carrier trough repair , tail shaft bed repair , mill pinion repair , cane carrier angle replacement , secondary rack carrier angle replacement , trpf roller juice plate repair , cold water pipeline work , bearing cooling line replacement , pipe fittings , mill juice pipeline work , hot water pipeline work , screen juice pipeline work , flange work , nipple work , mill fabrication work , header fabrication , delivery header fabrication , trpf tank repair , transmission gear repair , juice pump pipeline work , reducer fabrication , flange fabrication , band fabrication , trpf cover fabrication , trpl chute repair , crane unloader rail replacement , bearing housing repair , juice distribution tray fabrication , trpf roller repair , rack repair work , crown pinion guard repair , tail bar repair , trpf water cover repair , mill roller grooving , chain link forging work, fabrication and installation of 6 inch tee in the pipeline complete as required, dismantling of existing 8 inch ms pipeline complete, reinstallation of 8 inch ms pipeline at the designated position including alignment welding testing and successful trial run, opening/removal of existing 8 inch valve, installation of 8 inch valve at the designated location complete, supply fabrication and installation of 8 inch flange complete, supply and installation of 8 inch nipple complete, dismantling of existing 8 inch and 6 inch pipelines including removal from site, reinstallation of 8 inch and 6 inch pipelines at the designated position including alignment welding testing and successful trial run, dismantling of existing 8 inch raw juice pump pipeline and disposal of dismantled material at the designated scrap yard, reinstallation of 8 inch ms pipeline including alignment welding testing and successful trial run, fabrication and installation of 8 inch x 6 inch reducer complete, fabrication and installation of 8 inch flange complete, removal and reinstallation of 8 inch valve at the designated location complete, fabrication and installation of 8 inch nipple complete, dismantling of existing 6 inch syrup pipeline from syrup pump to syrup tank complete, fabrication and installation of 6 inch x 3 inch reducer complete, fabrication and installation of 2 inch flange complete, fabrication of 6 inch nipple complete, opening/removal of existing 6 inch valve, refitting and fastening of 6 inch valve after maintenance complete, fabrication and installation of 6 inch tee complete, fabrication and installation of 8 inch bend complete, fabrication and installation of 800 mm diameter nipple complete, dismantling of existing 8 inch pipeline complete, reinstallation of 8 inch pipeline at the designated position including alignment welding testing and successful trial run, fabrication and installation of 8 inch tee complete, dismantling of damaged extension catcher vapour body of new quad no 4 removal of corroded angle channels disposal of scrap at the designated scrap yard fabrication of a new catcher from 10 mm thick ms plate by bending installation at site completion of all necessary connections and successful trial run approximate size diameter 160 m x length 620 m, cutting and removing damaged casing of bagassilo fan fabrication using supplied 8/10 mm ms plate installation and satisfactory trial, cutting and removing damaged mud tray of big filter disposal of scrap fabrication using supplied 8/10 mm ms plate installation and satisfactory trial (approx dia 375 m x length 860 m), dismantling of 6 inch vacuum air line with filter, fixing of 6 inch vacuum air line in position including alignment and satisfactory trial, fabrication and installation of 6 inch ms flange, fabrication and installation of 6 inch ms tee, fabrication and installation of 6 inch ms nipple, cutting and removing corroded box of clear juice liquidation tank door fabrication using 8 mm ms plate installation all connections and satisfactory trial (approx size 10 m x 10 m), fitting fixing alignment of ms band for 120 hp clear juice pump and motor including satisfactory trial, replacement of strip and flat iron for top and bottom header rubber packing fixing new rubber packing and satisfactory trial, removal of condensate bottle of juice heater/quad semicaser/vapor cell fabrication of new bottle using supplied 8/10 mm ms plate and installation, removal of corroded distributor from clarifier compartment disposal of scrap fabrication of new distributor using 6/8 mm ms plate installation and satisfactory trial, replacement of damaged side and bottom plates of cane carrier using supplied 6 mm ms plate, replacement of damaged side and bottom plates using supplied 6 mm ms plate, replacement of damaged side and bottom plates of rack carrier no1 2 & 3 using supplied 6 mm ms plate, cutting and removing old runner and fixing new runner for cane carrier, cutting and removing old runner and fixing new runner, cutting and removing old runner and fixing new runner for rack carrier no1 2 & 3, removal of corroded supporting angles/channels and installation of new supporting angle, removal of corroded angles/channels and installation of new angle, replacement of 150 mm chain beam, removal of old trough of inter rack carrier no1 2 & 3 fabrication using supplied 8/10 mm ms plate and installation, cutting and replacing damaged trough of mill no3 & 4 including satisfactory trial, removal of damaged lower plate under trpf of mill no2 & 3 fabrication using supplied 10/12 mm ms plate and installation, fabrication of new juice rings for mill rollers using supplied 6/8 mm ms plate as per sample, dismantling damaged side plates of leveler disposal of scrap fabrication and installation of new 8/10 mm ms side plates, dismantling damaged side plate of fiberizer disposal of scrap fabrication and installation of new 8/10 mm ms side plate, removal of old trough fabrication using supplied 8/10/12 mm ms plate and installation, cutting and removing worn tail shaft bed of secondary rack carrier fabrication using supplied 200 mm beam and installation, fabrication and installation of new pinion gear for mill no3 removal of old gear and disposal to scrap yard, removal of damaged angles from cane carrier side plate/inter rack carrier 2 & 3 and installation of new angles, removal of damaged angles from secondary rack carrier/inter rack carrier 2 & 3 fabrication and installation of new angles, removal of damaged juice plate of trpf rollers fabrication using supplied 8/10 mm ms plate and installation, dismantling of existing 4 inch cold water pipeline from mill no1 to mill no3 and installation of new pipeline, removal of worn bearing cooling line from mill no1 to 4 and installation of new 3 inch pipeline complete with flange and nipple, supply/fabrication and installation of 3 inch flange, supply/fabrication and installation of 1 inch nipple, cutting and removing old 6 inch mill juice pipeline from mill juice pump no 3 to mill no 1 and installing new 6 inch ms pipeline complete with fitting and testing, dismantling existing 4 inch dia hot water pipeline from mill no 3 to mill no 4 and installing new pipeline complete with fittings and testing, cutting and removing old pipeline from mill juice pump no 4 to mill no 2 and installing new 6 inch ms pipeline complete with fittings and testing, cutting and removing old pipeline from mill screen juice pump to raw juice tank and installing new 6 inch & 8 inch pipeline complete with fittings and testing, dismantling and installation of 6 inch flange, dismantling and installation of 8 inch flange, dismantling and installation of 10 inch flange, dismantling and installation of 4 inch nipple, dismantling and installation of 6 inch nipple, dismantling and installation of 8 inch nipple, fabrication and preparation of mill beds complete as required, removing existing 12 inch screen juice header fabricating new header as per sample erection reconnection and satisfactory trial, fabrication and installation of new 10 inch delivery header (21 m long) for screen juice tank including 8 inch & 10 inch nipples erection and testing, cutting damaged top cover of trpf tank fabrication using supplied 8/10 mm ms plate installation and satisfactory trial, inspection and repair/checking of bottom cover of transmission gear of mill no 4 as per sample, installation of 6 inch juice pump pipeline complete with fitting and testing, fabrication and installation of 6 inch reducer in the pipeline, fabrication and installation of 8 inch reducer in the pipeline, fabrication and installation of 6 inch flange in the pipeline, fabrication and installation of 4 inch flange in the pipeline, fabrication and installation of 6 inch pipe band/support, fabrication of top cover for trpf sluice installed in mill house, removing damaged angles of cane carrier side plate and inter rack carrier no 2 & 3 and installing new angles, removing damaged angles of secondary rack carrier and inter rack carrier no 2 & 3 and installing new angles, dismantling damaged side and back plates of trpl chute of mill no 2 fabrication using supplied 10/12 mm ms plate installation and satisfactory trial, removing damaged rail of crane unloader trolley installing new 40 x 40 mm rail strengthening and testing, fabrication and installation of new cover for mill bearing housing, fabrication and installation of juice distribution trays in mill juice pipeline at designated locations, welding and repair of trpf rollers including welding and correction of damaged side plates, repair of secondary rack carrier and inter rack carrier racks, removing damaged water guard of crown pinion of mill no 3 fabrication of new guard from supplied 2/3 mm plate and installation, welding and fabrication of cut tail bars of mill no 1 & 3 as per required dimensions, dismantling damaged trpf water cover of mill no 2 fabrication using supplied 8/10 mm ms plate installation and satisfactory trial, carrying out pineapple (chevron) grooving/cutting work on mill rollers, forging of side links of cane carrier bagasse carrier elevator and rbc chain including fitting of pins and bushes profiling and finishing to required size


Due Date : Jul 27, 2026

Unlock Full Tender Access

Start Free Trial to download documents before deadline

T18 Ref No : 16239051
live Tender
Source : GEM Tenders
live Tender

corrigendum tender for fabrication repairing the condensate tank pump delivery line of the pan 1 , repairing the condensate tank pump delivery line of the pan 2 , repairing the condensate tank pump delivery line of the pan 3 , replacing damaged bypass line band flange of melter 1 , replacing damaged bypass line band flange of melter 2 , replacing damaged bypass line band flange of melter 3 , replace damaged 100 pound 3inch size pipeline from pan no 1 to pan no 6 and give satisfactory trial , replace the weak vapor pipe from pan no 1 to 6 size dia 1 150 m length 30 m 1 , replace the weak vapor pipe from pan no 1 to 6 size dia 1 150 m length 30 m 2 , replace main hole dia 600 mm of pan no 3 sevual with 10 mm thick plate , replace damaged overflow pipeline of bh and cl molasses conditioner of 6inch size 1 , replace damaged overflow pipeline of bh and cl molasses conditioner of 6inch size 2 , replace corroded nipples pipes flanges of 6inch size header on pan no 5 and 6 installation related nipples valves etc and give satisfactory trial , replace damaged ammonia pipeline flange nipple in pan no 4 and 6 1 , replace damaged ammonia pipeline flange nipple in pan no 4 and 6 2 , replace damaged ammonia pipeline flange nipple in pan no 4 and 6 3 , replace damaged ammonia pipeline flange nipple in pan no 4 and 6 4 , replace damaged ammonia pipeline flange nipple in pan no 4 and 6 5 , cut and remove damaged wash-out line installed on the pan and rebuild with supplied pipe and installation it 1 , cut and remove damaged wash-out line installed on the pan and rebuild with supplied pipe and installation it 2 , replace damaged washing pipeline nipple flange band on pan no 6 1 , replace damaged washing pipeline nipple flange band on pan no 6 2 , replace damaged washing pipeline nipple flange band on pan no 6 3 , replace damaged washing pipeline nipple flange band on pan no 6 4 , installation valve in steam line at pan no 2 550 mm 1 , installation valve in steam line at pan no 2 550 mm 2 , installation valve in steam line at pan no 2 550 mm 3 , installation valve in steam line at pan no 2 550 mm 4 , replace nipple and band of a heavy tank 2 , replace nipple and band of a heavy tank 3 , replace nipple and band of a heavy tank 4 , remove clean and reinstall 4inch size syrup line on pan , cut and remove syrup header and fabricate and installation new header , replacing the 6inch size glycol washing line fitted on pan no 1 , replacing nipples of different lines of pan no 6 1 , replacing nipples of different lines of pan no 6 2 , replacing nipples of different lines of pan no 6 3 , replacing nipples of different lines of pan no 6 4 , replacing 10inch size nipples of cut off line of pan no 6 1 , replacing 10inch size nipples of cut off line of pan no 6 2 , replacing 10inch size nipples of cut off line of pan no 6 3 , replacing 10inch size nipples of cut off line of pan no 6 4 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 1 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 2 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 3 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 4 , fabricating m s bed for syrup pump and motor fitting and alignment followed by satisfactory trial , dismantling weak condensate bottle of old set , replacing weak pipeline flange valve and band of old set vertical juice heater 1 , replacing weak pipeline flange valve and band of old set vertical juice heater 2 , replacing weak pipeline flange valve and band of old set vertical juice heater 3 , replacing weak pipeline flange valve and band of old set vertical juice heater 4 , replacing weak pipeline flange valve and band of old set vertical juice heater 5 , replacing weak pipeline of old quad set no 4 1 , replacing weak pipeline of old quad set no 4 2 , replacing weak pipeline of old quad set no 4 3 , replacing weak pipeline of old quad set no 4 4 , replacing weak pipeline of old quad set no 4 5 , dismantling damaged mesh of section pipe located at injection no 2 and 3 and making a new one from given m s plate and fitting it , cutting and discarding old damaged reducer plate of section pipe located at injection no 2 and 3 and remaking the same , fitting water line from overhead to service tank 1 , fitting water line from overhead to service tank 2 , details of work of canti machine no 6 and 7 1 , details of work of canti machine no 6 and 7 2 , details of work of canti machine no 6 and 7 3 , details of work with new pipes from s sugarbin 1 , details of work with new pipes from s sugarbin 2 , details of work with new pipes from s sugarbin 3 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 1 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 2 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 3 , work on hot water line of brown sugar magma 1 , work on hot water line of brown sugar magma 2 , work on hot water line of brown sugar magma 3 , work on hot water line of brown sugar magma 4 , cutting and removing damaged monitor casing and ribs , cutting and removing damaged center shaft and arms inside kcp machines no 1 and 2 bending and fitting new parts with 8 to 10 mm plate , dismantling damaged upper cover part of canty machine no 6 and 7 scrapping fabricating and fitting new cover with 12 mm plate and making all related connections , dismantling damaged part of molasses weighing scale receiving tank and fabricating and fitting new part by bending 8 mm thick, fabrication, fabricate and installation 6inch size nipple, fabricate and installation 6inch size flange, dismantling 6inch size pipeline, installing 6inch size pipeline and giving satisfactory trial, fabricate and installation 6inch size band, replace damaged 100 pound 3inch size pipeline from pan no 1 to pan no 6 and give satisfactory trial, dismantle the weak vapor pipe from pan no 1 to 6, fabricate the weak vapor pipe from pan no 1 to 6, replace main hole dia 600 mm of pan no 3 sevual with 10 mm thick plate, replace damaged overflow pipeline of bh and cl molasses conditioner of 6inch size, replace corroded nipples pipes flanges of 6inch size header on pan no 5 and 6 installation related nipples valves etc and give satisfactory trial, replace 2inch size pipeline, fabricate and installation 2inch size flange, fabricate and installation 2inch size nipple, fabricate and installation 3inch size flange, fabricate and installation 3inch size valve, replace and installation 6inch size pipeline, replace 6inch size pipeline of the above, installation valve in steam line at pan no 2 550 mm, installation flange in steam line at pan no 2 550 mm, installation nipple in steam line at pan no 2 550 mm, fabricate and installation catcher element size 75 x 75 x 8 angle on pan no 4 and 5, replace nipples of the above tank, replace bands of the above tank, replace partition of syrup tank with 10/12 mm thick plate, remove clean and reinstall 4inch size syrup line on pan, cut and remove syrup header and fabricate and installation new header, replacing the 6inch size glycol washing line fitted on pan no 1, replacing nipples of 2inch size line mentioned above, replacing nipples of 4inch size line mentioned above, replacing nipples of 6inch size line mentioned above, replacing nipples of 8inch size line mentioned above, replacing 10inch size nipples of cut off line of pan no 6, replacing 10inch size pipe line, making and fitting 10inch size flange, making and fitting 10inch size band, making and fitting 8inch size band, replacing 4inch size pipe line, making and fitting 4inch size flange, making and fitting 4inch size valve, fabricating m s bed for syrup pump and motor fitting and alignment followed by satisfactory trial, dismantling weak condensate bottle of old set vertical line juice heater and quad body no 4 disposing to scrap yard fabricating all connections using 8/10 mm plates and giving satisfactory vacuum trial, replacing 2inch size pipeline, replacing 6inch size pipeline, making and fitting 2inch size flange, making and fitting 6inch size flange, making and fitting 6inch size band, making and fitting 6inch size valve, dismantling damaged mesh of section pipe located at injection no 2 and 3 and making a new one from given m s plate and fitting it, cutting and discarding old damaged reducer plate of section pipe located at injection no 2 and 3 and remaking the same, fitting mentioned line into service tank, making and fitting 8inch size nipple, dismantling and fitting 6inch size pipeline, dismantling resistance box installed on spray making and fitting new one from given m m plate carrying out proper stay fitting and welding and conducting leak proof trial, dismantling and installing 8inch size pipeline, fabricating and installing 8inch size bands, fabricating and installing 8inch size flanges, dismantling and installing 12inch size pipeline, fabricating and installing 12inch size bands, fabricating and installing 12inch size flanges, dismantling and installing 3inch size pipeline, manufacturing and installing 3inch size nipples, manufacturing and installing 3inch size bands, cutting and removing damaged monitor casing and ribs inside canty no 1 and 2 and kcp machine 1 and 2 patching with 10/12 mm ms plate and giving satisfactory trial 1, cutting and removing damaged center shaft and arms inside kcp machines no 1 and 2 bending and fitting new parts with 8 to 10 mm plate 1, dismantling damaged upper cover part of canty machine no 6 and 7 scrapping fabricating and fitting new cover with 12 mm plate and making all related connections, dismantling damaged part of molasses weighing scale receiving tank and fabricating and fitting new part by bending 8 mm thick plate and depositing scrap in scrap yard, dismantling damaged plate of sugar discharge chute from sugar elevator to sugar grader and fabricating and fitting new plate of 6 mm thickness depositing scrap in scrap yard, modifying sugar chute of grader in dryer house and giving satisfactory trial, dismantling and installing 4inch size pipeline, fabricating and installing 4inch size flanges, manufacturing and installing 4inch size bands, manufacturing and installing 4inch size nipples, removing transit heater installed on c centrifugal machine opening side plate for cleaning and hydraulic servicing reinstalling in place and making all connections, dismantling and installing 2inch size pipeline, fabricating and installing 2inch size flanges, manufacturing and installing 2inch size nipples, manufacturing and installing 2inch size valves, removing old taper of sugar hopper no 1 scrapping it fabricating new one from 3/5 mm ms plate installing and giving satisfactory trial, dismantling and installing 6inch size pipeline, manufacturing and installing 6inch size bands, manufacturing and installing 6inch size flanges, manufacturing and installing 5inch size flanges, manufacturing and installing 5inch size valves, removing damaged/weak top and bottom sugar discharge chute of canty machine no 4 including flange scrapping fabricating new parts with 6 mm ms plate as per suit sample preparing all connections like angle channel etc fitting on side and giving satisfactory trial, installing 2inch flow meter, dismantling the damaged 6inch dia pipeline from primary clarifier to anoxic tank and putting it in scrap yard and installing a new pipeline, installing 4inch size valve/nrv, fabricating 4inch size band, fabricating and installing 2inch size flange, dismantling the damaged 8inch dia pipeline from aeration tank to secondary tank and putting it in scrap yard, dismantling diffusers installed in aeration tank and putting them in scrap yard and replacing the throat part, in sulfate removal plant reaction chamber dismantling corroded 6 mm partition plate putting it in scrap yard and fabricating with new 8 mm plate, dismantling corroded 2inch size treated water outlet line of etp and putting in scrap yard and installing new 3inch size line at the same location, dismantling 800 mm dia exhaust pipe line below turbine with nipple band flange and putting in scrap yard, fabricating 800 mm dia exhaust pipeline below turbine from 12 mm plate by bending and installing at position and providing satisfactory trial, fabricating 800 mm dia exhaust pipeline below vapor cell 950 wag meter from 12 mm plate by bending and installing at position and providing satisfactory trial, fabricating 800 mm dia exhaust pipeline below vapor cell 950 wag meter from 12 mm plate by bending into t shape and installing at position and providing satisfactory trial, fabricating 800 mm dia exhaust pipeline dummy/flange from 12 mm plate by bending and installing at position and providing satisfactory trial, dismantling weak part of semichemiser 1000 wag meter warm saser putting scrap in scrap yard fabricating from 12 mm thick plate by bending and installing with related connections and giving satisfactory trial size dia 3 4 m, dismantling weak parts of old quad body no 2 and 3 20inch vapor pipe putting scrap in scrap yard fabricating from 8 mm thick plate by bending and installing and providing satisfactory trial, dismantling weak parts of vapor pipe 32inch size of vapor cell 1000 wag meter putting scrap in scrap yard fabricating from 8 mm thick plate by bending and installing and providing satisfactory trial, dismantling weak part of 6inch size header of all juice heaters condensate and installing new one, removing all partition plates of juice heater header by cutting straight and circular shapes cleaning tube plate completely and fabricating new circular and straight partition plates from 10/12 mm plate installing and preparing header with ms strips as before applying rubber strips and providing satisfactory trial, cutting out quailons and all related angles fixed in clarifier compartments and refitting after completion of work and providing satisfactory trial, patching inside clarifier with 6/8 mm ms plate, dismantling damaged 8inch size ms pipeline from clarifier clear juice overflow tank to sombox, installing 6inch size ms pipeline from clarifier compartments no 2 and 3 to mud tank and providing satisfactory trial, opening 6inch size valve and installing at designated location, fabricating 6inch size nipple and installing at designated location, fabricating 6inch size flange by cutting plate and dismantling to fit, dismantling 4inch size air pipeline above door including nipple band flange and putting scrap in scrap yard, installing 4inch size air pipeline above door and providing satisfactory trial, dismantling 6inch size ms pipeline of big vacuum filter mud tank overflow line and putting scrap in scrap yard, fitting and trial of 6inch size ms pipeline overflow line of big vacuum filter mud tank at position, fabricating 6inch size band, fabricating 8inch size band, dismantling 8inch size pipeline from big vacuum filter pump to condenser and putting scrap in scrap yard, fitting and trial of 8inch size pipeline from big vacuum filter pump to condenser at position, dismantling 4inch ms pipeline from filter juice header to vibro screen, fitting and trial of 4inch ms pipeline from filter juice header to vibro screen at position, making 4inch size nipple, opening 4inch size valve, installing 4inch size valve at the specified location, cutting 4inch size flange from plate making it and fitting after drilling, dismantling 3inch size pipeline, installing and fitting 3inch size line at position and giving satisfactory trial, making and installing 3inch size t, making and installing 3inch size nipple, cutting 3inch size flange from plate making it and installing, making and installing 3inch size band, dismantling 8inch size clear juice overflow pipeline, installing and fitting 8inch size clear juice overflow pipeline at position and giving satisfactory trial, installing and fitting 6inch size pipeline at position and giving satisfactory trial, making and installing 6inch size band/elbow at specified location, making and installing 6inch size t, dismantling 4inch size pipeline, installing and fitting 4inch size pipeline at position and giving satisfactory trial, making and installing 4inch size band, making and installing 4inch size t, dismantling 10inch size pipeline, installing fitting and trial of 10inch size pipeline at position, making and installing 10inch size t, making and installing 10inch size dummy/flange, dismantling 6inch pipeline, installing fitting and trial of 6inch size pipeline at position, opening and binding 6inch size valve, installing fitting and trial of 4inch size pipeline at position, making and installing 8inch and 6inch size cross, dismantling 4inch size ammonia pipeline of semichemiser quad, installing 4inch size ammonia pipeline of semichemiser quad at position, making 4inch size band, making 4inch size t, making 4inch size flange, dismantling 2inch size pipeline, fixing 2inch size pipeline in position, dismantling new quad no 2 vapor pipe 24inch size vapor pipeline fabricating it by bending with 10 mm thick plate and installing, fabricating and installing 24inch size bends, fabricating and installing 24inch size tees, fabricating and installing 24inch size flange/dummy, dismantling 24inch size pipeline, fitting 24inch size pipeline in position, fabricating and installing 24inch size flange, cutting damaged 6inch syrup pump header fabricating new header and installing along with fitting all related nipples valves etc and conducting satisfactory trial, dismantling bent incoming and outgoing wax and heater cell and partition plate between double beat valve of juice heater/ juice heater header fabricating new one using 12/10 mm plate as before installing and conducting satisfactory trial, dismantling 6inch condensate header of juice heaters and replacing the weak part, fitting 6inch size pipeline in position and conducting satisfactory trial, fabricating and installing 6inch size flange, fabricating and installing 6inch size nipple, fabricating and installing 6inch size tees, dismantling and fitting 6inch size pipeline in position and conducting satisfactory trial


Due Date : Jul 17, 2026
T18 Ref No : 16021513
live Tender
Location : new delhi , delhi
Source : GEM Tenders
live Tender

tender for fancy hot plate with food warming lamp on top for snacks as per specification , risers as per specifications , cold milk dispenser as per specifications , ceramic salad bowls small as per specifications , ceramic salad bowls large as per specifications , ceramic platters as per specifications , 3 tier wrought iron stand with ceramic bowls as per specifications , transparent dessert holder single portion of various shapes as per specifications , buffet prop with fillings fancy as per specifications , buffet props or artifacts as per the restaurant theme and decor as per specifications , samovar as a thematic center piece as per specifications , perforated tub with drip tray small size as per specifications , polly rattan bread basket with cover large size as per specification , 4 tier salad bowl stand as per specifications , 2 tier juice glass organizer as per specifications , 2 tier chutney or soup bowl organizer as per specifications , ceramic rectangle tray 15 inch as per specifications , glass decanter with lid approx 1 litre as per specifications , 2 tier stands for dessert display as per specifications , ocean glass pitcher 1660 ml as per specifications , glass wide mouth cereal jar as per specifications , single tank commercial juice dispenser as per specification, fancy hot plate with food warming lamp on top for snacks as per specification, risers as per specifications, cold milk dispenser as per specifications, ceramic salad bowls small as per specifications, ceramic salad bowls large as per specifications, ceramic platters as per specifications, 3 tier wrought iron stand with ceramic bowls as per specifications, transparent dessert holder single portion of various shapes as per specifications, buffet prop with fillings fancy as per specifications, buffet props or artifacts as per the restaurant theme and decor as per specifications, samovar as a thematic center piece as per specifications, perforated tub with drip tray small size as per specifications, polly rattan bread basket with cover large size as per specification, 4 tier salad bowl stand as per specifications, 2 tier juice glass organizer as per specifications, 2 tier chutney or soup bowl organizer as per specifications, ceramic rectangle tray 15 inch as per specifications, glass decanter with lid approx 1 litre as per specifications, 2 tier stands for dessert display as per specifications, ocean glass pitcher 1660 ml as per specifications, glass wide mouth cereal jar as per specifications, single tank commercial juice dispenser as per specification


Tender Value : 777272
Due Date : Jul 20, 2026

Unlock Full Tender Access

Start Free Trial to download documents before deadline

T18 Ref No : 16155031
live Tender
Source : GEM Tenders
live Tender

corrigendum tender for rubber seat for pan discharge valve , rubber seat for telescope valve , rubber sheet for juice heater exhaust steam valve , rubber seat for juice weingh scale 1 , rubber seat for water weingh scale 2 , neoprene rubber buffer for centrifugal machine for 1250 , neoprene rubber seat for juice clarifier telescopic , neoprene rubber bucket for syrup sepretor cylinde , neoprene rubber ring , rubber sheet for quad ist body semikestner vapour inlet , rubber sheet for quad ist b body semikestner vapour inlet , rubber seat for semikestner vapuour outlet valve , sbr rubber seat for quad ist body exhaust valve , srb rubber seat for semikestner vapou in let valve to quad ist body , srb rubber seat for exhaust valve of juice heater 1 , srb rubber seat for exhaust valve of juice heater 2 , sbr rubber sheet for pan no. 7 b inlet vapour valve , sbr rubber sheet for pan no. 7 a inlet vapour valv , sbr rubber sheet for pan no. 1 a inlet vapour valve 1 , sbr rubber sheet for pan no. 1 a inlet vapour valve 2 , sbr rubber sheet for pan no. 1 a inlet vapour valve 3 , srb rubber seat for juice heater glove valve , srb rubber seat for vapour cell , srb rubber seat for semikestner inlet exhaust valve , srb rubber seat for vapour cell in let exhaust valve , rubber seat for quad , sbr seat for old vapour cell inlet exhaust valve , rubber stoper for juice and water tank , rubber seat for synth epdm nrv 1 , rubber seat for synth epdm nrv 2 , rubber seat for synth epdm nrv 3 , synth epdm rubber seat for nrv 4 , synth epdm rubber seat for nrv 5 , epdm rubber tapar plug for 42x45 brass tube , rubber taper plug for 96x100mm tube id , rubber taper plug for 98mmx100 brass tube id , neoprene rubber bucket for plough cylinder , neoprene rubber bucket for syrup sepretor puenmatic cylinde , neoprine rubber buffer a centrifugal machine 650 kg , neoprine rubber bucket for gate cylinder , neoprine rubber o ring for wk1350 , neoprine rubber seat for double bit valve , neoprone rubber seat for pan angle valve 1 , neoprone rubber seat for pan angle valve 2 , neoprone rubber seat for pan angle valve 3 , neoprone rubber seat for pan angle valve 4 , rubber bucket for brake cylinder , rubber bush 1 , rubber bush 2 , rubber cone 3 , rubber coupling for sugar grader , rubber damping pad for nk 1100 , rubber flat ring , rubber hose pipe 1 , rubber hose pipe 2 , rubber bush dholak type for coupling 1 , rubber bush dholak type for coupling 2 , rubber o ring 1 , rubber o ring 2 , rubber o ring 3 , rubber o ring 4 , rubber o ring 5 , rubber scraper for mud , rubber star for 1250 , rubber strip 1 , rubber strip 2 , neoprene mill hydrulic bucke , rubber mud seal , rubber o ring big , rubber o ring small , rubber bush for trpf coupling , rubber strip, rubber goods, rubber seat for pan discharge valve drg no 84 and 17 new, rubber seat for telescope valve as per drg no bh.85 and 118, rubber sheet for juice heater exhaust steam valve drg no 438 a part no 14, rubber seat for juice weingh scale drg no gk.2013.13 part no 1, rubber seat for juice weingh scale drg no gk/2013/13 part no 2, neoprene rubber buffer for c/f m/c for 1250 c.f m/c dc-c/f m/c drg no gk/bh/2016/3, neoprene rubber seat for juice clarifier telescopic v/v 8inch 5inchdrg gk/bh/2016/4inch, neoprene rubber bucket for syrup sepretor cylinder as per drg no 2017/10 item no 4, neoprene rubber ring as per drg 2017/10 item no 5 for c/f m/c as per sample, rubber sheet for quad ist body semikestner vapour inlet per drg. no.gk/bh/2020/05/ part.14, rubber sheet for quad ist b body semikestner vapour inlet per drg. no.gk/bh/2020/05/ part.13, rubber seat for semikestner vapuour outlet valve drg no gk/bh/2018/08 part no 3, sbr rubber seat for quad ist body exhaust valve drg gk/bh/2018/part-4, srb rubber seat for semikestner vapou in let valve to quad ist body 2 as per drg no gk/bh/2020/5 part 5, srb rubber seat for juice heater no 5 as per drg no gk/bh/2020/5 part 15, srb rubber seat for juice heater no 5 as per drg no gk/bh/2020/5 part 16, sbr rubber sheet for pan no.7 b inlet vapour valve as per drg no. gk/bh/2018/08/ part.08, sbr rubber sheet for pan no. 7 a inlet vapour valve as per drg no. gk/bh/2018/08/ part.09, sbr rubber sheet for pan no. 1 b inlet vapour valve as per drg no. gk/bh/2018/08/ part.10, sbr rubber sheet for pan no. 1 a inlet vapour valve as per drg no. gk/bh/2018/08/ part .11, n r seat for vapour valve of new vapour cell quad ist body as per drg no gk/bh/2020/5 part 1 suit for 180c to 200 c temp, srb rubber seat for juice heater glove valve for new vapour celll as per drg no gk/bh/2020/5 part 2, srb rubber seat for vapour cell for new 1750 in let exhaust main valve as per drg no gk/bh/2020/5 part 3, srb rubber seat for semikestner inlet exhaust valve as per drg no gk/bh/2020/5 part 4, srb rubber seat for vapour cell in let exhaust valveras drg no gk/bh/2020/05 part no 5, rubber seat for quad no ist and iind as per drg no gk/bh/2020/05 part no 7, sbr seat for old vapour cell inlet exhaust valve as per drawing no. gk/bh/2020/05/ part.12, rubber stoper for juice and water tank drg no gk/bh/2020/61, rubber seat for synth epdm nrv.6inch drg no 2021/25, rubber seat fo synth epdm nrv.8inch drg no 2021/25, rubber seat for synth epdm nrv.10inch drg no 2021/25, synth epdm rubber seat for nrv.12inch drg no 2021/25, synth epdm rubber seat for nrv.20inch drg no 2021/25, epdm rubber tapar plug for 42x45 brass tube, rubber taper plug for 96x100mm tube id, rubber taper plug for 98mmx100 brass tube id, neoprene rubber bucket for plough cylinder in/out od 105 mm for wil make 1750 kg/charge inchainch c/g m/c as per drg, neoprene rubber bucket for syrup sepretor puenmatic cylinder for wil make 1750 kg /charge inchainch c/f m/c as per drg, neoprine rubber buffer, neoprine rubber bucket for gate cylinder, neoprine rubber o ring forwk/1350 c/f machine as per sample, neoprine rubber seat for double bit valve 240x254x15 mm, neoprone rubber seat for pan angle valve 3 inch, neoprone rubber seat for pan angle valve 4 inch, neoprone rubber seat for pan angle valve 5 inch, neoprone rubber seat for pan angle valve 6 inch, rubber bucket for brake cylinder, rubber bush size 3/4inchx1 3 /4inchx2inch, rubber bush size 16x40x50 mm, rubber cone for boiler g glass, rubber coupling for sugar grader, rubber damping pad for nk 1100 c/f machine, rubber flat ring, rubber hose pipe size 3 1/2inchx 18 inch, rubber hose pipe size 2 1/2inchx 18 inch, rubber bush dholak type for feed pump size 16x30x30 mm, rubber bush dholak type for coupling as per drg/sample, rubber o ring size 110x3 mm, rubber o ring size 140x4 mm, rubber o ring size 240x5 mm, rubber o ringh size id-55 x od 62x3.5 thk mm long, rubber oinch ring for c/f machine size 3mm, rubber scraper for mud size 5inchwx32inchlx18 mm thk, rubber star for 1250 c/f m/c as per sample, rubber strip 1/2inchx5/8inchx3/4inch, rubber strip 45x6x8000mm length, neoprene mill hydrulic bucket for 30x60mill size bucket size 305 mm, rubber mud seal as per sample, rubber o ring big, rubber o ring small, rubber bush for trpf coupling size045x75x120 mm, rubber bush for trpf coupling size 45x74x120 mm, rubber strip 12x12 mm


Due Date : Jul 17, 2026
T18 Ref No : 16103288
live Tender
Location : sarsawa , uttar pradesh
Source : GEM Tenders
live Tender

tender for clarification and evaporator fabrication works removing the calandria of the evaporator and installing and fitting a new calandria of 650 m square heating surface and installing all the pipe lines valves and accessories in their place , replacing an old and worn out grand consultant juice plaza condensate syrup bottle with an 8 10 mm msc plate by connecting all connections. , the worn out umbrella plate in the vapor cell semi concentrator was removed and the plate was repaired and replaced with plastic , replacing the umbrella in the wide body vapor cell semi concentrator with a dated and 6 8 mm msc plate and conducting a trial. , removing the neck selvage of the quad body semi container and replacing it with a new 8 10 mm ms plate and testing it. , removing the neck selvage of the quad body semi container and repairing it with the provided plate and testing it. , cutting out the weakened roof of the quad body and replacing it with a 12mm plate provided and testing it. , cutting out the weakened part of the semi capacitor vapor cell quad body cell and replacing it with a 10 12mm plate provided and testing it for a satisfactory leak proofing test. , removal of the weak part of the exhaust pipeline going to the semi condenser vapor shell and fitting a new 800 mm diameter pipeline using the provided 8 10 mm plate in its place. , cutting out the worn partition plates of the top and bottom headers of the juice heater and replacing them with the provided 8 10 mm plate arranging for fitting the rubber strip , installing and strengthening the umbrella fitted to the vapor shell semiconductor quad body and conducting a satisfactory trial. , removing the weak intermediate first vapor second vapor pipes of the quad bodies and constructing new ones with a diameter of 500 650 mm using an 8 10 mm plate and conducting a satisfactory trial. , removing the weakened intermediate first vapor second vapor pipes of the quad bodies and installing new ones with a diameter of 700 850 mm from 8 10 mm plates and conducting a satisfactory trial. , dismantle fabricate and erect a 600 800 mm band and conduct a satisfactory trial. , dismantle fabricate and erect a 900 1100 mm band and conduct a satisfactory trial. , remove the steam valve from the juice heater and installation a new right angle valve size 400 500 mm with the corresponding pipe connection modifications and conduct a trial. , cut and remove the double beat valve from the juice heater and installation a new double beat valve size 8 diameter and conduct a trial , remove the intermediate coolers from the film type sulfur furnaces and installation them using the provided pipe plate and conduct a trial. , installation the sublimation pipes from the satvik type sulfur furnaces using the provided pipe or a new one and conduct a trial. , remove the empty filtrate bottle from the vacuum filter and installation a new filtrate bottle using an 8 10 mm ms plate and conduct a trial. make all connections and conduct a trial. , removing the filtrate bottle plate of the vacuum filter and repairing it with the provided plate and giving it a trial. , removing the filtrate plate of the vacuum filter tray and repairing it with the provided plate. , cutting and removing the neck shell of the lime slaker at the lime station and replacing it with a new one using the provided plate and giving it a trial. , creating the melter from the satvik sulfur furnace with a new 8 10 mm plate and giving it a satisfactory trial by installing the steam coil. , removing the worn out coils in the melters of the satvik sulfur furnace replacing them with new ones and conducting hydraulic testing and giving a satisfactory trial. , removing the worn out plates of the vacuum filter condensers replacing them with new ones and giving a satisfactory trial , removing the damaged weak steam coils in the film tine sulfur melters replacing them with new ones and conducting hydraulic testing and giving a satisfactory trial , renovate and installation a new so2 chamber inside the coolers of the satvik sulfur furnace and conduct a trial. , remove the old corroded so2 gas line at the sulfur furnace station and installation the new seamless ms line with flanges tightening the joints and bolts , remove the grooved plate of the mud mixture on the vacuum filter and repair it with the new plate provided , remove the grooved plate of the filtrate tank located below the vacuum filter installation the plate provided and perform a trial. , repairing the weak parts of juice and mud with dry box of clarifier and making all the connections. , patch the weak shell of the burning chamber of the film type sulfur furnace with the plate provided for a length of approximately 5 feet from the bottom and give a satisfactory trial. , patch the weak and rotten platforms of both vacuum filters with a new burner from the provided plate. , removing the so2 chamber inside the last cooler of the film type sulfur furnace and installing a new one using the provided 10 mm ms plate and making all connections. , repairing the damaged clear juice bottles near the clear juice pumps and making all the connections and giving satisfactory trial. , cut out and remove all rotten mud scrapers inside the door clarifier and installation the provided plates and belts according to size and give a satisfactory trial. , coat and remove the weak mud boot plates in each compartment of the clarifier and installation the provided new plates. , repairing the weak parts of the agitator fitted on the vacuum filter and giving satisfactory trial. , removing, clarification and evaporator fabrication works, clarification and evaporator


Due Date : Jul 18, 2026

Unlock Full Tender Access

Start Free Trial to download documents before deadline

T18 Ref No : 16222050
live Tender
Source : GEM Tenders
live Tender

corrigendum tender for instrument item 1 , instrument item 2 , instrument item 3 , instrument item 4 , instrument item 5 , instrument item 6 , instrument item 7 , instrument item 8 , instrument item 9 , instrument item 10 , instrument item 11 , instrument item 12 , instrument item 13 , instrument item 14 , instrument item 15 , instrument item 16 , instrument item 17 , instrument item 18 , instrument item 19 , instrument item 20 , instrument item 21, supply of insturment items 2, l1 600 thermowell 8x300 mm (connecting fitting 1/2 inch) furnace temperature, 20 selec make, pid controller(honey well-1040), push fitting 1/2 inchx8mm, push fitting 1/4 inchx8mm, 3 way manifold for dpt level transmitter, 2 way manifold for pressure transmitte, red thermometer alcohol filled ,(0-110 c) length-12 inch, push fitt connector 1/4inch tube size 10mm janatics make, push fitt connector 1/4 inch tube size 8mm janatics make, pressure gauge dia 6 inch 3/8 inch fitting heavy duty s.s. (h-guru make), 8mm thickness, 200mm lenght rtd, (ptx100), 8mm thickness, 200mm lenght rtd, pneumatic positioner air to open (4-20) ma single direction, level transmitter for open tank(raw juice) abb make size-1/2 inch-, 1/2 inch-od nptm connector, rotary disc valve 1/2 inch (airmax make), rotary disc valve 1/4 inch (airmax make), push fitting t type -1/2 inch, heavy duty pressure gauge having ss-316 internal fitting & body range (0-28) kg /cm2 dial size -6 inch ,3/8 inch bsp bottom fitting (h guru make), temperature gauge mercury filled stem type having copper/ss internal fitting range (0-120 c) (h-guru make)


Due Date : Jul 16, 2026
Published By

Every year, central and state government departments release thousands of high-value contracts specifically dedicated to Juice Tank. Whether it involves bulk material supply, executing specialized operational services, or end-to-end turnkey project execution, the demand for capable vendors in the Juice Tank sector is massive.

At Tender18, we help businesses cut through the noise and exclusively target the exact work categories they specialize in. Instead of browsing through generic procurement sites, our platform isolates high-potential opportunities that match your specific industry capabilities.

Work Dynamics in the Juice Tank Sector

Government requirements for this specific vertical generally fall into distinct procurement patterns:

  • Product & Material Supply: Tenders focused strictly on sourcing, testing, and delivering high-quality items that meet the exact technical specifications of the buyer.
  • Service Level Agreements (SLAs): Long-term hiring of expert agencies for routine maintenance, manpower deployment, or continuous operational management.
  • Execution & Turnkey Projects: Comprehensive contracts where the bidder is responsible for everything from raw material procurement to final site installation and testing.

By focusing purely on your core strength in Juice Tank, you can build a highly profitable and stable pipeline of government clients.

Stop wasting time filtering through irrelevant notices. Our Juice Tank Tender Information Service is engineered for precision. We track exact product codes, service names, and specialized work terms across all government portals nationwide. When a buyer publishes a requirement that matches your specific business profile, our system alerts you instantly.

Deep Technical Insights & Documentation For Juice Tank Tenders

Bidding for specific works requires studying strict technical parameters. We provide immediate access to the core documents you need to evaluate the project:

  • Detailed Specifications & Drawings: Download the exact engineering guidelines, material testing standards, and quality benchmarks demanded by the buyer for Juice Tank.
  • Financial BOQ Spreadsheets: Access the official blank pricing formats where you need to input your unit rates, tax configurations, and total bid value.
  • Real-Time Technical Amendments: If the buying department changes the product specifications, alters the service scope, or shifts the delivery timeline, we instantly update the parent file so you are never caught off-guard.

Winning a contract for Juice Tank depends entirely on how perfectly your technical capabilities match the buyer’s demands. Even if you have the best product or service, a poorly formatted document or a missing compliance certificate will lead to instant technical rejection. Tender18’s Tender Bidding Service eliminates this risk by taking complete ownership of your digital submission.

Flawless Compliance & Portal Execution For Juice Tank Tenders

Under this service, Tender18 assigns a Dedicated Experienced Technical Person to your profile. This expert handles the heavy lifting of the entire bidding cycle:

  • Capability Mapping: We thoroughly cross-check your past completion certificates, ISO standard proofs, and financial turnover against the strict eligibility criteria required for Juice Tank bids.
  • Secure System Integration: Our technical desk seamlessly links your Class III Digital Signature Certificate (DSC) with the required e-procurement servers to securely encrypt your technical and financial envelopes.
  • Error-Free Financial Uploads: We audit your quoted BOQ pricing sheets for any formula or formatting errors before the final upload, ensuring your bid is successfully locked before the portal's closing hours.

Government buyers are aggressively using the Government e-Marketplace (GeM) for the direct procurement of Juice Tank. If your business profile is not accurately mapped on this portal, you remain practically invisible to these purchasing officers. Recognized as a trusted and expert GeM consultant, Tender18 offers specialized support to build, optimize, and maintain a highly visible vendor account for your business.

With an industry-leading support success ratio of over 95%, we handle the complex marketplace compliance so you can focus entirely on executing your orders

Expert Profile Management & Catalogue

Our dedicated consultants ensure your GeM presence is structurally perfect:

  • Precise Catalogue Listing: We upload and categorize your specific offerings under the exact search terms and parameters used by government buyers looking for Juice Tank, ensuring maximum search visibility.
  • OEM Dashboard & Assessment: For original manufacturers and creators, we guide you through the mandatory Quality Council of India (QCI) vendor assessments to successfully unlock your official OEM panel.
  • Profile Compliance & Caution Money: We manage your statutory documentation, brand approvals, and caution money limits to keep your account immune from technical suspensions.

Strategic Live Bid Participation

Beyond setup, we actively drive your market participation. Our team expertly handles the digital paperwork and rate configurations for GeM Custom Bids and Reverse Auctions (RA) related to Juice Tank, maximizing your chances of securing L1 status.

1.

How do I find government contracts exclusively matching my work in Juice Tank?

The easiest way is through the Tender18 platform. Instead of searching department by department, our system uses advanced keyword matching to gather all live supply, service, and execution tenders related directly to your core business in one place.

2.

Do I need specific testing or quality certificates to apply for these contracts?

It heavily depends on the nature of the work. For supply contracts, buyers often ask for ISO certifications, BIS marks, or specific lab testing reports. For service contracts, they may ask for labor licenses or past performance certificates (work orders).

3.

What is a BOQ and why is it important for my bid?

The Bill of Quantities (BOQ) is the official financial Excel sheet where you enter your competitive prices. Any mistake in this file—like adding extra rows, changing formulas, or saving it in the wrong format—will cause the portal server to reject your entire bid.

4.

Are samples required to be submitted physically before the digital bid opens?

For many product-based Juice Tank tenders, buying departments do ask bidders to submit physical samples to their office before the digital technical evaluation date. This requirement is always clearly mentioned in the official NIT document.

5.

How does the Dedicated Tender Expert from Tender18 help me?

Our assigned expert manages your total portal compliance. They extract the hidden rules from long tender PDFs, create a precise document checklist for your team, map your digital signature, and securely upload your technical and financial files onto the government servers.

6.

What is the role of a Digital Signature Certificate (DSC)?

A Class III DSC is a secure USB device that contains your digital identity. You cannot upload a bid without it. It is used to securely encrypt and lock your sensitive price data and technical documents so no one can view them before the official opening date.

7.

As an MSME, can I get financial benefits when bidding for Juice Tank?

Yes, the government strongly supports MSMEs. By uploading a valid Udyam Registration Certificate in the technical envelope, small businesses are frequently exempted from paying the initial Tender Document Fee and the Earnest Money Deposit (EMD).

8.

Why should I list my services or products on GeM for this category?

GeM is now the primary digital marketplace for all government agencies. If you are properly cataloged for Juice Tank, officers can view your profile and generate direct purchase orders or invite you to participate in exclusive Custom Bids.

9.

What makes Tender18 a reliable GeM support partner?

As a highly trusted and expert GeM consultant, Tender18 holds a proven support success ratio of over 95%. From flawless profile creation and complex catalogue mapping to OEM panel approvals and live Reverse Auction (RA) support, we handle it all seamlessly.

10.

What does "L1" mean in these government contracts?

"L1" stands for "Lowest Bidder 1". In government procurement, after all technical envelopes are approved, the financial sheets (BOQs) are opened. The bidder who has quoted the lowest compliant price for Juice Tank is declared L1 and is generally awarded the contract