Filters By:

T18 Ref No
Keyword
State
City
Agency
Tender ID
Due Date
Tender Source
Tender Type

13Results forLatest Cement carrier Tenders List

Latest Cement carrier Tenders in India – Verified Leads & Real-Time Insights by Tender18

Finding the right Cement carrier tenders in India’s competitive e-procurement ecosystem requires more than just access—it demands accurate data, real-time monitoring, and expert analysis.

At Tender18 Infotech Private Limited, we bring deep industry experience in government procurement to help businesses identify, evaluate, and win Cement carrier tenders efficiently. With a centralized platform aggregating 1100+ live tenders, we provide a single, trusted source for opportunities from central, state, and PSU departments.


Real-Time Cement carrier Tender Intelligence & Monitoring

Our advanced dashboard delivers actionable insights and structured tender data, enabling you to make faster and smarter bidding decisions.

We categorize Cement carrier tenders into:

  • Supply Tenders – BOQs and specifications sourced from GeM and PSUs
  • Service Tenders – NITs and scope of work from CPPP and state portals
  • EPC Projects – Large-scale infrastructure tenders with financial and design data

✔ This structured approach ensures complete transparency and deeper bid analysis before submission.


Comprehensive Sources of Cement carrier Tenders

Tender18 acts as a centralized gateway by aggregating tenders from trusted and official sources:

  • Central Government Portals – CPPP, NIC, and Government e-Marketplace (GeM)
  • Railways & Transport – IREPS and Metro Rail projects
  • Power & Energy PSUs – NTPC, ONGC, NHPC, PowerGrid
  • Defense & Strategic Sectors – MES and DRDO tenders
  • State e-Procurement Portals – Gujarat, Maharashtra, Tamil Nadu, UP, and more

✔ Every listing is verified and regularly updated to maintain data accuracy and trust.


Step-by-Step Guide to Participate in Cement carrier Tenders

1. Eligibility & Prequalification

Before bidding, ensure compliance with:

  • Financial turnover requirements (30–50% of tender value)
  • Past experience (2–3 similar projects)
  • Valid solvency certificate

2. Mandatory Documentation Checklist

Prepare the following to avoid disqualification:

  • Digital Signature Certificate (Class 3 DSC)
  • GST, PAN, MSME/Udyam registration
  • EMD (Earnest Money Deposit) or exemption proof
  • Technical bid with execution methodology

3. BOQ Analysis & Financial Bidding

The BOQ (Bill of Quantities) is the most critical component:

  • Analyze item-wise pricing
  • Ensure competitive yet sustainable quotes
  • Avoid underbidding risks (L1 pressure)

✔ Expert analysis can significantly improve your bid success ratio.


Why Tender18 is a Trusted Platform for Cement carrier Tenders

✔ Proven Expertise in Government Procurement

We combine industry knowledge with practical bidding experience.

✔ Verified & Reliable Data

All Cement carrier tenders are sourced from official portals and cross-checked for accuracy.

✔ Advanced Filtering Tools

Filter tenders by value, EMD, location, and category for precise targeting.

✔ Corrigendum & Update Tracking

Get instant alerts on deadline changes and specification updates.

✔ Historical Data Insights

Analyze past tender results to understand pricing trends and competition.

✔ End-to-End Bidding Support

From discovery to submission, including GeM onboarding and strategy.


Growth of Cement carrier Sector in 2026

With the Government of India focusing on digital procurement and infrastructure expansion, the Cement carrier sector has seen significant growth in e-tendering opportunities.

The rise of GeM-based procurement models like:

  • L1 Purchase
  • Direct Procurement
  • MSME-friendly policies

…has made it easier for startups and SMEs to participate and win contracts


Frequently Asked Questions (SEO Optimized)

How can I get daily Cement carrier tender alerts?

You can register on Tender18 and select your preferred category. You will receive daily email alerts with all new Cement carrier tenders.

Is EMD mandatory for all Cement carrier tenders?

No, MSME and Udyam-registered businesses may get exemptions. Always check the NIT for specific conditions.

What is the difference between a Cement carrier work tender and supply tender?

A supply tender involves delivering goods, while a work tender includes execution, labor, and project completion.

Can I access private Cement carrier tenders on Tender18?

Yes, we also track major private sector and EPC tenders along with government opportunities.


Get Expert Support for Cement carrier Tenders

Tender18 is more than a listing platform—we are your strategic partner in winning tenders.

Our services include:

  • Tender discovery & analysis
  • Documentation support
  • Bid strategy & submission
  • GeM registration & OEM onboarding

📞 Call / WhatsApp: +91 7069661818
🌐 Website: www.tender18.com

T18 Ref No : 15476277
Location : shillong , meghalaya
Source : GEM Tenders

tender for dental instruments mouth mirror with handle , eplorer , tweezer , suture cutting scissor , needle holder small , ellis tissue forceps , austin tissue retractor with handle set , austin tissue retractor without handle set , luator set of 8 , mta carrier , gingival cord plunger , minnesota retractor , colour code root canal plunger , formalin chamber , wall mounted uv light dental cabinet , endo bo stainless steel , micro needle holder straight , micro needle holder curved , towel forceps , micro tissue holding forceps , stainless steel punch biopsy , bone curette , cement carrier , chisel 6mm , glass bead sterilizer , ligature wire cutter , s s wire cutter , universal plier , adams plier , silver amalgam filling , rubber bowl , enamel bowl , cheek retractor , tissue retractor , dental syringe stainless steel aspirating type , instrument cassette for 20 instruments steel , instrument cassette for etraction instruments , wa knife , wa spatula , crown holding forceps , plaster cutter , edentulous impression tray , impression half tray stainless steel , trauma kit for dental oral , 1 modelling lever , 1 plier , 1 bone cutting forceps single action , 1 zygomatic bone awl , 1 ordinary screw driver , 1 self holding screw driver , 1 wire twister , 1 bone holding forcep pointed , 1 ss drill bite for micrsomotor dss , 1 ss drill bite for micromotor dss 2.0mm , 1 ss drill bite for micromotor dss 2.5mm , 3 mini plates 2 holes , 3 mini plates 4 holes , 3 screw , 2 mini plates obital 4 holes , 2 l shape mini plates left 4 holes , 2 l shape mini plates right 4 holes , 2 mini plates 16 holes , cotton roll dispenser , spirit lamp , mouth prop elevator , cement condenser , composite instrument titanium blue- 06 nos , articulator hinge tripod , blow troch , needle holder curved , chip blower , cement miing spatula fleible , glass slab , standing bp instrument , warwick james straight elevator , karmer periosteal elevator , prichard periosteal elevator , water distiller , wa carver , g p cutter , microneedle holder straight , microneedle holder curved , plastic instrument tray with cover , dental amalgam filling set , amalgam condenser , ball burnisher , diamond carver , hollen back carver , inte proimal carver, medical grade stainless steel auto-cleavable sterile 1, medical grade stainless steel auto-cleavable sterile, medical grade stainless steel sterile reusable, medical grade stainless steel standard, medical grade stainless steel sterile reusable auto-cleavable, heat treated sharp and durable non-slip medical grade stainless steel, medical grade stainless steel serrated reusable auto-cleavable, special grade pmma acrylic/plastic transparent, single door tray 5-10 capacity 100-160 l uv safe viewing window glass, medical grade stainless steel auto-cleavable, medical grade stainless sterile reusable auto-cleavable, dental curette medical grade stainless sterile reusable auto-cleavable, dental spatula medical grade stainless steel sterile reusable auto-cleavable, bi-bevel 6mm, digital control stainless steel and portable digital disply, medical grade stainless sterile reusable auto-cleavable and durable, multi-functional medical grade stainless steel sterile reusable auto-cleavable and durablewarranty-3 years, amalgam carrier non- clogging operation, medium size washable for repeated use, medium size bottom-round shape 12 inch dia material- porcelain, medical grade stainless sterile reusable auto-cleavable cheek type, type & category- sterilization cassette stainless steel, medical grade stainless sterile reusable double ended auto-cleavable, hand-held manually-operated cutting instrument with a short curved toothed blade, set, 1 modelling lever, 1 plier, 1 bone cutting forceps single action, 1 zygomatic bone awl, 1 ordinary screw driver, 1 self holding screw driver, 1 wire twister, 1 bone holding forcep pointed, 1 ss drill bite for micrsomotor dss, 1 ss drill bite for micromotor dss 2.0mm, 1 ss drill bite for micromotor dss 2.5mm, 3 mini plates 2 holes, 3 mini plates 4 holes, 3 screw, 2 mini plates obital 4 holes, 2 l shape mini plates left 4 holes, 2 l shape mini plates right 4 holes, 2 mini plates 16 holes, durable hygienic storage solution designed to keep cotton rolls clean, ss304 polished, electronic self-starting ignition system medium size, medical grade stainless steel or teflon coated, medical-grade stainless steel, aisi 304 stainless steel blade- thin, glass slab for miing slabs are typically made of glass coated with a non-stick surface and backed with a non-skid base, mercurial sphygmomanometer, distillation capacity 5lph high-grade 304 stainless steel automatic shut-off suitable for clinic lab use, medical grade stainless or teflon coated, dental gutta percha cutter is a wireless electronic device that aids in cutting of gutta-percha at the end of endodontic treatment, 20 inches 25inches, medical grade stainless steel sterile reusable auto-cleavable 2 pieces, medical grade stainless or teflon coated sterile reusable auto-cleavable 2 pieces


Tender Value : 500000
Due Date : Jun 12, 2026
T18 Ref No : 15427077
Location : kasganj , uttar pradesh
Source : GEM Tenders

tender for safe carriage of pcc pole , safe carraige of st pole , cartage of line material , replacment of damaged pcc pole , replacment of damaged st pole , grouting nuzzling and muffling of pcc pole , grouting nuzzling and muffling of st pole , erection of double pcc pole , erection grouting and nuzzling of stay set , fixing and connecting of earthing rods , re sagging of acsr dog and weasel conductor , re sagging of lt ab cable , laying spreading lifting of cable , laying spreading lifting of cable , cutting and chopping of tree branches , supply and fixing of nut bolt off size , supply and fixing of holding clamp , erection of cross arm etc , weldig of stp rust pole , replacment of lt cable , recieved back material, maintinance and repair work in edd kasganj, safe carriage of pcc pole 8.5 / 9 mtr long store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, t&p carrier etc. required for proper completion of work., st poles 11/13 mtr, cartage of line material viz weasal conductor, dog concudtor, stay set, earthing rod, lt ab cable (different size) gi earth wire, cross arm, angle, channel, insulator, clamps & other line material from store centre or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, t&p carrier etc. required for proper completion of work. (up to 100 km)., replacement of damaged pcc pole 8.5/ 9 mtr. long by opening of all existing accessories and conductor from damaged pole properly and removal of damaged pole and erect the new pole at same place including fixing of all existing accessories and conductor on the new pole etc. as per direction of supervising engineer. its including the cost of all labour, t&p etc. (including carriage of damaged pole to store) required for proper completion of work., grouting, nuzzling and muffling of pcc pole 8.5/9 mtr. long as per resspo manual including of the cost of labour, t&p and carrier etc. required for proper completion of work. the support shall be grouted with cement, sand and brick ballast in ratio including the cost of arrangement of cement, sand, brick ballast etc., erection of st poles 11/13 mtr, erection of double supprot pcc pole 8.5/9 mtr long, erection, grouting and nuzzling of stay set including the work of nozzling etc. as per respo manual and also including the cost of arrangement of all grouting material, labour, t&p etc. required for proper completion of work as per resspo manual., fixing and connecting of earthing rods as per resspo manual including the cost of labour t&p etc required for proper completion of work., re-sagging of loose 33kv/11 kv / l.t. lines as per direction of supervising engineer. its includes the cost of labour, t&p etc. required for proper completion of work., lt a. b. cable (different size), laying, spreading, lifting & final sagging of aerial bunched 3x50+1x35+1x16 sq.mm.cable of following size including fixing of all accessories as per resspo manual & as per direction by supervising engineer., 3x95+1x70+1x16 sq.mm., 3x120+1x90+1x16 sq.mm., cutting & chopping of tree branches for proper clearance of ht/lt line, providing & fixing of nut bolt off size on vendors cost., providing & fixing of holding clamp for st/pcc pole one vendors cost., fixing of cross arm, insulator etc., welding of stp rust pole with fixing & removal of all accessiores., replacement of lt cable provided by department in distrubution transformers., rust/damage iron material carriage from site to store center, cartage of dismantlled line material / scrap viz st pole weasal conductor, gi earth wire, cross arm, angle, channel, insulator, clamps & other line material from site to store centre as per direction of supervising engineer through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, t&p carrier etc. required for proper completion of work. (dist. 0 to 100 kms.).


Tender Value : 500000
Due Date : Jun 09, 2026

Unlock Full Tender Access

Start Free Trial to download documents before deadline

T18 Ref No : 15443970
Location : mainpuri , uttar pradesh
Source : GEM Tenders

tender for carriage of distribution transformer 100 kva from esc mnp , carriage of distribution transformer 250 kva from esc mnp , carriage of acsr weasel conductor from esc mnp , carriage of m s earthing rod 20 x2540 mm from esc mnp , carriage of lt al. xlpe cable size 1x240 sq.mm. from esc mnp , carriage of lt xlpe cable 1x120 sq.mm. for dtr from esc mnp , carriage of lt xlpe cable 1x400 sq.mm. for dtr from esc mnp , carriage of lt xlpe cable size 3.5x70 or 35 sq.mm. from esc mnp , carriage of lt ab cable 3x120 1x95 1x16 sq.mm. from esc mnp , carriage of lt ab cable 3x50 1x35 1x16 sq.mm. from esc mnp , carriage of lt ab cable 3x95 1x70 1x16 sq.mm. from esc mnp , carriage of 33 kv xlpe cable 3x300 sq.mm. from esc mnp , carriage of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. from esc mnp , carriage of 33 kv straight through size 3x300 sq.mm. from esc mnp , carriage of g.i. wire 6 or 8 swg for guarding from esc mnp , carriage of three phase distribution box from esc mnp , erection of fixing of lt fuse set protection box with all respective accessories as per norms , execution of chemical earthing with g.i. patti clamp nut and bolts as per norms , erection of l.t. tail less unit with all respective material as grouted angel with fabrication work etc. , laying of acsr weasel conductor , laying of lt ab cable 3x120 1x95 1x16 sq.mm. , laying of lt ab cable 3x50 1x35 1x16 sq.mm. , laying of lt ab cable 3x95 1x70 1x16 sq.mm. , mounting of three phase distribution box , erection of double pole structure 8.5 mtr pcc pole , erection of single pole structure 8.5 mtrs pcc pole , erection of tri pole structure 33 kv 13 mtr st pole , grouting of pcc or stp pole , grouting of stay , earthing of pole , guarding of 11 kv line , fencing of 250 kva distribution transformers , plinth for 250 kva transformer , installation of 11by0.4 kv tf 25 kva , installation of 11by0.4 kv tf 63 kva , installation of 11by0.4 kv tf 100 kva , installation of 11by0.4 kv tf 250 kva , laying of 33 kv xlpe cable 3x300 sq.mm. , installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms. , dismentlling, received back and safe carriage of jarjar g.i. wire and weasel conducter including with rolling from pit site to esc, mainpuri , received back of distribution transformer after, boqbhogaon, clamp for 11 kv v type cross arm with bolts and nuts, three phase distribution box clamp with nut and bolts, connecting cable for distribution box 1x35 sq.mm., l.t. fuse set protection box with all accessories, tinned copper fuse wire different size, hdpe pipe 140 mm., stone pad 300x300x75, holding clamp for doulble pole unit with nut and bolts, ms angle 75x75x6x2028mm with clamp and bolt and nut t or f base, t off chhanel and t off clamp with nut and bolts, top chhanel 125x65x240, dropper channel 100x50x2028 mm., danger board with clamp and nut and bolt, chemical earthing with g.i. patti clamp nut and bolts as per norms, l.t. tail less unit with all respective material angel, patti and other material, copper l pieace 62x225x12mm., 11 kv f clamp with nut and bolts, suspension clamp, dead end clamp, eye i hook, eye bolts for guarding, j hook, lt clamp for pcc or stp with bolts and nuts, pearcing connector, alluminium lug 120 sq.mm., alluminium lug 240 sq.mm., alluminium lug 400 sq.mm., nut bolts and washers off size, guarding angel, guarding angel clamp, m.s. angel iron 65x65x6 mm. 2700 mm long bracing with 4 nos clamp with nut and bolts, 13 m stp pole sp55 galvanised, 8.5 m pcc pole, v type cross arm for 11 kv, 11 kv pin insulator with pin, disc insulator with fitting t and c 45 kn 114 nos and 70kn 27 nos, 11 kv fuse set, 11 kv tpmo with polymer insulator, complete stay 9gi stay rod 20x1800 mm stay wire 7 and 8 swg 10 kg stay clamp bolt nut and washer, distribution transformer 25 kva, distribution transformer 63 kva, distribution transformer 100 kva, distribution transformer 250 kva, acsr weasel conductor or insulated conductor as provided by department, m s earthing rod 20 x2540 mm, lt al. xlpe cable size 1x240 sq.mm., lt xlpe cable 1x120 sq.mm. for dtr, lt xlpe cable 1x400 sq.mm. for dtr, lt xlpe cable size 3.5x70 or 35 sq.mm., lt ab cable 3x120 1x95 1x16 sq.mm., lt ab cable 3x50 1x35 1x16 sq.mm., lt ab cable 3x95 1x70 1x16 sq.mm., 33 kv xlpe cable 3x300 sq.mm., 33 kv indoor or outdoor jointing kit size 3x300 sq.mm., 33 kv straight through size 3x300 sq.mm., g.i. wire 6 or 8 swg for guarding, three phase distribution box, fixing of l.t. fuse set protection box with all respective accessories as per norms, l.t. tail less unit with all respective material as grouted angel with fabrication work etc., laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr weasel conductor or insulated conductor as provided by department, laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x120 1x95 1x16 sq.mm., laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x50 1x35 1x16 sq.mm, laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x95 1x70 1x16 sq.mm., mounting of three phase distribution box with clamp nut & bolts and make proper connection with connecting cable., erection of double pole structure 8.5 mtr pcc pole by digging of pits fitting of all relevant accessories as per respo norms. 34 nos pole at different location under concern division., erection of single pole structure 8.5 mtrs pcc pole by digging of pits fitting of all relevant accessories as per respo norms. at different location under concern division., erection of tri pole structure 33 kv 13 mtr st pole by digging of pits fitting of all relevant accessories as per respo norms. 3 nos pole at different location under concern division., grouting of pcc or stp pole long as per respo norms with material cement, sand, blast stone with the ratio 0.268 cu.m. each will be provided by conractor, grouting of stay as per respo norms cement, sand, blast stone material will be provided by conractor, earthing of pole by m s earthing rod 20 x2540 mm with 6 swg earthing wire etc and make proper connection., guarding of 11 kv line with gaurding angel, clamp eye bolts and gaurding g.i. wire 6 or 8 swg 30 span, fencing of distribution transformers with enamel in proper alignment as per respo manual and as per direction of executive engineer including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work., plinth for 250 kva transformer proper size as per resspo norms, installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 25 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 63 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 100 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 250 kva with l.t. xlpe cable suitable size with all respective material as per norms., laying of following cable by hdd method with hdpe pipe (140 mm.) including digging and restoring along with brick and sand including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work. 33 kv xlpe cable 3x300 sq.mm., installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms., dismentlling of jarjar g.i. wire and weasel conducter including with rolling received back and safe carriage from pit site to esc, mainpuri, received back of distribution transformer after increasing capacity from pit site to esc, mainpuri ( 17 nos 100 kva)


Tender Value : 7000000
Due Date : Jun 10, 2026
T18 Ref No : 15443971
Location : mainpuri , uttar pradesh
Source : GEM Tenders

tender for , carriage of distribution transformer 250 kva from esc mnp , carriage of acsr rabbit conductor from esc mnp , carriage of acsr weasel conductor or insulated conductor as provided by department from esc mnp , carriage of m s earthing rod 20 x2540 mm from esc mnp , carriage of lt al. xlpe cable size 1x240 sq.mm. from esc mnp , carriage of lt xlpe cable 1x120 sq.mm. from esc mnp , carriage of 11 kv xlpe cable 3x185 sq.mm. from esc mnp , carriage of lt ab cable 3x120 1x95 1x16 sq.mm. from esc mnp , carriage of 33 kv xlpe cable 3x300 sq.mm. from esc mnp , carriage of 11 kv xlpe cable 3x300 sq.mm. from esc mnp , carriage of 11 kv indoor or outdoor jointing kit size 3x300 sq.mm. from esc mnp , carriage of 11 kv indoor or outdoor jointing kit size 3x185 sq.mm. from esc mnp , carriage of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. from esc mnp , carriage of 11 kv straight through size 3x185 sq.mm. from esc mnp , carriage of 11 kv vcb for og ctr 200by100by5a 350 mva 1250 amp. from esc mnp , carriage of 11 kv vcb ic ctr 600by300by5a 350 mva 1250 amp. from esc mnp , carriage of g.i. wire 6or8 swg for guarding from esc mnp , carriage of three phase distribution box from esc mnp , erection of fixing of l.t. fuse set protection box with all respective accessories as per norms , execution of chemical earthing with g.i. patti clamp nut and bolts as per norms , erection of l.t. tail less unit with all respective material as grouted angel with fabrication work etc. , laying of acsr rabbit conductor , laying of acsr weasel conductor or insulated conductor as provided by department , laying of lt ab cable 3x120 1x95 1x16 sq.mm. , mounting of three phase distribution box , erection of double pole structure , erection of single pole structure , grouting of pcc or stp pole , grouting of stay , earthing of pole , guarding of 11 kv line with gaurding angel etc , fencing of distribution transformers , make plinth for 250 kva transformer proper size as per resspo norms , installation of 11by0.4 kv tf 100 kva , installation of 11by0.4 kv tf 250 kva , laying of 11 kv xlpe cable 3x185 sq.mm. , laying of 11 kv xlpe cable 3x300 sq.mm. , laying of 33 kv xlpe cable 3x300 sq.mm. , installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms. , installation of 11 kv indoor or outdoor jointing kit size 3x185 sq.mm. as per norms. , installation of 11 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms. , installation of 11 kv straight through size 3x185 sq.mm. as per norms. , installation of 11 kv vcb og ctr 200by100by5a 350 mva 1250 amp. , installation of 11 kv vcb ic ctr 600by300by5a 350 mva 1250 amp. , dismentlling of old and damaged cable of different size , received back of distribution transformer after increasing, boqeudd, 11 kv v type cross arm clamp with bolts and nuts, three phase distribution box clamp with nut and bolts, connecting cable for distribution box 1x35 sq.mm., l.t. fuse set protection box with all accessories, tinned copper fuse wire different size, hdpe pipe 140 mm., stone pad 300x300x75, ms angle 75x75x6x2028mm with clamp and bolt and nut tf base, t off chhanel and t off clamp with nut and bolts, top chhanel 125x65x240, dropper channel 100x50x2028 mm., chemical earthing with g.i. patti clamp nut and bolts as per norms, l.t. tail less unit with all respective material angel, patti and other material, copper l pieace 62x225x12mm., 4 core lt mcb with box for 250 kva tf, 11 kv f clamp with nut and bolts, al. pg clamp weasel to weasel conductor, al. pg clamp rabbit to rabbit conductor, suspension clamp, dead end clamp, eye i hook, eye bolts for guarding, j hook, lt clamp for pcc or stp with bolts and nuts, pearcing connector, alluminium lug 120 sq.mm., alluminium lug 240 sq.mm., guarding angel, guarding angel clamp, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 8.5 m pcc pole, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 9 m stp pole sp 55 galvanised, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 m stp pole sp 55 galvanised, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 13 m stp pole sp 55 galvanised, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department v type cross arm for 11 kv, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv pin insulator with pin, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department disc insulator with fitting tandc 45 kn, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv fuse set, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv tpmo with polymer insulator, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department complete stay 9gi stay rod 20x1800 mm, stay wire 7 or 8 swg, 10 kg, stay clamp, bolt, nut and washer, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department distribution transformer 100 kva, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department distribution transformer 250 kva, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department acsr rabbit conductor, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department acsr weasel conductor or insulated conductor as provided by department, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department m s earthing rod 20 x2540 mm, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department lt al. xlpe cable size 1x240 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department lt xlpe cable 1x120 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv xlpe cable 3x185 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department lt ab cable 3x120 1x95 1x16 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 33 kv xlpe cable 3x300 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv xlpe cable 3x300 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv indoor or outdoor jointing kit size 3x300 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv indoor or outdoor jointing kit size 3x185 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 33 kv indoor or outdoor jointing kit size 3x300 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv straight through size 3x185 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv vcb for og ctr 200by100by5a 350 mva 1250 amp., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv vcb ic ctr 600by300by5a 350 mva 1250 amp., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department g.i. wire 6 or 8 swg for guarding, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department three phase distribution box, fixing of l.t. fuse set protection box with all respective accessories as per norms, l.t. tail less unit with all respective material as grouted angel with fabrication work etc., laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr rabbit conductor, laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr weasel conductor or insulated conductor as provided by department, laying, stringing, sagging, with all respective material clamp with nut and bolts suspension clamp eye j hook pearcing connector etc of following conductor cable on the erected supports, as per respo norms. lt ab cable 3x120 1x95 1x16 sq.mm., mounting of three phase distribution box with clamp nut & bolts and make proper connection with connecting cable., erection of double pole structure 11 mtr stp pole by digging of pits fitting of all relevant accessories as per respo norms. 22 nos pole at different location under concern division., erection of single pole structure 8.5 mtrs pcc pole, 9 mtr st, 11 mtr st pole, 13 mtr st by digging of pits fitting of all relevant accessories as per respo norms. at different location under concern division., grouting of pcc or stp pole long as per respo norms with material cement, sand, blast stone with the ratio 0.268 cu.m. each will be provided by conractor, grouting of stay as per respo norms cement, sand, blast stone material will be provided by conractor, earthing of pole by m s earthing rod 20 x2540 mm with 6 swg earthing wire etc and make proper connection., guarding of 11 kv line with gaurding angel, clamp eye bolts and gaurding g.i. wire 6 or 8 swg 60 span, fencing of distribution transformers with enamel in proper alignment as per respo manual and as per direction of executive engineer including the cost of arrangement of labour, t and p, carrier etc. required for proper completion of work., make plinth for 250 kva transformer proper size as per resspo norms, installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work. 11by0.4 kv tf 100 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work. 11by0.4 kv tf 250 kva with l.t. xlpe cable suitable size with all respective material as per norms., laying of following cable including digging and restoring along with brick and sand including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work. at different location under concern division.11 kv xlpe cable 3x185 sq.mm., laying of following cable including digging and restoring along with brick and sand including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work. at different location under concern division. 11 kv xlpe cable 3x300 sq.mm., laying of following cable by hdd method with hdpe pipe 140 mm. including digging and restoring along with brick and sand including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work. 33 kv xlpe cable 3x300 sq.mm., installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms., installation of 11 kv indoor or outdoor jointing kit size 3x185 sq.mm. as per norms., installation of 11 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms., installation of 11 kv straight through size 3x185 sq.mm. as per norms., installation of 11 kv vcb og ctr 200by100by5a 350 mva 1250 amp. and make proper connection as per norms., installation of 11 kv vcb ic ctr 600by300by5a 350 mva 1250 amp. and make proper connection as per norms., dismentlling of old and damaged cable of different size including with rolling received back and safe carriage from pit site to esc, mainpuri, received back of distribution transformer after increasing capacity from pit site to esc, mainpuri 30 nos 100 kva


Tender Value : 0
Due Date : Jun 10, 2026
T18 Ref No : 15749249
Location : mainpuri , uttar pradesh
Source : GEM Tenders

corrigendum tender for carriage of distribution transformer 100 kva from esc mnp , carriage of distribution transformer 250 kva from esc mnp , carriage of acsr weasel conductor from esc mnp , carriage of m s earthing rod 20 x2540 mm from esc mnp , carriage of lt al. xlpe cable size 1x240 sq.mm. from esc mnp , carriage of lt xlpe cable 1x120 sq.mm. for dtr from esc mnp , carriage of lt xlpe cable 1x400 sq.mm. for dtr from esc mnp , carriage of lt xlpe cable size 3.5x70 or 35 sq.mm. from esc mnp , carriage of lt ab cable 3x120 1x95 1x16 sq.mm. from esc mnp , carriage of lt ab cable 3x50 1x35 1x16 sq.mm. from esc mnp , carriage of lt ab cable 3x95 1x70 1x16 sq.mm. from esc mnp , carriage of 33 kv xlpe cable 3x300 sq.mm. from esc mnp , carriage of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. from esc mnp , carriage of 33 kv straight through size 3x300 sq.mm. from esc mnp , carriage of g.i. wire 6 or 8 swg for guarding from esc mnp , carriage of three phase distribution box from esc mnp , erection of fixing of lt fuse set protection box with all respective accessories as per norms , execution of chemical earthing with g.i. patti clamp nut and bolts as per norms , erection of l.t. tail less unit with all respective material as grouted angel with fabrication work etc. , laying of acsr weasel conductor , laying of lt ab cable 3x120 1x95 1x16 sq.mm. , laying of lt ab cable 3x50 1x35 1x16 sq.mm. , laying of lt ab cable 3x95 1x70 1x16 sq.mm. , mounting of three phase distribution box , erection of double pole structure 8.5 mtr pcc pole , erection of single pole structure 8.5 mtrs pcc pole , erection of tri pole structure 33 kv 13 mtr st pole , grouting of pcc or stp pole , grouting of stay , earthing of pole , guarding of 11 kv line , fencing of 250 kva distribution transformers , plinth for 250 kva transformer , installation of 11by0.4 kv tf 25 kva , installation of 11by0.4 kv tf 63 kva , installation of 11by0.4 kv tf 100 kva , installation of 11by0.4 kv tf 250 kva , laying of 33 kv xlpe cable 3x300 sq.mm. , installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms. , dismentlling, received back and safe carriage of jarjar g.i. wire and weasel conducter including with rolling from pit site to esc, mainpuri , received back of distribution transformer after, boqbhogaon, clamp for 11 kv v type cross arm with bolts and nuts, three phase distribution box clamp with nut and bolts, connecting cable for distribution box 1x35 sq.mm., l.t. fuse set protection box with all accessories, tinned copper fuse wire different size, hdpe pipe 140 mm., stone pad 300x300x75, holding clamp for doulble pole unit with nut and bolts, ms angle 75x75x6x2028mm with clamp and bolt and nut t or f base, t off chhanel and t off clamp with nut and bolts, top chhanel 125x65x240, dropper channel 100x50x2028 mm., danger board with clamp and nut and bolt, chemical earthing with g.i. patti clamp nut and bolts as per norms, l.t. tail less unit with all respective material angel, patti and other material, copper l pieace 62x225x12mm., 11 kv f clamp with nut and bolts, suspension clamp, dead end clamp, eye i hook, eye bolts for guarding, j hook, lt clamp for pcc or stp with bolts and nuts, pearcing connector, alluminium lug 120 sq.mm., alluminium lug 240 sq.mm., alluminium lug 400 sq.mm., nut bolts and washers off size, guarding angel, guarding angel clamp, m.s. angel iron 65x65x6 mm. 2700 mm long bracing with 4 nos clamp with nut and bolts, 13 m stp pole sp55 galvanised, 8.5 m pcc pole, v type cross arm for 11 kv, 11 kv pin insulator with pin, disc insulator with fitting t and c 45 kn 114 nos and 70kn 27 nos, 11 kv fuse set, 11 kv tpmo with polymer insulator, complete stay 9gi stay rod 20x1800 mm stay wire 7 and 8 swg 10 kg stay clamp bolt nut and washer, distribution transformer 25 kva, distribution transformer 63 kva, distribution transformer 100 kva, distribution transformer 250 kva, acsr weasel conductor or insulated conductor as provided by department, m s earthing rod 20 x2540 mm, lt al. xlpe cable size 1x240 sq.mm., lt xlpe cable 1x120 sq.mm. for dtr, lt xlpe cable 1x400 sq.mm. for dtr, lt xlpe cable size 3.5x70 or 35 sq.mm., lt ab cable 3x120 1x95 1x16 sq.mm., lt ab cable 3x50 1x35 1x16 sq.mm., lt ab cable 3x95 1x70 1x16 sq.mm., 33 kv xlpe cable 3x300 sq.mm., 33 kv indoor or outdoor jointing kit size 3x300 sq.mm., 33 kv straight through size 3x300 sq.mm., g.i. wire 6 or 8 swg for guarding, three phase distribution box, fixing of l.t. fuse set protection box with all respective accessories as per norms, l.t. tail less unit with all respective material as grouted angel with fabrication work etc., laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr weasel conductor or insulated conductor as provided by department, laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x120 1x95 1x16 sq.mm., laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x50 1x35 1x16 sq.mm, laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x95 1x70 1x16 sq.mm., mounting of three phase distribution box with clamp nut & bolts and make proper connection with connecting cable., erection of double pole structure 8.5 mtr pcc pole by digging of pits fitting of all relevant accessories as per respo norms. 34 nos pole at different location under concern division., erection of single pole structure 8.5 mtrs pcc pole by digging of pits fitting of all relevant accessories as per respo norms. at different location under concern division., erection of tri pole structure 33 kv 13 mtr st pole by digging of pits fitting of all relevant accessories as per respo norms. 3 nos pole at different location under concern division., grouting of pcc or stp pole long as per respo norms with material cement, sand, blast stone with the ratio 0.268 cu.m. each will be provided by conractor, grouting of stay as per respo norms cement, sand, blast stone material will be provided by conractor, earthing of pole by m s earthing rod 20 x2540 mm with 6 swg earthing wire etc and make proper connection., guarding of 11 kv line with gaurding angel, clamp eye bolts and gaurding g.i. wire 6 or 8 swg 30 span, fencing of distribution transformers with enamel in proper alignment as per respo manual and as per direction of executive engineer including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work., plinth for 250 kva transformer proper size as per resspo norms, installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 25 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 63 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 100 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 250 kva with l.t. xlpe cable suitable size with all respective material as per norms., laying of following cable by hdd method with hdpe pipe (140 mm.) including digging and restoring along with brick and sand including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work. 33 kv xlpe cable 3x300 sq.mm., installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms., dismentlling of jarjar g.i. wire and weasel conducter including with rolling received back and safe carriage from pit site to esc, mainpuri, received back of distribution transformer after increasing capacity from pit site to esc, mainpuri ( 17 nos 100 kva)


Tender Value : 7000000
Due Date : Jun 13, 2026

Unlock Full Tender Access

Start Free Trial to download documents before deadline

T18 Ref No : 15763007
Location : mainpuri , uttar pradesh
Source : GEM Tenders

corrigendum tender for , carriage of distribution transformer 250 kva from esc mnp , carriage of acsr rabbit conductor from esc mnp , carriage of acsr weasel conductor or insulated conductor as provided by department from esc mnp , carriage of m s earthing rod 20 x2540 mm from esc mnp , carriage of lt al. xlpe cable size 1x240 sq.mm. from esc mnp , carriage of lt xlpe cable 1x120 sq.mm. from esc mnp , carriage of 11 kv xlpe cable 3x185 sq.mm. from esc mnp , carriage of lt ab cable 3x120 1x95 1x16 sq.mm. from esc mnp , carriage of 33 kv xlpe cable 3x300 sq.mm. from esc mnp , carriage of 11 kv xlpe cable 3x300 sq.mm. from esc mnp , carriage of 11 kv indoor or outdoor jointing kit size 3x300 sq.mm. from esc mnp , carriage of 11 kv indoor or outdoor jointing kit size 3x185 sq.mm. from esc mnp , carriage of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. from esc mnp , carriage of 11 kv straight through size 3x185 sq.mm. from esc mnp , carriage of 11 kv vcb for og ctr 200by100by5a 350 mva 1250 amp. from esc mnp , carriage of 11 kv vcb ic ctr 600by300by5a 350 mva 1250 amp. from esc mnp , carriage of g.i. wire 6or8 swg for guarding from esc mnp , carriage of three phase distribution box from esc mnp , erection of fixing of l.t. fuse set protection box with all respective accessories as per norms , execution of chemical earthing with g.i. patti clamp nut and bolts as per norms , erection of l.t. tail less unit with all respective material as grouted angel with fabrication work etc. , laying of acsr rabbit conductor , laying of acsr weasel conductor or insulated conductor as provided by department , laying of lt ab cable 3x120 1x95 1x16 sq.mm. , mounting of three phase distribution box , erection of double pole structure , erection of single pole structure , grouting of pcc or stp pole , grouting of stay , earthing of pole , guarding of 11 kv line with gaurding angel etc , fencing of distribution transformers , make plinth for 250 kva transformer proper size as per resspo norms , installation of 11by0.4 kv tf 100 kva , installation of 11by0.4 kv tf 250 kva , laying of 11 kv xlpe cable 3x185 sq.mm. , laying of 11 kv xlpe cable 3x300 sq.mm. , laying of 33 kv xlpe cable 3x300 sq.mm. , installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms. , installation of 11 kv indoor or outdoor jointing kit size 3x185 sq.mm. as per norms. , installation of 11 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms. , installation of 11 kv straight through size 3x185 sq.mm. as per norms. , installation of 11 kv vcb og ctr 200by100by5a 350 mva 1250 amp. , installation of 11 kv vcb ic ctr 600by300by5a 350 mva 1250 amp. , dismentlling of old and damaged cable of different size , received back of distribution transformer after increasing, boqeudd, 11 kv v type cross arm clamp with bolts and nuts, three phase distribution box clamp with nut and bolts, connecting cable for distribution box 1x35 sq.mm., l.t. fuse set protection box with all accessories, tinned copper fuse wire different size, hdpe pipe 140 mm., stone pad 300x300x75, ms angle 75x75x6x2028mm with clamp and bolt and nut tf base, t off chhanel and t off clamp with nut and bolts, top chhanel 125x65x240, dropper channel 100x50x2028 mm., chemical earthing with g.i. patti clamp nut and bolts as per norms, l.t. tail less unit with all respective material angel, patti and other material, copper l pieace 62x225x12mm., 4 core lt mcb with box for 250 kva tf, 11 kv f clamp with nut and bolts, al. pg clamp weasel to weasel conductor, al. pg clamp rabbit to rabbit conductor, suspension clamp, dead end clamp, eye i hook, eye bolts for guarding, j hook, lt clamp for pcc or stp with bolts and nuts, pearcing connector, alluminium lug 120 sq.mm., alluminium lug 240 sq.mm., guarding angel, guarding angel clamp, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 8.5 m pcc pole, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 9 m stp pole sp 55 galvanised, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 m stp pole sp 55 galvanised, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 13 m stp pole sp 55 galvanised, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department v type cross arm for 11 kv, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv pin insulator with pin, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department disc insulator with fitting tandc 45 kn, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv fuse set, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv tpmo with polymer insulator, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department complete stay 9gi stay rod 20x1800 mm, stay wire 7 or 8 swg, 10 kg, stay clamp, bolt, nut and washer, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department distribution transformer 100 kva, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department distribution transformer 250 kva, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department acsr rabbit conductor, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department acsr weasel conductor or insulated conductor as provided by department, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department m s earthing rod 20 x2540 mm, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department lt al. xlpe cable size 1x240 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department lt xlpe cable 1x120 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv xlpe cable 3x185 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department lt ab cable 3x120 1x95 1x16 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 33 kv xlpe cable 3x300 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv xlpe cable 3x300 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv indoor or outdoor jointing kit size 3x300 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv indoor or outdoor jointing kit size 3x185 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 33 kv indoor or outdoor jointing kit size 3x300 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv straight through size 3x185 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv vcb for og ctr 200by100by5a 350 mva 1250 amp., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv vcb ic ctr 600by300by5a 350 mva 1250 amp., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department g.i. wire 6 or 8 swg for guarding, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department three phase distribution box, fixing of l.t. fuse set protection box with all respective accessories as per norms, l.t. tail less unit with all respective material as grouted angel with fabrication work etc., laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr rabbit conductor, laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr weasel conductor or insulated conductor as provided by department, laying, stringing, sagging, with all respective material clamp with nut and bolts suspension clamp eye j hook pearcing connector etc of following conductor cable on the erected supports, as per respo norms. lt ab cable 3x120 1x95 1x16 sq.mm., mounting of three phase distribution box with clamp nut & bolts and make proper connection with connecting cable., erection of double pole structure 11 mtr stp pole by digging of pits fitting of all relevant accessories as per respo norms. 22 nos pole at different location under concern division., erection of single pole structure 8.5 mtrs pcc pole, 9 mtr st, 11 mtr st pole, 13 mtr st by digging of pits fitting of all relevant accessories as per respo norms. at different location under concern division., grouting of pcc or stp pole long as per respo norms with material cement, sand, blast stone with the ratio 0.268 cu.m. each will be provided by conractor, grouting of stay as per respo norms cement, sand, blast stone material will be provided by conractor, earthing of pole by m s earthing rod 20 x2540 mm with 6 swg earthing wire etc and make proper connection., guarding of 11 kv line with gaurding angel, clamp eye bolts and gaurding g.i. wire 6 or 8 swg 60 span, fencing of distribution transformers with enamel in proper alignment as per respo manual and as per direction of executive engineer including the cost of arrangement of labour, t and p, carrier etc. required for proper completion of work., make plinth for 250 kva transformer proper size as per resspo norms, installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work. 11by0.4 kv tf 100 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work. 11by0.4 kv tf 250 kva with l.t. xlpe cable suitable size with all respective material as per norms., laying of following cable including digging and restoring along with brick and sand including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work. at different location under concern division.11 kv xlpe cable 3x185 sq.mm., laying of following cable including digging and restoring along with brick and sand including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work. at different location under concern division. 11 kv xlpe cable 3x300 sq.mm., laying of following cable by hdd method with hdpe pipe 140 mm. including digging and restoring along with brick and sand including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work. 33 kv xlpe cable 3x300 sq.mm., installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms., installation of 11 kv indoor or outdoor jointing kit size 3x185 sq.mm. as per norms., installation of 11 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms., installation of 11 kv straight through size 3x185 sq.mm. as per norms., installation of 11 kv vcb og ctr 200by100by5a 350 mva 1250 amp. and make proper connection as per norms., installation of 11 kv vcb ic ctr 600by300by5a 350 mva 1250 amp. and make proper connection as per norms., dismentlling of old and damaged cable of different size including with rolling received back and safe carriage from pit site to esc, mainpuri, received back of distribution transformer after increasing capacity from pit site to esc, mainpuri 30 nos 100 kva


Tender Value : 0
Due Date : Jun 13, 2026
T18 Ref No : 15779645
Location : mainpuri , uttar pradesh
Source : GEM Tenders

corrigendum tender for carriage of distribution transformer 100 kva from esc mnp , carriage of distribution transformer 250 kva from esc mnp , carriage of acsr weasel conductor from esc mnp , carriage of m s earthing rod 20 x2540 mm from esc mnp , carriage of lt al. xlpe cable size 1x240 sq.mm. from esc mnp , carriage of lt xlpe cable 1x120 sq.mm. for dtr from esc mnp , carriage of lt xlpe cable 1x400 sq.mm. for dtr from esc mnp , carriage of lt xlpe cable size 3.5x70 or 35 sq.mm. from esc mnp , carriage of lt ab cable 3x120 1x95 1x16 sq.mm. from esc mnp , carriage of lt ab cable 3x50 1x35 1x16 sq.mm. from esc mnp , carriage of lt ab cable 3x95 1x70 1x16 sq.mm. from esc mnp , carriage of 33 kv xlpe cable 3x300 sq.mm. from esc mnp , carriage of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. from esc mnp , carriage of 33 kv straight through size 3x300 sq.mm. from esc mnp , carriage of g.i. wire 6 or 8 swg for guarding from esc mnp , carriage of three phase distribution box from esc mnp , erection of fixing of lt fuse set protection box with all respective accessories as per norms , execution of chemical earthing with g.i. patti clamp nut and bolts as per norms , erection of l.t. tail less unit with all respective material as grouted angel with fabrication work etc. , laying of acsr weasel conductor , laying of lt ab cable 3x120 1x95 1x16 sq.mm. , laying of lt ab cable 3x50 1x35 1x16 sq.mm. , laying of lt ab cable 3x95 1x70 1x16 sq.mm. , mounting of three phase distribution box , erection of double pole structure 8.5 mtr pcc pole , erection of single pole structure 8.5 mtrs pcc pole , erection of tri pole structure 33 kv 13 mtr st pole , grouting of pcc or stp pole , grouting of stay , earthing of pole , guarding of 11 kv line , fencing of 250 kva distribution transformers , plinth for 250 kva transformer , installation of 11by0.4 kv tf 25 kva , installation of 11by0.4 kv tf 63 kva , installation of 11by0.4 kv tf 100 kva , installation of 11by0.4 kv tf 250 kva , laying of 33 kv xlpe cable 3x300 sq.mm. , installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms. , dismentlling, received back and safe carriage of jarjar g.i. wire and weasel conducter including with rolling from pit site to esc, mainpuri , received back of distribution transformer after, boqbhogaon, clamp for 11 kv v type cross arm with bolts and nuts, three phase distribution box clamp with nut and bolts, connecting cable for distribution box 1x35 sq.mm., l.t. fuse set protection box with all accessories, tinned copper fuse wire different size, hdpe pipe 140 mm., stone pad 300x300x75, holding clamp for doulble pole unit with nut and bolts, ms angle 75x75x6x2028mm with clamp and bolt and nut t or f base, t off chhanel and t off clamp with nut and bolts, top chhanel 125x65x240, dropper channel 100x50x2028 mm., danger board with clamp and nut and bolt, chemical earthing with g.i. patti clamp nut and bolts as per norms, l.t. tail less unit with all respective material angel, patti and other material, copper l pieace 62x225x12mm., 11 kv f clamp with nut and bolts, suspension clamp, dead end clamp, eye i hook, eye bolts for guarding, j hook, lt clamp for pcc or stp with bolts and nuts, pearcing connector, alluminium lug 120 sq.mm., alluminium lug 240 sq.mm., alluminium lug 400 sq.mm., nut bolts and washers off size, guarding angel, guarding angel clamp, m.s. angel iron 65x65x6 mm. 2700 mm long bracing with 4 nos clamp with nut and bolts, 13 m stp pole sp55 galvanised, 8.5 m pcc pole, v type cross arm for 11 kv, 11 kv pin insulator with pin, disc insulator with fitting t and c 45 kn 114 nos and 70kn 27 nos, 11 kv fuse set, 11 kv tpmo with polymer insulator, complete stay 9gi stay rod 20x1800 mm stay wire 7 and 8 swg 10 kg stay clamp bolt nut and washer, distribution transformer 25 kva, distribution transformer 63 kva, distribution transformer 100 kva, distribution transformer 250 kva, acsr weasel conductor or insulated conductor as provided by department, m s earthing rod 20 x2540 mm, lt al. xlpe cable size 1x240 sq.mm., lt xlpe cable 1x120 sq.mm. for dtr, lt xlpe cable 1x400 sq.mm. for dtr, lt xlpe cable size 3.5x70 or 35 sq.mm., lt ab cable 3x120 1x95 1x16 sq.mm., lt ab cable 3x50 1x35 1x16 sq.mm., lt ab cable 3x95 1x70 1x16 sq.mm., 33 kv xlpe cable 3x300 sq.mm., 33 kv indoor or outdoor jointing kit size 3x300 sq.mm., 33 kv straight through size 3x300 sq.mm., g.i. wire 6 or 8 swg for guarding, three phase distribution box, fixing of l.t. fuse set protection box with all respective accessories as per norms, l.t. tail less unit with all respective material as grouted angel with fabrication work etc., laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr weasel conductor or insulated conductor as provided by department, laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x120 1x95 1x16 sq.mm., laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x50 1x35 1x16 sq.mm, laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x95 1x70 1x16 sq.mm., mounting of three phase distribution box with clamp nut & bolts and make proper connection with connecting cable., erection of double pole structure 8.5 mtr pcc pole by digging of pits fitting of all relevant accessories as per respo norms. 34 nos pole at different location under concern division., erection of single pole structure 8.5 mtrs pcc pole by digging of pits fitting of all relevant accessories as per respo norms. at different location under concern division., erection of tri pole structure 33 kv 13 mtr st pole by digging of pits fitting of all relevant accessories as per respo norms. 3 nos pole at different location under concern division., grouting of pcc or stp pole long as per respo norms with material cement, sand, blast stone with the ratio 0.268 cu.m. each will be provided by conractor, grouting of stay as per respo norms cement, sand, blast stone material will be provided by conractor, earthing of pole by m s earthing rod 20 x2540 mm with 6 swg earthing wire etc and make proper connection., guarding of 11 kv line with gaurding angel, clamp eye bolts and gaurding g.i. wire 6 or 8 swg 30 span, fencing of distribution transformers with enamel in proper alignment as per respo manual and as per direction of executive engineer including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work., plinth for 250 kva transformer proper size as per resspo norms, installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 25 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 63 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 100 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 250 kva with l.t. xlpe cable suitable size with all respective material as per norms., laying of following cable by hdd method with hdpe pipe (140 mm.) including digging and restoring along with brick and sand including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work. 33 kv xlpe cable 3x300 sq.mm., installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms., dismentlling of jarjar g.i. wire and weasel conducter including with rolling received back and safe carriage from pit site to esc, mainpuri, received back of distribution transformer after increasing capacity from pit site to esc, mainpuri ( 17 nos 100 kva)


Tender Value : 7000000
Due Date : Jun 15, 2026
T18 Ref No : 15779646
Location : mainpuri , uttar pradesh
Source : GEM Tenders

corrigendum tender for , carriage of distribution transformer 250 kva from esc mnp , carriage of acsr rabbit conductor from esc mnp , carriage of acsr weasel conductor or insulated conductor as provided by department from esc mnp , carriage of m s earthing rod 20 x2540 mm from esc mnp , carriage of lt al. xlpe cable size 1x240 sq.mm. from esc mnp , carriage of lt xlpe cable 1x120 sq.mm. from esc mnp , carriage of 11 kv xlpe cable 3x185 sq.mm. from esc mnp , carriage of lt ab cable 3x120 1x95 1x16 sq.mm. from esc mnp , carriage of 33 kv xlpe cable 3x300 sq.mm. from esc mnp , carriage of 11 kv xlpe cable 3x300 sq.mm. from esc mnp , carriage of 11 kv indoor or outdoor jointing kit size 3x300 sq.mm. from esc mnp , carriage of 11 kv indoor or outdoor jointing kit size 3x185 sq.mm. from esc mnp , carriage of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. from esc mnp , carriage of 11 kv straight through size 3x185 sq.mm. from esc mnp , carriage of 11 kv vcb for og ctr 200by100by5a 350 mva 1250 amp. from esc mnp , carriage of 11 kv vcb ic ctr 600by300by5a 350 mva 1250 amp. from esc mnp , carriage of g.i. wire 6or8 swg for guarding from esc mnp , carriage of three phase distribution box from esc mnp , erection of fixing of l.t. fuse set protection box with all respective accessories as per norms , execution of chemical earthing with g.i. patti clamp nut and bolts as per norms , erection of l.t. tail less unit with all respective material as grouted angel with fabrication work etc. , laying of acsr rabbit conductor , laying of acsr weasel conductor or insulated conductor as provided by department , laying of lt ab cable 3x120 1x95 1x16 sq.mm. , mounting of three phase distribution box , erection of double pole structure , erection of single pole structure , grouting of pcc or stp pole , grouting of stay , earthing of pole , guarding of 11 kv line with gaurding angel etc , fencing of distribution transformers , make plinth for 250 kva transformer proper size as per resspo norms , installation of 11by0.4 kv tf 100 kva , installation of 11by0.4 kv tf 250 kva , laying of 11 kv xlpe cable 3x185 sq.mm. , laying of 11 kv xlpe cable 3x300 sq.mm. , laying of 33 kv xlpe cable 3x300 sq.mm. , installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms. , installation of 11 kv indoor or outdoor jointing kit size 3x185 sq.mm. as per norms. , installation of 11 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms. , installation of 11 kv straight through size 3x185 sq.mm. as per norms. , installation of 11 kv vcb og ctr 200by100by5a 350 mva 1250 amp. , installation of 11 kv vcb ic ctr 600by300by5a 350 mva 1250 amp. , dismentlling of old and damaged cable of different size , received back of distribution transformer after increasing, boqeudd, 11 kv v type cross arm clamp with bolts and nuts, three phase distribution box clamp with nut and bolts, connecting cable for distribution box 1x35 sq.mm., l.t. fuse set protection box with all accessories, tinned copper fuse wire different size, hdpe pipe 140 mm., stone pad 300x300x75, ms angle 75x75x6x2028mm with clamp and bolt and nut tf base, t off chhanel and t off clamp with nut and bolts, top chhanel 125x65x240, dropper channel 100x50x2028 mm., chemical earthing with g.i. patti clamp nut and bolts as per norms, l.t. tail less unit with all respective material angel, patti and other material, copper l pieace 62x225x12mm., 4 core lt mcb with box for 250 kva tf, 11 kv f clamp with nut and bolts, al. pg clamp weasel to weasel conductor, al. pg clamp rabbit to rabbit conductor, suspension clamp, dead end clamp, eye i hook, eye bolts for guarding, j hook, lt clamp for pcc or stp with bolts and nuts, pearcing connector, alluminium lug 120 sq.mm., alluminium lug 240 sq.mm., guarding angel, guarding angel clamp, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 8.5 m pcc pole, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 9 m stp pole sp 55 galvanised, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 m stp pole sp 55 galvanised, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 13 m stp pole sp 55 galvanised, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department v type cross arm for 11 kv, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv pin insulator with pin, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department disc insulator with fitting tandc 45 kn, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv fuse set, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv tpmo with polymer insulator, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department complete stay 9gi stay rod 20x1800 mm, stay wire 7 or 8 swg, 10 kg, stay clamp, bolt, nut and washer, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department distribution transformer 100 kva, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department distribution transformer 250 kva, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department acsr rabbit conductor, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department acsr weasel conductor or insulated conductor as provided by department, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department m s earthing rod 20 x2540 mm, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department lt al. xlpe cable size 1x240 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department lt xlpe cable 1x120 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv xlpe cable 3x185 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department lt ab cable 3x120 1x95 1x16 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 33 kv xlpe cable 3x300 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv xlpe cable 3x300 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv indoor or outdoor jointing kit size 3x300 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv indoor or outdoor jointing kit size 3x185 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 33 kv indoor or outdoor jointing kit size 3x300 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv straight through size 3x185 sq.mm., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv vcb for og ctr 200by100by5a 350 mva 1250 amp., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department 11 kv vcb ic ctr 600by300by5a 350 mva 1250 amp., carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department g.i. wire 6 or 8 swg for guarding, carriage following material from centre stores, mainpuri to site of work distance 00-20 kms through the kacha and pakka road including the work of its loading and unloading at the respective ends as per respo manual and as per direction of concern executive engineer including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work in the area of concern division under edc mainpuri, material shall be provieded by department three phase distribution box, fixing of l.t. fuse set protection box with all respective accessories as per norms, l.t. tail less unit with all respective material as grouted angel with fabrication work etc., laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr rabbit conductor, laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr weasel conductor or insulated conductor as provided by department, laying, stringing, sagging, with all respective material clamp with nut and bolts suspension clamp eye j hook pearcing connector etc of following conductor cable on the erected supports, as per respo norms. lt ab cable 3x120 1x95 1x16 sq.mm., mounting of three phase distribution box with clamp nut & bolts and make proper connection with connecting cable., erection of double pole structure 11 mtr stp pole by digging of pits fitting of all relevant accessories as per respo norms. 22 nos pole at different location under concern division., erection of single pole structure 8.5 mtrs pcc pole, 9 mtr st, 11 mtr st pole, 13 mtr st by digging of pits fitting of all relevant accessories as per respo norms. at different location under concern division., grouting of pcc or stp pole long as per respo norms with material cement, sand, blast stone with the ratio 0.268 cu.m. each will be provided by conractor, grouting of stay as per respo norms cement, sand, blast stone material will be provided by conractor, earthing of pole by m s earthing rod 20 x2540 mm with 6 swg earthing wire etc and make proper connection., guarding of 11 kv line with gaurding angel, clamp eye bolts and gaurding g.i. wire 6 or 8 swg 60 span, fencing of distribution transformers with enamel in proper alignment as per respo manual and as per direction of executive engineer including the cost of arrangement of labour, t and p, carrier etc. required for proper completion of work., make plinth for 250 kva transformer proper size as per resspo norms, installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work. 11by0.4 kv tf 100 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work. 11by0.4 kv tf 250 kva with l.t. xlpe cable suitable size with all respective material as per norms., laying of following cable including digging and restoring along with brick and sand including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work. at different location under concern division.11 kv xlpe cable 3x185 sq.mm., laying of following cable including digging and restoring along with brick and sand including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work. at different location under concern division. 11 kv xlpe cable 3x300 sq.mm., laying of following cable by hdd method with hdpe pipe 140 mm. including digging and restoring along with brick and sand including the cost of arrangement of labour, tandp, carrier etc. required for proper completion of work. 33 kv xlpe cable 3x300 sq.mm., installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms., installation of 11 kv indoor or outdoor jointing kit size 3x185 sq.mm. as per norms., installation of 11 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms., installation of 11 kv straight through size 3x185 sq.mm. as per norms., installation of 11 kv vcb og ctr 200by100by5a 350 mva 1250 amp. and make proper connection as per norms., installation of 11 kv vcb ic ctr 600by300by5a 350 mva 1250 amp. and make proper connection as per norms., dismentlling of old and damaged cable of different size including with rolling received back and safe carriage from pit site to esc, mainpuri, received back of distribution transformer after increasing capacity from pit site to esc, mainpuri 30 nos 100 kva


Tender Value : 0
Due Date : Jun 15, 2026

Unlock Full Tender Access

Start Free Trial to download documents before deadline

T18 Ref No : 16170943
Location : mainpuri , uttar pradesh
Source : GEM Tenders

corrigendum tender for 9gi stay rod 20x1800 mm etc material from esc mnp , carriage of distribution transformer 25 kva from esc mnp , carriage of distribution transformer 63 kva from esc mnp , carriage of distribution transformer 100 kva from esc mnp , carriage of distribution transformer 250 kva from esc mnp , carriage of acsr weasel conductor from esc mnp , carriage of m s earthing rod 20 x2540 mm from esc mnp , carriage of lt al. xlpe cable size 1x240 sq.mm. from esc mnp , carriage of lt xlpe cable 1x120 sq.mm. for dtr from esc mnp , carriage of lt xlpe cable 1x400 sq.mm. for dtr from esc mnp , carriage of lt xlpe cable size 3.5x70 or 35 sq.mm. from esc mnp , carriage of lt ab cable 3x120 1x95 1x16 sq.mm. from esc mnp , carriage of lt ab cable 3x50 1x35 1x16 sq.mm. from esc mnp , carriage of lt ab cable 3x95 1x70 1x16 sq.mm. from esc mnp , carriage of 33 kv xlpe cable 3x300 sq.mm. from esc mnp , carriage of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. from esc mnp , carriage of 33 kv straight through size 3x300 sq.mm. from esc mnp , carriage of g.i. wire 6 or 8 swg for guarding from esc mnp , carriage of three phase distribution box from esc mnp , erection of fixing of lt fuse set protection box with all respective accessories as per norms , execution of chemical earthing with g.i. patti clamp nut and bolts as per norms , erection of l.t. tail less unit with all respective material as grouted angel with fabrication work etc. , laying of acsr weasel conductor , laying of lt ab cable 3x120 1x95 1x16 sq.mm. , laying of lt ab cable 3x50 1x35 1x16 sq.mm. , laying of lt ab cable 3x95 1x70 1x16 sq.mm. , mounting of three phase distribution box , erection of double pole structure 8.5 mtr pcc pole , erection of single pole structure 8.5 mtrs pcc pole , erection of tri pole structure 33 kv 13 mtr st pole , grouting of pcc or stp pole , grouting of stay , earthing of pole , guarding of 11 kv line , fencing of 250 kva distribution transformers , plinth for 250 kva transformer , installation of 11by0.4 kv tf 25 kva , installation of 11by0.4 kv tf 63 kva , installation of 11by0.4 kv tf 100 kva , installation of 11by0.4 kv tf 250 kva , laying of 33 kv xlpe cable 3x300 sq.mm. , installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms. , dismentlling, received back and safe carriage of jarjar g.i. wire and weasel conducter including with rolling from pit site to esc, mainpuri , received back of distribution transformer after, boqbp2627, clamp for 11 kv v type cross arm with bolts and nuts, three phase distribution box clamp with nut and bolts, connecting cable for distribution box 1x35 sq.mm., l.t. fuse set protection box with all accessories, tinned copper fuse wire different size, hdpe pipe 140 mm., stone pad 300x300x75, holding clamp for doulble pole unit with nut and bolts, ms angle 75x75x6x2028mm with clamp and bolt and nut t or f base, t off chhanel and t off clamp with nut and bolts, top chhanel 125x65x240, dropper channel 100x50x2028 mm., danger board with clamp and nut and bolt, chemical earthing with g.i. patti clamp nut and bolts as per norms, l.t. tail less unit with all respective material angel, patti and other material, copper l pieace 62x225x12mm., 11 kv f clamp with nut and bolts, suspension clamp, dead end clamp, eye i hook, eye bolts for guarding, j hook, lt clamp for pcc or stp with bolts and nuts, pearcing connector, alluminium lug 120 sq.mm., alluminium lug 240 sq.mm., alluminium lug 400 sq.mm., nut bolts and washers off size, guarding angel, guarding angel clamp, m.s. angel iron 65x65x6 mm. 2700 mm long bracing with 4 nos clamp with nut and bolts, 13 m stp pole sp55 galvanised, 8.5 m pcc pole, v type cross arm for 11 kv, 11 kv pin insulator with pin, disc insulator with fitting t and c 45 kn 114 nos and 70kn 27 nos, 11 kv fuse set, 11 kv tpmo with polymer insulator, complete stay 9gi stay rod 20x1800 mm stay wire 7 and 8 swg 10 kg stay clamp bolt nut and washer, distribution transformer 25 kva, distribution transformer 63 kva, distribution transformer 100 kva, distribution transformer 250 kva, acsr weasel conductor or insulated conductor as provided by department, m s earthing rod 20 x2540 mm, lt al. xlpe cable size 1x240 sq.mm., lt xlpe cable 1x120 sq.mm. for dtr, lt xlpe cable 1x400 sq.mm. for dtr, lt xlpe cable size 3.5x70 or 35 sq.mm., lt ab cable 3x120 1x95 1x16 sq.mm., lt ab cable 3x50 1x35 1x16 sq.mm., lt ab cable 3x95 1x70 1x16 sq.mm., 33 kv xlpe cable 3x300 sq.mm., 33 kv indoor or outdoor jointing kit size 3x300 sq.mm., 33 kv straight through size 3x300 sq.mm., g.i. wire 6 or 8 swg for guarding, three phase distribution box, fixing of l.t. fuse set protection box with all respective accessories as per norms, l.t. tail less unit with all respective material as grouted angel with fabrication work etc., laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per respo norms. acsr weasel conductor or insulated conductor as provided by department, laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x120 1x95 1x16 sq.mm., laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x50 1x35 1x16 sq.mm, laying, stringing, sagging, with all respective material clamp with nut & bolts or suspension clamp or eye or j hook or pearcing connector etc of following conductor or cable on the erected supports, as per respo norms. lt ab cable 3x95 1x70 1x16 sq.mm., mounting of three phase distribution box with clamp nut & bolts and make proper connection with connecting cable., erection of double pole structure 8.5 mtr pcc pole by digging of pits fitting of all relevant accessories as per respo norms. 34 nos pole at different location under concern division., erection of single pole structure 8.5 mtrs pcc pole by digging of pits fitting of all relevant accessories as per respo norms. at different location under concern division., erection of tri pole structure 33 kv 13 mtr st pole by digging of pits fitting of all relevant accessories as per respo norms. 3 nos pole at different location under concern division., grouting of pcc or stp pole long as per respo norms with material cement, sand, blast stone with the ratio 0.268 cu.m. each will be provided by conractor, grouting of stay as per respo norms cement, sand, blast stone material will be provided by conractor, earthing of pole by m s earthing rod 20 x2540 mm with 6 swg earthing wire etc and make proper connection., guarding of 11 kv line with gaurding angel, clamp eye bolts and gaurding g.i. wire 6 or 8 swg 30 span, fencing of distribution transformers with enamel in proper alignment as per respo manual and as per direction of executive engineer including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work., plinth for 250 kva transformer proper size as per resspo norms, installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 25 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 63 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 100 kva with l.t. xlpe cable suitable size with all respective material as per norms., installation of the following new transformers at various 11by0.4 kv substation, under the jurisdiction of concern distribution division, mainpuri, in proper alignment and direction and making proper htbylt connection as per instruction of executive engineer after carriage the same from centre stores,mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, tandp, carrier etc required for proper completion of work.11by0.4 kv tf 250 kva with l.t. xlpe cable suitable size with all respective material as per norms., laying of following cable by hdd method with hdpe pipe (140 mm.) including digging and restoring along with brick and sand including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work. 33 kv xlpe cable 3x300 sq.mm., installation of 33 kv indoor or outdoor jointing kit size 3x300 sq.mm. as per norms., dismentlling of jarjar g.i. wire and weasel conducter including with rolling received back and safe carriage from pit site to esc, mainpuri, received back of distribution transformer after increasing capacity from pit site to esc, mainpuri ( 17 nos 100 kva)


Tender Value : 0
Due Date : Jul 13, 2026
Published By

Every year, central and state government departments release thousands of high-value contracts specifically dedicated to Cement Carrier. Whether it involves bulk material supply, executing specialized operational services, or end-to-end turnkey project execution, the demand for capable vendors in the Cement Carrier sector is massive.

At Tender18, we help businesses cut through the noise and exclusively target the exact work categories they specialize in. Instead of browsing through generic procurement sites, our platform isolates high-potential opportunities that match your specific industry capabilities.

Work Dynamics in the Cement Carrier Sector

Government requirements for this specific vertical generally fall into distinct procurement patterns:

  • Product & Material Supply: Tenders focused strictly on sourcing, testing, and delivering high-quality items that meet the exact technical specifications of the buyer.
  • Service Level Agreements (SLAs): Long-term hiring of expert agencies for routine maintenance, manpower deployment, or continuous operational management.
  • Execution & Turnkey Projects: Comprehensive contracts where the bidder is responsible for everything from raw material procurement to final site installation and testing.

By focusing purely on your core strength in Cement Carrier, you can build a highly profitable and stable pipeline of government clients.

Stop wasting time filtering through irrelevant notices. Our Cement Carrier Tender Information Service is engineered for precision. We track exact product codes, service names, and specialized work terms across all government portals nationwide. When a buyer publishes a requirement that matches your specific business profile, our system alerts you instantly.

Deep Technical Insights & Documentation For Cement Carrier Tenders

Bidding for specific works requires studying strict technical parameters. We provide immediate access to the core documents you need to evaluate the project:

  • Detailed Specifications & Drawings: Download the exact engineering guidelines, material testing standards, and quality benchmarks demanded by the buyer for Cement Carrier.
  • Financial BOQ Spreadsheets: Access the official blank pricing formats where you need to input your unit rates, tax configurations, and total bid value.
  • Real-Time Technical Amendments: If the buying department changes the product specifications, alters the service scope, or shifts the delivery timeline, we instantly update the parent file so you are never caught off-guard.

Winning a contract for Cement Carrier depends entirely on how perfectly your technical capabilities match the buyer’s demands. Even if you have the best product or service, a poorly formatted document or a missing compliance certificate will lead to instant technical rejection. Tender18’s Tender Bidding Service eliminates this risk by taking complete ownership of your digital submission.

Flawless Compliance & Portal Execution For Cement Carrier Tenders

Under this service, Tender18 assigns a Dedicated Experienced Technical Person to your profile. This expert handles the heavy lifting of the entire bidding cycle:

  • Capability Mapping: We thoroughly cross-check your past completion certificates, ISO standard proofs, and financial turnover against the strict eligibility criteria required for Cement Carrier bids.
  • Secure System Integration: Our technical desk seamlessly links your Class III Digital Signature Certificate (DSC) with the required e-procurement servers to securely encrypt your technical and financial envelopes.
  • Error-Free Financial Uploads: We audit your quoted BOQ pricing sheets for any formula or formatting errors before the final upload, ensuring your bid is successfully locked before the portal's closing hours.

Government buyers are aggressively using the Government e-Marketplace (GeM) for the direct procurement of Cement Carrier. If your business profile is not accurately mapped on this portal, you remain practically invisible to these purchasing officers. Recognized as a trusted and expert GeM consultant, Tender18 offers specialized support to build, optimize, and maintain a highly visible vendor account for your business.

With an industry-leading support success ratio of over 95%, we handle the complex marketplace compliance so you can focus entirely on executing your orders

Expert Profile Management & Catalogue

Our dedicated consultants ensure your GeM presence is structurally perfect:

  • Precise Catalogue Listing: We upload and categorize your specific offerings under the exact search terms and parameters used by government buyers looking for Cement Carrier, ensuring maximum search visibility.
  • OEM Dashboard & Assessment: For original manufacturers and creators, we guide you through the mandatory Quality Council of India (QCI) vendor assessments to successfully unlock your official OEM panel.
  • Profile Compliance & Caution Money: We manage your statutory documentation, brand approvals, and caution money limits to keep your account immune from technical suspensions.

Strategic Live Bid Participation

Beyond setup, we actively drive your market participation. Our team expertly handles the digital paperwork and rate configurations for GeM Custom Bids and Reverse Auctions (RA) related to Cement Carrier, maximizing your chances of securing L1 status.

1.

How do I find government contracts exclusively matching my work in Cement Carrier?

The easiest way is through the Tender18 platform. Instead of searching department by department, our system uses advanced keyword matching to gather all live supply, service, and execution tenders related directly to your core business in one place.

2.

Do I need specific testing or quality certificates to apply for these contracts?

It heavily depends on the nature of the work. For supply contracts, buyers often ask for ISO certifications, BIS marks, or specific lab testing reports. For service contracts, they may ask for labor licenses or past performance certificates (work orders).

3.

What is a BOQ and why is it important for my bid?

The Bill of Quantities (BOQ) is the official financial Excel sheet where you enter your competitive prices. Any mistake in this file—like adding extra rows, changing formulas, or saving it in the wrong format—will cause the portal server to reject your entire bid.

4.

Are samples required to be submitted physically before the digital bid opens?

For many product-based Cement Carrier tenders, buying departments do ask bidders to submit physical samples to their office before the digital technical evaluation date. This requirement is always clearly mentioned in the official NIT document.

5.

How does the Dedicated Tender Expert from Tender18 help me?

Our assigned expert manages your total portal compliance. They extract the hidden rules from long tender PDFs, create a precise document checklist for your team, map your digital signature, and securely upload your technical and financial files onto the government servers.

6.

What is the role of a Digital Signature Certificate (DSC)?

A Class III DSC is a secure USB device that contains your digital identity. You cannot upload a bid without it. It is used to securely encrypt and lock your sensitive price data and technical documents so no one can view them before the official opening date.

7.

As an MSME, can I get financial benefits when bidding for Cement Carrier?

Yes, the government strongly supports MSMEs. By uploading a valid Udyam Registration Certificate in the technical envelope, small businesses are frequently exempted from paying the initial Tender Document Fee and the Earnest Money Deposit (EMD).

8.

Why should I list my services or products on GeM for this category?

GeM is now the primary digital marketplace for all government agencies. If you are properly cataloged for Cement Carrier, officers can view your profile and generate direct purchase orders or invite you to participate in exclusive Custom Bids.

9.

What makes Tender18 a reliable GeM support partner?

As a highly trusted and expert GeM consultant, Tender18 holds a proven support success ratio of over 95%. From flawless profile creation and complex catalogue mapping to OEM panel approvals and live Reverse Auction (RA) support, we handle it all seamlessly.

10.

What does "L1" mean in these government contracts?

"L1" stands for "Lowest Bidder 1". In government procurement, after all technical envelopes are approved, the financial sheets (BOQs) are opened. The bidder who has quoted the lowest compliant price for Cement Carrier is declared L1 and is generally awarded the contract