Search Tenders
Filters
Reset All
Tender Status
T18 Ref No
All States
All Cities
All Agencies
Tender ID
Due Date
Tender Value
Tender Source (GeM, Cppp & Others)
Tender Type

13Latest Gas pipeline filters Tenders List

Latest Gas pipeline filters Tenders in India – Verified Leads & Real-Time Insights by Tender18

Finding the right Gas pipeline filters tenders in India’s competitive e-procurement ecosystem requires more than just access—it demands accurate data, real-time monitoring, and expert analysis.

At Tender18 Infotech Private Limited, we bring deep industry experience in government procurement to help businesses identify, evaluate, and win Gas pipeline filters tenders efficiently. With a centralized platform aggregating 1100+ live tenders, we provide a single, trusted source for opportunities from central, state, and PSU departments.


Real-Time Gas pipeline filters Tender Intelligence & Monitoring

Our advanced dashboard delivers actionable insights and structured tender data, enabling you to make faster and smarter bidding decisions.

We categorize Gas pipeline filters tenders into:

  • Supply Tenders – BOQs and specifications sourced from GeM and PSUs
  • Service Tenders – NITs and scope of work from CPPP and state portals
  • EPC Projects – Large-scale infrastructure tenders with financial and design data

✔ This structured approach ensures complete transparency and deeper bid analysis before submission.


Comprehensive Sources of Gas pipeline filters Tenders

Tender18 acts as a centralized gateway by aggregating tenders from trusted and official sources:

  • Central Government Portals – CPPP, NIC, and Government e-Marketplace (GeM)
  • Railways & Transport – IREPS and Metro Rail projects
  • Power & Energy PSUs – NTPC, ONGC, NHPC, PowerGrid
  • Defense & Strategic Sectors – MES and DRDO tenders
  • State e-Procurement Portals – Gujarat, Maharashtra, Tamil Nadu, UP, and more

✔ Every listing is verified and regularly updated to maintain data accuracy and trust.


Step-by-Step Guide to Participate in Gas pipeline filters Tenders

1. Eligibility & Prequalification

Before bidding, ensure compliance with:

  • Financial turnover requirements (30–50% of tender value)
  • Past experience (2–3 similar projects)
  • Valid solvency certificate

2. Mandatory Documentation Checklist

Prepare the following to avoid disqualification:

  • Digital Signature Certificate (Class 3 DSC)
  • GST, PAN, MSME/Udyam registration
  • EMD (Earnest Money Deposit) or exemption proof
  • Technical bid with execution methodology

3. BOQ Analysis & Financial Bidding

The BOQ (Bill of Quantities) is the most critical component:

  • Analyze item-wise pricing
  • Ensure competitive yet sustainable quotes
  • Avoid underbidding risks (L1 pressure)

✔ Expert analysis can significantly improve your bid success ratio.


Why Tender18 is a Trusted Platform for Gas pipeline filters Tenders

✔ Proven Expertise in Government Procurement

We combine industry knowledge with practical bidding experience.

✔ Verified & Reliable Data

All Gas pipeline filters tenders are sourced from official portals and cross-checked for accuracy.

✔ Advanced Filtering Tools

Filter tenders by value, EMD, location, and category for precise targeting.

✔ Corrigendum & Update Tracking

Get instant alerts on deadline changes and specification updates.

✔ Historical Data Insights

Analyze past tender results to understand pricing trends and competition.

✔ End-to-End Bidding Support

From discovery to submission, including GeM onboarding and strategy.


Growth of Gas pipeline filters Sector in 2026

With the Government of India focusing on digital procurement and infrastructure expansion, the Gas pipeline filters sector has seen significant growth in e-tendering opportunities.

The rise of GeM-based procurement models like:

  • L1 Purchase
  • Direct Procurement
  • MSME-friendly policies

…has made it easier for startups and SMEs to participate and win contracts


Frequently Asked Questions (SEO Optimized)

How can I get daily Gas pipeline filters tender alerts?

You can register on Tender18 and select your preferred category. You will receive daily email alerts with all new Gas pipeline filters tenders.

Is EMD mandatory for all Gas pipeline filters tenders?

No, MSME and Udyam-registered businesses may get exemptions. Always check the NIT for specific conditions.

What is the difference between a Gas pipeline filters work tender and supply tender?

A supply tender involves delivering goods, while a work tender includes execution, labor, and project completion.

Can I access private Gas pipeline filters tenders on Tender18?

Yes, we also track major private sector and EPC tenders along with government opportunities.


Get Expert Support for Gas pipeline filters Tenders

Tender18 is more than a listing platform—we are your strategic partner in winning tenders.

Our services include:

  • Tender discovery & analysis
  • Documentation support
  • Bid strategy & submission
  • GeM registration & OEM onboarding

📞 Call / WhatsApp: +91 7069661818
🌐 Website: www.tender18.com

Due Date
T18 Ref No : 16877286
Location : kharagpur , west bengal
Source : GEM Tenders
LIVE TENDER
tender for supply of 1.5 tr inverter type 5 star rated split air- conditioner unit , dismantling of ac , installation, testing and commissioning of the split ac unit , supplying and fixing extra copper pipe line , supplying and laying 4 core 2.5 sq. mm pvc insulated and pvc sheathed flexible copper cable , supplying and fixing of powder coated ms frame stand , supplying and fixing of 20 mm dia heavy duty pvc pipe with accessories for drain water connection , supplying and laying of pvc insulated and pvc round sheathed, 3 core ,2.5 sqmm, 1.1kv copper cable, nit9bsnlkgp, supply of 1.5 tr inverter type 5 star rated split air-conditioner unit as per bee star rating, (as per new bee rating valid for 1st january 2026 to 31 december 2027 ) with remote control unit, filters, rotary type compressor, copper tubes for both indoor and outdoor unit, refrigerant gas with topping up of refrigerant if required, transportation of all of the above to the various sites and supplying the following up to the length of 3 mtrs etc. as required. (1) hot and cold refrigerant piping (2) suitable connecting electrical cable between indoor and outdoor unit. note-- 1) the manufacturers / suppliers shall give a warranty of the air conditioner for 15 months from date of supply or 12 months from date of installation, which is earlier. thereafter 9 years (108 months) additional warranty on the compressor and 5 years on pcb, dismantling of existing one point five tr split ac unit indoor and outdoor units along with interconnecting copper pipe and cable, power connection cable etc and storing at place shown by exchange in charge as required, installation, testing and commissioning of the split ac unit at a specified location by mounting and fitting indoor and outdoor units at their respective locations , laying and fixing of both liquid and hot gas lines, interconnecting wiring for both indoor outdoor units up to 3 mtrs length and ,interconnecting the indoor unit and outdoor unit with refrigerant line, insulating the refrigerant pipe with expandable polyethylene foam tubing unit , leak testing entire system ,charging refrigerant gas in the unit ,making power supply connections from the power point etc complete as required., supplying and fixing extra copper pipe line both 1/4 inch for gas line and 5/8 inch for liquid line or suitable dia to match with the pipeline of the new unit along with suitable size rubber foam/insulation on surface of the wall i/c necessary flare nuts, suitably brazing with the existing pipe clamping, making holes in walls, same etc., as per site requirement. note - the length of refrigerant pipes supplied with each ac units is 3 mtr. extra length shall be paid extra for which firm shall quote their unit rates., supplying and laying 4 core 2.5sq.mm pvc insulated and pvc sheathed flexible copper cable along refrigerant pipe or on existing conduit / cable tray i/c binding with plastic tags for extending supply from existing industrial socket to indoor unit etc, as required . (make- any isi mark ) . note- the length of copper cable supplied with each unit is 3 mtr . extra length shall be paid extra., supplying and fixing of powder coated ms frame stand comprising of two numbers bracket made of heavy duty ms sheet to accommodate the condenser (outdoor) unit for fixing on the wall with suitable diameter and length of anchor fast bolts and making good damages etc as per site requirement ., supplying and fixing of 20 mm dia heavy duty pvc pipe with accessories for drain water connection where ever required etc. complete as required.(make- any isi mark ) ., supplying and laying of pvc insulated and pvc round sheathed, 3 core ,2.5 sqmm, 1.1kv copper cable ( un-aoumerd ) including connection , testing checking etc as complete as required
T18 Ref No : 16952586
Location : sarsawa , uttar pradesh
Source : GEM Tenders
LIVE TENDER
tender for repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; removing the calandria of the evaporator and installing and fitting a new calandria of 650 m square heating surface and installing all the pipe lines va.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; replacing an old and worn out grand consultant juice plaza condensate syrup bottle with an 8 10 mm msc plate by connecting all connections; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; the worn out umbrella plate in the vapor cell semi concentrator was removed and the plate was repaired and replaced with plastic; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; replacing the umbrella in the wide body vapor cell semi concentrator with a dated and 6 8 mm msc plate and conducting a trial; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; removing the neck selvage of the quad body semi container and replacing it with a new 8 10 mm ms plate and testing it; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; removing the neck selvage of the quad body semi container and repairing it with the provided plate and testing it; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; cutting out the weakened roof of the quad body and replacing it with a 12mm plate provided and testing it; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; cutting out the weakened part of the semi capacitor vapor cell quad body cell and replacing it with a 10 12mm plate provided and testing it for a sat.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; removal of the weak part of the exhaust pipeline going to the semi condenser vapor shell and fitting a new 800 mm diameter pipeline using the provided 8 .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; cutting out the worn partition plates of the top and bottom headers of the juice heater and replacing them with the provided 8 10 mm plate arranging fo.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; installing and strengthening the umbrella fitted to the vapor shell semiconductor quad body and conducting a satisfactory trial; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; removing the weak intermediate first vapor second vapor pipes of the quad bodies and constructing new ones with a diameter of 500 650 mm using an 8 10 .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; removing the weakened intermediate first vapor second vapor pipes of the quad bodies and installing new ones with a diameter of 700 850 mm from 8 10 mm.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; dismantle fabricate and erect a 600 800 mm band and conduct a satisfactory trial; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; dismantle fabricate and erect a 900 1100 mm band and conduct a satisfactory trial; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; remove the steam valve from the juice heater and installation a new right angle valve size 400 500 mm with the corresponding pipe connection modifications and.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; cut and remove the double beat valve from the juice heater and installation a new double beat valve size 8 diameter and conduct a trial; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; remove the intermediate coolers from the film type sulfur furnaces and installation them using the provided pipe plate and conduct a trial; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; installation the sublimation pipes from the satvik type sulfur furnaces using the provided pipe or a new one and conduct a trial; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; remove the empty filtrate bottle from the vacuum filter and installation a new filtrate bottle using an 8 10 mm ms plate and conduct a trial make all connect.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; removing the filtrate bottle plate of the vacuum filter and repairing it with the provided plate and giving it a trial; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; removing the filtrate plate of the vacuum filter tray and repairing it with the provided plate; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; cutting and removing the neck shell of the lime slaker at the lime station and replacing it with a new one using the provided plate and giving it a trial;.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; creating the melter from the satvik sulfur furnace with a new 8 10 mm plate and giving it a satisfactory trial by installing the steam coil; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; removing the worn out coils in the melters of the satvik sulfur furnace replacing them with new ones and conducting hydraulic testing and giving a sat.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; removing the worn out plates of the vacuum filter condensers replacing them with new ones and giving a satisfactory trial; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; removing the damaged weak steam coils in the film tine sulfur melters replacing them with new ones and conducting hydraulic testing and giving a sati.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; renovate and installation a new so2 chamber inside the coolers of the satvik sulfur furnace and conduct a trial; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; remove the old corroded so2 gas line at the sulfur furnace station and installation the new seamless ms line with flanges tightening the joints and bolts;.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; remove the grooved plate of the mud mixture on the vacuum filter and repair it with the new plate provided; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; remove the grooved plate of the filtrate tank located below the vacuum filter installation the plate provided and perform a trial; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; repairing the weak parts of juice and mud with dry box of clarifier and making all the connections; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; patch the weak shell of the burning chamber of the film type sulfur furnace with the plate provided for a length of approximately 5 feet from the bottom a.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; patch the weak and rotten platforms of both vacuum filters with a new burner from the provided plate; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; removing the so2 chamber inside the last cooler of the film type sulfur furnace and installing a new one using the provided 10 mm ms plate and making all .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; repairing the damaged clear juice bottles near the clear juice pumps and making all the connections and giving satisfactory trial; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; cut out and remove all rotten mud scrapers inside the door clarifier and installation the provided plates and belts according to size and give a satisfacto.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; coat and remove the weak mud boot plates in each compartment of the clarifier and installation the provided new plates; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; repairing the weak parts of the agitator fitted on the vacuum filter and giving satisfactory trial; buyer , repair, maintenance, and installation of plant/ systems/equipments
T18 Ref No : 16934073
Location : rawatbhata , rajasthan
Source : GEM Tenders
LIVE TENDER
corrigendum tender for pressure relief valve , rupture disc , lead gasket , o ring seal , filter element , manifold valve , tonner valve , ball valve , pressure reducing valve , auto shutoff valve , vacuum regulator , vacuum relief valve , flow control valve , flow control valve , differential presuee regulator , emergency drain relief valve , check valve , injector assembly , injector assembly , injector isolating valve , instrument valve , special fittings , chlorination steam cleaning, servicing, testing and assembly , cl2 gas filter servicing, steam cleaning testing and assembly , expansion chamber servicing, steam cleaning testing and assembly , vacuum line servicing, steam cleaning testing and assembly , evaporator chamber servicing, steam cleaning testing and assembly , evaporator water bath servicing, steam cleaning testing and assembly in the system , cw system testing, caliberation of rvs prvs and commissioning of both chlorinators , gas manifold and gas pipelines from manifold tovaccum regulators steam cleaning servicing , gas filter servicing, steam cleaning testing and assembly , dw system testing caliberation of rvs prvs and commissioning, spares for chlorination plant valves prvs and gasket, cw evp pressure relief valve evp prlv 4297 r tag n0. rv1507,1607, cw rupture disc rd-1702, cw lead gasket for flanges, dw lead gasket for flanges, cw lead gasket for evaporator, cw lead gaskets for filter, dw lead gaskets for filter, cw and dw coper tube lead gasket, cw o ring seal, dw o ring seal, cw filter element, dw filter element, cw & dw manifold valve clv-4236, cw yoke for aux tonner valve yk 4234, cw and dw aux tonner valve aux 4235, cw ball valve bv 4238, dw ball valve bv 4238, cw pressure reducing valve prdv 4253, dw pressure reducing valve prdv 4253, cw auto shutoff valve valve asv 4262, dw auto shutoff valve valve asv 4262, cw vacuum regulator rvr 4240 r1, dw vacuum regulator rvr 4240 r1, cw pressure relief valve prlv 4241 tag rv 1514,1614, dw pressure relief valve prlv 4241, tag rv 1758, cw vacuum relief valve vrlv 4242, tag no rv 1517,1617, dw vacuum relief valve vrlv 4242 tag no rv 1761, cw flow control valve fcv 4245, dw flow control valve fcv 4255, cw differential presure regulator dpr 4243 r1, dw differential presure regulator dpr 4243 r1, cw emergency drain relief valve edrv 4246 tag no rv 1518, 1618, dw emergency drain relief valve edrv 4252 tag no rv 1762, cw check valve ckv 4246 tag no 1520,1620, dw check valve ckv - 4251 tag no rv 1763, cw injector assembly inj-4247, dw injector assembly inj 4255, cw injector isolating valve flange 40 nb, ppbv 4298, dw injector isolating valve flange ppbv 4298, cw instrument iso. valve screwed pvcbv 4300, dw instrument iso valve screwed pvcpb 4300, special fittings for ps pg on gas lines and vacuum lines, cw chlorination servicing cl2 manifold, liquid chlorine pipelines from manifold to both evaporators and gas chlorine pipe lines from evaporators to vacuum regulators steam cleaning, servicing, testing and assembly in the system., cl2 gas filter servicing, steam cleaning testing and assembly in the system, expansion chamber servicing, steam cleaning testing and assembly in the system, vacuum line servicing, steam cleaning testing and assembly in the system, evaporator chamber servicing, steam cleaning testing and assembly in the system, evaporator water bath servicing, steam cleaning testing and assembly in the system, cw system testing, caliberation of rvs prvs and commissioning of both chlorinators and pipe lines, gas manifold and gas pipelines from manifold tovaccum regulators steam cleaning,servicing,, gas filter servicing, steam cleaning testing and assembly in the system, dw system testing the entire system, caliberation of rvs prvs and commissioning of chlorination

Unlock Full Tender Access

Start Free Trial to download documents before deadline

T18 Ref No : 15605084
Location : kolkata , west bengal
Source : GEM Tenders
tender for supply of 1.5 tr inverter type 5 star rated split air- conditioner unit , installation, testing and commissioning of the split ac unit , supplying and fixing extra copper pipe line , supplying and laying 4 core 2.5 sq. mm pvc insulated and pvc sheathed flexible copper cable , supplying and fixing of powder coated ms frame stand , supplying and fixing of 20 mm dia heavy duty pvc pipe with accessories for drain water connection , supplying and laying of pvc insulated and pvc round sheathed, 3 core ,2.5 sqmm, 1.1kv copper cable , supplying and fixing dp sheet steel enclosure on surface or recess along with 25,32a 240v, supply installation testing and commissioning of 4 nos inverter split ac at cto kolkata, supply of 1.5 tr inverter type 5 star rated split air-conditioner unit as per bee star rating, (as per new bee rating valid for 1st january 2026 to 31 december 2027 ) with remote control unit, filters, rotary type compressor, copper tubes for both indoor and outdoor unit, refrigerant gas with topping up of refrigerant if required, transportation of all of the above to the various sites and supplying the following up to the length of 3 mtrs etc. as required. (1) hot and cold refrigerant piping (2) suitable connecting electrical cable between indoor and outdoor unit. note-- 1) the manufacturers / suppliers shall give a warranty of the air conditioner for 15 months from date of supply or 12 months from date of installation, which is earlier. thereafter 9 years (108 months) additional warranty on the compressor., installation, testing and commissioning of the split ac unit at a specified location by mounting and fitting indoor and outdoor units at their respective locations , laying and fixing of both liquid and hot gas lines, interconnecting wiring for both indoor outdoor units up to 3 mtrs length and ,interconnecting the indoor unit and outdoor unit with refrigerant line, insulating the refrigerant pipe with expandable polyethylene foam tubing unit , leak testing entire system ,charging refrigerant gas in the unit ,making power supply connections from the power point etc complete as required., supplying and fixing extra copper pipe line both 1/4 inch for gas line and 5/8 inch for liquid line or suitable dia to match with the pipeline of the new unit along with suitable size rubber foam/insulation on surface of the wall i/c necessary flare nuts, suitably brazing with the existing pipe clamping, making holes in walls, same etc., as per site requirement. note - the length of refrigerant pipes supplied with each ac units is 3 mtr. extra length shall be paid extra for which firm shall quote their unit rates., supplying and laying 4 core 2.5sq.mm pvc insulated and pvc sheathed flexible copper cable along refrigerant pipe or on existing conduit / cable tray i/c binding with plastic tags for extending supply from existing industrial socket to indoor unit etc, as required . (make- any isi mark ) . note- the length of copper cable supplied with each unit is 3 mtr . extra length shall be paid extra., supplying and fixing of powder coated ms frame stand comprising of two numbers bracket made of heavy duty ms sheet to accommodate the condenser (outdoor) unit for fixing on the wall with suitable diameter and length of anchor fast bolts and making good damages etc as per site requirement ., supplying and fixing of 20 mm dia heavy duty pvc pipe with accessories for drain water connection where ever required etc. complete as required.(make- any isi mark ) ., supplying and laying of pvc insulated and pvc round sheathed, 3 core ,2.5 sqmm, 1.1kv copper cable ( un-aoumerd ) including connection , testing checking etc as complete as required, supplying and fixing dp sheet steel enclosure on surface or recess along with 25,32a 240v c curve dp mcb complete with connections ,testing and commissioning etc. as complete as reqd.
T18 Ref No : 15692541
Location : new delhi , delhi
Source : GEM Tenders
tender for procurement 96 lines of dg set spares cylinder liner with joint ring , shaft for lub pump intermediate gear , washer , push rod , bush for injector , bolt for mb cap hex head m14x2x128 , oil seal 115x140x16 , oil seal , bolt , banjo bolt , pin , ammeter 50 050 amp , special banjo bolt lo supply to pump , duel fuel filter , washer for sump screw , valve sealed , copper washer inj , compression ring for gas outlet manifold , injector yoke , drain plug with magnet and o ring , thrust washer , worm drive clamp 29 45 mm dia , screw with stainer , washer fip gear , rubber bush for oil filling cap , thermostat element , liquid gasket , o ring for injector , primary element , secondary element , sealing ring fuel filter , electrical lub oil pressure guage , v belt cogged bx 48 , joint for turbo , thrust washer cam shaft , lo supply hose fip , cyl head bolt , hose by pass , water pump assy , v belt xpa 1250 cogged , hose thermostat , spacer ex manifold , fuel injector koel 6r 4r 1080ta 100 kva , rubber hose turbocharger , fuel filling hose for 36 to 125kva for skid mount , rubber hose , banjo bolt m14x1.5 thread , coolent temp switch degree , set bolt m8x1.25x30 8.8 , set bolt , set bolt for front cover , set screw , set screw expansion bellow , nut 8m , stud , sump screw , dowel , spring washer m12 , washerplain , copper washer , worm drive hose clip 12mm , radiator hose clip 22mm , worm drive hose clip 29mm , hose clip , worm drive hose clip , spring dowell pin cylinder block , set bolt m8x1.25x100-8.8 front cover , nut for asjusting screw , piston cooling nozzle assy , camshaft gear assy , gasket cyl head 6r1080 ta , high pressure pipeline complete set , pipe rkr arm , hose for water pipe , turbo charger assy , fuel pipe feed pump to filter , lub oil drain pipe , lp pump assy , vent pipe for radiator , fuel pipe fuel filter to fuel pump , leak off pipe , breather hose for 125kva silent set , hose for air cleaner , centrfugal filter , lub oil cooler koel 6r1080 ta , indicator air cleaner , air cleaner element koel 6r 1080 ta 100 kva , bearing main kir 6r1080 std , thrust washer set of inner and outer pairs , hose , plain machined washer m6, 2h.008.10.0.00, 4h.372.01.0.00, 02.024.09.0.00, 02.024.70.0.00, 02.035.08.0.00, 03.001.22.0.00, 03.007.06.0.00, 03.013.06.0.00, 03.016.02.0.00, 03.027.04.0.00, 03.117.02.0.00, 03.124.01.0.00, 03.660.07.0.00, 365620000, 06.074.16.0.00, 06.631.02.0.00, 10.029.07.0.00, 1001205000, 2h.023.01.0.00, 2h.035.02.0.00, 2h.038.02.0.00, 2h.112.02.0.00, 34.016.15.0.00, 34.017.05.0.00, 359202000, 39.040.09.0.00, 3931904, 3h.009.11.0.00, 3h.132.01.0.00, 3h.132.02.0.00, 3h13203000, 4625001000, 47.305.01.0.00, 4844302000, 4h.003.02.0.00, 4h.006.01.0.00, 4h.007.07.0.00, 4h.023.02.0.00, 4h.052.20.0.00, 4h.069.01.0.00, 4h.073.01.0.00, 4h.107.02.0.00, 4h.154.10.0.00, 4h.168.11.0.00, 4h.488.03.0.00, 4h07302000, 4h07705000, 4h90701000, 50.002.08.030, 50.002.08.040, 50.002.08.070, 50.002.08.080, 50.002.08.110, 50.003.06.012, 50.003.08.025, 50.003.12.035, 50.006.08.000, 50.010.08.020, 50.011.08.016, 50.052.10.030, 50.401.08.014, 50.504.06.000, 50.505.12.000, 50.506.12.000, 50.508.12.000, 50.519.01.000, 50.519.03.000, 50.519.05.000, 50.519.08.000, 50.519.11.000, 50.540.09.016, 50002081000, 60.007.03.0.00, 6h.001.17.0.00, 6h.003.10.0.00, 6h.007.06.0.00, 6h.009.70.0.00, 6h.012.03.0.00, 6h.019.12.0.00, 6h.029.10.0.00, 6h.032.01.0.00, 6h.034.05.0.00, 6h.047.30.0.00, 6h.056.03.0.00, 6h.081.02.0.000, 6h.145.10.0.00, 6h.345.04.0.00, 6h.899.02.0.00, f6.024.46.0.00, f6.358.01.0.00, f6.504.02.0.00, f6.504.08.0.00, m.006.4.00.003, w.006.3.20.003, 306302000, 50.506.06.000
T18 Ref No : 16760837
Location : rawatbhata , rajasthan
Source : GEM Tenders
corrigendum tender for pressure relief valve , rupture disc , lead gasket , o ring seal , filter element , manifold valve , tonner valve , ball valve , pressure reducing valve , auto shutoff valve , vacuum regulator , vacuum relief valve , flow control valve , flow control valve , differential presuee regulator , emergency drain relief valve , check valve , injector assembly , injector assembly , injector isolating valve , instrument valve , special fittings , chlorination steam cleaning, servicing, testing and assembly , cl2 gas filter servicing, steam cleaning testing and assembly , expansion chamber servicing, steam cleaning testing and assembly , vacuum line servicing, steam cleaning testing and assembly , evaporator chamber servicing, steam cleaning testing and assembly , evaporator water bath servicing, steam cleaning testing and assembly in the system , cw system testing, caliberation of rvs prvs and commissioning of both chlorinators , gas manifold and gas pipelines from manifold tovaccum regulators steam cleaning servicing , gas filter servicing, steam cleaning testing and assembly , dw system testing caliberation of rvs prvs and commissioning, spares for chlorination plant valves prvs and gasket, cw evp pressure relief valve evp prlv 4297 r tag n0. rv1507,1607, cw rupture disc rd-1702, cw lead gasket for flanges, dw lead gasket for flanges, cw lead gasket for evaporator, cw lead gaskets for filter, dw lead gaskets for filter, cw and dw coper tube lead gasket, cw o ring seal, dw o ring seal, cw filter element, dw filter element, cw & dw manifold valve clv-4236, cw yoke for aux tonner valve yk 4234, cw and dw aux tonner valve aux 4235, cw ball valve bv 4238, dw ball valve bv 4238, cw pressure reducing valve prdv 4253, dw pressure reducing valve prdv 4253, cw auto shutoff valve valve asv 4262, dw auto shutoff valve valve asv 4262, cw vacuum regulator rvr 4240 r1, dw vacuum regulator rvr 4240 r1, cw pressure relief valve prlv 4241 tag rv 1514,1614, dw pressure relief valve prlv 4241, tag rv 1758, cw vacuum relief valve vrlv 4242, tag no rv 1517,1617, dw vacuum relief valve vrlv 4242 tag no rv 1761, cw flow control valve fcv 4245, dw flow control valve fcv 4255, cw differential presure regulator dpr 4243 r1, dw differential presure regulator dpr 4243 r1, cw emergency drain relief valve edrv 4246 tag no rv 1518, 1618, dw emergency drain relief valve edrv 4252 tag no rv 1762, cw check valve ckv 4246 tag no 1520,1620, dw check valve ckv - 4251 tag no rv 1763, cw injector assembly inj-4247, dw injector assembly inj 4255, cw injector isolating valve flange 40 nb, ppbv 4298, dw injector isolating valve flange ppbv 4298, cw instrument iso. valve screwed pvcbv 4300, dw instrument iso valve screwed pvcpb 4300, special fittings for ps pg on gas lines and vacuum lines, cw chlorination servicing cl2 manifold, liquid chlorine pipelines from manifold to both evaporators and gas chlorine pipe lines from evaporators to vacuum regulators steam cleaning, servicing, testing and assembly in the system., cl2 gas filter servicing, steam cleaning testing and assembly in the system, expansion chamber servicing, steam cleaning testing and assembly in the system, vacuum line servicing, steam cleaning testing and assembly in the system, evaporator chamber servicing, steam cleaning testing and assembly in the system, evaporator water bath servicing, steam cleaning testing and assembly in the system, cw system testing, caliberation of rvs prvs and commissioning of both chlorinators and pipe lines, gas manifold and gas pipelines from manifold tovaccum regulators steam cleaning,servicing,, gas filter servicing, steam cleaning testing and assembly in the system, dw system testing the entire system, caliberation of rvs prvs and commissioning of chlorination

Unlock Full Tender Access

Start Free Trial to download documents before deadline

T18 Ref No : 16385494
Location : rawatbhata , rajasthan
Source : GEM Tenders
tender for pressure relief valve , rupture disc , lead gasket , o ring seal , filter element , manifold valve , tonner valve , ball valve , pressure reducing valve , auto shutoff valve , vacuum regulator , vacuum relief valve , flow control valve , flow control valve , differential presuee regulator , emergency drain relief valve , check valve , injector assembly , injector assembly , injector isolating valve , instrument valve , special fittings , chlorination steam cleaning, servicing, testing and assembly , cl2 gas filter servicing, steam cleaning testing and assembly , expansion chamber servicing, steam cleaning testing and assembly , vacuum line servicing, steam cleaning testing and assembly , evaporator chamber servicing, steam cleaning testing and assembly , evaporator water bath servicing, steam cleaning testing and assembly in the system , cw system testing, caliberation of rvs prvs and commissioning of both chlorinators , gas manifold and gas pipelines from manifold tovaccum regulators steam cleaning servicing , gas filter servicing, steam cleaning testing and assembly , dw system testing caliberation of rvs prvs and commissioning, spares for chlorination plant valves prvs and gasket, cw evp pressure relief valve evp prlv 4297 r tag n0. rv1507,1607, cw rupture disc rd-1702, cw lead gasket for flanges, dw lead gasket for flanges, cw lead gasket for evaporator, cw lead gaskets for filter, dw lead gaskets for filter, cw and dw coper tube lead gasket, cw o ring seal, dw o ring seal, cw filter element, dw filter element, cw & dw manifold valve clv-4236, cw yoke for aux tonner valve yk 4234, cw and dw aux tonner valve aux 4235, cw ball valve bv 4238, dw ball valve bv 4238, cw pressure reducing valve prdv 4253, dw pressure reducing valve prdv 4253, cw auto shutoff valve valve asv 4262, dw auto shutoff valve valve asv 4262, cw vacuum regulator rvr 4240 r1, dw vacuum regulator rvr 4240 r1, cw pressure relief valve prlv 4241 tag rv 1514,1614, dw pressure relief valve prlv 4241, tag rv 1758, cw vacuum relief valve vrlv 4242, tag no rv 1517,1617, dw vacuum relief valve vrlv 4242 tag no rv 1761, cw flow control valve fcv 4245, dw flow control valve fcv 4255, cw differential presure regulator dpr 4243 r1, dw differential presure regulator dpr 4243 r1, cw emergency drain relief valve edrv 4246 tag no rv 1518, 1618, dw emergency drain relief valve edrv 4252 tag no rv 1762, cw check valve ckv 4246 tag no 1520,1620, dw check valve ckv - 4251 tag no rv 1763, cw injector assembly inj-4247, dw injector assembly inj 4255, cw injector isolating valve flange 40 nb, ppbv 4298, dw injector isolating valve flange ppbv 4298, cw instrument iso. valve screwed pvcbv 4300, dw instrument iso valve screwed pvcpb 4300, special fittings for ps pg on gas lines and vacuum lines, cw chlorination servicing cl2 manifold, liquid chlorine pipelines from manifold to both evaporators and gas chlorine pipe lines from evaporators to vacuum regulators steam cleaning, servicing, testing and assembly in the system., cl2 gas filter servicing, steam cleaning testing and assembly in the system, expansion chamber servicing, steam cleaning testing and assembly in the system, vacuum line servicing, steam cleaning testing and assembly in the system, evaporator chamber servicing, steam cleaning testing and assembly in the system, evaporator water bath servicing, steam cleaning testing and assembly in the system, cw system testing, caliberation of rvs prvs and commissioning of both chlorinators and pipe lines, gas manifold and gas pipelines from manifold tovaccum regulators steam cleaning,servicing,, gas filter servicing, steam cleaning testing and assembly in the system, dw system testing the entire system, caliberation of rvs prvs and commissioning of chlorination
T18 Ref No : 16211132
Source : GEM Tenders
corrigendum tender for erection and fabrication work a 1 , erection and fabrication work a 2 , erection and fabrication work a 3 , erection and fabrication work a 4 , erection and fabrication work a 5 , erection and fabrication work a 6 , erection and fabrication work a 7 , erection and fabrication work a 8 , erection and fabrication work a 9 , erection and fabrication work a 10 , erection and fabrication work a 11 , erection and fabrication work a 12 , erection and fabrication work a 13 , erection and fabrication work a 14 , erection and fabrication work a 15 , erection and fabrication work a 16 , erection and fabrication work a 17 , erection and fabrication work a 18 , erection and fabrication work a 19 , erection and fabrication work a 20 , erection and fabrication work a 21 , erection and fabrication work a 22 , erection and fabrication work a 23 , erection and fabrication work a 24 , erection and fabrication work a 25 , erection and fabrication work a 26 , erection and fabrication work a 27 , erection and fabrication work a 28 , erection and fabrication work a 29 , erection and fabrication work a 30 , erection and fabrication work a 31 , erection and fabrication work a 32 , erection and fabrication work a 33 , erection and fabrication work a 34 , erection and fabrication work a 35 , erection and fabrication work a 36 , erection and fabrication work a 37 , erection and fabrication work a 38 , erection and fabrication work a 39 , erection and fabrication work a 40 , erection and fabrication work a 41 , erection and fabrication work a 42 , erection and fabrication work a 43 , erection and fabrication work a 44 , erection and fabrication work a 45 , erection and fabrication work a 46 , erection and fabrication work a 47 , erection and fabrication work a 48 , erection and fabrication work a 49 , erection and fabrication work a 50 , erection and fabrication work a 51 , erection and fabrication work a 52 , erection and fabrication work a 53 , erection and fabrication work a 54 , erection and fabrication work a 55 , erection and fabrication work a 56 , erection and fabrication work a 57 , erection and fabrication work a 58 , erection and fabrication work a 59 , erection and fabrication work a 60 , erection and fabrication work a 61 , erection and fabrication work a 62 , erection and fabrication work a 63 , erection and fabrication work a 64 , erection and fabrication work a 65 , erection and fabrication work a 66, erection and fabrication work a, cut out and remove the weakened and worn-out portions of the discharge chute of the mill scraper. fabricate new sections using 12 mm thick plates, reinstall them, and provide perforated plates as per the scraper profile. weld and fix them securely, then conduct a satisfactory trial. remove the worn-out runner base of the cane carrier. fabricate a new runner base using a 100 mm channel box, installation it, and straighten, reverse, and reinstall the old channel. remove the worn 40/50 mm square bars of the cane unloader and replace them with new square bars of the same size. conduct a satisfactory trial. remove the worn runners of the cane carrier, rake carrier, bagasse elevator, and r.b.c. replace them by reversing the old runners or installing new runners as required. remove the worn or damaged side plates of the chains of the cane carrier, rake carrier, and r.b.c. replace them with repaired old plates or new plates. remove the worn side plates of the fibrizer hood. installation new plates, weld them from both inside and outside, and conduct a satisfactory trial. carry out complete overhauling, testing, and trial of the bagasse baling machine. perform the required repairs on the old racks of the s.r.c. and i.r.c. fabricate new racks for the bagasse elevator/r.b.c. chains as per the sample. fabricate and installation new top and bottom covers of the t.r.p.f. as per the existing design and conduct a satisfactory trial. remove the worn tail-end boots of the s.r.c./i.r.c. fabricate new boots from 8 mm/10 mm thick plates as per the sample, installation them, carry out leak-proof welding, and conduct a satisfactory trial. dismantle the grabs of the cane unloaders, repair all parts, perform hardfacing on the fingers as instructed, reassemble the grabs, and conduct a satisfactory trial. remove the damaged juice tray used for compound imbibition in the mills. fabricate and installation a new tray as per the sample and reconnect all fittings. remove the worn guides provided to prevent the chains of the cane carrier, s.r.c., i.r.c., and bagasse elevator from lifting. fabricate and installation new guides as instructed and conduct a satisfactory trial. repair the worn wheels of the bridge/trolley drive of the cane unloaders by welding as instructed. remove the damaged twin chutes of the t.r.p.f. fabricate new twin chutes matching the existing design and erect them in position. fabricate and fit m.s. rings on the idler wheels of the cane carrier. provide a 25 mm thick plate support between the mill headstock and the t.r.p.f. headstock as instructed. repair the old hammer shanks of the fibrizer by welding, hardfacing, and balancing. remove the damaged hoods of the cane chopper/leveller. fabricate and installation new folding-type hoods. replace the broken pocket plates of the pocket-type anvil plate of the fibrizer with new plates. straighten bent plates, weld them, and perform hardfacing as instructed. build up the worn hub surfaces of the cane leveller/chopper rotor assembly by welding, machine them flat, and perform hardfacing. remove the weakened motor and gearbox beds of the cane unloaders. fabricate modified new beds, installation them, align the motor and gearbox, and conduct a trial. strengthen the weakened columns of the cane carrier structure by welding reinforcing plates. fabricate and fit juice rings in the mill rollers as per the sample. carry out the required repairs to the pressure chutes between the t.r.p.f. and the mill. remove the damaged mill juice receiving tank. fabricate a new tank using 8 mm/10 mm thick plates, installation it, reconnect all connections, and conduct a leak-proof trial. remove the damaged bottom cone of the mill juice receiving tank. fabricate and installation a new cone as per the sample, reconnect all fittings, and conduct a leak-proof trial. remove the damaged 10"/12" pipes between the mill juice tray and the gutter. fabricate and installation new stainless steel pipes and conduct a leak-proof trial. provide 3 mm thick stainless steel lining in the bottom trough of the s.r.c./i.r.c. with leak-proof welding. remove the loose bed of boiler feed pump no. 1, fabricate and installation a new bed, reconnect all fittings, and conduct a trial. fabricate a leak-proof damper in the old i.d. fan ducting before the chimney so that there is no backflow of air when the new i.d. fan operates. remove the nipple reducers and damaged pipelines of all three wet scrubber pumps. installation new pipelines and carry out leak-proof welding. remove all nozzles inside the wet scrubber venturi, replace damaged nozzles with new ones, and reconnect all fittings. fabricate a new backwash pipeline from old boiler tubes between the service tank and wet scrubber. installation new valves, clamps, and complete all connections. remove the damaged juice tray below the t.r.p.f. leading to the mill juice tray. fabricate and installation a new tray. remove damaged ash chutes of the boilers. fabricate new chutes from old/new plates matching the original design and installation them. repair the damaged dampers of air heaters, economizers, and f.d./i.d. fan inlet, outlet, suction, and delivery ducts. fabricate new frames and fit new mesh/screens for the internal steam filters of the boiler drums. remove the damaged flue gas ducting between the i.d. fans and chimney. fabricate and installation new ducting from 5–6 mm thick plates and conduct a leak-proof trial. fabricate new impellers for the bagassilo fan as per the sample, repair the casing, and conduct a successful trial. remove the damaged suction cones of the i.d./f.d. fan casings. fabricate and installation new cones as per the sample and conduct a satisfactory trial. replace the damaged perforated baffle plates inside the boiler feed tank. remove and repair the damaged bagasse feeding chutes of boilers 1, 2, and 3. replace the damaged air headers supplying additional f.d. air to the furnaces of 20-ton boilers 1 and 2. replace the damaged ducting between the air heater and i.d. fan with new ducting made from 5–6 mm thick plates. replace damaged perforated screens used for bagasse filtration in the bagasse elevator. remove the economizer coils/tubes of 20-ton boilers 1 and 2, clean them internally and externally, conduct hydraulic testing, reinstall them, make them leak-proof, and carry out final hydraulic testing. remove damaged trough channels/plates of the s.r.c./i.r.c., fabricate replacements as instructed, and installation them. fabricate and installation angle iron strengthening rings on the boiler chimney. strengthen the damaged truss-type bridge structure of the cane unloader using new channels, angles, and plates. weld and restore the enlarged holes of the block-type chain links of the s.r.c./i.r.c., redrill pin holes, and grind the surfaces smooth. replace the worn rack attachment links of the s.r.c./i.r.c. chains with new 12 mm thick plate attachments, weld them, and drill holes as per the drawing. construct separate access platforms for all three cane unloaders using old angle channels. replace the damaged portions of the i.d. fan casing, air heater cell/ducting, and economizer cell. replace the old m.s. plates of the s.r.c./i.r.c. trough and boot, make them leak-proof, and provide 3 mm stainless steel lining. fabricate new racks for the s.r.c./i.r.c. chains from 25 mm thick plates, drill holes, and provide roller supports at both ends. remove the bent 250 mm channel of the cane unloader trolley, restore line and level, strengthen the structure, fit a new runner square bar, check diagonals, and align the wheels. dismantle all four wheels of the mill and powerhouse cranes, clean them, inspect bearings, grease all plumber blocks, replace damaged bearings from mill spares, repair worn wheels by welding, and conduct a satisfactory trial. repair the worn shells and teeth of the t.r.p.f. top and bottom rollers by hardfacing. fit rings on both sides to compensate for reduced shell length. remove the damaged mill juice tray and fabricate a new tray using 5 mm stainless steel plate as per the sample. conduct a leak-proof trial. repair the stainless steel juice tray of the mill. remove the mill headstock if cracked or misaligned, re-grout it, realign it, and complete all associated works. remove the shaft of the damaged t.r.p.f. roller and dismantle the shell using gas cutting. cut old 63.5 mm boiler tubes with bends, prepare 5.1-meter straight tubes for the air heater, and clean them by grinding.
T18 Ref No : 16103288
Location : sarsawa , uttar pradesh
Source : GEM Tenders
tender for clarification and evaporator fabrication works removing the calandria of the evaporator and installing and fitting a new calandria of 650 m square heating surface and installing all the pipe lines valves and accessories in their place , replacing an old and worn out grand consultant juice plaza condensate syrup bottle with an 8 10 mm msc plate by connecting all connections. , the worn out umbrella plate in the vapor cell semi concentrator was removed and the plate was repaired and replaced with plastic , replacing the umbrella in the wide body vapor cell semi concentrator with a dated and 6 8 mm msc plate and conducting a trial. , removing the neck selvage of the quad body semi container and replacing it with a new 8 10 mm ms plate and testing it. , removing the neck selvage of the quad body semi container and repairing it with the provided plate and testing it. , cutting out the weakened roof of the quad body and replacing it with a 12mm plate provided and testing it. , cutting out the weakened part of the semi capacitor vapor cell quad body cell and replacing it with a 10 12mm plate provided and testing it for a satisfactory leak proofing test. , removal of the weak part of the exhaust pipeline going to the semi condenser vapor shell and fitting a new 800 mm diameter pipeline using the provided 8 10 mm plate in its place. , cutting out the worn partition plates of the top and bottom headers of the juice heater and replacing them with the provided 8 10 mm plate arranging for fitting the rubber strip , installing and strengthening the umbrella fitted to the vapor shell semiconductor quad body and conducting a satisfactory trial. , removing the weak intermediate first vapor second vapor pipes of the quad bodies and constructing new ones with a diameter of 500 650 mm using an 8 10 mm plate and conducting a satisfactory trial. , removing the weakened intermediate first vapor second vapor pipes of the quad bodies and installing new ones with a diameter of 700 850 mm from 8 10 mm plates and conducting a satisfactory trial. , dismantle fabricate and erect a 600 800 mm band and conduct a satisfactory trial. , dismantle fabricate and erect a 900 1100 mm band and conduct a satisfactory trial. , remove the steam valve from the juice heater and installation a new right angle valve size 400 500 mm with the corresponding pipe connection modifications and conduct a trial. , cut and remove the double beat valve from the juice heater and installation a new double beat valve size 8 diameter and conduct a trial , remove the intermediate coolers from the film type sulfur furnaces and installation them using the provided pipe plate and conduct a trial. , installation the sublimation pipes from the satvik type sulfur furnaces using the provided pipe or a new one and conduct a trial. , remove the empty filtrate bottle from the vacuum filter and installation a new filtrate bottle using an 8 10 mm ms plate and conduct a trial. make all connections and conduct a trial. , removing the filtrate bottle plate of the vacuum filter and repairing it with the provided plate and giving it a trial. , removing the filtrate plate of the vacuum filter tray and repairing it with the provided plate. , cutting and removing the neck shell of the lime slaker at the lime station and replacing it with a new one using the provided plate and giving it a trial. , creating the melter from the satvik sulfur furnace with a new 8 10 mm plate and giving it a satisfactory trial by installing the steam coil. , removing the worn out coils in the melters of the satvik sulfur furnace replacing them with new ones and conducting hydraulic testing and giving a satisfactory trial. , removing the worn out plates of the vacuum filter condensers replacing them with new ones and giving a satisfactory trial , removing the damaged weak steam coils in the film tine sulfur melters replacing them with new ones and conducting hydraulic testing and giving a satisfactory trial , renovate and installation a new so2 chamber inside the coolers of the satvik sulfur furnace and conduct a trial. , remove the old corroded so2 gas line at the sulfur furnace station and installation the new seamless ms line with flanges tightening the joints and bolts , remove the grooved plate of the mud mixture on the vacuum filter and repair it with the new plate provided , remove the grooved plate of the filtrate tank located below the vacuum filter installation the plate provided and perform a trial. , repairing the weak parts of juice and mud with dry box of clarifier and making all the connections. , patch the weak shell of the burning chamber of the film type sulfur furnace with the plate provided for a length of approximately 5 feet from the bottom and give a satisfactory trial. , patch the weak and rotten platforms of both vacuum filters with a new burner from the provided plate. , removing the so2 chamber inside the last cooler of the film type sulfur furnace and installing a new one using the provided 10 mm ms plate and making all connections. , repairing the damaged clear juice bottles near the clear juice pumps and making all the connections and giving satisfactory trial. , cut out and remove all rotten mud scrapers inside the door clarifier and installation the provided plates and belts according to size and give a satisfactory trial. , coat and remove the weak mud boot plates in each compartment of the clarifier and installation the provided new plates. , repairing the weak parts of the agitator fitted on the vacuum filter and giving satisfactory trial. , removing, clarification and evaporator fabrication works, clarification and evaporator

Unlock Full Tender Access

Start Free Trial to download documents before deadline

T18 Ref No : 15914061
Location : kolkata , west bengal
Source : GEM Tenders
tender for supply of 1.5 tr inverter type 5 star rated split air- conditioner unit , installation, testing and commissioning of the split ac unit , supplying and fixing extra copper pipe line , supplying and laying 4 core 2.5 sq. mm pvc insulated and pvc sheathed flexible copper cable , supplying and fixing of powder coated ms frame stand , supplying and fixing of 20 mm dia heavy duty pvc pipe with accessories for drain water connection , supplying and laying of pvc insulated and pvc round sheathed, 3 core ,2.5 sqmm, 1.1kv copper cable , supplying and fixing dp sheet steel enclosure on surface or recess along with 25,32a 240v, supply installation testing and commissioning of 4 nos inverter split ac at cto kolkata, supply of 1.5 tr inverter type 5 star rated split air-conditioner unit as per bee star rating, (as per new bee rating valid for 1st january 2026 to 31 december 2027 ) with remote control unit, filters, rotary type compressor, copper tubes for both indoor and outdoor unit, refrigerant gas with topping up of refrigerant if required, transportation of all of the above to the various sites and supplying the following up to the length of 3 mtrs etc. as required. (1) hot and cold refrigerant piping (2) suitable connecting electrical cable between indoor and outdoor unit. note-- 1) the manufacturers / suppliers shall give a warranty of the air conditioner for 15 months from date of supply or 12 months from date of installation, which is earlier. thereafter 9 years (108 months) additional warranty on the compressor., installation, testing and commissioning of the split ac unit at a specified location by mounting and fitting indoor and outdoor units at their respective locations , laying and fixing of both liquid and hot gas lines, interconnecting wiring for both indoor outdoor units up to 3 mtrs length and ,interconnecting the indoor unit and outdoor unit with refrigerant line, insulating the refrigerant pipe with expandable polyethylene foam tubing unit , leak testing entire system ,charging refrigerant gas in the unit ,making power supply connections from the power point etc complete as required., supplying and fixing extra copper pipe line both 1/4 inch for gas line and 5/8 inch for liquid line or suitable dia to match with the pipeline of the new unit along with suitable size rubber foam/insulation on surface of the wall i/c necessary flare nuts, suitably brazing with the existing pipe clamping, making holes in walls, same etc., as per site requirement. note - the length of refrigerant pipes supplied with each ac units is 3 mtr. extra length shall be paid extra for which firm shall quote their unit rates., supplying and laying 4 core 2.5sq.mm pvc insulated and pvc sheathed flexible copper cable along refrigerant pipe or on existing conduit / cable tray i/c binding with plastic tags for extending supply from existing industrial socket to indoor unit etc, as required . (make- any isi mark ) . note- the length of copper cable supplied with each unit is 3 mtr . extra length shall be paid extra., supplying and fixing of powder coated ms frame stand comprising of two numbers bracket made of heavy duty ms sheet to accommodate the condenser (outdoor) unit for fixing on the wall with suitable diameter and length of anchor fast bolts and making good damages etc as per site requirement ., supplying and fixing of 20 mm dia heavy duty pvc pipe with accessories for drain water connection where ever required etc. complete as required.(make- any isi mark ) ., supplying and laying of pvc insulated and pvc round sheathed, 3 core ,2.5 sqmm, 1.1kv copper cable ( un-aoumerd ) including connection , testing checking etc as complete as required, supplying and fixing dp sheet steel enclosure on surface or recess along with 25,32a 240v c curve dp mcb complete with connections ,testing and commissioning etc. as complete as reqd.

Every year, central and state government departments release thousands of high-value contracts specifically dedicated to Gas Pipeline Filters. Whether it involves bulk material supply, executing specialized operational services, or end-to-end turnkey project execution, the demand for capable vendors in the Gas Pipeline Filters sector is massive.

At Tender18, we help businesses cut through the noise and exclusively target the exact work categories they specialize in. Instead of browsing through generic procurement sites, our platform isolates high-potential opportunities that match your specific industry capabilities.

Work Dynamics in the Gas Pipeline Filters Sector

Government requirements for this specific vertical generally fall into distinct procurement patterns:

  • Product & Material Supply: Tenders focused strictly on sourcing, testing, and delivering high-quality items that meet the exact technical specifications of the buyer.
  • Service Level Agreements (SLAs): Long-term hiring of expert agencies for routine maintenance, manpower deployment, or continuous operational management.
  • Execution & Turnkey Projects: Comprehensive contracts where the bidder is responsible for everything from raw material procurement to final site installation and testing.

By focusing purely on your core strength in Gas Pipeline Filters, you can build a highly profitable and stable pipeline of government clients.

Stop wasting time filtering through irrelevant notices. Our Gas Pipeline Filters Tender Information Service is engineered for precision. We track exact product codes, service names, and specialized work terms across all government portals nationwide. When a buyer publishes a requirement that matches your specific business profile, our system alerts you instantly.

Deep Technical Insights & Documentation For Gas Pipeline Filters Tenders

Bidding for specific works requires studying strict technical parameters. We provide immediate access to the core documents you need to evaluate the project:

  • Detailed Specifications & Drawings: Download the exact engineering guidelines, material testing standards, and quality benchmarks demanded by the buyer for Gas Pipeline Filters.
  • Financial BOQ Spreadsheets: Access the official blank pricing formats where you need to input your unit rates, tax configurations, and total bid value.
  • Real-Time Technical Amendments: If the buying department changes the product specifications, alters the service scope, or shifts the delivery timeline, we instantly update the parent file so you are never caught off-guard.

Winning a contract for Gas Pipeline Filters depends entirely on how perfectly your technical capabilities match the buyer’s demands. Even if you have the best product or service, a poorly formatted document or a missing compliance certificate will lead to instant technical rejection. Tender18’s Tender Bidding Service eliminates this risk by taking complete ownership of your digital submission.

Flawless Compliance & Portal Execution For Gas Pipeline Filters Tenders

Under this service, Tender18 assigns a Dedicated Experienced Technical Person to your profile. This expert handles the heavy lifting of the entire bidding cycle:

  • Capability Mapping: We thoroughly cross-check your past completion certificates, ISO standard proofs, and financial turnover against the strict eligibility criteria required for Gas Pipeline Filters bids.
  • Secure System Integration: Our technical desk seamlessly links your Class III Digital Signature Certificate (DSC) with the required e-procurement servers to securely encrypt your technical and financial envelopes.
  • Error-Free Financial Uploads: We audit your quoted BOQ pricing sheets for any formula or formatting errors before the final upload, ensuring your bid is successfully locked before the portal's closing hours.

Government buyers are aggressively using the Government e-Marketplace (GeM) for the direct procurement of Gas Pipeline Filters. If your business profile is not accurately mapped on this portal, you remain practically invisible to these purchasing officers. Recognized as a trusted and expert GeM consultant, Tender18 offers specialized support to build, optimize, and maintain a highly visible vendor account for your business.

With an industry-leading support success ratio of over 95%, we handle the complex marketplace compliance so you can focus entirely on executing your orders

Expert Profile Management & Catalogue

Our dedicated consultants ensure your GeM presence is structurally perfect:

  • Precise Catalogue Listing: We upload and categorize your specific offerings under the exact search terms and parameters used by government buyers looking for Gas Pipeline Filters, ensuring maximum search visibility.
  • OEM Dashboard & Assessment: For original manufacturers and creators, we guide you through the mandatory Quality Council of India (QCI) vendor assessments to successfully unlock your official OEM panel.
  • Profile Compliance & Caution Money: We manage your statutory documentation, brand approvals, and caution money limits to keep your account immune from technical suspensions.

Strategic Live Bid Participation

Beyond setup, we actively drive your market participation. Our team expertly handles the digital paperwork and rate configurations for GeM Custom Bids and Reverse Auctions (RA) related to Gas Pipeline Filters, maximizing your chances of securing L1 status.

1.

How do I find government contracts exclusively matching my work in Gas Pipeline Filters?

The easiest way is through the Tender18 platform. Instead of searching department by department, our system uses advanced keyword matching to gather all live supply, service, and execution tenders related directly to your core business in one place.

2.

Do I need specific testing or quality certificates to apply for these contracts?

It heavily depends on the nature of the work. For supply contracts, buyers often ask for ISO certifications, BIS marks, or specific lab testing reports. For service contracts, they may ask for labor licenses or past performance certificates (work orders).

3.

What is a BOQ and why is it important for my bid?

The Bill of Quantities (BOQ) is the official financial Excel sheet where you enter your competitive prices. Any mistake in this file—like adding extra rows, changing formulas, or saving it in the wrong format—will cause the portal server to reject your entire bid.

4.

Are samples required to be submitted physically before the digital bid opens?

For many product-based Gas Pipeline Filters tenders, buying departments do ask bidders to submit physical samples to their office before the digital technical evaluation date. This requirement is always clearly mentioned in the official NIT document.

5.

How does the Dedicated Tender Expert from Tender18 help me?

Our assigned expert manages your total portal compliance. They extract the hidden rules from long tender PDFs, create a precise document checklist for your team, map your digital signature, and securely upload your technical and financial files onto the government servers.

6.

What is the role of a Digital Signature Certificate (DSC)?

A Class III DSC is a secure USB device that contains your digital identity. You cannot upload a bid without it. It is used to securely encrypt and lock your sensitive price data and technical documents so no one can view them before the official opening date.

7.

As an MSME, can I get financial benefits when bidding for Gas Pipeline Filters?

Yes, the government strongly supports MSMEs. By uploading a valid Udyam Registration Certificate in the technical envelope, small businesses are frequently exempted from paying the initial Tender Document Fee and the Earnest Money Deposit (EMD).

8.

Why should I list my services or products on GeM for this category?

GeM is now the primary digital marketplace for all government agencies. If you are properly cataloged for Gas Pipeline Filters, officers can view your profile and generate direct purchase orders or invite you to participate in exclusive Custom Bids.

9.

What makes Tender18 a reliable GeM support partner?

As a highly trusted and expert GeM consultant, Tender18 holds a proven support success ratio of over 95%. From flawless profile creation and complex catalogue mapping to OEM panel approvals and live Reverse Auction (RA) support, we handle it all seamlessly.

10.

What does "L1" mean in these government contracts?

"L1" stands for "Lowest Bidder 1". In government procurement, after all technical envelopes are approved, the financial sheets (BOQs) are opened. The bidder who has quoted the lowest compliant price for Gas Pipeline Filters is declared L1 and is generally awarded the contract