tender for soil investigation 1 , soil investigation 2 , soil investigation 3 , soil investigation 4 , soil investigation 5 , soil investigation 6 , soil investigation 7 , soil investigation 8 , soil investigation 9 , soil investigation 10 , soil investigation 11 , consultancy 1 , consultancy 2 , consultancy 3 , consultancy 5, consultancy and soil investigation, carrying out soil investigation incl all necessary t&p labour and required materials etc all field work collection and interpretation of data and laboratory studies and submission of report comprising of the following, mobilization of plants and equipment including men and materials as required at site of soil investigation setting of boring drilling as required and demobilization of plants and equipments on completion of work etc complete which includes conveyance of sample collected to testing lab as reqd for the purpose of testing, boring 150mm dia bore holes to any depth through following type of strata, any type of soil, soft rock, hard rock, collection of undisturbed soil samples at every 3m intervals or at any change of strata in 100mm bore thin walled tube including waxing sealing packing transporting to the lab, carrying out standard penetration test spt as per is 2131 including collection of disturbed soil samples in bore holes at every 5m depth or at any change of strata and submit the report with all requisite data, conducting necessary test on all collected samples of each bore hole which includes the determination of, atterberg limits natural moisture content wet and dry density soil particle size using sieve hydrometer analysis and shear strength test unconfined compression v tri-axial shear test c & determination shrinkage limit consolidation test incl pre-consolidation pressure specific gravity test for sand rock crushing strength of rock sample permeability test testing of water sample including ph determination 02 sample free swelling index soluble salt content chloride and sulphate shear strength test un confined compression, complition and analysis of laboratory and field test results and submission of reports in 04 sets alongwith recommendations for seletions of type of foundation with supporting design details and recommendation of sbc etc complete, consultancy services for preparation and supply of architectural drawing plan section and elevation structural design preapration of boq and estimate rate analysis for provision of consultancy work for extension of rcc varandha alongwith rcc roof for airmen billet at lambaline af stn sri vijaya puram consisting of following scope of works, preparation and submission of self sufficient structural design and drawing including structural details structural notes conforming to is 456 and is 816 and is 875 and is 1893 and is 2062 and is 4326 and is 13920 and is 2911 and any other latest and relevant is code, third party vetting & proof checking the consultant shall be responsible for third party vetting or proof checking from iits or nits or any government engineeering college duly signed by authorised signatory on behalf of the institute and not from a professor or individual of the institute in his personal capacity. the design drawings shall also be liable for ensuring that the design and drawings are in compliance as per laid down standards regulations adherence to is specifications and sound engineering practices the consultant is responsible for obtaining clarification from the vetting agency till the completion of work a certificate that all details have been thoroughly checked and are in compliance to standards codes regulations in respect of safety soundness and economy shall be obtained from vetting agency, preparation of boq as per the approved drawing or design based on mes ssr part ii 2020 and market rates where ssr rates are not available note the responsibilty for the structural design or drawings prepared rests with the consultant in case of any defects damage in the designed structure during its design life and the same is attribute to faulty design or drawing the consultant will be liable for penalty of 10 per centage of total project cost
Latest Tender Detail from indian army for the tender for soil investigation 1 , soil investigation 2 , soil investigation 3 , soil investigation 4 , soil investigation 5 , soil investigation 6 , soil investigation 7 , soil investigation 8 , soil investigation 9 , soil investigation 10 , soil investigation 11 , consultancy 1 , consultancy 2 , consultancy 3 , consultancy 5, consultancy and soil investigation, carrying out soil investigation incl all necessary t&p labour and required materials etc all field work collection and interpretation of data and laboratory studies and submission of report comprising of the following, mobilization of plants and equipment including men and materials as required at site of soil investigation setting of boring drilling as required and demobilization of plants and equipments on completion of work etc complete which includes conveyance of sample collected to testing lab as reqd for the purpose of testing, boring 150mm dia bore holes to any depth through following type of strata, any type of soil, soft rock, hard rock, collection of undisturbed soil samples at every 3m intervals or at any change of strata in 100mm bore thin walled tube including waxing sealing packing transporting to the lab, carrying out standard penetration test spt as per is 2131 including collection of disturbed soil samples in bore holes at every 5m depth or at any change of strata and submit the report with all requisite data, conducting necessary test on all collected samples of each bore hole which includes the determination of, atterberg limits natural moisture content wet and dry density soil particle size using sieve hydrometer analysis and shear strength test unconfined compression v tri-axial shear test c & determination shrinkage limit consolidation test incl pre-consolidation pressure specific gravity test for sand rock crushing strength of rock sample permeability test testing of water sample including ph determination 02 sample free swelling index soluble salt content chloride and sulphate shear strength test un confined compression, complition and analysis of laboratory and field test results and submission of reports in 04 sets alongwith recommendations for seletions of type of foundation with supporting design details and recommendation of sbc etc complete, consultancy services for preparation and supply of architectural drawing plan section and elevation structural design preapration of boq and estimate rate analysis for provision of consultancy work for extension of rcc varandha alongwith rcc roof for airmen billet at lambaline af stn sri vijaya puram consisting of following scope of works, preparation and submission of self sufficient structural design and drawing including structural details structural notes conforming to is 456 and is 816 and is 875 and is 1893 and is 2062 and is 4326 and is 13920 and is 2911 and any other latest and relevant is code, third party vetting & proof checking the consultant shall be responsible for third party vetting or proof checking from iits or nits or any government engineeering college duly signed by authorised signatory on behalf of the institute and not from a professor or individual of the institute in his personal capacity. the design drawings shall also be liable for ensuring that the design and drawings are in compliance as per laid down standards regulations adherence to is specifications and sound engineering practices the consultant is responsible for obtaining clarification from the vetting agency till the completion of work a certificate that all details have been thoroughly checked and are in compliance to standards codes regulations in respect of safety soundness and economy shall be obtained from vetting agency, preparation of boq as per the approved drawing or design based on mes ssr part ii 2020 and market rates where ssr rates are not available note the responsibilty for the structural design or drawings prepared rests with the consultant in case of any defects damage in the designed structure during its design life and the same is attribute to faulty design or drawing the consultant will be liable for penalty of 10 per centage of total project cost in port blair, andaman and nicobar islands,. Reference number 15381344. Don't miss out on this chance to be part of a significant project. Register for free today to access the complete tender details and download the necessary documents. Seize the opportunity with Tender 18!