Search Tenders
Filters
Reset All
Tender Status
T18 Ref No
All States
All Cities
All Agencies
Tender ID
Due Date
Tender Value
Tender Source (GeM, Cppp & Others)
Tender Type

5Latest Ammonia air conditioning Tenders List

Latest Ammonia air conditioning Tenders in India – Verified Leads & Real-Time Insights by Tender18

Finding the right Ammonia air conditioning tenders in India’s competitive e-procurement ecosystem requires more than just access—it demands accurate data, real-time monitoring, and expert analysis.

At Tender18 Infotech Private Limited, we bring deep industry experience in government procurement to help businesses identify, evaluate, and win Ammonia air conditioning tenders efficiently. With a centralized platform aggregating 1100+ live tenders, we provide a single, trusted source for opportunities from central, state, and PSU departments.


Real-Time Ammonia air conditioning Tender Intelligence & Monitoring

Our advanced dashboard delivers actionable insights and structured tender data, enabling you to make faster and smarter bidding decisions.

We categorize Ammonia air conditioning tenders into:

  • Supply Tenders – BOQs and specifications sourced from GeM and PSUs
  • Service Tenders – NITs and scope of work from CPPP and state portals
  • EPC Projects – Large-scale infrastructure tenders with financial and design data

✔ This structured approach ensures complete transparency and deeper bid analysis before submission.


Comprehensive Sources of Ammonia air conditioning Tenders

Tender18 acts as a centralized gateway by aggregating tenders from trusted and official sources:

  • Central Government Portals – CPPP, NIC, and Government e-Marketplace (GeM)
  • Railways & Transport – IREPS and Metro Rail projects
  • Power & Energy PSUs – NTPC, ONGC, NHPC, PowerGrid
  • Defense & Strategic Sectors – MES and DRDO tenders
  • State e-Procurement Portals – Gujarat, Maharashtra, Tamil Nadu, UP, and more

✔ Every listing is verified and regularly updated to maintain data accuracy and trust.


Step-by-Step Guide to Participate in Ammonia air conditioning Tenders

1. Eligibility & Prequalification

Before bidding, ensure compliance with:

  • Financial turnover requirements (30–50% of tender value)
  • Past experience (2–3 similar projects)
  • Valid solvency certificate

2. Mandatory Documentation Checklist

Prepare the following to avoid disqualification:

  • Digital Signature Certificate (Class 3 DSC)
  • GST, PAN, MSME/Udyam registration
  • EMD (Earnest Money Deposit) or exemption proof
  • Technical bid with execution methodology

3. BOQ Analysis & Financial Bidding

The BOQ (Bill of Quantities) is the most critical component:

  • Analyze item-wise pricing
  • Ensure competitive yet sustainable quotes
  • Avoid underbidding risks (L1 pressure)

✔ Expert analysis can significantly improve your bid success ratio.


Why Tender18 is a Trusted Platform for Ammonia air conditioning Tenders

✔ Proven Expertise in Government Procurement

We combine industry knowledge with practical bidding experience.

✔ Verified & Reliable Data

All Ammonia air conditioning tenders are sourced from official portals and cross-checked for accuracy.

✔ Advanced Filtering Tools

Filter tenders by value, EMD, location, and category for precise targeting.

✔ Corrigendum & Update Tracking

Get instant alerts on deadline changes and specification updates.

✔ Historical Data Insights

Analyze past tender results to understand pricing trends and competition.

✔ End-to-End Bidding Support

From discovery to submission, including GeM onboarding and strategy.


Growth of Ammonia air conditioning Sector in 2026

With the Government of India focusing on digital procurement and infrastructure expansion, the Ammonia air conditioning sector has seen significant growth in e-tendering opportunities.

The rise of GeM-based procurement models like:

  • L1 Purchase
  • Direct Procurement
  • MSME-friendly policies

…has made it easier for startups and SMEs to participate and win contracts


Frequently Asked Questions (SEO Optimized)

How can I get daily Ammonia air conditioning tender alerts?

You can register on Tender18 and select your preferred category. You will receive daily email alerts with all new Ammonia air conditioning tenders.

Is EMD mandatory for all Ammonia air conditioning tenders?

No, MSME and Udyam-registered businesses may get exemptions. Always check the NIT for specific conditions.

What is the difference between a Ammonia air conditioning work tender and supply tender?

A supply tender involves delivering goods, while a work tender includes execution, labor, and project completion.

Can I access private Ammonia air conditioning tenders on Tender18?

Yes, we also track major private sector and EPC tenders along with government opportunities.


Get Expert Support for Ammonia air conditioning Tenders

Tender18 is more than a listing platform—we are your strategic partner in winning tenders.

Our services include:

  • Tender discovery & analysis
  • Documentation support
  • Bid strategy & submission
  • GeM registration & OEM onboarding

📞 Call / WhatsApp: +91 7069661818
🌐 Website: www.tender18.com

Due Date
T18 Ref No : 16877009
Location : nagpur , maharashtra
Source : GEM Tenders
LIVE TENDER
tender for toilet cleaning acid 500 ml , cleaning powder 500 gram , anti mosquito spray 225 ml , cockroach repellent spray 225 ml , glass household cleaner 500 ml , mopper duster cloth big size , broom soft , broom kharata , disinfectant surface cleaner 500 ml , air freshener 50 gram , disinfectant toilet cleaner 500ml , liquide hand wash 1 dire , phenyl liquid 500ml , napthalene balls 100 gms , toilet cleaning brush , pvc dust bin 15litre , garbage bag medium size , floor mop for floor cleaning industrial mop with 140 cm long handle , floor wiper 18inch , bleeching powder 1 kg , air pressure pump for toilet , hand gloves rubber , spade wooden handle , watering hose pipe with nozzle 1 inch , fertilizers urea 50kg , fertilizers 10 x 26 x 26 dap 50kg , fertilizers vermicompost and cocopeat 50kg , fertilizers glycel liquide, adama 1 lit , garden soil 1truck 450 cft , flower plants , premises liquid , hitmala liquid , insecticides topguar , insecticides xl pride , chorodust , xl mida , nursery bag , diamond lawn 100 sqft x 3 , lime chuna , snow cem, housekeeping and gardening material, toilet cleaning acid 500 ml the material shall be toilet cleaning acid or equivalent acidic toilet bowl,urinal cleaner suitable for removal of stains, rust deposits, scale, and organic dirt from ceramic and sanitary ware surfaces., cleaning powder 500 gram the product shall provide effective removal of dirt, grease, and common stains with good foaming and fabric friendly properties. it shall have a pleasant fragrance, free flowing texture, and shall not damage fabric during regular use. the material shall conform to applicable is standards for detergent powders and be supplied in moisture-resistant sealed packaging. each pack shall clearly mention batch number, manufacturing date, expiry,shelf life, net quantity., anti mosquito spray 225 ml anti mosquito spray shall be ready to use aerosol of reputed make similar to hit, suitable for control of mosquitoes and flying insects, providing fast knockdown effect and residual protection, supplied in sealed aerosol cans with spray nozzle and proper labeling. transfluthrin 0.08 percentage aerosol ready to use household insecticide,transfluthrin 100 percentage purity, perfume citronellol, coumarin, eugenol, geraniol, linalool etc. 0.30 percentage lpg propellant 60.0 percentage, hydrocarbon solvent compounds with c9 tp c20 aliphatic branched and unbranched chains q.s., total 100 percentage, purpose ready to use household insecticide, pest group this is ready to use aerosol insecticide to eliminate mosquitoes and houseflies., cockroach repellent spray 225 ml cockroach repellent spray shall be ready to use aerosol, suitable for control of cockroaches and crawling insects, providing fast knockdown and residual action, supplied in sealed aerosol cans with spray nozzle and proper labeling. imiprothrin 0.07 percentage plus cypermethrin 0.20 percentage plus perfume mixture of benzyl, sallcylate, benzyl benzoate, linalol and rose crystal 0.20 plus propellant lpg 50.00 plus solvents isopropyl alcohol 0.50, hydrocarbon solvent compounds with c9 to c20 aliphatic branched and unbranched chain q.s to make 100 percentage equal to 100 percentage, glass household cleaner 500ml glass household cleaner shall be ready to use liquid, suitable for cleaning glass, mirrors, and smooth surfaces, providing streak-free and residue free finish formulation shall contain water, isopropyl alcohol, mild surfactants, ammonia free cleaning agents, and permitted fragrance components. key ingredients rubbing alcohol, isopropanol or dimethyl carbinol, isopropyl alcohol. grater than 5 percentage surfactants 5 to15 percentage alcohols contains ammonia solution, mopper duster cloth big size mop,duster cloth shall be of good quality cotton,microfiber material, suitable for wet and dry cleaning of floors and surfaces. the cloth shall be highly absorbent, lint free, durable, washable, and reusable, with properly finished stitched edges to prevent fraying. it shall be free from defects and suitable for repeated use in cleaning applications., broom soft soft broom shall be made from high quality synthetic pet or pp or pvc flagged bristles fixed to a durable virgin plastic body with a sturdy plastic or metal handle. the broom shall be lightweight, washable, long-lasting, and suitable for indoor sweeping applications. bristles shall be soft, flexible, dense, and capable of collecting fine dust and dirt effectively without scratching tiles, marble, granite, vitrified, or wooden flooring. the broom shall preferably have ergonomic long handle design for easy operation and shall be free from dust shedding, cracks, loose fittings, sharp edges, and manufacturing defects. product shall be supplied in proper packing condition., broom kharata natural coconut stick broom hard broom. outdoor sweeping, roads, terraces, bathrooms, rough floor cleaning. overall length 100 cm to less than110 cm, weight 0.4 to 0.6 kg each, disinfectant surface cleaner 500 ml disinfectant surface cleaner shall be a ready to use liquid formulation suitable for cleaning and disinfecting hard, non porous surfaces such as floors, platforms, tiles, bathroom fittings, and office surfaces. the product shall effectively remove dirt, grease, and stains while providing broad-spectrum antibacterial, antiviral, and antifungal action, ensuring hygienic sanitation and deodorization. the formulation shall typically contain quaternary ammonium compounds such as alkyl dimethyl benzyl ammonium chloride, isopropyl alcohol,ethanol, surfactants, water, fragrance, and permitted stabilizers, ensuring effective cleaning and disinfection without damaging common household and institutional surfaces. the product shall be safe for regular use when applied as per manufacturer instructions and shall conform to applicable hygiene and safety standards. ingradients benzalkonium chloride solution 80 percentage to 2.4584 percentage ww, aqua, lauryl alcohol ethoxylate, sodium bicarbonate, cocamidopropyl betaine, perfume, tetra sodium edta, denatonium benzosyr, c.i. 47005, benzalkonium chloride disinfectant fluid., air freshener 50 gram air freshener shall be a solid based deodorizing agent suitable for toilets, bathrooms, offices and enclosed spaces. the product shall effectively neutralize foul odours and provide long-lasting fragrance using odour-buster technology instead of merely masking smells. the formulation shall contain permitted fragrance compounds and odour-neutralizing agents, typically based on floral or essential oil fragrances such as jasmine, lavender, rose, orchid, or sandalwood. the product shall be non-toxic, safe for indoor use, and suitable for continuous release of fragrance over a defined period. solid base cellulose, polymer, waxy binders approximately 40 to 70 percentage water moisture content approximately 10 to 40 percentage fragrance oils main odor source approximately 5 to 20 percentage solvents glycols like propylene glycol, ethanol in some variants approximately 1 to10 percentage odor neutralizers or additives e.g., bicarbonates, salts, functional agentsnapproximately 1to 5 percentage stabilizers, preservatives, dyes grater than 1 percentage, disinfectant toilet cleaner 500 ml disinfectant toilet cleaner shall be an acid-based, thick liquid formulation suitable for cleaning and disinfecting toilet bowls and sanitary ware. the product shall effectively remove stains, limescale, rust, and organic deposits while providing strong germicidal and deodorizing properties, ensuring hygienic sanitation. the formulation shall contain hydrochloric acid, suitable surfactants, thickening agents, fragrance, and permitted stabilizers, and shall conform to applicable hygiene and safety standards. the product shall be supplied in leak-proof hdpe containers with nozzle applicator for ease of use. ingradients hydrochloric acid 10.5 percentage w by v, alkylamine ethoxylate, alkyl trimethyl ammonium chloride, butylated hydroxy to toluene, c.i. 61585, c.i. 45100, perfume and water., liquide hand wash 1 dire liquid hand wash shall be antibacterial and ph-balanced formulation suitable for frequent hand hygiene use. it shall effectively remove dirt, grease, and germs while being gentle on skin, dermatologically tested, and suitable for all skin types. the product shall contain mild surfactants with moisturising agents and comply with applicable cosmetic and hygiene safety standards, free from harmful chemicals. waterapproximately 50 to 75 percentage largest part surfactants approximately10 to 30 percentage additives or moisturizers approximately 1 to 10 percentage herbal fragranceactives less than 1 to 3 percentage very small., phenyl liquid 500ml phenyl shall be a concentrated disinfectant floor cleaning solution, suitable for industrial and domestic use. it shall be an emulsified phenolic formulation with effective cleaning, germicidal, bactericidal, and deodorizing properties, suitable for dilution with water for routine floor cleaning and sanitation. the product shall conform to applicable bis standards and ensure effective removal of dirt, grease, and organic contamination. approximate 60 to 85 percentage water plus approximately 5 to 15 percentage emulsifier plus approximately 0.5 to 25 percentage phenolic disinfectant system plus small fragrance or additives, napthalene balls 100 gms naphthalene balls shall be of reputed quality white crystalline deodorizing and moth repellent type suitable for protection against insects foul odour and moisture in toilets cupboards urinals and storage areas supplied in sealed moisture resistant packing with proper labeling., toilet cleaning brush shall have high density nylon or polypropylene bristles with a minimum brush length of 80 to 100 mm and overall length of 350 to 450 mm, fitted with a durable plastic handle and holder, suitable for regular toilet cleaning. the brush shall be corrosion-resistant, easy to clean, free from defects, pvc dust bin 15 litre shall be made of high-quality, virgin polypropylene pp or pvc, durable, crack- and corrosion-resistant, and suitable for indoor or outdoor use. the bin shall have a smooth, non-porous finish, fitted with a snug, matching lid, easy to clean, and capable of holding 15 litres of waste. the product shall be free from any defect and as per satisfaction to eic., garbage bag shall be made of high-quality material, strong, leak-proof, and puncture-resistant, suitable for collection and disposal of general waste. the bags shall be of medium size approx. 20 to 30 litre capacity, with adequate thickness to prevent tearing during use, supplied in roll or pack form with proper sealing. the product shall be free from manufacturing defects, floor mop for floor cleaning shall be of heavy duty commercial grade suitable for housekeeping applications. the mop shall be provided with a lightweight durable and corrosion resistant aluminium or stainless steel handle of minimum 140 cm length. mop head shall be made of high absorbent microfiberor cotton material suitable for effective wet and dry cleaning of smooth floors. the frame and locking arrangement shall be of sturdy heavy duty plastic or stainless steel construction with replaceable and washable refill system. the complete assembly shall be rust proof ergonomically designed for easy handling and suitable for continuous cleaning operations., floor wiper 18 inch shall be heavy duty type with 18 inch rubber or silicon blade and long handle made of stainless steel or aluminium metal,suitable for floor cleaning and water removal in institutional and industrial areas. the wiper shall be durable lightweight rust resistant and free from defects., bleeching powder 1 kg bleaching powder shall be suitable for disinfection, sanitation, and cleaning applications, with minimum available chlorine content as specified under bis standards. the material shall be dry, free flowing and stable in storage. the product shall be supplied in sealed moisture-resistant packing with proper labeling, batch number, manufacturing date, and expiry details., very effective suction for cleaning all kind of sinks and all other plumbing blockages. better quality rubber more suction durable and long life.hanging provision. bigger base for better coverage and effectiveness voluminous base for better air or suction pressure made up of rubber., rubber hand gloves shall be made of good quality natural or synthetic rubber suitable for general cleaning and sanitation activities. the gloves shall be durable flexible water resistant and provide protection against dirt chemicals and abrasions during sweeping and cleaning operations. the gloves shall have a comfortable fit with textured palm or fingers for better grip and appropriate thickness for repeated use. the product shall be free from defects such as cuts, pinholes, or surface imperfections. each pair shall be properly packed and marked with size and manufacturer details and shall be supplied with manufacturers warranty against manufacturing defects., spade wooden handle shall be made of high quality, seasoned hardwood, smooth, straight, durable, and free from cracks, knots, or defects, suitable for use with hand., watering hose pipe shall be of 1 inch diameter, made of good quality flexible pvc or rubber material suitable for gardening and general water supply use. the hose shall be durable, kink resistant, and capable of withstanding normal working pressure without leakage or deformation. it shall be fitted with a 1 inch compatible nozzle of corrosion-resistant material brass or metal. the complete assembly shall be free from defects and supplied with proper size marking, manufacturer details, and warranty against manufacturing defects., fertilizers urea 50kg urea fertilizer shall be of standard agricultural grade, free flowing, uniform in composition, and suitable for agricultural or horticultural use. the material shall conform to the specifications prescribed under the fertilizer control order fco and relevant government of india standards. the fertilizer shall contain minimum 46 percentage nitrogen by weight, free from harmful impurities, excessive moisture, and foreign materials. the product shall be supplied in properly sealed hdpe bags with clear marking of manufacturers name, batch number, net weight, date of manufacture, and nutrient composition., fertilizers 10 x 26 x 26 dap 50kg fertilizer 10 ratio 26 ratio 26 shall be a granulated, free flowing, uniform mixture fertilizer suitable for horticultural use. the product shall conform to the fertilizer control order fco, government of india specifications and shall contain nitrogen 10 percentage phosphorus 26 percentage, and potash 26 percentage by weight. the fertilizer shall be free from lumps, harmful impurities, and excessive moisture, ensuring proper nutrient availability for plants., fertilizers vermicompost and cocopeat 50k) vermicompost vermicompost shall be well decomposed organic manure produced through earthworm activity, suitable for horticultural use. it shall be dark brown, friable, free-flowing, and free from foul odour, plastics, stones, pathogens, and weed seeds, and rich in organic matter for improving soil fertility and structure. it shall be rich in organic carbon and essential plant nutrients, free from pathogens and weed seeds, and suitable for improving soil fertility and structure.cocopeat cocopeat shall be processed, washed, and buffered coir pith in block or loose form suitable for horticulture and nursery use. it shall be free from salts, pathogens, weeds, and foreign matter, with good water retention and aeration properties. it shall be properly washed and buffered to reduce ec levels as per horticultural standards., fertilizers glycel liquide, adama 1 lit. the material to be supplied shall be glycel adama or equivalent glyphosate 41 percentage sl formulation conforming to the provisions of the insecticides and used for weed control applications., garden soil 1truck equal to 450 ft supplying good earth garden soil at site including loading, unloading, transportation, stacking and dressing as directed. garden soil shall be good quality, well-graded suitable for horticulture, landscaping, and plantation work. it shall be free from stones, roots, plastics, weeds, and other foreign materials., flower plants shall be of premium quality, healthy, robust, and free from pests, diseases, or damage. it shall be freshly harvested, with vibrant natural color, intact stems, and natural fragrance, suitable for decorative, landscaping, or related purposes. plants shall be properly packed in clean, leak-proof packets to prevent damage during transport and delivered in a condition fit for immediate use., termite control liquid shall be a synthetic pyrethroid or approved termiticide formulation suitable for anti termite treatment of building foundations, floors, walls, and wooden structures. the product shall conform to relevant bis standards for soil and wood treatment anti termite formulations and shall be effective in providing long lasting protection against subterranean termites through nonrepellent action and colony control. the chemical shall be stable, water miscible or emulsifiable, and safe for use when applied as per recommended dilution. the product shall be supplied in sealed, leak proof containers with clear labeling of composition, batch number, manufacturing date, expiry date, and safety instructions, along with manufacturers warranty and test certificate from nabl accredited laboratory., insecticides the material to be supplied shall be malathion 50 percentage ec conforming to relevant standards the formulation shall be a clear, stable emulsifiable concentrate containing 50 percentage ww malathion active ingredient, free from visible impurities, sediments, and phase separation, and suitable for uniform mixing with water. the product shall be an organophosphate insecticide effective against a wide range of sucking and chewing pests and suitable for use in agriculture, horticulture, plantations, nurseries, and landscaping works as per recommended dosage., insecticides the material is equivalent dimethoate 30 percentage ec formulation insecticides and be used for agricultural and horticultural applications. the formulation shall be a clear, stable emulsifiable concentrate containing 30 percentage ww dimethoate active ingredient, free from sediments, suspended particles, and phase separation, and shall form a uniform emulsion when mixed with water., insecticides the material to be supplied shall be liquid or powder with and acetamiprid 20 percentage sp for plant growth promoter or bio stimulant suitable for horticulture, landscaping, nurseries, lawns, gardens, and plantation works. the product shall be a homogeneous, water soluble liquid formulation free from sediments, suspended particles, and foul odour and shall be suitable for foliar spray and soil application. it shall be eco friendly, non toxic, and safe for plants, soil, and environment. the formulation shall be capable of promoting plant growth, improving nutrient uptake, enhancing root development, and increasing overall plant vigor and stress tolerance., the material to be supplied shall contains chlorpyrifos dusting powder formulation conforming to the provisions as per the insecticides used for horticultural., the formulation shall be a ready to use dusting powder containing chlorpyrifos active ingredient of approved concentration, uniformly mixed and free from lumps, moisture, and foreign matter, with fine and consistent particle size suitable for effective field application., nursery bag uv protected and durable material made from premium quality virgin ldpe plastic with uv protection for long outdoor life. resistant to tearing, cracking, and sunlight damage for reliable nursery use ideal for seedlings and nursery plants perfect for seed germination, plant propagation, vegetable seedlings, flower plants, saplings, and early plant growth stages.proper drainage and root development designed to support healthy root growth by allowing proper drainage and preventing water stagnation, reducing risk of root rot. reusable and eco friendly grow bags lightweight yet strong recyclable poly bags suitable for multiple planting cycles. easy to handle, shift, and transplant plants., diamond lawn 100 sqft x 3 diamond grass shall consist of healthy, well established grass turf suitable for landscaping and horticultural development. the turf shall be of uniform green cover, free from weeds, pests, diseases, and bare patches, and suitable for plantation, gardens. the lawn shall be properly rooted, capable of fast establishment, and suitable for maintenance under normal watering and climatic conditions., lime chuna material shall be a ready to use or mixable formulation of hydrated lime chuna. the material shall be suitable for application on tree trunks in horticulture and plantation areas to protect against sunburn, pests, fungal infection, and cracking. it shall form a uniform white protective layer, be weather resistant, and non toxic to plants when applied as per standard practice. the product shall be free from harmful chemicals and impurities and suitable for environmental use., material shall be a ready to use or mixable formulation of hydrated lime chuna based paint. the material shall be suitable for application on tree trunks in horticulture and plantation areas to protect against sunburn, pests, fungal infection, and cracking. it shall form a uniform white protective layer, be weather resistant, and non-toxic to plants when applied as per standard practice. the product shall be free from harmful chemicals and impurities and suitable for environmental use. 150 kg per bag
T18 Ref No : 16239051
Source : GEM Tenders
corrigendum tender for fabrication repairing the condensate tank pump delivery line of the pan 1 , repairing the condensate tank pump delivery line of the pan 2 , repairing the condensate tank pump delivery line of the pan 3 , replacing damaged bypass line band flange of melter 1 , replacing damaged bypass line band flange of melter 2 , replacing damaged bypass line band flange of melter 3 , replace damaged 100 pound 3inch size pipeline from pan no 1 to pan no 6 and give satisfactory trial , replace the weak vapor pipe from pan no 1 to 6 size dia 1 150 m length 30 m 1 , replace the weak vapor pipe from pan no 1 to 6 size dia 1 150 m length 30 m 2 , replace main hole dia 600 mm of pan no 3 sevual with 10 mm thick plate , replace damaged overflow pipeline of bh and cl molasses conditioner of 6inch size 1 , replace damaged overflow pipeline of bh and cl molasses conditioner of 6inch size 2 , replace corroded nipples pipes flanges of 6inch size header on pan no 5 and 6 installation related nipples valves etc and give satisfactory trial , replace damaged ammonia pipeline flange nipple in pan no 4 and 6 1 , replace damaged ammonia pipeline flange nipple in pan no 4 and 6 2 , replace damaged ammonia pipeline flange nipple in pan no 4 and 6 3 , replace damaged ammonia pipeline flange nipple in pan no 4 and 6 4 , replace damaged ammonia pipeline flange nipple in pan no 4 and 6 5 , cut and remove damaged wash-out line installed on the pan and rebuild with supplied pipe and installation it 1 , cut and remove damaged wash-out line installed on the pan and rebuild with supplied pipe and installation it 2 , replace damaged washing pipeline nipple flange band on pan no 6 1 , replace damaged washing pipeline nipple flange band on pan no 6 2 , replace damaged washing pipeline nipple flange band on pan no 6 3 , replace damaged washing pipeline nipple flange band on pan no 6 4 , installation valve in steam line at pan no 2 550 mm 1 , installation valve in steam line at pan no 2 550 mm 2 , installation valve in steam line at pan no 2 550 mm 3 , installation valve in steam line at pan no 2 550 mm 4 , replace nipple and band of a heavy tank 2 , replace nipple and band of a heavy tank 3 , replace nipple and band of a heavy tank 4 , remove clean and reinstall 4inch size syrup line on pan , cut and remove syrup header and fabricate and installation new header , replacing the 6inch size glycol washing line fitted on pan no 1 , replacing nipples of different lines of pan no 6 1 , replacing nipples of different lines of pan no 6 2 , replacing nipples of different lines of pan no 6 3 , replacing nipples of different lines of pan no 6 4 , replacing 10inch size nipples of cut off line of pan no 6 1 , replacing 10inch size nipples of cut off line of pan no 6 2 , replacing 10inch size nipples of cut off line of pan no 6 3 , replacing 10inch size nipples of cut off line of pan no 6 4 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 1 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 2 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 3 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 4 , fabricating m s bed for syrup pump and motor fitting and alignment followed by satisfactory trial , dismantling weak condensate bottle of old set , replacing weak pipeline flange valve and band of old set vertical juice heater 1 , replacing weak pipeline flange valve and band of old set vertical juice heater 2 , replacing weak pipeline flange valve and band of old set vertical juice heater 3 , replacing weak pipeline flange valve and band of old set vertical juice heater 4 , replacing weak pipeline flange valve and band of old set vertical juice heater 5 , replacing weak pipeline of old quad set no 4 1 , replacing weak pipeline of old quad set no 4 2 , replacing weak pipeline of old quad set no 4 3 , replacing weak pipeline of old quad set no 4 4 , replacing weak pipeline of old quad set no 4 5 , dismantling damaged mesh of section pipe located at injection no 2 and 3 and making a new one from given m s plate and fitting it , cutting and discarding old damaged reducer plate of section pipe located at injection no 2 and 3 and remaking the same , fitting water line from overhead to service tank 1 , fitting water line from overhead to service tank 2 , details of work of canti machine no 6 and 7 1 , details of work of canti machine no 6 and 7 2 , details of work of canti machine no 6 and 7 3 , details of work with new pipes from s sugarbin 1 , details of work with new pipes from s sugarbin 2 , details of work with new pipes from s sugarbin 3 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 1 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 2 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 3 , work on hot water line of brown sugar magma 1 , work on hot water line of brown sugar magma 2 , work on hot water line of brown sugar magma 3 , work on hot water line of brown sugar magma 4 , cutting and removing damaged monitor casing and ribs , cutting and removing damaged center shaft and arms inside kcp machines no 1 and 2 bending and fitting new parts with 8 to 10 mm plate , dismantling damaged upper cover part of canty machine no 6 and 7 scrapping fabricating and fitting new cover with 12 mm plate and making all related connections , dismantling damaged part of molasses weighing scale receiving tank and fabricating and fitting new part by bending 8 mm thick, fabrication, fabricate and installation 6inch size nipple, fabricate and installation 6inch size flange, dismantling 6inch size pipeline, installing 6inch size pipeline and giving satisfactory trial, fabricate and installation 6inch size band, replace damaged 100 pound 3inch size pipeline from pan no 1 to pan no 6 and give satisfactory trial, dismantle the weak vapor pipe from pan no 1 to 6, fabricate the weak vapor pipe from pan no 1 to 6, replace main hole dia 600 mm of pan no 3 sevual with 10 mm thick plate, replace damaged overflow pipeline of bh and cl molasses conditioner of 6inch size, replace corroded nipples pipes flanges of 6inch size header on pan no 5 and 6 installation related nipples valves etc and give satisfactory trial, replace 2inch size pipeline, fabricate and installation 2inch size flange, fabricate and installation 2inch size nipple, fabricate and installation 3inch size flange, fabricate and installation 3inch size valve, replace and installation 6inch size pipeline, replace 6inch size pipeline of the above, installation valve in steam line at pan no 2 550 mm, installation flange in steam line at pan no 2 550 mm, installation nipple in steam line at pan no 2 550 mm, fabricate and installation catcher element size 75 x 75 x 8 angle on pan no 4 and 5, replace nipples of the above tank, replace bands of the above tank, replace partition of syrup tank with 10/12 mm thick plate, remove clean and reinstall 4inch size syrup line on pan, cut and remove syrup header and fabricate and installation new header, replacing the 6inch size glycol washing line fitted on pan no 1, replacing nipples of 2inch size line mentioned above, replacing nipples of 4inch size line mentioned above, replacing nipples of 6inch size line mentioned above, replacing nipples of 8inch size line mentioned above, replacing 10inch size nipples of cut off line of pan no 6, replacing 10inch size pipe line, making and fitting 10inch size flange, making and fitting 10inch size band, making and fitting 8inch size band, replacing 4inch size pipe line, making and fitting 4inch size flange, making and fitting 4inch size valve, fabricating m s bed for syrup pump and motor fitting and alignment followed by satisfactory trial, dismantling weak condensate bottle of old set vertical line juice heater and quad body no 4 disposing to scrap yard fabricating all connections using 8/10 mm plates and giving satisfactory vacuum trial, replacing 2inch size pipeline, replacing 6inch size pipeline, making and fitting 2inch size flange, making and fitting 6inch size flange, making and fitting 6inch size band, making and fitting 6inch size valve, dismantling damaged mesh of section pipe located at injection no 2 and 3 and making a new one from given m s plate and fitting it, cutting and discarding old damaged reducer plate of section pipe located at injection no 2 and 3 and remaking the same, fitting mentioned line into service tank, making and fitting 8inch size nipple, dismantling and fitting 6inch size pipeline, dismantling resistance box installed on spray making and fitting new one from given m m plate carrying out proper stay fitting and welding and conducting leak proof trial, dismantling and installing 8inch size pipeline, fabricating and installing 8inch size bands, fabricating and installing 8inch size flanges, dismantling and installing 12inch size pipeline, fabricating and installing 12inch size bands, fabricating and installing 12inch size flanges, dismantling and installing 3inch size pipeline, manufacturing and installing 3inch size nipples, manufacturing and installing 3inch size bands, cutting and removing damaged monitor casing and ribs inside canty no 1 and 2 and kcp machine 1 and 2 patching with 10/12 mm ms plate and giving satisfactory trial 1, cutting and removing damaged center shaft and arms inside kcp machines no 1 and 2 bending and fitting new parts with 8 to 10 mm plate 1, dismantling damaged upper cover part of canty machine no 6 and 7 scrapping fabricating and fitting new cover with 12 mm plate and making all related connections, dismantling damaged part of molasses weighing scale receiving tank and fabricating and fitting new part by bending 8 mm thick plate and depositing scrap in scrap yard, dismantling damaged plate of sugar discharge chute from sugar elevator to sugar grader and fabricating and fitting new plate of 6 mm thickness depositing scrap in scrap yard, modifying sugar chute of grader in dryer house and giving satisfactory trial, dismantling and installing 4inch size pipeline, fabricating and installing 4inch size flanges, manufacturing and installing 4inch size bands, manufacturing and installing 4inch size nipples, removing transit heater installed on c centrifugal machine opening side plate for cleaning and hydraulic servicing reinstalling in place and making all connections, dismantling and installing 2inch size pipeline, fabricating and installing 2inch size flanges, manufacturing and installing 2inch size nipples, manufacturing and installing 2inch size valves, removing old taper of sugar hopper no 1 scrapping it fabricating new one from 3/5 mm ms plate installing and giving satisfactory trial, dismantling and installing 6inch size pipeline, manufacturing and installing 6inch size bands, manufacturing and installing 6inch size flanges, manufacturing and installing 5inch size flanges, manufacturing and installing 5inch size valves, removing damaged/weak top and bottom sugar discharge chute of canty machine no 4 including flange scrapping fabricating new parts with 6 mm ms plate as per suit sample preparing all connections like angle channel etc fitting on side and giving satisfactory trial, installing 2inch flow meter, dismantling the damaged 6inch dia pipeline from primary clarifier to anoxic tank and putting it in scrap yard and installing a new pipeline, installing 4inch size valve/nrv, fabricating 4inch size band, fabricating and installing 2inch size flange, dismantling the damaged 8inch dia pipeline from aeration tank to secondary tank and putting it in scrap yard, dismantling diffusers installed in aeration tank and putting them in scrap yard and replacing the throat part, in sulfate removal plant reaction chamber dismantling corroded 6 mm partition plate putting it in scrap yard and fabricating with new 8 mm plate, dismantling corroded 2inch size treated water outlet line of etp and putting in scrap yard and installing new 3inch size line at the same location, dismantling 800 mm dia exhaust pipe line below turbine with nipple band flange and putting in scrap yard, fabricating 800 mm dia exhaust pipeline below turbine from 12 mm plate by bending and installing at position and providing satisfactory trial, fabricating 800 mm dia exhaust pipeline below vapor cell 950 wag meter from 12 mm plate by bending and installing at position and providing satisfactory trial, fabricating 800 mm dia exhaust pipeline below vapor cell 950 wag meter from 12 mm plate by bending into t shape and installing at position and providing satisfactory trial, fabricating 800 mm dia exhaust pipeline dummy/flange from 12 mm plate by bending and installing at position and providing satisfactory trial, dismantling weak part of semichemiser 1000 wag meter warm saser putting scrap in scrap yard fabricating from 12 mm thick plate by bending and installing with related connections and giving satisfactory trial size dia 3 4 m, dismantling weak parts of old quad body no 2 and 3 20inch vapor pipe putting scrap in scrap yard fabricating from 8 mm thick plate by bending and installing and providing satisfactory trial, dismantling weak parts of vapor pipe 32inch size of vapor cell 1000 wag meter putting scrap in scrap yard fabricating from 8 mm thick plate by bending and installing and providing satisfactory trial, dismantling weak part of 6inch size header of all juice heaters condensate and installing new one, removing all partition plates of juice heater header by cutting straight and circular shapes cleaning tube plate completely and fabricating new circular and straight partition plates from 10/12 mm plate installing and preparing header with ms strips as before applying rubber strips and providing satisfactory trial, cutting out quailons and all related angles fixed in clarifier compartments and refitting after completion of work and providing satisfactory trial, patching inside clarifier with 6/8 mm ms plate, dismantling damaged 8inch size ms pipeline from clarifier clear juice overflow tank to sombox, installing 6inch size ms pipeline from clarifier compartments no 2 and 3 to mud tank and providing satisfactory trial, opening 6inch size valve and installing at designated location, fabricating 6inch size nipple and installing at designated location, fabricating 6inch size flange by cutting plate and dismantling to fit, dismantling 4inch size air pipeline above door including nipple band flange and putting scrap in scrap yard, installing 4inch size air pipeline above door and providing satisfactory trial, dismantling 6inch size ms pipeline of big vacuum filter mud tank overflow line and putting scrap in scrap yard, fitting and trial of 6inch size ms pipeline overflow line of big vacuum filter mud tank at position, fabricating 6inch size band, fabricating 8inch size band, dismantling 8inch size pipeline from big vacuum filter pump to condenser and putting scrap in scrap yard, fitting and trial of 8inch size pipeline from big vacuum filter pump to condenser at position, dismantling 4inch ms pipeline from filter juice header to vibro screen, fitting and trial of 4inch ms pipeline from filter juice header to vibro screen at position, making 4inch size nipple, opening 4inch size valve, installing 4inch size valve at the specified location, cutting 4inch size flange from plate making it and fitting after drilling, dismantling 3inch size pipeline, installing and fitting 3inch size line at position and giving satisfactory trial, making and installing 3inch size t, making and installing 3inch size nipple, cutting 3inch size flange from plate making it and installing, making and installing 3inch size band, dismantling 8inch size clear juice overflow pipeline, installing and fitting 8inch size clear juice overflow pipeline at position and giving satisfactory trial, installing and fitting 6inch size pipeline at position and giving satisfactory trial, making and installing 6inch size band/elbow at specified location, making and installing 6inch size t, dismantling 4inch size pipeline, installing and fitting 4inch size pipeline at position and giving satisfactory trial, making and installing 4inch size band, making and installing 4inch size t, dismantling 10inch size pipeline, installing fitting and trial of 10inch size pipeline at position, making and installing 10inch size t, making and installing 10inch size dummy/flange, dismantling 6inch pipeline, installing fitting and trial of 6inch size pipeline at position, opening and binding 6inch size valve, installing fitting and trial of 4inch size pipeline at position, making and installing 8inch and 6inch size cross, dismantling 4inch size ammonia pipeline of semichemiser quad, installing 4inch size ammonia pipeline of semichemiser quad at position, making 4inch size band, making 4inch size t, making 4inch size flange, dismantling 2inch size pipeline, fixing 2inch size pipeline in position, dismantling new quad no 2 vapor pipe 24inch size vapor pipeline fabricating it by bending with 10 mm thick plate and installing, fabricating and installing 24inch size bends, fabricating and installing 24inch size tees, fabricating and installing 24inch size flange/dummy, dismantling 24inch size pipeline, fitting 24inch size pipeline in position, fabricating and installing 24inch size flange, cutting damaged 6inch syrup pump header fabricating new header and installing along with fitting all related nipples valves etc and conducting satisfactory trial, dismantling bent incoming and outgoing wax and heater cell and partition plate between double beat valve of juice heater/ juice heater header fabricating new one using 12/10 mm plate as before installing and conducting satisfactory trial, dismantling 6inch condensate header of juice heaters and replacing the weak part, fitting 6inch size pipeline in position and conducting satisfactory trial, fabricating and installing 6inch size flange, fabricating and installing 6inch size nipple, fabricating and installing 6inch size tees, dismantling and fitting 6inch size pipeline in position and conducting satisfactory trial
T18 Ref No : 16022210
Source : GEM Tenders
tender for pan no 6 4 , installation valve in steam line at pan no 2 550 mm 1 , installation valve in steam line at pan no 2 550 mm 2 , installation valve in steam line at pan no 2 550 mm 3 , installation valve in steam line at pan no 2 550 mm 4 , replace nipple and band of a heavy tank 2 , replace nipple and band of a heavy tank 3 , replace nipple and band of a heavy tank 4 , remove clean and reinstall 4inch size syrup line on pan , cut and remove syrup header and fabricate and installation new header , replacing the 6inch size glycol washing line fitted on pan no 1 , replacing nipples of different lines of pan no 6 1 , replacing nipples of different lines of pan no 6 2 , replacing nipples of different lines of pan no 6 3 , replacing nipples of different lines of pan no 6 4 , replacing 10inch size nipples of cut off line of pan no 6 1 , replacing 10inch size nipples of cut off line of pan no 6 2 , replacing 10inch size nipples of cut off line of pan no 6 3 , replacing 10inch size nipples of cut off line of pan no 6 4 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 1 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 2 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 3 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 4 , fabricating m s bed for syrup pump and motor fitting and alignment followed by satisfactory trial , dismantling weak condensate bottle of old set , replacing weak pipeline flange valve and band of old set vertical juice heater 1 , replacing weak pipeline flange valve and band of old set vertical juice heater 2 , replacing weak pipeline flange valve and band of old set vertical juice heater 3 , replacing weak pipeline flange valve and band of old set vertical juice heater 4 , replacing weak pipeline flange valve and band of old set vertical juice heater 5 , replacing weak pipeline of old quad set no 4 1 , replacing weak pipeline of old quad set no 4 2 , replacing weak pipeline of old quad set no 4 3 , replacing weak pipeline of old quad set no 4 4 , replacing weak pipeline of old quad set no 4 5 , dismantling damaged mesh of section pipe located at injection no 2 and 3 and making a new one from given m s plate and fitting it , cutting and discarding old damaged reducer plate of section pipe located at injection no 2 and 3 and remaking the same , fitting water line from overhead to service tank 1 , fitting water line from overhead to service tank 2 , details of work of canti machine no 6 and 7 1 , details of work of canti machine no 6 and 7 2 , details of work of canti machine no 6 and 7 3 , details of work with new pipes from s sugarbin 1 , details of work with new pipes from s sugarbin 2 , details of work with new pipes from s sugarbin 3 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 1 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 2 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 3 , work on hot water line of brown sugar magma 1 , work on hot water line of brown sugar magma 2 , work on hot water line of brown sugar magma 3 , work on hot water line of brown sugar magma 4 , cutting and removing damaged monitor casing and ribs , cutting and removing damaged center shaft and arms inside kcp machines no 1 and 2 bending and fitting new parts with 8 to 10 mm plate , dismantling damaged upper cover part of canty machine no 6 and 7 scrapping fabricating and fitting new cover with 12 mm plate and making all related connections , dismantling damaged part of molasses weighing scale receiving tank and fabricating and fitting new part by bending 8 mm thick, fabrication, fabricate and installation 6inch size nipple, fabricate and installation 6inch size flange, dismantling 6inch size pipeline, installing 6inch size pipeline and giving satisfactory trial, fabricate and installation 6inch size band, replace damaged 100 pound 3inch size pipeline from pan no 1 to pan no 6 and give satisfactory trial, dismantle the weak vapor pipe from pan no 1 to 6, fabricate the weak vapor pipe from pan no 1 to 6, replace main hole dia 600 mm of pan no 3 sevual with 10 mm thick plate, replace damaged overflow pipeline of bh and cl molasses conditioner of 6inch size, replace corroded nipples pipes flanges of 6inch size header on pan no 5 and 6 installation related nipples valves etc and give satisfactory trial, replace 2inch size pipeline, fabricate and installation 2inch size flange, fabricate and installation 2inch size nipple, fabricate and installation 3inch size flange, fabricate and installation 3inch size valve, replace and installation 6inch size pipeline, replace 6inch size pipeline of the above, installation valve in steam line at pan no 2 550 mm, installation flange in steam line at pan no 2 550 mm, installation nipple in steam line at pan no 2 550 mm, fabricate and installation catcher element size 75 x 75 x 8 angle on pan no 4 and 5, replace nipples of the above tank, replace bands of the above tank, replace partition of syrup tank with 10/12 mm thick plate, remove clean and reinstall 4inch size syrup line on pan, cut and remove syrup header and fabricate and installation new header, replacing the 6inch size glycol washing line fitted on pan no 1, replacing nipples of 2inch size line mentioned above, replacing nipples of 4inch size line mentioned above, replacing nipples of 6inch size line mentioned above, replacing nipples of 8inch size line mentioned above, replacing 10inch size nipples of cut off line of pan no 6, replacing 10inch size pipe line, making and fitting 10inch size flange, making and fitting 10inch size band, making and fitting 8inch size band, replacing 4inch size pipe line, making and fitting 4inch size flange, making and fitting 4inch size valve, fabricating m s bed for syrup pump and motor fitting and alignment followed by satisfactory trial, dismantling weak condensate bottle of old set vertical line juice heater and quad body no 4 disposing to scrap yard fabricating all connections using 8/10 mm plates and giving satisfactory vacuum trial, replacing 2inch size pipeline, replacing 6inch size pipeline, making and fitting 2inch size flange, making and fitting 6inch size flange, making and fitting 6inch size band, making and fitting 6inch size valve, dismantling damaged mesh of section pipe located at injection no 2 and 3 and making a new one from given m s plate and fitting it, cutting and discarding old damaged reducer plate of section pipe located at injection no 2 and 3 and remaking the same, fitting mentioned line into service tank, making and fitting 8inch size nipple, dismantling and fitting 6inch size pipeline, dismantling resistance box installed on spray making and fitting new one from given m m plate carrying out proper stay fitting and welding and conducting leak proof trial, dismantling and installing 8inch size pipeline, fabricating and installing 8inch size bands, fabricating and installing 8inch size flanges, dismantling and installing 12inch size pipeline, fabricating and installing 12inch size bands, fabricating and installing 12inch size flanges, dismantling and installing 3inch size pipeline, manufacturing and installing 3inch size nipples, manufacturing and installing 3inch size bands, cutting and removing damaged monitor casing and ribs inside canty no 1 and 2 and kcp machine 1 and 2 patching with 10/12 mm ms plate and giving satisfactory trial 1, cutting and removing damaged center shaft and arms inside kcp machines no 1 and 2 bending and fitting new parts with 8 to 10 mm plate 1, dismantling damaged upper cover part of canty machine no 6 and 7 scrapping fabricating and fitting new cover with 12 mm plate and making all related connections, dismantling damaged part of molasses weighing scale receiving tank and fabricating and fitting new part by bending 8 mm thick plate and depositing scrap in scrap yard, dismantling damaged plate of sugar discharge chute from sugar elevator to sugar grader and fabricating and fitting new plate of 6 mm thickness depositing scrap in scrap yard, modifying sugar chute of grader in dryer house and giving satisfactory trial, dismantling and installing 4inch size pipeline, fabricating and installing 4inch size flanges, manufacturing and installing 4inch size bands, manufacturing and installing 4inch size nipples, removing transit heater installed on c centrifugal machine opening side plate for cleaning and hydraulic servicing reinstalling in place and making all connections, dismantling and installing 2inch size pipeline, fabricating and installing 2inch size flanges, manufacturing and installing 2inch size nipples, manufacturing and installing 2inch size valves, removing old taper of sugar hopper no 1 scrapping it fabricating new one from 3/5 mm ms plate installing and giving satisfactory trial, dismantling and installing 6inch size pipeline, manufacturing and installing 6inch size bands, manufacturing and installing 6inch size flanges, manufacturing and installing 5inch size flanges, manufacturing and installing 5inch size valves, removing damaged/weak top and bottom sugar discharge chute of canty machine no 4 including flange scrapping fabricating new parts with 6 mm ms plate as per suit sample preparing all connections like angle channel etc fitting on side and giving satisfactory trial, installing 2inch flow meter, dismantling the damaged 6inch dia pipeline from primary clarifier to anoxic tank and putting it in scrap yard and installing a new pipeline, installing 4inch size valve/nrv, fabricating 4inch size band, fabricating and installing 2inch size flange, dismantling the damaged 8inch dia pipeline from aeration tank to secondary tank and putting it in scrap yard, dismantling diffusers installed in aeration tank and putting them in scrap yard and replacing the throat part, in sulfate removal plant reaction chamber dismantling corroded 6 mm partition plate putting it in scrap yard and fabricating with new 8 mm plate, dismantling corroded 2inch size treated water outlet line of etp and putting in scrap yard and installing new 3inch size line at the same location, dismantling 800 mm dia exhaust pipe line below turbine with nipple band flange and putting in scrap yard, fabricating 800 mm dia exhaust pipeline below turbine from 12 mm plate by bending and installing at position and providing satisfactory trial, fabricating 800 mm dia exhaust pipeline below vapor cell 950 wag meter from 12 mm plate by bending and installing at position and providing satisfactory trial, fabricating 800 mm dia exhaust pipeline below vapor cell 950 wag meter from 12 mm plate by bending into t shape and installing at position and providing satisfactory trial, fabricating 800 mm dia exhaust pipeline dummy/flange from 12 mm plate by bending and installing at position and providing satisfactory trial, dismantling weak part of semichemiser 1000 wag meter warm saser putting scrap in scrap yard fabricating from 12 mm thick plate by bending and installing with related connections and giving satisfactory trial size dia 3 4 m, dismantling weak parts of old quad body no 2 and 3 20inch vapor pipe putting scrap in scrap yard fabricating from 8 mm thick plate by bending and installing and providing satisfactory trial, dismantling weak parts of vapor pipe 32inch size of vapor cell 1000 wag meter putting scrap in scrap yard fabricating from 8 mm thick plate by bending and installing and providing satisfactory trial, dismantling weak part of 6inch size header of all juice heaters condensate and installing new one, removing all partition plates of juice heater header by cutting straight and circular shapes cleaning tube plate completely and fabricating new circular and straight partition plates from 10/12 mm plate installing and preparing header with ms strips as before applying rubber strips and providing satisfactory trial, cutting out quailons and all related angles fixed in clarifier compartments and refitting after completion of work and providing satisfactory trial, patching inside clarifier with 6/8 mm ms plate, dismantling damaged 8inch size ms pipeline from clarifier clear juice overflow tank to sombox, installing 6inch size ms pipeline from clarifier compartments no 2 and 3 to mud tank and providing satisfactory trial, opening 6inch size valve and installing at designated location, fabricating 6inch size nipple and installing at designated location, fabricating 6inch size flange by cutting plate and dismantling to fit, dismantling 4inch size air pipeline above door including nipple band flange and putting scrap in scrap yard, installing 4inch size air pipeline above door and providing satisfactory trial, dismantling 6inch size ms pipeline of big vacuum filter mud tank overflow line and putting scrap in scrap yard, fitting and trial of 6inch size ms pipeline overflow line of big vacuum filter mud tank at position, fabricating 6inch size band, fabricating 8inch size band, dismantling 8inch size pipeline from big vacuum filter pump to condenser and putting scrap in scrap yard, fitting and trial of 8inch size pipeline from big vacuum filter pump to condenser at position, dismantling 4inch ms pipeline from filter juice header to vibro screen, fitting and trial of 4inch ms pipeline from filter juice header to vibro screen at position, making 4inch size nipple, opening 4inch size valve, installing 4inch size valve at the specified location, cutting 4inch size flange from plate making it and fitting after drilling, dismantling 3inch size pipeline, installing and fitting 3inch size line at position and giving satisfactory trial, making and installing 3inch size t, making and installing 3inch size nipple, cutting 3inch size flange from plate making it and installing, making and installing 3inch size band, dismantling 8inch size clear juice overflow pipeline, installing and fitting 8inch size clear juice overflow pipeline at position and giving satisfactory trial, installing and fitting 6inch size pipeline at position and giving satisfactory trial, making and installing 6inch size band/elbow at specified location, making and installing 6inch size t, dismantling 4inch size pipeline, installing and fitting 4inch size pipeline at position and giving satisfactory trial, making and installing 4inch size band, making and installing 4inch size t, dismantling 10inch size pipeline, installing fitting and trial of 10inch size pipeline at position, making and installing 10inch size t, making and installing 10inch size dummy/flange, dismantling 6inch pipeline, installing fitting and trial of 6inch size pipeline at position, opening and binding 6inch size valve, installing fitting and trial of 4inch size pipeline at position, making and installing 8inch and 6inch size cross, dismantling 4inch size ammonia pipeline of semichemiser quad, installing 4inch size ammonia pipeline of semichemiser quad at position, making 4inch size band, making 4inch size t, making 4inch size flange, dismantling 2inch size pipeline, fixing 2inch size pipeline in position, dismantling new quad no 2 vapor pipe 24inch size vapor pipeline fabricating it by bending with 10 mm thick plate and installing, fabricating and installing 24inch size bends, fabricating and installing 24inch size tees, fabricating and installing 24inch size flange/dummy, dismantling 24inch size pipeline, fitting 24inch size pipeline in position, fabricating and installing 24inch size flange, cutting damaged 6inch syrup pump header fabricating new header and installing along with fitting all related nipples valves etc and conducting satisfactory trial, dismantling bent incoming and outgoing wax and heater cell and partition plate between double beat valve of juice heater/ juice heater header fabricating new one using 12/10 mm plate as before installing and conducting satisfactory trial, dismantling 6inch condensate header of juice heaters and replacing the weak part, fitting 6inch size pipeline in position and conducting satisfactory trial, fabricating and installing 6inch size flange, fabricating and installing 6inch size nipple, fabricating and installing 6inch size tees, dismantling and fitting 6inch size pipeline in position and conducting satisfactory trial

Unlock Full Tender Access

Start Free Trial to download documents before deadline

T18 Ref No : 16355769
Source : GEM Tenders
corrigendum tender for pan no 6 4 , installation valve in steam line at pan no 2 550 mm 1 , installation valve in steam line at pan no 2 550 mm 2 , installation valve in steam line at pan no 2 550 mm 3 , installation valve in steam line at pan no 2 550 mm 4 , replace nipple and band of a heavy tank 2 , replace nipple and band of a heavy tank 3 , replace nipple and band of a heavy tank 4 , remove clean and reinstall 4inch size syrup line on pan , cut and remove syrup header and fabricate and installation new header , replacing the 6inch size glycol washing line fitted on pan no 1 , replacing nipples of different lines of pan no 6 1 , replacing nipples of different lines of pan no 6 2 , replacing nipples of different lines of pan no 6 3 , replacing nipples of different lines of pan no 6 4 , replacing 10inch size nipples of cut off line of pan no 6 1 , replacing 10inch size nipples of cut off line of pan no 6 2 , replacing 10inch size nipples of cut off line of pan no 6 3 , replacing 10inch size nipples of cut off line of pan no 6 4 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 1 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 2 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 3 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 4 , fabricating m s bed for syrup pump and motor fitting and alignment followed by satisfactory trial , dismantling weak condensate bottle of old set , replacing weak pipeline flange valve and band of old set vertical juice heater 1 , replacing weak pipeline flange valve and band of old set vertical juice heater 2 , replacing weak pipeline flange valve and band of old set vertical juice heater 3 , replacing weak pipeline flange valve and band of old set vertical juice heater 4 , replacing weak pipeline flange valve and band of old set vertical juice heater 5 , replacing weak pipeline of old quad set no 4 1 , replacing weak pipeline of old quad set no 4 2 , replacing weak pipeline of old quad set no 4 3 , replacing weak pipeline of old quad set no 4 4 , replacing weak pipeline of old quad set no 4 5 , dismantling damaged mesh of section pipe located at injection no 2 and 3 and making a new one from given m s plate and fitting it , cutting and discarding old damaged reducer plate of section pipe located at injection no 2 and 3 and remaking the same , fitting water line from overhead to service tank 1 , fitting water line from overhead to service tank 2 , details of work of canti machine no 6 and 7 1 , details of work of canti machine no 6 and 7 2 , details of work of canti machine no 6 and 7 3 , details of work with new pipes from s sugarbin 1 , details of work with new pipes from s sugarbin 2 , details of work with new pipes from s sugarbin 3 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 1 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 2 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 3 , work on hot water line of brown sugar magma 1 , work on hot water line of brown sugar magma 2 , work on hot water line of brown sugar magma 3 , work on hot water line of brown sugar magma 4 , cutting and removing damaged monitor casing and ribs , cutting and removing damaged center shaft and arms inside kcp machines no 1 and 2 bending and fitting new parts with 8 to 10 mm plate , dismantling damaged upper cover part of canty machine no 6 and 7 scrapping fabricating and fitting new cover with 12 mm plate and making all related connections , dismantling damaged part of molasses weighing scale receiving tank and fabricating and fitting new part by bending 8 mm thick, fabrication, fabricate and installation 6inch size nipple, fabricate and installation 6inch size flange, dismantling 6inch size pipeline, installing 6inch size pipeline and giving satisfactory trial, fabricate and installation 6inch size band, replace damaged 100 pound 3inch size pipeline from pan no 1 to pan no 6 and give satisfactory trial, dismantle the weak vapor pipe from pan no 1 to 6, fabricate the weak vapor pipe from pan no 1 to 6, replace main hole dia 600 mm of pan no 3 sevual with 10 mm thick plate, replace damaged overflow pipeline of bh and cl molasses conditioner of 6inch size, replace corroded nipples pipes flanges of 6inch size header on pan no 5 and 6 installation related nipples valves etc and give satisfactory trial, replace 2inch size pipeline, fabricate and installation 2inch size flange, fabricate and installation 2inch size nipple, fabricate and installation 3inch size flange, fabricate and installation 3inch size valve, replace and installation 6inch size pipeline, replace 6inch size pipeline of the above, installation valve in steam line at pan no 2 550 mm, installation flange in steam line at pan no 2 550 mm, installation nipple in steam line at pan no 2 550 mm, fabricate and installation catcher element size 75 x 75 x 8 angle on pan no 4 and 5, replace nipples of the above tank, replace bands of the above tank, replace partition of syrup tank with 10/12 mm thick plate, remove clean and reinstall 4inch size syrup line on pan, cut and remove syrup header and fabricate and installation new header, replacing the 6inch size glycol washing line fitted on pan no 1, replacing nipples of 2inch size line mentioned above, replacing nipples of 4inch size line mentioned above, replacing nipples of 6inch size line mentioned above, replacing nipples of 8inch size line mentioned above, replacing 10inch size nipples of cut off line of pan no 6, replacing 10inch size pipe line, making and fitting 10inch size flange, making and fitting 10inch size band, making and fitting 8inch size band, replacing 4inch size pipe line, making and fitting 4inch size flange, making and fitting 4inch size valve, fabricating m s bed for syrup pump and motor fitting and alignment followed by satisfactory trial, dismantling weak condensate bottle of old set vertical line juice heater and quad body no 4 disposing to scrap yard fabricating all connections using 8/10 mm plates and giving satisfactory vacuum trial, replacing 2inch size pipeline, replacing 6inch size pipeline, making and fitting 2inch size flange, making and fitting 6inch size flange, making and fitting 6inch size band, making and fitting 6inch size valve, dismantling damaged mesh of section pipe located at injection no 2 and 3 and making a new one from given m s plate and fitting it, cutting and discarding old damaged reducer plate of section pipe located at injection no 2 and 3 and remaking the same, fitting mentioned line into service tank, making and fitting 8inch size nipple, dismantling and fitting 6inch size pipeline, dismantling resistance box installed on spray making and fitting new one from given m m plate carrying out proper stay fitting and welding and conducting leak proof trial, dismantling and installing 8inch size pipeline, fabricating and installing 8inch size bands, fabricating and installing 8inch size flanges, dismantling and installing 12inch size pipeline, fabricating and installing 12inch size bands, fabricating and installing 12inch size flanges, dismantling and installing 3inch size pipeline, manufacturing and installing 3inch size nipples, manufacturing and installing 3inch size bands, cutting and removing damaged monitor casing and ribs inside canty no 1 and 2 and kcp machine 1 and 2 patching with 10/12 mm ms plate and giving satisfactory trial 1, cutting and removing damaged center shaft and arms inside kcp machines no 1 and 2 bending and fitting new parts with 8 to 10 mm plate 1, dismantling damaged upper cover part of canty machine no 6 and 7 scrapping fabricating and fitting new cover with 12 mm plate and making all related connections, dismantling damaged part of molasses weighing scale receiving tank and fabricating and fitting new part by bending 8 mm thick plate and depositing scrap in scrap yard, dismantling damaged plate of sugar discharge chute from sugar elevator to sugar grader and fabricating and fitting new plate of 6 mm thickness depositing scrap in scrap yard, modifying sugar chute of grader in dryer house and giving satisfactory trial, dismantling and installing 4inch size pipeline, fabricating and installing 4inch size flanges, manufacturing and installing 4inch size bands, manufacturing and installing 4inch size nipples, removing transit heater installed on c centrifugal machine opening side plate for cleaning and hydraulic servicing reinstalling in place and making all connections, dismantling and installing 2inch size pipeline, fabricating and installing 2inch size flanges, manufacturing and installing 2inch size nipples, manufacturing and installing 2inch size valves, removing old taper of sugar hopper no 1 scrapping it fabricating new one from 3/5 mm ms plate installing and giving satisfactory trial, dismantling and installing 6inch size pipeline, manufacturing and installing 6inch size bands, manufacturing and installing 6inch size flanges, manufacturing and installing 5inch size flanges, manufacturing and installing 5inch size valves, removing damaged/weak top and bottom sugar discharge chute of canty machine no 4 including flange scrapping fabricating new parts with 6 mm ms plate as per suit sample preparing all connections like angle channel etc fitting on side and giving satisfactory trial, installing 2inch flow meter, dismantling the damaged 6inch dia pipeline from primary clarifier to anoxic tank and putting it in scrap yard and installing a new pipeline, installing 4inch size valve/nrv, fabricating 4inch size band, fabricating and installing 2inch size flange, dismantling the damaged 8inch dia pipeline from aeration tank to secondary tank and putting it in scrap yard, dismantling diffusers installed in aeration tank and putting them in scrap yard and replacing the throat part, in sulfate removal plant reaction chamber dismantling corroded 6 mm partition plate putting it in scrap yard and fabricating with new 8 mm plate, dismantling corroded 2inch size treated water outlet line of etp and putting in scrap yard and installing new 3inch size line at the same location, dismantling 800 mm dia exhaust pipe line below turbine with nipple band flange and putting in scrap yard, fabricating 800 mm dia exhaust pipeline below turbine from 12 mm plate by bending and installing at position and providing satisfactory trial, fabricating 800 mm dia exhaust pipeline below vapor cell 950 wag meter from 12 mm plate by bending and installing at position and providing satisfactory trial, fabricating 800 mm dia exhaust pipeline below vapor cell 950 wag meter from 12 mm plate by bending into t shape and installing at position and providing satisfactory trial, fabricating 800 mm dia exhaust pipeline dummy/flange from 12 mm plate by bending and installing at position and providing satisfactory trial, dismantling weak part of semichemiser 1000 wag meter warm saser putting scrap in scrap yard fabricating from 12 mm thick plate by bending and installing with related connections and giving satisfactory trial size dia 3 4 m, dismantling weak parts of old quad body no 2 and 3 20inch vapor pipe putting scrap in scrap yard fabricating from 8 mm thick plate by bending and installing and providing satisfactory trial, dismantling weak parts of vapor pipe 32inch size of vapor cell 1000 wag meter putting scrap in scrap yard fabricating from 8 mm thick plate by bending and installing and providing satisfactory trial, dismantling weak part of 6inch size header of all juice heaters condensate and installing new one, removing all partition plates of juice heater header by cutting straight and circular shapes cleaning tube plate completely and fabricating new circular and straight partition plates from 10/12 mm plate installing and preparing header with ms strips as before applying rubber strips and providing satisfactory trial, cutting out quailons and all related angles fixed in clarifier compartments and refitting after completion of work and providing satisfactory trial, patching inside clarifier with 6/8 mm ms plate, dismantling damaged 8inch size ms pipeline from clarifier clear juice overflow tank to sombox, installing 6inch size ms pipeline from clarifier compartments no 2 and 3 to mud tank and providing satisfactory trial, opening 6inch size valve and installing at designated location, fabricating 6inch size nipple and installing at designated location, fabricating 6inch size flange by cutting plate and dismantling to fit, dismantling 4inch size air pipeline above door including nipple band flange and putting scrap in scrap yard, installing 4inch size air pipeline above door and providing satisfactory trial, dismantling 6inch size ms pipeline of big vacuum filter mud tank overflow line and putting scrap in scrap yard, fitting and trial of 6inch size ms pipeline overflow line of big vacuum filter mud tank at position, fabricating 6inch size band, fabricating 8inch size band, dismantling 8inch size pipeline from big vacuum filter pump to condenser and putting scrap in scrap yard, fitting and trial of 8inch size pipeline from big vacuum filter pump to condenser at position, dismantling 4inch ms pipeline from filter juice header to vibro screen, fitting and trial of 4inch ms pipeline from filter juice header to vibro screen at position, making 4inch size nipple, opening 4inch size valve, installing 4inch size valve at the specified location, cutting 4inch size flange from plate making it and fitting after drilling, dismantling 3inch size pipeline, installing and fitting 3inch size line at position and giving satisfactory trial, making and installing 3inch size t, making and installing 3inch size nipple, cutting 3inch size flange from plate making it and installing, making and installing 3inch size band, dismantling 8inch size clear juice overflow pipeline, installing and fitting 8inch size clear juice overflow pipeline at position and giving satisfactory trial, installing and fitting 6inch size pipeline at position and giving satisfactory trial, making and installing 6inch size band/elbow at specified location, making and installing 6inch size t, dismantling 4inch size pipeline, installing and fitting 4inch size pipeline at position and giving satisfactory trial, making and installing 4inch size band, making and installing 4inch size t, dismantling 10inch size pipeline, installing fitting and trial of 10inch size pipeline at position, making and installing 10inch size t, making and installing 10inch size dummy/flange, dismantling 6inch pipeline, installing fitting and trial of 6inch size pipeline at position, opening and binding 6inch size valve, installing fitting and trial of 4inch size pipeline at position, making and installing 8inch and 6inch size cross, dismantling 4inch size ammonia pipeline of semichemiser quad, installing 4inch size ammonia pipeline of semichemiser quad at position, making 4inch size band, making 4inch size t, making 4inch size flange, dismantling 2inch size pipeline, fixing 2inch size pipeline in position, dismantling new quad no 2 vapor pipe 24inch size vapor pipeline fabricating it by bending with 10 mm thick plate and installing, fabricating and installing 24inch size bends, fabricating and installing 24inch size tees, fabricating and installing 24inch size flange/dummy, dismantling 24inch size pipeline, fitting 24inch size pipeline in position, fabricating and installing 24inch size flange, cutting damaged 6inch syrup pump header fabricating new header and installing along with fitting all related nipples valves etc and conducting satisfactory trial, dismantling bent incoming and outgoing wax and heater cell and partition plate between double beat valve of juice heater/ juice heater header fabricating new one using 12/10 mm plate as before installing and conducting satisfactory trial, dismantling 6inch condensate header of juice heaters and replacing the weak part, fitting 6inch size pipeline in position and conducting satisfactory trial, fabricating and installing 6inch size flange, fabricating and installing 6inch size nipple, fabricating and installing 6inch size tees, dismantling and fitting 6inch size pipeline in position and conducting satisfactory trial
T18 Ref No : 16324690
Source : GEM Tenders
corrigendum tender for fabrication repairing the condensate tank pump delivery line of the pan 1 , repairing the condensate tank pump delivery line of the pan 2 , repairing the condensate tank pump delivery line of the pan 3 , replacing damaged bypass line band flange of melter 1 , replacing damaged bypass line band flange of melter 2 , replacing damaged bypass line band flange of melter 3 , replace damaged 100 pound 3inch size pipeline from pan no 1 to pan no 6 and give satisfactory trial , replace the weak vapor pipe from pan no 1 to 6 size dia 1 150 m length 30 m 1 , replace the weak vapor pipe from pan no 1 to 6 size dia 1 150 m length 30 m 2 , replace main hole dia 600 mm of pan no 3 sevual with 10 mm thick plate , replace damaged overflow pipeline of bh and cl molasses conditioner of 6inch size 1 , replace damaged overflow pipeline of bh and cl molasses conditioner of 6inch size 2 , replace corroded nipples pipes flanges of 6inch size header on pan no 5 and 6 installation related nipples valves etc and give satisfactory trial , replace damaged ammonia pipeline flange nipple in pan no 4 and 6 1 , replace damaged ammonia pipeline flange nipple in pan no 4 and 6 2 , replace damaged ammonia pipeline flange nipple in pan no 4 and 6 3 , replace damaged ammonia pipeline flange nipple in pan no 4 and 6 4 , replace damaged ammonia pipeline flange nipple in pan no 4 and 6 5 , cut and remove damaged wash-out line installed on the pan and rebuild with supplied pipe and installation it 1 , cut and remove damaged wash-out line installed on the pan and rebuild with supplied pipe and installation it 2 , replace damaged washing pipeline nipple flange band on pan no 6 1 , replace damaged washing pipeline nipple flange band on pan no 6 2 , replace damaged washing pipeline nipple flange band on pan no 6 3 , replace damaged washing pipeline nipple flange band on pan no 6 4 , installation valve in steam line at pan no 2 550 mm 1 , installation valve in steam line at pan no 2 550 mm 2 , installation valve in steam line at pan no 2 550 mm 3 , installation valve in steam line at pan no 2 550 mm 4 , replace nipple and band of a heavy tank 2 , replace nipple and band of a heavy tank 3 , replace nipple and band of a heavy tank 4 , remove clean and reinstall 4inch size syrup line on pan , cut and remove syrup header and fabricate and installation new header , replacing the 6inch size glycol washing line fitted on pan no 1 , replacing nipples of different lines of pan no 6 1 , replacing nipples of different lines of pan no 6 2 , replacing nipples of different lines of pan no 6 3 , replacing nipples of different lines of pan no 6 4 , replacing 10inch size nipples of cut off line of pan no 6 1 , replacing 10inch size nipples of cut off line of pan no 6 2 , replacing 10inch size nipples of cut off line of pan no 6 3 , replacing 10inch size nipples of cut off line of pan no 6 4 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 1 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 2 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 3 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 4 , fabricating m s bed for syrup pump and motor fitting and alignment followed by satisfactory trial , dismantling weak condensate bottle of old set , replacing weak pipeline flange valve and band of old set vertical juice heater 1 , replacing weak pipeline flange valve and band of old set vertical juice heater 2 , replacing weak pipeline flange valve and band of old set vertical juice heater 3 , replacing weak pipeline flange valve and band of old set vertical juice heater 4 , replacing weak pipeline flange valve and band of old set vertical juice heater 5 , replacing weak pipeline of old quad set no 4 1 , replacing weak pipeline of old quad set no 4 2 , replacing weak pipeline of old quad set no 4 3 , replacing weak pipeline of old quad set no 4 4 , replacing weak pipeline of old quad set no 4 5 , dismantling damaged mesh of section pipe located at injection no 2 and 3 and making a new one from given m s plate and fitting it , cutting and discarding old damaged reducer plate of section pipe located at injection no 2 and 3 and remaking the same , fitting water line from overhead to service tank 1 , fitting water line from overhead to service tank 2 , details of work of canti machine no 6 and 7 1 , details of work of canti machine no 6 and 7 2 , details of work of canti machine no 6 and 7 3 , details of work with new pipes from s sugarbin 1 , details of work with new pipes from s sugarbin 2 , details of work with new pipes from s sugarbin 3 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 1 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 2 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 3 , work on hot water line of brown sugar magma 1 , work on hot water line of brown sugar magma 2 , work on hot water line of brown sugar magma 3 , work on hot water line of brown sugar magma 4 , cutting and removing damaged monitor casing and ribs , cutting and removing damaged center shaft and arms inside kcp machines no 1 and 2 bending and fitting new parts with 8 to 10 mm plate , dismantling damaged upper cover part of canty machine no 6 and 7 scrapping fabricating and fitting new cover with 12 mm plate and making all related connections , dismantling damaged part of molasses weighing scale receiving tank and fabricating and fitting new part by bending 8 mm thick, fabrication, fabricate and installation 6inch size nipple, fabricate and installation 6inch size flange, dismantling 6inch size pipeline, installing 6inch size pipeline and giving satisfactory trial, fabricate and installation 6inch size band, replace damaged 100 pound 3inch size pipeline from pan no 1 to pan no 6 and give satisfactory trial, dismantle the weak vapor pipe from pan no 1 to 6, fabricate the weak vapor pipe from pan no 1 to 6, replace main hole dia 600 mm of pan no 3 sevual with 10 mm thick plate, replace damaged overflow pipeline of bh and cl molasses conditioner of 6inch size, replace corroded nipples pipes flanges of 6inch size header on pan no 5 and 6 installation related nipples valves etc and give satisfactory trial, replace 2inch size pipeline, fabricate and installation 2inch size flange, fabricate and installation 2inch size nipple, fabricate and installation 3inch size flange, fabricate and installation 3inch size valve, replace and installation 6inch size pipeline, replace 6inch size pipeline of the above, installation valve in steam line at pan no 2 550 mm, installation flange in steam line at pan no 2 550 mm, installation nipple in steam line at pan no 2 550 mm, fabricate and installation catcher element size 75 x 75 x 8 angle on pan no 4 and 5, replace nipples of the above tank, replace bands of the above tank, replace partition of syrup tank with 10/12 mm thick plate, remove clean and reinstall 4inch size syrup line on pan, cut and remove syrup header and fabricate and installation new header, replacing the 6inch size glycol washing line fitted on pan no 1, replacing nipples of 2inch size line mentioned above, replacing nipples of 4inch size line mentioned above, replacing nipples of 6inch size line mentioned above, replacing nipples of 8inch size line mentioned above, replacing 10inch size nipples of cut off line of pan no 6, replacing 10inch size pipe line, making and fitting 10inch size flange, making and fitting 10inch size band, making and fitting 8inch size band, replacing 4inch size pipe line, making and fitting 4inch size flange, making and fitting 4inch size valve, fabricating m s bed for syrup pump and motor fitting and alignment followed by satisfactory trial, dismantling weak condensate bottle of old set vertical line juice heater and quad body no 4 disposing to scrap yard fabricating all connections using 8/10 mm plates and giving satisfactory vacuum trial, replacing 2inch size pipeline, replacing 6inch size pipeline, making and fitting 2inch size flange, making and fitting 6inch size flange, making and fitting 6inch size band, making and fitting 6inch size valve, dismantling damaged mesh of section pipe located at injection no 2 and 3 and making a new one from given m s plate and fitting it, cutting and discarding old damaged reducer plate of section pipe located at injection no 2 and 3 and remaking the same, fitting mentioned line into service tank, making and fitting 8inch size nipple, dismantling and fitting 6inch size pipeline, dismantling resistance box installed on spray making and fitting new one from given m m plate carrying out proper stay fitting and welding and conducting leak proof trial, dismantling and installing 8inch size pipeline, fabricating and installing 8inch size bands, fabricating and installing 8inch size flanges, dismantling and installing 12inch size pipeline, fabricating and installing 12inch size bands, fabricating and installing 12inch size flanges, dismantling and installing 3inch size pipeline, manufacturing and installing 3inch size nipples, manufacturing and installing 3inch size bands, cutting and removing damaged monitor casing and ribs inside canty no 1 and 2 and kcp machine 1 and 2 patching with 10/12 mm ms plate and giving satisfactory trial 1, cutting and removing damaged center shaft and arms inside kcp machines no 1 and 2 bending and fitting new parts with 8 to 10 mm plate 1, dismantling damaged upper cover part of canty machine no 6 and 7 scrapping fabricating and fitting new cover with 12 mm plate and making all related connections, dismantling damaged part of molasses weighing scale receiving tank and fabricating and fitting new part by bending 8 mm thick plate and depositing scrap in scrap yard, dismantling damaged plate of sugar discharge chute from sugar elevator to sugar grader and fabricating and fitting new plate of 6 mm thickness depositing scrap in scrap yard, modifying sugar chute of grader in dryer house and giving satisfactory trial, dismantling and installing 4inch size pipeline, fabricating and installing 4inch size flanges, manufacturing and installing 4inch size bands, manufacturing and installing 4inch size nipples, removing transit heater installed on c centrifugal machine opening side plate for cleaning and hydraulic servicing reinstalling in place and making all connections, dismantling and installing 2inch size pipeline, fabricating and installing 2inch size flanges, manufacturing and installing 2inch size nipples, manufacturing and installing 2inch size valves, removing old taper of sugar hopper no 1 scrapping it fabricating new one from 3/5 mm ms plate installing and giving satisfactory trial, dismantling and installing 6inch size pipeline, manufacturing and installing 6inch size bands, manufacturing and installing 6inch size flanges, manufacturing and installing 5inch size flanges, manufacturing and installing 5inch size valves, removing damaged/weak top and bottom sugar discharge chute of canty machine no 4 including flange scrapping fabricating new parts with 6 mm ms plate as per suit sample preparing all connections like angle channel etc fitting on side and giving satisfactory trial, installing 2inch flow meter, dismantling the damaged 6inch dia pipeline from primary clarifier to anoxic tank and putting it in scrap yard and installing a new pipeline, installing 4inch size valve/nrv, fabricating 4inch size band, fabricating and installing 2inch size flange, dismantling the damaged 8inch dia pipeline from aeration tank to secondary tank and putting it in scrap yard, dismantling diffusers installed in aeration tank and putting them in scrap yard and replacing the throat part, in sulfate removal plant reaction chamber dismantling corroded 6 mm partition plate putting it in scrap yard and fabricating with new 8 mm plate, dismantling corroded 2inch size treated water outlet line of etp and putting in scrap yard and installing new 3inch size line at the same location, dismantling 800 mm dia exhaust pipe line below turbine with nipple band flange and putting in scrap yard, fabricating 800 mm dia exhaust pipeline below turbine from 12 mm plate by bending and installing at position and providing satisfactory trial, fabricating 800 mm dia exhaust pipeline below vapor cell 950 wag meter from 12 mm plate by bending and installing at position and providing satisfactory trial, fabricating 800 mm dia exhaust pipeline below vapor cell 950 wag meter from 12 mm plate by bending into t shape and installing at position and providing satisfactory trial, fabricating 800 mm dia exhaust pipeline dummy/flange from 12 mm plate by bending and installing at position and providing satisfactory trial, dismantling weak part of semichemiser 1000 wag meter warm saser putting scrap in scrap yard fabricating from 12 mm thick plate by bending and installing with related connections and giving satisfactory trial size dia 3 4 m, dismantling weak parts of old quad body no 2 and 3 20inch vapor pipe putting scrap in scrap yard fabricating from 8 mm thick plate by bending and installing and providing satisfactory trial, dismantling weak parts of vapor pipe 32inch size of vapor cell 1000 wag meter putting scrap in scrap yard fabricating from 8 mm thick plate by bending and installing and providing satisfactory trial, dismantling weak part of 6inch size header of all juice heaters condensate and installing new one, removing all partition plates of juice heater header by cutting straight and circular shapes cleaning tube plate completely and fabricating new circular and straight partition plates from 10/12 mm plate installing and preparing header with ms strips as before applying rubber strips and providing satisfactory trial, cutting out quailons and all related angles fixed in clarifier compartments and refitting after completion of work and providing satisfactory trial, patching inside clarifier with 6/8 mm ms plate, dismantling damaged 8inch size ms pipeline from clarifier clear juice overflow tank to sombox, installing 6inch size ms pipeline from clarifier compartments no 2 and 3 to mud tank and providing satisfactory trial, opening 6inch size valve and installing at designated location, fabricating 6inch size nipple and installing at designated location, fabricating 6inch size flange by cutting plate and dismantling to fit, dismantling 4inch size air pipeline above door including nipple band flange and putting scrap in scrap yard, installing 4inch size air pipeline above door and providing satisfactory trial, dismantling 6inch size ms pipeline of big vacuum filter mud tank overflow line and putting scrap in scrap yard, fitting and trial of 6inch size ms pipeline overflow line of big vacuum filter mud tank at position, fabricating 6inch size band, fabricating 8inch size band, dismantling 8inch size pipeline from big vacuum filter pump to condenser and putting scrap in scrap yard, fitting and trial of 8inch size pipeline from big vacuum filter pump to condenser at position, dismantling 4inch ms pipeline from filter juice header to vibro screen, fitting and trial of 4inch ms pipeline from filter juice header to vibro screen at position, making 4inch size nipple, opening 4inch size valve, installing 4inch size valve at the specified location, cutting 4inch size flange from plate making it and fitting after drilling, dismantling 3inch size pipeline, installing and fitting 3inch size line at position and giving satisfactory trial, making and installing 3inch size t, making and installing 3inch size nipple, cutting 3inch size flange from plate making it and installing, making and installing 3inch size band, dismantling 8inch size clear juice overflow pipeline, installing and fitting 8inch size clear juice overflow pipeline at position and giving satisfactory trial, installing and fitting 6inch size pipeline at position and giving satisfactory trial, making and installing 6inch size band/elbow at specified location, making and installing 6inch size t, dismantling 4inch size pipeline, installing and fitting 4inch size pipeline at position and giving satisfactory trial, making and installing 4inch size band, making and installing 4inch size t, dismantling 10inch size pipeline, installing fitting and trial of 10inch size pipeline at position, making and installing 10inch size t, making and installing 10inch size dummy/flange, dismantling 6inch pipeline, installing fitting and trial of 6inch size pipeline at position, opening and binding 6inch size valve, installing fitting and trial of 4inch size pipeline at position, making and installing 8inch and 6inch size cross, dismantling 4inch size ammonia pipeline of semichemiser quad, installing 4inch size ammonia pipeline of semichemiser quad at position, making 4inch size band, making 4inch size t, making 4inch size flange, dismantling 2inch size pipeline, fixing 2inch size pipeline in position, dismantling new quad no 2 vapor pipe 24inch size vapor pipeline fabricating it by bending with 10 mm thick plate and installing, fabricating and installing 24inch size bends, fabricating and installing 24inch size tees, fabricating and installing 24inch size flange/dummy, dismantling 24inch size pipeline, fitting 24inch size pipeline in position, fabricating and installing 24inch size flange, cutting damaged 6inch syrup pump header fabricating new header and installing along with fitting all related nipples valves etc and conducting satisfactory trial, dismantling bent incoming and outgoing wax and heater cell and partition plate between double beat valve of juice heater/ juice heater header fabricating new one using 12/10 mm plate as before installing and conducting satisfactory trial, dismantling 6inch condensate header of juice heaters and replacing the weak part, fitting 6inch size pipeline in position and conducting satisfactory trial, fabricating and installing 6inch size flange, fabricating and installing 6inch size nipple, fabricating and installing 6inch size tees, dismantling and fitting 6inch size pipeline in position and conducting satisfactory trial

Every year, central and state government departments release thousands of high-value contracts specifically dedicated to Ammonia Air Conditioning. Whether it involves bulk material supply, executing specialized operational services, or end-to-end turnkey project execution, the demand for capable vendors in the Ammonia Air Conditioning sector is massive.

At Tender18, we help businesses cut through the noise and exclusively target the exact work categories they specialize in. Instead of browsing through generic procurement sites, our platform isolates high-potential opportunities that match your specific industry capabilities.

Work Dynamics in the Ammonia Air Conditioning Sector

Government requirements for this specific vertical generally fall into distinct procurement patterns:

  • Product & Material Supply: Tenders focused strictly on sourcing, testing, and delivering high-quality items that meet the exact technical specifications of the buyer.
  • Service Level Agreements (SLAs): Long-term hiring of expert agencies for routine maintenance, manpower deployment, or continuous operational management.
  • Execution & Turnkey Projects: Comprehensive contracts where the bidder is responsible for everything from raw material procurement to final site installation and testing.

By focusing purely on your core strength in Ammonia Air Conditioning, you can build a highly profitable and stable pipeline of government clients.

Stop wasting time filtering through irrelevant notices. Our Ammonia Air Conditioning Tender Information Service is engineered for precision. We track exact product codes, service names, and specialized work terms across all government portals nationwide. When a buyer publishes a requirement that matches your specific business profile, our system alerts you instantly.

Deep Technical Insights & Documentation For Ammonia Air Conditioning Tenders

Bidding for specific works requires studying strict technical parameters. We provide immediate access to the core documents you need to evaluate the project:

  • Detailed Specifications & Drawings: Download the exact engineering guidelines, material testing standards, and quality benchmarks demanded by the buyer for Ammonia Air Conditioning.
  • Financial BOQ Spreadsheets: Access the official blank pricing formats where you need to input your unit rates, tax configurations, and total bid value.
  • Real-Time Technical Amendments: If the buying department changes the product specifications, alters the service scope, or shifts the delivery timeline, we instantly update the parent file so you are never caught off-guard.

Winning a contract for Ammonia Air Conditioning depends entirely on how perfectly your technical capabilities match the buyer’s demands. Even if you have the best product or service, a poorly formatted document or a missing compliance certificate will lead to instant technical rejection. Tender18’s Tender Bidding Service eliminates this risk by taking complete ownership of your digital submission.

Flawless Compliance & Portal Execution For Ammonia Air Conditioning Tenders

Under this service, Tender18 assigns a Dedicated Experienced Technical Person to your profile. This expert handles the heavy lifting of the entire bidding cycle:

  • Capability Mapping: We thoroughly cross-check your past completion certificates, ISO standard proofs, and financial turnover against the strict eligibility criteria required for Ammonia Air Conditioning bids.
  • Secure System Integration: Our technical desk seamlessly links your Class III Digital Signature Certificate (DSC) with the required e-procurement servers to securely encrypt your technical and financial envelopes.
  • Error-Free Financial Uploads: We audit your quoted BOQ pricing sheets for any formula or formatting errors before the final upload, ensuring your bid is successfully locked before the portal's closing hours.

Government buyers are aggressively using the Government e-Marketplace (GeM) for the direct procurement of Ammonia Air Conditioning. If your business profile is not accurately mapped on this portal, you remain practically invisible to these purchasing officers. Recognized as a trusted and expert GeM consultant, Tender18 offers specialized support to build, optimize, and maintain a highly visible vendor account for your business.

With an industry-leading support success ratio of over 95%, we handle the complex marketplace compliance so you can focus entirely on executing your orders

Expert Profile Management & Catalogue

Our dedicated consultants ensure your GeM presence is structurally perfect:

  • Precise Catalogue Listing: We upload and categorize your specific offerings under the exact search terms and parameters used by government buyers looking for Ammonia Air Conditioning, ensuring maximum search visibility.
  • OEM Dashboard & Assessment: For original manufacturers and creators, we guide you through the mandatory Quality Council of India (QCI) vendor assessments to successfully unlock your official OEM panel.
  • Profile Compliance & Caution Money: We manage your statutory documentation, brand approvals, and caution money limits to keep your account immune from technical suspensions.

Strategic Live Bid Participation

Beyond setup, we actively drive your market participation. Our team expertly handles the digital paperwork and rate configurations for GeM Custom Bids and Reverse Auctions (RA) related to Ammonia Air Conditioning, maximizing your chances of securing L1 status.

1.

How do I find government contracts exclusively matching my work in Ammonia Air Conditioning?

The easiest way is through the Tender18 platform. Instead of searching department by department, our system uses advanced keyword matching to gather all live supply, service, and execution tenders related directly to your core business in one place.

2.

Do I need specific testing or quality certificates to apply for these contracts?

It heavily depends on the nature of the work. For supply contracts, buyers often ask for ISO certifications, BIS marks, or specific lab testing reports. For service contracts, they may ask for labor licenses or past performance certificates (work orders).

3.

What is a BOQ and why is it important for my bid?

The Bill of Quantities (BOQ) is the official financial Excel sheet where you enter your competitive prices. Any mistake in this file—like adding extra rows, changing formulas, or saving it in the wrong format—will cause the portal server to reject your entire bid.

4.

Are samples required to be submitted physically before the digital bid opens?

For many product-based Ammonia Air Conditioning tenders, buying departments do ask bidders to submit physical samples to their office before the digital technical evaluation date. This requirement is always clearly mentioned in the official NIT document.

5.

How does the Dedicated Tender Expert from Tender18 help me?

Our assigned expert manages your total portal compliance. They extract the hidden rules from long tender PDFs, create a precise document checklist for your team, map your digital signature, and securely upload your technical and financial files onto the government servers.

6.

What is the role of a Digital Signature Certificate (DSC)?

A Class III DSC is a secure USB device that contains your digital identity. You cannot upload a bid without it. It is used to securely encrypt and lock your sensitive price data and technical documents so no one can view them before the official opening date.

7.

As an MSME, can I get financial benefits when bidding for Ammonia Air Conditioning?

Yes, the government strongly supports MSMEs. By uploading a valid Udyam Registration Certificate in the technical envelope, small businesses are frequently exempted from paying the initial Tender Document Fee and the Earnest Money Deposit (EMD).

8.

Why should I list my services or products on GeM for this category?

GeM is now the primary digital marketplace for all government agencies. If you are properly cataloged for Ammonia Air Conditioning, officers can view your profile and generate direct purchase orders or invite you to participate in exclusive Custom Bids.

9.

What makes Tender18 a reliable GeM support partner?

As a highly trusted and expert GeM consultant, Tender18 holds a proven support success ratio of over 95%. From flawless profile creation and complex catalogue mapping to OEM panel approvals and live Reverse Auction (RA) support, we handle it all seamlessly.

10.

What does "L1" mean in these government contracts?

"L1" stands for "Lowest Bidder 1". In government procurement, after all technical envelopes are approved, the financial sheets (BOQs) are opened. The bidder who has quoted the lowest compliant price for Ammonia Air Conditioning is declared L1 and is generally awarded the contract