Filters By:

T18 Ref No
Keyword
State
City
Agency
Tender ID
Due Date
Tender Source
Tender Type

10Results forLatest Fan coil machine repair Tenders List

Latest Fan coil machine repair Tenders in India – Verified Leads & Real-Time Insights by Tender18

Finding the right Fan coil machine repair tenders in India’s competitive e-procurement ecosystem requires more than just access—it demands accurate data, real-time monitoring, and expert analysis.

At Tender18 Infotech Private Limited, we bring deep industry experience in government procurement to help businesses identify, evaluate, and win Fan coil machine repair tenders efficiently. With a centralized platform aggregating 1100+ live tenders, we provide a single, trusted source for opportunities from central, state, and PSU departments.


Real-Time Fan coil machine repair Tender Intelligence & Monitoring

Our advanced dashboard delivers actionable insights and structured tender data, enabling you to make faster and smarter bidding decisions.

We categorize Fan coil machine repair tenders into:

  • Supply Tenders – BOQs and specifications sourced from GeM and PSUs
  • Service Tenders – NITs and scope of work from CPPP and state portals
  • EPC Projects – Large-scale infrastructure tenders with financial and design data

✔ This structured approach ensures complete transparency and deeper bid analysis before submission.


Comprehensive Sources of Fan coil machine repair Tenders

Tender18 acts as a centralized gateway by aggregating tenders from trusted and official sources:

  • Central Government Portals – CPPP, NIC, and Government e-Marketplace (GeM)
  • Railways & Transport – IREPS and Metro Rail projects
  • Power & Energy PSUs – NTPC, ONGC, NHPC, PowerGrid
  • Defense & Strategic Sectors – MES and DRDO tenders
  • State e-Procurement Portals – Gujarat, Maharashtra, Tamil Nadu, UP, and more

✔ Every listing is verified and regularly updated to maintain data accuracy and trust.


Step-by-Step Guide to Participate in Fan coil machine repair Tenders

1. Eligibility & Prequalification

Before bidding, ensure compliance with:

  • Financial turnover requirements (30–50% of tender value)
  • Past experience (2–3 similar projects)
  • Valid solvency certificate

2. Mandatory Documentation Checklist

Prepare the following to avoid disqualification:

  • Digital Signature Certificate (Class 3 DSC)
  • GST, PAN, MSME/Udyam registration
  • EMD (Earnest Money Deposit) or exemption proof
  • Technical bid with execution methodology

3. BOQ Analysis & Financial Bidding

The BOQ (Bill of Quantities) is the most critical component:

  • Analyze item-wise pricing
  • Ensure competitive yet sustainable quotes
  • Avoid underbidding risks (L1 pressure)

✔ Expert analysis can significantly improve your bid success ratio.


Why Tender18 is a Trusted Platform for Fan coil machine repair Tenders

✔ Proven Expertise in Government Procurement

We combine industry knowledge with practical bidding experience.

✔ Verified & Reliable Data

All Fan coil machine repair tenders are sourced from official portals and cross-checked for accuracy.

✔ Advanced Filtering Tools

Filter tenders by value, EMD, location, and category for precise targeting.

✔ Corrigendum & Update Tracking

Get instant alerts on deadline changes and specification updates.

✔ Historical Data Insights

Analyze past tender results to understand pricing trends and competition.

✔ End-to-End Bidding Support

From discovery to submission, including GeM onboarding and strategy.


Growth of Fan coil machine repair Sector in 2026

With the Government of India focusing on digital procurement and infrastructure expansion, the Fan coil machine repair sector has seen significant growth in e-tendering opportunities.

The rise of GeM-based procurement models like:

  • L1 Purchase
  • Direct Procurement
  • MSME-friendly policies

…has made it easier for startups and SMEs to participate and win contracts


Frequently Asked Questions (SEO Optimized)

How can I get daily Fan coil machine repair tender alerts?

You can register on Tender18 and select your preferred category. You will receive daily email alerts with all new Fan coil machine repair tenders.

Is EMD mandatory for all Fan coil machine repair tenders?

No, MSME and Udyam-registered businesses may get exemptions. Always check the NIT for specific conditions.

What is the difference between a Fan coil machine repair work tender and supply tender?

A supply tender involves delivering goods, while a work tender includes execution, labor, and project completion.

Can I access private Fan coil machine repair tenders on Tender18?

Yes, we also track major private sector and EPC tenders along with government opportunities.


Get Expert Support for Fan coil machine repair Tenders

Tender18 is more than a listing platform—we are your strategic partner in winning tenders.

Our services include:

  • Tender discovery & analysis
  • Documentation support
  • Bid strategy & submission
  • GeM registration & OEM onboarding

📞 Call / WhatsApp: +91 7069661818
🌐 Website: www.tender18.com

T18 Ref No : 16174786
live Tender
Location : jammu , jammu & kashmir
Source : GEM Tenders
live Tender

corrigendum tender for taking down carefully copper aluminium point , material and labour for point wiring for light fan , material and labour complete for switch , material and labour complete for socket , material and labour complete for socket outlet , material and labour complete for switch socket , supply and fixing in replacement , supply and fixing switch modular , supply and fixing led tube light , supply and fixing led tube light fitting , supply and fixing 12 watts led bulb , supply and fixing in replacement of lam , supply and fixing of powder coated pressure , supply and fixing in replacement mccb , supply and fixing amp rating , supply and fixing amp rating 240v 10ka , supply and fixing exhaust fan steel body , supply and fixing mccb 4 pole , material and labour for comprehensive maintenece , replacement of old unseviceable damage , repalcement of old unsv damage pcb with new , material and labour for detecting the gas leakage , supply and fixing copper pipe , repair rewinding and maint of voltage stabilizer , earthing complete with copper earth plate, repair and maint of internal electric wiring and repair to air conditioning system, taking down carefully copper aluminium point wiring light fan bell socket or power complete including fixture and fittings such as switches ceiling roses pendents regulators sockets light fittings etc removing materials to store for keeping in safe custody or for taking credit and making good disturbed surfaces of walls floors etc . credit for above items should be made as per conditions separately., material and labour for point wiring for light fan bell with frls cable 1.5 sqmm pvc insulated red for phase and black for neutral unsheathed multi stranded copper conductor 1100 volt grade in and incl not less than 2mm thick pvc casing caping concealed with pvc conduit as per site requirment with all accessories and 1.50 sqmm green in colour pvc copper conductor cable for earth continuity connected to common earth dolly incl pvc box surface modular sunken box type with pvc sheet for mounting fittings such as switches sockets fan regulators etc complete all as specified and directed for one light/fan bell point controlled by one switch and making good to disturbed surface of wall etc, material and labour complete for switch piano flush button single pole one way 16 amp 240 volts., material and labour complete for socket outlet 2 in 1 2 and 3 pin 6 amp piano flush type 240 volts complete all as specified, material and labour complete for socket outlet 2 in 1 3 pin 6 amp and 16 amp piano flush type 240 volts complete all as specified, material and labour complete for switch socket combination 5a 16 a 5 in 1 flush type 240 volts complete all as specified, supply and fixing in replacement 36 watts recess pendant mounting ultraslim led flat panel 2 x 2 made of extruded aluminium frame with high leds and glare free opal diffuser ip20 incl taking down old unsv., supply and fixing switch modular piano flush button single pole one way 6 amps 1 module with suitable plate and cover complete all as specified and directed., supply and fixing led tube light fitting 1x18 20 watt wall mounted led batten with aluminum housing and integrated electronic driver incl taking down old unsv., supply and fixing led tube light fitting 1x10 watt wall mounted led batten with aluminum housing and integrated electronic driver incl taking down old unsv., supply and fixing 12 watts led bulb complete all as specified and directed., supply and fixing in replacement of lamp holder angle holder insulated body with black white plate for batten fittings including taking down unsv lamp holder complete all as specified and directed., supply and fixing of powder coated pressure die cast aluminium compact high power led street light fittings with heat resistant toughned glass with lense and top opening having 60 watt including making electric connections using two run of 1.5 sqmm single core unarmoured wire from junction box fixed in repairs complete all as specified and as directed., supply and fixing in replacement mccb having current ratings 63 amps with rupturing cap 16 ka ac 415 volts three pole all as specified and directed including dismentling the existing u s mccbs with all connections and all as required at site or directed., supply and fixing amp rating 240v 10ka c curve spn miniature circuit breaker mcb and 32 amp current carrying capacity complete with connection testing and commissioning including taking down old unsv mcb complete., supply and fixing amp rating 240v 10ka c curve sp miniature circuit breaker mcb and 6 to 32 amp current carrying capacity complete with connection testing and commissioning including taking down old unsv mcb complete., supply and fixing exhaust fan steel body ac single phase. 230v of size 300mm sweep heavy duty with blades frame and louvers including making hole and suitable fixing avoid bird entred from outside complete all as specified and directed, supply and fixing mccb 4 pole 415 volts adjustable type 200 amps with breaking capacity 36 ka including old taking dwon and refixing with new complete all as specified directed., material and labour for comprehensive maintenece and servicing of split type air conditioner/window type unit of any capacity upto 2 ton outer and inner unit both of any make including cleaning the dust from body with blower cleaning of condenser and cooling coil checking all connections including functioning of metal clad socket dp switch function of relay capacitors overload protector thermostat fan motor fan blower drum electronic contol box, etc,, replacement of old unseviceable damage hermatic sealed compressor unit with new hermatic sealed unit 2 ton capacity and any specifications including taking down unsv hermatic sealed unit complete all as specified and directed., repalcement of old unsv damage pcb with new pcb for split air conditioner of capacity 2 ton and any type any specification including taking down old unsv pcb complete all as specified and directed., material and labour for detecting the gas leakage rectifying the defects including repair to condensor coil/evaporator coil by means of welding soldring etc vacumizing and charging topping up fresh freon gas and commissioning and testing for split type window type ac all as specified and directed, supply and fixing copper pipe 1 4 and also removing old unsv copper pipe from existing split acs any type any make complete all as specified and direceted., repair rewinding and maint of voltage stabilizer of any make and capacity up to 5 kva after disconnecting the voltage stabilizer from machine rewinding with super enamalled copper of existing gauge including replacement of unsv part like voltmetre amp metre cut out relay electric circuit indicator lamp top plug flexible wire including neccessary painting with two coats of synthetic enamel paint after proper sctretching and preparing the surface complete all as specified and directed., earthing complete with copper earth plate electrode 60x60cmx3.15mm thick buried directly in ground earth pit not less than 2.25 metres deep below ground level with top edge of the plate not less than 1.5 metres below normal ground level connected to copper strip 20x3mm as earthing lead by means of bolts nuts check nuts and washers of copper brazing all as shown in electrical plate no. 3 connected to earthing test point including pcc earth pit with galavanised pit cover all as specified or indicated including testing on completion


Agency / Dept : indian army
Tender Value : 0
Due Date : Jul 21, 2026
T18 Ref No : 15266964
Location : dhanbad , jharkhand
Source : GEM Tenders

tender for installation of ac , serviceing of ac with minor repair , supply of , labour charge of ac machine checking minor repair dismantling and after fitting , gas charging , rewinding of , repairing of , water cooler and fridge , geyser, arc of ac water cooler and geyser, window type, split type, air filter, gas filter, capillary tube, compressor, indoor motor split type, outdoor motor split type, combined capacitor, fan net, fan capacitor, outdoor heat condenser, swing motor, display, pcb wire, single sensor, double sensor, remote, pcb board non inverter type, ac flap, indoor water pipe, pcb board transformer, contactor 2 phase, compressor oil, indoor stand, outdoor stand, cotton tape insulation, blower window type, blower split type, nut 1 by 2 inch split type, nut 1 by 4 in split type, nut 3 by 8 in split type, nut 5 by 8 in split type, indoor pcb board inverter type, outdoor pcb board inverter type, indoor dc motor inverter type, outdoor dc motor inverter type, 1 by 2 inch diameter copper pipe, 1 by 4 inch diameter copper pipe, 3 by 8 inch diameter copper pipe, 5 by 8 inch diameter copper pipe, 1 by 2 inch diameter insulation pipe, 1 by 4 inch diameter insulation pipe, 3 by 8 inch diameter insulation pipe, 5 by 8 inch diameter insulation pipe, r22, r32, r410, fan motor window type, outdoor fan motor split type, pcb, indoor leakage split type, indoor leakage window type, indoor pcb board inverter ac, outdoor pcb board inverter ac, servicing of water cooler with minor repair, capacitor, fan motor, fan blade, relay overload, drayer, filter, nrv, condensor coil, evaprator coil, thermostate, gas charging r600, gas charging r134, servicing of gyser with minor repair, thermostat, element, auto cut switch, safety valve, assembly, connecting pipe, indicator led, capillary thermal switch


Tender Value : 271464.9
Due Date : May 16, 2026
T18 Ref No : 15284604
Location : rawatbhata , rajasthan
Source : GEM Tenders

corrigendum tender for repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 1 rewinding of three phase 415 v 50hz motors of less than 1 point 1kw rating as per part a scope of work for further detail refer scope of work and bo.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 2 rewinding of three phase 415 v 50hz motors of more than 1 point 1 kw up to 2 point 2 kw rating as per part a scope of work for further detail refer .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 3 rewinding of three phase 415 v 50hz, motors of more than 2 point 2 kw up to 5 point 5 kw rating as per part a scope of work for further detail refer.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 4 rewinding of three phase, 415 v 50hz motors of more than 5 point 5 kw up to 11 kw rating as per part a scope of work for further detail refer scope .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 5 rewinding of three phase 415 v 50hz motors of more than 11 kw up to 22 kw rating as per part a scope of work for further detail refer scope of work .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 6 rewinding of three phase 415 v 50hz motors of more than 22 kw up to 55 kw rating as per part a scope of work for further detail refer scope of work .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 7 rewinding of three phase 415 v 50hz motors of more than 55 kw up to 75 kw rating as per part a scope of work for further detail refer scope of work .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 8 rewinding of three phase 415 v 50hz motors of more than 75 kw up to 90 kw rating as per part a scope of work for further detail refer scope of work .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 9 rewinding of three phase 415 v 50hz motors of more than 90 kw up to 110 kw rating as per part a scope of work for further detail refer scope of work.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 10 rewinding of three phase, 415 v 50hz motors of more than 110 kw up to 132 kw rating as per part a scope of work for further detail refer scope of w.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 11 rewinding of three phase, 415 v 50hz motors of more than 132 kw up to 140 kw rating as per part a scope of work for further detail refer scope of w.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 12 rewinding of three phase 415 v 50hz motors of more than 140 kw up to 180 kw rating as per part a scope of work for further detail refer scope of wo.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 13 rewinding of three phase, 415 v 50hz submersible pump motors up to 2 point 5 kw rating as per part a scope of work for further detail refer scope o.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 14 rewinding of three phase 415 v 50hz submersible pump motors more than 2 point 5 kw up to 5 point 5 kw rating as per part a scope of work for furthe.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 15 rewinding of three phase, 415 v 50hz submersible pump motors more than 5 point 5 kw up to 11 kw rating as per part a scope of work for further deta.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 16 rewinding of three phase 415 v 50hz submersible pump motors more than 11 kw up to 15 kw rating as per part a scope of work for further detail refer.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 17 rewinding of three phase 415 v 50hz submersible pump motors more than 30 kw up to 37 kw rating as per part a scope of work for further detail refer.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 18 rewinding of single phase 230 v 50hz motors of pedestal fan by wall mounted fan by exhaust fan up to 450 mm sweep as per part a scope of work for f.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 19 rewinding of single phase 230 v 50hz motors of exhaust fan by cooler fan above 400 mm sweep as per part a scope of work for further detail refer sc.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 20 rewinding of 2000 va control transformer as per part a scope of work for further detail refer scope of work and boq attached total quantity 1 is eq.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 21 rewinding of 1000 va control transformer as per part a scope of work for further detail refer scope of work and boq attached total quantity 1 is eq.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 22 rewinding of 500 va control transformer as per part a scope of work for further detail refer scope of work and boq attached total quantity 1 is equ.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp- 7 and 8; cart 23 rewinding of control coil 415v diameter up to 300mm including bobbin as per part a scope of work for further detail refer scope of work and boq att.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 24 rewinding of single phase 230 v 50hz submersible pump motors up to 1 point 5 kw rating as per part a scope of work for further detail refer scope o.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 25 repair of hot spot in three phase 415 v 50hz motors up to 1 point 5 kw rating as per part b scope of work for further detail refer scope of work an.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 26 repair of hot spot in three phase 415 v 50hz motors of more than 1 point 5 kw up to 7 point 5 kw rating as per part b scope of work for further det.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 27 repair of hot spot in three phase 415 v 50hz motors of more than 7 point 5 kw up to 22 kw rating as per part b scope of work for further detail ref.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 28 repair of hot spot in three phase 415 v 50hz motors of more than 22 kw up to 45 kw rating as per part b scope of work for further detail refer scop.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 29 repair of hot spot in three phase 415 v 50hz motors of more than 45 kw up to 90 kw rating as per part b scope of work for further detail refer scop.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 30 repair of hot spot in three phase 415 v 50hz motors of more than 90 kw up to 180kw rating as per part b scope of work for further detail refer scop.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 31 removal of hot spot by dismantling of total stampings in three phase 415 v 50hz motors up to 22 kw rating as per part b scope of work for further d.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 32 removal of hot spot by dismantling of total stampings in three phase 415 v 50hz motors of more than 22 kw up to 45 kw rating as per part b scope of.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 33 removal of hot spot by dismantling of total stampings in three phase 415 v 50hz motors of more than 45 kw up to 90 kw rating as per part b scope of.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 34 removal of hot spot by dismantling of total stampings in three phase 415 v 50hz motors of more than 90 kw up to 180 kw rating as per part b scope o.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 35 remetalizing of shaft using tafa arc technique after preparation of surface and machining to proper size up to 1 point 5 kw motor as per part b sc.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 36 re-metalizing of shaft using tafa arc technique after preparation of surface and machining to proper size more than 1 point 5kw up to 7 point 5 kw .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 37 remetalizing of shaft using tafa arc technique after preparation of surface and machining to proper size more than 7 point 5 kw up to 15kw motor a.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 38 re-metalizing of shaft using tafa arc technique after preparation of surface and machining to proper size more than 15 up to 45 kw motor as per par.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 39 remetalizing of shaft using tafa arc technique after preparation of surface and machining to proper size more than 45kw up to 90 kw motor as per p.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 40 re-metalizing of shaft using tafa arc technique after preparation of surface and machining to proper size more than 90kw to 180kw motor as per part.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 41 remetalizing of end covers using tafa arc technique after preparation of surface and machining to proper size up to 1 point 5 kw motor as per part.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 42 re-metalizing of end covers using tafa arc technique after preparation of surface and machining to proper size more than 1 point 5 kw up to 7 point.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 43 re-metalizing of end covers using tafa arc technique after preparation of surface and machining to proper size more than 7 point 5 kw to 15kw motor.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 44 re-metalizing of end covers using tafa arc technique after preparation of surface and machining to proper size more than 15 kw up to 45 kw motor as.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 45 re metalizing of end covers using tafa arc technique after preparation of surface and machining to proper size more than 45kw up to 90 kw motor as .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 46 re-metalizing of end covers using tafa arc technique after preparation of surface and machining to proper size more than 90 kw to 180kw motor as pe.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 47 replacement of pvc cooling fan for motors size up to 1 point 5 kw as per part b scope of work for further detail refer scope of work and boq attach.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 48 replacement of pvc cooling fan for motors size more than 1 point 5kw up to 7 point 5 kw as per part b scope of work for further detail refer scope .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 49 replacement of pvc cooling fan for motors size more than 7 point 5kw unto 15kw as per part b scope of work for further detail refer scope of work a.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 50 replacement of pvc cooling fan for motors size more than 15kw up to 45kw as per part b scope of work for further detail refer scope of work and boq.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 51 dynamic balancing of rotor with 2 point 5 microns accuracy size more than 1kg up to 4 kg as per part b scope of work for further detail refer scope.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 52 dynamic balancing of rotor with 2 point 5 microns accuracy size more than 4 kg up to 16 kg as per part b scope of work for further detail refer sco.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 53 dynamic balancing of rotor with 2 point 5 microns accuracy size more than 16 kg up to 48 kg as per part b scope of work for further detail refer sc.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 54 dynamic balancing of rotor with 2 point 5 microns accuracy size more than 48 kg up to 96 kg as per part-b scope of work for further detail refer sc.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 55 dynamic balancing of rotor with 2 point 5 microns accuracy size more than 96 kg up to 192 kg as per part b scope of work for further detail refer s.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 56 dynamic balancing of rotor with 2 point 5 microns accuracy size more than 192 kg up to 378 kg as per part b scope of work for further detail refer .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 57 dynamic balancing of rotor with 2 point 5 microns accuracy size more than 378 kg up to 500 kg as per part b scope of work for further detail refer .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 58 dynamic balancing of rotor with 2 point 5 microns accuracy size more than 500 kg up to 1000 kg as per part b scope of work for further detail refer.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 59 dynamic balancing of rotor with 2 point 5 microns accuracy size more than 1000 kg up to 1500 kg as per part b scope of work for further detail refe.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 60 dynamic balancing of rotor with 2 point 5 microns accuracy size more than 1500 kg up to 3000 kg as per part b scope of work for further detail refe.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 61 supply and installation of terminal plate by terminal studs with insulators one quantity includes terminal studs for all three phases size up to 1 .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 62 supply and installation of terminal plate by terminal studs with insulators one quantity includes terminal studs for all three phases size more tha.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 63 supply and installation of terminal plate by terminal studs with insulators one quantity includes terminal studs for all three phases size more tha.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 64 supply and installation of terminal plate by terminal studs with insulators one quantity includes terminal studs for all three phases size more tha.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 65 supply and installation of terminal plate by terminal studs with insulators one quantity includes terminal studs for all three phases size more tha.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 66 supply and installation of terminal plate by terminal studs with insulators one quantity includes terminal studs for all three phases size more tha.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 67 removing of shaft making of new shaft and refitting of shaft with key way material used shall be same as original and material is in contractor sco.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 68 removing of shaft making of new shaft and refitting of shaft with key way material used shall be same as original and material is in contractor sco.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 69 removing of shaft making of new shaft and refitting of shaft with key way material used shall be same as original and material is in contractor sco.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 70 removing of shaft making of new shaft and refitting of shaft with key way material used shall be same as original and material is in contractor sco.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 71 making of end cover including machining drilling and threading etc to size up to 1 point 5 kw material cast iron for above end cover is in contract.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 72 making of end cover including machining drilling and threading etc to size more than 1 point 5kw up to 7 point 5 kw material cast iron for above en.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 73 making of end cover including machining drilling and threading etc to size more than 7 point 5kw up to 15kw material cast iron for above end cover .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 74 making of end cover including machining drilling and threading etc to size more than 15kw up to 45kw material cast iron for above end cover is in c.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 75 making of end cover including machining drilling and threading etc to size more than 45kw up to 90kw material cast iron for above end cover is in c.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 76 making of end cover including machining drilling and threading etc to size more than 90kw up to 180kw material cast iron for above end cover is in .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 77 making of cooling fan including machining keyway and key hub excluding material size up to 1 point 5 kw as per part b scope of work for further det.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 78 making of cooling fan including machining keyway and key hub excluding material size more than 1 point 5kw up to 7 point 5 kw as per part b scope o.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 79 making of cooling fan including machining keyway and key hub excluding material size more than 7 point 5kw up to 15kw as per part b scope of work f.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 80 making of cooling fan including machining keyway and key hub excluding material size more than 15kw up to 45kw as per part b scope of work for furt.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 81 making of cooling fan including machining keyway and key hub excluding material size more than 45kw up to 90kw as per part b scope of work for furt.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 82 making of cooling fan including machining keyway and key hub excluding material size more than 90kw up to 180kw as per part b scope of work for fur.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 83 material cost iron for making of cooling fan end cover as per part b scope of work for further detail refer scope of work and boq attached total qu.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 84 providing and fixing of bearing plates with material same as original size up to 1 point 5 kw as per part b scope of work for further detail refer .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 85 providing and fixing of bearing plates with material same as original size more than 1 point 5kw up to 7 point 5 kw as per part b scope of work for.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 86 providing and fixing of bearing plates with material same as original size more than 7 point 5kw up to 15kw as per part b scope of work for further.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 87 providing and fixing of bearing plates with material same as original size more than 15kw up to 45kw as per part b scope of work for further detail.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 88 providing and fixing of bearing plates with material same as original size more than 45kw up to 90kw as per part b scope of work for further detail.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 89 providing and fixing of bearing plates with material same as original size more than 90kw up to 180kw as per part b scope of work for further detai.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 90 providing and fixing of bearing locks duly machined threaded and drilled with material same as original size up to 15kw as per part b scope of work.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 91 providing and fixing of bearing locks duly machined threaded and drilled with material same as original size more than 15kw up to 45kw as per part .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 92 providing and fixing of bearing locks duly machined threaded and drilled with material same as original size more than 45kw up to 90kw as per part .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 93 providing and fixing of bearing locks duly machined threaded and drilled with material same as original size more than 90kw to 180kw as per part b .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 94 providing and fixing of foundation legs including machining drilling and levelling etc material shall be in contractor scope size up to 1 point 5 k.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 95 providing and fixing of foundation legs including machining drilling and levelling etc material shall बड ववरण/bid details be in contractor scope size more than 1 point.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 96 providing and fixing of foundation legs including machining drilling and levelling etc material shall be in contractor scope size more than 7 point.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 97 providing and fixing of foundation legs including machining drilling and levelling etc material shall be in contractor scope size more than 15 up t.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 98 dismantling and refitting without varnish and baking size up to 1 point 5 kw as per part b scope of work for further detail refer scope of work and.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 99 dismantling and refitting without varnish and baking size more than 1 point 5kw up to 7 point 5kw as per part b scope of work for further detail re.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 100 dismantling and refitting without varnish and baking size more than 7 point 5kw up to 15kw as per part b scope of work for further detail refer sc.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 101 dismantling and refitting without varnish and baking size more than 15kw up to 45kw as per part b scope of work for further detail refer scope of .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 102 dismantling and refitting without varnish and baking size more than 45kw up to 90kw as per part b scope of work for further detail refer scope of .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 103 dismantling and refitting without varnish and baking size more than 90kw up to 180kw as per part b scope of work for further detail refer scope of.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 104 dismantling and refitting with varnish and baking size up to 1 point 5 kw as per part b scope of work for further detail refer scope of work and b.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 105 dismantling and refitting with varnish and baking size more than 1 point 5kw up to 7 point 5kw as per part b scope of work for further detail refe.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 106 dismantling and refitting with varnish and baking size more than 7 point 5kw up to 15kw as per part b scope of work for further detail refer scope.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 107 dismantling and refitting with varnish and baking size more than 15kw up to 45kw as per part b scope of work for further detail refer scope of wor.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 108 dismantling and refitting with varnish and baking size more than 45kw up to 90kw as per part b scope of work for further detail refer scope of wor.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 109 dismantling and refitting with varnish and baking size more than 90kw up to 180kw as per part b scope of work for further detail refer scope of wo.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 110 providing and fixing of oil seal size less than 1 point 1 kw as per part b scope of work for further detail refer scope of work and boq attached t.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 111 providing and fixing of oil seal size 1 point 1 kw to 2 point 2 kw as per part b scope of work for further detail refer scope of work and boq atta.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 112 providing and fixing of oil seal size more than 2 point 2 kw up to 5 point 5 kw as per part b scope of work for further detail refer scope of work.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 113 providing and fixing of oil seal size more than 5 point 5 kw up to 15 kw as per part b scope of work for further detail refer scope of work and bo.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 114 providing and fixing of oil seal size more than 15kw up to 30kw as per part b scope of work for further detail refer scope of work and boq attache.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 115 providing and fixing of space heater size more than 30 up to 45kw as per part b scope of work for further detail refer scope of work and boq attac.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 116 providing and fixing of space heater size more than 45kw up to 90kw as per part b scope of work for further detail refer scope of work and boq att.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 117 providing and fixing of space heater size more than 90kw up to 180kw as per part b scope of work for further detail refer scope of work and boq at.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 118 providing of skf make bearing 6203 zz as per part b scope of work for further detail refer scope of work and boq attached total quantity 1 is equa.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 119 providing of skf make bearing 6204 zz as per part b scope of work for further detail refer scope of work and boq attached total quantity 1 is equa.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 120 providing of skf make bearing 6205 zz as per part b scope of work for further detail refer scope of work and boq attached total quantity 1 is equa.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 121 providing of skf make bearing 6206 zz as per part b scope of work for further detail refer scope of work and boq attached total quantity 1 is equa.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 122 providing of skf make bearing 6208 zz as per part b scope of work for further detail refer scope of work and boq attached total quantity 1 is equa.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 123 providing of skf make bearing 6209 zz as per part b scope of work for further detail refer scope of work and boq attached total quantity 1 is equa.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 124 providing of skf make bearing 6310 zz as per part b scope of work total quantity 1 is equal to 10 nos for two years for further detail refer scope.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp7 and 8; cart 125 providing of skf make bearing 6312 as per part b scope of work for further detail refer scope of work and boq attached total quantity 1 is equal t.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 126 providing of skf make bearing 6312 zz as per part b scope of work for further detail refer scope of work and boq attached total quantity 1 is equa.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rapp-7 and 8; cart 127 providing of skf make bearing 6313 c3 as per part b scope of work for further detail refer scope of work and boq attached total quantity 1 is equa..


Tender Value : 6411231
Due Date : May 14, 2026

Unlock Full Tender Access

Start Free Trial to download documents before deadline

T18 Ref No : 15393154
Location : dhanbad , jharkhand
Source : GEM Tenders

corrigendum tender for installation of ac , serviceing of ac with minor repair , supply of , labour charge of ac machine checking minor repair dismantling and after fitting , gas charging , rewinding of , repairing of , water cooler and fridge , geyser, arc of ac water cooler and geyser, window type, split type, air filter, gas filter, capillary tube, compressor, indoor motor split type, outdoor motor split type, combined capacitor, fan net, fan capacitor, outdoor heat condenser, swing motor, display, pcb wire, single sensor, double sensor, remote, pcb board non inverter type, ac flap, indoor water pipe, pcb board transformer, contactor 2 phase, compressor oil, indoor stand, outdoor stand, cotton tape insulation, blower window type, blower split type, nut 1 by 2 inch split type, nut 1 by 4 in split type, nut 3 by 8 in split type, nut 5 by 8 in split type, indoor pcb board inverter type, outdoor pcb board inverter type, indoor dc motor inverter type, outdoor dc motor inverter type, 1 by 2 inch diameter copper pipe, 1 by 4 inch diameter copper pipe, 3 by 8 inch diameter copper pipe, 5 by 8 inch diameter copper pipe, 1 by 2 inch diameter insulation pipe, 1 by 4 inch diameter insulation pipe, 3 by 8 inch diameter insulation pipe, 5 by 8 inch diameter insulation pipe, r22, r32, r410, fan motor window type, outdoor fan motor split type, pcb, indoor leakage split type, indoor leakage window type, indoor pcb board inverter ac, outdoor pcb board inverter ac, servicing of water cooler with minor repair, capacitor, fan motor, fan blade, relay overload, drayer, filter, nrv, condensor coil, evaprator coil, thermostate, gas charging r600, gas charging r134, servicing of gyser with minor repair, thermostat, element, auto cut switch, safety valve, assembly, connecting pipe, indicator led, capillary thermal switch


Tender Value : 271464.9
Due Date : May 23, 2026
T18 Ref No : 16211132
Source : GEM Tenders

corrigendum tender for erection and fabrication work a 1 , erection and fabrication work a 2 , erection and fabrication work a 3 , erection and fabrication work a 4 , erection and fabrication work a 5 , erection and fabrication work a 6 , erection and fabrication work a 7 , erection and fabrication work a 8 , erection and fabrication work a 9 , erection and fabrication work a 10 , erection and fabrication work a 11 , erection and fabrication work a 12 , erection and fabrication work a 13 , erection and fabrication work a 14 , erection and fabrication work a 15 , erection and fabrication work a 16 , erection and fabrication work a 17 , erection and fabrication work a 18 , erection and fabrication work a 19 , erection and fabrication work a 20 , erection and fabrication work a 21 , erection and fabrication work a 22 , erection and fabrication work a 23 , erection and fabrication work a 24 , erection and fabrication work a 25 , erection and fabrication work a 26 , erection and fabrication work a 27 , erection and fabrication work a 28 , erection and fabrication work a 29 , erection and fabrication work a 30 , erection and fabrication work a 31 , erection and fabrication work a 32 , erection and fabrication work a 33 , erection and fabrication work a 34 , erection and fabrication work a 35 , erection and fabrication work a 36 , erection and fabrication work a 37 , erection and fabrication work a 38 , erection and fabrication work a 39 , erection and fabrication work a 40 , erection and fabrication work a 41 , erection and fabrication work a 42 , erection and fabrication work a 43 , erection and fabrication work a 44 , erection and fabrication work a 45 , erection and fabrication work a 46 , erection and fabrication work a 47 , erection and fabrication work a 48 , erection and fabrication work a 49 , erection and fabrication work a 50 , erection and fabrication work a 51 , erection and fabrication work a 52 , erection and fabrication work a 53 , erection and fabrication work a 54 , erection and fabrication work a 55 , erection and fabrication work a 56 , erection and fabrication work a 57 , erection and fabrication work a 58 , erection and fabrication work a 59 , erection and fabrication work a 60 , erection and fabrication work a 61 , erection and fabrication work a 62 , erection and fabrication work a 63 , erection and fabrication work a 64 , erection and fabrication work a 65 , erection and fabrication work a 66, erection and fabrication work a, cut out and remove the weakened and worn-out portions of the discharge chute of the mill scraper. fabricate new sections using 12 mm thick plates, reinstall them, and provide perforated plates as per the scraper profile. weld and fix them securely, then conduct a satisfactory trial. remove the worn-out runner base of the cane carrier. fabricate a new runner base using a 100 mm channel box, installation it, and straighten, reverse, and reinstall the old channel. remove the worn 40/50 mm square bars of the cane unloader and replace them with new square bars of the same size. conduct a satisfactory trial. remove the worn runners of the cane carrier, rake carrier, bagasse elevator, and r.b.c. replace them by reversing the old runners or installing new runners as required. remove the worn or damaged side plates of the chains of the cane carrier, rake carrier, and r.b.c. replace them with repaired old plates or new plates. remove the worn side plates of the fibrizer hood. installation new plates, weld them from both inside and outside, and conduct a satisfactory trial. carry out complete overhauling, testing, and trial of the bagasse baling machine. perform the required repairs on the old racks of the s.r.c. and i.r.c. fabricate new racks for the bagasse elevator/r.b.c. chains as per the sample. fabricate and installation new top and bottom covers of the t.r.p.f. as per the existing design and conduct a satisfactory trial. remove the worn tail-end boots of the s.r.c./i.r.c. fabricate new boots from 8 mm/10 mm thick plates as per the sample, installation them, carry out leak-proof welding, and conduct a satisfactory trial. dismantle the grabs of the cane unloaders, repair all parts, perform hardfacing on the fingers as instructed, reassemble the grabs, and conduct a satisfactory trial. remove the damaged juice tray used for compound imbibition in the mills. fabricate and installation a new tray as per the sample and reconnect all fittings. remove the worn guides provided to prevent the chains of the cane carrier, s.r.c., i.r.c., and bagasse elevator from lifting. fabricate and installation new guides as instructed and conduct a satisfactory trial. repair the worn wheels of the bridge/trolley drive of the cane unloaders by welding as instructed. remove the damaged twin chutes of the t.r.p.f. fabricate new twin chutes matching the existing design and erect them in position. fabricate and fit m.s. rings on the idler wheels of the cane carrier. provide a 25 mm thick plate support between the mill headstock and the t.r.p.f. headstock as instructed. repair the old hammer shanks of the fibrizer by welding, hardfacing, and balancing. remove the damaged hoods of the cane chopper/leveller. fabricate and installation new folding-type hoods. replace the broken pocket plates of the pocket-type anvil plate of the fibrizer with new plates. straighten bent plates, weld them, and perform hardfacing as instructed. build up the worn hub surfaces of the cane leveller/chopper rotor assembly by welding, machine them flat, and perform hardfacing. remove the weakened motor and gearbox beds of the cane unloaders. fabricate modified new beds, installation them, align the motor and gearbox, and conduct a trial. strengthen the weakened columns of the cane carrier structure by welding reinforcing plates. fabricate and fit juice rings in the mill rollers as per the sample. carry out the required repairs to the pressure chutes between the t.r.p.f. and the mill. remove the damaged mill juice receiving tank. fabricate a new tank using 8 mm/10 mm thick plates, installation it, reconnect all connections, and conduct a leak-proof trial. remove the damaged bottom cone of the mill juice receiving tank. fabricate and installation a new cone as per the sample, reconnect all fittings, and conduct a leak-proof trial. remove the damaged 10"/12" pipes between the mill juice tray and the gutter. fabricate and installation new stainless steel pipes and conduct a leak-proof trial. provide 3 mm thick stainless steel lining in the bottom trough of the s.r.c./i.r.c. with leak-proof welding. remove the loose bed of boiler feed pump no. 1, fabricate and installation a new bed, reconnect all fittings, and conduct a trial. fabricate a leak-proof damper in the old i.d. fan ducting before the chimney so that there is no backflow of air when the new i.d. fan operates. remove the nipple reducers and damaged pipelines of all three wet scrubber pumps. installation new pipelines and carry out leak-proof welding. remove all nozzles inside the wet scrubber venturi, replace damaged nozzles with new ones, and reconnect all fittings. fabricate a new backwash pipeline from old boiler tubes between the service tank and wet scrubber. installation new valves, clamps, and complete all connections. remove the damaged juice tray below the t.r.p.f. leading to the mill juice tray. fabricate and installation a new tray. remove damaged ash chutes of the boilers. fabricate new chutes from old/new plates matching the original design and installation them. repair the damaged dampers of air heaters, economizers, and f.d./i.d. fan inlet, outlet, suction, and delivery ducts. fabricate new frames and fit new mesh/screens for the internal steam filters of the boiler drums. remove the damaged flue gas ducting between the i.d. fans and chimney. fabricate and installation new ducting from 5–6 mm thick plates and conduct a leak-proof trial. fabricate new impellers for the bagassilo fan as per the sample, repair the casing, and conduct a successful trial. remove the damaged suction cones of the i.d./f.d. fan casings. fabricate and installation new cones as per the sample and conduct a satisfactory trial. replace the damaged perforated baffle plates inside the boiler feed tank. remove and repair the damaged bagasse feeding chutes of boilers 1, 2, and 3. replace the damaged air headers supplying additional f.d. air to the furnaces of 20-ton boilers 1 and 2. replace the damaged ducting between the air heater and i.d. fan with new ducting made from 5–6 mm thick plates. replace damaged perforated screens used for bagasse filtration in the bagasse elevator. remove the economizer coils/tubes of 20-ton boilers 1 and 2, clean them internally and externally, conduct hydraulic testing, reinstall them, make them leak-proof, and carry out final hydraulic testing. remove damaged trough channels/plates of the s.r.c./i.r.c., fabricate replacements as instructed, and installation them. fabricate and installation angle iron strengthening rings on the boiler chimney. strengthen the damaged truss-type bridge structure of the cane unloader using new channels, angles, and plates. weld and restore the enlarged holes of the block-type chain links of the s.r.c./i.r.c., redrill pin holes, and grind the surfaces smooth. replace the worn rack attachment links of the s.r.c./i.r.c. chains with new 12 mm thick plate attachments, weld them, and drill holes as per the drawing. construct separate access platforms for all three cane unloaders using old angle channels. replace the damaged portions of the i.d. fan casing, air heater cell/ducting, and economizer cell. replace the old m.s. plates of the s.r.c./i.r.c. trough and boot, make them leak-proof, and provide 3 mm stainless steel lining. fabricate new racks for the s.r.c./i.r.c. chains from 25 mm thick plates, drill holes, and provide roller supports at both ends. remove the bent 250 mm channel of the cane unloader trolley, restore line and level, strengthen the structure, fit a new runner square bar, check diagonals, and align the wheels. dismantle all four wheels of the mill and powerhouse cranes, clean them, inspect bearings, grease all plumber blocks, replace damaged bearings from mill spares, repair worn wheels by welding, and conduct a satisfactory trial. repair the worn shells and teeth of the t.r.p.f. top and bottom rollers by hardfacing. fit rings on both sides to compensate for reduced shell length. remove the damaged mill juice tray and fabricate a new tray using 5 mm stainless steel plate as per the sample. conduct a leak-proof trial. repair the stainless steel juice tray of the mill. remove the mill headstock if cracked or misaligned, re-grout it, realign it, and complete all associated works. remove the shaft of the damaged t.r.p.f. roller and dismantle the shell using gas cutting. cut old 63.5 mm boiler tubes with bends, prepare 5.1-meter straight tubes for the air heater, and clean them by grinding.


Due Date : Jul 13, 2026

Unlock Full Tender Access

Start Free Trial to download documents before deadline

T18 Ref No : 15825179
Location : gandhinagar , gujarat
Source : GEM Tenders

tender for vehicle spare parts mounting nut bolt rubber bush washer , m s sheet 3mm 4x4 , silencer pipe back side , plastic bumper bracket front both side , automotive fastener clip push type , automotive push type plastic retainer clip , steel screw with washer 8 no , nut bolt with washer 10 no , nut bolt with washer 12 no , 2 in 1 tape 6 mtr , feviquick tube 50 ml , dendrite , drill bit 2.5 mm , drill bit 3 mm , drill bit 5 mm , rubber silicone tube , front wind screen glass rubber beading , belt crank to steering gear box , belt crank to ac pump , silencer tail pipe , silencer gasket , silence muffler mounting rubber , shock absorber with bush rear , silencer nut bolt 12 no tvs bss , u j cross 4x4 , u j cross clamp with nut 4x4 , rear propeller shaft nut bolt 14 no tvs bss , rear ball joint end with bolt balancing rod , engine mounting plate right side , fuel filter pipe with clamp , coil spring rear , dumper rubber rear , front stabilizer nut bolt 17 no 3 tvs bss , front lower arm nut with lock 24 no tvs bss , front chassis nut bolt 15 no tvs bss , nut bolt 13 n tvs bss , old cloth 2 mtr , plastic tape , tie cable , 1016 bulb , pull push switch , pipe joint connector , chassis black paint , thinner n c , tarpine oil , paint white enamel , paint 2k pearl white , hardener 2k , thinner 2k , clear , polyester putty , n c putty , emery roll , old cotton cloth , red oxide , front axle repair kit 32 , bearing front wheel , seal hub front wheel , front axle centre pin shim , tie rod with end assy 2nd , accelerate cable assy , power steering pipe , pipe diesel feed pump , diesel knob lock , fan belt , crank water pump belt , power steering end , clamp small type , center oil seal , rear wheel bearing , rear wheel hub oil seal , setting chain both side , trolley carrying hook assy , trolley hydraulic pipe , head light assembly both side , wind shield reserve water motor , revers switch , head light coupler , combination switch , head light bulb 55 60 , bulb 1141 , head light relay 4 pin , head light parking bulb 53 , right side door handle outer , side mirror right side , rear door lock handle outer , accelerator pedal assembly , radiator reverse assembly , tyre size 205x65 r15 tubeless tyre with valve , tyre size 215x75 r15 tubeless tyre with valve , m oil filter , diesel filter , wiper blade with motor and arms , m oil filter main , m oil filter by pass , ac filter , air filter , wiper blade , flasher unit , bulb push , brake switch light , hand brake light switch , engine overhauling gasket , engine overhauling oil seal kit , engine overhauling o ring , inlet exhaust valve , cylinder block with piston std , connecting rod with bearing , oil pump , timing chain , spark plug , rear wheel hub rubber bush , clutch cable , fuel pipe , both side side panel, mahindra scorpio parts only, for jk, minda, genuine parts only, good quality, for use of machinic, for new holland tractor, for trolly escort india ltd, for tata sumo, innova, m&m bolero, tata sumo gold, innova, m and m bolero neo, m and m bolero, mand m bolero, sml medium truck, ashok leyland mini bus, a leyland heavy bus, a leyland truck, tata safari, swift dzire 01 set innova 03 set bolero 03 nos tata 407 01 set sml mini bus 01 set force ambulance 01 set tata safari 01 set jcb 01 set with arms, for hero honda glamor


Tender Value : 0
Due Date : Jul 07, 2026
T18 Ref No : 15982890
Source : GEM Tenders

tender for erection and fabrication work a erection and fabrication work a 1 , erection and fabrication work a 2 , erection and fabrication work a 3 , erection and fabrication work a 4 , erection and fabrication work a 5 , erection and fabrication work a 6 , erection and fabrication work a 7 , erection and fabrication work a 8 , erection and fabrication work a 9 , erection and fabrication work a 10 , erection and fabrication work a 11 , erection and fabrication work a 12 , erection and fabrication work a 13 , erection and fabrication work a 14 , erection and fabrication work a 15 , erection and fabrication work a 16 , erection and fabrication work a 17 , erection and fabrication work a 18 , erection and fabrication work a 19 , erection and fabrication work a 20 , erection and fabrication work a 21 , erection and fabrication work a 22 , erection and fabrication work a 23 , erection and fabrication work a 24 , erection and fabrication work a 25 , erection and fabrication work a 26 , erection and fabrication work a 27 , erection and fabrication work a 28 , erection and fabrication work a 29 , erection and fabrication work a 30 , erection and fabrication work a 31 , erection and fabrication work a 32 , erection and fabrication work a 33 , erection and fabrication work a 34 , erection and fabrication work a 35 , erection and fabrication work a 36 , erection and fabrication work a 37 , erection and fabrication work a 38 , erection and fabrication work a 39 , erection and fabrication work a 40 , erection and fabrication work a 41 , erection and fabrication work a 42 , erection and fabrication work a 43 , erection and fabrication work a 44 , erection and fabrication work a 45 , erection and fabrication work a 46 , erection and fabrication work a 47 , erection and fabrication work a 48 , erection and fabrication work a 49 , erection and fabrication work a 50 , erection and fabrication work a 51 , erection and fabrication work a 52 , erection and fabrication work a 53 , erection and fabrication work a 54 , erection and fabrication work a 55 , erection and fabrication work a 56 , erection and fabrication work a 57 , erection and fabrication work a 58 , erection and fabrication work a 59 , erection and fabrication work a 60 , erection and fabrication work a 61 , erection and fabrication work a 62 , erection and fabrication work a 63 , erection and fabrication work a 64 , erection and fabrication work a 65 , erection and fabrication work a 66, erection and fabrication work a, cutting and removing the weak/broken parts of the discharge chute for the scraper in the mill, fabricating new parts from 12 mm plate, reinstalling them, fixing hole plates as per profile by welding to secure the scraper, and conducting a trial after completion of work., cutting and removing the worn/weak runner base of the cane carrier, fabricating a box structure using 100 mm channel to installation the runner base, fitting it properly, and straightening and reusing the old channel by turning it over., cutting and removing the old worn/cut 40/50 mm square bars of the cane unloader and installing new square bars in their place as before, followed by a satisfactory trial., cutting and removing the worn/cut runners of the cane carrier/rake carrier/bagasse elevator/r.b.c., reinstalling them by either turning over the old ones or fitting new runners as per original design., cutting and removing the worn/cut/weak side plates of chains used in cane carrier/rake carrier/r.b.c., and installing old or new plates in their place., cutting and removing the worn/weak side plates of the fibrizer hood, installing new plates, welding inside and outside, and conducting a satisfactory trial., complete overhauling, testing, and trial of the bagasse baling machine., performing necessary repairs on the old racks of s.r.c./i.r.c., fabricating new racks as per sample for the chains of bagasse elevator/r.b.c., replacing the weak/broken bottom/top covers of t.r.p.f. by fabricating and installing new covers as per original design, and conducting a satisfactory trial., cutting and removing the weak/broken tail end boots of s.r.c./i.r.c., fabricating new ones from 8.0/10.0 mm old/new plate as per sample, installing, leak-proof welding, and conducting a satisfactory trial., dismantling various parts of the cane unloader grabs, repairing all parts, hardfacing the fingers as per instructions, and reassembling the grabs., cutting and removing the weak/broken juice tray used for compound imbibition in mills, fabricating a new tray from plate as per sample, installing it in place, and making all connections., cutting and removing the worn/weak guides that prevent chains of cane carrier/s.r.c./i.r.c. and bagasse elevator from lifting, fabricating new guides as per instructions, installing them, and conducting a satisfactory trial., welding the worn/cut wheels of the cane unloader bridge/trolley drive as per instructions., cutting and removing the weak/broken donali chutes of t.r.p.f., fabricating new donali chutes as per the old ones, and erecting them in place., fabricating and installing m.s. rings on the idler wheel of the cane carrier as per instructions., fabricating and installing a support using 25.0 mm plate between the mill head stock and t.r.p.f. head stock as per instructions., repairing and balancing the old hammer shanks of the fibrizer by welding and hardfacing as per instructions., cutting and removing the worn/weak hoods of the cane chopper/leveller and fabricating a new folding type from new plate and installing it., replacing the broken plates in the pockets of the fibrizer's pocketed type anvil plate with new plates, straightening bent plates, welding, and hardfacing as per instructions., welding and leveling the worn hubs of the cane leveller/chopper rotor assembly on the working side and top sides, and hardfacing as per instructions., cutting and removing the weak beds of reduction gears and motors on cane unloaders, modifying and fabricating new beds, installing them, aligning the gear and motor, and conducting a trial., strengthening the weak/broken columns of the cane carrier structure by welding plates as per instructions., fabricating and fitting juice rings in the mill rollers as per sample., performing necessary repairs on the pressure chutes installed between t.r.p.f. and the mill., cutting and removing the weak/broken juice receiving tank of the mills, fabricating a new tank from 8.0/10.0 mm plate as per sample, fitting it in place, making all connections, and conducting a leak-proof trial., cutting and removing the weak/broken bottom cone of the mill's juice receiving tank, fabricating a new cone as per sample, fitting it in place, making all connections as before, and conducting a leak-proof trial., cutting and removing the weak/broken 10 inch/12 inch pipes between the mill juice tray and gutter, fabricating and fitting new s.s. pipes in their place, and conducting a leak-proof trial., lining the bottom trough of s.r.c./i.r.c. with 3.00 mm thick s.s. plate and doing leak-proof welding., removing the shifted bed of feed pump no. 1 on the boiler, fabricating and installing a new bed, making related connections, and conducting a trial., making the damper in the old i.d. fan ducting at the boiler station leak-proof using new/old plate before the chimney and doing complete welding so that when the new i.d. runs, there is no back air from the chimney., cutting and removing the nipple reducers of all three wet scrubber pumps and their leaking pipe lines, installing new pipe lines, and making all connections as before with leak-proof welding., opening all nozzles inside the wet scrubber venturi, removing damaged nozzles, installing new nozzles, and making all connections as before., fabricating new pipes from old boiler tubes for backwash from the service tank to the wet scrubber, and making all connections with new valves and clamps in the pipeline., cutting and removing the weak and leaking juice tray from under the t.r.p.f. that brings juice to the mill juice tray, and fabricating and installing a new one., cutting and removing the weak/broken ash chutes of the boilers, and fabricating and fitting new chutes from old/new plate as per the old ones., performing necessary repairs on the weak/broken dampers of air heaters, economizers, and f.d./i.d. fans' inlets/outlets or suction/delivery., replacing the frames and grids of the internal steam filter fitted in the boiler drums by fabricating new frames and fitting grids., cutting and removing the weak/broken flue gas ducting between the i.d. fans and the chimney, fabricating and installing new ducting from 5.0/6.0 mm thick plate, and conducting a leak-proof trial., for the weak bagassilo fan, fabricating a new impeller as per sample, repairing the casing as necessary, and conducting a successful trial., cutting and removing the weak/broken suction cones in the casings of i.d./f.d. fans, fabricating and installing new cones as per sample, and conducting a successful trial., replacing the damaged weak grids/perforated sheets of the baffle plates inside the boiler feed tank., cutting and removing the weak/broken bagasse feeding chutes of boiler no. 1, 2, and 3, and performing necessary repairs., replacing the weak/broken air headers installed outside for supplying additional f.d. air in the furnace of 20-ton capacity boiler no. 1 and 2 with new headers., cutting the weak/broken ducting between the air heater and i.d. fans and fabricating and installing new ducting from 5/6 mm thick plate., removing damaged perforated grids in the bagasse elevator used for bagasse to bagassilo filtration and fitting new grids., lowering the economizer coils/tubes of 20-ton capacity boiler no. 1 and 2, cleaning them internally and externally, conducting hydraulic testing at standard pressure, and after testing, lifting and refitting them, making the economizer bands leak-proof, and conducting a satisfactory hydraulic test., cutting and removing the weak/broken channel/plate of the s.r.c./i.r.c. trough and fabricating and installing new ones as per instructions., fabricating and installing angle iron rings for strengthening the boiler chimney., strengthening the weak and damaged truss-type bridge structure of the cane unloader by adding new channels, angles, and plates to provide satisfactory strength., welding the oval/worn enlarged holes on both ends of the block-type chain links of s.r.c./i.r.c. chains, drilling pin-size holes in the attachment, and grinding the faces to level., cutting and removing the worn/weak attachment used for fixing racks on the block-type chain links of s.r.c./i.r.c. chains, fabricating new attachment links from 12 mm thick plate as before, welding them onto the links, and drilling holes as per drawing., constructing a separate platform path using old angle channels for access to all three unloaders., replacing the weak/broken parts of i.d. fan casing, air heater cell/ducting, and economizer cell., cutting and removing the old m.s. plate of the bottom trough and boot of s.r.c./i.r.c., installing new plate to make the trough and boot leak-proof, and lining the boot and trough with 3 mm thick s.s. plate, followed by a satisfactory trial., fabricating new racks from 25 mm thick plate as per sample for s.r.c./i.r.c. chains, drilling holes, cutting and supporting chain rollers on both ends, and preparing them., removing the bent 250 mm channel of the trolley in the cane unloader, leveling it, strengthening the structure, fitting worn/weak runner square bars, checking diagonals, and leveling the wheel., removing all four wheels of the mill and power house crane, cleaning, checking bearings, greasing all plumber blocks, replacing damaged bearings with mill spares, welding worn wheels to a uniform size, and conducting a satisfactory trial., performing necessary repairs and hardfacing on the worn shells/teeth of t.r.p.f. top/bottom rollers, and adding rings on both sides as needed to compensate for reduced shell length., cutting and removing the weak/leaking juice tray of the mill and fabricating a new one from 5 mm s.s. plate as per sample, and conducting a leak-proof trial., performing necessary repairs on the damaged s.s. juice tray of the mill., in case of head stock cracking or misalignment, removing the head stock, regrouting, aligning, and completing all related work., removing the shaft of the damaged t.r.p.f. roller and dismantling the shell using gas cutting., cutting the 63.5 mm old boiler tubes with bends, making a 5.1 meter straight line, preparing them for the air heater, and cleaning them by grinding.


Due Date : Jul 10, 2026

Unlock Full Tender Access

Start Free Trial to download documents before deadline

T18 Ref No : 16008457
Location : nanauta , uttar pradesh
Source : GEM Tenders

tender for centrifugal house item no 1 , centrifugal house item no 2 , centrifugal house item no 3 , centrifugal house item no 4 , centrifugal house item no 5 , centrifugal house item no 6 , centrifugal house item no 7 , centrifugal house item no 8 , centrifugal house item no 9 , centrifugal house item no 10 , centrifugal house item no 11 , centrifugal house item no 12 , centrifugal house item no 13 , centrifugal house item no 14 , centrifugal house item no 15 , centrifugal house item no 16 , centrifugal house item no 17 , centrifugal house item no 18 , centrifugal house item no 19 , centrifugal house item no 20 , centrifugal house item no 21 , centrifugal house item no 22 , centrifugal house item no 23 , centrifugal house item no 24 , centrifugal house item no 25 , e t p item no 1 , e t p item no 2 , crystallizer item no 1 , crystallizer item no 2 , crystallizer item no 4 , crystallizer item no 5 , crystallizer item no 6 , crystallizer item no 7 , schedule work item no 1 , schedule work item no 2 , schedule work item no 3 , schedule work item no 4 , schedule work item no 5 , schedule work item no 6 , schedule work item no 7 , schedule work item no 8 , schedule work item no 9 , schedule work item no 10 , schedule work item no 11 , schedule work item no 12 , schedule work item no 13 , schedule work item no 14 , schedule work item no 15 , schedule work item no 16 , schedule work item no 17 , schedule work item no 18 , schedule work item no 19 , schedule work item no 20 , schedule work item no 21 , schedule work item no 22 , schedule work item no 23 , schedule work item no 24 , schedule work item no 25 , schedule work item no 26 , schedule work item no 27 , schedule work item no 28 , schedule work item no 29 , schedule work item no 30 , schedule work item no 31 , schedule work item no 32 , schedule work item no 33 , schedule work item no 34 , schedule work item no 35 , schedule work item no 36 , schedule work item no 37 , schedule work item no 38 , schedule work item no 39 , schedule work item no 40 , schedule work item no 41 , schedule work item no 42 , schedule work item no 43 , schedule work item no 44 , schedule work item no 45 , schedule work item no 46 , schedule work item no 47 , schedule work item no 48 , schedule work item no 49 , schedule work item no 50 , schedule work item no 51 , schedule work item no 52 , schedule work item no 53 , schedule work item no 54 , schedule work item no 55, centrifugal house and etp fabrication work, to replace worn-out molasses jacket of b and c continuous centrifugal machine with proper trial, to replace worn-out molasses casing of a-centrifugal machine followed by satisfactory trial, replacement of worn out portion of horizontal sugar melter shell with steam and juice connection followed by leak proof trial, dismantling of existing stirrer shaft of magma mixture of b or c continuous machine straightening of worn out shaft replacement of bushes re-fitting of shaft arms and alignment of drive system with satisfactory trial, replacement of weak orworn out portion of sugar hopper, broken shaft of crystallizer to be made correct or replaced by new one alignment is to be done after proper fitting of arms and ribbon, replacement of worn-out bushes and arms of sugar melter with satisfactory trial, dismantling fabrication and erection of weak body shell of pug mill melter and magma mixer of a b and c fw or af cf machines, dis and fitting work of bushes of magma mixer and sugar elevator, replacement of worn- out or weak molasses ring along with fingure of wk-1500 cf machine complete in all respect, replacement of worn out channel after de-grouting and re-fitting of a4 or a5 side hopper no 04 new channel clit in size 4inchx4inch fitting of wooden strip, replacement of worn out or broken pedestal arms of magma mixture and pug mill, replacement of weak or worn out perforated sheet of hopper and fitting with frame, replacement of damaged or worn-out arms of mono crystallizer, dismantling fabrication and erection of ms coil of 1inchdiameter for wk-1500 and sc1350-kt cf machine with 3mm perforation, dismantling fabrication and erection of new molasses storage tank(1 5meter diameter x 1 5meter height) with 08mm ms plate for a centrifugal machine and providing with all connection nipples etc, dismantling of existing gate type masscuite taking valve 1250 batch type machine and fitting of pneumatic type butterfly valve in place of above and make in all necessary provision with satisfactory trial, dismantling fabrication and erection of worn out orweak conical discharge chute for continuous machine with 06mm new or old plate (as per sample), dismantling fabrication and fitting of man hole of vertical crystallizer, dismantling of old worn out or disturbed sugar hopper fabrication and erection of complete hopper along with satisfactory trial, dismantling of drive system of molasses conditioner replacement of weak top plate and re fitting of driving system with trial, modification work of sugar melter melt pump suction system comprise of catcher and receiving tank, fabrication of new cold/hot air blower fan and casing erection and fitting of new one along with satisfactory trial, fabrication and erection of top cover of continuous centrifugal machine steam/watercoil, repair of internal jacket of wk 1500 b-1 continuous centrifugal machine along with fixing of molasses baffle plate /fingure, disamntling,fabrication and fitting work of structure including rubber scrapper drum of etp clarification pit, fabrication,erection and fitting work of spray pond mesh type inlet channel stainer size-2 5mtx2 5mt, replacement of worn out bushes of air cooled crystallizer of both side after dismantling all drive arrangement (worm wheel reduction gear) and there after fitting alignment after replacement of bush (bush will be provided by factory), replacement of leaky cooling coil of c twin vertical crystallizer b mono vertical crystallizer with 3inch size ms pipe with proper hydraulic testing and trial, replacement of worn out or broken angle arms of crystallizer and replacing of paddel type arms with ribbon type of air cooled or vaccume crystallizer, repair of worn out or broken arm or ribbon of air cooled vacuum and seed crystallizer, replacement of weak shell of air cooled crystallizer, replacement of weak shell of a- vaccum crystallizer setting right of arms and necessary strengthning, dismantling ,fabrication and erection of m s pipe line including bend or flange etc 1 inch diameter, dismantling ,fabrication and erection of m s pipe line including bend or flange etc 2 inch diameter, dismantling ,fabrication and erection of m s pipe line including bend or flange etc 3 inch diameter, dismantling ,fabrication and erection of m s pipe line including bend or flange etc 4 inch diameter, dismantling ,fabrication and erection of m s pipe line including bend or flange etc 6 inch diameter, dismantling ,fabrication and erection of m s pipe line including bend or flange etc 8 inch diameter, dismantling fabrication and erection of bend size-2 inch diameter (ms), dismantling fabrication and erection of bend size- 3 inch diameter (ms), dismantling fabrication and erection of bend size- 4 inch diameter (ms), dismantling fabrication and erection of bend size- 6 inch diameter (ms), dismantling fabrication and erection of bend size- 8 inch diameter (ms), dismantling fabrication and erection of bend size-10 inch diameter (ms), dismantling fabrication and erection of bend size-12 inch diameter (ms), dismantling fabrication and erection of nipple size- 1inch diameter (ms), dismantling fabrication and erection of nipple size- 2 inch diameter (ms), dismantling fabrication and erection of nipple size- 3 inch diameter (ms), dismantling fabrication and erection of nipple size- 4 inch diameter (ms), dismantling fabrication and erection of nipple size- 6 inch diameter (ms), dismantling fabrication and erection of nipple size- 8 inch diameter (ms), dismantling fabrication and erection of nipple size- 10 inch diameter (ms), dismantling fabrication and erection of nipple size- 12 inch diameter (ms), dismantling fabrication and erection of tee size- 4 inch diameter (ms), dismantling fabrication and erection of tee size- 6 inch diameter (ms), dismantling fabrication and erection of tee size- 8 inch diameter (ms), dismantling fabrication and erection of flange size- 4 inch diameter (ms), dismantling fabrication and erection of flange size- 6 inch diameter (ms), dismantling fabrication and erection of flange size- 8 inch diameter (ms), dismantling fabrication and erection of flange size- 10 inch diameter (ms), dismantling fabrication and erection of flange size- 12 inch diameter (ms), dismantling fabrication and erection of reducer size-4 inch diameter (ms), dismantling fabrication and erection of reducer size-6 inch diameter (ms), dismantling fabrication and erection of reducer size-8 inch diameter (ms), dismantling fabrication and erection of reducer size-10 inch diameter (ms), dismantling fabrication and erection of reducer size-12 inch diameter (ms), dismantling and fitting of valve size- 3 inch diameter, dismantling and fitting of valve size- 4 inch diameter, dismantling and fitting of valve size- 6 inch diameter, dismantling and fitting of valve size- 8 inch diameter, dismantling fabrication and fitting of man hole, dismantling fabrication and erection of platform by using old/new plate, fabrication and erection of railing from old material, dismantling of ms heavy structure / tank, dismantling of ms light structure, fabrication and erection light structure, fabrication and erection heavy structure, fabrication of pump bed with pump, reduction gear and motor alignment up to 7 5 h p, fabrication of pump bed with pump, reduction gear and motor alignment up to 10 h p, fabrication of pump bed with pump, reduction gear and motor alignment up to 25 h p, fabrication of pump bed with pump, reduction gear and motor alignment up to 30 h p, fabrication and erection of complete square / rectangular /round tank with conical bottom, fabrication and fitting of ms coil (coils are to be duly bend and not offset pipe welding offset welds shall not be treated as coils but as pipes ) size-25mm, fabrication and fitting of ms coil (coils are to be duly bend and not offset pipe welding offset welds shall not be treated as coils but as pipes ) size-50mm, fabrication and fitting of ms coil (coils are to be duly bend and not offset pipe welding offset welds shall not be treated as coils but as pipes ) size-75mm, fabrication and patchwork of equipments using old/ new ms plate by 6/8 mm thick plate over round vessels/any vessels


Due Date : Jul 14, 2026
Published By

Every year, central and state government departments release thousands of high-value contracts specifically dedicated to Fan Coil Machine Repair. Whether it involves bulk material supply, executing specialized operational services, or end-to-end turnkey project execution, the demand for capable vendors in the Fan Coil Machine Repair sector is massive.

At Tender18, we help businesses cut through the noise and exclusively target the exact work categories they specialize in. Instead of browsing through generic procurement sites, our platform isolates high-potential opportunities that match your specific industry capabilities.

Work Dynamics in the Fan Coil Machine Repair Sector

Government requirements for this specific vertical generally fall into distinct procurement patterns:

  • Product & Material Supply: Tenders focused strictly on sourcing, testing, and delivering high-quality items that meet the exact technical specifications of the buyer.
  • Service Level Agreements (SLAs): Long-term hiring of expert agencies for routine maintenance, manpower deployment, or continuous operational management.
  • Execution & Turnkey Projects: Comprehensive contracts where the bidder is responsible for everything from raw material procurement to final site installation and testing.

By focusing purely on your core strength in Fan Coil Machine Repair, you can build a highly profitable and stable pipeline of government clients.

Stop wasting time filtering through irrelevant notices. Our Fan Coil Machine Repair Tender Information Service is engineered for precision. We track exact product codes, service names, and specialized work terms across all government portals nationwide. When a buyer publishes a requirement that matches your specific business profile, our system alerts you instantly.

Deep Technical Insights & Documentation For Fan Coil Machine Repair Tenders

Bidding for specific works requires studying strict technical parameters. We provide immediate access to the core documents you need to evaluate the project:

  • Detailed Specifications & Drawings: Download the exact engineering guidelines, material testing standards, and quality benchmarks demanded by the buyer for Fan Coil Machine Repair.
  • Financial BOQ Spreadsheets: Access the official blank pricing formats where you need to input your unit rates, tax configurations, and total bid value.
  • Real-Time Technical Amendments: If the buying department changes the product specifications, alters the service scope, or shifts the delivery timeline, we instantly update the parent file so you are never caught off-guard.

Winning a contract for Fan Coil Machine Repair depends entirely on how perfectly your technical capabilities match the buyer’s demands. Even if you have the best product or service, a poorly formatted document or a missing compliance certificate will lead to instant technical rejection. Tender18’s Tender Bidding Service eliminates this risk by taking complete ownership of your digital submission.

Flawless Compliance & Portal Execution For Fan Coil Machine Repair Tenders

Under this service, Tender18 assigns a Dedicated Experienced Technical Person to your profile. This expert handles the heavy lifting of the entire bidding cycle:

  • Capability Mapping: We thoroughly cross-check your past completion certificates, ISO standard proofs, and financial turnover against the strict eligibility criteria required for Fan Coil Machine Repair bids.
  • Secure System Integration: Our technical desk seamlessly links your Class III Digital Signature Certificate (DSC) with the required e-procurement servers to securely encrypt your technical and financial envelopes.
  • Error-Free Financial Uploads: We audit your quoted BOQ pricing sheets for any formula or formatting errors before the final upload, ensuring your bid is successfully locked before the portal's closing hours.

Government buyers are aggressively using the Government e-Marketplace (GeM) for the direct procurement of Fan Coil Machine Repair. If your business profile is not accurately mapped on this portal, you remain practically invisible to these purchasing officers. Recognized as a trusted and expert GeM consultant, Tender18 offers specialized support to build, optimize, and maintain a highly visible vendor account for your business.

With an industry-leading support success ratio of over 95%, we handle the complex marketplace compliance so you can focus entirely on executing your orders

Expert Profile Management & Catalogue

Our dedicated consultants ensure your GeM presence is structurally perfect:

  • Precise Catalogue Listing: We upload and categorize your specific offerings under the exact search terms and parameters used by government buyers looking for Fan Coil Machine Repair, ensuring maximum search visibility.
  • OEM Dashboard & Assessment: For original manufacturers and creators, we guide you through the mandatory Quality Council of India (QCI) vendor assessments to successfully unlock your official OEM panel.
  • Profile Compliance & Caution Money: We manage your statutory documentation, brand approvals, and caution money limits to keep your account immune from technical suspensions.

Strategic Live Bid Participation

Beyond setup, we actively drive your market participation. Our team expertly handles the digital paperwork and rate configurations for GeM Custom Bids and Reverse Auctions (RA) related to Fan Coil Machine Repair, maximizing your chances of securing L1 status.

1.

How do I find government contracts exclusively matching my work in Fan Coil Machine Repair?

The easiest way is through the Tender18 platform. Instead of searching department by department, our system uses advanced keyword matching to gather all live supply, service, and execution tenders related directly to your core business in one place.

2.

Do I need specific testing or quality certificates to apply for these contracts?

It heavily depends on the nature of the work. For supply contracts, buyers often ask for ISO certifications, BIS marks, or specific lab testing reports. For service contracts, they may ask for labor licenses or past performance certificates (work orders).

3.

What is a BOQ and why is it important for my bid?

The Bill of Quantities (BOQ) is the official financial Excel sheet where you enter your competitive prices. Any mistake in this file—like adding extra rows, changing formulas, or saving it in the wrong format—will cause the portal server to reject your entire bid.

4.

Are samples required to be submitted physically before the digital bid opens?

For many product-based Fan Coil Machine Repair tenders, buying departments do ask bidders to submit physical samples to their office before the digital technical evaluation date. This requirement is always clearly mentioned in the official NIT document.

5.

How does the Dedicated Tender Expert from Tender18 help me?

Our assigned expert manages your total portal compliance. They extract the hidden rules from long tender PDFs, create a precise document checklist for your team, map your digital signature, and securely upload your technical and financial files onto the government servers.

6.

What is the role of a Digital Signature Certificate (DSC)?

A Class III DSC is a secure USB device that contains your digital identity. You cannot upload a bid without it. It is used to securely encrypt and lock your sensitive price data and technical documents so no one can view them before the official opening date.

7.

As an MSME, can I get financial benefits when bidding for Fan Coil Machine Repair?

Yes, the government strongly supports MSMEs. By uploading a valid Udyam Registration Certificate in the technical envelope, small businesses are frequently exempted from paying the initial Tender Document Fee and the Earnest Money Deposit (EMD).

8.

Why should I list my services or products on GeM for this category?

GeM is now the primary digital marketplace for all government agencies. If you are properly cataloged for Fan Coil Machine Repair, officers can view your profile and generate direct purchase orders or invite you to participate in exclusive Custom Bids.

9.

What makes Tender18 a reliable GeM support partner?

As a highly trusted and expert GeM consultant, Tender18 holds a proven support success ratio of over 95%. From flawless profile creation and complex catalogue mapping to OEM panel approvals and live Reverse Auction (RA) support, we handle it all seamlessly.

10.

What does "L1" mean in these government contracts?

"L1" stands for "Lowest Bidder 1". In government procurement, after all technical envelopes are approved, the financial sheets (BOQs) are opened. The bidder who has quoted the lowest compliant price for Fan Coil Machine Repair is declared L1 and is generally awarded the contract