Search Tenders
Filters
Reset All
Tender Status
T18 Ref No
All States
All Cities
All Agencies
Tender ID
Due Date
Tender Value
Tender Source (GeM, Cppp & Others)
Tender Type

19Latest Heater strip scrap Tenders List

Latest Heater strip scrap Tenders in India – Verified Leads & Real-Time Insights by Tender18

Finding the right Heater strip scrap tenders in India’s competitive e-procurement ecosystem requires more than just access—it demands accurate data, real-time monitoring, and expert analysis.

At Tender18 Infotech Private Limited, we bring deep industry experience in government procurement to help businesses identify, evaluate, and win Heater strip scrap tenders efficiently. With a centralized platform aggregating 1100+ live tenders, we provide a single, trusted source for opportunities from central, state, and PSU departments.


Real-Time Heater strip scrap Tender Intelligence & Monitoring

Our advanced dashboard delivers actionable insights and structured tender data, enabling you to make faster and smarter bidding decisions.

We categorize Heater strip scrap tenders into:

  • Supply Tenders – BOQs and specifications sourced from GeM and PSUs
  • Service Tenders – NITs and scope of work from CPPP and state portals
  • EPC Projects – Large-scale infrastructure tenders with financial and design data

✔ This structured approach ensures complete transparency and deeper bid analysis before submission.


Comprehensive Sources of Heater strip scrap Tenders

Tender18 acts as a centralized gateway by aggregating tenders from trusted and official sources:

  • Central Government Portals – CPPP, NIC, and Government e-Marketplace (GeM)
  • Railways & Transport – IREPS and Metro Rail projects
  • Power & Energy PSUs – NTPC, ONGC, NHPC, PowerGrid
  • Defense & Strategic Sectors – MES and DRDO tenders
  • State e-Procurement Portals – Gujarat, Maharashtra, Tamil Nadu, UP, and more

✔ Every listing is verified and regularly updated to maintain data accuracy and trust.


Step-by-Step Guide to Participate in Heater strip scrap Tenders

1. Eligibility & Prequalification

Before bidding, ensure compliance with:

  • Financial turnover requirements (30–50% of tender value)
  • Past experience (2–3 similar projects)
  • Valid solvency certificate

2. Mandatory Documentation Checklist

Prepare the following to avoid disqualification:

  • Digital Signature Certificate (Class 3 DSC)
  • GST, PAN, MSME/Udyam registration
  • EMD (Earnest Money Deposit) or exemption proof
  • Technical bid with execution methodology

3. BOQ Analysis & Financial Bidding

The BOQ (Bill of Quantities) is the most critical component:

  • Analyze item-wise pricing
  • Ensure competitive yet sustainable quotes
  • Avoid underbidding risks (L1 pressure)

✔ Expert analysis can significantly improve your bid success ratio.


Why Tender18 is a Trusted Platform for Heater strip scrap Tenders

✔ Proven Expertise in Government Procurement

We combine industry knowledge with practical bidding experience.

✔ Verified & Reliable Data

All Heater strip scrap tenders are sourced from official portals and cross-checked for accuracy.

✔ Advanced Filtering Tools

Filter tenders by value, EMD, location, and category for precise targeting.

✔ Corrigendum & Update Tracking

Get instant alerts on deadline changes and specification updates.

✔ Historical Data Insights

Analyze past tender results to understand pricing trends and competition.

✔ End-to-End Bidding Support

From discovery to submission, including GeM onboarding and strategy.


Growth of Heater strip scrap Sector in 2026

With the Government of India focusing on digital procurement and infrastructure expansion, the Heater strip scrap sector has seen significant growth in e-tendering opportunities.

The rise of GeM-based procurement models like:

  • L1 Purchase
  • Direct Procurement
  • MSME-friendly policies

…has made it easier for startups and SMEs to participate and win contracts


Frequently Asked Questions (SEO Optimized)

How can I get daily Heater strip scrap tender alerts?

You can register on Tender18 and select your preferred category. You will receive daily email alerts with all new Heater strip scrap tenders.

Is EMD mandatory for all Heater strip scrap tenders?

No, MSME and Udyam-registered businesses may get exemptions. Always check the NIT for specific conditions.

What is the difference between a Heater strip scrap work tender and supply tender?

A supply tender involves delivering goods, while a work tender includes execution, labor, and project completion.

Can I access private Heater strip scrap tenders on Tender18?

Yes, we also track major private sector and EPC tenders along with government opportunities.


Get Expert Support for Heater strip scrap Tenders

Tender18 is more than a listing platform—we are your strategic partner in winning tenders.

Our services include:

  • Tender discovery & analysis
  • Documentation support
  • Bid strategy & submission
  • GeM registration & OEM onboarding

📞 Call / WhatsApp: +91 7069661818
🌐 Website: www.tender18.com

Due Date
T18 Ref No : 16909295
Location : nashik , maharashtra
LIVE TENDER
auction or scrap of lot no - 01 lot name - scrap mech ferrous ms part including ms scrap plates, product type - metal category - mixed metal scraps scrap mech. ferrous ms part including ms scrap plates,sheets,esp plates, erw pipes, basket sheets, bends, angles,cylinder, channels, rods, rollers, coils, chain, m.s.tanks, m.s.valve,gear wheel pcs, housing, coupling, hub, nozzles, m.s. grills,springs, engine parts,scrap of hard c.i. pipes , bends, nozzle withceramic lining & scrap boiler tubes and coils etc remark:- cutting will be allowed for easy loading from shown location.delivery of scrap material will be started from location (a):-infront of major stores gate. after completion of (a), then location(b):- near shed no 10 of stage i msa custody & location c& d:- | lot no - 02 lot name - scrap conveyor belt more than 2 meters product type - miscellaneous category - rubber scrap conveyor belt more than 2 meters remark:- as is where is basis. location:- stage i custody open yard | lot no - 03 lot name - scrap conveyor belt pieces, rubber pieces product type - miscellaneous category - rubber scrap conveyor belt pieces, rubber pieces etc. (approx wt = 8.910mt) remark:- 1. as is where is basis. location:- stage i custody open yard 2.delivery will be on a lot basis only. | lot no - 04 lot name - aluminium strips, aluminium pieces product type - metal category - aluminium aluminium strips, aluminium pieces, lamp fixures with m.sattached, alluminium cable scrap etc. remark:- as is where is basis. cutting/peeling/ burning is not allowed. location (a) :- shed no 05 of stage-i msa custody location (b) :- open yard of stage-i msa custody | lot no - 05 lot name - scrap of stainless steel buckets,plates product type - metal category - mixed metal scraps scrap of stainless steel buckets,plates, oil gun hose pipes, espelectrodes etc. remark:- as is where is basis. location:- stage i custody open yard | lot no - 06 lot name - empty m s barrels product type - container category - barrel/drum sub category - ms barrel/drum empty m.s. barrels remark:- as is where is basis. location:- behind scrap oil shed | lot no - 07 lot name - scrap of batteries of various capacity product type - electrical items category - battery pcb group - used batteries/lead acid batteries/lead acid cells & lead scrap scrap of batteries of various capacity (approx wt = 1.730 mt) remark:- 1.as is where is basis. cpcb/spcb consent is required. location:- shed no 06 of stage-i msa custody. 2.delivery will be on a lot basis only. | lot no - 08 lot name - ferrous scrap of coal mill grinding rolls product type - miscellaneous category - miscellaneous items ferrous scrap of coal mill grinding rolls of different sizes(qty. 57 nos. having approx wt = 27.850 mt) remark:- as is where is basis. cutting & hammering is not allowed location:- stage i custody open yard | lot no - 09 lot name - electrical mix scrap like contactor product type - electrical items category - others - electrical mix scrap like contactor electrical mix scrap like contactor, fan parts,connector, fan motor,fan blades, relays, wooden/plastic switchboards ,heater coils, falseceiling sheets,foils, fixures with attachment of glass lighting,ms/alumi num/glass attachment,switch gear panels, firefightingpumps, fridge,welding machines with ms attached scrap ofelectrical motors of various type, sizes and capacity etc. (totalapprox wt =16.500 mt) remark:- as is where is basis. cutting/peeling/ burning is not allowed. .location (a) :- shed no 05 of stage-i msa custody & location (b) :- shed no 06 of stage-i msa custody. | lot no - 10 lot name - scrap of e-waste of computer material product type - electronics items category - compters/peripherals pcb group - e- waste-rule 2022 scrap of e-waste of computer material like mouse, keyboards,various types of dot matrix/laser jet printers, scanners, cartiagesand toners, smps, ups, projector, crt tv, cd disks, projectorfilms etc. (approx wt = 4.240 mt) remark:- 1.as is where is basis. cpcb/spcb consent is required. location:- shed no 06 of stage-i msa custody. 2.delivery will be on a lot basis only. | lot no - 11 lot name - ferrous scrap of detoriated g i sheets, m s sheets, m s scrap product type - metal category - mixed metal scraps ferrous scrap of detoriated g.i. sheets, m.s. sheets, m.s. scrappieces, (approx wt. = 66.540 mt) remark:- 1.as is where is basis. location :- near shed no 10 of stage i msa custody 2.delivery will be on a lot basis only. | lot no - 12 lot name - bearing scrap product type - metal category - mixed metal scraps bearing scrap remark:- as is where is basis. location:- shed no 06 of stage-i msa custody | lot no - 13 lot name - scrap of empty plastic barrels product type - container category - barrel/drum sub category - plastic barrel/drum scrap of empty plastic barrels (capacity = 210 ltr) = 230 nos & scrap empty small plastic barrels (capacity =50 ltr) = 700 nos remark:- as is where is basis. location:- 1.as is where is basis. location (a) :- shed no 05 of stage-i msa custody & location (b) :- shed no 02 of stage-i msa custody 2.delivery will be on a lot basis only. | lot no - 14 lot name - scrap of bull ring segment product type - metal category - mixed metal scraps scrap of bull ring segment remark:- as is where is basis. location:- shed no 01 of stage-i msa custody | lot no - 15 lot name - scrap of tyres of various sizes product type - miscellaneous category - rubber scrap of tyres of various sizes of heavy & light vehiclesbig -05 nos ,medium - 12 nos & smal.-11 nos remark:- 1.as is where is basis. location:- oil shed of stage-i msa custody 2.delivery will be on a lot basis only. | lot no - 16 lot name - scrap of brass wheel product type - metal category - brass scrap of brass wheel (approx wt. = 2.100 mt) remark:- 1.as is where is basis. location:- shed no 05 of stage-i msa custody 2.delivery will be on a lot basis only. | lot no - 17 lot name - copper cable scrap product type - metal category - copper copper cable scrap remark:- 1.as is where is basis. location:- as is where is basis. location:- shed no 05 of stage-i msa custody | lot no - 18 lot name - scrap of polymar plastic rollers product type - miscellaneous category - plastic scrap of polymar plastic rollers with ms shaft and its pieces etc. remark:- as is where is basis. | lot no - 19 lot name - scrap of geyser tanks product type - metal category - mixed metal scraps scrap of geyser tanks in various sizes (approx wt.= 0.990 mt,qty = 80.000 nos) scrap of radiator, cooler with ms attached(approx wt.= 1.950 mt,) remark:- 1.as is where is basis location:- (a) shed no 06 of stage-i msa custody location:- (a) shed no 05 of stage-i msa custody 2.delivery will be on a lot basis only. | lot no - 20 lot name - scrap of air-heater baskets product type - electrical items category - others - scrap of air-heater baskets scrap of air- heater baskets (approx wt. = 10.000 mt) remark:- 1.as is where is basis. location:- stage i custody open yard 2.delivery will be on a lot basis only. | lot no - 21 lot name - railway m s scrap product type - metal category - mixed metal scraps railway m.s.scrap remark:- as is where is basis. location:- stage i custody open yard | lot no - 22 lot name - various type of used lub oil product type - petroleum products category - used/ waste oil pcb group - used spent/burnt oil/used lube oil/used engine oil lot of various type of used lub oil approximate 20000 ltr in 100nos. of barrels remark:- 1.as is where is basis. cpcb/spcb consent is required. location (a) :- scrap oil shed 2.delivery will be on a lot basis only.
T18 Ref No : 16978024
Source : GEM Tenders
LIVE TENDER
tender for evapouration fabrication work 1 , evapouration fabrication work 2 , evapouration fabrication work 3 , evapouration fabrication work 4 , evapouration fabrication work 5 , evapouration fabrication work 6 , evapouration fabrication work 7 , evapouration fabrication work 8 , evapouration fabrication work 9 , evapouration fabrication work 10 , evapouration fabrication work 11 , evapouration fabrication work 12 , evapouration fabrication work 13 , evapouration fabrication work 14 , evapouration fabrication work 15 , evapouration fabrication work 16 , evapouration fabrication work 17 , evapouration fabrication work 18 , evapouration fabrication work 19 , evapouration fabrication work 20 , evapouration fabrication work 21 , evapouration fabrication work 22 , evapouration fabrication work 23 , evapouration fabrication work 24 , evapouration fabrication work 25 , evapouration fabrication work 26 , evapouration fabrication work 27 , evapouration fabrication work 28 , evapouration fabrication work 29 , evapouration fabrication work 30 , evapouration fabrication work 31 , evapouration fabrication work 32 , evapouration fabrication work 33 , evapouration fabrication work 34 , evapouration fabrication work 35 , evapouration fabrication work 36 , evapouration fabrication work 37 , evapouration fabrication work 38 , evapouration fabrication work 39 , evapouration fabrication work 40 , evapouration fabrication work 41 , evapouration fabrication work 42 , evapouration fabrication work 43 , evapouration fabrication work 44 , evapouration fabrication work 45 , evapouration fabrication work 46 , evapouration fabrication work 47 , evapouration fabrication work 48 , evapouration fabrication work 49 , evapouration fabrication work 50 , evapouration fabrication work 51 , evapouration fabrication work 52 , evapouration fabrication work 53 , evapouration fabrication work 54 , evapouration fabrication work 55 , evapouration fabrication work 56 , evapouration fabrication work 57 , evapouration fabrication work 58 , evapouration fabrication work 59 , evapouration fabrication work 60 , evapouration fabrication work 61, evaporation house dismantling damaged pipelines at various locations, disposing of them in the scrap yard, and installing new pipelines (8inch), evaporation house dismantling damaged pipelines at various locations, disposing of them in the scrap yard, and installing new pipelines (6inch), evaporation house dismantling damaged pipelines at various locations, disposing of them in the scrap yard, and installing new pipelines (4inch), evaporation house dismantling damaged pipelines at various locations, disposing of them in the scrap yard, and installing new pipelines (2inch), evaporation house fabricating and installing bends at various locations (8inch), evaporation house fabricating and installing bends at various locations (6inch), evaporation house fabricating and installing bends at various locations (4inch), evaporation house fabricating and installing bends at various locations (3inch), evaporation house fabricating and installing bends at various locations (2inch), evaporation house fabricating and installing flanges at various locations (24inch), evaporation house fabricating and installing flanges at various locations (10inch), evaporation house fabricating and installing flanges at various locations (8inch), evaporation house fabricating and installing flanges at various locations (6inch), evaporation house fabricating and installing flanges at various locations (4inch), evaporation house fabricating and installing flanges at various locations (2inch), evaporation house fabricating and installing nipples at various locations (800 mm), evaporation house fabricating and installing nipples at various locations (10inch), evaporation house fabricating and installing nipples at various locations (8inch), evaporation house fabricating and installing nipples at various locations (6inch), evaporation house fabricating and installing nipples at various locations (4inch), evaporation house fabricating and installing nipples at various locations (3inch), evaporation house opening and closing valves at various locations (8inch), evaporation house opening and closing valves at various locations (6inch), evaporation house opening and closing valves at various locations (4inch), evaporation house opening and closing valves at various locations (3inch), evaporation house opening and closing valves at various locations (2inch), evaporation house fabricating and installing a tee (4inch), vapor cell/quad body remove old brass/s.s. tubes, weigh them, place them in the store/specified location, fit and expand the tubes, and carry out a satisfactory hydraulic test at 75 to 100 psi (tube size 42 x 45 x 2010 mm)., vapor cell/quad body fit new brass/s.s. tubes, expand them, and carry out a satisfactory hydraulic test at 75to100 psi (tube size 42 x 45 x 2010 mm)., hydraulically test of various bodies and give satisfactory trial at 75 to 100 p.s.i., juice heater remove the installed 400 mm diameter valve and fabricate approximately 5 meters of 400 mm diameter pipeline from a 10 mm plate, installation it with the valve in the calandria, and carry out a satisfactory trial., juice weighing (round tank) cut out and remove the damaged shell, dispose of it in the scrap yard, fabricate a new shell from an 8/10 mm thick plate, installation it, reconnect all related connections, and carry out a leak-proof trial. (height 1.35 m, diameter 2.66 m, channel size 200 mm), raw juice pump cut out and remove the damaged 14inch header, fabricate and installation a new header, reconnect all related connections, and carry out a leak-proof trial., raw juice receiving tank cut out and remove the damaged shell, dispose of it in the scrap yard, fabricate a new shell from an 8/10 mm thick plate, installation it, and carry out a leak-proof trial. diameter 3.5 m x height 3.0 m., vapor cell 950 sq. m and old quad body no. 4 remove damaged sections of the sidewall and umbrella, fabricate and installation new parts, and conduct a trial. approx. 2 m (size 2 x 2.0 m)., new quad bodies no. 1 and 2 remove damaged sections of the sidewall and umbrella, fabricate and installation new parts, and conduct a trial. approx. 2 m (size 1 x 1.5 m)., fabricate an m.s. bed for the syrup pump and motor, complete fitting and alignment, and carry out a satisfactory trial. 25hp, old set vertical line juice heater and quad body no. 4 dismantle the damaged condensate bottle, dispose of it in the scrap yard, fabricate a new one from an 8/10 mm plate, complete all connections, and carry out a satisfactory vacuum trial., dismantle the 800 mm diameter exhaust pipeline below the turbine, including nipple, bend, and flange, and dispose of it in the scrap yard., fabricate a new 800 mm diameter exhaust pipeline below the turbine from a 10/12 mm plate, installation it in position, and carry out a satisfactory trial., dismantle 800 mm diameter exhaust pipeline below the vapor cell 950 sq. m , dispose of in scrap yard, fabricate and installation an 800 mm diameter exhaust pipeline below the vapor cell 950 sq. m using a 12 mm plate, and carry out a satisfactory trial., fabricate and installation an 800 mm diameter tee for the exhaust pipeline below the vapor cell 950 sq. m using a 12 mm plate, and carry out a satisfactory trial., fabricate and installation an 800 mm diameter dummy/flange for the exhaust pipeline from a 12 mm plate and carry out a satisfactory trial., semikestner 1000 sq. m dismantle the damaged portion of the vapor saucer, dispose of the scrap in the scrap yard, fabricate a replacement from a 12 mm thick plate, reconnect all related connections, and carry out a satisfactory trial. size diameter 3.4 m., old quad bodies no. 2 and 3 dismantle the damaged portion of the 20inch vapor pipe, dispose of the scrap in the scrap yard. length 16 m., old quad bodies no. 2 and 3 20inch vapor pipe, fabricate and installation a replacement from an 8 mm thick plate, and carry out a satisfactory trial. length 16 m., dismantlling the 32inch size valve of the vapor pipe of the 1000 sq. m. vapor cell., erection 32inch size valve of the vapor pipe of the 1000 sq. m. vapor cell., juice heater header remove all partition plates by cutting, thoroughly clean the tube plate, fabricate and installation new circular and straight partition plates from a 10/12 mm plate, prepare the header as before using m.s. strips, fit rubber strips, and carry out a satisfactory trial., semi kestner 800 sq. m cut out and remove the damaged portion of the steam jacket, dispose of it in the scrap yard, fabricate a replacement from an 8 mm plate, installation it in position, and carry out a satisfactory trial., new quad set dismantle the 800 mm vapor pipe. approx. 34 m., new quad set 800 mm vapor pipe, fabricate a replacement from a new 8/10 mm plate, installation it in position, and carry out a satisfactory trial. approx. 34 m., new quad no. 2 dismantle the 600 mm vapor pipeline. length 10 m., new quad no. 2 600 mm vapor pipeline and fabricate and installation a replacement from an 8/10 mm thick plate. length 10 m., juice heater dismantle the incoming and outgoing boxes, heater shell, and partition plate between the double-beat valve and the heater header, fabricate new components from a 12/10 mm plate as before, installation them, and carry out a satisfactory trial., new quad body no. 4 dismantle the damaged external catcher/vapor body section and corroded angle channel, dispose of the scrap in the scrap yard, fabricate a new catcher from a 10 mm thick plate, installation it in position, complete all connections, and carry out a satisfactory trial. diameter 1.6 m, length 6.2 m., etp house dismantling damaged pipelines at various locations, disposing of them in the scrap yard, and installing new pipelines (6inch), etp house fabricating and installing bends at various locations (4inch), aeration tank dismantle the installed diffuser, dispose of it in the scrap yard, and replace the damaged portion., sulphate removal plant reaction chamber dismantle the damaged 6 mm partition plate, dispose of it in the scrap yard, and fabricate and installation a new partition plate from an 8 mm plate.
T18 Ref No : 16978466
Location : nashik , maharashtra
LIVE TENDER
auction or scrap of e-auction sale of scrap material scrap mech. ferrous ms part including ms scrap plates, sheets,esp plates, erw pipes, basket sheets, bends, angles, cylinder, channels, rods, rollers, coils, chain, m.s.tanks, m.s.valve, gear wheel pcs, housing, coupling, hub, nozzles, m.s. grills, springs, engine parts,scrap of hard c.i. pipes , bends, nozzle with ceramic lining & scrap boiler tubes and coils etc, scrap conveyor belt more than 2 meters, scrap conveyor belt pieces, rubber pieces etc. (approx wt = 8.910 mt), aluminium strips, aluminium pieces, lamp fixures with m.s attached, alluminium cable scrap etc, scrap of stainless steel buckets,plates, oil gun hose pipes, esp electrodes etc, empty m.s. barrels, scrap of batteries of various capacity (approx wt = 1.730 mt), ferrous scrap of coal mill grinding rolls of different sizes (qty. 57 nos. having approx wt = 27.850 mt) , electrical mix scrap like contactor, fan parts,connector, fan motor, fan blades, relays, wooden/plastic switchboards ,heater coils, false ceiling sheets,foils, fixures with attachment of glass lighting, ms/aluminum/glass attachment,switchgear panels, firefighting pumps,fridge,welding machines with ms attached scrap of electrical motors of various type, sizes and capacity etc. (total approx wt =16.500 mt), scrap of e-waste of computer material like mouse, keyboards, various types of dot matrix/laser jet printers, scanners, cartiages and toners, smps, ups, projector, crt tv, cd disks, projector films etc. (approx wt = 4.240 mt), ferrous scrap of detoriated g.i. sheets, m.s. sheets, m.s. scrap pieces, (approx wt. = 66.540 mt), bearing scrap, scrap of empty plastic barrels (capacity = 210 ltr) = 230 nos & scrap empty small plastic barrels (capacity =50 ltr) = 700 nos, scrap of bull ring segment, scrap of tyres of various sizes of heavy & light vehicles big -05 nos ,medium - 12 nos & smal.-11 nos, scrap of brass wheel (approx wt. = 2.100 mt), copper cable scrap, scrap of polymar plastic rollers with ms shaft and its pieces etc, scrap of geyser tanks in various sizes (approx wt.= 0.990 mt, qty = 80.000 nos) scrap of radiator, cooler with ms attached (approx wt.= 1.950 mt,) , scrap of air-heater baskets (approx wt. = 10.000 mt), railway m.s.scrap, lot of various type of used lub oil approximate 20000 ltr in 100 nos. of barrels at nashik thermal power station

Unlock Full Tender Access

Start Free Trial to download documents before deadline

T18 Ref No : 16978470
Location : nashik , maharashtra
LIVE TENDER
auction or scrap of e-auction sale of scrap material scrap mech. ferrous ms part including ms scrap plates, sheets,esp plates, erw pipes, basket sheets, bends, angles, cylinder, channels, rods, rollers, coils, chain, m.s.tanks, m.s.valve, gear wheel pcs, housing, coupling, hub, nozzles, m.s. grills, springs, engine parts,scrap of hard c.i. pipes , bends, nozzle with ceramic lining & scrap boiler tubes and coils etc, scrap conveyor belt more than 2 meters , scrap conveyor belt pieces, rubber pieces etc. (approx wt = 8.910 mt) , aluminium strips, aluminium pieces, lamp fixures with m.s attached, alluminium cable scrap etc., scrap of stainless steel buckets,plates, oil gun hose pipes, esp electrodes etc., empty m.s. barrels, scrap of batteries of various capacity (approx wt = 1.730 mt), ferrous scrap of coal mill grinding rolls of different sizes (qty. 57 nos. having approx wt = 27.850 mt), electrical mix scrap like contactor, fan parts,connector, fan motor, fan blades, relays, wooden/plastic switchboards ,heater coils, false ceiling sheets,foils, fixures with attachment of glass lighting, ms/aluminum/glass attachment,switchgear panels, firefighting pumps,fridge,welding machines with ms attached scrap of electrical motors of various type, sizes and capacity etc. (total approx wt =16.500 mt), scrap of e-waste of computer material like mouse, keyboards, various types of dot matrix/laser jet printers, scanners, cartridges and toners, smps, ups, projector, crt tv, cd disks, projector films etc. (approx wt. = 4.240 mt), ferrous scrap of deteriorated g.i. sheets, m.s. sheets, m.s. scrap pieces (approx wt. = 66.540 mt), bearing scrap, scrap of empty plastic barrels (capacity = 210 ltr) = 230 nos & scrap empty small plastic barrels (capacity = 50 ltr) = 700 nos, scrap of bull ring segment, scrap of tyres of various sizes of heavy & light vehicles big - 05 nos, medium - 12 nos & small - 11 nos, scrap of brass wheel (approx wt. = 2.100 mt), copper cable scrap, scrap of polymer plastic rollers with ms shaft and its pieces etc., scrap of geyser tanks in various sizes (approx wt. = 0.990 mt, qty = 80.000 nos), scrap of radiator, cooler with ms attached (approx wt. = 1.950 mt), scrap of air-heater baskets (approx wt. = 10.000 mt), railway m.s. scrap, lot of various type of used lub oil approximate 20000 ltr in 100 nos. of barrels. at nashik thermal power station.
T18 Ref No : 16239051
Source : GEM Tenders
corrigendum tender for fabrication repairing the condensate tank pump delivery line of the pan 1 , repairing the condensate tank pump delivery line of the pan 2 , repairing the condensate tank pump delivery line of the pan 3 , replacing damaged bypass line band flange of melter 1 , replacing damaged bypass line band flange of melter 2 , replacing damaged bypass line band flange of melter 3 , replace damaged 100 pound 3inch size pipeline from pan no 1 to pan no 6 and give satisfactory trial , replace the weak vapor pipe from pan no 1 to 6 size dia 1 150 m length 30 m 1 , replace the weak vapor pipe from pan no 1 to 6 size dia 1 150 m length 30 m 2 , replace main hole dia 600 mm of pan no 3 sevual with 10 mm thick plate , replace damaged overflow pipeline of bh and cl molasses conditioner of 6inch size 1 , replace damaged overflow pipeline of bh and cl molasses conditioner of 6inch size 2 , replace corroded nipples pipes flanges of 6inch size header on pan no 5 and 6 installation related nipples valves etc and give satisfactory trial , replace damaged ammonia pipeline flange nipple in pan no 4 and 6 1 , replace damaged ammonia pipeline flange nipple in pan no 4 and 6 2 , replace damaged ammonia pipeline flange nipple in pan no 4 and 6 3 , replace damaged ammonia pipeline flange nipple in pan no 4 and 6 4 , replace damaged ammonia pipeline flange nipple in pan no 4 and 6 5 , cut and remove damaged wash-out line installed on the pan and rebuild with supplied pipe and installation it 1 , cut and remove damaged wash-out line installed on the pan and rebuild with supplied pipe and installation it 2 , replace damaged washing pipeline nipple flange band on pan no 6 1 , replace damaged washing pipeline nipple flange band on pan no 6 2 , replace damaged washing pipeline nipple flange band on pan no 6 3 , replace damaged washing pipeline nipple flange band on pan no 6 4 , installation valve in steam line at pan no 2 550 mm 1 , installation valve in steam line at pan no 2 550 mm 2 , installation valve in steam line at pan no 2 550 mm 3 , installation valve in steam line at pan no 2 550 mm 4 , replace nipple and band of a heavy tank 2 , replace nipple and band of a heavy tank 3 , replace nipple and band of a heavy tank 4 , remove clean and reinstall 4inch size syrup line on pan , cut and remove syrup header and fabricate and installation new header , replacing the 6inch size glycol washing line fitted on pan no 1 , replacing nipples of different lines of pan no 6 1 , replacing nipples of different lines of pan no 6 2 , replacing nipples of different lines of pan no 6 3 , replacing nipples of different lines of pan no 6 4 , replacing 10inch size nipples of cut off line of pan no 6 1 , replacing 10inch size nipples of cut off line of pan no 6 2 , replacing 10inch size nipples of cut off line of pan no 6 3 , replacing 10inch size nipples of cut off line of pan no 6 4 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 1 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 2 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 3 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 4 , fabricating m s bed for syrup pump and motor fitting and alignment followed by satisfactory trial , dismantling weak condensate bottle of old set , replacing weak pipeline flange valve and band of old set vertical juice heater 1 , replacing weak pipeline flange valve and band of old set vertical juice heater 2 , replacing weak pipeline flange valve and band of old set vertical juice heater 3 , replacing weak pipeline flange valve and band of old set vertical juice heater 4 , replacing weak pipeline flange valve and band of old set vertical juice heater 5 , replacing weak pipeline of old quad set no 4 1 , replacing weak pipeline of old quad set no 4 2 , replacing weak pipeline of old quad set no 4 3 , replacing weak pipeline of old quad set no 4 4 , replacing weak pipeline of old quad set no 4 5 , dismantling damaged mesh of section pipe located at injection no 2 and 3 and making a new one from given m s plate and fitting it , cutting and discarding old damaged reducer plate of section pipe located at injection no 2 and 3 and remaking the same , fitting water line from overhead to service tank 1 , fitting water line from overhead to service tank 2 , details of work of canti machine no 6 and 7 1 , details of work of canti machine no 6 and 7 2 , details of work of canti machine no 6 and 7 3 , details of work with new pipes from s sugarbin 1 , details of work with new pipes from s sugarbin 2 , details of work with new pipes from s sugarbin 3 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 1 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 2 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 3 , work on hot water line of brown sugar magma 1 , work on hot water line of brown sugar magma 2 , work on hot water line of brown sugar magma 3 , work on hot water line of brown sugar magma 4 , cutting and removing damaged monitor casing and ribs , cutting and removing damaged center shaft and arms inside kcp machines no 1 and 2 bending and fitting new parts with 8 to 10 mm plate , dismantling damaged upper cover part of canty machine no 6 and 7 scrapping fabricating and fitting new cover with 12 mm plate and making all related connections , dismantling damaged part of molasses weighing scale receiving tank and fabricating and fitting new part by bending 8 mm thick, fabrication, fabricate and installation 6inch size nipple, fabricate and installation 6inch size flange, dismantling 6inch size pipeline, installing 6inch size pipeline and giving satisfactory trial, fabricate and installation 6inch size band, replace damaged 100 pound 3inch size pipeline from pan no 1 to pan no 6 and give satisfactory trial, dismantle the weak vapor pipe from pan no 1 to 6, fabricate the weak vapor pipe from pan no 1 to 6, replace main hole dia 600 mm of pan no 3 sevual with 10 mm thick plate, replace damaged overflow pipeline of bh and cl molasses conditioner of 6inch size, replace corroded nipples pipes flanges of 6inch size header on pan no 5 and 6 installation related nipples valves etc and give satisfactory trial, replace 2inch size pipeline, fabricate and installation 2inch size flange, fabricate and installation 2inch size nipple, fabricate and installation 3inch size flange, fabricate and installation 3inch size valve, replace and installation 6inch size pipeline, replace 6inch size pipeline of the above, installation valve in steam line at pan no 2 550 mm, installation flange in steam line at pan no 2 550 mm, installation nipple in steam line at pan no 2 550 mm, fabricate and installation catcher element size 75 x 75 x 8 angle on pan no 4 and 5, replace nipples of the above tank, replace bands of the above tank, replace partition of syrup tank with 10/12 mm thick plate, remove clean and reinstall 4inch size syrup line on pan, cut and remove syrup header and fabricate and installation new header, replacing the 6inch size glycol washing line fitted on pan no 1, replacing nipples of 2inch size line mentioned above, replacing nipples of 4inch size line mentioned above, replacing nipples of 6inch size line mentioned above, replacing nipples of 8inch size line mentioned above, replacing 10inch size nipples of cut off line of pan no 6, replacing 10inch size pipe line, making and fitting 10inch size flange, making and fitting 10inch size band, making and fitting 8inch size band, replacing 4inch size pipe line, making and fitting 4inch size flange, making and fitting 4inch size valve, fabricating m s bed for syrup pump and motor fitting and alignment followed by satisfactory trial, dismantling weak condensate bottle of old set vertical line juice heater and quad body no 4 disposing to scrap yard fabricating all connections using 8/10 mm plates and giving satisfactory vacuum trial, replacing 2inch size pipeline, replacing 6inch size pipeline, making and fitting 2inch size flange, making and fitting 6inch size flange, making and fitting 6inch size band, making and fitting 6inch size valve, dismantling damaged mesh of section pipe located at injection no 2 and 3 and making a new one from given m s plate and fitting it, cutting and discarding old damaged reducer plate of section pipe located at injection no 2 and 3 and remaking the same, fitting mentioned line into service tank, making and fitting 8inch size nipple, dismantling and fitting 6inch size pipeline, dismantling resistance box installed on spray making and fitting new one from given m m plate carrying out proper stay fitting and welding and conducting leak proof trial, dismantling and installing 8inch size pipeline, fabricating and installing 8inch size bands, fabricating and installing 8inch size flanges, dismantling and installing 12inch size pipeline, fabricating and installing 12inch size bands, fabricating and installing 12inch size flanges, dismantling and installing 3inch size pipeline, manufacturing and installing 3inch size nipples, manufacturing and installing 3inch size bands, cutting and removing damaged monitor casing and ribs inside canty no 1 and 2 and kcp machine 1 and 2 patching with 10/12 mm ms plate and giving satisfactory trial 1, cutting and removing damaged center shaft and arms inside kcp machines no 1 and 2 bending and fitting new parts with 8 to 10 mm plate 1, dismantling damaged upper cover part of canty machine no 6 and 7 scrapping fabricating and fitting new cover with 12 mm plate and making all related connections, dismantling damaged part of molasses weighing scale receiving tank and fabricating and fitting new part by bending 8 mm thick plate and depositing scrap in scrap yard, dismantling damaged plate of sugar discharge chute from sugar elevator to sugar grader and fabricating and fitting new plate of 6 mm thickness depositing scrap in scrap yard, modifying sugar chute of grader in dryer house and giving satisfactory trial, dismantling and installing 4inch size pipeline, fabricating and installing 4inch size flanges, manufacturing and installing 4inch size bands, manufacturing and installing 4inch size nipples, removing transit heater installed on c centrifugal machine opening side plate for cleaning and hydraulic servicing reinstalling in place and making all connections, dismantling and installing 2inch size pipeline, fabricating and installing 2inch size flanges, manufacturing and installing 2inch size nipples, manufacturing and installing 2inch size valves, removing old taper of sugar hopper no 1 scrapping it fabricating new one from 3/5 mm ms plate installing and giving satisfactory trial, dismantling and installing 6inch size pipeline, manufacturing and installing 6inch size bands, manufacturing and installing 6inch size flanges, manufacturing and installing 5inch size flanges, manufacturing and installing 5inch size valves, removing damaged/weak top and bottom sugar discharge chute of canty machine no 4 including flange scrapping fabricating new parts with 6 mm ms plate as per suit sample preparing all connections like angle channel etc fitting on side and giving satisfactory trial, installing 2inch flow meter, dismantling the damaged 6inch dia pipeline from primary clarifier to anoxic tank and putting it in scrap yard and installing a new pipeline, installing 4inch size valve/nrv, fabricating 4inch size band, fabricating and installing 2inch size flange, dismantling the damaged 8inch dia pipeline from aeration tank to secondary tank and putting it in scrap yard, dismantling diffusers installed in aeration tank and putting them in scrap yard and replacing the throat part, in sulfate removal plant reaction chamber dismantling corroded 6 mm partition plate putting it in scrap yard and fabricating with new 8 mm plate, dismantling corroded 2inch size treated water outlet line of etp and putting in scrap yard and installing new 3inch size line at the same location, dismantling 800 mm dia exhaust pipe line below turbine with nipple band flange and putting in scrap yard, fabricating 800 mm dia exhaust pipeline below turbine from 12 mm plate by bending and installing at position and providing satisfactory trial, fabricating 800 mm dia exhaust pipeline below vapor cell 950 wag meter from 12 mm plate by bending and installing at position and providing satisfactory trial, fabricating 800 mm dia exhaust pipeline below vapor cell 950 wag meter from 12 mm plate by bending into t shape and installing at position and providing satisfactory trial, fabricating 800 mm dia exhaust pipeline dummy/flange from 12 mm plate by bending and installing at position and providing satisfactory trial, dismantling weak part of semichemiser 1000 wag meter warm saser putting scrap in scrap yard fabricating from 12 mm thick plate by bending and installing with related connections and giving satisfactory trial size dia 3 4 m, dismantling weak parts of old quad body no 2 and 3 20inch vapor pipe putting scrap in scrap yard fabricating from 8 mm thick plate by bending and installing and providing satisfactory trial, dismantling weak parts of vapor pipe 32inch size of vapor cell 1000 wag meter putting scrap in scrap yard fabricating from 8 mm thick plate by bending and installing and providing satisfactory trial, dismantling weak part of 6inch size header of all juice heaters condensate and installing new one, removing all partition plates of juice heater header by cutting straight and circular shapes cleaning tube plate completely and fabricating new circular and straight partition plates from 10/12 mm plate installing and preparing header with ms strips as before applying rubber strips and providing satisfactory trial, cutting out quailons and all related angles fixed in clarifier compartments and refitting after completion of work and providing satisfactory trial, patching inside clarifier with 6/8 mm ms plate, dismantling damaged 8inch size ms pipeline from clarifier clear juice overflow tank to sombox, installing 6inch size ms pipeline from clarifier compartments no 2 and 3 to mud tank and providing satisfactory trial, opening 6inch size valve and installing at designated location, fabricating 6inch size nipple and installing at designated location, fabricating 6inch size flange by cutting plate and dismantling to fit, dismantling 4inch size air pipeline above door including nipple band flange and putting scrap in scrap yard, installing 4inch size air pipeline above door and providing satisfactory trial, dismantling 6inch size ms pipeline of big vacuum filter mud tank overflow line and putting scrap in scrap yard, fitting and trial of 6inch size ms pipeline overflow line of big vacuum filter mud tank at position, fabricating 6inch size band, fabricating 8inch size band, dismantling 8inch size pipeline from big vacuum filter pump to condenser and putting scrap in scrap yard, fitting and trial of 8inch size pipeline from big vacuum filter pump to condenser at position, dismantling 4inch ms pipeline from filter juice header to vibro screen, fitting and trial of 4inch ms pipeline from filter juice header to vibro screen at position, making 4inch size nipple, opening 4inch size valve, installing 4inch size valve at the specified location, cutting 4inch size flange from plate making it and fitting after drilling, dismantling 3inch size pipeline, installing and fitting 3inch size line at position and giving satisfactory trial, making and installing 3inch size t, making and installing 3inch size nipple, cutting 3inch size flange from plate making it and installing, making and installing 3inch size band, dismantling 8inch size clear juice overflow pipeline, installing and fitting 8inch size clear juice overflow pipeline at position and giving satisfactory trial, installing and fitting 6inch size pipeline at position and giving satisfactory trial, making and installing 6inch size band/elbow at specified location, making and installing 6inch size t, dismantling 4inch size pipeline, installing and fitting 4inch size pipeline at position and giving satisfactory trial, making and installing 4inch size band, making and installing 4inch size t, dismantling 10inch size pipeline, installing fitting and trial of 10inch size pipeline at position, making and installing 10inch size t, making and installing 10inch size dummy/flange, dismantling 6inch pipeline, installing fitting and trial of 6inch size pipeline at position, opening and binding 6inch size valve, installing fitting and trial of 4inch size pipeline at position, making and installing 8inch and 6inch size cross, dismantling 4inch size ammonia pipeline of semichemiser quad, installing 4inch size ammonia pipeline of semichemiser quad at position, making 4inch size band, making 4inch size t, making 4inch size flange, dismantling 2inch size pipeline, fixing 2inch size pipeline in position, dismantling new quad no 2 vapor pipe 24inch size vapor pipeline fabricating it by bending with 10 mm thick plate and installing, fabricating and installing 24inch size bends, fabricating and installing 24inch size tees, fabricating and installing 24inch size flange/dummy, dismantling 24inch size pipeline, fitting 24inch size pipeline in position, fabricating and installing 24inch size flange, cutting damaged 6inch syrup pump header fabricating new header and installing along with fitting all related nipples valves etc and conducting satisfactory trial, dismantling bent incoming and outgoing wax and heater cell and partition plate between double beat valve of juice heater/ juice heater header fabricating new one using 12/10 mm plate as before installing and conducting satisfactory trial, dismantling 6inch condensate header of juice heaters and replacing the weak part, fitting 6inch size pipeline in position and conducting satisfactory trial, fabricating and installing 6inch size flange, fabricating and installing 6inch size nipple, fabricating and installing 6inch size tees, dismantling and fitting 6inch size pipeline in position and conducting satisfactory trial
T18 Ref No : 16022210
Source : GEM Tenders
tender for pan no 6 4 , installation valve in steam line at pan no 2 550 mm 1 , installation valve in steam line at pan no 2 550 mm 2 , installation valve in steam line at pan no 2 550 mm 3 , installation valve in steam line at pan no 2 550 mm 4 , replace nipple and band of a heavy tank 2 , replace nipple and band of a heavy tank 3 , replace nipple and band of a heavy tank 4 , remove clean and reinstall 4inch size syrup line on pan , cut and remove syrup header and fabricate and installation new header , replacing the 6inch size glycol washing line fitted on pan no 1 , replacing nipples of different lines of pan no 6 1 , replacing nipples of different lines of pan no 6 2 , replacing nipples of different lines of pan no 6 3 , replacing nipples of different lines of pan no 6 4 , replacing 10inch size nipples of cut off line of pan no 6 1 , replacing 10inch size nipples of cut off line of pan no 6 2 , replacing 10inch size nipples of cut off line of pan no 6 3 , replacing 10inch size nipples of cut off line of pan no 6 4 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 1 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 2 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 3 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 4 , fabricating m s bed for syrup pump and motor fitting and alignment followed by satisfactory trial , dismantling weak condensate bottle of old set , replacing weak pipeline flange valve and band of old set vertical juice heater 1 , replacing weak pipeline flange valve and band of old set vertical juice heater 2 , replacing weak pipeline flange valve and band of old set vertical juice heater 3 , replacing weak pipeline flange valve and band of old set vertical juice heater 4 , replacing weak pipeline flange valve and band of old set vertical juice heater 5 , replacing weak pipeline of old quad set no 4 1 , replacing weak pipeline of old quad set no 4 2 , replacing weak pipeline of old quad set no 4 3 , replacing weak pipeline of old quad set no 4 4 , replacing weak pipeline of old quad set no 4 5 , dismantling damaged mesh of section pipe located at injection no 2 and 3 and making a new one from given m s plate and fitting it , cutting and discarding old damaged reducer plate of section pipe located at injection no 2 and 3 and remaking the same , fitting water line from overhead to service tank 1 , fitting water line from overhead to service tank 2 , details of work of canti machine no 6 and 7 1 , details of work of canti machine no 6 and 7 2 , details of work of canti machine no 6 and 7 3 , details of work with new pipes from s sugarbin 1 , details of work with new pipes from s sugarbin 2 , details of work with new pipes from s sugarbin 3 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 1 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 2 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 3 , work on hot water line of brown sugar magma 1 , work on hot water line of brown sugar magma 2 , work on hot water line of brown sugar magma 3 , work on hot water line of brown sugar magma 4 , cutting and removing damaged monitor casing and ribs , cutting and removing damaged center shaft and arms inside kcp machines no 1 and 2 bending and fitting new parts with 8 to 10 mm plate , dismantling damaged upper cover part of canty machine no 6 and 7 scrapping fabricating and fitting new cover with 12 mm plate and making all related connections , dismantling damaged part of molasses weighing scale receiving tank and fabricating and fitting new part by bending 8 mm thick, fabrication, fabricate and installation 6inch size nipple, fabricate and installation 6inch size flange, dismantling 6inch size pipeline, installing 6inch size pipeline and giving satisfactory trial, fabricate and installation 6inch size band, replace damaged 100 pound 3inch size pipeline from pan no 1 to pan no 6 and give satisfactory trial, dismantle the weak vapor pipe from pan no 1 to 6, fabricate the weak vapor pipe from pan no 1 to 6, replace main hole dia 600 mm of pan no 3 sevual with 10 mm thick plate, replace damaged overflow pipeline of bh and cl molasses conditioner of 6inch size, replace corroded nipples pipes flanges of 6inch size header on pan no 5 and 6 installation related nipples valves etc and give satisfactory trial, replace 2inch size pipeline, fabricate and installation 2inch size flange, fabricate and installation 2inch size nipple, fabricate and installation 3inch size flange, fabricate and installation 3inch size valve, replace and installation 6inch size pipeline, replace 6inch size pipeline of the above, installation valve in steam line at pan no 2 550 mm, installation flange in steam line at pan no 2 550 mm, installation nipple in steam line at pan no 2 550 mm, fabricate and installation catcher element size 75 x 75 x 8 angle on pan no 4 and 5, replace nipples of the above tank, replace bands of the above tank, replace partition of syrup tank with 10/12 mm thick plate, remove clean and reinstall 4inch size syrup line on pan, cut and remove syrup header and fabricate and installation new header, replacing the 6inch size glycol washing line fitted on pan no 1, replacing nipples of 2inch size line mentioned above, replacing nipples of 4inch size line mentioned above, replacing nipples of 6inch size line mentioned above, replacing nipples of 8inch size line mentioned above, replacing 10inch size nipples of cut off line of pan no 6, replacing 10inch size pipe line, making and fitting 10inch size flange, making and fitting 10inch size band, making and fitting 8inch size band, replacing 4inch size pipe line, making and fitting 4inch size flange, making and fitting 4inch size valve, fabricating m s bed for syrup pump and motor fitting and alignment followed by satisfactory trial, dismantling weak condensate bottle of old set vertical line juice heater and quad body no 4 disposing to scrap yard fabricating all connections using 8/10 mm plates and giving satisfactory vacuum trial, replacing 2inch size pipeline, replacing 6inch size pipeline, making and fitting 2inch size flange, making and fitting 6inch size flange, making and fitting 6inch size band, making and fitting 6inch size valve, dismantling damaged mesh of section pipe located at injection no 2 and 3 and making a new one from given m s plate and fitting it, cutting and discarding old damaged reducer plate of section pipe located at injection no 2 and 3 and remaking the same, fitting mentioned line into service tank, making and fitting 8inch size nipple, dismantling and fitting 6inch size pipeline, dismantling resistance box installed on spray making and fitting new one from given m m plate carrying out proper stay fitting and welding and conducting leak proof trial, dismantling and installing 8inch size pipeline, fabricating and installing 8inch size bands, fabricating and installing 8inch size flanges, dismantling and installing 12inch size pipeline, fabricating and installing 12inch size bands, fabricating and installing 12inch size flanges, dismantling and installing 3inch size pipeline, manufacturing and installing 3inch size nipples, manufacturing and installing 3inch size bands, cutting and removing damaged monitor casing and ribs inside canty no 1 and 2 and kcp machine 1 and 2 patching with 10/12 mm ms plate and giving satisfactory trial 1, cutting and removing damaged center shaft and arms inside kcp machines no 1 and 2 bending and fitting new parts with 8 to 10 mm plate 1, dismantling damaged upper cover part of canty machine no 6 and 7 scrapping fabricating and fitting new cover with 12 mm plate and making all related connections, dismantling damaged part of molasses weighing scale receiving tank and fabricating and fitting new part by bending 8 mm thick plate and depositing scrap in scrap yard, dismantling damaged plate of sugar discharge chute from sugar elevator to sugar grader and fabricating and fitting new plate of 6 mm thickness depositing scrap in scrap yard, modifying sugar chute of grader in dryer house and giving satisfactory trial, dismantling and installing 4inch size pipeline, fabricating and installing 4inch size flanges, manufacturing and installing 4inch size bands, manufacturing and installing 4inch size nipples, removing transit heater installed on c centrifugal machine opening side plate for cleaning and hydraulic servicing reinstalling in place and making all connections, dismantling and installing 2inch size pipeline, fabricating and installing 2inch size flanges, manufacturing and installing 2inch size nipples, manufacturing and installing 2inch size valves, removing old taper of sugar hopper no 1 scrapping it fabricating new one from 3/5 mm ms plate installing and giving satisfactory trial, dismantling and installing 6inch size pipeline, manufacturing and installing 6inch size bands, manufacturing and installing 6inch size flanges, manufacturing and installing 5inch size flanges, manufacturing and installing 5inch size valves, removing damaged/weak top and bottom sugar discharge chute of canty machine no 4 including flange scrapping fabricating new parts with 6 mm ms plate as per suit sample preparing all connections like angle channel etc fitting on side and giving satisfactory trial, installing 2inch flow meter, dismantling the damaged 6inch dia pipeline from primary clarifier to anoxic tank and putting it in scrap yard and installing a new pipeline, installing 4inch size valve/nrv, fabricating 4inch size band, fabricating and installing 2inch size flange, dismantling the damaged 8inch dia pipeline from aeration tank to secondary tank and putting it in scrap yard, dismantling diffusers installed in aeration tank and putting them in scrap yard and replacing the throat part, in sulfate removal plant reaction chamber dismantling corroded 6 mm partition plate putting it in scrap yard and fabricating with new 8 mm plate, dismantling corroded 2inch size treated water outlet line of etp and putting in scrap yard and installing new 3inch size line at the same location, dismantling 800 mm dia exhaust pipe line below turbine with nipple band flange and putting in scrap yard, fabricating 800 mm dia exhaust pipeline below turbine from 12 mm plate by bending and installing at position and providing satisfactory trial, fabricating 800 mm dia exhaust pipeline below vapor cell 950 wag meter from 12 mm plate by bending and installing at position and providing satisfactory trial, fabricating 800 mm dia exhaust pipeline below vapor cell 950 wag meter from 12 mm plate by bending into t shape and installing at position and providing satisfactory trial, fabricating 800 mm dia exhaust pipeline dummy/flange from 12 mm plate by bending and installing at position and providing satisfactory trial, dismantling weak part of semichemiser 1000 wag meter warm saser putting scrap in scrap yard fabricating from 12 mm thick plate by bending and installing with related connections and giving satisfactory trial size dia 3 4 m, dismantling weak parts of old quad body no 2 and 3 20inch vapor pipe putting scrap in scrap yard fabricating from 8 mm thick plate by bending and installing and providing satisfactory trial, dismantling weak parts of vapor pipe 32inch size of vapor cell 1000 wag meter putting scrap in scrap yard fabricating from 8 mm thick plate by bending and installing and providing satisfactory trial, dismantling weak part of 6inch size header of all juice heaters condensate and installing new one, removing all partition plates of juice heater header by cutting straight and circular shapes cleaning tube plate completely and fabricating new circular and straight partition plates from 10/12 mm plate installing and preparing header with ms strips as before applying rubber strips and providing satisfactory trial, cutting out quailons and all related angles fixed in clarifier compartments and refitting after completion of work and providing satisfactory trial, patching inside clarifier with 6/8 mm ms plate, dismantling damaged 8inch size ms pipeline from clarifier clear juice overflow tank to sombox, installing 6inch size ms pipeline from clarifier compartments no 2 and 3 to mud tank and providing satisfactory trial, opening 6inch size valve and installing at designated location, fabricating 6inch size nipple and installing at designated location, fabricating 6inch size flange by cutting plate and dismantling to fit, dismantling 4inch size air pipeline above door including nipple band flange and putting scrap in scrap yard, installing 4inch size air pipeline above door and providing satisfactory trial, dismantling 6inch size ms pipeline of big vacuum filter mud tank overflow line and putting scrap in scrap yard, fitting and trial of 6inch size ms pipeline overflow line of big vacuum filter mud tank at position, fabricating 6inch size band, fabricating 8inch size band, dismantling 8inch size pipeline from big vacuum filter pump to condenser and putting scrap in scrap yard, fitting and trial of 8inch size pipeline from big vacuum filter pump to condenser at position, dismantling 4inch ms pipeline from filter juice header to vibro screen, fitting and trial of 4inch ms pipeline from filter juice header to vibro screen at position, making 4inch size nipple, opening 4inch size valve, installing 4inch size valve at the specified location, cutting 4inch size flange from plate making it and fitting after drilling, dismantling 3inch size pipeline, installing and fitting 3inch size line at position and giving satisfactory trial, making and installing 3inch size t, making and installing 3inch size nipple, cutting 3inch size flange from plate making it and installing, making and installing 3inch size band, dismantling 8inch size clear juice overflow pipeline, installing and fitting 8inch size clear juice overflow pipeline at position and giving satisfactory trial, installing and fitting 6inch size pipeline at position and giving satisfactory trial, making and installing 6inch size band/elbow at specified location, making and installing 6inch size t, dismantling 4inch size pipeline, installing and fitting 4inch size pipeline at position and giving satisfactory trial, making and installing 4inch size band, making and installing 4inch size t, dismantling 10inch size pipeline, installing fitting and trial of 10inch size pipeline at position, making and installing 10inch size t, making and installing 10inch size dummy/flange, dismantling 6inch pipeline, installing fitting and trial of 6inch size pipeline at position, opening and binding 6inch size valve, installing fitting and trial of 4inch size pipeline at position, making and installing 8inch and 6inch size cross, dismantling 4inch size ammonia pipeline of semichemiser quad, installing 4inch size ammonia pipeline of semichemiser quad at position, making 4inch size band, making 4inch size t, making 4inch size flange, dismantling 2inch size pipeline, fixing 2inch size pipeline in position, dismantling new quad no 2 vapor pipe 24inch size vapor pipeline fabricating it by bending with 10 mm thick plate and installing, fabricating and installing 24inch size bends, fabricating and installing 24inch size tees, fabricating and installing 24inch size flange/dummy, dismantling 24inch size pipeline, fitting 24inch size pipeline in position, fabricating and installing 24inch size flange, cutting damaged 6inch syrup pump header fabricating new header and installing along with fitting all related nipples valves etc and conducting satisfactory trial, dismantling bent incoming and outgoing wax and heater cell and partition plate between double beat valve of juice heater/ juice heater header fabricating new one using 12/10 mm plate as before installing and conducting satisfactory trial, dismantling 6inch condensate header of juice heaters and replacing the weak part, fitting 6inch size pipeline in position and conducting satisfactory trial, fabricating and installing 6inch size flange, fabricating and installing 6inch size nipple, fabricating and installing 6inch size tees, dismantling and fitting 6inch size pipeline in position and conducting satisfactory trial

Unlock Full Tender Access

Start Free Trial to download documents before deadline

T18 Ref No : 16355769
Source : GEM Tenders
corrigendum tender for pan no 6 4 , installation valve in steam line at pan no 2 550 mm 1 , installation valve in steam line at pan no 2 550 mm 2 , installation valve in steam line at pan no 2 550 mm 3 , installation valve in steam line at pan no 2 550 mm 4 , replace nipple and band of a heavy tank 2 , replace nipple and band of a heavy tank 3 , replace nipple and band of a heavy tank 4 , remove clean and reinstall 4inch size syrup line on pan , cut and remove syrup header and fabricate and installation new header , replacing the 6inch size glycol washing line fitted on pan no 1 , replacing nipples of different lines of pan no 6 1 , replacing nipples of different lines of pan no 6 2 , replacing nipples of different lines of pan no 6 3 , replacing nipples of different lines of pan no 6 4 , replacing 10inch size nipples of cut off line of pan no 6 1 , replacing 10inch size nipples of cut off line of pan no 6 2 , replacing 10inch size nipples of cut off line of pan no 6 3 , replacing 10inch size nipples of cut off line of pan no 6 4 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 1 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 2 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 3 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 4 , fabricating m s bed for syrup pump and motor fitting and alignment followed by satisfactory trial , dismantling weak condensate bottle of old set , replacing weak pipeline flange valve and band of old set vertical juice heater 1 , replacing weak pipeline flange valve and band of old set vertical juice heater 2 , replacing weak pipeline flange valve and band of old set vertical juice heater 3 , replacing weak pipeline flange valve and band of old set vertical juice heater 4 , replacing weak pipeline flange valve and band of old set vertical juice heater 5 , replacing weak pipeline of old quad set no 4 1 , replacing weak pipeline of old quad set no 4 2 , replacing weak pipeline of old quad set no 4 3 , replacing weak pipeline of old quad set no 4 4 , replacing weak pipeline of old quad set no 4 5 , dismantling damaged mesh of section pipe located at injection no 2 and 3 and making a new one from given m s plate and fitting it , cutting and discarding old damaged reducer plate of section pipe located at injection no 2 and 3 and remaking the same , fitting water line from overhead to service tank 1 , fitting water line from overhead to service tank 2 , details of work of canti machine no 6 and 7 1 , details of work of canti machine no 6 and 7 2 , details of work of canti machine no 6 and 7 3 , details of work with new pipes from s sugarbin 1 , details of work with new pipes from s sugarbin 2 , details of work with new pipes from s sugarbin 3 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 1 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 2 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 3 , work on hot water line of brown sugar magma 1 , work on hot water line of brown sugar magma 2 , work on hot water line of brown sugar magma 3 , work on hot water line of brown sugar magma 4 , cutting and removing damaged monitor casing and ribs , cutting and removing damaged center shaft and arms inside kcp machines no 1 and 2 bending and fitting new parts with 8 to 10 mm plate , dismantling damaged upper cover part of canty machine no 6 and 7 scrapping fabricating and fitting new cover with 12 mm plate and making all related connections , dismantling damaged part of molasses weighing scale receiving tank and fabricating and fitting new part by bending 8 mm thick, fabrication, fabricate and installation 6inch size nipple, fabricate and installation 6inch size flange, dismantling 6inch size pipeline, installing 6inch size pipeline and giving satisfactory trial, fabricate and installation 6inch size band, replace damaged 100 pound 3inch size pipeline from pan no 1 to pan no 6 and give satisfactory trial, dismantle the weak vapor pipe from pan no 1 to 6, fabricate the weak vapor pipe from pan no 1 to 6, replace main hole dia 600 mm of pan no 3 sevual with 10 mm thick plate, replace damaged overflow pipeline of bh and cl molasses conditioner of 6inch size, replace corroded nipples pipes flanges of 6inch size header on pan no 5 and 6 installation related nipples valves etc and give satisfactory trial, replace 2inch size pipeline, fabricate and installation 2inch size flange, fabricate and installation 2inch size nipple, fabricate and installation 3inch size flange, fabricate and installation 3inch size valve, replace and installation 6inch size pipeline, replace 6inch size pipeline of the above, installation valve in steam line at pan no 2 550 mm, installation flange in steam line at pan no 2 550 mm, installation nipple in steam line at pan no 2 550 mm, fabricate and installation catcher element size 75 x 75 x 8 angle on pan no 4 and 5, replace nipples of the above tank, replace bands of the above tank, replace partition of syrup tank with 10/12 mm thick plate, remove clean and reinstall 4inch size syrup line on pan, cut and remove syrup header and fabricate and installation new header, replacing the 6inch size glycol washing line fitted on pan no 1, replacing nipples of 2inch size line mentioned above, replacing nipples of 4inch size line mentioned above, replacing nipples of 6inch size line mentioned above, replacing nipples of 8inch size line mentioned above, replacing 10inch size nipples of cut off line of pan no 6, replacing 10inch size pipe line, making and fitting 10inch size flange, making and fitting 10inch size band, making and fitting 8inch size band, replacing 4inch size pipe line, making and fitting 4inch size flange, making and fitting 4inch size valve, fabricating m s bed for syrup pump and motor fitting and alignment followed by satisfactory trial, dismantling weak condensate bottle of old set vertical line juice heater and quad body no 4 disposing to scrap yard fabricating all connections using 8/10 mm plates and giving satisfactory vacuum trial, replacing 2inch size pipeline, replacing 6inch size pipeline, making and fitting 2inch size flange, making and fitting 6inch size flange, making and fitting 6inch size band, making and fitting 6inch size valve, dismantling damaged mesh of section pipe located at injection no 2 and 3 and making a new one from given m s plate and fitting it, cutting and discarding old damaged reducer plate of section pipe located at injection no 2 and 3 and remaking the same, fitting mentioned line into service tank, making and fitting 8inch size nipple, dismantling and fitting 6inch size pipeline, dismantling resistance box installed on spray making and fitting new one from given m m plate carrying out proper stay fitting and welding and conducting leak proof trial, dismantling and installing 8inch size pipeline, fabricating and installing 8inch size bands, fabricating and installing 8inch size flanges, dismantling and installing 12inch size pipeline, fabricating and installing 12inch size bands, fabricating and installing 12inch size flanges, dismantling and installing 3inch size pipeline, manufacturing and installing 3inch size nipples, manufacturing and installing 3inch size bands, cutting and removing damaged monitor casing and ribs inside canty no 1 and 2 and kcp machine 1 and 2 patching with 10/12 mm ms plate and giving satisfactory trial 1, cutting and removing damaged center shaft and arms inside kcp machines no 1 and 2 bending and fitting new parts with 8 to 10 mm plate 1, dismantling damaged upper cover part of canty machine no 6 and 7 scrapping fabricating and fitting new cover with 12 mm plate and making all related connections, dismantling damaged part of molasses weighing scale receiving tank and fabricating and fitting new part by bending 8 mm thick plate and depositing scrap in scrap yard, dismantling damaged plate of sugar discharge chute from sugar elevator to sugar grader and fabricating and fitting new plate of 6 mm thickness depositing scrap in scrap yard, modifying sugar chute of grader in dryer house and giving satisfactory trial, dismantling and installing 4inch size pipeline, fabricating and installing 4inch size flanges, manufacturing and installing 4inch size bands, manufacturing and installing 4inch size nipples, removing transit heater installed on c centrifugal machine opening side plate for cleaning and hydraulic servicing reinstalling in place and making all connections, dismantling and installing 2inch size pipeline, fabricating and installing 2inch size flanges, manufacturing and installing 2inch size nipples, manufacturing and installing 2inch size valves, removing old taper of sugar hopper no 1 scrapping it fabricating new one from 3/5 mm ms plate installing and giving satisfactory trial, dismantling and installing 6inch size pipeline, manufacturing and installing 6inch size bands, manufacturing and installing 6inch size flanges, manufacturing and installing 5inch size flanges, manufacturing and installing 5inch size valves, removing damaged/weak top and bottom sugar discharge chute of canty machine no 4 including flange scrapping fabricating new parts with 6 mm ms plate as per suit sample preparing all connections like angle channel etc fitting on side and giving satisfactory trial, installing 2inch flow meter, dismantling the damaged 6inch dia pipeline from primary clarifier to anoxic tank and putting it in scrap yard and installing a new pipeline, installing 4inch size valve/nrv, fabricating 4inch size band, fabricating and installing 2inch size flange, dismantling the damaged 8inch dia pipeline from aeration tank to secondary tank and putting it in scrap yard, dismantling diffusers installed in aeration tank and putting them in scrap yard and replacing the throat part, in sulfate removal plant reaction chamber dismantling corroded 6 mm partition plate putting it in scrap yard and fabricating with new 8 mm plate, dismantling corroded 2inch size treated water outlet line of etp and putting in scrap yard and installing new 3inch size line at the same location, dismantling 800 mm dia exhaust pipe line below turbine with nipple band flange and putting in scrap yard, fabricating 800 mm dia exhaust pipeline below turbine from 12 mm plate by bending and installing at position and providing satisfactory trial, fabricating 800 mm dia exhaust pipeline below vapor cell 950 wag meter from 12 mm plate by bending and installing at position and providing satisfactory trial, fabricating 800 mm dia exhaust pipeline below vapor cell 950 wag meter from 12 mm plate by bending into t shape and installing at position and providing satisfactory trial, fabricating 800 mm dia exhaust pipeline dummy/flange from 12 mm plate by bending and installing at position and providing satisfactory trial, dismantling weak part of semichemiser 1000 wag meter warm saser putting scrap in scrap yard fabricating from 12 mm thick plate by bending and installing with related connections and giving satisfactory trial size dia 3 4 m, dismantling weak parts of old quad body no 2 and 3 20inch vapor pipe putting scrap in scrap yard fabricating from 8 mm thick plate by bending and installing and providing satisfactory trial, dismantling weak parts of vapor pipe 32inch size of vapor cell 1000 wag meter putting scrap in scrap yard fabricating from 8 mm thick plate by bending and installing and providing satisfactory trial, dismantling weak part of 6inch size header of all juice heaters condensate and installing new one, removing all partition plates of juice heater header by cutting straight and circular shapes cleaning tube plate completely and fabricating new circular and straight partition plates from 10/12 mm plate installing and preparing header with ms strips as before applying rubber strips and providing satisfactory trial, cutting out quailons and all related angles fixed in clarifier compartments and refitting after completion of work and providing satisfactory trial, patching inside clarifier with 6/8 mm ms plate, dismantling damaged 8inch size ms pipeline from clarifier clear juice overflow tank to sombox, installing 6inch size ms pipeline from clarifier compartments no 2 and 3 to mud tank and providing satisfactory trial, opening 6inch size valve and installing at designated location, fabricating 6inch size nipple and installing at designated location, fabricating 6inch size flange by cutting plate and dismantling to fit, dismantling 4inch size air pipeline above door including nipple band flange and putting scrap in scrap yard, installing 4inch size air pipeline above door and providing satisfactory trial, dismantling 6inch size ms pipeline of big vacuum filter mud tank overflow line and putting scrap in scrap yard, fitting and trial of 6inch size ms pipeline overflow line of big vacuum filter mud tank at position, fabricating 6inch size band, fabricating 8inch size band, dismantling 8inch size pipeline from big vacuum filter pump to condenser and putting scrap in scrap yard, fitting and trial of 8inch size pipeline from big vacuum filter pump to condenser at position, dismantling 4inch ms pipeline from filter juice header to vibro screen, fitting and trial of 4inch ms pipeline from filter juice header to vibro screen at position, making 4inch size nipple, opening 4inch size valve, installing 4inch size valve at the specified location, cutting 4inch size flange from plate making it and fitting after drilling, dismantling 3inch size pipeline, installing and fitting 3inch size line at position and giving satisfactory trial, making and installing 3inch size t, making and installing 3inch size nipple, cutting 3inch size flange from plate making it and installing, making and installing 3inch size band, dismantling 8inch size clear juice overflow pipeline, installing and fitting 8inch size clear juice overflow pipeline at position and giving satisfactory trial, installing and fitting 6inch size pipeline at position and giving satisfactory trial, making and installing 6inch size band/elbow at specified location, making and installing 6inch size t, dismantling 4inch size pipeline, installing and fitting 4inch size pipeline at position and giving satisfactory trial, making and installing 4inch size band, making and installing 4inch size t, dismantling 10inch size pipeline, installing fitting and trial of 10inch size pipeline at position, making and installing 10inch size t, making and installing 10inch size dummy/flange, dismantling 6inch pipeline, installing fitting and trial of 6inch size pipeline at position, opening and binding 6inch size valve, installing fitting and trial of 4inch size pipeline at position, making and installing 8inch and 6inch size cross, dismantling 4inch size ammonia pipeline of semichemiser quad, installing 4inch size ammonia pipeline of semichemiser quad at position, making 4inch size band, making 4inch size t, making 4inch size flange, dismantling 2inch size pipeline, fixing 2inch size pipeline in position, dismantling new quad no 2 vapor pipe 24inch size vapor pipeline fabricating it by bending with 10 mm thick plate and installing, fabricating and installing 24inch size bends, fabricating and installing 24inch size tees, fabricating and installing 24inch size flange/dummy, dismantling 24inch size pipeline, fitting 24inch size pipeline in position, fabricating and installing 24inch size flange, cutting damaged 6inch syrup pump header fabricating new header and installing along with fitting all related nipples valves etc and conducting satisfactory trial, dismantling bent incoming and outgoing wax and heater cell and partition plate between double beat valve of juice heater/ juice heater header fabricating new one using 12/10 mm plate as before installing and conducting satisfactory trial, dismantling 6inch condensate header of juice heaters and replacing the weak part, fitting 6inch size pipeline in position and conducting satisfactory trial, fabricating and installing 6inch size flange, fabricating and installing 6inch size nipple, fabricating and installing 6inch size tees, dismantling and fitting 6inch size pipeline in position and conducting satisfactory trial
T18 Ref No : 16211058
Source : GEM Tenders
tender for works related to semikestner 1000 msq pipeline , wash out pipeline header to new quad body no 1 , raw juice pump pipeline , syrup pipeline cleaning work , syrup sulphiter pipeline , new quad no 4 extension catcher vapour body , bagassilo fan repair , big filter mud tray repair , vacuum air line work , pipe fabrication , clear juice tank repair , pump and motor alignment , juice heater repair , condensate bottle fabrication , clarifier repair , cane carrier repair , secondary rack carrier repair , rack carrier repair , cane carrier runner replacement , secondary rack carrier runner replacement , rack carrier runner replacement , cane carrier structural repair , rack carrier structural repair , cane carrier chain beam repair , inter rack carrier trough repair , mill trough repair , trpf lower plate repair , mill roller repair , leveler repair , fiberizer repair , secondary rack carrier trough repair , tail shaft bed repair , mill pinion repair , cane carrier angle replacement , secondary rack carrier angle replacement , trpf roller juice plate repair , cold water pipeline work , bearing cooling line replacement , pipe fittings , mill juice pipeline work , hot water pipeline work , screen juice pipeline work , flange work , nipple work , mill fabrication work , header fabrication , delivery header fabrication , trpf tank repair , transmission gear repair , juice pump pipeline work , reducer fabrication , flange fabrication , band fabrication , trpf cover fabrication , trpl chute repair , crane unloader rail replacement , bearing housing repair , juice distribution tray fabrication , trpf roller repair , rack repair work , crown pinion guard repair , tail bar repair , trpf water cover repair , mill roller grooving , chain link forging work, fabrication and installation of 6 inch tee in the pipeline complete as required, dismantling of existing 8 inch ms pipeline complete, reinstallation of 8 inch ms pipeline at the designated position including alignment welding testing and successful trial run, opening/removal of existing 8 inch valve, installation of 8 inch valve at the designated location complete, supply fabrication and installation of 8 inch flange complete, supply and installation of 8 inch nipple complete, dismantling of existing 8 inch and 6 inch pipelines including removal from site, reinstallation of 8 inch and 6 inch pipelines at the designated position including alignment welding testing and successful trial run, dismantling of existing 8 inch raw juice pump pipeline and disposal of dismantled material at the designated scrap yard, reinstallation of 8 inch ms pipeline including alignment welding testing and successful trial run, fabrication and installation of 8 inch x 6 inch reducer complete, fabrication and installation of 8 inch flange complete, removal and reinstallation of 8 inch valve at the designated location complete, fabrication and installation of 8 inch nipple complete, dismantling of existing 6 inch syrup pipeline from syrup pump to syrup tank complete, fabrication and installation of 6 inch x 3 inch reducer complete, fabrication and installation of 2 inch flange complete, fabrication of 6 inch nipple complete, opening/removal of existing 6 inch valve, refitting and fastening of 6 inch valve after maintenance complete, fabrication and installation of 6 inch tee complete, fabrication and installation of 8 inch bend complete, fabrication and installation of 800 mm diameter nipple complete, dismantling of existing 8 inch pipeline complete, reinstallation of 8 inch pipeline at the designated position including alignment welding testing and successful trial run, fabrication and installation of 8 inch tee complete, dismantling of damaged extension catcher vapour body of new quad no 4 removal of corroded angle channels disposal of scrap at the designated scrap yard fabrication of a new catcher from 10 mm thick ms plate by bending installation at site completion of all necessary connections and successful trial run approximate size diameter 160 m x length 620 m, cutting and removing damaged casing of bagassilo fan fabrication using supplied 8/10 mm ms plate installation and satisfactory trial, cutting and removing damaged mud tray of big filter disposal of scrap fabrication using supplied 8/10 mm ms plate installation and satisfactory trial (approx dia 375 m x length 860 m), dismantling of 6 inch vacuum air line with filter, fixing of 6 inch vacuum air line in position including alignment and satisfactory trial, fabrication and installation of 6 inch ms flange, fabrication and installation of 6 inch ms tee, fabrication and installation of 6 inch ms nipple, cutting and removing corroded box of clear juice liquidation tank door fabrication using 8 mm ms plate installation all connections and satisfactory trial (approx size 10 m x 10 m), fitting fixing alignment of ms band for 120 hp clear juice pump and motor including satisfactory trial, replacement of strip and flat iron for top and bottom header rubber packing fixing new rubber packing and satisfactory trial, removal of condensate bottle of juice heater/quad semicaser/vapor cell fabrication of new bottle using supplied 8/10 mm ms plate and installation, removal of corroded distributor from clarifier compartment disposal of scrap fabrication of new distributor using 6/8 mm ms plate installation and satisfactory trial, replacement of damaged side and bottom plates of cane carrier using supplied 6 mm ms plate, replacement of damaged side and bottom plates using supplied 6 mm ms plate, replacement of damaged side and bottom plates of rack carrier no1 2 & 3 using supplied 6 mm ms plate, cutting and removing old runner and fixing new runner for cane carrier, cutting and removing old runner and fixing new runner, cutting and removing old runner and fixing new runner for rack carrier no1 2 & 3, removal of corroded supporting angles/channels and installation of new supporting angle, removal of corroded angles/channels and installation of new angle, replacement of 150 mm chain beam, removal of old trough of inter rack carrier no1 2 & 3 fabrication using supplied 8/10 mm ms plate and installation, cutting and replacing damaged trough of mill no3 & 4 including satisfactory trial, removal of damaged lower plate under trpf of mill no2 & 3 fabrication using supplied 10/12 mm ms plate and installation, fabrication of new juice rings for mill rollers using supplied 6/8 mm ms plate as per sample, dismantling damaged side plates of leveler disposal of scrap fabrication and installation of new 8/10 mm ms side plates, dismantling damaged side plate of fiberizer disposal of scrap fabrication and installation of new 8/10 mm ms side plate, removal of old trough fabrication using supplied 8/10/12 mm ms plate and installation, cutting and removing worn tail shaft bed of secondary rack carrier fabrication using supplied 200 mm beam and installation, fabrication and installation of new pinion gear for mill no3 removal of old gear and disposal to scrap yard, removal of damaged angles from cane carrier side plate/inter rack carrier 2 & 3 and installation of new angles, removal of damaged angles from secondary rack carrier/inter rack carrier 2 & 3 fabrication and installation of new angles, removal of damaged juice plate of trpf rollers fabrication using supplied 8/10 mm ms plate and installation, dismantling of existing 4 inch cold water pipeline from mill no1 to mill no3 and installation of new pipeline, removal of worn bearing cooling line from mill no1 to 4 and installation of new 3 inch pipeline complete with flange and nipple, supply/fabrication and installation of 3 inch flange, supply/fabrication and installation of 1 inch nipple, cutting and removing old 6 inch mill juice pipeline from mill juice pump no 3 to mill no 1 and installing new 6 inch ms pipeline complete with fitting and testing, dismantling existing 4 inch dia hot water pipeline from mill no 3 to mill no 4 and installing new pipeline complete with fittings and testing, cutting and removing old pipeline from mill juice pump no 4 to mill no 2 and installing new 6 inch ms pipeline complete with fittings and testing, cutting and removing old pipeline from mill screen juice pump to raw juice tank and installing new 6 inch & 8 inch pipeline complete with fittings and testing, dismantling and installation of 6 inch flange, dismantling and installation of 8 inch flange, dismantling and installation of 10 inch flange, dismantling and installation of 4 inch nipple, dismantling and installation of 6 inch nipple, dismantling and installation of 8 inch nipple, fabrication and preparation of mill beds complete as required, removing existing 12 inch screen juice header fabricating new header as per sample erection reconnection and satisfactory trial, fabrication and installation of new 10 inch delivery header (21 m long) for screen juice tank including 8 inch & 10 inch nipples erection and testing, cutting damaged top cover of trpf tank fabrication using supplied 8/10 mm ms plate installation and satisfactory trial, inspection and repair/checking of bottom cover of transmission gear of mill no 4 as per sample, installation of 6 inch juice pump pipeline complete with fitting and testing, fabrication and installation of 6 inch reducer in the pipeline, fabrication and installation of 8 inch reducer in the pipeline, fabrication and installation of 6 inch flange in the pipeline, fabrication and installation of 4 inch flange in the pipeline, fabrication and installation of 6 inch pipe band/support, fabrication of top cover for trpf sluice installed in mill house, removing damaged angles of cane carrier side plate and inter rack carrier no 2 & 3 and installing new angles, removing damaged angles of secondary rack carrier and inter rack carrier no 2 & 3 and installing new angles, dismantling damaged side and back plates of trpl chute of mill no 2 fabrication using supplied 10/12 mm ms plate installation and satisfactory trial, removing damaged rail of crane unloader trolley installing new 40 x 40 mm rail strengthening and testing, fabrication and installation of new cover for mill bearing housing, fabrication and installation of juice distribution trays in mill juice pipeline at designated locations, welding and repair of trpf rollers including welding and correction of damaged side plates, repair of secondary rack carrier and inter rack carrier racks, removing damaged water guard of crown pinion of mill no 3 fabrication of new guard from supplied 2/3 mm plate and installation, welding and fabrication of cut tail bars of mill no 1 & 3 as per required dimensions, dismantling damaged trpf water cover of mill no 2 fabrication using supplied 8/10 mm ms plate installation and satisfactory trial, carrying out pineapple (chevron) grooving/cutting work on mill rollers, forging of side links of cane carrier bagasse carrier elevator and rbc chain including fitting of pins and bushes profiling and finishing to required size
T18 Ref No : 16324690
Source : GEM Tenders
corrigendum tender for fabrication repairing the condensate tank pump delivery line of the pan 1 , repairing the condensate tank pump delivery line of the pan 2 , repairing the condensate tank pump delivery line of the pan 3 , replacing damaged bypass line band flange of melter 1 , replacing damaged bypass line band flange of melter 2 , replacing damaged bypass line band flange of melter 3 , replace damaged 100 pound 3inch size pipeline from pan no 1 to pan no 6 and give satisfactory trial , replace the weak vapor pipe from pan no 1 to 6 size dia 1 150 m length 30 m 1 , replace the weak vapor pipe from pan no 1 to 6 size dia 1 150 m length 30 m 2 , replace main hole dia 600 mm of pan no 3 sevual with 10 mm thick plate , replace damaged overflow pipeline of bh and cl molasses conditioner of 6inch size 1 , replace damaged overflow pipeline of bh and cl molasses conditioner of 6inch size 2 , replace corroded nipples pipes flanges of 6inch size header on pan no 5 and 6 installation related nipples valves etc and give satisfactory trial , replace damaged ammonia pipeline flange nipple in pan no 4 and 6 1 , replace damaged ammonia pipeline flange nipple in pan no 4 and 6 2 , replace damaged ammonia pipeline flange nipple in pan no 4 and 6 3 , replace damaged ammonia pipeline flange nipple in pan no 4 and 6 4 , replace damaged ammonia pipeline flange nipple in pan no 4 and 6 5 , cut and remove damaged wash-out line installed on the pan and rebuild with supplied pipe and installation it 1 , cut and remove damaged wash-out line installed on the pan and rebuild with supplied pipe and installation it 2 , replace damaged washing pipeline nipple flange band on pan no 6 1 , replace damaged washing pipeline nipple flange band on pan no 6 2 , replace damaged washing pipeline nipple flange band on pan no 6 3 , replace damaged washing pipeline nipple flange band on pan no 6 4 , installation valve in steam line at pan no 2 550 mm 1 , installation valve in steam line at pan no 2 550 mm 2 , installation valve in steam line at pan no 2 550 mm 3 , installation valve in steam line at pan no 2 550 mm 4 , replace nipple and band of a heavy tank 2 , replace nipple and band of a heavy tank 3 , replace nipple and band of a heavy tank 4 , remove clean and reinstall 4inch size syrup line on pan , cut and remove syrup header and fabricate and installation new header , replacing the 6inch size glycol washing line fitted on pan no 1 , replacing nipples of different lines of pan no 6 1 , replacing nipples of different lines of pan no 6 2 , replacing nipples of different lines of pan no 6 3 , replacing nipples of different lines of pan no 6 4 , replacing 10inch size nipples of cut off line of pan no 6 1 , replacing 10inch size nipples of cut off line of pan no 6 2 , replacing 10inch size nipples of cut off line of pan no 6 3 , replacing 10inch size nipples of cut off line of pan no 6 4 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 1 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 2 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 3 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 4 , fabricating m s bed for syrup pump and motor fitting and alignment followed by satisfactory trial , dismantling weak condensate bottle of old set , replacing weak pipeline flange valve and band of old set vertical juice heater 1 , replacing weak pipeline flange valve and band of old set vertical juice heater 2 , replacing weak pipeline flange valve and band of old set vertical juice heater 3 , replacing weak pipeline flange valve and band of old set vertical juice heater 4 , replacing weak pipeline flange valve and band of old set vertical juice heater 5 , replacing weak pipeline of old quad set no 4 1 , replacing weak pipeline of old quad set no 4 2 , replacing weak pipeline of old quad set no 4 3 , replacing weak pipeline of old quad set no 4 4 , replacing weak pipeline of old quad set no 4 5 , dismantling damaged mesh of section pipe located at injection no 2 and 3 and making a new one from given m s plate and fitting it , cutting and discarding old damaged reducer plate of section pipe located at injection no 2 and 3 and remaking the same , fitting water line from overhead to service tank 1 , fitting water line from overhead to service tank 2 , details of work of canti machine no 6 and 7 1 , details of work of canti machine no 6 and 7 2 , details of work of canti machine no 6 and 7 3 , details of work with new pipes from s sugarbin 1 , details of work with new pipes from s sugarbin 2 , details of work with new pipes from s sugarbin 3 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 1 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 2 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 3 , work on hot water line of brown sugar magma 1 , work on hot water line of brown sugar magma 2 , work on hot water line of brown sugar magma 3 , work on hot water line of brown sugar magma 4 , cutting and removing damaged monitor casing and ribs , cutting and removing damaged center shaft and arms inside kcp machines no 1 and 2 bending and fitting new parts with 8 to 10 mm plate , dismantling damaged upper cover part of canty machine no 6 and 7 scrapping fabricating and fitting new cover with 12 mm plate and making all related connections , dismantling damaged part of molasses weighing scale receiving tank and fabricating and fitting new part by bending 8 mm thick, fabrication, fabricate and installation 6inch size nipple, fabricate and installation 6inch size flange, dismantling 6inch size pipeline, installing 6inch size pipeline and giving satisfactory trial, fabricate and installation 6inch size band, replace damaged 100 pound 3inch size pipeline from pan no 1 to pan no 6 and give satisfactory trial, dismantle the weak vapor pipe from pan no 1 to 6, fabricate the weak vapor pipe from pan no 1 to 6, replace main hole dia 600 mm of pan no 3 sevual with 10 mm thick plate, replace damaged overflow pipeline of bh and cl molasses conditioner of 6inch size, replace corroded nipples pipes flanges of 6inch size header on pan no 5 and 6 installation related nipples valves etc and give satisfactory trial, replace 2inch size pipeline, fabricate and installation 2inch size flange, fabricate and installation 2inch size nipple, fabricate and installation 3inch size flange, fabricate and installation 3inch size valve, replace and installation 6inch size pipeline, replace 6inch size pipeline of the above, installation valve in steam line at pan no 2 550 mm, installation flange in steam line at pan no 2 550 mm, installation nipple in steam line at pan no 2 550 mm, fabricate and installation catcher element size 75 x 75 x 8 angle on pan no 4 and 5, replace nipples of the above tank, replace bands of the above tank, replace partition of syrup tank with 10/12 mm thick plate, remove clean and reinstall 4inch size syrup line on pan, cut and remove syrup header and fabricate and installation new header, replacing the 6inch size glycol washing line fitted on pan no 1, replacing nipples of 2inch size line mentioned above, replacing nipples of 4inch size line mentioned above, replacing nipples of 6inch size line mentioned above, replacing nipples of 8inch size line mentioned above, replacing 10inch size nipples of cut off line of pan no 6, replacing 10inch size pipe line, making and fitting 10inch size flange, making and fitting 10inch size band, making and fitting 8inch size band, replacing 4inch size pipe line, making and fitting 4inch size flange, making and fitting 4inch size valve, fabricating m s bed for syrup pump and motor fitting and alignment followed by satisfactory trial, dismantling weak condensate bottle of old set vertical line juice heater and quad body no 4 disposing to scrap yard fabricating all connections using 8/10 mm plates and giving satisfactory vacuum trial, replacing 2inch size pipeline, replacing 6inch size pipeline, making and fitting 2inch size flange, making and fitting 6inch size flange, making and fitting 6inch size band, making and fitting 6inch size valve, dismantling damaged mesh of section pipe located at injection no 2 and 3 and making a new one from given m s plate and fitting it, cutting and discarding old damaged reducer plate of section pipe located at injection no 2 and 3 and remaking the same, fitting mentioned line into service tank, making and fitting 8inch size nipple, dismantling and fitting 6inch size pipeline, dismantling resistance box installed on spray making and fitting new one from given m m plate carrying out proper stay fitting and welding and conducting leak proof trial, dismantling and installing 8inch size pipeline, fabricating and installing 8inch size bands, fabricating and installing 8inch size flanges, dismantling and installing 12inch size pipeline, fabricating and installing 12inch size bands, fabricating and installing 12inch size flanges, dismantling and installing 3inch size pipeline, manufacturing and installing 3inch size nipples, manufacturing and installing 3inch size bands, cutting and removing damaged monitor casing and ribs inside canty no 1 and 2 and kcp machine 1 and 2 patching with 10/12 mm ms plate and giving satisfactory trial 1, cutting and removing damaged center shaft and arms inside kcp machines no 1 and 2 bending and fitting new parts with 8 to 10 mm plate 1, dismantling damaged upper cover part of canty machine no 6 and 7 scrapping fabricating and fitting new cover with 12 mm plate and making all related connections, dismantling damaged part of molasses weighing scale receiving tank and fabricating and fitting new part by bending 8 mm thick plate and depositing scrap in scrap yard, dismantling damaged plate of sugar discharge chute from sugar elevator to sugar grader and fabricating and fitting new plate of 6 mm thickness depositing scrap in scrap yard, modifying sugar chute of grader in dryer house and giving satisfactory trial, dismantling and installing 4inch size pipeline, fabricating and installing 4inch size flanges, manufacturing and installing 4inch size bands, manufacturing and installing 4inch size nipples, removing transit heater installed on c centrifugal machine opening side plate for cleaning and hydraulic servicing reinstalling in place and making all connections, dismantling and installing 2inch size pipeline, fabricating and installing 2inch size flanges, manufacturing and installing 2inch size nipples, manufacturing and installing 2inch size valves, removing old taper of sugar hopper no 1 scrapping it fabricating new one from 3/5 mm ms plate installing and giving satisfactory trial, dismantling and installing 6inch size pipeline, manufacturing and installing 6inch size bands, manufacturing and installing 6inch size flanges, manufacturing and installing 5inch size flanges, manufacturing and installing 5inch size valves, removing damaged/weak top and bottom sugar discharge chute of canty machine no 4 including flange scrapping fabricating new parts with 6 mm ms plate as per suit sample preparing all connections like angle channel etc fitting on side and giving satisfactory trial, installing 2inch flow meter, dismantling the damaged 6inch dia pipeline from primary clarifier to anoxic tank and putting it in scrap yard and installing a new pipeline, installing 4inch size valve/nrv, fabricating 4inch size band, fabricating and installing 2inch size flange, dismantling the damaged 8inch dia pipeline from aeration tank to secondary tank and putting it in scrap yard, dismantling diffusers installed in aeration tank and putting them in scrap yard and replacing the throat part, in sulfate removal plant reaction chamber dismantling corroded 6 mm partition plate putting it in scrap yard and fabricating with new 8 mm plate, dismantling corroded 2inch size treated water outlet line of etp and putting in scrap yard and installing new 3inch size line at the same location, dismantling 800 mm dia exhaust pipe line below turbine with nipple band flange and putting in scrap yard, fabricating 800 mm dia exhaust pipeline below turbine from 12 mm plate by bending and installing at position and providing satisfactory trial, fabricating 800 mm dia exhaust pipeline below vapor cell 950 wag meter from 12 mm plate by bending and installing at position and providing satisfactory trial, fabricating 800 mm dia exhaust pipeline below vapor cell 950 wag meter from 12 mm plate by bending into t shape and installing at position and providing satisfactory trial, fabricating 800 mm dia exhaust pipeline dummy/flange from 12 mm plate by bending and installing at position and providing satisfactory trial, dismantling weak part of semichemiser 1000 wag meter warm saser putting scrap in scrap yard fabricating from 12 mm thick plate by bending and installing with related connections and giving satisfactory trial size dia 3 4 m, dismantling weak parts of old quad body no 2 and 3 20inch vapor pipe putting scrap in scrap yard fabricating from 8 mm thick plate by bending and installing and providing satisfactory trial, dismantling weak parts of vapor pipe 32inch size of vapor cell 1000 wag meter putting scrap in scrap yard fabricating from 8 mm thick plate by bending and installing and providing satisfactory trial, dismantling weak part of 6inch size header of all juice heaters condensate and installing new one, removing all partition plates of juice heater header by cutting straight and circular shapes cleaning tube plate completely and fabricating new circular and straight partition plates from 10/12 mm plate installing and preparing header with ms strips as before applying rubber strips and providing satisfactory trial, cutting out quailons and all related angles fixed in clarifier compartments and refitting after completion of work and providing satisfactory trial, patching inside clarifier with 6/8 mm ms plate, dismantling damaged 8inch size ms pipeline from clarifier clear juice overflow tank to sombox, installing 6inch size ms pipeline from clarifier compartments no 2 and 3 to mud tank and providing satisfactory trial, opening 6inch size valve and installing at designated location, fabricating 6inch size nipple and installing at designated location, fabricating 6inch size flange by cutting plate and dismantling to fit, dismantling 4inch size air pipeline above door including nipple band flange and putting scrap in scrap yard, installing 4inch size air pipeline above door and providing satisfactory trial, dismantling 6inch size ms pipeline of big vacuum filter mud tank overflow line and putting scrap in scrap yard, fitting and trial of 6inch size ms pipeline overflow line of big vacuum filter mud tank at position, fabricating 6inch size band, fabricating 8inch size band, dismantling 8inch size pipeline from big vacuum filter pump to condenser and putting scrap in scrap yard, fitting and trial of 8inch size pipeline from big vacuum filter pump to condenser at position, dismantling 4inch ms pipeline from filter juice header to vibro screen, fitting and trial of 4inch ms pipeline from filter juice header to vibro screen at position, making 4inch size nipple, opening 4inch size valve, installing 4inch size valve at the specified location, cutting 4inch size flange from plate making it and fitting after drilling, dismantling 3inch size pipeline, installing and fitting 3inch size line at position and giving satisfactory trial, making and installing 3inch size t, making and installing 3inch size nipple, cutting 3inch size flange from plate making it and installing, making and installing 3inch size band, dismantling 8inch size clear juice overflow pipeline, installing and fitting 8inch size clear juice overflow pipeline at position and giving satisfactory trial, installing and fitting 6inch size pipeline at position and giving satisfactory trial, making and installing 6inch size band/elbow at specified location, making and installing 6inch size t, dismantling 4inch size pipeline, installing and fitting 4inch size pipeline at position and giving satisfactory trial, making and installing 4inch size band, making and installing 4inch size t, dismantling 10inch size pipeline, installing fitting and trial of 10inch size pipeline at position, making and installing 10inch size t, making and installing 10inch size dummy/flange, dismantling 6inch pipeline, installing fitting and trial of 6inch size pipeline at position, opening and binding 6inch size valve, installing fitting and trial of 4inch size pipeline at position, making and installing 8inch and 6inch size cross, dismantling 4inch size ammonia pipeline of semichemiser quad, installing 4inch size ammonia pipeline of semichemiser quad at position, making 4inch size band, making 4inch size t, making 4inch size flange, dismantling 2inch size pipeline, fixing 2inch size pipeline in position, dismantling new quad no 2 vapor pipe 24inch size vapor pipeline fabricating it by bending with 10 mm thick plate and installing, fabricating and installing 24inch size bends, fabricating and installing 24inch size tees, fabricating and installing 24inch size flange/dummy, dismantling 24inch size pipeline, fitting 24inch size pipeline in position, fabricating and installing 24inch size flange, cutting damaged 6inch syrup pump header fabricating new header and installing along with fitting all related nipples valves etc and conducting satisfactory trial, dismantling bent incoming and outgoing wax and heater cell and partition plate between double beat valve of juice heater/ juice heater header fabricating new one using 12/10 mm plate as before installing and conducting satisfactory trial, dismantling 6inch condensate header of juice heaters and replacing the weak part, fitting 6inch size pipeline in position and conducting satisfactory trial, fabricating and installing 6inch size flange, fabricating and installing 6inch size nipple, fabricating and installing 6inch size tees, dismantling and fitting 6inch size pipeline in position and conducting satisfactory trial

Unlock Full Tender Access

Start Free Trial to download documents before deadline

Every year, central and state government departments release thousands of high-value contracts specifically dedicated to Heater Strip Scrap. Whether it involves bulk material supply, executing specialized operational services, or end-to-end turnkey project execution, the demand for capable vendors in the Heater Strip Scrap sector is massive.

At Tender18, we help businesses cut through the noise and exclusively target the exact work categories they specialize in. Instead of browsing through generic procurement sites, our platform isolates high-potential opportunities that match your specific industry capabilities.

Work Dynamics in the Heater Strip Scrap Sector

Government requirements for this specific vertical generally fall into distinct procurement patterns:

  • Product & Material Supply: Tenders focused strictly on sourcing, testing, and delivering high-quality items that meet the exact technical specifications of the buyer.
  • Service Level Agreements (SLAs): Long-term hiring of expert agencies for routine maintenance, manpower deployment, or continuous operational management.
  • Execution & Turnkey Projects: Comprehensive contracts where the bidder is responsible for everything from raw material procurement to final site installation and testing.

By focusing purely on your core strength in Heater Strip Scrap, you can build a highly profitable and stable pipeline of government clients.

Stop wasting time filtering through irrelevant notices. Our Heater Strip Scrap Tender Information Service is engineered for precision. We track exact product codes, service names, and specialized work terms across all government portals nationwide. When a buyer publishes a requirement that matches your specific business profile, our system alerts you instantly.

Deep Technical Insights & Documentation For Heater Strip Scrap Tenders

Bidding for specific works requires studying strict technical parameters. We provide immediate access to the core documents you need to evaluate the project:

  • Detailed Specifications & Drawings: Download the exact engineering guidelines, material testing standards, and quality benchmarks demanded by the buyer for Heater Strip Scrap.
  • Financial BOQ Spreadsheets: Access the official blank pricing formats where you need to input your unit rates, tax configurations, and total bid value.
  • Real-Time Technical Amendments: If the buying department changes the product specifications, alters the service scope, or shifts the delivery timeline, we instantly update the parent file so you are never caught off-guard.

Winning a contract for Heater Strip Scrap depends entirely on how perfectly your technical capabilities match the buyer’s demands. Even if you have the best product or service, a poorly formatted document or a missing compliance certificate will lead to instant technical rejection. Tender18’s Tender Bidding Service eliminates this risk by taking complete ownership of your digital submission.

Flawless Compliance & Portal Execution For Heater Strip Scrap Tenders

Under this service, Tender18 assigns a Dedicated Experienced Technical Person to your profile. This expert handles the heavy lifting of the entire bidding cycle:

  • Capability Mapping: We thoroughly cross-check your past completion certificates, ISO standard proofs, and financial turnover against the strict eligibility criteria required for Heater Strip Scrap bids.
  • Secure System Integration: Our technical desk seamlessly links your Class III Digital Signature Certificate (DSC) with the required e-procurement servers to securely encrypt your technical and financial envelopes.
  • Error-Free Financial Uploads: We audit your quoted BOQ pricing sheets for any formula or formatting errors before the final upload, ensuring your bid is successfully locked before the portal's closing hours.

Government buyers are aggressively using the Government e-Marketplace (GeM) for the direct procurement of Heater Strip Scrap. If your business profile is not accurately mapped on this portal, you remain practically invisible to these purchasing officers. Recognized as a trusted and expert GeM consultant, Tender18 offers specialized support to build, optimize, and maintain a highly visible vendor account for your business.

With an industry-leading support success ratio of over 95%, we handle the complex marketplace compliance so you can focus entirely on executing your orders

Expert Profile Management & Catalogue

Our dedicated consultants ensure your GeM presence is structurally perfect:

  • Precise Catalogue Listing: We upload and categorize your specific offerings under the exact search terms and parameters used by government buyers looking for Heater Strip Scrap, ensuring maximum search visibility.
  • OEM Dashboard & Assessment: For original manufacturers and creators, we guide you through the mandatory Quality Council of India (QCI) vendor assessments to successfully unlock your official OEM panel.
  • Profile Compliance & Caution Money: We manage your statutory documentation, brand approvals, and caution money limits to keep your account immune from technical suspensions.

Strategic Live Bid Participation

Beyond setup, we actively drive your market participation. Our team expertly handles the digital paperwork and rate configurations for GeM Custom Bids and Reverse Auctions (RA) related to Heater Strip Scrap, maximizing your chances of securing L1 status.

1.

How do I find government contracts exclusively matching my work in Heater Strip Scrap?

The easiest way is through the Tender18 platform. Instead of searching department by department, our system uses advanced keyword matching to gather all live supply, service, and execution tenders related directly to your core business in one place.

2.

Do I need specific testing or quality certificates to apply for these contracts?

It heavily depends on the nature of the work. For supply contracts, buyers often ask for ISO certifications, BIS marks, or specific lab testing reports. For service contracts, they may ask for labor licenses or past performance certificates (work orders).

3.

What is a BOQ and why is it important for my bid?

The Bill of Quantities (BOQ) is the official financial Excel sheet where you enter your competitive prices. Any mistake in this file—like adding extra rows, changing formulas, or saving it in the wrong format—will cause the portal server to reject your entire bid.

4.

Are samples required to be submitted physically before the digital bid opens?

For many product-based Heater Strip Scrap tenders, buying departments do ask bidders to submit physical samples to their office before the digital technical evaluation date. This requirement is always clearly mentioned in the official NIT document.

5.

How does the Dedicated Tender Expert from Tender18 help me?

Our assigned expert manages your total portal compliance. They extract the hidden rules from long tender PDFs, create a precise document checklist for your team, map your digital signature, and securely upload your technical and financial files onto the government servers.

6.

What is the role of a Digital Signature Certificate (DSC)?

A Class III DSC is a secure USB device that contains your digital identity. You cannot upload a bid without it. It is used to securely encrypt and lock your sensitive price data and technical documents so no one can view them before the official opening date.

7.

As an MSME, can I get financial benefits when bidding for Heater Strip Scrap?

Yes, the government strongly supports MSMEs. By uploading a valid Udyam Registration Certificate in the technical envelope, small businesses are frequently exempted from paying the initial Tender Document Fee and the Earnest Money Deposit (EMD).

8.

Why should I list my services or products on GeM for this category?

GeM is now the primary digital marketplace for all government agencies. If you are properly cataloged for Heater Strip Scrap, officers can view your profile and generate direct purchase orders or invite you to participate in exclusive Custom Bids.

9.

What makes Tender18 a reliable GeM support partner?

As a highly trusted and expert GeM consultant, Tender18 holds a proven support success ratio of over 95%. From flawless profile creation and complex catalogue mapping to OEM panel approvals and live Reverse Auction (RA) support, we handle it all seamlessly.

10.

What does "L1" mean in these government contracts?

"L1" stands for "Lowest Bidder 1". In government procurement, after all technical envelopes are approved, the financial sheets (BOQs) are opened. The bidder who has quoted the lowest compliant price for Heater Strip Scrap is declared L1 and is generally awarded the contract