auction or scrap of lot no - 115 lot name - control cable scrap product type - electrical items category - cables - - control cable scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 116 lot name - xlpe cable scrap product type - electrical items category - cables - - xlpe cable scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 117 lot name - xlpe cable scrap product type - electrical items category - cables - - xlpe cable scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 118 lot name - transformer stamping good core scrap product type - metal category - iron and steel - - transformer stamping good core scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 119 lot name - transformer stamping rusted / damaged core scrap product type - metal category - iron and steel - - transformer stamping rusted / damaged core scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 120 lot name - transformer stamping rusted / damaged core scrap product type - metal category - iron and steel - - transformer stamping rusted / damaged core scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 121 lot name - transformer stamping rusted / damaged core scrap product type - metal category - iron and steel - - transformer stamping rusted / damaged core scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 122 lot name - transformer stamping rusted / damaged core scrap product type - metal category - iron and steel - - transformer stamping rusted / damaged core scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 123 lot name - transformer stamping rusted / damaged core scrap product type - metal category - iron and steel - - transformer stamping rusted / damaged core scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 124 lot name - transformer stamping rusted / damaged core scrap product type - metal category - iron and steel - - transformer stamping rusted / damaged core scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 125 lot name - transformer stamping rusted / damaged core scrap product type - metal category - iron and steel - - transformer stamping rusted / damaged core scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 126 lot name - transformer stamping rusted / damaged core scrap product type - metal category - iron and steel - - transformer stamping rusted / damaged core scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 127 lot name - transformer stamping rusted / damaged core scrap product type - metal category - iron and steel - - transformer stamping rusted / damaged core scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 128 lot name - transformer stamping rusted / damaged core scrap product type - metal category - iron and steel - - transformer stamping rusted / damaged core scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 129 lot name - transformer stamping rusted / damaged core scrap product type - metal category - iron and steel - - transformer stamping rusted / damaged core scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 130 lot name - transformer stamping rusted / damaged core scrap product type - metal category - iron and steel - - transformer stamping rusted / damaged core scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 131 lot name - transformer stamping rusted / damaged core scrap product type - metal category - iron and steel - - transformer stamping rusted / damaged core scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 132 lot name - transformer stamping rusted / damaged core scrap product type - metal category - iron and steel - - transformer stamping rusted / damaged core scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 133 lot name - a.c.s.r. (category - b) scrap product type - metal category - b) scrap product type - metal category - aluminium - - a.c.s.r. (category - b) scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 134 lot name - a.c.s.r. (category - b) scrap product type - metal category - b) scrap product type - metal category - aluminium - - a.c.s.r. (category - b) scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 135 lot name - a.c.s.r. (category - b) scrap product type - metal category - b) scrap product type - metal category - aluminium - - a.c.s.r. (category - b) scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 136 lot name - a.c.s.r. (category - b) scrap product type - metal category - b) scrap product type - metal category - aluminium - - a.c.s.r. (category - b) scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 137 lot name - a.c.s.r. (category - b) scrap product type - metal category - b) scrap product type - metal category - aluminium - - a.c.s.r. (category - b) scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 138 lot name - a.c.s.r. (category - b) scrap product type - metal category - b) scrap product type - metal category - aluminium - - a.c.s.r. (category - b) scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 139 lot name - all alluminium/other al. scrap product type - metal category - aluminium - - all alluminium/other al. scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 140 lot name - all alluminium/other al. scrap product type - metal category - aluminium - - all alluminium/other al. scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 141 lot name - aluminium t/fs. coil (unburnt) scrap product type - metal category - aluminium - - aluminium t/fs. coil (unburnt) scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 142 lot name - aluminium t/fs. coil (unburnt) scrap product type - metal category - aluminium - - aluminium t/fs. coil (unburnt) scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 143 lot name - insulated conductor scrap product type - metal category - iron and steel - - insulated conductor scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 144 lot name - brass scrap product type - metal category - brass - - brass scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 145 lot name - brass scrap product type - metal category - brass - - brass scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 146 lot name - brass scrap product type - metal category - brass - - brass scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 147 lot name - brass scrap product type - metal category - brass - - brass scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 148 lot name - a. kwh elect. meter without plastic box (e-waste) product type - electrical items category - others - - pcb group - e- waste-rule 2022 a. kwh elect. meter without plastic box (e- waste) note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 149 lot name - a. kwh elect. meter without plastic box (e-waste) product type - electrical items category - others - - pcb group - e- waste-rule 2022 a. kwh elect. meter without plastic box (e- waste) note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 150 lot name - a. kwh elect. meter without plastic box (e-waste) product type - electrical items category - others - - pcb group - e- waste-rule 2022 a. kwh elect. meter without plastic box (e- waste) note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 151 lot name - a. kwh elect. meter without plastic box (e-waste) product type - electrical items category - others - - pcb group - e- waste-rule 2022 a. kwh elect. meter without plastic box (e- waste) note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment
Latest Tender Detail from paschimanchal vidyut vitran nigam limited PVVNL for the auction or scrap of lot no - 115 lot name - control cable scrap product type - electrical items category - cables - - control cable scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 116 lot name - xlpe cable scrap product type - electrical items category - cables - - xlpe cable scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 117 lot name - xlpe cable scrap product type - electrical items category - cables - - xlpe cable scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 118 lot name - transformer stamping good core scrap product type - metal category - iron and steel - - transformer stamping good core scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 119 lot name - transformer stamping rusted / damaged core scrap product type - metal category - iron and steel - - transformer stamping rusted / damaged core scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 120 lot name - transformer stamping rusted / damaged core scrap product type - metal category - iron and steel - - transformer stamping rusted / damaged core scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 121 lot name - transformer stamping rusted / damaged core scrap product type - metal category - iron and steel - - transformer stamping rusted / damaged core scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 122 lot name - transformer stamping rusted / damaged core scrap product type - metal category - iron and steel - - transformer stamping rusted / damaged core scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 123 lot name - transformer stamping rusted / damaged core scrap product type - metal category - iron and steel - - transformer stamping rusted / damaged core scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 124 lot name - transformer stamping rusted / damaged core scrap product type - metal category - iron and steel - - transformer stamping rusted / damaged core scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 125 lot name - transformer stamping rusted / damaged core scrap product type - metal category - iron and steel - - transformer stamping rusted / damaged core scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 126 lot name - transformer stamping rusted / damaged core scrap product type - metal category - iron and steel - - transformer stamping rusted / damaged core scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 127 lot name - transformer stamping rusted / damaged core scrap product type - metal category - iron and steel - - transformer stamping rusted / damaged core scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 128 lot name - transformer stamping rusted / damaged core scrap product type - metal category - iron and steel - - transformer stamping rusted / damaged core scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 129 lot name - transformer stamping rusted / damaged core scrap product type - metal category - iron and steel - - transformer stamping rusted / damaged core scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 130 lot name - transformer stamping rusted / damaged core scrap product type - metal category - iron and steel - - transformer stamping rusted / damaged core scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 131 lot name - transformer stamping rusted / damaged core scrap product type - metal category - iron and steel - - transformer stamping rusted / damaged core scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 132 lot name - transformer stamping rusted / damaged core scrap product type - metal category - iron and steel - - transformer stamping rusted / damaged core scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 133 lot name - a.c.s.r. (category - b) scrap product type - metal category - b) scrap product type - metal category - aluminium - - a.c.s.r. (category - b) scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 134 lot name - a.c.s.r. (category - b) scrap product type - metal category - b) scrap product type - metal category - aluminium - - a.c.s.r. (category - b) scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 135 lot name - a.c.s.r. (category - b) scrap product type - metal category - b) scrap product type - metal category - aluminium - - a.c.s.r. (category - b) scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 136 lot name - a.c.s.r. (category - b) scrap product type - metal category - b) scrap product type - metal category - aluminium - - a.c.s.r. (category - b) scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 137 lot name - a.c.s.r. (category - b) scrap product type - metal category - b) scrap product type - metal category - aluminium - - a.c.s.r. (category - b) scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 138 lot name - a.c.s.r. (category - b) scrap product type - metal category - b) scrap product type - metal category - aluminium - - a.c.s.r. (category - b) scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 139 lot name - all alluminium/other al. scrap product type - metal category - aluminium - - all alluminium/other al. scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 140 lot name - all alluminium/other al. scrap product type - metal category - aluminium - - all alluminium/other al. scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 141 lot name - aluminium t/fs. coil (unburnt) scrap product type - metal category - aluminium - - aluminium t/fs. coil (unburnt) scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 142 lot name - aluminium t/fs. coil (unburnt) scrap product type - metal category - aluminium - - aluminium t/fs. coil (unburnt) scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 143 lot name - insulated conductor scrap product type - metal category - iron and steel - - insulated conductor scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 144 lot name - brass scrap product type - metal category - brass - - brass scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 145 lot name - brass scrap product type - metal category - brass - - brass scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 146 lot name - brass scrap product type - metal category - brass - - brass scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 147 lot name - brass scrap product type - metal category - brass - - brass scrap note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 148 lot name - a. kwh elect. meter without plastic box (e-waste) product type - electrical items category - others - - pcb group - e- waste-rule 2022 a. kwh elect. meter without plastic box (e- waste) note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 149 lot name - a. kwh elect. meter without plastic box (e-waste) product type - electrical items category - others - - pcb group - e- waste-rule 2022 a. kwh elect. meter without plastic box (e- waste) note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 150 lot name - a. kwh elect. meter without plastic box (e-waste) product type - electrical items category - others - - pcb group - e- waste-rule 2022 a. kwh elect. meter without plastic box (e- waste) note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment | lot no - 151 lot name - a. kwh elect. meter without plastic box (e-waste) product type - electrical items category - others - - pcb group - e- waste-rule 2022 a. kwh elect. meter without plastic box (e- waste) note : 1) 15 % post bid emd to be paid on the date of the auction 2) 35 % post bid emd to be paid within 3 days from the date of auction in mstc using e-payment in meerut, uttar pradesh,. Reference number 15499842. Don't miss out on this chance to be part of a significant project. Register for free today to access the complete tender details and download the necessary documents. Seize the opportunity with Tender 18!